Inspection & Test Plan for Khabat PP

132kV Switchyard Earthing


Installation Works

TOTAL 3 PAGES
(Including Cover)

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

Purpose

DOCUMENT NO.

: KP-00+++-CQ712-B7363

For Information

TITLE

: Inspection&Test Plan for Khabat PP


132kV Switchyard Earthing Installation Works

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

For Review
For Approval
For Construction
As-Built

24.04.2015

For Construction

DE

AY

08.04.2015

First Issue

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

Rev.
No.

DATE

DESCRIPTION

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection & Test Plan


for EARTHING INSTALLATION WORKS

Item Name

No.

Earthing

Inspection & Test


Activity

Inspection & Test


Description

Application
Document/Code/Spec.
Supplier/
No.

KP-00+++-CQ712-B7363

Rev. No.

Page

1/1

Document Submittal

Remarks

Inspection Status

Subcontractor

GAMA

3rd Party POSCO


/ AI
E&C

Owner

1.1

Receiving
Inspection

Visually checking of the


earthing materials for and
physical damage.

Drawings and Technical


Specifications

Check List for Earthing Erection Item 1

1.2

Package List

Checking of package list

Assembly Catalog

Check List for Earthing Erection Item 2

1.3

Survey works

Checking coordinates of wire


Drawings and Technical
trenchs and depth of
Specifications
excavations

Check List for Earthing Erection Item 3

1.4

Excavation

Checking excavations

Drawings and Technical


Specifications

Check List for Earthing Erection Item 3

1.5

Construction of
grid copper
structure

Checking of construction

Drawings and Technical


Specifications

Check List for Earthing Erection Item 4

1.6

Earthing System
Resistance Test

Check List for Earthing Erection Item 5

1.7

Site Construction
Dossier

Site Construction Dossier

Document preparation and


review

Drawings and Technical


Specifications

Notes) #1 CL (Check List) form of Earthing Erection is submitted as attachment of this ITP.
Legend

SIEMENS

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

CHECK LIST of Earthing

Num
.

Identification

Visual check of the equipment

Checking of Package List

Survey Works

a.

Coordinates of Wire Trench

b.

Depth of Excavations

Accept

Reject

KHABAT THERMAL POWER PLANT UNITS


1 & 2 PROJECT 132kV AIR INSULATED
SWITCHGEAR
Rev: 0
Page No:1 of 1
Job No:

N/A

Signature

Comments

Subcontractor

Construction of copper grid structure

a.

Wire Type

b.

Joints and Connections of Copper Wires

c.

Count of Copper Rods

d.

Connection to the Copper Rods

e.

Manholes of the Copper Rods

Earthing system resistance test

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

GAMA

Employer