4/10/2013

HANDOUTS OF
APPLICATION OF PRIMAVERA
SOFTWARE TRAINING
Fery Safaria
Safaria,, MT

Pelatihan Manajemen Proyek (Primavera)


PT Wijaya Karya (Persero
Persero)) Tbk April 2013

INSTALLATION
2

Fery Safaria, MT - Primavera Software


Training

4/10/2013

Minimum Requirement in order to able for


Primavera Installation
SupportedPlatformsforPrimaveraClientmodules(ProjectManagement,
Methodology
Management,myPrimavera,andPortfolioAnalysis)
Management myPrimavera and Portfolio Analysis)
MicrosoftWindows2000Professional(SP4)
MicrosoftWindowsXP(SP2)
CitrixMetaFrameXPFR2(forWindows2000)
CitrixMetaFrameXPFR3(forWindows2003)
MinimumClientConfigurationsForclientsrunningtheProjectManagement,
PortfolioAnalysis,andMethodologyManagementmodules
128MBofRAM,256MBfreerecommended
40MBofharddiskspace(permodule)
MicrosoftInternetExplorer6.0(SP1orSP2)
TCP/IPnetworkprotocol

Primavera Installation Process


IfyouareinstallingfromaCD,insertCD1.Anintroductoryscreenshouldappear
thatprovidesinstallationoptions.Ifthescreendoesnotappear,orifyouare
installingfromanetworklocation,doubleclickSETUP.EXEintherootfolderofCD1
andskipStep2.
and skip Step 2
ClickInstallClientApplications.

Fery Safaria, MT - Primavera Software


Training

4/10/2013

Primavera Installation Process


EntertheproductkeylocatedontheCD1label.
Ifyouareinstallingfromanetworklocationandarenotsurewhattheproductkeyis,ask
yoursystemadministrator.
Product Code :
EC C01

Primavera Installation Process


Ifyouwanttoinstallthestand
thestandaloneversion,choosePrimaveraStand
Standalone.

Fery Safaria, MT - Primavera Software


Training

4/10/2013

Primavera Installation Process


BrowsetothelocationoftheLICENSE.TXTfile.Alicensekeyfileisrequiredtousethe
softwareandshouldhavebeenprovidedviaemailordiskette.

Primavera Installation Process


SelectthedrivertypeforthePrimaveradatabase.

Fery Safaria, MT - Primavera Software


Training

4/10/2013

Primavera Installation Process


Enteryourpubliclogininformation.

Primavera Installation Process


ClickNexttotestthedatabaseconnection.

10

Fery Safaria, MT - Primavera Software


Training

4/10/2013

Primavera Installation Process


ClickFinishtocompletetheinstallation.

11

PROJECT MANAGEMENT REVIEW


12

Fery Safaria, MT - Primavera Software


Training

4/10/2013

WHAT IS A PROJECT??
Suatu proyek adalah serangkaian aktivitas dan
informasi terkait yang menyatakan suatu
rencana untuk membuat produk atau
memberikan pelayanan.
Proyek memiliki tanggal mulai dan selesai, work
breakdown structure (WBS), sejumlah aktivitas,
h b
hubungan,
pengeluaran,
l
resiko,
ik dan
d llainnya.
i

13

CHARACTERISTICS OF PROJECTS
New / innovative, relevant / important.
Complex,
C
dynamic.
Interdisciplinary.
Project culture (rules and way of
management).

14

Fery Safaria, MT - Primavera Software


Training

4/10/2013

WHAT IS A PROJECT ?

Project is a process to reach a unique certain target,


which limited by time and resources.
performance

req performance

Target

Cost

due date
15

Time (schedule)

TEN PROBLEMS WITH PROJECTS

(BIENKOWSKI
BIENKOWSKI,, 1989)

The project is a solution in search of a


problem.
problem
Only the project team is interested in the end
result.
No one is in charge.
The project plan lacks structure.
structure
The project plan lacks detail.
The project is under-budgeted.

16

Fery Safaria, MT - Primavera Software


Training

4/10/2013

TEN PROBLEMS WITH PROJECTS

(BIENKOWSKI
BIENKOWSKI,, 1989)

Insufficient resources are allocated.


The project is not tracked against its plan.
The project team is not communicating.
The project strays from its original goals.

Solution:
employ Project Management techniques!
17

PROJECT MANAGEMENT (PMBOK)


Project management is the application of
knowledge, skills, tools, and techniques
to
t project
j t activities
ti iti in
i order
d to
t meett or exceed
d
stakeholder needs and expectations
from a project.
project. Meeting or exceeding stakeholder
needs and expectations invariably
involves balancing competing demands among:
Scope, time, cost, and quality.
Stakeholders with differing needs and
expectations.
Identified requirements (needs) and unidentified
requirements (expectations).
18

Fery Safaria, MT - Primavera Software


Training

4/10/2013

WHAT IS MANAGEMENT?
Basic Principles of Management:
Think and act resultresult-orientated.
Contribute to the big picture.
Focus on few things.
Use your strengths.
Create trust.
Think positive.
(Fredmund Malik)
19

PROJECT MANAGEMENT
WHO does
WHAT
(until) WHEN
HOW (in which form)
WHY
WHERE.

20

Fery Safaria, MT - Primavera Software


Training

10

4/10/2013

PRIME OBJECTIVES OF PROJECT MANAGEMENT


Done on time.
Completed
C
within budget.
Quality work (meets specifications).
Safe work environment.
Time
Free from litigation.

Quality

$
21

WHY PROJECT MANAGEMENT?


Optimal work

Actual work

Level of Effort

Max work load

Time
Due Date

Assigned
Date
22

Fery Safaria, MT - Primavera Software


Training

11

4/10/2013

PROJECTS ARE BALANCING ACTS

Cost/Resources

Scope/Quality

Schedule/Duration

Project

23

PROJECT MANAGEMENT SCOPE


Planning

j
Objectives

Scheduling

Resources
Work break
break--down
schedule

Project activities
Start & end times
Network

Organization

Controlling

Monitor, compare, revise, action


24

Fery Safaria, MT - Primavera Software


Training

12

4/10/2013

PROJECT MANAGEMENT SCOPE


SCOPE-- PLANNING

Before
project

Start of project
Timeline

During
project
25

PROJECT MANAGEMENT SCOPESCOPE- SCHEDULING

Before
project

Start of project
Timeline

During
project
26

Fery Safaria, MT - Primavera Software


Training

13

4/10/2013

PROJECT MANAGEMENT SCOPESCOPE- CONTROLLING

Before
project

Start of project
Timeline

During
project
27

PROJECT MANAGEMENT SCOPE

Before
project

Start of project
Timeline

During
project
28

Fery Safaria, MT - Primavera Software


Training

14

4/10/2013

If you do not know where you are


going, every road will get you
nowhere.

Henry Kissinger
29

PRIMAVERA SOFTWARE
Primaveraprovidesasetofintegrated
componentsthatmeettheprojectmanagement
p
p j
g
needsofdifferentareasofanorganization.Ituses
standardWindowsinterfaces,Webenabled
technology,andstandalone(MicrosoftSQLServer
DesktopEngine(MSDE))ornetworkbased(Oracle
and Microsoft SQL Server) databases
andMicrosoftSQLServer)databases.

30

Fery Safaria, MT - Primavera Software


Training

15

4/10/2013

MSDE

MSDE is a data engine built on SQL Server


technology.
technology It supports up to eight concurrent
users and multiple databases, limited to 2
GB perdatabase. If your requirements extend
beyond these limitations, you can easily
move to SQL Server.

31

Module of Primavera
1. Project Management module, which can stand alone for
project and resource management or be used with companion
p
products. Timesheets enables Web-based team communication
and time keeping;

2. Methodology Management a module for authoring and


storing methodologies, or project plan templates. Methodology
Management enables your organization to gather its best
practices and store them in a central methodology
management database.

3.

Portfolio Analysis Portfolio Analysis is an executive


reporting tool, providing summaries and tracking layouts of
project data. Portfolio Analysis is the ideal tool for members of
the senior management team to review project data and analyze
performance.
32

Fery Safaria, MT - Primavera Software


Training

16

4/10/2013

GETTING STARTED
33

GETTING STARTED
Click Project Management Icon
Login Name:

admin
Password:

admin

34

Fery Safaria, MT - Primavera Software


Training

17

4/10/2013

Getting Started

35

CUSTOMIZING DISPLAY

36

Fery Safaria, MT - Primavera Software


Training

18

4/10/2013

CREATING A NEW PROJECT FILE

File > New.


Choose
Ch
EPS where
h
the
th project
j t will
ill be
b
developed.
Determine ID and the New Project Name;
Determine Starting Date of Project;
Determine the Responsible Manager;
Choose rate type;
Choose No, do not run the Project Architect.
Finish.
37

CREATING A NEW PROJECT FILE

38

Fery Safaria, MT - Primavera Software


Training

19

4/10/2013

ENTERPRISE PROJECT STRUCTURE (EPS)


39

EPS : ENTERPRISE PROJECT STRUCTURE

40

Fery Safaria, MT - Primavera Software


Training

20

4/10/2013

Primavera Terms
EPS

A hierarchy that represents the breakdown of projects in the


organization. Nodes at the highest, or root, level might represent divisions within
organization.
your company, project phases, site locations, or other major groupings that meet
the needs of your organization, while projects always represent the lowest level
of the hierarchy.
hierarchy. Every project in the organization must be included in an EPS
node..
node

OBS A global hierarchy that represents the managers responsible for the
projects in your organization.
organization. The OBS usually reflects the management structure
of your organization, from top
top--level personnel down through the various levels
constituting your business
business.. The OBS can be role
role--based or name
name--based
based..
WBS A hierarchical arrangement of the products and services produced
during and by a project
project.. In the Project Management module, the project is the
highest level of the WBS, while an individual activity required to create a
product or service is the lowest level
level.. Each project in the EPS has its own
WBS..
WBS
41

EPS

Enterprise project structure (EPS) membentuk


struktur hirarkis dari semua proyek.
proyek
Tiap EPS node (atau folder) bisa diurai
keberbagai tingkatan untuk menunjukkan
pekerjaan yang harus dilakukan.
Jumlah tingkatan dan strukturnya masingmasing bergantung pada lingkup dari poyek dan
cara merangkum data.

42

Fery Safaria, MT - Primavera Software


Training

21

4/10/2013

EPS
Kita bisa gunakan EPS untuk
Melakukan
M l k k top-down
t d
budgeting
b d ti serta
t analisis
li i
sumber daya dan biaya.
Mengatur WBS dan OBS dalam satu struktur
yang umum.
Mengelola
g
berbagai
g p
proyek
y dari tingkatan
g
tertinggi sampai pada individu yang melakukan
aktivitas spesifik dari proyek.

43

Enterprise Project Struct


Struct.. (EPS)
WIKA

DEPT. WILAYAH
& LUAR NEGRI

DEPT. SIPIL
UMUM

DEPT. UTILITAS

DEPT. SIPIL
UMUM i
CIREBON STA.
MODIFICATION
PROJECT

DEPT. ENERGI

DEPT. SIPIL
UMUM II

BANDENGAN
FLYOVER
PROJECT

WBS1
WBS2

Fery Safaria, MT - Primavera Software


Training

44

22

4/10/2013

Setting up EPS
To establish the EPS nodes that will contain your projects, choose Enterprise,
Enterprise Project Structure.
Structure.

45

Setting up EPS

46

Fery Safaria, MT - Primavera Software


Training

23

4/10/2013

ORGANIZATIONAL BREAKDOWN (OBS)


47

OBS

Organizational breakdown structure (OBS)


adalah hirarki umum yang menjabarkan manajer
yang bertanggung jawab untuk berbagai proyek
di perusahaan.
OBS biasanya menguraikan struktur
manajemen dari perusahaan, mulai dari jajaran
t l
top-level
l sampaii pada
d berbagai
b b
i tingkatan
ti k t
dibawahnya.

48

Fery Safaria, MT - Primavera Software


Training

24

4/10/2013

OBS
(MENAMPILKAN OBS)

Kita bisa menampilkan OBS dalam dua cara.


1. Dengan
D
menggunakan
k OBS chart
h t untuk
t k
menampilkan gambaran grafikal dari informasi
OBS.
2. Dengan menggunakan OBS table untuk
menampilkan informasi dalam format kolom.

49

OBS
(MENAMPILKAN OBS)

Enterprise > OBS.


Klik pada
d OBS dialog
di l box
b untuk
t k menentukan
t k
cara penampilan OBS yang diinginkan (dalam
bentuk Chart View atau Table View).

50

Fery Safaria, MT - Primavera Software


Training

25

4/10/2013

Organizational Breakdown (OBS)

51

Setting up OBS
Choose Enterprise, OBS
OBS.. Select the OBS element immediately above and of
the same hierarchy level as the element you want to add, then click Add

52

Fery Safaria, MT - Primavera Software


Training

26

4/10/2013

Setting up OBS

53

WORK BREAKDOWN STRUCTURE (WBS)


54

Fery Safaria, MT - Primavera Software


Training

27

4/10/2013

WORK BREAKDOWN STRUCTURE

Work breakdown structure (WBS) adalah hirarki


dari pekerjaan yang harus dilakukan untuk
menyelesaikan suatu proyek.
WBS disusun dalam tahapan detail pekerjaan,
dimulai dari outputnya
outputnya, dan kemudian diuraikan
ke berbagai elemen kerja yang bisa
diid tifik ik
diidentifikasikan.
Dalammembuatproyek,manajerproyeksecaratipikalmengembangkan
WBSterlebihdahulu,menyediakandokumenuntuktiapelemenWBS,dan
menentukanberbagaiaktivitasuntukmelakukanelemenkerjayangada.
55

SUCCESSFUL WBS
Each activity in the WBS will be:

Single-purposed;
SingleOf a specific time duration;
Manageable;
Its time and cost easily derived;
Deliverables clearly understood;
Responsibilities for its completion clearly
assigned; and
The final defined activities will be known as
entities.
56

Fery Safaria, MT - Primavera Software


Training

28

4/10/2013

VIEWING Work breakdown structure


View the Work Breakdown Structure chart
Click the Display Options bar, then choose Show on Top, Chart View. To change
the displayed information, click the Display Options bar and choose Chart Box
Template, then an information type.

57

VIEWING Work breakdown structure


(TABLE style)

58

Fery Safaria, MT - Primavera Software


Training

29

4/10/2013

GROUPING BY WBS PATH

59

WBS OF CIREBON STATION MODIFICATION PROJECT


Commencement

CivilWork

Platform&Shelter
DEPO
POLSUSKA
Watchman
Rehabilitation
Kejaksan
k
Station
Building.

GeneralProvision
TopographicalSurvey
UtilitiesInvestigation
SoilInvestigation

p
y
TemporaryAccess
TemporaryBridge
Cut&Fill

FacilityWork

Relocation&Protection
ofPublicUtilities

Mobilization

BridgeWork

Signal&Telecom
Work

TrackWork
RailwaySwitch
NewTrackPanel

ModificationofInterlocking
PointMachine
AxleCounter

CTC
Commissioning

Completion

JP - JDIR

Fery Safaria, MT - Primavera Software


Training

60

30

4/10/2013

FORMATTING CURRENCY, DATES & UNIT


61

Formatting Currency

62

Fery Safaria, MT - Primavera Software


Training

31

4/10/2013

SETTING UP USER PREFERENCES


Choose Edit, User Preferences, then click the Currency tab to specify the
currency used to view cost data, and whether to show or hide the currency
symbol and/or decimal values in cost values.

63

Formatting Currency

64

Fery Safaria, MT - Primavera Software


Training

32

4/10/2013

Formatting Time Unit


Time unit settings affect how time unit values are displayed in tracking
layouts, activity durations, resource prices, availability, and work efforts
efforts..
Choose Edit, User Preferences, then click the Time Units tab
tab..

65

Formatting Dates
Choose Edit, User Preferences, then click the Dates tab to specify how to
display dates
dates..

66

Fery Safaria, MT - Primavera Software


Training

33

4/10/2013

Formatting Units
Choose Admin, Admin Categories, then click the Unit Measures

67

CALENDARS
68

Fery Safaria, MT - Primavera Software


Training

34

4/10/2013

Creating Calendars
There are three calendar pools
pools:: global, resource, and
project.
The
Th global
l b l calendar
l d pooll contains
t i
calendars
l d
that
th t
apply to all projects in the database
database..
The project calendar pool is a separate pool of
calendars for each project in the organization
organization..
The resource calendar pool is a separate pool of
calendars for each resource.
resource.

69

Creating Calendars
Create a global calendar
Choose Enterprise, Calendars. Choose Global, then click Add. Select the
calendar you want to copy for the new global calendar, then click the Select
button. Type the new calendars name. To make the new calendar the default
global
l b l calendar
l d for
f activities
ti iti and
d resources, mark
k the
th Default
D f lt checkbox.
h kb
To
T edit
dit
the new calendar, click Modify. To view the calendars assignments before
changing it, click Used By.

70

Fery Safaria, MT - Primavera Software


Training

35

4/10/2013

Modifying Calendars

71

Modifying Calendars

72

Fery Safaria, MT - Primavera Software


Training

36

4/10/2013

Modifying Calendars

73

ACTIVITIES
74

Fery Safaria, MT - Primavera Software


Training

37

4/10/2013

ACTIVITY CODES

Kita bisa mengelola berbagai proyek didalam


EPS ke dalam kelompok berdasarkan kategori
spesifik, misalnya lokasi dan manajer,
menggunakan kode proyek (project codes).
Kita bisa mendefinisikan kode proyek hirarkis
yang tak-terbatas untuk memenuhi persyaratan
menyaring, mengurutkan, dan melaporkan
proyek, dan mengatur secara hirarkis untuk
pengelolaan dan penempatan yang lebih
mudah.
75

ACTIVITY CODES
Kode proyek bersifat global untuk seluruh
perusahaan.
perusahaan
Tetapkan nilai untuk tiap kode proyek yang
dibuat.

76

Fery Safaria, MT - Primavera Software


Training

38

4/10/2013

Establishing Activity Codes (Pay Item)

77

Establishing Activity Codes (Pay Item)

78

Fery Safaria, MT - Primavera Software


Training

39

4/10/2013

Establishing Activity Codes (Pay Item)

79

Establishing Activity Codes


Create global activity codes
Choose Enterprise, Activity Codes. Choose Global, then click Modify. Click Add, then
type the name of the global activity code.

80

Fery Safaria, MT - Primavera Software


Training

40

4/10/2013

Establishing Activity Codes

81

Overview Activities
Activities represent work that must take place in a
determined amount of time.
Activity
y ID and name to uniquely
y identify
y and
describe the activity
Predecessor and successor relationships to define
relationships with other activities in the same project
or in different projects in the enterprise project
structure (EPS)
Activity start and finish dates
Activity
A ti it calendar
l d
Activity type, duration type, and percent complete
type; whether an activity is a start or finish milestone;
how to keep an activitys unit values, duration values,
and resource units/time values synchronized; and
how to calculate an activitys percent complete

Fery Safaria, MT - Primavera Software


Training

82

41

4/10/2013

Overview Activities
WBS element
Activity codes and values to categorize activities
Constraints on the activity
activitys
s scheduled start and finish dates
Expenses
Work products and documents, standards, and deliverables
Resources
Roles to identify skill requirements for staffing the activity
Notes and feedback to communicate with the resource
working on an activity
Notes about performing the activity
Steps to divide the activity into smaller units
Activity Step Templates to define sets of reusable steps
common to many activities in a project or across projects
83

Adding Activities
Add activities in the Activity Table
Select an activity within the group to which you want to add a new activity, then
click Add. The new activity is placed according to the sorting options selected for
the layout.

84

Fery Safaria, MT - Primavera Software


Training

42

4/10/2013

DEFINING GENERAL ACTIVITY INFORMATION


In the Activities window, select the activity whose general information you want to
define. Click the Layout Options bar, then choose Show on Bottom, Activity Details;
click the General tab.

85

RELATIONSHIPS
86

Fery Safaria, MT - Primavera Software


Training

43

4/10/2013

ACTIVITY RELATIONSHIPS

Hubungan mendefinisikan bagaimana suatu


aktivitas terkait dengan dimulainya atau
selesainya aktivitas lainnya.
Tetapkan hubungan antar aktivitas untuk
membentuk suatu jalur didalam jadwal mulai
dari aktivitas pertama sampai pada aktivitas
t khi
terakhir.
Hubungan ini, yang membentuk logika dari
jaringan proyek, digunakan bersama dengan
durasi aktivitas untuk menentukan jadwal.
87

ACTIVITY RELATIONSHIPS
Type

Definition

Finish to Start
(FS)

Task A has to be completed before


Task B can begin.

Start to Start
(SS)

Task A must be started


(but does not need to be completed)
before Task B can begin.

Finish to Finish
(FF)

Task A must be completed


before
Task B can be completed
completed.

Start to Finish
(SF)

Task A has to be started before Task B can be


finished.

Examples
Task A

You can't take a picture until you've loaded the camera with
film.

Task B
Task A
Task B
Task A
Task B
Task A
Task B

"Paint fence" can't start until "Construct fence" finishes.

You have to begin training new employees before you can


evaluate their progress. The training, however, need not be
complete before evaluation begins.
"Level concrete" can't begin until "Pour foundation" begins.

You can't finish logging inventory off a truck until everything


has been unloaded from the truck.
"Inspect
Inspect electrical
electrical" can
can'tt finish until "Add
Add wiring"
wiring finishes.
finishes

We need to begin painting the house before someone can


evaluate the color for a proper match. But the painting need
not be finished before the evaluation is completed

88

Fery Safaria, MT - Primavera Software


Training

44

4/10/2013

ACTIVITY RELATIONSHIPS

LAG represents a delay between the finish of


the predecessor and the start of the
successor task.
Example:

Use on day lag between the finish of


Paint Wall and the start of Hang Pictures to
allow the paint to dry.
Paint Wall

Finish to Start
w/ 1 day LAG

Hang Pictures

89

ACTIVITY RELATIONSHIPS

LEAD is an overlap of two tasks, so the


successor starts before the predecessor
finishes. Lead time is represented as
negative lag (i.e. -1 day).
Example:

Use lead time to begin Plaster Walls


when Construct Walls is half done.
Construct Wall

Finish to Start
w/ 50% LEAD

Plaster Walls

90

Fery Safaria, MT - Primavera Software


Training

45

4/10/2013

ASSIGN RELATIONSHIPS USING ACTIVITY DETAILS


In the Activities window, select the activity to which you
want to add a predecessor or successor relationship.

91

RESOURCES
92

Fery Safaria, MT - Primavera Software


Training

46

4/10/2013

RESOURCES
Resources include the personnel and
equipment that perform work on activities
across all projects.
projects.
Resources are different than expenses.
expenses. While
some resources are time
time--based and generally
extend across multiple activities and projects,
expenses are one
one--time
ti
expenditures
dit
f
for
nonreusable items required by activities.
activities.

93

RESOURCES

94

Fery Safaria, MT - Primavera Software


Training

47

4/10/2013

RESOURCES

95

DEFINE RESOURCE SHIFTS


Define resource shifts
Choose Enterprise, Resource Shifts. Click Add, then type the new shifts name.
To edit the new shift, click Modify.

96

Fery Safaria, MT - Primavera Software


Training

48

4/10/2013

VIEW RESOURCES
Choose Enterprise, Resources, or click Resources on the
Home workspace.
workspace. Click the Display Options bar, then
choose one of the following:
following
g:
To view detailed information about a specific resource,
choose Details, then select the resource whose
information you want to view
view..
To view resources as a chart, choose Chart View.
View.
To select the columns to include in the display, choose
Columns, Customize, or one of the predefined column
displays..
displays
To select the resources to display, choose Filter By,
then choose All Active Resources, All Resources, or
Current Projects Resources
Resources..
97

ADD RESOURCE CODE VALUES


In the Resource Codes dialog box, select the code for which you want to
establish values, then click Add
Add.. Type the resource code value name
name;; the
maximum number of characters is preset at the resource code level.
level. Type a
description for the value
value.. To create a hierarchy of code values, click the right
arrow key to indent the selected value one level.
level.

98

Fery Safaria, MT - Primavera Software


Training

49

4/10/2013

ASSIGN RESOURCE CODE VALUES


To use the Codes tab, click the Display Options bar and choose Details (the
box next to the Details command should be marked)
marked).. Click the Codes tab,
then click Assign
Assign..

99

KODE SUMBER DAYA


Kode
SDY
C001
C002
C003
C004
C007
C008
C014
C015
C018
C019
C020
C021
C024
C044
C045
C046
C048
C049
C050
C051

Sumber Daya

Unit

LABOUR
Supervisor
man day
man-day
Trade Foreman
man-day
Foreman
man-day
Mechanic
man-day
Welder
man-day
Mason
man-day
Skilled Labour
man-day
Labour
man-day
Surveyor
man-day
Technician
man-day
Install of Geotextile
m2
Placing Concrete without Concrete Pum m3
Install & Fabrication of Reinforcement b kg
Install RCP dia 60 cm
m
Install RCP dia 100 cm
m
Labour
Ls
Labour
Ls
Labour
Ls
Labour
Ls
Labour
Ls

UNIT RATE
Equiv.
76 885 00
76,885.00
76,885.00
59,143.00
59,143.00
65,057.00
65,057.00
59,143.00
53,228.00
70,971.00
76,885.00
591.00
53,228.00
1,136.00
118 285 00
118,285.00
236,571.00
72,864.00
82,445,309.00
38,534,349.00
128,423,644.00
214,079,719.00

Quantity
2 642 52
2,642.52
2,720.71
18,653.20
2,642.52
272.00
4,239.75
33,972.10
84,579.37
3,547.56
252.26
73,305.00
1,928.26
308,268.39
115 00
115.00
98.00
15.00
2.00
2.00
2.00
2.00

AMOUNT
Rp.
203 169 894
203,169,894
209,181,907
1,103,206,479
156,286,363
17,695,504
275,825,416
2,009,212,059
4,501,990,832
251,773,565
19,394,981
43,323,255
102,637,477
350,192,891
13 602 775
13,602,775
23,183,958
1,092,960
164,890,618
77,068,698
256,847,288
428,159,438

Resources

P ASEP JFE REV


P ASEP JFE REV
P ASEP JFE REV
P ASEP JFE REV
P ASEP JFE REV

100

Fery Safaria, MT - Primavera Software


Training

50

4/10/2013

ADD A RESOURCE CURVE


Choose Enterprise, Resource Curves. Click Add. Select an existing curve
from which to copy the curve value percentages, then click Select. Type a
name for the new resource curve

101

ADD A RESOURCE CURVE


Click Modify to define the curves distribution. Edit the curve value
percentages to create a curve that indicates how your costs/units should
distribute over time. Curves are defined by 21 points (at 5% intervals from 0
to 100). Click Prorate to make the total of the distribution values equal to
100% while maintaining the shape you specified. Click OK, then Close

102

Fery Safaria, MT - Primavera Software


Training

51

4/10/2013

MANAGING RESOURCE ASSIGNMENTS


Display the Resource Usage Spreadsheet
Choose View, Resource Usage Spreadsheet, or click the Display Options bar, then
choose Resource Usage Spreadsheet.

103

ROLES
104

Fery Safaria, MT - Primavera Software


Training

52

4/10/2013

ROLES
Roles are project personnel job titles or skills, for
example, project planner, quality assurance tester, and
engineer..
engineer
View roles
Choose Enterprise, Roles, then click the Display Options
bar..
bar
To view only those roles that have assignments in the
open project,
project choose Filter By,
By Current Projects Roles
Roles..
To view all roles, choose Filter By, All Roles
Roles..

105

ROLES

106

Fery Safaria, MT - Primavera Software


Training

53

4/10/2013

ROLES VS PROJECT ORGANIZATION CHART

107

ASSIGNING RESOURCES AND ROLES


In the Activities window, select the activity to which you want to assign a
resource or role
role.. Click the Resources tab in Activity Details

Click Add Resource to assign a resource to the selected activity; click


Add Role to assign a role to the selected activity. Select the resource
or role you want to assign. To assign multiple resources or roles, hold
down the Ctrl key, then click each resource/role you want to assign.
Click the Select button, then click the Close button

108

Fery Safaria, MT - Primavera Software


Training

54

4/10/2013

BUDGETING
109

COST ACCOUNTS AND PROJECT EXPENSES

Expenses
p

are nonnon-resource costs


associated with a project and assigned to
a projects activities
activities.. They are typically
one--time expenditures for non
one
non--reusable
items.. Examples of expenses include
items
facilities travel,
facilities,
travel consulting,
consulting and training
training..

110

Fery Safaria, MT - Primavera Software


Training

55

4/10/2013

COST ACCOUNT

Kita bisa membuat akun biaya (cost accounts)


dan mengaitkannya dengan penempatan atau
pengeluaran dari sumber daya aktivitas pada
proyek.
Akun biaya bersifat hirarkis dan memungkinkan
kita menelusuri biaya aktivitas dan nilai yang
did
didapat.
t

111

CREATE A COST ACCOUNT HIERARCHY


Choose Enterprise, Cost Accounts.
Accounts. Click the Cost Account ID column label to
display the cost accounts hierarchy
hierarchy.. An outline symbol in the Cost Account ID
column label indicates a hierarchy display.
display.

112

Fery Safaria, MT - Primavera Software


Training

56

4/10/2013

SET THE PROJECT DEFAULT COST ACCOUNT


Choose Enterprise, Projects, to open the Projects window.
window. Display Project
Details by clicking the Display Options bar and choosing Show on Bottom,
Project Details.
Details. Click the Defaults tab, select a project in the upper layout,
then click the Browse button in the Cost Account field.
field. Select the default cost
account,
t then
th click
li k the
th Select
S l t button
b tt

113

ADDING EXPENSES AND ENTERING COST


INFORMATION
To include Project Expense Details at the bottom of the Project Expenses
window, click the Display Options bar and choose Expense Details

114

Fery Safaria, MT - Primavera Software


Training

57

4/10/2013

ENTER COST INFORMATION FOR EXPENSES


Choose Project, Expenses.
Expenses. Select the expense
information you want to enter, then click the Costs tab

whose

cost

115

ENTER AN EXPENSE ACCRUAL TYPE


Choose Project, Expenses.
Expenses. Select the expense whose accrual type you want
to enter, then click the Activity tab
tab..
g accrual types:
yp
Select one of the following
Start of Activity, to accrue the entire expense on the date the activity begins
End of Activity, to accrue the entire expense on the date the activity ends
Uniform Over Activity, to evenly distribute the expense over the course of
the activitys duration

116

Fery Safaria, MT - Primavera Software


Training

58

4/10/2013

CHANGE AN EXPENSE ASSIGNMENT


Choose Project, Expenses
Expenses.. Select the expense you want to reassign, then
click the Activity tab
tab..

117

ANALYZING COSTS

118

Fery Safaria, MT - Primavera Software


Training

59

4/10/2013

BASELINES
119

MANAGING BASELINES
A baseline is a complete copy of
a project plan that you can
compare to the current schedule
to evaluate progress.

120

Fery Safaria, MT - Primavera Software


Training

60

4/10/2013

CREATE PROJECT BASELINES


Choose Project, Maintain Baselines
Baselines.. The Maintain Baselines dialog box
groups the currently open projects into individual bands, with any existing
baseline projects beneath its current project

121

COMPARING CURRENT AND BASELINE SCHEDULES


After a project is updated, you can quickly evaluate progress and
performance onscreen.
onscreen. Use a layout that shows current and baseline bars to
identify tasks that start or finish later than planned

122

Fery Safaria, MT - Primavera Software


Training

61

4/10/2013

UPDATING SCHEDULE
123

HIGHLIGHTING ACTIVITIES FOR UPDATING

124

Fery Safaria, MT - Primavera Software


Training

62

4/10/2013

UPDATING ACTIVITIES MANUALLY

125

PERCENT COMPLETE
126

Fery Safaria, MT - Primavera Software


Training

63

4/10/2013

PERCENT COMPLETE TYPE


to calculate an activitys percent complete according to activity
duration, activity units, or a physical percent complete that you
enter
t for
f each
h activity
activity.
ti it . You
Y mustt define
d fi a percentt complete
l t type
t
for each activity.
activity.
To indicate that the activitys percent complete will be entered
by the user for this activity, select Physical
Physical..
To specify that the activitys percent complete be calculated
from the original and remaining duration, select Duration
Duration..
To specify that the activitys
activity s percent complete be calculated
from the actual and remaining units, select Units
Units..

127

UPDATE ACTIVITIES WITH DURATION PERCENT


COMPLETE TYPE

128

Fery Safaria, MT - Primavera Software


Training

64

4/10/2013

UPDATE ACTIVITIES WITH PHYSICAL PERCENT


COMPLETE TYPE

129

UPDATE ACTIVITIES WITH UNITS PERCENT


COMPLETE TYPE

130

Fery Safaria, MT - Primavera Software


Training

65

4/10/2013

ASSIGN A TRACKING LAYOUT TO AN ISSUE

131

REPORTS
132

Fery Safaria, MT - Primavera Software


Training

66

4/10/2013

REPORTING

Dua alat pelaporan yang tersedia: Report


Wizard dan Report Editor.
Editor
Report Editor adalah alat yang sangat baik yang
memungkinkan kita untuk membuat berbagai
laporan dengan kastomasi yang sangat tinggi.
Dibandingkan dengan Report Wizard, Report
Editor memiliki kapabilitas untuk memberikan
laporan yang sangat dekat dengan persyaratan
spesifik pengguna.
133

REPORTING
(LAPORAN DENGAN REPORT WIZARD)

Tools > Report Wizard.


Ikuti
Ik ti instruksi
i t k i pada
d tiap
ti dialog
di l box
b pada
d wizard
i d
untuk membuat laporan yang diinginkan.

134

Fery Safaria, MT - Primavera Software


Training

67

4/10/2013

REPORTING
(LAPORAN DENGAN REPORT EDITOR)

Pilih suatu laporan yang sudah ada.


Klik Modify.
M dif
Klik Yes untuk konfirmasi bahwa kita ingin
menggunakan Report Editor.
Pada Report Editor, klik ikon New Report.
Klik Yes untuk konfirmasi.
konfirmasi

135

PELAPORAN
(PRA-TINJAU LAPORAN)

Pada Reports window, pilih laporan dan klik Run


Report.
Report
Pilih Print Preview, lalu klik OK.

136

Fery Safaria, MT - Primavera Software


Training

68

4/10/2013

CREATING AND MODIFYING REPORTS


Create a report with the Report Wizard, Choose Tools, Report Wizard, and follow
the prompts. Using the Wizard, you can select multiple subject areas for the report.
For each selected subject area you can customize columns and apply group, sort,
and filter options.
options

137

USING THE REPORT EDITOR

138

Fery Safaria, MT - Primavera Software


Training

69

4/10/2013

THANK YOU

139

ABOUT TRAINER

Education
Work Experience

Full Name*)
: Fery Safaria
Employee Number
: ET042204
Gender
: Male
Religion
g
: Moslem
Marital Status
: Married (1 son & 1 daughter);
Permanent Address
: Jl. Rancapetir 49A Ciamis West Java;
Mobile Phone Number
: +62-813-23687756
Email
: ferysafaria@hotmail.com
: Bachelor Program (ST), Sebelas Maret University (!994-1998)
Post Graduate Program (MT), Bandung Institute of Technology (1999-2002)
: Lecturer (1999
(1999--2003)
- Garut School of Tecnology;
- Siliwangi University;
- Galuh University;
Head of Department of Civil Engineering,
Engineering Garut School of Tecnology (2002
(2002-2003);
2003);
Engineering Staff,
Staff Double Tracking of Jogja-Kroya Project
Chief Eng of Bridge. Section,
Section Double Tracking of Jogja-Kroya Project;
Project Scheduler/Planner,
Scheduler/Planner Aceh Road & Bridge Reconstruction and

Rehabilitation Project;
Construction Manager,
Manager Cirebon Station Modification Project;
Construction Manager,
Manager Alam Sutera Rigid Pavement Project;

140

Fery Safaria, MT - Primavera Software


Training

70