You are on page 1of 1158

KRA

SL.No.

BSC Parameter BSC Target

Stretch of
target **

KRA Id

Note: 1. Each Scorecard (BSC) parameter is to be listed seperately. 2. KRAs for each scorecard
to be selected form the KRA masters & populated in the relevant columns against that parameter.
alloted to Executives by marking in the KRA row under the column alloted to the concerned Execu

** This will be filled once the Stretch Tool has been finalised and communicated for implementatio

KRA RESPONSIBILITY MATR


Description of the relevant KRA taken
from KRA master

KAR type Budget


KRA Target O/C
KRA Y /N

to be listed seperately. 2. KRAs for each scorecard (BSC) parameter have


ated in the relevant columns against that parameter. 3. The KRAs are to be
ow under the column alloted to the concerned Executive.
been finalised and communicated for implementation.

Compulsory
KRA Y/N

BILITY MATRIX
KRA Alloted to : Initials / Name of Executive
Ex 1

Ex 2

Ex 3

Ex 4

Ex 5

Ex 6

Ex 7

Ex 8

Ex 9

Ex 10

Ex 11

Ex 12

MANUFACTURING / PRODUCTIO
KRA ID

Function

KRA Description

KRA
Type

MFM00100

MFM

Cycle time reduction for a product / assembly/Process

MFM00101

MFM

Timely identification of number of activities having


maximum contribution towards cycle time within a
specified time period.

MFM00102

MFM

Timely Implementaion of action plan in identified


activities for time reduction

MFM00200

MFM

MFM00201

MFM

MFM00300

MFM

MFM00400

MFM

Timely identification of new technology and its


implementation.
Value created through new / improved technologies
within a time frame.
Increase in Employee satisfaction in parameters related
to production
Savings accured through various improvement projects

MFM00401

MFM

MFM00500

MFM

MFM00501

MFM

MFM00502

MFM

Identification of critical areas for improvement and


implementation of action plan drawn
Development of System for time reduction in issue of
process sheets
Area identification and implimentation of action plan for
reduction of time in issue of process sheets
Timely issue of process sheets for different products/
assemblies

MFM00600

MFM

Increase in productivity by relevant initiatives

MFM00700

MFM

Timely establishment of additional facilities/ improvement C


in existing facilities as per plan

MFM00701

MFM

Timely analysis of existing facilities against productivity/ C


Quality/ load projection/ establising the requirement and
implementing within a specified period

MFM00800

MFM

Development of new weld processes

C
O
O

C
C
C

MFM00900

MFM

No. of New Processes implemented within a specified


period
Timely analysis of processes in operation/ detailing the
need for improvement and redesigning the process

MFM00901

MFM

MFM00902

MFM

Ensuring the availability of inputs for New process in


time

MFM01000

MFM

Percentage Increase in implimented suggestions /


employee.

MFM01100

MFM

MFM01101

MFM

Introduction of latest testing techniques and accredition / C


recognition wherever necessary
Timely analysis of existing techniques for their short
C
comings / advantages and establishing the need for
improvement

MFM01102

MFM

Time bound plan for actions required to improve upon /


procurement of new items

MFM01200

MFM

Identification and implimentation of action plan for


C
upgradation of CNC hardware / software for machine tool

MFM01300

MFM

Strengthening of Quality circle movement

MFM01301

MFM

Setting-up of quality circles and defining their role clearly O

MFM01302

MFM

Monthly review meetings/ monitoring progress and


submission of reports

MFM01400

MFM

MFM01401

MFM

MFM01500

MFM

Number of fresh welders qualified for additional position C


and customers
Pooling up of data and firming up the
C
requirement/execution of action plan for qualification.
Development/ Implementation and monitoring of
C
moulding process Technology

MFM01501

MFM

Timely identification of various factors/ viz. Qulity/ safety/ C


Process time/ and drawing improvement plan

MFM01502

MFM

MFM01600

MFM

MFM01601

MFM

MFM01700

Action Plans implemented

Measurement of process capability of machines and


finalising the action plan for improvement
Action Plan implemented and final report submitted

MFM

Analysis of existing methodology of welding vis-a-vis


quality of output and drawing an action plan for
automation of welding process

MFM01701

MFM

MFM01702

MFM

Automation in welding processes by procuring new /


improved technologies
Timely Implementation of action plan and final report

MFM01800

MFM

Improvement projects implemented in a time scale

MFM01900

MFM

Indeginisation of technology / components within a


specified period

MFM02000

MFM

Reduction in variety of cutting tools.

MFM02100

MFM

Development of systems for tracking online Shopfloor


progress through L4-L5 chart

MFM02200
MFM02300

MFM
MFM

Increase in no.of active Quality Circles in the deptt.


O
Achieving Business excellence thru' TQM at Deptt. Level C

MFM02301

MFM

MFM02302

MFM

MFM02400
MFM02401

MFM
MFM

Implementation of Improvement projects identified in


the Position Report as per schedule
Preparation of action plan based on Position report as
per schedule
Completion of KM Projects as per schedule
Development of Knowledge management Portal

C
O
C
C

MFM02402

MFM

Contributing case studies etc. for Knowledge


Management Portal
Implementation of Special Improvement Projects taken
under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM02500

MFM

MFM02600

MFM

Implementation of Special Improvement Projects taken


under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM02700

MFM

Implementation of Special Improvement Projects taken


under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM02800

MFM

Implementation of Special Improvement Projects taken


under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM02900

MFM

Implementation of Special Improvement Projects taken


under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM03000

MFM

Implementation of Special Improvement Projects taken


under IMPRESS as per schedule (Registration No. &
other details of project to be specified in the boxes
provided against the KRA)

MFM03100

MFM

Development of system for reduction of consumption of


ferro-alloys/ graphite electordes/ flour spar/ etc. to
optimise the cost of production.

MFM03200

MFM

Development of new products namely OR 60/ V - 738/


Stallite bushes/ Strainer housings for 500 MW sets and
similar items.

MFM03300

MFM

MFM03400

MFM

Development of a system for enhancing overall


equipment effectiveness.
Shop turnover (Physical & / or Financial)

MFM03401

MFM

Timely preparation of Quarterly / monthly plan against


L3-network.

MFM03402

MFM

Follow-up for the timely inputs as per plan

MFM03403

MFM

Monitoring day-today output and course correction


ensuring timely despatch.

MFM03404

MFM

Physical/Financial achievement vis--vis issued monthly O


plan

MFM03405

MFM

Timely Finalisation of plans for sub-contracting /


manufacturing inside.

MFM03406

MFM

Preparation of machine loading plan/ follow up/ course


correction and ensuring timely out.

MFM03500

MFM

Reduction in material consumption as a % of GTO less


excise duty.

MFM03600
MFM03601

MFM
MFM

Total WIP as a % of GTO less excise duty.


Follow up for timely inputs and ensuring its availability.

O
O

MFM03700
MFM03701

MFM
MFM

Reduction in cost quality (Reject/ rework)


Periodic Review of Rework / Rejection reports/
identification of area of concern and action plan.

O
O

MFM03702

MFM

Timely implementation of action plan and course


correction if required.

MFM03800

MFM

MFM03900

MFM

MFM04000

MFM

MFM04100

MFM

% of installed capacity utilised.( Work shop capacity like


shop capacity / Critical installations)
Implementation of recommendations of Apex TQM
Council
Reduction in customer complaints. Internal & external
with respect to previous year.
% reduction in response time to resolve customer
complaints.

MFM04200

MFM

Delivery performance (ratio of milestone deliveries on


time / total deliveries due)

MFM04201

MFM

Time bound planning for outsourcing against shop


capacity with respect to PPC plan.

MFM04202

MFM

Timely machine loading/ periodic review and course


correction

MFM04300
MFM04400

MFM
MFM

% Reduction in No.of Days of inventory


% of Contracts for which all the items get despatched
within stipulated time.

O
O

O
O
O

MFM04500

MFM

% adherence to production plan on a periodic basis

MFM04600

MFM

MFM04700

MFM

Reduction in indirect material consumption vis--vis


shop turnover
% supplies completed in sequence

MFM04701

MFM

Ensuring sequencial input of raw-materials to shop /


sub-contractor's works in time

MFM04800

MFM

Turnover from New products

MFM04900

MFM

Increase in efficiency of direct workers

MFM04901

MFM

MFM05000

MFM

Identification of the cause responsible for low efficiency O


and implementation of action plan
testing targets achieved vis--vis plan and time schedule O

MFM05100

MFM

Reduction in failure due to testing errors

MFM05200

MFM

Reduction in customer complaints w.r.t. Testing aspects O

MFM05300

MFM

MFM05400

MFM

MFM05500
MFM05600

MFM
MFM

Average reduction in testing cycle time of all machines


planned for the year.
Value achieved through disposal of obsolete / surplus
equipment
Reduction in downtime of test plant
Timely delivery of assemblies as per schedule for testing

MFM05601

MFM

Follow up for sequencial receipt of components in time

MFM05700

MFM

Liquidation of shortages within stipulated time

MFM05800

MFM

Adherence to dockets delivery commitment

O
O
O

MFM05801

MFM

Follow-up with concerned agencies for receipt of


documents (e.g. part list from engg.) in time as per
schedule.

MFM05802

MFM

generation of required documents and handing over in


time..

MFM05900

MFM

Time reduction in generation of indents for


subcontracting as stipulated.

MFM06000

MFM

Reduction in No. of audit NCRs (ISO/ HSE/ 5S)

MFM06001

MFM

Reduction in No. of audit NCRs for ISO.

MFM06002

MFM

Reduction in No. of audit NCRs for HSE.

MFM06003

MFM

Reduction in No. of audit NCRs for 5 S.

MFM06100

MFM

Reduction in average handing over time

MFM06200

MFM

Reduction in NCRs

MFM06201

MFM

Timely Collection of past data for similar NCRs and


indepth analysis for root cause

MFM06202

MFM

Implementation of corrective action in time.

MFM06300

MFM

MFM06301

MFM

Implementation of HSE through monitoring of OCP's


identification and completion of OHSEMPs.
Identification of training needs/ maintaining health
records/ communication of learning points out of
accidents..

MFM06302

MFM

Ensuring regular usage of PPE's/ providing/ maintaining O


and trainning on usage of first-aid boxes/ firefighting
equipment etc.

MFM06303

MFM

MFM06400

MFM

Achieving the targets set for identified key parameters


of HSE.
Turnover from spares and service

MFM06401

MFM

Timely preparation of machine loading schedule and


identifying sub-contract need

MFM06402

MFM

Follow-up for timely induction of rawmaterial/Documents/ manufacturing the items as per


plan/review and course correcion.

MFM06500

MFM

Reduction in slow moving/ non-moving inventory over


previous year

MFM06600

MFM

Increase in machine tool utilization through better


planning

MFM06700

MFM

Availability of calibrated measuring instruments on time

MFM06800

MFM

Number of testing problems solved successfully in time. O

MFM06900
MFM07000
MFM07001

MFM
MFM
MFM

Indigenization of input raw materials as per plan


Reduction in consumption of energy and fuel
Planned identification of potential sources of wastages
of energy and fuel/ solutions and its implementation to
reduce wastages.

O
O
O

MFM07100
MFM07200

MFM
MFM

Preventive maintenance as per schedule


Implementation of Tool Calibration
instrumentsManagement system

O
O

MFM07201

MFM

MFM07202

MFM

Ensuring availability of calibrated instruments and cutting O


tools in ready to use condition
Ensuring economic usage of consumable toolings.
O

MFM07300

MFM

Reduction of defects in welding jobs undertaken

MFM07400

MFM

Yield achieved vis--vis target yield

MFM07500

MFM

Implementation of Training programs for skilled


technician

MFM07600

MFM

Timely available of welding accessories in good


condition

MFM07700

MFM

Increase in post kiln operation recovery

MFM07800

MFM

Increase in timely supply of material to shop vis--vis


Prodn. Schedule

MFM07801

MFM

Follow-up with concerned agencies for timely (as per


L3-network) release of W.O./ Engg/ Doc./ Purchase
indent etc./ and raising of exception reports for course
corection.

MFM07900

MFM

Number of reconditioning / retro fitting as per plan

MFM08000
MFM08100

MFM
MFM

Number of Multiskilled work centers developed.


Disposal of surplus / condemned facilities

O
O

MFM08101

MFM

MFM08102

MFM

Timely identification of surplus / condemned facilities and O


preparation of action plan
Timely implementation of action plan for disposal
O

MFM08200

MFM

Increase in online mfg. process availability.

MFM08300

MFM

Increase in salvage of tooling / jigs / fixture etc.

MFM08400

MFM

Jobs which clear customer inspection in first check

MFM08500

MFM

MFM08501

MFM

Timely preparation of schedules for delivery / services to O


internal customer
Adherance to delivery schedule to interanl customer
O

MFM08600
MFM08700

MFM
MFM

Quality of planning and review of e-MAP of assesees


Preparation of Direct & Indirect material budget

O
O

MFM08800
MFM08900

MFM
MFM

Issue and monitoring of periodic production plan


Intershop material movement

O
O

MFM09000

MFM

Waste segregation and disposal

MFM09100

MFM

Vendor development for shop technological items

MFM09200

MFM

Availability of ready to use special toolings in store

MFM09300

MFM

Root cause analysis for all reported non-conformity

MFM09400

MFM

Conversion of material Requisition plan to indent

MFM09500

MFM

Ensuring proper storage / issue of shelf life items.

MFM09600

MFM

MFM09700

MFM

Monitoring and reporting of KAMP (Key Activity


measurement parameters) like No of Stock out items
Timely issue of subcontract scope

MFM09800

MFM

Preparation of Technological work instructions

MFM09900

MFM

Reduction in cycle Time for designing jigs & fixtures

MFM10000

MFM

Reduction in time taken for process planning and time


estimation for Repair jobs / Design change advice /
change proposals

MFM10100

MFM

Updation of personnel for special process

MFM10200

MFM

Increase in Number of Heat Treatement cycles

MFM10300

MFM

Reply to Govt. Audit queries/Inspection report


paras/Action Taken Reports etc. Furnished within
specified time (2 weeks)

MFM10400

MFM

MFM10500

MFM

MFM10600

MFM

MFM10700

MFM

Reply / settlement of Internal Audit paras within


specified time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit reconciliation of accounts
Timely inputs to unit/corporate finance for
BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by specified date

MFM10800
MFM10900

MFM
MFM

Improvement in Employee Satisfaction Score


Close monitoring of preproduction activities w.r.t L2
network to avoid delay in initiat stage of production.

O
O

MFM11000

MFM

Pre planning for availability of commercial work order/


engineering/ Technological documentation to relevent
groups.

MFM11100

MFM

Accomplishment of targets of
Unit/NC/Function/Department level Balance Score Card

MFM11200

MFM

MFM11300

MFM

MFM11400

MFM

Percentage Increase in production of liquid metal


through secondary refining route(VAD).
Modify / Retrofit the existing item/ equipment for
improved usage.
Establish new test facilities to enhance System testing
capabilities.

O
O
O

C
C

MFM11500

MFM

Enhancing the process quality levels for MAX control


modules.
Conductin audit for ISO-9000, ISO-14000, ISO-18000 &
SA-8000 as internal auditor
Technical support for Fabriction and machining to
development projects/ commercial projects.
Development of Forgings through ESR Route
Adherence to safety regulations in shop floor / use of
safety devices, equipments etc.

MFM11600

MFM

MFM11700

MFM

MFM11800
MFM11900

MFM
MFM

MFM12000

GMX

Reply to Govt. Audit queries/ Inspection report paras/


Action Taken Reports etc. furnished within specified time
(2 weeks)

MFM12100

GMX

MFM12200

GMX

MFM12300

GMX

Reply/settlement of Internal Audit paras within specified


time (4 weeks)
Timely inputs to unit/corporate finance for inter-unit reconciliationof accounts
Increase in no. of active Quality Circles in the deptt.

O
C
C
O

O
O

FACTURING / PRODUCTION FUNCTION KRA MASTER - 2006-07


Unit of Measurement

Critical
KRA
(Y/N)

Special Universal
Suggested Weightage for
KRA
KRA (Y/N) category
(Y/N)
A
B
C

% reduction

% Delay

% Delay

Number

MV

% Increase in Score

% Achievement of
target
Number

Number

Number

Time Index

Composite index in
productivity saving
Time Index

% Delay

Number

Number

% Delay

Availability Index

Number

Time Index

Number

Implementation Index

Number alive

Time Index

Number

Number

Number

Number

Time Index

Number

Time Index

Number

Number

Time Index

Time Index

Time Index

Variety Index

To be mutually
decided by appraiser
and appraisee.

Number
TQM Score

N
N

N
N

N
Y

M
M

X
X

X
X

Time Index

No. of days delayed


from scheduled date
Date / Time Index
No. of days delayed
from scheduled date

N
N

N
Y

Y
Y

X
L

M
M

H
H

Number

No. of days delayed


from scheduled date

No. of days delayed


from scheduled date

No. of days delayed


from scheduled date

No. of days delayed


from scheduled date

No. of days delayed


from scheduled date

No. of days delayed


from scheduled date

Number

Time Index

Average % of OEE of
selected machines
Money value/
Numbers/ Tonne.
Time Index

Index

Time Index

Index

Index

Index
Index

Y
N

N
N

N
N

M
X

X
X

X
M

Ratio
Delay

Y
N

N
N

N
N

M
X

X
M

X
X

Delay

% Implementation of
recommendations
Percentage of
complaints reduced.
% Reduction

Time Index

Index

Index

% Reduction
%

Y
Y

N
N

N
N

M
M

L
L

L
L

Time Index

Time Index

Rupees

Number

Money value

%
Time Index

N
Y

N
N

N
N

M
M

L
X

L
X

availability index

Number

Time Index

Time Index

Time Index

Time Index

No. of days delayed


from scheduled date
%

Time Index

Time Index

Nos. completed

No.of activities
implemented

No.of defaulters

Targets

Money Value Numbers Y

% Delay

Time Index

Time Index

Time Index

MV
% reduction
In KWH / liters

N
Y
N

N
N
N

N
N
N

M
H
X

M
M
X

L
M
M

Number
Time Index

Y
N

N
N

N
N

L
H

M
X

M
X

No of defaults

% reduction in
N
consumption over last
year

Number

Time Index

Time Index

Time Index

Time Index

Number
Number

N
N

N
N

N
N

L
L

L
X

L
X

Number

Cleared in first
attempt / Jobs
offered

Time Index
%

N
N

N
N

N
N

M
L

M
H

M
H

Time Index
%

N
N

N
N

N
N

H
L

H
M

H
L

Number

Complaints

Ratio

Number

% Delay

Time Index

Ratio

Index

% reduction

Number

% Increase

Time Index

Time Index

No. of days delayed


from scheduled date
Score
Time Index

N
N

N
N

Y
N

M
M

X
M

X
M

Time Index

Balanced Scorecard
Rating (5/4/3/2/1)

Metric Tons

No. of items

No. of facility
established

Six sigma scale

No of day

Number of
components.
Time Index
No. of NCRs

N
N

N
N

N
N

H
M

H
M

H
M

Time Index

Number of new circles

- 2006-07
Source of Data For Measurement

Reduction in % = 1 Tc = Time mentioned in


contract / L2 chart ; Ta = Actual Time L5 L4 L3 L2
L1
((d/N)* 100)
Delay = 1 n = No. of activities
delayed ; d = Delay in no. of days N = Total no. of
days agreed at the beginning of the year L5 L4 L3
L2 L1
Delay = 1 n = No. of activities delayed ; d = Delay
in no. of days N = Total no. of days agreed at the
beginning of the year L5 L4 L3 L2 L1
x = No. of new technologies planned to be
implemented in the year L5 L4 L3 L2 L1
x = Planned value of savings in Rs. at the begining of
the year L5 L4 L3 L2 L1
(Present score - Previous score) / previous score
Actual Savings / Projected savings
x = No. of actions plans planned to be implemented
in the year L5 L4 L3 L2 L1
x = No. of systems planned to be developed in the
year L5 L4 L3 L2 L1
x = No. of actions plans planned to be implemented
in the year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of delayed processes
issued / Total no. of planned processes to issue Ib =
Cummulative no. of days of delay / Cummulative
total time planned in days L5 L4 L3 L2 L1
CP ; Ip = 1 S = Saving in each project ; N = No. of
projects L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of facilities delayed /
Total no. of facilities proposed at the begining of the
year Ib = Cummulative no. of days of delay /
Cummulative total time planned in days L5 L4 L3
L2 L1
L5 L4 L3 L2 L1

x = No. of welding processes planned to be


developed in the year L5 L4 L3 L2 L1

KRA Remarks

x = No. of productive processes planned to be


implemented in the year L5 L4 L3 L2 L1
L5 L4 L3 L2 L1

Ia = 1 - 1 X2 = No. of items planned for the year X1 =


No. of items actually made available L5 L4 L3 L2 L1
% = 1 X2 = No. of actually implemented suggestions
per employee for current year X1 = No. of actually
implemented suggestions per employee for
preceeding year L5 L4 L3 L2 L1
x = No. of latest techniques / accredition planned to
be implemented in the year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib q Ia = No. of techniques
identified / Total no. of techniques planned for the
year Ib = Cummulative no. of days of delay /
Cummulative total time planned in days L5 L4 L3
L2 L1
%=1-(X2-X1)/X2 X2= No of items planned for the
year, X1= No of Items actually procured L5L4L3L2L1
x = No. of upgradations planned and implemented in
the year L5 L4 L3 L2 L1
Index ; I = P1 / 1 P2 P2 = No. of Improvement
Projects planned to be implemented for the year P1
= No. of Improvement Projects actually implemented
L5 L4 L3 L2 L1
Target ( X ) to be decided between Appraisee and
Appraiser q L5 L4 L3 L2 L1 X 0.8X 0.7X 0.6X
0.5X
Delay ; D = Ia * Ib Ia = No. of progress reports
submitted / Total no. of planned submission of
progress reports Ib = Cummulative no. of days of
delay / Cummulative total time planned in days L5
L4 L3 L2 L1
Target ( X ) to be decided between Appraisee and
Appraiser q L5 L4 L3 L2 L1
x = No. of actions planned to be implemented in the
year L5 L4 L3 L2 L1
x = No. of new / improved moulding processes
planned to be implemented in the year L5 L4 L3
L2 L1
x = No. of factors planned to be identified in the year
L5 L4 L3 L2 L1

Delay ; D = Ia * Ib q Ia = No. of action plans


implemented / Total no. of planned action plans to be
implemented Ib = Cummulative no. of days of
delay / Cummulative total time planned in days L5
L4 L3 L2 L1
x = No. of action plans planned to be identified in the
year L5 L4 L3 L2 L1
Delay ; D = Ia * Ib , Ia = No. of action plans
implemented / Total no. of action plans planned to be
implemented Ib = Cummulative no. of days of delay /
Cummulative total time planned in days L5 L4 L3
L2 L1
x = No. of equipments / processes planned to be
identified in the year w L5 L4 L3 L2 L1
x = No. of equipments / processes planned to be
procured in the year w L5 L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of action plans
implemented / Total no. of planned action plans to be
implemented Ib = Cummulative no. of days of
delay / Cummulative total time planned in days L5
L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of Improvement
Projects implemented / Total no. of planned
Improvement Projects to be implemented Ib =
Cummulative no. of days of delay / Cummulative
total time planned in days L5 L4 L3 L2 L1
Delay ; D = Ia * Ib Ia = No. of technologies or
components indeginised / Total no. of technologies
or components planned to be indeginised Ib =
Cummulative no. of days of delay / Cummulative
total time planned in days L5 L4 L3 L2 L1
Ia = X1 / X2, X2 = No. of cutting tools planned for the
variety reduction in the year X1 = No. of variety
reductions actually achieved L5 L4 L3 L2 L1
To be mutually decided by appraiser and appraisee.

Unit QA/QC
Quality Deptt.
Project report
Project report
Project report

Project report

Project report

Project report

Project report

Project report

Project report

L5 L4 L3 L2 L1 5 4 3 2 1

Time index = Ia * Ib Ia = No. of products delayed /


Total no. of products planned Ib = Cummulative no.
of days of delay / total time planned in days L5 L4
L3 L2 L1 0 0.05 0.1 0.15 0.2
Average Percentage of OEE L5 L4 L3 L2 L1
90% 85% 80% 75% 70%
Turnover against target set in score card L5 L4 L3
L2 L1
Index = Ia x Ib Number of plans provided in time Ia =
Total Number of plans to be made Cummulative
number of days of delays Ib = Cummulative total
time planned in days L5 L4 L3 L2 L1
Number of inputs in time =
-------------------------------- Total inputs planned L5 L4
L3
L2 L1 achieved ) =
? (Output
------------------------------------------------------------- x 100
Total output planned L5 L4 L3 L2 L1

% of total packages achieved / financial achievement Plan issued by


L5 L4 PPC
L3 L2 L1
95
90 85 80 75
Delay = Ia x Ib Ia = No.of plans delayed / Total
No.of plans Ib = Cummulative No.of days of
delay / Comulative total time planned in days L5 L4
L3 L2 L1
? (output of each facility ) =
----------------------------------------------- Total output
planned. L5 L4 L3 L2 L1
Reduction in material consumption in Rs. =
----------------------------------------------------- x 100
Gross Turnover L5 L4 L3 L2 L1
WIP as % of GTO L5 L4 L3 L2 L1
No.of inputs in time = --------------------------------- Total
inputs planned L5 L4 L3 L2 L1
1-(x1/x2)
? (d1 + d2 + d3 + . . . . . . . . ) di = No.of days by
which action plan delayed beyond 30 days of
occurence of RJ/RW L5 L4 L3 L2 L1
? (d1 + d2 + d + . . . . . . . . . ) di = No.of days by
which implementation delayed beyond 60 days of
occurence of RJ/RW L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
% achieved L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
Number of complaints replied to within 6 days x =
----------------------------------------------------------- x 100
Total number of complaints L5 L4 L3 L2 L1
Dealy D = Ia x Ib Ia = Number of deliveries delayed
/ Total Deliveries Ib = Cummulative Number of days
of delay / cummulative Total time planned in days L5
L4 L3 L2 L1
Ia = x2 - x1 x 100 x2 X2 = No.of Items planned
for outsourcing x1 = Number of items moved in time
L5 L4 L3 L2 L1
? (Output of each facility in std.hrs.) =
----------------------------------------------- Total output
planned in std. hrs. L5 L4 L3 L2 L1
X = Target set for the unit L5 L4 L3 L2 L1
L5 L4 L3 L2 L1

Delay = Ia x Ib Number of items delayed (against


Production Plan) Ia = Total items planned
Cummulative number of days delayed Ib =
Cummulative total time planned in days L5 L4 L3
L2 L1
L5 L4 L3 L2 L1
Total Number of Supplies - Number of supplies
sequencially x =
----------------------------------------------------------------------x 100 Total number of projects L5 L4 L3 L2 L1
D = Ia x Ib Number of inputs supplied
sequencially as per plan Ia = Total number of inputs
planned Cummulative number of days of delay Ib =
Cummulative Total time planned. L5 L4 L3 L2 L1
x = Turnover planned from new products in Rs. L5
L4 L3 L2 L1
The increase in efficiency of work centre over
previous year L5 L4 L3 L2 L1
x = Number of action plans implemented within
stipulated time L5 L4 3 L2 L1
Testing targets achieved / Testing targets planned
Reduction in failures over prev. year L5 L4 L3 L2 L1
Reduction in complaints over prev. year L5 L4 L3
L2 L1
Reduction over previous year L5 L4 L3 L2 L1
x =Planned value of savings at the begining of the
year L5 L4 L3 L2 L1
Reduction over previous year L5 L4 L3 L2 L1
D = Ia x Ib Ia = Number of assemblies delayed /
Total assemblies Ib = Cummulative Number of days
of delay / cummulative Total time planned in days L5
L4 L3 L2 L1
x1 - ----------- x2 x2 = Number of items planned
x1 = Number of items actually made available L5
L4 L3 L4 L1
No of projects for which Items not despatched for
each product in time L5 L4 L3 L2 L1
Delay D = Ia x Ib Numbers of delayed dockets
issued Ia = Total Number of planned dockets to
issue Cummulative number of days of delay Ib =
Cummulative total time planned in days L5 L4 L3
L2 L1 0 0.05 0.1 0.15 0.2

Delay D = Ia x Ib Numbers of delayed documents


received Ia = Total Number of planned documents
to receive Cummulative number of days of delay
Ib = Cummulative total time planned in days L5 L4
L3 L2 L1
D=Ia x Ib. Ia = No. of documents dispatched / total
No. of documents planned. Ib = cum. No. of days of
delay / cum. Total time planned in days.
D=Ia x Ib. Ia = No. of indents delayed / total No. of
indents planned. Ib = cum. No. of days of delay /
cum. Total time planned in days.
X = (X1 -X2)/X1 x 100 X1= NCR raised for
previous audit . X2 = NCR raised for the dept. this
year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous
audit . X2 = NCR raised for the dept. this year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous
audit . X2 = NCR raised for the dept. this year.
X = (X1-X2)/X1 x 100 X1= NCR raised for previous
audit . X2 = NCR raised for the dept. this year.
Delay in days. L5 L4 L3 L2 L1
X=((Last year's NCR - Present NCR's) / Last Year's
NCRs. X 100)
x = Ia / Ib. Ia = No. of days delayed for collection
and analysis. Ib = Total No. of days planned for
collection and analysis.
D=Ia x Ib. Ia = No. of corrective actions done / Total
No. of corrective actions planned for this year. Ib =
cum. No. of days of delay / cum. Total time planned
in days.
x = No. of EMPs planned for completion in this year.
x = No. of (Training needs + health records planned
for maintaining + communication of learning points
out of accidents)
x = ensuring No. of defaulters to wear PPEs by
providing training and also usage of first aid boxes
and fire fighting equipments.
x = No. of key parameters planned for achieving the
set target.
Turnover against target set on score card
(Delay / No of days planned) * 100

Delay; D = Ia * Ib Ia = No. of components


delayed/Total No. of components planned. Ib =
Cum. No. of days of delay/Cum. Total days planned.
% reduction = Ip-Ic / Ip x 100. Ip = Non-moving
Inventory Previous year; Ic = Current year Nonmoving inventory.
% increase = Cy - Ly (In percentage) Cy = Current
year percentage; Ly = Last year percentage.
Delay; D = Ia * Ib; Ia = No. of Instruments delayed in
calibration / Total No. of instruments planned for
calibration . Ib = Cum. No. of days delay / Cum.
Total time planned in days.
Delay; D = Ia * Ib; Ia = No. of testing delayed /
Total No. of testing planned . Ib = Cum. No. of days
delay / Cum. Total time planned in days.
x = Planned value of Indigenisation.
x = Planned value.
Savings over previous years

X = No of machines planned to be completed


Time Index = Ia x Ib Ia = No of requirements not
met / Total no of reqts planned Ib = Cum. no days
of delay / cum.total time planned in days
X = No of defaults
X = Value of Savings identified L5 = 'X' / L4 =
0.95'X' / L3 = 0.90'X' / L2 = 0.85 'X'/ L1 = 0.80'X'
% reduction = [% defect of last year -% defect of this
year / % defect of last year ] L5 = 2%/ L4 = 1.5%/
L3 = 1.0% L2 = 0.5%/ L1 = 0.25%
% Yield achieved=100 -[Matl consumed - (Finished
product wt + Process allowance) / Matl consumed]
L5 = 90%/ L4 = 88%/ L3 = 85%/ L2 = 82%/ L1 =
80%
No.of Trg.programes = SUM of[Trg. program
conducted X No of skilled Technician attended X
duration in days / Total no. of technicians avl in
dept./section ] L5 = 4.5 Mandays / Emp./ L4 = 4.0/
L3 = 3.5/ L2 = 3.0/ L1 = 2.5
Time index= Ia X Ib Ia = No of accessories in bad
condition/Total no of accessories required. Ib =
Cum. No days of Delay / Cum. Total time planned in
days L5= 0.05/ L4 = 0.10/ L3 = 0.15/ L2 = 0.20/ L1 =
0.25
% recovery

Matl. reqd. month 'A' =(Planned month - Product


cycletime in months) L5 = 8 weeks ahead of 'A'/ L4
= 6 weeks ahead of 'A'/ L3 = 4 weeks ahead of 'A'/
L2 = 2 weeks ahead of 'A'/ L1 = 1 week ahead of'A'
Matl. reqd. month 'A' =(Planned month - Product
cycletime) L5 = 8 weeks ahead of 'A'/ L4 = 6 weeks
ahead of 'A'/ L3 = 4 weeks ahead of 'A'/ L2 = 2
weeks ahead of 'A'/ L1 = 1 week ahead of 'A'
Time Index = Ia X Ib Ia = (No of m/c not
Reconditioned/Retrofitted / No of m/cs planned ) Ib =
Cum no days of delay / cum total time planned in
days
No.of multi skilled work centers L5 L4 L3 L2 L1
No.of surplus / condemned facilities disposed L5 L4
L3 L2 L1
Delay in days Delay = ------------------ x 100
Planned days L5 L4 L3 L2 L1
Delay in days Delay = ------------------- x 100
Planned days L5 L4 L3 L2 L1
Availability of process on line for manufacturing L5
L4 L3 L2 L1
Number of tools / jigs / fixtures salvaged L5 L4 L3
L2 L1
X=(Total jobs offered - No. of jobs reworked / No. of
jobs rejected) / Total jobs offered.
Delay in days Dealy = ------------------ x 100
Planned days L5 L4 L3 L2 L1
On time delivery of items to interanl customer L5
L4 L3 L2 L1
L5 L4 L3 L2 L1
Delay in days Delay = ------------------ x 100
Planned days L5 L4 L3 L2 L1
L5 L4 L3 L2 L1
( (Actual time in hrs.- Planned hours) / Planned
hours ) * 100
Waste Disposal in Kgs. Disposal % =
---------------------------------------- x 100 Waste
Generated in Kgs. L5 L4 L3 L2 L1
Number of vendors developed L5 L4 L3 L2 L1 5 4
3 2 1
Number of complaints in a month L5 L4 L3 L2 L1
No.of processes modified '
-------------------------------------- x 100 Number of nonconforming process L5 L4 L3 L2 L1
Number of Indents/ No of requisitions

Number of items for which shelf life expired L5 L4


L3 L2 L1
Delay in days Delay = ------------------ x 100
Planned days L5 L4 L3 L2 L1
Delay = Ia x Ib Number of scopes delayed Ia =
Total Number of scopes Cummulative number of
days of delay Ib = Cummulative total time planned in
days L5 L4 L3 L2 L1
(Number of work instruction issued) / (Number of
work instructions planned) L5 L4 L3 L2 L1 1.0
0.9 0.8 0.7 0.6
Planned Time - Actual Time =
---------------------------------------- x 100 Planned Time
(All Times in days) L5 L4 L3 L2 L1 10% 8% 6%
4% 2% Fraction to be converted to whole Number
( (Planned days - Actual Days ) / planned days) * 100

Reduction in NCR's on special processes L5 L4


L3 L2 L1
( ( Actual cycles - Planned cycles) / Planned cycles) *
100
Targets to sets as follows; 100% case L5; 95-99%
cases - L4;8. 94% cases. L3; 75-84% cases - L2;
<75% cases-L1
Record maintained by Audit deptt.
Record maintained by individual / deptt.
Record maintained by Unit/corp. Finance deptt.
Record maintained by Unit Head / Unit P&D
Survey Report
Time Index = Ia x Ib Ia = Number of activities
delayed / Total no activity planned. Ib = Cummulative
no of days delayed/ total no of days.
Time Index = Ia x Ib Ia = Number of documents
delayed / Total no of documents required Ib =
Cummulative no of days delayed/ total no of days.
Rating declared at year end by Corporate / Unit
Management

This KRA will be taken by Head of Unit /Function / Department , if cover

Percentage Increase of VAD liquid metal produced


from 2004-05.
Report

Documents.

nil

nil

ICT report

Measured for Max control modules.

Schedule Issued by MR

Complte the audit as per schedule.

Supported to number of components.

A:X, B:X, C:M

Delay in development
No. of NCRs in Safety audit
L5 L4 L3 L2 L1
0
1
2
3
4
Record maintained by Audit deptt.

The forgings developed through ESR route have not been included in K
Audit report of
audit conducted
by head of shop
every six
months

Record maintained by Audit deptt.


Record maintained by individual/ deptt.
Unit QA/QC

/Function / Department , if covered under MAP, and can be assigned a weightage upto 100%

oute have not been included in KRA master list. Development of Forgings thorugh ESR route are included in Forge Shop Balance Score Ca

e Shop Balance Score Card.

CENTRAL DESPATCH CELL FUNCTION KRA MA


KRA ID

Function

KRA Description

KRA
Type

Unit of
Measurement

Critical Special
KRA
KRA
(Y/N)
(Y/N)

CDC00100

CDC

Packaging cost/ shop turnover


to be kept within limits

% Reduction

CDC00101

CDC

Planning/ indenting & coordination for packing materials

Number

CDC00102

CDC

% Reduction in the average


packing box providing period

CDC00103

CDC

Increase in Cost saving through


contract for recovery of wood/
GI sheet etc. from used boxes
& packing.

% increase

CDC00104

CDC

Packaging materials cost as %


of turnover to be kept within
limits

Time Index
CDC00105

CDC

Provide wooden tooling

CDC00106

CDC

Organise annual packing/


loading / unloading works
cantract in time at competitive
rates

CDC00107

CDC

Timely availability of packing


and transport fixtures drawings

CDC00108

CDC

packing within specified time

% nonconformility

CDC00200

CDC

Transportation cost/ shop


turnover to be kept within limits

% Reduction

Index (Refer
remarks column)
Time Index

CDC00201

CDC

Transportation cost to be kept


within limits.

Rs in Lakhs

CDC00202

CDC

Contract review of ODC &


heavy consignment as per DWI

Index (Refer
remarks column)

CDC00203

CDC

Ensure placement of vehicle of


suitable capacity & proper
quality

Index (Refer
remarks column)

CDC00204

CDC

% of vehicles placed within


specified time of requisition

CDC00205

CDC

Obtaining ODC sanction from


railways in time

Index (Refer
Remarks column)

CDC00206

CDC

Placement of wagon for loading

Index (Refer
remarks column)

CDC

Periodic review &


implementation of transporter
performance rating through
computerization

Index (Refer
remarks column)

CDC00208

CDC

Freight bill receipts/ Frieght


confirmation letter( to pay
consignments)/ verification and
timely forwarding to finance
dept for release of payment

Index (Refer
remarks column)

CDC00209

CDC

% of transportation rate
contracts awarded within
specified time

CDC00210

CDC

Cost savings through


competitive transportation
contract rates.

Index

CDC00300

CDC

Meeting despatch target of the


unit

Index (Refer
remarks column)

CDC00301

CDC

% Reduction in No. of days of


dispatchable inventory

CDC

Timely dispatch of items for


contract closing projects

CDC00207

Time Index
CDC00302

CDC00303

CDC

Maximizing dispatches by
railway wagon

CDC00304

CDC

Keeping the loco in running


condition

Index (Refer
Remarks column)

CDC00305

CDC

Despatch completion of 100%


projects for delivery at site.

Time Index

CDC00306

CDC

% Achievement of delivery vis-vis norm for delivery at site

CDC00307

CDC

Uptime availability of special


wagons

Index (Refer
Remarks column)

CDC00308

CDC

% Reduction in demurrages
paid to railways

CDC00309

CDC

% Reduction in No. of
complaints as per DWI

CDC00310

CDC

Maximum receipt of inwards


goods by wagon/rail tankers

Index (Refer
Remarks column)

CDC00311

CDC

CDC00400

CDC

Number

Document preparation
connected with Despatches
No. of technology initiatives
undertaken to reduce cost or
improve services

CDC

Development/ maintenance &


use of computerized
transporters
performance
evaluation system.

CDC00402

CDC

% Of IT application developed
within the specified targeted
time

CDC00403

CDC

% Of new IT systems
developed put to use

CDC00401

Time Index

CDC00404

CDC

Saving accrued through various


improvement projects

Rs in Lakhs

CDC00405

CDC

Development /maintenance of
home page for CDC

Index (Refer
remarks column)

CDC00406

CDC

Number

CDC00407

CDC

Number

CDC00500

CDC

% improvement in
man days of
training

CDC00501

CDC

man days

CDC00600

CDC

Number

CDC00601

CDC

Reduction in pending disputed


cases by follow up & persuasion
including adjudication cases.

CDC00602

CDC

100% Availing of CENVAT credit


on input & capital goods

CDC

% Reduction of debit of duty for


sub-contracting jobs-materials
outstanding for more then 180
days.

CDC00604

CDC

Ensure 100% liquidation of duty


debits in physical exports and
stock transfer with in prescribed
time limits

CDC00605

CDC

Number

CDC00606

CDC

No. of days

CDC00607

CDC

CDC00700

CDC

CDC00603

No. of accepted suggestions


implemented
Implementation of 5S in the
Deptt.
% improvement in average
competency score of employee
as identified n MAP
Training needs plan
implemented
Ensure nil show cause notices
from jurisdictional excise
authorities

Timely filing of periodical


returns / MIRs
Excise sealing and
documentation of export
consignments
Finalisation of Provisional
Assessments
Ensure smooth running of
internal transport function

CDC00701

CDC

% Improvement on internal
customer satisfaction

CDC00702

CDC

% Reduction in break down


time of vehicles

CDC00703

CDC

Reduction in fuel & lub oil cost

Rs in Lakhs

CDC00704

CDC

Maintenance cost reduction/


optimisation

Rs in Lakhs

CDC00800

CDC

Reply to Govt. Audit queries/


Inspection report paras/ Action
Taken Reports etc. furnished
within specified time (2 weeks)

CDC00900

CDC

Reply/settlement of Internal
Audit paras within specified time
(4 weeks)

CDC01000

CDC

Timely inputs to unit/corporate


finance for inter-unit reconciliationof accounts

No. of days delayed


from scheduled
date

CDC01100

CDC

Timely inputs to unit/corporate


finance for
BUDGET/FLASH/MIRs etc.

No. of days delayed


from scheduled
date

CDC01200

CDC

Finalisation of Functional
scorecard by specified date

No. of days delayed


from scheduled
date

CDC01300

CDC

Improvement in Employee
Satisfaction Score

Score

CDC01301

CDC

Implementation of Improvement
projects identified in the
Position Report as per schedule

CDC01400

CDC

Increase in no. of active Quality


Circles in the deptt.

Number of circles in
the deptt.

CDC01500

CDC

Achieving Business excellence


thru' TQM at Deptt. level

TQM Score

CDC01501

CDC

Preparation of action plan


based on Position report

No. of days delayed


from scheduled
date

CDC

Implementation of Improvement
projects identified in the
Position Report as per schedule

CDC01502

Time Index

Time Index
C

CDC01600

CDC

Development of Knowledge
management Portal

No. of days delayed


from scheduled
date

CDC01700

CDC

Contributing case studies etc.for


Knowledge Management Portal

Number

CDC01800

CDC

Completion of KM Projects as
per schedule

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

CDC01900

CDC02000

CDC02100

CDC02200

CDC02300

CDC02400

Time Index
No. of days delayed
from scheduled
date

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
C

CDC02500

CDC

Settlement of NCRs of ISO


9001/ OHSAS/ ISO 14000 etc.

% of total

CDC02501

CDC

Settlement of NCRs of ISO


9001

% of total

CDC02502

CDC

Settlement of NCRs of OHSAS

% of total

CDC02503

CDC

Settlement of NCRs of ISO


14000

% of total

CDC02600

CDC

Accomplishment of targets of
Unit/NC/Function/Department
level Balance Score Card

Balanced
Scorecard Rating
(5/4/3/2/1)

CDC02700

CDC

NUMBER OF DAYS FOR


SEALING OF EXPORT
CONSIGNMENTS

NUMBER OF
DAYS

CDC02800

CDC

NUMBER OF DAYS DELAY IN


CONSIGNMENTS DUE TO
EXCISE ISSUES

NUMBER OF
DAYS

CTION KRA MASTER - 2006-07 (previously TFX)


Universal
KRA
(Y/N)

Suggested Weightage for


category
A
B
C

Source of Data For


Measurement

KRA Remarks

X=Packing Cost /Shop turn-over;


Departmental Revenue
Reduction in % = {(X2Expense record
X1)*100}/X1;
available on-line
X1 = last year ratio;
X2emergency
= current year
ratio
No of
PIs acceptable
in a
year
Departmental Records

L5

L4

L3

L2
0

L1
2

12
X
N

X2 average
box providing period fo current year
x1=
average box provding period of last
year
{(X2 - X1) * 100}/X1
X1- last year saving
Departmental Records
X2- current
year saving
Packing Demand
Record

{(X2 - X1) * 100}/X1


X1- last year cost per Crore
Departmental Records values of dispatches
X2- current year
cost per Crore values of dispatches
Ia = (Nos) Provided /Demanded
Ib = (No. of days);
Monthly Production
Required/Provided
Programme
L5
L4
L3 L2
L1
1.0
0.9 0. 8
0.7 0.6
Actual / Planned
L5
L4
L3
L2
L1
Departmental records
1.04 1.05 1.06 1.07
1.08
Departmental Records

L5

L4
0

L3
0.8

L2
0.6

L1
0.4

0.2

% of packing delayed beyond


departmental specified norm
Departmental Records
L5 L4 L3 L4 L1
10 8 7 6 5
X= Freight payment /Shop turn-over
Reduction in % = {(X2-X1)*100} / X1
Departmental Records
X1 = last year ratio;
X2 = current year
ratio

Transportation cost per Rs Crore


computed on last year value of dispatch. Best of last year
record
ratio and budgetted ratio to be taken
as L3.
No. Reviewed /No.Planned
L5 L4 L3
L2
L1
Despatch Programme
1.0 0.98 0.97 0.96
0.95
Supplies made / Supplies committed
L5
Vehicle Demand
L4 L3 L2 L1
1.0 0.9 0.8 0.7 0.6
{[( VD-VP)*100]/ VD}/12
VD= vehicles demanded
Departmental Records
VP= vehicles placed
Monthly percentage
No Obtained/ No Applied
ODC Sanction request
L5
L4
L3
L2
L1
record
1.0
0.9 0.8 0.7
0.6
No. placed/No. planned
Demand Register
L5
L4 L3 L2 L1
1.0
0.9 0.8 0.7 0.6
Index= No of reviewed / No of planned
Review Records

L5

L4
1.0

L3
L2
L1
0.99 0.98 0.97

0.96
Index = (Total bills processed with
intime/ Total no of bills received)
N

Freight Bill Register

L5

L4

L3
1.0

L2 L1
0.99 0.98

0.97 0.96
N

Departmental Plan

Contracts Record

Unit despatch target

Warehouse Inventory
Register

Annual Plan Record

L5

L4
L3
L2
L1
1.04 1.05 1.06 1.07 1.08

Despatch Value / Cleared despatch


value
L5 0.98 L4 0.96 L3
0.94 L2 0.92 L1 0.90
?
monthly index 12
To start with
this should be monthly (12) to be
improved to weekly (52).

Ia x Ib where Ia = No. of projects


completed/No. of projects planned.
And Ib = No. of days of delay/No. of
total delays.

Departmental Action
Plan

{(X2-X1)*100 }/ X1
X1= MT dispatched last year
X2= MT dispatched in current
year. (Based on economic
consideration)

No of days available/ No of days


planned
L5
L4
L3
L2
L1
Failure Reports Record
1.0 0.98
0.97 0.96
0.95 (Considering maintenance
schedule)

Annual Plan Record

Contract clauses and


Freight Bill Register

WEX Maintenance
Schedule

Departmental Data

Complaint Register

Departmental Plan

Departmental records

PIP/QIP Action plans

Departmental Plan

L5

L4 L3 L2
L1
1.0
0.9 0.8 0.7 0.6
Index = {( X1 - X2) * 100} / X1 where
X1- Total No. of
LR/RR &
X2-Total
No. of LR/RR payment with
penalty/demurrage
L5 100 L4 98 L3 96 L2 94
L1 92
No.
of periodic overhaul completed /
No. of periodic overhaul planned
L5
L4 L3 L2
L1
1.0
0.8 0.7 0.6
0.5
{(X2-X1)* 100} / X1
X1= last year payment.
X2= current year payment.
Index = {(X2 - X1)*100} / X1
L5 L4
L3 L2 L1
1.0 0.9
0.7 0.6

0.8

Index = MT Achieved / MT Planned


L5 1.0 L4 0.9
L3 0.8 L2 0.7 L1 0.6
No. of documents prepared against
GRs in a day
Number;
Minimum target 0.5 per
executives
{( X2 - X1 )* 100} / X1
X1 =No. of evaluation
planned
X2 - No. of
evaluation done

Application developed / Application


development planned
Departmental Plan
L5
1.0 L4 0.9 L3 0.8 L2 0.7 L1
0.6
(No of put to use / Total no of
development) * 100
L5
L4 L3 L2
L1
Departmental Records
100
90 80
70
60

Productivity Figures

In Rs Lakhs; At least 1 improvement


projects per executive. Timely
completion in No. of months delay
L5 L4 L3 L2
L1
0
1
2
3
4
Index = No of times updated / No of
time planned
L5 1.0 L4 0.9 L3 0.8
L2 0.7 L1 0.6
Generally
every month to be updated.

Departmental Plan

Departmental Records Number

Departmental Records Nos. completed

Departmental Plan

X2 - X1 X 100
X2
N

Departmental Plan

Departmental Records

Departmental Records

L5

L4

L3 L2 L1
0
1
2

(No availed / Total No ) * 100


N

Departmental Records

Departmental Records

L5
L4
100

L3
99

L2
98

L1
97

96

(No of cases liquidated / Total no of


cases) * 100
Departmental Records
L5
L4
L3 L2 L1
100 99
98
97 96

Departmental Records No. of defaults

Departmental Records

L5

L4

L3

L2
1

5
L5

L4

L3 L2
100 90

L1
2
L1
80

70

60

Departmental Records

Departmental Records Vehicles provided/vehicles demanded

{( X2 - X1) * 100}/ X1
X1 = last year %
X2 - current year %
(model survey format
is appended)
{(X2 - X1 ) * 100 } / X1
X1 - Last years figure;
X2 - Current Year
Figure
L5 L4 L3
L2 L1
2.0 1.5 1.0 0.5
0

Survey Report

WEX Maintenance
Records

Departmental Records Rs. Lakhs saved

Departmental Records Rs. Lakhs saved

Record maintained by
Audit deptt.

Targets to be set as follows: 100%


cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1
Targets to be set as follows: 100%
cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1

Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Questionnaire developed by CQA to


be adopted .

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Departmental Records No. of NCRs settled/Total NCRsX100

Departmental Records No. of NCRs settled/Total NCRsX101

Departmental Records No. of NCRs settled/Total NCRsX102

Departmental Records No. of NCRs settled/Total NCRsX103

This KRA will be taken by Head of


Rating declared at year
Unit /Function / Department , if
end by Corporate / Unit
covered under MAP, and can be
Management
assigned a weightage upto 100%

ARE-1/ INVOICE

INVOICE/OBD

ENGINEERING / DESIG
KRA_ID

Function

KRA Description

KRA
Type

EDE00100
EDE00101
EDE00102
EDE00103
EDE00104

EDE
EDE
EDE
EDE
EDE

Proposal/Tender Engineering/ Estimates completed in time


Design/selection of equipments/ system
Preparation of schemes/layout drgs.
Preparation of technical offer
Estimation

O
O
O
O
O

EDE00105

EDE

Computerisation of Tender Proposals

EDE00106
EDE00107

EDE
EDE

C
O

EDE00200

EDE

Computerisation of proposal Engineering


Finalisation of performance guarantee schedule for proposals
Reduction in Technical Queries on offers submitted for tenders
having detailed specifications

EDE00201
EDE00300
EDE00301
EDE00302
EDE00303
EDE00304

EDE
EDE
EDE
EDE
EDE
EDE

Average response time to customer Technical queries on proposals


Standard proposals prepared and submitted as per plan
Design/selection of equipments/ system for standard proposal
Preparation of schemes/ layout drgs. for standard proposal
Preparation of technical offer for standard proposal
Estimation of standard proposal

O
C
C
C
C
C

EDE00400

EDE

Ratio of orders received to tenders submitted and decided

EDE00500

EDE

EDE00600

EDE

EDE00601

EDE

EDE00602

EDE

EDE00700

EDE

Technical support to Proposal/Tender Engineering/ Estimates for


timely completion.
Reduction in time to submit technical offer/ tender document/
Estimates
Creation/Updation of Engineering Cost Data for tendering /
Estimation
Documenting for KM Portal the process change adopted to achieve
time reduction within specified time schedule
Technical acceptance of offers by customer for In house developed
products.

EDE00800

EDE

Business acquired through RLA/ R&M / Consultancy services

EDE00801

EDE

Review of customer requirements in time

EDE00802

EDE

Organising site performance data & results of RLA studies in time

EDE00803

EDE

EDE00804

EDE

Preparation of technical offer & estimate in time


Developing checklists& computerisation of procedure for RLA
studies within specified time schedule

O
O
O
C
O

EDE00900

EDE

EDE00901

EDE

EDE00902

EDE

EDE00903

EDE

EDE01000

EDE

EDE01001

EDE

EDE01002

EDE

EDE01100

EDE

EDE01200

EDE

EDE01300
EDE01400
EDE01401

EDE
EDE
EDE

EDE01402

EDE

EDE01403

EDE

EDE01404

Input information settled with other products/ engineering groups as


per agreed schedule

Finalisation of information flow schedule with other BHEL Unit


Releasing input information to other BHEL unit as per information
flow schedule
Average time taken for review & commenting of drawings/
documents from other BHEL Unit
Interface information arranged from/to customer/consultant as per
project schedule

EDE

Finalisation of list of information required from customer


Average time taken for review & commenting of customer drawings/
documents
Project milestones achieved by monitoring group for engg.
documents and interface information
Average time taken to resolve contractual issues related to scope
and specification
Average time taken for issue of L3 schedule (indents/drawings/
documents)
Completion of contract Engg. Documents in time.
Completion of Project /Lay out Engineering in time
Contract drawing/ document/ O&M Manuals/ E & C documents
submitted in time
Computerisation of Project/Layout Engg. within specified time
schedule
Computerisation of Contract drawings/documents/O&M and E&C
documents/manuals within specified time schedule

EDE01500

EDE

Timely issue of Engg inputs to sites for erection as per schedule

EDE01600
EDE01601
EDE01602
EDE01603

EDE
EDE
EDE
EDE

O
O
O
O

EDE01604

EDE

Obtaining customers approval on Engg. Drgs.// Documents in time


Preparation / Finalisation of Vendors / Sub-Vendors list in time.
Finalisation of quality plan
Finalisation of Computerised Engg. Drgs.
Computerisation of Customer Approvals on Engg.
Drawings/documents within specified time schedule

EDE01700

EDE

EDE01701

EDE

Engineering information issued as per manufacturing plan.


Issue of Manufcaturing documents as per schedule
( Drawings/GMS/CBOM/GIS/MID/PGMA/Engg. Spec. etc.)

EDE01702

EDE

EDE01703

EDE

EDE01800

EDE

EDE01801

EDE

Issue of Enineering Indent in time


Issue of Packing/Shipping documents/ completion schedules as per
schedule
Design calculation/ analysis/ documentation completed as per
schedule
Computerisation of design calculation & analysis within specified
time schedule

O
O
O

O
O
O
O
O
O
O
C
C

O
O
C

EDE01900

EDE

Timely arranging of ODC sanction from railway for transportation

EDE02000

EDE

Statutory approval obtained as per schedule

EDE02100

EDE

Deviation from tender material cost w.r.t. final design material cost

EDE02200

EDE

EDE02201

EDE

EDE02202

EDE

EDE02203

EDE

Number of PIR proposals approved in TC/PC & initiated


No of documents generated by state-of-the-art technology scanning
& loaded on KM Portal
Timely preparation of product development plan & identification of
PIRs
Timely approval of proposed PIRs by organising review in TC/PC
meetings

EDE02204
EDE02300
EDE02301
EDE02302
EDE02303
EDE02304
EDE02305
EDE02306
EDE02307
EDE02308

EDE
EDE
EDE
EDE
EDE
EDE
EDE
EDE
EDE
EDE

Timely initiation of PIRs


Completion of approved PIR as per schedule
Preparation of development plan
Conceptual design against development project
Detailed Design against development project
Design Review against development project
Proto type manufacturing/ Assy
Routine Tests against development project
Type testing/Performance testing
Project completion report

O
O
O
O
O
O
O
O
O
C

EDE02400
EDE02500

EDE
EDE

New products/ services introduced as per schedule


No. of designs validated within the year

O
O

EDE02600
EDE02700
EDE02800

EDE
EDE
EDE

No. of type test conducted / organised successfully during the year


Completion of MOU projects in time
No. of products variant added during the year

O
O
O

EDE02900

EDE

EDE03000

EDE

No. of product standards/ specification reviewed


O
No. of new design methods / calculations carried out during the year
and captured as procedure for KM Portal
C

EDE03100

EDE

EDE03101

EDE

EDE03200

EDE

Response/recommendations to customer query/complaint within


targeted time
Documenting for KM Portal within specified time schedule the
responses to customer complaints
Technical support provided to customer for resolving operational
problems

EDE03300

EDE

No. of customer training programs/ technical presentations

EDE03400

EDE

Timely review & updation of PMD.

C
O
O

O
C
O

EDE03500

EDE

EDE03600

EDE

Release of Material forecast/ Procurement specifications/ indents in


time
O
Average time for technical recommendations for purchase/bought
out items
O

EDE03700

EDE

Average time taken for approval of vendor drawing / documents

EDE03800
EDE03900

EDE
EDE

C
O

EDE04000
EDE04100

EDE
EDE

EDE04101

EDE

EDE04200

EDE

EDE04300

EDE

Reduction in no. of items with less than three vendors


Rate contract entered as per plan
Value of non moving inventories/ site returned material utilized
during the year
No. of shop problem studied and resolved during the year
Documentation of shop problems resolved for KM portal within
specified time
Technical support provided for Erection & Commissioning of
prototype equipments
Average time taken to recommend resolution to engineering punch
points related to contract closing

EDE04400
EDE04500

EDE
EDE

O
O

EDE04501
EDE04600
EDE04601
EDE04602
EDE04603
EDE04604
EDE04605

EDE
EDE
EDE
EDE
EDE
EDE
EDE

EDE04606

EDE

Average Time taken for completion of as-built drawings


No. of Site problem attended and resolved during the year
Documentation of site problems resolved for KM portal within
specified time
No. of PG /PE Tests conducted & reports prepared
Proposals for PG /PE Tests prepared in time
Preparation of test procedure & scheme
Organising site operation data
Timely calibration of PG test instruments
Test conducted & report submitted in time
Documentation of PG/PE tests for KM Portal within specified time
schedule

EDE04700

EDE

No. of system testing / commissioning completed

EDE04800

EDE

Reduction in test cycle time

EDE04900
EDE05000

EDE
EDE

No. of new test methods established


No. of online spare catalogues generated.

C
C

EDE05100
EDE05200

EDE
EDE

Completion of new design of tooling as per emerging technologies


% of tooling activity completed as per schedule

C
O

EDE05300

EDE

% success of the tooling designed during the year

EDE05400

EDE

Reduction in engineering cycle time

EDE05401

EDE

Identification of projects &deciding action plan as per schedule

O
O
C
O
O

C
O
O
O
O
O
O
C

Increase in Drawings/ models generated through special softwares


like IDEAS/ PROE/PDS/ PDMS/ CFD/ etc

EDE05402

EDE

EDE05403

EDE

EDE05404

EDE

No. of Special IT initiatives implemented


Documenting for KM Portal within specified time schedule the
procedure for achieving reduction in Engg.cycle time

EDE05500
EDE05600

EDE
EDE

Special assignment (other than normal identified responsibility) to


be completed during the year (Details of assignments & milestone
targets to be given in action plan)3
Cost saving due to Engg. efforts

C
O

EDE05601

EDE

Identification of cost saving projects & deciding action plan

EDE05602

EDE

Total savings due to VE/ Economic Buying / Alt. source/ Productivity/


Indigenisation/Alternate Material
O

EDE05700

EDE

improvement of Internal customer satisfaction score

EDE05701

EDE

EDE05800
EDE05900

EDE
EDE

Conducting Survey in time


No of action plans identified & implemented for TQM / ISO/
NABL/HSE in time
Increase in number of suggestions

EDE06000
EDE06100

EDE
EDE

House Keeping / 5S implementation


Implementation of identified training needs

O
C

EDE06200

EDE

No. of improvement projects/ QIP/ JIP/ SIP/ PIP etc. completed

EDE06300

EDE

EDE06400

EDE

EDE06500

EDE

EDE06600

EDE

EDE06700

EDE

EDE06701

EDE

EDE06702

EDE

EDE06703

EDE

Standardisation projects completed as per schedule (Individual


level)
Reduction in no. of Design/ drawing/ drafting changes due to
engineering errors
Average time taken to dispose off NCRs (DCNs/ DCRs/
concessions/ deviations)
No of equipment for which feed back/performance data obtained
during the year

Reduction in customer complaints


Corrective & preventive actions implemented through DRC/RCA
meetings
Corrective & preventive actions implemented through analysis of
SAR/CAR
No. of corrective/ preventive actions recommended from feedback
on performance of products

C
C
C

C
O

C
O

O
O

O
O
O
O

EDE06800

EDE

EDE06900

EDE

No. of system deficiencies identified and accepted by the auditee


during pre-commissioning/ commissioning/ post-commissioning
audits.
Average resolution time for computer hardware and software
complaints

EDE07000

EDE

Validation of computer programs

EDE07100

EDE

Milestones on knowledge management project completed

EDE07200

EDE

New technologies/ systems absorbed/ introduced as per plan

EDE07300

EDE

Patents/ copyrights filed as per schedule

EDE07400

EDE

No. of technical paper presented/published

EDE07500

EDE

Reply to Govt. Audit queries/ Inspection report paras/ Action Taken


Reports etc. furnished within specified time (2 weeks)

EDE07600

EDE

EDE07700

EDE

Reply/settlement of Internal Audit paras within specified time (4


weeks)
Timely inputs to unit/corporate finance for inter-unit re-conciliationof
accounts

EDE07800

EDE

Timely inputs to unit/corporate for BUDGET/FLASH/MIRs etc.

EDE07900

EDE

Finalisation of Functional scorecard by specified date

EDE08000

EDE

EDE08001
EDE08100
EDE08200

EDE
EDE
EDE

Improvement in Employee Satisfaction Score


Implementation of Improvement projects identified in the Position
Report as per schedule
Increase in no. of active Quality Circles in the deptt.
Achieving Business excellence thru' TQM at Deptt. level

EDE08201

EDE

EDE08202

EDE

Preparation of action plan based on Position report


Implementation of Improvement projects identified in the Position
Report as per schedule

EDE08300
EDE08400
EDE08500

EDE
EDE
EDE

Development of Knowledge management Portal


Contributing case studies etc.for Knowledge Management Portal
Completion of KM Projects as per schedule

O
C
C

EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

EDE08600

O
O

O
O

O
O
C

EDE08700

EDE08800

EDE08900

EDE09000

EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

EDE09100
EDE09200
EDE09300
EDE09301

EDE
EDE
EDE
EDE

EDE09302
EDE09303
EDE09400
EDE09500

EDE
EDE
EDE
EDE

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)
No of A4 equivalent Drgs digitised as per plan
Outsourcing of Design/Engg/Drafting activities as per schedule
Indenfication/ Evaluation and Finalisation of Vendors as per plan
Preparation and issue of Specification and recommendation for
placement of order..
Review of drawings/document submitted by vendor
No of vendor Evaluation carried out during the year
No of new Product/Plant standard/Specification generated

EDE09600
EDE09700

EDE
EDE

Finalisation of scope and issue of engg information for Repair W.O.


Number of engineering highlights presented in MCM

O
O

EDE09800

EDE

Timely completion of R&D budget for approval of Board

EDE09900

EDE

Accomplishment of targets of Unit/NC/Function/Department level


Balance Score Card

EDE10000

EDE

EDE10100
EDE10200

C
C
O
O
O
O
O
O

EDE

Organising timely clearance of PIR proposals.


Timely preparation of yearly KM-Budget as per KM-policy guide
lines.

EDE

Organising completion of Collaboration milestones as per shedule.

NGINEERING / DESIGNING FUNCTION KRA MASTER - 2006-07


Unit of Measurement

Time Index

Critical
KRA
(Y/N)

Special Universal
Suggested Weightage for
KRA
KRA
category
(Y/N)
(Y/N)
A
B
C

Y
N
N
Y
Y

N
N
N
N
N

N
N
N
N
N

L
X
X
X
X

M
M
X
X
X

X
H
H
H
H

Y
N

Y
N

N
N

X
X

X
X

H
L

% reduction over last year

Average No. of days


Time Index
Time Index
Time Index
Time Index
Time Index

Y
N
N
N
N
N

N
N
N
N
N
N

N
N
N
N
N
N

L
L
X
X
X
X

M
M
X
X
X
X

M
X
M
M
M
M

% success

% offers accepted/ submitte

Rs. Lacs

Time Index
Time Index
Time Index
Time Index
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Time Index

Time Index

% reduction over last year


No. of days delayed from
scheduled date
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date

Time Index

No. of days delayed from


scheduled date
Time Index

% reduction in Av. Time over

N
Y
N

Y
N
N

N
N
N

X
L
X

L
L
X

L
X
H

Y
N
N
N

N
N
N
N

N
N
N
N

X
X
X
X

L
X
X
X

X
L
L
L

Time Index
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Time Index
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Time Index
Time Index
Time Index
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Time Index
Time Index
Time Index
Time Index
Time Index
No. of days delayed from
scheduled date
Time Index
Time Index
Time Index
Time Index
Time Index
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date

% deviation
Number
Number
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
Time Index
Time Index
Time Index
Time Index
Time Index
Time Index
Time Index
Time Index
Time Index
Time Index
Number
Number
Time Index
Number
Number

Number

N
Y
N
N
N
N
N
N
N
N

Y
N
N
N
N
N
N
N
N
N

N
N
N
N
N
N
N
N
N
N

X
M
X
X
X
X
X
X
X
X

X
X
M
M
X
M
X
X
X
X

L
X
X
H
M
X
M
L
M
L

N
N

N
N

N
N

H
X

M
M

L
M

N
N
Y

N
N
N

N
N
N

X
M
X

X
H
L

M
H
M

Time Index

Time Index
%
Number
No. of days delayed from
scheduled date

Time Index

% reduction in Av. Time over

% reduction in Av. Time over

Y
N

N
N

N
N

X
X

L
M

M
L

N
N

N
N

N
N

X
X

L
M

M
M

% provided / requests

% reduction in Av. Time over

% reduction in Av. Time over

N
N

N
N

N
N

X
X

X
M

L
M

Y
N
N
N
N
N
N

Y
N
N
N
N
N
N

N
N
N
N
N
N
N

M
X
X
X
X
X
X

H
L
X
X
X
X
X

H
X
M
L
L
L
M

N
N

N
N

N
N

X
X

X
M

M
M

N
N

N
N

N
N

X
X

M
L

H
X

% reduction

No. of days delayed from


scheduled date

Time Index
Rs. Lacs
Number
No. of days delayed from
scheduled date

Number
No. of days delayed from
scheduled date
Number
Time Index
Time Index
Time Index
Time Index
Time Index
No. of days delayed from
scheduled date
Number
%

Number
Number
Time Index
Time Index
%

Rs Lacs

N
Y

N
N

N
N

H
L

H
X

H
X

No. of days delayed from


scheduled date

Rs. Lacs

Y
N

Y
N

N
N

H
L

H
X

M
X

Y
N

N
N

N
N

L
L

L
L

L
X

% reduction over last year

Reduction in average time ov

% obtained / planned

% reduction over last year

% implemented / planned

% implemented / planned

Number
No. of days delayed from
scheduled date
Time Index

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
%
Score
%
Time Index
Time Index

Number

No. of deficiencies identified

Av. Time in Hours

% validated/ planned

No. of days delayed from


scheduled date

Score

Y
N
Y

N
N
N

Y
Y
Y

X
M
H

M
X
X

M
X
X

Y
N
Y

Y
N
N

Y
Y
Y

L
M
X

M
M
M

H
M
H

Time Index

Time Index

Time Index
Number

Time Index
Time Index

Time Index
Number of new circles
TQM Score
No. of days delayed from
scheduled date
Time Index
No. of days delayed from
scheduled date
Number
Time Index
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date
N

N
N
N
N

Y
N
N
N

N
N
N
N

H
X
M
M

H
X
M
M

H
M
X
X

N
N
N
N

N
N
N
N

N
N
N
N

X
X
X
X

M
L
L
L

M
M
L
L

Number

N
N

N
N

N
N

X
L

M
L

M
M

No. of days delayed from


scheduled date

Balanced Scorecard Rating (

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
% digitised / planned
Time Index
Time Index
Time Index
Time Index
Number
Number
Time Index

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
Time Index

06-07
Source of Data For Measurement

Proposal/ Tender submission as per


schedule
As per engg plan
As per engg plan
As per engg plan
As per engg plan
As per engg plan
As per engg plan
As per agreed schedule
Proposal / tender files
Data maintained by individuals in
proposal/tender files/Computer data base
Data to be maintained by individuals
As per engg plan
As per engg plan
As per engg plan
As per engg plan
wrt tender finalised for established products/
Data to be maintained by tendering group
Submission of technical data / information in
time. Data to be maintained by individual.
wrt previous year's average / Data to be
captured from computer database
With respect to agreed schedule
Deptt. Records / CEPD records
WRT No of offers submitted
During the year/ data to be maintained by
individuals
As per agreed sch
As per agreed sch
As per agreed sch
Deptt. Records / CEPD records

KRA Remarks

As per L2/ preponed schedule/ Data to be


maintained by individuals

Critical to project Engg Group

With respect to project zero date


As per agreed schedule
As per agreed schedule
wrt project schedule/ Data to be maintained
by individual/ data base
Critical to Project Engg Group
With respect to project zero date
With respect to project zero date
of schedule milestone/ Data to be
maintained by individuals
Date of receipt of order/ Data to be
maintained by individuals

Critical to project Engg Group

Date of receipt of order


Agreed schedule ( ex.L2/ L3 Network)
Agreed schedule ( ex.L2/ L3 Network)
Agreed schedule ( ex.L2/ L3 Network)

Critical to Manufacturing units only

Deptt. Records / CEPD records


Deptt. Records / CEPD records
As per planned schedule. Individual to
maintain the record
As per L2/L3 schedule.
As per Engg. Schedule
As per Engg. schedule
As per Engg. schedule
Deptt. Records / CEPD records
wrt agreed schedule/ Data to be captured
from computer database
Critical to Manufacturing units only
wrt agreed schedule/ Data to be captured
from computer database
wrt agreed schedule/ Data to be captured
from computer database
wrt agreed schedule/ Data to be captured
from computer database
wrt project schedule/ Data to be maintained
by individuals
Deptt. Records / CEPD records

Completion as per schedule


As per schedule. Individual to maintain data
base
Average for all the WOs executed during
the year. Final design material cost to be
captured from MID.
Project initiated during the year/ Data to be
maintained by individuals
Individual to maintain record/CEPD records
As per Engg. Schedule
As per Engg. Schedule
As per Engg. schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
wrt approved schedule
Index will be calculated based on milestone
achived.
Individual to maintain record.
Individual to maintain record.
As per schedule
Data to be captured from Data Base

Critical to Manufacturing units only

Specification reviewed during the year. Data


to be captured from computer database
through no. of revision of specification/
product standard
Data to be maintained by individuals
Target to be decided in no. of days by each
Engg. Group/ Computer Data base to be
maintained by individuals/unit
Deptt. Records / CEPD records
wrt request from customer
No. of programs during the year/ Data to be
maintained by individuals
As per guide lines

Critical to Manufacturing units only

Agreed schedule
Data maintained by individuals & PO
files/data base
Date of receipt of vendor drg/ document/
Data to be maintained by individual

Critical to all Manufacturing units

Alternate source developed during the year/


Data to be captured from PMD Database
wrt to plan
Data to be maintained by individuals
Individual to maintain record.
Deptt. Records / CEPD records
Data to be maintained by individuals/ during
the year
Date of receipt of punch points/ to be
maintained by individuals
Critical to Project Engg Group
Receipt of marked up document from
site/shop
Individual to maintain record.
Deptt. Records / CEPD records
Data to be maintained by individuals
As per schedule
As per schedule
As per schedule
As per schedule
As per schedule
Deptt. Records / CEPD records
Data to be maintained by individuals/ during
the year
wrt previous year/ Test cycle time=
(Available working days/ No. of product
tested during the year )
During the year/ data to be maintained by
individuals
As per data base
As per planned schedule. Data to be
maintained by individuals
Individual to maintain record.
wrt total no of tool designed during the year/
Data to be maintained by individuals
Average compared to previous year/ Data to
be captured from computer database
As per Engg schedule

WRT last year. Data to be captured from


Computer Data Base
IT projects completed during the year/ Data
to be maintained by individuals.
Deptt. Records / CEPD records
Mile stone completion. These can be
identified and agreed at beginning/during
the year
Actual saving during the year
As per Engg. schedule
Actual saving during the year wrt tender
EFC / Data to be maintained by individuals
Survey to be conducted and satisfaction
index to be worked out by each engg. Group
As per schedule
No completed. Data to be maintained by
individuals
wrt to last year data
Evaluation audit wrt check lists & guide lines
Data base
Projects completed during the year. Data to
be maintained by individuals.
"For L2 and L3 level
Milestone of the projects to listed out and
Database to be maintained by individuals.
Index Calculation will be based on no of
milestones achieved
% of last year to this year/ Data to be
captured from Computer Data Base
Target to be decided in no. of days by each
Engg. Group/ Computer Data base to be
maintained by individuals/unit
No. obtained to planned
wrt last year/ No of complaints received
during the year/ Data to be captured from
database With reference to No.identified
With reference to No.identified
Data to be maintained by individuals

Data to be maintained by individuals


Computer data base
No of programs validated Vs planned.
Individual to maintain the record
Project initiated and mile stone completed/
Data to be maintained by individuals
Technology development plan and schedule
to be prepared at the beginning of the
project
Index will be calculated based on no of
milestone achieved.
No of papers presented/published during
the year/ Data to be managed by individuals

Record maintained by Audit deptt.

Targets to be set as follows: 100%


cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1

Record maintained by Audit deptt.

Targets to be set as follows: 100%


cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1

Record maintained by individual/ deptt.


Record maintained by Unit/Corp. Finance
deptt.

To delete finance

Record maintained by Unit Head/Unit P&D


Survey Report
Project report
Unit QA/QC
Quality Deptt.
Action plan document
Project report

Project report

Project report

Questionnaire developed by CQA to


be adopted . To delete the KRA

Project report

Project report

Project report

Project report

Project report

CEPD Records

CEPD Records

Rating declared at year end by Corporate /


Unit Management

This KRA will be taken by Head of


Unit /Function / Department , if
covered under MAP, and can be
assigned a weightage upto 100%

Record

CEPD plan

As per plan.

RESEARCH & DEVELOPMENT FUNCTION KRA MASTE


KRA ID

Function KRA Description

KRA Type

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Fabrication /Assembly of
prototype as per
schedule

RDE00103 RDE
Testing and modification
as per schedule

RDE00104 RDE
Documentation of
develoment process as
per schedule

RDE00105 RDE

No. of days
delayed from
scheduled
date

Timely completion of
R&D project(#2) of
capability-building nature
for R&D function as per
schedule

RDE00200 RDE

C
Design finalisation as per
schedule

RDE00201 RDE
Specification and
procurement of project
material / eqpt./prototype

RDE00202 RDE
Fabrication /Assembly of
prototype as per
schedule

RDE00203 RDE

Universal
KRA
(Y/N)

Specification and
procurement of project
material / eqpt./prototype

RDE00102 RDE

Special
KRA
(Y/N)

Design finalisation as per


schedule

RDE00101 RDE

Critical
KRA
(Y/N)

No. of days
delayed from
scheduled
date

Timely completion of
R&D project(#1) of
capability-building nature
for R&D function
(completion date as in
project target (PIR's)

RDE00100 RDE

Unit of
Measurement

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Testing and modification


as per schedule

RDE00204 RDE
Documentation of
develoment process as
per schedule

RDE00205 RDE

No. of days
delayed from
scheduled
date

Timely completion of
R&D project(#3) of
capability-building nature
for R&D function as per
schedule

RDE00300 RDE

C
Design finalisation as per
schedule

RDE00301 RDE
Specification and
procurement of project
material / eqpt./prototype

RDE00302 RDE
Fabrication /Assembly of
prototype as per
schedule

RDE00303 RDE
Testing and modification
as per schedule

RDE00304 RDE
Documentation of
develoment process as
per schedule

RDE00305 RDE
Timely development of
software packages/
modules(#1) for
improving R&D capability
as per schedule

RDE00400 RDE

RDE00401 RDE

No. of days
delayed from
scheduled
date
C

Formulation of
requirements
specification as per
schedule
Coding and testing as
per schedule

RDE00402 RDE

Implementation and
modifications as per
schedule

RDE00403 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Timely development of
software packages/
modules (#2) for
improving R&D capability
as per schedule

RDE00500 RDE

RDE00501 RDE

C
Formulation of
requirements
specification as per
schedule
Coding and testing as
per schedule

RDE00502 RDE
Implementation and
modifications as per
schedule

RDE00503 RDE

No. of days
delayed from
scheduled
date

Timely development of
software packages/
modules(#3) for
improving R&D capability
as per schedule

RDE00600 RDE

RDE00601 RDE

C
Formulation of
requirements
specification as per
schedule
Coding and testing as
per schedule

RDE00602 RDE
Implementation and
modifications as per
schedule

RDE00603 RDE
Identification of
advanced technology
programmes through
Networking/
Collaborative research

RDE00700 RDE

RDE00800 RDE

No. of days
delayed from
scheduled
date

No. of projects
identified

C
Preparation of long-term
vision and road map for
new areas as per
schedule

No. of days
delayed from
scheduled
date

RDE00900 RDE

Bench marking /
Feasibility study /
Forecasting / Literature
Survey / Technology
scanning

No. of days
delayed from
scheduled
date

Number of
items
developed as
per target
dates

No. of days
delayed from
scheduled
date

No. of projects/ related


milestones completed for
modernization &
upgradation of testing
facilities as per schedule

RDE01000 RDE

C
No. of processes
updated as per schedule

RDE01100

RDE

RDE01200 RDE

No. of days
delayed from
scheduled
date
% reduction in
cycle time

Reduction in cycle time


through improvements in
technology/ process/
tools

C
Time Index

New testing procedures/


standards/ equipment/
processes established

RDE01300 RDE

C
Documentation for
technology transfer
process as per schedule

RDE01400 RDE
Development of new jigs
and fixtures for new
equipment/ machines

RDE01500 RDE

No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

RDE01600 RDE

C
No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

RDE01700 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

RDE01800 RDE

RDE01900 RDE

RDE02200 RDE

C
Timely completion of
R&D project(#1) for
product/process
development as per
schedule

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Fabrication /Assembly of
prototype as per
schedule

RDE02203 RDE

No. of days
delayed from
scheduled
date

Specification and
procurement of project
material / eqpt./prototype

RDE02202 RDE

No. of days
delayed from
scheduled
date

Design finalisation as per


schedule

RDE02201 RDE

No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

RDE02100 RDE

No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

RDE02000 RDE

N
No. of days
delayed from
scheduled
date

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No.
& other details of project to
be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Testing and modification


as per schedule

RDE02204 RDE
Documentation of
develoment process as
per schedule

RDE02205 RDE

RDE02300 RDE

Timely completion of
R&D project(#2) for
product/process
development as per
schedule

No. of days
delayed from
scheduled
date
O

Design finalisation as per


schedule

RDE02301 RDE
Specification and
procurement of project
material / eqpt./prototype

RDE02302 RDE
Fabrication /Assembly of
prototype as per
schedule

RDE02303 RDE
Testing and modification
as per schedule

RDE02304 RDE
Documentation of
develoment process as
per schedule

RDE02305 RDE

RDE02400 RDE

Timely completion of
R&D project(#3) for
product/process
development as per
schedule

No. of days
delayed from
scheduled
date
O

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Design finalisation as per


schedule

RDE02401 RDE
Specification and
procurement of project
material / eqpt./prototype

RDE02402 RDE
Fabrication /Assembly of
prototype as per
schedule

RDE02403 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Testing and modification


as per schedule

RDE02404 RDE
Documentation of
develoment process as
per schedule

RDE02405 RDE

No. of days
delayed from
scheduled
date

Timely completion of
commercial project(#1)
activities and milestones
as per target as per
schedule

RDE02500 RDE

RDE02501 RDE

O
Assimilation of all project
related data and
information as per
schedule
Planning and timely
procurement of required
inputs as per schedule

RDE02502 RDE

RDE02503 RDE

Timely completion of
targeted activities and
milestones as per
schedule

No. of days
delayed from
scheduled
date

Timely completion of
commercial project(#2)
activities and milestones
as per target as per
schedule

RDE02600 RDE

RDE02601 RDE

O
Assimilation of all project
related data and
information as per
schedule
Planning and timely
procurement of required
inputs as per schedule

RDE02602 RDE

RDE02603 RDE

Timely completion of
targeted activities and
milestones as per
schedule

No. of days
delayed from
scheduled
date

Timely completion of
commercial project(#3)
activities and milestones
as per target as per
schedule

RDE02700 RDE

RDE02701 RDE

Assimilation of all project


related data and
information as per
schedule

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Planning and timely


procurement of required
inputs as per schedule

RDE02702 RDE

RDE02703 RDE

RDE02800 RDE

Timely completion of
targeted activities and
milestones as per
schedule
Product/System
Improvements as
required by Business
Sector/ Units as per
schedule

Finalisation of
improvements planned
through benchmarking
with competing products
as per schedule

RDE02801 RDE

No. of days
delayed from
scheduled
date
O

Timely completion of
improvement activities
as per schedule

RDE02802 RDE
Implementation of
improvements at Units/
sites as per schedule

RDE02803 RDE

RDE02804 RDE

RDE02900 RDE

Making procedure &


documenting the
improvement for KM
portal as per schedule
Preparation and
submission of
development project
proposals as per
schedule

RDE03100 RDE

Customer
requirements
Timely development of
software packages/
modules for external use
as per schedule

No. of days
delayed from
scheduled
date
No. of
proposals
submitted in
required time

Preparation and
submission of
commercial project
proposals as per

RDE03000 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Formulation of
requirements
specification as per
schedule

RDE03101 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of
presentations
to prospective
customers
Y

No. of days
delayed from
scheduled
date

Coding and testing as


per schedule

RDE03102 RDE
Implementation and
modifications as per
schedule

RDE03103 RDE
New technological
capability building as per
schedule

RDE03200 RDE
Identification of scheme
and preparation of
project report

RDE03201 RDE
Planning and
procurement of inputs as
per schedule

RDE03202 RDE
Implementation of
scheme as per schedule

RDE03203 RDE
Achieving target of direct
commercialization of
R&D products & services

RDE03300 RDE

O
Marketing efforts for
commercialization of
new developments

RDE03400 RDE
Implementation of
system improvement
projects as per schedule

RDE03500 RDE

RDE03600 RDE

Cost savings through


value engg. projects/
new processes/ subcontracting

Completion
Date as per
target / No. of
days delayed
from
scheduled
date

%
achievement
of targeted
turnover

% saving
achieved vis-vis target

Number of
analysis
reports issued
vis--vis target N

Number of
reports issued
vis--vis target N

Analysis and modelling


of systems / Product /

process
RDE03700 RDE

RDE03800 RDE

Test & analysis reports


issued vis--vis
envisaged

% availability
over targeted
value

Maintenance and
calibration of Lab/ Plant
equipment/ Instrument/
accessories

RDE03900 RDE

RDE04000 RDE

Maintenance and
upkeep of accredited
labs

RDE04100 RDE

Raising
objections/contesting
competetors' patents

Renewal of
certificates as
per schedule Y

Time Index
O

Projects for capturing


expertise for Knowledge
Management System as
per schedule

RDE04200 RDE

RDE04300 RDE

C
Assimilation of know-why
of product designs
obtained through
collaboration

Number of
know-why
reports
generated
No of
documents
generated as
per target

Documentation of new
learnings and concepts
from executed projects
for strengthening R&D
process

RDE04400 RDE

No. of days
delayed from
scheduled
date

C
No. of days
delayed from
scheduled
date

Timely completion of
project / milestones on
absorption of product
technology (know why)
as per schedule

RDE04500 RDE

O
Development of
Knowledge management
Portal

No. of days
delayed from
scheduled
date

RDE04600 RDE

Number

RDE04700 RDE

Contributing case
studies etc.for
Knowledge Management
Portal
C
Completion of KM
Projects as per schedule

Time Index

RDE04800 RDE

% of referred
problems
solved

Investigation and
recommendations for
resolution of Plant/ Site/
Customer problems

RDE04900 RDE

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

No of training
programmes
completed
N

Understanding and
resolution of the problem
as per schedule

RDE04901 RDE
Implementation and
feedback from site as
per schedule

RDE04902 RDE
No. of problems resolved
through networking with
national/iinternational
experts

RDE05000 RDE

%. of
problems
resolved
O
% uptime

Field support to new


products at customer site

RDE05100 RDE

RDE05200 RDE

No of technical papers in
journals
O

RDE05300 RDE

No of technical papers in
conferences
O

RDE05400 RDE

Preparation of Capital
Budget- Proposals

Achievement of Capital
Budget as per schedule

RDE05500 RDE
Specification and
procurement of capital
material / equipment

RDE05501 RDE
Imparting structured
training

RDE05600 RDE
Skills development for
self and subordinates in
key technological areas

RDE05700 RDE

RDE05800 RDE

O
Timely completion of
Technology Audit in
identified areas as per
schedule

No. of papers
submitted
No. of papers
submitted
Time Index

Number of
hours used for
training
No. of days
delayed from
scheduled
date

Reply to Govt. Audit


queries/ Inspection
report paras/ Action
Taken Reports etc.
furnished within specified
time (2 weeks)

RDE05900 RDE

RDE06000 RDE

O
Reply/settlement of
Internal Audit paras
within specified time (4
weeks)

O
Finalisation of Functional
scorecard by specified
date

RDE06301 RDE

O
Improvement in
Employee Satisfaction
Score

No. of days
delayed from
scheduled
date

RDE06400 RDE

Increase in no. of active


Quality Circles in the
deptt.
C

Number of
new circles
TQM Score

RDE06500 RDE

Achieving Business
excellence thru' TQM at
Deptt. level

Preparation of action
plan based on Position
report

RDE06600 RDE

No. of days
delayed from
scheduled
date

Time Index

Implementation of
Improvement projects
identified in the Position
Report as per schedule

C
Facilitating funding of
R&D projects form
external sources as per
schedule

Time Index

RDE06302 RDE

RDE06502 RDE

Score

Implementation of
Improvement projects
identified in the Position
Report as per schedule

RDE06501 RDE

Time Index

Timely inputs to
unit/corporate finance for
BUDGET/FLASH/MIRs
etc.

RDE06300 RDE

Time Index

RDE06200 RDE

Timely inputs to
unit/corporate finance for
inter-unit re-conciliationof
accounts

RDE06100 RDE

No. of days
delayed from
scheduled
date

Conducting market
survey for new products
as per schedule

RDE06700 RDE
RDE06800 RDE

O
Vendor development for
new products

Operating existing
processes/ plants for
collection/ assimilation
and analysis of operating
data

RDE06900 RDE

Number of
vendors
No. of runs

O
Technical support to
other Units/ Departments
as per schedule

RDE07000 RDE

RDE07100 RDE

No. of days
delayed from
scheduled
date

O
Planning and
organization of
"Standardization
Programme of BHEL" as
per schedule

No. of days
delayed from
scheduled
date
No. of days
delayed from
scheduled
date

No. of days
delayed from
scheduled
date

Review of earlier work


and preparation of basic
working guidelines for
the near future

RDE07200 RDE

RDE07300 RDE

Review of Standards /
Specs and follow up with
respect to WGs.
O

Number of
documents

Review of Standards /
Specs and follow up with
respect to Electrical
/Electronics work groups

Number of
documents

RDE07301 RDE

O
Number of
documents

RDE07302 RDE

Review of Standards /
Specs and follow up with
respect to Metallurgy
workgroup.
O
Review of Standards /
Specs and follow up with
respect to Mechanical
work group

Number of
documents

RDE07303 RDE

O
Number of
documents

RDE07304 RDE

Review of Standards /
Specs and follow up with
respect to other work
groups.
O

RDE07400 RDE

Review of standards
/specs and follow-up
with respect to MRCs

Number of
documents

Number of
documents

RDE07401 RDE

Review of standards
/specs and follow-up
with respect to electrical
items
O

Number of
documents

RDE07402 RDE

Review of standards
/specs and follow-up
with respect to
metallurgical items

RDE07403 RDE

Review of standards
/specs and follow-up
with respect to
mechanical items

RDE07600

RDE

RDE07700

RDE07800
RDE
RDE07900

RDE
RDE08000

O
Issue of Corporate
Standards, Specs and
MCCs
Identification of new
areas for
standardization,
Unification and taking
follow up action

No. of Pages
O
No. of Pages

O
No. of issues
No. of docs

RDE

Development of Systems
/ Methods as per
schedule
O
Conceptualisation and
preparation of IPR Policy
/ IPM Manual /
Development of Methods
& Systems / Creation of
IPRs

%comp. of
target

RDE

No. of Pages

Preparation and Issue of


O
Standards Bulletin

RDE08200

RDE08301

No. of Pages

RDE

RDE08100

RDE08300

Number of new
standards/specifications
proposed and discussed

RDE

No. of days
delayed from
scheduled
date

O
Number of new drafts/
revisions circulated

Number of
documents

Tracking changes of
National/International
standards, in the areas
of relevance to BHEL
and Preparation of
Agenda and Issue of
MOMs as per schedule

RDE07500 RDE

RDE

Converting IPR
applications to IPRs

RDE

Filing of new IPR


applications

%comp. of
target
No. of IPRs

RDE08400

RDE
RDE08401

RDE

O
Shortlisting/ Facilitating
& Submission of award
entries for Corporate/
Unit level IPR awards

RDE
RDE08500

RDE
RDE08600 RDE
RDE08601
RDE

RDE08603

IPR Protection
Patent Office Journal
Scan

RDE

C
Agreements/Payments
to Attorneys and related
agencies in IPR area

O
No. of docs

RDE

Information
dissemination in the area
of IPM
C
Organising seminars and
programmes on IPM

No. of events

RDE08701
RDE
RDE08800

RDE

RDE

Deciding Maintainability
of IPRs

RDE

Obtaining information on
Commercialisation /
value addition /
Utilisation of patents
O
Patent Intelligence

RDE

RDE
RDE09002 RDE

C
Product / Area wise
Patent Mapping
Patent Search

Y
Y

N
N

N
N

N
N

N
N

N
N

No. of Issues

IPM Bulletin, data


collection/preparation /
editing and issue

RDE08901

RDE09001

%comp. of
target
%No. of IPRs
No. of issues
covered
%comp. of
target
%comp. of
target
%comp. of
target

RDE
RDE08700

RDE09000

IPR Infringement

RDE08604

RDE08900

O
C

IPR Opposition

RDE

%comp. of
traget
C

MIRs and Exception


reports

Y
%comp. of
target

Data validation and


hosting of IPR
information on VPN site,
e-conversion of BHEL
patents/abstracts and
hyper linking

RDE08402

RDE08602

No. of
paraameters

Meeting the BSC


parameters through
geneartion of reports on
various data, analysis
and actual
implementation.

C
C

%comp. of
target
No. of docs

%comp. of
target
%comp. of
target
No. of docs

RDE09003
RDE

O
No of product
serviced

RDE

Identification of patents
of relevance in the areas
of interest to BHEL for
buying.
C

RDE

Intellectual property
assessment

No. of reports

RDE09100

RDE09200

No. of docs

Downloading of patents
required during the
process related to IPRs

RDE09300

RDE09400

C
Technical Finalisation of
Tenders for procurement
of New Facilities of
capital nature.

RDE

Balanced
Scorecard
Rating
(5/4/3/2/1)

Accomplishment of
targets of
Unit/NC/Function/Depart
ment level Balance
Score Card

RDE

No. of days
delayed from
scheduled
date

TION KRA MASTER - 2006-07


Suggested Weightage for
category
A
B
C

Source of Data for


Measurement

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

KRA Remarks

Deptt. records

Deptt. records

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Divisional
records

Divisional
records

Deptt. records

Divisional
records

Divisional
records

Divisional
records

Divisional
records

Divisional
records

Departmental
records

Project report

Project report

Project report

Project report

Project report

Project report

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Project status
reports submitted
to PMS Deptt. &
TC/PC

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Deptt. records

Comml Deptt.
reports

Dept. records

Divisional
records

Divisional
records

Comml Deptt.
reports

Dept. records

Divisional
records

Divisional
records

Comml Deptt.
reports

Dept. records

Divisional
records

Divisional
records

Reports
submitted to
respective units

Divisional
records

Divisional
records

Divisional
records

Divisional
records

Plg & Mgmnt


Services Deptt.
Records

Comml. Deptt.
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Depart- mental
records

Divisional
records

Divisional
records

Divisional
records

Divisional
records

Comml. Deptt.

Comml. Deptt.
records

Divisional
records

Divisional
records

Departmental
records

Deptt. records

Deptt. records

Departmental
records

Records of
Patents deptt.

Divisional
records

Divisional
records

Divisional
records

Divisional
records

Project report

Depart- mental
records

Depart- mental
records

Depart- mental
records

Record of
problems
referred

Departmental
records

HR Deptt.

HR Deptt.
Divisional
records

Divisional
records

Deptt. records
Divisional
records

Deptt. records

Divisional
records

Record
maintained by
Audit deptt.

Record
maintained by
Audit deptt.

Record
maintained by
individual/ deptt.

Record
maintained by
Unit/Corp.
Finance deptt.

Record
maintained by
Unit Head/Unit
P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan
document

Project report

Departmental
records

Departmental
records
Departmental
records

Departmental
records

Departmental
records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Rating declared
at year end by
Corporate / Unit
Management
H

Deptl. Records

Deptl. Records

L
M

M
H

H
H

Deptl. Records
Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records

H
H

H
H

H
H

Deptl. Records
Deptl. Records

Deptl. Records

Deptl. Records

Deptl. Records
Rating declared
at year end by
Corporate / Unit
Management

X
Departmental
plan and record.

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970 RDE0970
0
0
0
0
0
0
0
0
0
0

RDE0970 RDE0970 RDE0970


0
0
0

PRODUCTIVITY / MS FUNCTION KRA MAST


KRA Id

Function

KRA Description

KRA
Type

Unit of
Measurement

Critical
KRA (Y/N)

MSX00100

MSX

Organising Theme based drives/


Suggestors & IMPRESS
Workshops/ Productivity
Competitions/ Award functions etc

Nos. of
programmes

MSX00200

MSX

Creation, implementation,
operation and refinement of the
on-line system for registration of
Suggestions

Nos. of
suggestions
registered.

MSX00201

MSX

Monitoring the status of


suggestions through periodic
exception reports, generated as
per schedule.

Nos of reports
issued

MSX00202

MSX

Processing of Suggestions &


award payment within specified
Time.

% awarded
within specified
time

MSX00300

MSX

Creation, implementation,
operation and refinement of the
on-line system for registration of
Improvement Projects

Nos. of projects
registered.

MSX00301

MSX

Monitoring the status of


Improvement Projects through
periodic exception reports,
generated as per schedule.

Nos of reports
issued

MSX00302

MSX

Processing and evaluation of


Improvement projects & award
payment within specified Time.

% awarded
within specified
time

MSX00303

MSX

Cost reduction thro projects


undertaken in Productivity Thrust
Areas viz. Value engineering/
Economic Buying/ material
Utilisation/ Energy Conservation/
Scrap Reduction/ War on
Wastage, etc.

Total Savings as
% of Budget
value

MSX00400

MSX

Analysis & Feedback on


Productivity related performance
parameters within specified time,
including timely trend reports.

No. of days
delayed from
scheduled date

MSX00500

MSX

Shortlisting/ Facilitating &


Submission of award entries for
Corporate/ State/ National level
awards viz. Excel/ VRP/ SV/
NPC/ INSSAN etc.

Targetted Nos. of
entries

MSX00501

MSX

Scanning of opportunities and


organising Targetted No. of
Entries

Targetted Nos. of
proposals

MSX00502

MSX

Screening / Refinement and


Submission of Entries

Days before due


date for
submission

MSX00600

MSX

Formulate/ Issue & implemention


of Productivity function related
policy/ Guidelines viz. Award
Scheme for Improvement
Projects.

No. of days
delayed from
scheduled date

MSX00601

MSX

Development & Issue of


productivity related policy
guidelines

No. of days
delayed from
scheduled date

MSX00602

MSX

Follow up Implementation of
productivity related policy
guidelines.

% Area covered

MSX00700

MSX

Processing of entries from


different units, for Excel awards,
within specified period for
function in Nov

No. of days
delayed from
scheduled date

MSX00800

MSX

Awareness generation to imbibe


productivity culture amongst
employees

Nos of initiatives
planned

MSX00801

MSX

Imparting specialised inputs


through training programmes/
inter unit exchange

Mandays

MSX00802

MSX

Scanning best practices and


sharing case-studies.

No. of case
studies hosted
on the
Knowledge
sharing portal

MSX00900

MSX

Create a system for capturing the


savings from PIP's and
suggestions

No. of days
delayed from
scheduled date

MSX01000

MSX

Preparing a compendium of
award winners

No. of days
delayed from
scheduled date

MSX01100

MSX

Maintaining a knowledge sharing


portal for Productivity issues

No. of days
delayed from
scheduled date

MSX01200

MSX

Creating a web based system to


track the progress of productivity
projects

No. of days
delayed from
scheduled date

MSX01300

MSX

Development of new systems/


Mgmt. Instruction within specified
time.

No. of days
delayed from
scheduled date

MSX01400

MSX

System Modifications within


specified time

No. of days
delayed from
scheduled date

MSX01500

MSX

Number

MSX01600

MSX

Form Design/ Improvement/


Simplification
Organise Pre-Audit*
preparedness review.

% closing of MI
related NCRs,
raised during
previous Audit.

MSX01601

MSX

MSX

% achievement
of target
No. of WC
proposals
evaluated.

MSX01700

Auditing targetted number of MIs


by the systems' group
Evaluation of 'Works Contract'
proposal based on norms &
Target within specfied time

MSX01701

MSX

Building & Updating database for


evaluation

No. of days
delayed from
scheduled date

MSX01702

MSX

Proposal Scrutiny &


Recommendation

No. of days
delayed from
scheduled date

MSX01800

MSX

Recommendation for
Redeployment of manpower to
deficit area

%
recommendation
s met

MSX01900

MSX

Plan/ Conduct & Finalise studies


for Review/ Development of
Norms

No. of days
delayed from
scheduled date

MSX01901

MSX

Norms Development IE

No. of days
delayed from
scheduled date

MSX01902

MSX

Revalidation of Time Standards

No. of days
delayed from
scheduled date

MSX02000

MSX

Savings through IE
studies/scrutiny in areas viz
Indirect material/ Maintenance/
Spares/Tooling etc

% achieved /
targeted

MSX02100

MSX

Plan/ Conduct & Implement


Studies for Methods / Systems
Improvement

No. of days
delayed from
scheduled date

MSX02200

MSX

Post Investment Evaluation of


Schemes / Major Capital Items
within specified time

% evaluations
completed wrt
planned.

MSX02201

MSX

Facilitating Improvement in
utilization of critical M/cs

% improvement
achieved

MSX02300

MSX

Development/ Approval &


Implementation of Proposal for
Relocation of Plant & M/cs / office
area.

No. of days
delayed from
scheduled date

MSX02301

MSX

Developing Alternative layouts


Plant and M/c and office

No. of days
delayed from
scheduled date

MSX02302

MSX

Implementation of Approved
Relocation Plan in specified time.

No. of days
delayed from
scheduled date

MSX02400

MSX

Recommendation/ Approval for


disposal of Redundant Plant &
M/cs

No. of days
delayed from
scheduled date

MSX02401

MSX

Identification of redundant
facilities

No. of days
delayed from
scheduled date

MSX02402

MSX

Formulation of proposals for


approval of disposal of redundant
facilities within specified time

No. of days
delayed from
scheduled date

MSX02403

MSX

Facilitating transfer/ disposal of


surplus/ Condemned Plant &
M/cs

No. of days
delayed from
scheduled date

MSX02500

MSX

Time Index

MSX02600

MSX

Completion of Special
Assignments as per request
Achievement of 'Unit Level'
targets for major improvement
initiatives like '5S' Implementation

Index/ Score

MSX02601

MSX

Facilitating Implemenation of 5-Sspecific milestones

100XNos. of
areas covered /
Nos. planned

MSX02602

MSX

Number

MSX02700

MSX

Audit & Computation of 5-S Index


in areas covered.
Review of BIS standards ( and
like documents ), as per specified
time schedule

No. of days
delayed from
scheduled date

MSX02800

MSX

Implementation of Productivity
Linked Incentive scheme /
Approval of proposal of Extended
hours

No. of days
delayed from
scheduled date

MSX02900

MSX

Reply to Govt. Audit queries,


Inspection report paras, Action
Taken Reports etc. furnished
within specified time (2 weeks)

MSX03000

MSX

Reply/settlement of Internal Audit


paras within specified time (4
weeks)

MSX03100

MSX

Timely inputs to unit/ corporate


finance for inter-unit reconciliation of accounts

Time Index

MSX03200

MSX

Timely inputs to unit/ corporate


finance for BUDGET/ FLASH/
MIRs etc.

Time Index

MSX03300

MSX

Finalisation of Functional
scorecard by specified date

No. of days
delayed from
scheduled date

MSX03400

MSX

Improvement in Employee
Satisfaction Score

Score

MSX03401

MSX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

MSX03500

MSX

MSX03600

MSX

MSX03601

MSX

Increase in no. of active Quality


Circles in the deptt.
Achieving Business excellence
thru' TQM at Deptt. level
Preparation of action plan based
on Position report

No. of days
delayed from
scheduled date

MSX03602

MSX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

MSX03700

MSX

Development of Knowledge
management Portal

No. of days
delayed from
scheduled date

MSX03800

MSX

Contributing case studies etc.for


Knowledge Management Portal

Number

MSX03900

MSX

Time Index

MSX04000

MSX

Completion of KM Projects as per


schedule
Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

Number of new
circles
TQM Score

N
Y

MSX04100

MSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

MSX04200

MSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

MSX04300

MSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

MSX04400

MSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

MSX04500

MSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per schedule
(Registration No. & other details
of project to be specified in the
boxes provided against the KRA)

No. of days
delayed from
scheduled date

MSX04600

MSX

Accomplishment of targets of
Unit/NC/Function/Department
level Balance Score Card

Balanced
Scorecard Rating
(5/4/3/2/1)

NCTION KRA MASTER - 2006-07


Special
KRA
(Y/N)
N

Universal
Suggested
Source Of Data For
KRA
Weightage for
Measurement
(Y/N)
category
A
B
C
N
H
H
H
Score Card

Score Card
On-line system MIR

As per Plan
Deptt records

Deptt. Record / Mgmt.


Instruction

Score Card
On-line system MIR

On-line system

On-line system

Score Card
On-line system MIR

As per Plan
Deptt records

KRA Remarks

Manual registration,
to be switched to online system.

IMPRES

As per Plan
Deptt records

Nomination Proposals

Deptt. Record

As per Deptt plan

As per implementation
plan

As per implementation
plan

As per plan

As per Plan

As per Plan

As per Plan

Certification by HOD

Departmental record

On-line record

Certification by HOD

may be deleted in
07-08

may be deleted 0708

As per Plan

Departmental record

System file

Audit report

As per plan

WC Proposals

As per Plan

As per Plan

Redeployment plan
Actual Posting

As per Plan

As per Plan

As per Plan

Budget proposals
study Reports

As per Plan

Depttal records

BSC & MIR 20.2

Proposals

Proposals

Proposals

As per Plan

As per Plan

Proposal records

As per Plan

Reports

BSC/ Audit Document

Departmental plan

Audit sheets

Departmental records

Proposal records

Record maintained by Targets to be set as


Audit deptt.
follows: 100% casesL5; 95-99% casesL4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

Record maintained by Targets to be set as


Audit deptt.
follows: 100% casesL5; 95-99% casesL4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Case Document

Project report

Project report

Questionnaire
developed by CQA to
be adopted .

Project report

Project report

Project report

Project report

Project report

Rating declared at
year end by
Corporate / Unit
Management

This KRA will be


taken by Head of
Unit /Function /
Department , if
covered under MAP,
and can be assigned
a weightage upto
100%

INFORMATION
KRA ID

Function

KRA Description

KRA
Type

IFX00100

IFX

Completion of targeted projects/ applications within specified time

IFX00101
IFX00102
IFX00103
IFX00104
IFX00200

IFX
IFX
IFX
IFX
IFX

Identification/ Planning/ Feasibility study & review of targeted projects


System Analysis & Design of targeted projects
Coding & Testing of targeted projects
Master data creation
Completion of targeted projects/ applications within specified time

O
O
O
O
O

IFX00201
IFX00202
IFX00203
IFX00204
IFX00300

IFX
IFX
IFX
IFX
IFX

Identification/ Planning/ Feasibility study & review of targeted projects


System Analysis & Design of targeted projects
Coding & Testing of targeted projects
Master data creation
Completion of targeted projects/ applications within specified time

O
O
O
O
O

IFX00301
IFX00302
IFX00303
IFX00304
IFX00400

IFX
IFX
IFX
IFX
IFX

Identification/ Planning/ Feasibility study & review of targeted projects


System Analysis & Design of targeted projects
Coding & Testing of targeted projects
Master data creation
Completion of targeted projects/ applications within specified time

O
O
O
O
O

IFX00401
IFX00402
IFX00403
IFX00404
IFX00500

IFX
IFX
IFX
IFX
IFX

Identification/ Planning/ Feasibility study & review of targeted projects


System Analysis & Design of targeted projects
Coding & Testing of targeted projects
Master data creation
Completion of targeted projects/ applications within specified time

O
O
O
O
O

IFX00501
IFX00502
IFX00503
IFX00504

IFX
IFX
IFX
IFX

Identification/ Planning/ Feasibility study & review of targeted projects


System Analysis & Design of targeted projects
Coding & Testing of targeted projects
Master data creation

O
O
O
O

IFX00600

IFX

Completion of adhoc requirements for system development and review

IFX00601

IFX

IFX00602
IFX00603
IFX00604

IFX
IFX
IFX

Planning/ Feasibility study & review of adhoc requirements for system


development
System Analysis & Design of adhoc requirements for system
development
Coding & Testing of adhoc requirements for system development
Master data creation

IFX00700
IFX00701

IFX
IFX

Productivity projects undertaken


Identification & review of targeted improvement projects

C
C

IFX00702
IFX00703

IFX
IFX

System Analysis & Design of applications under productivity projects


Coding & Testing of applications under productivity projects

C
C

O
O
O
O

IFX00800

IFX

Implementation of targeted applications

IFX00801
IFX00802

IFX
IFX

Planning and review for implementation of targeted applications


End user training for implementation of targeted applications

O
O

IFX00803

IFX

IFX00900

IFX

Trial run & go live for implementation of targeted applications


Conversion of legacy applications to current technology within specified
time

IFX00901
IFX00902
IFX00903

IFX
IFX
IFX

Migration planning & review of conversion projects


Integration analysis & redesign of targeted conversion projects
Coding & Testing of the targeted conversion projects

C
C
C

IFX01000
IFX01001
IFX01002
IFX01003

IFX
IFX
IFX
IFX

Percent completion of targeted documentation as per standards


Planning and review for documentation of targeted applications
Issue of User Documentation for targeted applications
System Documentation for targeted applications

C
O
O
O

IFX01100

IFX

Reply to Govt. Audit queries/ Inspection report paras/ Action Taken


Reports etc. furnished within specified time (2 weeks)

IFX01200

IFX

IFX01300

IFX

Reply/settlement of Internal Audit paras within specified time (4 weeks)


Timely inputs to unit/corporate finance for inter-unit re-conciliation of
accounts

IFX01400
IFX01500

IFX
IFX

Timely inputs to unit/corporate finance for BUDGET/ FLASH/ MIRs etc.


Review / Audit of implemented IT Systems as per schedule.

O
C

IFX01600
IFX01601

IFX
IFX

C
C

IFX01602
IFX01603

IFX
IFX

Introduction of new technology within specified time


Planning for new technology projects & Monitoring
Scanning / learning & Identification of projects for introduction of new
technology
Execution of Pilot projects related to new technology

IFX01700

IFX

IFX01701

IFX

IFX01800

IFX

Asset management of computer hardware and software


Creation and maintenance of asset database and generation of
downtime reports
Augmentation of IT facilities including hardware/ software/ networking
and other infrastructure

IFX01801

IFX

IFX01802

IFX

Planning/ Budget approvals and review for augmentation of IT facilities


Preparation of Specifications & Indent generation for targeted
augmentation of IT facilities

IFX01803

IFX

IFX01900
IFX01901

IFX
IFX

PO / Works Contract Placement for targeted IT facilities


Procurement and control of IT Consumables & AMC's of existing IT
resources
Planning/ Budget approvals and review for IT consumables

IFX01902

IFX

Preparation of Specifications & Indent generation for IT consumables

C
C

O
C

O
O

IFX01903

IFX

IFX02000

IFX

IFX02001

IFX

IFX02002

IFX

IFX02003
IFX02100

IFX
IFX

IFX02101

IFX

IFX02102

IFX

IFX02103
IFX02200

IFX
IFX

IFX02201

IFX

IFX02202
IFX02300

IFX
IFX

IFX02301

IFX

IFX02302

PO / Works Contract Placement for IT consumables


Management of IT facilities (Servers/Workstations/ Network
equipment )

Planning for Contingency and monitoring of IT facilities


Improving complaint resolution time through better coordination with
maintenance staff for upkeep of IT facilities

Reporting of problems & Generation of logs of downtime of IT facilities


Availability of Application Systems / Databases
Planning for Contingency and monitoring of application systems and
databases
Improving complaint resolution time through better coordination with
DBA and system developer
Reporting of problems & generation of log related to applications and
database
Improving response time to cater to user complaints
Periodic review of complaints records and monitoring of critical
complaints

O
O

O
O

IFX

Recording of complaints and allocation for resolution


Uptime of power-conditioning/ air-conditioning equipment
Periodic review of complaints records and monitoring of critical
complaints related to power equipment/ air-conditioning
Allocation and coordination for resolution of complaints related to
power/ air-conditioning

IFX02303
IFX02400
IFX02401
IFX02402
IFX02403
IFX02500
IFX02501
IFX02502
IFX02503
IFX02600
IFX02601
IFX02602
IFX02603
IFX02604

IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX
IFX

Recording and reporting of complaints related to power/ air-conditioning


Increase in Internal Customer satisfaction score
Planning for survey & Corrective actions
Analysis of internal customer survey results
conduction of internal customer survey
Manpower developed in contemporary IT skill set
Identification of requirements related to skill development
Planning of skill development programs
Execution of skill development plan
Programs conducted for user training at different levels
Identification of user training requirements & monitoring
Finalisation of user training program
Execution of user training programs
Support to users through Help desk

O
O
O
O
O
C
C
C
C
O
O
O
O
O

IFX02605
IFX02700
IFX02701

IFX
IFX
IFX

O
C
O

IFX02702

IFX

IFX02800

IFX

IFX02801
IFX02802

IFX
IFX

Effectiveness analysis of training programs


Achieving Business excellence thru' TQM at Deptt. level
Preparation of action plan based on Position report
Implementation of Improvement projects identified in the Position
Report as per schedule
Finalisation & issue of IT related policies/ strategic plans & their
implementation
Formulation of IT related policy guide lines/ plan document & issue
policy document within specified time
Preparation of action plan for implementation of IT related policies

C
O
O
O
O

O
O

C
C
C
C

Implementation of action plan for IT related policies within specified


time.

IFX02803

IFX

IFX02900
IFX02901
IFX02902
IFX02903

IFX
IFX
IFX
IFX

IFX03000

IFX

IFX03001

IFX

IFX03002
IFX03003

IFX
IFX

Issue of targeted policy documents within specified time


Issue of final Policy Documentation
Draft Document Preparation for IT related policies
Study of national / international standards
Projects developed/completed with technology/best practices absorbed
from collaborators/partners
Develop time bound plan & monitoring of projects related to absorption
of technology/ best practices of collaborator/ partner
Project monitoring & issue of documents containing assimilated
knowledge of collaborator/ partner within specified time.
Study of systems & practices of collaborator/ partner

IFX03100
IFX03101

IFX
IFX

Identification of business area for IT related business by targetted date.


Identification of business partner for joint working

O
C

IFX03102
IFX03103
IFX03200

IFX
IFX
IFX

O
O
O

IFX03201

IFX

IFX03202
IFX03203
IFX03204

IFX
IFX
IFX

Finalisation of MOU / JV with business partner within a specified time


Draft MOU/JV Document Preparation
Business generated from new IT initiatives
Identification of IT products for joint development and assessment of
market potential
Issue of technical recommendations and manpower planning for joint
projects with business partners within specified time
Development of targeted products
Marketing of targeted products

IFX03300
IFX03400
IFX03500
IFX03600
IFX03700

IFX
IFX
IFX
IFX
IFX

IFX03800

IFX03900

IFX04000

IFX04100

IFX04200

IFX04300

Finalisation of Functional scorecard by specified date

C
C
C
C
C
C
O
C
C

C
O
C
O

Contributing case studies etc.for Knowledge Management Portal


Completion of KM Projects as per schedule

O
C
O
C
C

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

IFX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

Increase effectiveness of Quality Circles in the deptt.


Development of Knowledge management Portal

IFX04400

IFX

IFX04500

IFX

IFX04501

IFX

IFX04502

IFX

IFX04503

IFX

IFX04600
IFX04700

IFX
IFX

IFX04701
IFX04702
IFX04703

IFX
IFX
IFX

IFX04704

IFX
IFX
IFX

IFX04800
IFX04900

Accomplishment of targets of Unit/NC/Function/Department level


Balance Score Card
Completion of milestones for appointment of Advisory/ Consulting
services for IT initiatives/ Projects
Finalising the terms of reference and deliverables for Selection and
Appointment of advisor / Consultant
Preparation of documents and issue of tenders for appointment of
Consultant by specified date
Finalisation of Contract and issue of appointment order for consultant
by specified date
Building of systems for Compliance to IT Related Statuatory
Regulations.
Completion of milestones for availing Advisory/ Consulting services.
Study and sharing of Reports on key strategic topics with interested
groups.
Queries raised to advisor and their closing within specified time
Organizing workshops/conferences with advisor.

C
C
C
C
C
C
C
C
C
O

Raising Reports/Action plans based on Queries/Reports/Conferences


with Advisor / consultant within specified time.

Improvement in Employee Satisfaction Score


Increase in no. of active Quality Circles in the deptt.

O
O

INFORMATION TECHNOLOGY FUNCTION KRA MASTER - 2006-07


Unit of Measurement

Critical
KRA
(Y/N)

Special
KRA
(Y/N)

%Completion with weightages


S(%X*Wx) %X=%completion of project X/ Wx=
Weightage of Project X

Y
Y
Y
Y
Y

N
N
N
N
N

N
N
N
N
N

H
M
L
L
H

Y
Y
Y
Y
Y

N
N
N
N
N

N
N
N
N
N

H
M
L
L
H

Y
Y
Y
Y
Y

N
N
N
N
N

N
N
N
N
N

H
M
L
L
H

Y
Y
Y
Y
Y

N
N
N
N
N

N
N
N
N
N

H
M
L
L
H

Time Index
Time Index
Time Index

Y
Y
Y
Y

N
N
N
N

N
N
N
N

H
M
L
L

%Completion

Time Index
Time Index

Y
Y
Y

N
N
N

N
N
N

L
L
L

Total Savings
Number

Y
N

N
N

N
N

H
H

N
N

N
N

N
N

L
L

Time Index
Time Index
Time Index
%Completion with weightages
S(%X*Wx) %X=%completion of project X/ Wx=
Weightage of Project X
Time Index
Time Index
Time Index
%Completion with weightages
S(%X*Wx) %X=%completion of project X/ Wx=
Weightage of Project X
Time Index
Time Index
Time Index
%Completion with weightages
S(%X*Wx) %X=%completion of project X/ Wx=
Weightage of Project X
Time Index
Time Index
Time Index
%Completion with weightages
S(%X*Wx) %X=%completion of project X/ Wx=
Weightage of Project X

%Completion= S(%X)/A
of applications Targeted
project X
Time Index

Time Index
Time Index

Universal Suggested Weightage for


KRA
category
(Y/N)
A
B
C

A=Total number
%X= % completion of

%Completion with weightages


S(%X*Wx) %X=%completion of project X Wx=
Weightage of Project X

N
N

N
N

N
N

H
L

N
N
N

N
N
N

N
N
N

H
L
L

Time Index
Time Index
Time Index

N
N
N
N

N
N
N
N

N
N
N
N

M
M
M
L

Y
Y

N
N

Y
N

M
M

N
N

N
N

N
N

H
H

N
N

N
N

N
N

M
M

Average response Time

%Completion with weightages

N
N

N
N

N
N

H
H

Time Index
Time Index
%Completion with weightages
S(%X*Wx) %X=%completion of project X
Wx= Weightage of Project X
Time Index
Time Index
(A-B)*100/A A=Total number of targeted documents
B= Number of documents not issued)

Time Index
Time Index

Time Index
% completion with Weighted average of Targeted
applications
Time Index
No of projects identified
Time Index
S((A-DT)/A*Wx) A=Total Hrs available DT=Down Time
WX= Weightage factor in %

Time Index
Time Index
Time Index
% completion with weightages
Time Index
Time Index

Time Index

% Uptime with weightages


S((A-DT)/A*Wx) A=Total Hrs available DT=Down Time
WX= Weightage factor in %

Complaint resolution time


Average response time = S RTx / Number of
complaints
RTx=Response Time
% Uptime with weightages
S((A-DT)/A*Wx) A=Total Hrs available/ DT=Down Time/
WX= Weightage factor in %

N
N

N
N

N
N

L
H

Complaint resolution time


N
Average response Time =S RTx / Number of complaints
RTx=Response Time
N
Percent of complaints resolved with in specified time
N

N
N

N
N

L
H

Percent of complaints resolved with in specified time


Average response Time =S RTx / Number of
complaints
RTx=Response Time
Percentage uptime over targeted base value

N
N

N
N

N
N

L
H

Percent of complaints resolved with in specified time

Average complaint resolution time

Average response time


Score
Achievement of targeted score

N
N
N
N
N
N
N
N
N
N
N
N
N
N

N
N
N
N
N
N
Y
Y
N
N
Y
Y
N
N

N
N
N
N
N
N
N
N
N
N
N
N
N
N

L
H
H
M
M
H
H
H
M
M
H
L
L
M

N
Y
Y

N
N
Y

N
Y
Y

L
H
X

N
N

Y
N

N
N

H
M

Time Index
Time Index
% Completion of Targeted Training Programs
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Time Index
Number of programs conducted.
No. of days delayed from scheduled date
No. of days delayed from scheduled date
Time Index
Average response time
User satisfaction Score
TQM Score
No. of days delayed from scheduled date
No. of days delayed from scheduled date
% completion with Weighted average of targeted
features implemented.
No. of days delayed from scheduled date
Time Index

Time Index

N
N
N
N

N
N
N
N

N
N
N
N

H
H
H
H

N
N

N
N

N
N

L
L

N
N

Y
N

N
N

H
H

Time Index
Revenue earned

N
N
Y

N
N
N

N
N
N

H
L
H

Number of products developed during specified time

Y
Y
Y

N
N
N

N
N
N

H
H
H

Y
N
Y
N
Y

Y
N
Y
N
N

N
N
Y
Y
Y

H
M
L
M
X

% completion with weighted average of targeted


documents
Time Index
Time Index
Time Index
% completion with Weighted average of Targeted
projects
Time Index
Time Index
Time Index
No. of days delayed from scheduled date
Time Index
Time Index

Time Index
Time Index
Value of orders received within specified time
No. of days delayed from scheduled date
Number of projects submitted by quality circles
No. of days delayed from scheduled date
Number
Time Index
No. of days delayed from scheduled date

No. of days delayed from scheduled date

No. of days delayed from scheduled date

No. of days delayed from scheduled date

No. of days delayed from scheduled date

No. of days delayed from scheduled date

Balanced Scorecard Rating (5/4/3/2/1)

Time Index

Y
Y

Y
N

N
N

H
H

No. of Reports studied and shared.


% of Queries closed within specified time.
No. of Conferences/Workshops Organized.

Y
Y
Y

N
N
N

N
N
N

H
H
L

Y
Y

M
M

Time Index
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date
No. of days delayed from scheduled date

No. of days delayed from scheduled date

Score
Number of new circles

006-07
Suggested Weightage for Source of Data For
category
Measurement
A
B
C
H

Completion certificate

H
H
M
L
H

L
M
H
H
H

Completion certificate
SRS document
Completion certificate
System log
Completion certificate

H
H
M
L
H

L
M
H
H
H

Completion certificate
SRS document
Completion certificate
System log
Completion certificate

H
H
M
L
H

L
M
H
H
H

Completion certificate
SRS document
Completion certificate
System log
Completion certificate

H
H
M
L
H

L
M
H
H
H

Completion certificate
SRS document
Completion certificate
System log
Completion certificate

H
H
M
L

L
M
H
H

Completion certificate
SRS document
Completion certificate
System log

Completion certificate

Completion certificate

H
M
L

M
H
H

SRS document
Completion certificate
System log

H
H

H
L

Completion report /
Vetting by finance & user
Completion Report

H
M

M
H

SRS document
Completion certificate

KRA Remarks

M
H

L
M

Record / certificate by
user
Record / certificate by
user
Training Record
Record / certificate by
user

Completion certificate

H
H
M

L
M
H

Conversion plan
review by Appraiser
Test certificate

H
H
M
L

M
L
H
H

Documentation
Manuals issued
Documentation
Documentation

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.
Record maintained by
individual/ deptt.

Targets to be set as follows: 100% cases-L5;


95-99% cases-L4;85-94% cases-L3; 75-84%
cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5;
95-99% cases-L4;85-94% cases-L3; 75-84%
cases-L2;<75%cases-L1

L
H

L
H

H
H

H
M

Record maintained by
Unit/Corp. Finance deptt.
Records
Completion certificate and
review by Appraiser
Milestone dates

M
H

H
H

Report
Completion report

Complaint log

Complaint log

Installation certificates

Installation certificates

H
L

L
L

Indent dates
PO dates/ Works contract
date
Stock record and AMC
dates
Approval dates

Indent dates

PO dates/ Works contract


date

Review of logs

Daily system logs

Call sheets

M
H

H
H

Call sheets
Reporting system

Reporting system

Reporting system

M
H

H
H

Reporting system
Records

Reporting system

L
H

H
H

Reporting system
Maintenance of log

Records

Records

L
M
M
H
H
H
M
H
H
M
M
H
M
M

H
L
L
L
H
H
L
L
H
M
L
M
H
H

H
X
M

L
X
X

Records
Survey results
Survey results
Records
Records
Training Record
Records
Records
Records
Training Record
Records
Records
Records
Log
User feedback after
training program
Quality Deptt.
Action plan document

Project report

Audit by interunit team

M
H

L
L

Policy document
Action plan document

Audit by inter unit team.

L
L
L
L

X
X
X
X

Final policy document


Milestone dates
Milestone dates
Milestone dates

Completion certificates

Project plan document

H
M

M
H

Documents issued
Plan document

M
M

L
L

Plan document
Plan document

M
M
M

L
H
L

Signing of MOU / JV
Draft document
EVA calculations

Documentation

H
H
M

H
H
L

M
M
M
M
M

L
M
H
M
H

Plan document
Product Release
Actual orders
Record maintained by
Unit Head/Unit P&D
Unit QA/QC

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Rating declared at year


end by Corporate / Unit
Management

This KRA will be taken by Head of Unit


/Function / Department , if covered under MAP,
and can be assigned a weightage upto 100%

Records

Records

Records

Records

M
M

M
M

Records
Records

M
M
L

L
M
L

Records
Records
Records

Records

X
X

X
X

Survey Report
Unit QA/QC

GENERAL MANAGEMENT FUNCTION


KRA ID

Function KRA Description

KRA
TYPE

Unit of Measurement

Balanced Scorecard Rating


(5/4/3/2/1)

GMX00100 GMX

Achieving the parameters as laid


down in Balance Score Card

GMX00200 GMX

Improvement in Internal Customer O


satisfaction score
To carry out special assignments
C
within specified time
Number of new initiatives
O
conceptualised/ implemented within
specified time

ICPS (Internal Customer Perception


Survey) Score
No. of days delayed from scheduled
date
No. of days delayed from scheduled
date

Improving response to customers & O


top management queries
Develop system within specified
C
time to ensure quick response to
queries

ICPS (Internal Customer Perception


Survey) Score
No. of days delayed from scheduled
date

Effective Office Management


Maintaining Office records
Administrative support
Planning and execution of special
assignments
Maximising usage of office
automation
Scanning & dissemination of
information related to business
environment including reporting to
top management

O
O
O
C

Appraisers feed back


Appraisers feed back
Appraisers feed back
Appraisers feed back

Appraisers feed back

No. of reports

GMX00800 GMX

Co-ordination with various


agencies to ensure on time
availability of materials & inputs
required

Time Index

GMX00900 GMX

Provide support to top


management on policy matters on
new initiatives

Appraisers feed back

GMX01000 GMX

Appraisers feed back

GMX01102 GMX

Implementation of Computerised
mail management system
Timely compilation of revenue
budget for approval by Board
Timely identification of issues for
Directors/Budget discussions
Timely consolidation of Unit budget

GMX01103 GMX

Final presentation in MCM

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date
No. of days delayed from scheduled
date
No. of days delayed from scheduled
date

GMX00300 GMX
GMX00400 GMX

GMX00500 GMX
GMX00501 GMX

GMX00600
GMX00601
GMX00602
GMX00603

GMX
GMX
GMX
GMX

GMX00604 GMX
GMX00700 GMX

GMX01100 GMX
GMX01101 GMX

O
O

GMX01200 GMX

Timely submission of physical/


financial turnover reports
Timely submission of Agenda
papers for MCM
Finalisation of Balanced Score
Card (BSC) within specified time.
Follow-up for timely receipt of
calculations on BSC from units
Evaluation and submission of final
calculation to top management for
approval in JCM

Time Index

Time Index

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date
No. of days delayed from scheduled
date

GMX01500 GMX

Timely compilation and analysis


before submission of flash results
to Board

GMX01600 GMX

Physical assessment/ through


C
visits/ of status of manufacturing for
identifying constraints/ critical
issues for achieving year end
budget

Time Index

GMX01601 GMX

Designing a system within specified C


time for assessing visit
effectiveness

No. of days delayed from scheduled


date

GMX01602 GMX
GMX01700 GMX

Evaluation of each visit


O
Timely organising half yearly review O
of operation for assessment of year
end turnover

As per format
No. of days delayed from scheduled
date

GMX01701 GMX

Finalisation of schedule

GMX01702 GMX

Submission of agenda paper with


issues and issue of minutes
Assessment of year end turnover
Timely submission of reports to
Board/ Govt.
Designing and implementation of a
system for hosting MC/MIR
information through web

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date
%age Variance over LE
Time Index

No. of days delayed from scheduled


date

GMX02000 GMX

FORMULATION OF ANNUAL
PLAN FOR SUBMISSION TO
GOVT. FOR THEIR APPROVAL
WITHIN SPECIFIED SCHEDULE

No. of days delayed from scheduled


date

GMX02100 GMX

TIMELY COMPLETION OF
ANNUAL PLAN
EVOLVE CORPORATE GUIDELINES BY SCHEDULED DATE
SPECIFYING THRUST AREAS
FOR INVESTMENT

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date

GMX01300 GMX
GMX01400 GMX
GMX01401 GMX
GMX01402 GMX

GMX01703 GMX
GMX01800 GMX
GMX01900 GMX

GMX02101 GMX

O
O

C
O

No. of days delayed from scheduled


date

GMX02102 GMX

SUBMISSION OF ANNUAL PLAN O


BY UNITS/ ORGANISE CAPITAL
BUDGET DISCUSSIONS WITH
CORPORATE TEAM /
PRESENTATION TO DIRECTORS
AS PER PLAN.

Time Index

GMX02103 GMX

TIMELY COLLECTION OF DATA & O


RECOMMENDATION OF
VARIOUS CORP. AGENCIES

No. of days delayed from scheduled


date

GMX02104 GMX

ANNUAL PLAN CONSOLIDATION O


& SUBMISSION. APPROVAL OF
CMD / BOARD WITHIN
SPECIFIED TIME

No. of days delayed from scheduled


date

GMX02105 GMX

COMMUNICATION TO UNITS
WITHIN SPECIFIED TIME
APPRAISAL & APPROVAL OF
CAPITAL INVESTMENT
PROPOSALS >5 CRORES/
IDENTIFIED IN ANNUAL PLAN

O
O

No. of days delayed from scheduled


date
Time Index

GMX02201 GMX

INITIATION OF INTERACTION
WITH UNITS IN FREEZING
FACILITIES/ BROAD
SPECIFICATIONS & FINALISING
PROPOSALS (>5 CRORES)

Time Index

GMX02202 GMX

APPRAISAL & OBSERVATIONS


ON DRAFT PROPOSALS (>5
CRORES)

Time Index

GMX02203 GMX

RECEIPT OF FINAL PROPOSALS O


(>5 CRORES) AS PER CAPITAL
BUDGET MANUAL AND
PROCESSING FOR APPROVAL
BY CMD / BOARD

Time Index

GMX02204 GMX

COORDINATE FOR TIMELY


COMPLETION OF APPROVED
CAPITAL SCHEMES / ITEMS

Time Index

GMX02300 GMX

APPRAISAL & APPROVAL


CAPITAL INVESTMENT
PROPOSALS <5 CRORES/
IDENTIFIED IN ANNUAL PLAN

Time Index

GMX02301 GMX

APPRAISAL & OBSERVATIONS


ON DRAFT PROPOSALS (<5
CRORES)

Time Index

GMX02200 GMX

GMX02302 GMX

RECEIPT OF FINAL PROPOSALS O


(<5 CRORES) AS PER CAPITAL
BUDGET MANUAL AND
PROCESSING FOR APPROVAL
BY CMD & COMMUNICATION TO
UNITS

Time Index

GMX02400 GMX

TIMELY FINALISATION OF
FACILITIES FOR FORMULATION
& APPROVAL OF
RECONDITIONING &
RETROFITTING BUDGET OF
UNITS

No. of days delayed from scheduled


date

GMX02500 GMX

FOLLOW-UP FOR TIMELY


COMPLETION OF AGREED
MILESTONES FOR MOU
SCHEMES

Time Index

GMX02600 GMX

Monitoring physical / financial


O
progress of implementation of
Capital Schemes & status reporting
to MCM/ Board/ Govt.

Time Index

GMX02700 GMX

Timely compilation & analysis of


O
Annual Flash & actual results on
Capital Investment before
submitting to Management / Board

Time Index

GMX02800 GMX

Technology Scanning &


dissemination. Organise /
preparation of presentations.

Time Index

GMX02900 GMX

To carry out special assignments


within specified time-3rd repeat
To carry out special assignments
within specified time-4th repeat
ON RECONDITIONING OF P&M;
TIMELY RECEIPT OF MIR /
CONSOLIDATION. PROGRESS /
STATUS REPORTING TO MCM

Time Index

Time Index

Time Index

GMX03200 GMX

OPTIMUM UTILISATION OF
CRITICAL MACHINE TOOLS

Time Index

GMX03201 GMX

TIMELY RECEIPT OF MIR/


CONSOLIDATION/ DOWNTIME
ANALYSIS & REPORTING TO
MCM

Time Index

GMX03202 GMX

IDENTIFY MACHINES HAVING


O
UTILISATION <50%/ REPORTING
IN MCM FOR DISCUSSIONS ON
INTER UNIT LOAD SHARING

Time Index

GMX03203 GMX

UPDATION OF DIRECTORY OF
O
CNC MACHINES IN BHEL WITHIN
SPECIFIED TIME

No. of days delayed from scheduled


date

GMX03000 GMX
GMX03100 GMX

GMX03300 GMX

TIMELY APPROVAL FOR


DISPOSAL OF SURPLUS ITEMS
OF P&M AFTER EXPLORING
THEIR ALTERNATE USE IN
BHEL / PSUs

GMX03400 GMX

IMPLEMENTATION OF OEE ON
C
CRITICAL MACHINES
CREATING AWARENES IN UNITS O
THRU' WORKSHOPS
IDENTIFICATION OF MACHINES O
& EVOLVING METHODOLOGY
FOR IMPLEMENTATION

Time Index

ENSURE IMPLEMENTATION BY
UNITS
ORGANISE INTER UNIT MEET
ON MANUFACTURING
TECHNOLOGY FOR
EXPERIENCE SHARING BY
SPECIFIED DATE

Time Index

No. of days delayed from scheduled


date

GMX03401 GMX
GMX03402 GMX

GMX03403 GMX
GMX03500 GMX

No. of days delayed from scheduled


date

Time Index
Time Index

GMX03600 GMX

Reply to Govt. Audit queries/


O
Inspection report paras/ Action
Taken Reports etc. furnished within
specified time (2 weeks)

GMX03700 GMX

Reply/settlement of Internal Audit


paras within specified time (4
weeks)

GMX03800 GMX

Timely inputs to unit/corporate


finance for inter-unit reconciliationof accounts

Time Index

GMX03900 GMX

Timely inputs to unit/corporate


O
finance for BUDGET/FLASH/MIRs
etc.

Time Index

GMX04000 GMX

Finalisation of Functional scorecard O


by specified date
Improvement in Employee
O
Satisfaction Score
Implementation of Improvement
O
projects identified in the Position
Report as per schedule

No. of days delayed from scheduled


date
Score

GMX04100 GMX
GMX04101 GMX

GMX04200 GMX
GMX04300 GMX
GMX04301 GMX
GMX04302 GMX

GMX04400 GMX

Time Index

Increase in no. of active Quality


Circles in the deptt.
Achieving Business excellence
thru' TQM at Deptt. level
Preparation of action plan based
on Position report
Implementation of Improvement
projects identified in the Position
Report as per schedule

Number of new circles

TQM Score

No. of days delayed from scheduled


date
Time Index

Development of Knowledge
management Portal

No. of days delayed from scheduled


date

GMX04500 GMX

Contributing case studies etc.for


C
Knowledge Management Portal
Completion of KM Projects as per C
schedule
Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

Number

GMX04800 GMX

Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from scheduled


date

GMX04900 GMX

Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from scheduled


date

GMX05000 GMX

Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from scheduled


date

GMX05100 GMX

Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from scheduled


date

GMX05200 GMX

Implementation of Special
C
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from scheduled


date

GMX05300 GMX

Review and Finalisation of Unit/


O
functional Balanced scorecards
Finalisation of Unit level Balanced O
scorecards in consultation with the
Corporate functions and Business
sectors by a specified date

Time Index

GMX04600 GMX
GMX04700 GMX

GMX05301 GMX

Time Index
No. of days delayed from scheduled
date

Time Index

GMX05302 GMX

Finalisation of Balanced scorecards O


of Corporate functions/ Unit
NC's/Functions/ departments in line
with Strategy map by a specified
date

Time Index

GMX05303 GMX

Finalisation of Calculation of
Stretch in the Unit/ NC/ functional/
departmental Scorecards by
specified date.

No. of days delayed from scheduled


date

GMX05400 GMX

Development and implementation


of R&D Management System
Development of system for
interaction with academic and
research institutions

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date

Timely evaluation of excel award


proposals.
Formulation and finalisation of
MOU Criterion related to
engineering and R&D

GMX05500 GMX

GMX05600 GMX
GMX05700 GMX

No. of days delayed from scheduled


date
No. of days delayed from scheduled
date

GMX05800 GMX

Appraisal and approval of R&D


O
projects(> Rs10 lakhs) identified in
various Product Committees.

Time Index

GMX05900 GMX

Creation of database of BHEL


O
executives visiting abroad for
attending Conference/Paper
Presentation/Training/Pre-despatch
Inspection etc.

No. of days delayed from scheduled


date

GMX06000 GMX

Dev. of PC based system by


specified date for on-line
scheduling of appointments,
meetings, tours, tasks using
Microsoft Outlook

No. of days delayed from scheduled


date

GMX06100 GMX

Completion of KM roadmap for


manufacturing areas by specified
date

No. of days delayed from scheduled


date

GMX06200 GMX

Improvement in functioning of
product and technical committees.

%variance from calendar date


planned at year beginning.

GMX06300 GMX

Approval of PIRs within specified


time.
Ensuring timely disposal of legal
issues, vigilance & disciplinary
matters requiring CMD approval

% of approvals obtained within


specified time.
% of cases disposed off within
specified time

Analyze, discuss & prepare


recommendations on legal issues

GMX06400 GMX

GMX06401 GMX

Appraiser feedback

GMX06500 GMX

To design and implement a system C


to capture and retrieve information
related to environmental changes
impacting BHEL for quick reference
by top management.

No. of days delayed from scheduled


date

GMX06600 GMX

Preparing the background material O


and inputs for meetings and
presentations with customers and
VIPs.

%satisfaction of Appraiser

GMX06601 GMX

Arranging and verification of data/


status/ drafts/ technical info etc.
from concerned departments

%satisfaction of Appraiser

GMX06700 GMX

Providing technical assistance to


top management on Commercial
and Technical matters.

%satisfaction of Appraiser

GMX06800 GMX

Providing inputs to CMD / Directors O


for discussions in fora like FICCI,
CII, ASSOCHAM & various
Committees to present BHEL view
point.

% satisfaction of appraiser

GMX06900 GMX

Analysis of Operations monitoring


reports of various units and
suggest corrective measures for
timely intervention of the top
management.

% satisfaction of appraiser

GMX06901 GMX

Analysis of DO letters, apprise


exceptions
Designing a system for tracking
and redressal of customer/ other
complaints received at the level of
CMD / Director (as applicable).

Time Index

%redressal

GMX07001 GMX

Implementation and use of the


system for quick disposal of
complaints.

%resolution

GMX07002 GMX

Periodic review and follow up and


putting up exception reports to
meet the commitments made at
CMD / Director level.

Time Index

GMX07003 GMX
GMX07100 GMX

Put up exception report to CMD


Periodic review of small units by
Review Committee of Small Units
(RCSU)

O
O

%resolution
Time Index

GMX07000 GMX

EMENT FUNCTION KRA MASTER - 2006-07


Critical
KRA
(Y/N)

Special
KRA
(Y/N)

Universal
KRA
(Y/N)

Suggested Weightage for


category
A
B
C

Source of Data for


Measurement

Rating declared at year


end by Corporate / Unit
Management

Internal Customers

Record

Internal Customers

Measured Data

N
N
N
N

N
N
N
N

N
N
N
N

H
M
M
M

H
M
M
M

H
M
M
M

Assesment Data
Assesment Data
Assesment Data
Assesment Data

Assesment Data

Report generated

Milestone Dates

Assesment Data

Assesment Data

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Milestone

Milestone

N
Y

N
Y

N
N

H
H

H
H

X
X

Visit

Milestone

Y
N

N
N

N
N

H
H

H
H

X
X

LE
Report

Milestone

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Within 1 week of
approval
Milestone Dates

Milestone Dates

Milestone Dates

As per Milestone

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

AS PER MOU
SCHEDULE

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

1 WEEK PRIOR TO
MCM

1 WEEK PRIOR TO
MCM

1 WEEK PRIOR TO
MCM

1 WEEK PRIOR TO
MCM

ANNUAL

ANNUAL (as per


Corp. Proce-dure)

20% M/Cs.

Milestone Dates

Milestone Dates

Milestone Dates

Milestone Dates

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D
Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Records

Records

Records

Records

Departmental records

Departmental records

As per BHEL Plan

CEPD records

CEPD
records/identified
milestones for
approval process

Departmental record.

Department record.

Roadmap report of mfg


units.

Records of meetings
held.

Records of approval
date.
Assessment data

Assessment data

records

Appraisers feedback

Appraisers feedback

Appraisers feedback

Appraisers feedback

Appraiser feedback

Milestone dates

Records

Milestone dates

Milestone dates

N
N

N
N

N
N

M
H

M
H

L
H

records.
Generations of
Minutes of Meeting.

KRA Remarks

This KRA will be taken by


Head of Unit /Function /
Department , if covered under
MAP, and can be assigned a
weightage upto 100%

Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1

Targets to be set as follows: 100% cases-L5; 95-99% cases-L4;85-94% cases-L3; 75-84% cases-L2;<75%cases-L1

Questionnaire developed by CQA to be adopted .

nil
nil

nil

nil

Uniform company wide guidelines will be developed which will simplify taking up joint R&D projects with academic and researc

Units to be reviewed by CMD by exception.

L2;<75%cases-L1

L2;<75%cases-L1

s with academic and research institutions

QUALITY FUNCTION KRA MASTER


KRA id

Function

KRA Description

KRA
Type

Unit of
Critical Special
Measurement
KRA
KRA
(Y/N)
(Y/N)

QAX00100

QAX

Timely disposition of Product


NCRs/ SDRs as per Department
Plan/Procedure

% Cleared as
per norms

QAX00200

QAX

First time clearance in


Inspection/Testing by Third
Party Inspection Agency/
Customer

% requests
cleared in first
time

QAX00300

QAX

Timely inspection/testing during


inprocess/ final stages of
Manufactured/ BoI's

% Cleared as
per norms

QAX00400

QAX

Timely issue of Inspection/


Testing Reports for
manufactured/ BoI's

% Cleared as
per norms

QAX00500

QAX

Reduction in time taken to clear


inspection/ calibration/ testing
requisitions through
improvement in planning
process.

% based on
previous year

QAX00600

QAX

Improvement in time taken to


submit quality documentation/
Inspection reports/ Log sheets
etc.

% based on
previous year

QAX00700

QAX

Improvement in number of
stages for Self inspection
(checked by task performer)

% over
previous year

QAX00701

QAX

Identification of new self


inspection stages to be
introduced.

% as per plan

QAX00702

QAX

Training & Qualification of task


performers of identified stages.

% Eligible Task
Performers
trained

QAX00703

QAX

Development and
implementation of training
and qualification modules for
task performers of identified
stages.

Date

QAX00704

QAX

Pilot Implementation of self


inspection by qualified task
performer

% as per plan

QAX00705

QAX

% as per plan

QAX00800

QAX

Surveillance of self-inspection
stages as per plan
Coordination with Statutory
/Customer agencies for
necessary clearance as per
schedule

% Cleared as
per norms

QAX00900

QAX

Review of Risk/ Hazard


Analysis to establish safety
standards during inspection
and testing

% reviewed as
per plan

QAX01000

QAX

Compliance to safety
standards during
inspection/testing

% compliance

QAX01100

QAX

Planning/ organising/
monitoring timely inspection
of BOIs

Time Index

QAX01200

QAX

Measuring instruments
calibrated in time as per
department plan/procedure

% calibrated
within specified
time

QAX01300

QAX

Calibration of Non BHEL


instruments/ gauges within
specified time

% calibrated
within specified
time

QAX01400

QAX

QAX

z value/ En
Value
% as per plan

QAX01500
QAX01600

QAX

Interlab Testing/ Proficiency


Testing as per schedule
Procurement of equipment /
consumables
Development of systems to
assess uncertainty of
measurement during
calibration and testing

No. of days
delayed from
scheduled date

QAX01700

QAX

Evaluation of uncertainty of
identified measurements/
calibration and testing

% of identified
measurement
s

QAX01800

QAX

Generation of external
business from
Lab/Testing/Caliberation
facilities

Rs. Lakhs

QAX01900

QAX

Timely disposition of SARs/


CARs/ SFRs/ SSARs as per
Department Plan/Procedure

% Cleared as
per norms

QAX02000

QAX

Product/Milestone/Process audit
as per plan (Inter Unit/ In-house/
Vendor/ Site/ Subcontractor
etc.)

% Agreed
improvement
opportunities to
identified

QAX02100

QAX

Organising System audit


(Intra/Inter Unit/Divn.) to bring
out improvement at Unit/Divn.
Levels

Timely closure
of System
NCRs ensuring
CA/PA

QAX02200

QAX

QAX

QAX02400

QAX

% participated
to plan
% over
previous year
Time Index

QAX02300

Participation in System audit as


per plan
Improvement in number of
"Active" Quality Circles.
Organising/ undertaking Quality
Circle related activities including
QC Convention

QAX02500

QAX

Release of Quality
documentation (eg: Vendor list/
Type Test reports/ Procedures
QP/FQP etc.) with due customer
approval (if required) within
specified time.

% released as
per plan

QAX02600

QAX

Development of identified
quality systems and
documentation within specified
time as per plan

No. of days
delayed from
scheduled date

QAX02700

QAX

Development of System to
measure effectiveness of Third
Party Inspection Agencies

No. of days
delayed from
scheduled date

QAX02800

QAX

Achieving New Quality


accreditations/ certificates and
awards.

No. of days
delayed from
scheduled date

QAX02900

QAX

Development of New
measurement techniques
including automation / Testing
procedures/ standards/
processes, as per plan

% completed
as per plan

QAX03000

QAX

Computerization of identified
projects / Systems as per plan

Time Index

QAX03001

QAX

Development of System

No. of days
delayed from
scheduled date

O
O

QAX03002

QAX

Pilot implementation of
computerisation

No. of days
delayed from
scheduled date

QAX03003

QAX

Institutionalisation of
computerised system as per
plan

No. of days
delayed from
scheduled date

QAX03100

QAX

Development of System to
measure Quality Index of
products/processes (Eg. QTM)

Time Index

QAX03101

QAX

Study of Systems in practice at


other places as per plan

No. of days
delayed from
scheduled date

QAX03102

QAX

System Design and


development including
computerisation as per
milestones/plan

Time Index

QAX03103

QAX

Pilot Implementation and course


correction of System

No. of days
delayed from
scheduled date

QAX03104

QAX

Institutionalisation of the system


as per plan

No. of days
delayed from
scheduled date

QAX03105

QAX

Development of quality systems


in line with ISO 9001
requirements as per plan

% completed
as per plan

QAX03200

QAX

Development of Knowledge
management Portal

No. of days
delayed from
scheduled date

QAX03300

QAX

Contributing case studies etc.for


Knowledge Management Portal

Number

QAX03400

QAX

Time Index

QAX03500

QAX

Completion of KM Projects as
per schedule
Timely disposition of (Quality
function related attributes) of
Customer Complaints as per
Department Plan/Procedure

% as per norms

QAX03600

QAX

% Issues
resolved and
remedial
measures
implemented

Investigation of Customer
Complaints/ Customer related
Quality Issues assigned to
individual/ individual as part of a
team.

QAX03700

QAX

Improvement of Internal (Intra


Unit/ Division) Customer
Perception score related to
Quality Function

% Improvement
in Internal
Customer
Satisfaction
Score

QAX03701

QAX

Analysis of feedback of
Internal Customer Perception
Survey (ICPS)

No. of days
delayed from
scheduled date

QAX03702

QAX

Develop time-bound plans for


corrective/ preventive actions

No. of days
delayed from
scheduled date

QAX03703

QAX

Implementation of action
plans

% of planned
actions
implemented

QAX03800

QAX

Quality function personnel


(NDT/ Auditors etc) trained and
certified/ recertified as per plan.

% trained to
total planned

QAX03900

QAX

Improvement in systems and


processes to reduce product
nonconformances like MDRs,
SARs, CARs, SDRs & SSARs

% based on
previous year

QAX03901

QAX

Development of system for data


capturing/ root cause analysis
and identification of
corrective/preventive actions

No. of days
delayed from
scheduled date

QAX03902

QAX

Data Compilation as per plan

No. of days
delayed from
scheduled date

QAX03903

QAX

Root Cause Analysis of


nonconformities raised during
identified period.

% NCRs
covered

QAX03904

QAX

Develop time-bound plans for


corrective/ preventive actions
covering identified Root Causes
of product NCRs

% root causes
covered

QAX03905

QAX

Monitor Implementation of
action plans to reduce
nonconformities

% of planned
actions
implemented

QAX03906

QAX

Effectiveness of action plans to


reduce product nonconformances attributed to
Quality Function.

% of repeat
NCRs
attributed to
Quality
Function

QAX04000

QAX

Improvement in systems and


processes to reduce Cost of
rework/ rejection

% based on
previous year

QAX04001

QAX

Development of system for data


capturing of the cost of rework
and rejection

No. of days
delayed from
scheduled date

QAX04002

QAX

Develop time-bound plans for


corrective/ preventive actions
through Root Cause Analysis of
rework/rejection

No. of days
delayed from
scheduled date

QAX04003

QAX

Implementation of action plans


to reduce cost of
rework/rejection

No. of days
delayed from
scheduled date

QAX04100

QAX

Improvement in systems and


processes to reduce
customer complaints
attributed to Quality Function

% reduction
based on
previous year

QAX04101

QAX

Data Compilation of Customer


Complaints as per plan

No. of days
delayed from
scheduled date

QAX04102

QAX

Root Cause Analysis of


Customer Complaints

% Customer
complaints
covered

QAX04103

QAX

Develop time bound plan for


Corrective and Preventive
actions covering identified root
causes.

% root causes
covered

QAX04104

QAX

Implementation of action plans


to reduce Quality function
related Customer Complaints

% of planned
actions
implemented

QAX04200

QAX

Improvement in Quality Index


(QI) of identified processes of
Quality function (QTM level).

% based on QI
at the
beginning of
year after
including new
characteristics

QAX04201

QAX

Analysis of Quality Index data to


identify potential areas for
improvement as per plan

No. of days
delayed from
scheduled date

QAX04202

QAX

Develop time bound plan for


bringing improvement in
identified areas of Quality Index

No. of days
delayed from
scheduled date

QAX04203

QAX

Implementation of action plan


for improving Quality Index

% implemented
as per plan

QAX04300

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

% Implemented
to identified

QAX04400

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
delayed from
scheduled date

QAX04500

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
delayed from
scheduled date

QAX04600

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
delayed from
scheduled date

QAX04700

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
delayed from
scheduled date

QAX04800

QAX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
delayed from
scheduled date

QAX04900

QAX

Process/Product improvements
through SQC/Six Sigma
Projects (as indicated in action
plan)

Time Index

QAX05000

QAX

Process/Product improvements
through FMEA/ QFD Projects
(as indicated in action plan)

Time Index

QAX05100

QAX

Improvements through
implementation of 5S in Quality
function

Time Index

QAX05200

QAX

Process/Product improvements
through Benchmarking projects

Number of
processes/
products

QAX05201

QAX

Collect and document best


practices

No. of days
delayed from
scheduled date

QAX05202

QAX

Gap analysis of identified


processes w.r.t. best practices

Time Index

QAX05203

QAX

Time Index

QAX05204

QAX

Development of time-bound
action plans for improvement
Implementation of action plans

% of planned
actions
implemented

QAX05300

QAX

Organising management
reviews for review and
resolution of issues

%issues
implemented to
identified

QAX05400

QAX

Organising Annual TQ
assessment to bring out
improvements at Units/
Divisions as per schedule

% completed
as per
schedule

QAX05500

QAX

Achieving Business Excellence


through improvement in Key
Business Processes

TQ Score

QAX05501

QAX

Preparation of Action plan


based on TQ Feedback report
and other initiatives

No. of days
delayed from
scheduled date

QAX05502

QAX

Review and monitoring of action


plans

% of planned
actions
implemented

QAX05503

QAX

Preparation of Position report

No. of days
delayed from
scheduled date

QAX05504

QAX

Dissemination of Position report


and preparation for site visit as
per schedule

No. of days
delayed from
scheduled date

QAX05600

QAX

Development of modules for


bringing TQ Culture/ improving
TQ Status

No. of days
delayed from
scheduled date

QAX05700

QAX

Publication of journals/Technical
reports/MIR s

No. of days
delayed from
scheduled date

QAX05800

QAX

Number of Papers
presented/published in
National/International
Seminars/Journals

Number of
Papers

QAX05900

QAX

QAX05901

QAX

Enhancing maturity Level of


Quality Systems
Identify critical systems
impacting on business results/
customer satisfaction

% Systems
improved
Number of
Systems

QAX05902

QAX

Gap analysis of identified


critical systems through
review of adequacy and
compliance

Time Index

QAX05903

QAX

Development of time-bound
action plans for improvement

Time Index

QAX05904

QAX

Implementation of action
plans

% of planned
actions
implemented

QAX06000

QAX

Vendor development/
assessment as per requests

QAX06100

QAX

Support to other
departments/site on specialised
services (Eg: RLA/ Site support/
Testing/ IT/ Tenders etc) as per
schedule.

% completed
as per
schedule
% completed
as per
schedule

QAX06200

QAX

Uptime (Availability) of testing


equipment/ Instrument and
guages (including master
gauges)

% Availability

QAX06300

QAX

Enhancement of capability of
identified measurement/
testing/ calibration
facilities/processes

% completed
as per plan

QAX06400

QAX

Outsourcing identified Services


(Example: Third Party
Inspection agencies/ Service
providers like Agency for
undertaking Customer
Satisfaction Survey etc.) as per
schedule

No. of days
delayed from
scheduled date

QAX06401

QAX

Preparation of tender
specification as per schedule

No. of days
delayed from
scheduled date

QAX06402

QAX

Techno-commercial evaluation
of offers as per schedule

No. of days
delayed from
scheduled date

QAX06500

QAX

Implementation of CTQs/Special
Contract requirements

% Implemented
to identified

QAX06600

QAX

Updation of
database/Information (like
PERT/ Intranet sites etc.) in
System

% completed
as per plan

QAX06700

QAX

Identification/incorporation of
CTQs/Special Contract
requirements in documents
like work instructions, check
lists, quality plans, purchase
documents etc.

No. of
Exceptions

QAX06800

QAX

QAX06900

QAX

Monitoring Performance of
Service Provider(Third Party
Inspection Agencies appointed
by BHEL and other service
providers/ sub-contractors
Increase
of active Quality
appointedinbyno.
BHEL)
Circles in the deptt.

Performance
Index =
0.3(Time Index)
+0.7 (No.of
errors/No. of
Number
of new
opportunities)
circles

QAX07000

QAX

Number

QAX07001

QAX

Enhance Skill/Awareness on
Quality/BE initiatives
Identification of Needs

No. of days
delayed from
scheduled date

QAX07002

QAX

Development of Training
Modules

No. of days
delayed from
scheduled date

QAX07003

QAX

Organise training programmes

Number

QAX07004

QAX

Facilitate Improvement
initiatives/activities

Number

QAX07100

QAX

Reply to Govt. Audit queries/


Inspection report paras/ Action
Taken Reports etc. furnished
within specified time (2 weeks)

QAX07200

QAX

Reply/settlement of Internal
Audit paras within specified time
(4 weeks)

QAX07300

QAX

Timely inputs to unit/corporate


finance for inter-unit reconciliationof accounts

Time Index

QAX07400

QAX

Timely inputs to unit/corporate


finance for
BUDGET/FLASH/MIRs etc.

Time Index

QAX07500

QAX

Finalisation of Functional
scorecard by specified date

No. of days
delayed from
scheduled date

QAX07600

QAX

Score

QAX07700

QAX

Improvement in Employee
Satisfaction Score
Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

QAX07800

QAX

Achieving Business excellence


thru' TQM at Deptt. level

TQM Score

QAX07900

QAX

Preparation of action plan based


on Position report

No. of days
delayed from
scheduled date

QAX08000

QAX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

QAX08100

QAX

Accomplishment of targets of
Unit/NC/Function/Department
level Balance Score Card

Balanced
Scorecard
Rating
(5/4/3/2/1)

UNCTION KRA MASTER - 2006-07


Universal Suggested Weightage
KRA
for category
(Y/N)
A
B
C

Source of Data For


Measurement

KRA Remarks

MIR/ Computer generated 1. Department Plan/ Procedure to be


Database
prepaared (if not available) reflecting period
of disposition.
2. NCRs for Mfg. Units/ Engg. Centres and
SDRs for Power Sector Regions.
3. Not applicable to Corporate Quality

Reports of QC/Labs

Process Sheets/
Inspection requests

Department plan/ Procedure to be prepared


(if not available) reflecting period required
for undertaking inspection/ testing.

Inspection Reports/
Register

Department plan/ Procedure to be prepared


(if not available) reflecting period required
for issue of reports.

Data log

Data log

Data log

List of stages

Test Records

Schedule to be prepared by the


department.

Pilot Implementation
Records

Surveillance Report

Reports/ Feedback

Safety Reports

Safety Audits

Planning Schedule

Data log of labs

Requests received

Test Report

MIRs/Budget report

Lab Systems

Lab Reports

Lab Reports

MIR/ Computer generated 1. Department Plan/ Procedure to be


Database
prepaared (if not available) reflecting period
of disposition.
2. SFRs/ SSARs and SARs wherever
applicable for PS-Regions.
3.
Not applicable to Corporate Quality

Schedule to be prepared by the


department.

1. Department plan/ Procedure to be


prepared (if not available) reflecting
category-wise period required for
undertaking calibration
2. Not applicable to Corporate Quality

Target to be based on Z value or En Value


as applicable
Schedule to be prepared by the
department.

Audit reports

Effectiveness of audit is measured by


agreed improvements by the auditee.
Targets could be for example like: 100%/
90%/ 80%/ 70% etc.

Audit reports

1. It is the responsibility of auditor


department for timely closure of system
NCRs through follow-up with auditee
departments.
2. Standard time for closure of NCRs to be
given in DPs (if not existing)
2. Not applicable to Corporate Quality

Audit reports

Not applicable to Corporate Quality

Quality Circle data

Not applicable to Corporate Quality

Quality Circle Reports

Schedule to be prepared by the


department.

Database/ MIRs

Schedule to be prepared by the


department.

List of identified systems

Schedule to be prepared by the


department.

List of identified systems

Applicable where isnpection activity is


outsourced

Department Plan and


accreditations

Schedule to be prepared by the


department.

Department Plan and


Reports

Schedule to be prepared by the


department.

MIR/Reports

Schedule to be prepared by the department

Action plan & report

Validation report

List of areas planned

Project completion Report 1. Milestone Schedule to be prepared by


the department.
2. Not applicable to Corporate Quality

Study Report

Not applicable to Corporate Quality

Reports

Not applicable to Corporate Quality

Implementation Records

Not applicable to Corporate Quality

System Documentation

Not applicable to Corporate Quality

Department Plan

All corporate functions

Project report

MIR/ Computer generated 1. Department Plan/ Procedure to be


Database
prepaared (if not available) reflecting period
of disposition.
2. Not applicable to Corporate Quality

Investigation Reports

Internal Customer
Satisfaction Score

Department to measure internal Customer


Satisfaction Score/ if not available.

Certification records

Planned to be prepared by department


covering personnel to be trained.

Product NCRs

1. Milestone schedule/ Plan to be prepared


by the Department.
2. NCR for Mfg.
Units/ Engg. Centres & SDR for PS
Regions.
3. Not applicable to Corporate Quality

List of identified systems

1. Applicable where system does not exist


2. System to be computerised and
preferably made online

Data Compilation records/ Not applicable to Corporate Quality


Computer generated
records

Analysis report

1. NCR for Mfg. Units/ Engg. Centres &


SDR for PS Regions. 2.Not applicable to
Corporate Quality

Action Plan

Not applicable to Corporate Quality

Status reports

1. NCR for Mfg. Units/ Engg. Centres &


SDR for PS Regions.
2. Not applicable
to Corporate Quality

NCR Data

Not applicable to Corporate Quality

MIR on cost of
Rework/Rejection

1. Milestone schedule/ Plan to be prepared


by the Department.
2. Not applicable to Corporate Quality

List of identified systems

1. Applicable where system does not exist


2. System to be computerised
3.
System to be in line with Corporate System

Analysis report and action Not applicable to Corporate Quality


plans

Status reports

Not applicable to Corporate Quality

Customer complaint
MIRs/ computer
generated data

1. Milestone schedule/ Plan to be prepared


by the Department.
2. Not applicable to Corporate Quality

Data Compilation records/ Not applicable to Corporate Quality


Computer generated
records

Analysis report

Not applicable to Corporate Quality

Action Plan

Not applicable to Corporate Quality

Status reports

Not applicable to Corporate Quality

QTM records of computer

QTM records

Department Plan/ Procedure to be prepared


(if not available) reflecting period required
for analysis.

Analysis report

Schedule to be prepared by the


department.

Status reports

Schedule to be prepared by the


department.

Project report

Project report

Project report

Project report

Project report

Project report

MIRs

MIRs

MIRs

MIRs

MIRs

Review reports

Action Plans

Action Plans

Review records

Assessment Schedule

Feedback Report

1. Department to prepare schedule of


activities
2. Not applicable to Corporate Quality

Feedback Report/ BSC/


Unit plans

Not applicable to Corporate Quality

Status reports

Not applicable to Corporate Quality

Unit reports/ Highlights/


MIR

Not applicable to Corporate Quality

Time Index based on identified processes

Not applicable to Corporate Quality

Schedule

Not applicable to Corporate Quality

TQ Status

Facilitaion to other Units/Divns as assigned


to the individual

Reports/ Feedback

Publications/MIR s

Audit/review reports

Review reports

Review reports

Action Plans

Action Plans

Vendor Development/
Assessment reports

Schedule to be obtained from indenting


department (if not provided)

MIR / Report

Schedule to be obtained from related


deparment/ if not available

Data log of labs

Not applicable to Corporate Quality

MIRs

Time Index based on identified systems

Contract

Schedule to be prepared by the


department.

Tender specification

Comparitive Statement of
offers

Inspection Reports/
NCRs/ Feedback

MIRs/Feedback

Schedule to be prepared by the


department.

Feedback

CTQs wherever applicable.

Reports of Service
Provider

Unit QA/QC

For Third Party Inspection Agencies/ subcontractors appointed by BHEL Performance Index = 0.3 (Time Index) + 0.7
(No. of errors/ No. of opportunities).
For other service providers Performance
Index = Time Index

MIR

Schedule to be prepared by the department

Letters/Feedback/ Review

Training materials

Training schedule

MIR/Reports

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance deptt.

Record maintained by
Unit Head/Unit P&D

Survey Report

Project report

Quality Deptt.

Action plan document

Project report

Rating declared at year


end by Corporate / Unit
Management

This KRA will be taken by Head of Unit


/Function / Department , if covered under
MAP, and can be assigned a weightage
upto 100%

Description

GROUP

Quality Control - Inspection, Testing


(including BOIs)

Calibration and Management of LABS

Quality Assurance, Quality Audits/Reviews

Certifications, New Systems, New


Measurement techniques

Enhancing customer satisfaction (Internal/


External)

Training

Quality Improvement activities - Initiatives &


Improvements to reduce NCRs, Rework,
Rejection, Customer Complaints, SARs etc

TQM, Quality Management activities

Support to other functions

ription

ection, Testing

gement of LABS

uality Audits/Reviews

ystems, New
ques

satisfaction (Internal/

activities - Initiatives &


uce NCRs, Rework,
Complaints, SARs etc

ement activities

tions

HUMAN RESOURCES / ADMINISTRATION FUNCT

KRA ID

Function

KRA Description

KRA
TYPE

Unit of Measurement

Critical
KRA
(Y/N)

No. of days delayed


from scheduled date

HRX00200 HRX

Design/ implementation and


maintenance of IT enabled HRIS as
per plan.
Timely allocation of interest subsidy
on housing/vehicle loan.

No. of days delayed


from scheduled date

HRX00300 HRX

Reduction in subsidy of social


overheads. Eg. Canteen/ School etc
against score card/Plan.

% reduction over last


year

% reduction / overall
cost

HRX00100 HRX

HRX00302 HRX

Reduction in subsidy by review of


existing canteen rates/ menu/
preparation practices etc.
Implementation of subsidy reduction
measures.

HRX00400 HRX

Percentage of feedbacks on which


initiatives taken to improve the
canteen services.

HRX00301 HRX

HRX00500 HRX

Timely development of a system for


evaluation of quality of raw materials.

HRX00600 HRX

Implementation of intiatives to
increase satisfaction level of
consumers of canteen as per
schedule.

No. of days delayed


from scheduled date
%

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

HRX00900 HRX

Number of decisions taken in


Canteen Mgt. Committee
implemented within the timeframe.
% of disciplinary cases delayed w.r.t
to the target time.
% of grievance cases settled within
the target time.

HRX01000 HRX

Working days lost due to


absenteeism as a % of total working
days as per plan.

% days lost/ total


available days

HRX01001 HRX

Identifying the chronic cases of


absenteeism and root cause analysis
of the same. (individualy)

No. of cases identified


and RCA done

% improvement in
attendance

HRX00700 HRX
HRX00800 HRX

HRX01002 HRX
HRX01100 HRX
HRX01200 HRX

Remedial action like counselling and


institutional measures for the
attendance improvement of chronic
absenteeism cases.
Maintenance of HRIS-updation of
data every month by specified date
Timely completion of promotion cycle
as per plan

% implemented in
time/ total decision
taken

% delayed/ total

% settled in time/ total

O
O

Time Index
No. of days delayed
from scheduled date

N
N

HRX01300 HRX

Monthly updation of employee data


base as per schedule

HRX01500 HRX

Timely resolution of issues referred to


HR (Time limit to be specified in
action plan)
Ensuring timely delivery of HR
Deliverables

HRX01501 HRX

Finalising the case of review


employees on attaining the age of
55/58 years.

HRX01502 HRX

Timely settlement of pay fixation/pay


anomaly issues within specified time

HRX01400 HRX

O
O

Time Index

% issues not resolves


within specified time
Time Index

N
N

Time Index
O

% anomalies not
settled within
specified time

HRX01503 HRX

Timely completion of P-Map cases


within specified time as announced by
Corp. office

% cases not
completed in the
specified time

HRX01600 HRX

Timely administration/processing of
RECHS- satisfaction level to be
judged by survey

Satisfaction score

HRX01700 HRX

Processing and settlement of terminal


benefits within specified time of
seperation.

% cases not settled in


the specified time

% of employees

HRX01802 HRX

Employee participation in excellence


award scheme/suggestions/ PIP/QC/
improvement projects in HR function.
Number of PIP and improvement
projects undertaken in HR.
Number of active Quality Circles in
HR.

HRX01900 HRX

No. of improvement projects /new


initiatives/new systems implemented
on employee internal communication.

HRX01800 HRX
HRX01801 HRX

HRX01902 HRX

Formulation of system and action


plan for meeting the communication
gaps.
Implementaion of action plan on
communication.

HRX01903 HRX

Timely arrangement of open


forum/Mgt - Employee
Communication Meetings (MECOM)

HRX01901 HRX

HRX01904 HRX

Percentage of issues raised in the


Mgt Employee Communication
Meetings resolved.

HRX02000 HRX

HR practices such as Training/


Recruitment etc bench marked and
improved as per schedule.

O
O

Number
Number

No. of projects
planned and
completed.

N
N

No. of days delayed


from scheduled date
C
C

Y
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

Y
%

Y
No. of days delayed
from scheduled date

HRX02100 HRX

Cost saving in HR services w.r.t


plan/target as per departmental score
card.

HRX02101 HRX

Fixing a target/ identifying and


preparing action plan for cost saving
thru' wastage reduction/ economic
buying/ rationalisation of services
etc.as per schedule

HRX02102 HRX

Implementation of action plan to meet


target on cost saving through wastage
reduction/ economic buying/
rationalisation of services etc.as per
schedule

HRX02200 HRX

No. of services/contracts reviewed for


Rationalisation/ rating of vendors for
utilities/servicesas per schedule.

HRX02300 HRX

No. of works completed without cost


overruns as per target.

HRX02400 HRX

Finalisation of Functional scorecard


by specified date

HRX02500 HRX

Completion of improvement and OD


projects/HR initiatives undertaken
aligned to strategic plan/ balance
score card as per schedule.

HRX02501 HRX

Identification of improvement projects


aligned to strategic plan/ balance
score card as per schedule.

HRX02502 HRX

Preparation of action plan for


implementation of identified
improvement projects aligned to
strategic plan/ balance score card as
per schedule.

HRX02503 HRX

Implementation of action plan for


identified improvement projects
aligned to strategic plan/ BSC as per
schedule.

HRX02600 HRX

No. of new initiatives implemented as


per schedule to improve Organisation
Work Culture and mile stones to be
reached with in the year.(Few aspects
from the list to be selected)

HRX02601 HRX

Identification as per schedule


initiatives/ formulation of system and
action plan for improving the work
culture.

Actual savings in Rs./


target

No. of days delayed


from scheduled date

Y
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

Y
Index= No. works with
cost overrun/ Total
works * Cost overrun/
Budget cost

No. of days delayed


from scheduled date
O

Y
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

No. of days delayed


from scheduled date

Implementation of action plan on work


culture improvement initiatives as per
schedule.
Conducting leadership effectiveness
survey as per schedule

HRX02701 HRX

Design of questionnaire for


conducting Leadership Effectiveness
Survey as per schedule.

HRX02702 HRX

Administering survey questionnaire to


assess the Leadership Effectiveness
Survey and analysis of data as
scheduled.

HRX02602 HRX
HRX02700

HRX

HRX02703 HRX
HRX02800 HRX

HRX02900 HRX
HRX03000 HRX

Implementation of action plan as per


schedule to improve the Leadership
Effectiveness Survey.
Number of agrieved employees
counselled.
Development of centralised coding
and standardisation of works contract
as per schedule.
% productive hours lost due to strikes/
lockouts and labor unrest.

Y
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

O
O

N
Number

No. of days delayed


from scheduled date
C
O

N
% hours lost/ total
hours

Time Index

HRX03100 HRX

Holding structured meetings of


Unions/Associations with Head of
Unit/GM/AGM(HR) as per schedule

Percentage of issues resolved out of


the ones agreed in various structured
meetings with unions/associations.
Percentage of meetings of bi-partite
fora organised as per plan.

% issues resolved/
total issues discussed

No. of days delayed


from scheduled date

% issues resolved/
total issues discussed

HRX03500 HRX

Percentage of issues resolved out of


the ones agreed in the meetings of
bi-partite fora.
Timely and effective conduct of
elections.

HRX03600 HRX

Timely and effective conduct of


various sports/games events as per
schedule.

HRX03700 HRX

Reduction in number of contract


labour through various initiatives like
enhanced outsourcing/ VRS etc.

HRX03200 HRX
HRX03300 HRX

HRX03400 HRX

No. of days delayed


from scheduled date
No. of days delayed
from scheduled date

No's reduced

HRX03701 HRX

Organising workshops with line


managers on the various aspects and
issues on Contract Labour as
scheduled.

HRX03702 HRX

Identifying the areas and action plan


for reducing the number of contract
labour jointly with line managers.

HRX03703 HRX

Implementation of action plan for


reduction of contract labour as
scheduled.

HRX03800 HRX
HRX03801 HRX
HRX03802 HRX

No. of employees redeployed


consequent upon outsourcing of
services and non-core activities as
per plan.
Identification of activities to be
outsourced as per schedule.
Finalisation of methodology for
outsourcing by specified date.

O
O
C

HRX04000 HRX

Identification of manpower
requirement at unit level and getting
the sanction to fill up the posts by
specified date.

HRX04001 HRX

Generation of data on category and


skillwise manpower gap by specified
date.

HRX04002 HRX

Submission of proposal on
manpower requirement to Corporate
Office after proper analysis &
complete in all respects

HRX03902 HRX

N
No. of days delayed
from scheduled date

HRX03903 HRX

HRX03901 HRX

No. of days delayed


from scheduled date

Development of a system for


manpower planning by specified date
Gathering input on present system by
specified date
Finalising the revised system by
specified date
Issue Guidelines for 'Core' & 'NonCore' activities by the Units

HRX03900 HRX

Time frame / No. of


days delayed from
scheduled date

No's redeployed.
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

C
O
C
C

N
N
N

Y
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

Y
Y
N

Y
No. of days delayed
from scheduled date
Y

No. of clarifications
sought by Corp office

No. of days delayed


from scheduled date

HRX04100 HRX

HRX04101 HRX

Induction of manpower as per plan/


with in the specified time.
Preparation/review of norms/criteria
for various aspects of the recruitment
process and sharing the same with all
concerned by specific date.

N
No. of days delayed
from scheduled date

HRX04200 HRX

Notifying the vacancies/ getting the


applications/ screening and
shortlisting candidates for selection by
specific date.
Organising the selection process for
positioning by specified date.
% of employees assessed for skill
inventory.

HRX04201 HRX

Designing a system for collecting data


for compiling skill inventory by specific
date.

HRX04202 HRX

Implementing and maintaining the


system developed for skill inventory
by specific date.

HRX04102 HRX
HRX04103 HRX

HRX04400 HRX

No. of employees redeployed as a


part of HR optimisation as per plan.
Induction of fixed tenure appointees
by specified date.

HRX04500 HRX

No. of improvement projects


implemented as per plan based on
Township residents Satisfaction
survey.

HRX04501 HRX

Preparation and administering survey


questionnaire to assess the
satisfaction score of Township
residents as per schedule.

HRX04300 HRX

HRX04502 HRX

HRX04503 HRX

Identification of areas for


improvement and action planning to
improve the satisfaction score of
township residents as per schedule.
Implementation of action plan to
improve the satisfaction score of
township residents as per schedule.

No. of days delayed


from scheduled date
O
O
O

N
No. of days delayed
from scheduled date
%

N
Y

No. of days delayed


from scheduled date
C

Y
No. of days delayed
from scheduled date

No. redeployed

No. of days delayed


from scheduled date

No. implemented/
total

No. of days delayed


from scheduled date
C

Y
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

Y
Number

HRX04600 HRX
HRX04700 HRX

HRX04701 HRX
HRX04702 HRX
HRX04800 HRX

No. of projects undertaken and


implemented on rain water harvesting
and energy conservation.
Increase in revenue through township
facilities.
Review of norms for rent/lease rent
for township facilities for outsiders by
specified date.
Increase in collection of rent from
non-BHEL residents.
% of unauthorised occupants evicted
in township.

O
O

Y
% increase over last
year

No. of days delayed


from scheduled date
O
O
O

N
% increase over last
year
% evicted/ total to be
evicted

N
N

HRX04900 HRX

No. of jhuggies/ unauthorized


construction removed/rehabilitated.

HRX05100 HRX

Average cycle time from EO court


order to execution/ compliance
Plantation of trees/shrubs/lawns as
per target.

HRX05200 HRX

Number of social/national
festivals/functions organised in
township/project sites.

HRX05300 HRX

No. of Community Development


initiaves like Medical Camps/ Blood
donation/ upgrading of school
facilities in neighbouring villages/
literacy programmes etc.

HRX05000 HRX

HRX05400 HRX
HRX05500 HRX
HRX05600 HRX

HRX05700 HRX
HRX05800 HRX

No. of participant mandays on


programs on official language
implementation including Hindi on
Computers.
Number of seminars conducted on
official language act for PSUs.
Number of participants in Hindi
competition .
Percentage compliance of Sec 3(3)/
Rule 5/6 & 11of Official Languages
Act/ 1963 and Rules 1976.
Percentage increase in Hindi
Correspondence

HRX06200 HRX

Percentage compliance of the


assurance(s) given to various
inspection agencies of Rajbhasha
including Parliament Committees.
Publication of annual souvenoir on
Rajbhasha as per schedule
Timely updation of roster on Hindi
knowledge
No. of Training man days per
employee per year

HRX06201 HRX

Revisiting the system for training


need identification at all levels by
specific date.

HRX06202 HRX

Designing and organising training


programmes as per the identified
training needs by specific date.

HRX05900 HRX
HRX06000 HRX
HRX06100 HRX

HRX06300 HRX

No. of persons trained in Technical


Skills including multi-skill training as
per plan.

HRX06301 HRX

Revisiting the present system of


multiskilling by specific date to
enhance its effectiveness.

O
O

No.done/ No. planned


% reduction in Av.
Cycle time
% of total plantation
area covered

N
Y

Number
O

N
Number

N
Number

O
O
O

N
Number
Number

N
N

%
O
O

N
%

%
O
O
O
O

N
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date
Trg. Mandays/
employee

N
N
Y

No. of days delayed


from scheduled date
O

Y
No. of days delayed
from scheduled date

Y
Number

Y
No. of days delayed
from scheduled date

HRX06302 HRX

Implementation of the revised multi


skill training programme by specific
date.

HRX06400 HRX

% completion of training programs as


identified in MAP for executives and
other employees as per present
system in units.

HRX06401 HRX

Designing training programmes as


per the identified training needs by
specific date.

HRX06402 HRX

Organising training programmes as


per the identified training needs as
per schedule.

HRX06403 HRX

Planning and Preparation of Annual


Training Programme Calendar by
specified date

No. of days delayed


from scheduled date
C

Y
%

Y
No. of days delayed
from scheduled date

Y
Time Index

Y
No. of days delayed
from scheduled date

N
Time Index

HRX06500 HRX

New training programs developed &


implemented in the year as per
schedule.

HRX06600 HRX

Improvement in the performance of


Trade Apprentices with reference to
the average marks scored by them in
the National Trade Test.

Av. Marks

HRX06700 HRX

No. of joint training programmes with


customers/suppliers/institutes as per
plan.

No. & Training


Effectiveness index

No. of days delayed


from scheduled date

HRX06701 HRX

Identifiy the partners for conducting


joint training programmes and
designing the programme by specific
date.

HRX06702 HRX

Organising joint training programmes


with customers/suppliers/institutes as
per schedule.

HRX06800 HRX

Devpt.and implementation of new


training module for promotee
supervisors/Executives by specific
date.

HRX06900 HRX

No. of awards won in National and


Regional Level competitions by
Apprentices.

HRX07000 HRX

Production completion with reference


to the budget. (For HRDC workshop)

Rs./Tonnage

HRX07100 HRX

Increase in revenue through


HRDC/HRDI programmes for nonBHEL participants.

% increase over last


year

Y
Time Index

Y
No. of days delayed
from scheduled date

Y
Number
N

HRX07102 HRX

Number of programmes planned &


conducted for other organisations at
their place.
Revenue through consultancy in the
area of expertise.

HRX07200 HRX

Development of a system for


competency mapping/ as per
schedule.

HRX07201 HRX

Finalisation of approach for


competency mapping by specified
date.

HRX07202 HRX

Piloting of competency mapping


system at one major unit as per
schedule.

HRX07101 HRX

Number
O
O

HRX07400 HRX

Number of projects useful for BHEL


identified and completed through Inplant trainees/Vocational trainees

HRX07500 HRX

Percentage inprovement in feedback


ratings by the participants of training
programmes

HRX07800 HRX

HRX08000 HRX

Ensuring compliance to various


statutory provisions
Redesign of MAP system for next
cycle as per schedule

HRX08001 HRX

Compilation & analysis of feedback


for redesign of MAP as per schedule

HRX07900 HRX

Y
No. of days delayed
from scheduled date

HRX07301 HRX

Announcement regarding various


awards like Swasth Karmachari/
Excel etc as per schedule.

Y
No. of days delayed
from scheduled date

Setting up of Question Papers,


Evaluation of Answer Sheets and
Evaluation of Project Reports
submitted by Engineer/ Executive
Trainees

HRX07700 HRX

HRX07600 HRX

No. of days delayed


from scheduled date

HRX07300 HRX

Procurement and issue of Gift items/


uniform cloth/ shoes and other items
by specific date.
No. of Workers Education
Programmes organised as plan.

Rs.
No. of days delayed
from scheduled date

Deployment of the competency


mapping system across the
organisation to E6 and above levels
by specific date.
Timely implementation of ET training
mudules as per schedule.

HRX07203 HRX

Y
No. of days delayed
from scheduled date
Time Index

N
Number
N

Feedback rating

Time Index
O
O

Y
Number

No. of days delayed


from scheduled date
O

O
C

N
No. of non
compliances reported
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

N
N

No. of days delayed


from scheduled date

HRX08002 HRX

Review & redesign specific module(s)


as per requirement by specified date.
Module to be mentioned in action
plan box.

HRX08100 HRX

Communication & training of MAP coordinators for implementing modified


system at units by specified date

HRX08200 HRX

Updation of MAP database - all


changes to be incorporated within 30
days of event

HRX08300 HRX

Review & re-design of KRA Masters &


incorporating changes in the system
by specified date

HRX08400 HRX

Organising & conducting Roll-out


workshops at unit level for MAP
changes as per schedule

C
No. of days delayed
from scheduled date

N
% cases updated
within specified time

No. of days delayed


from scheduled date
O

N
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

HRX08500 HRX

Implementing design changes for


current year MAP cycle as per
schedule

HRX08600 HRX

Responding to queries on HELP


DESK within specified time

N
% queries responded
within specified time

No. of days delayed


from scheduled date

HRX08800 HRX

Finalising of Corporate/ unit level


Balanced Score Cards by specified
date
Evaluation of unit level Scorecards by
specified date

HRX08900 HRX

Compilation & submission of various


SC/ST/OBC/PH/Ex-Sevicemen etc.
Returns as per schedule

HRX09000 HRX

% of grievances related to SC/ST


remaining unresolved at the end of
the year including ones received
during the current year

HRX09100 HRX

% of VIP references replied within


specified time.

HRX09200 HRX

No. of improvement initiatives


implemented based on EPS results.

HRX09201 HRX

Design of questionnaire for


conducting employee perception
survey by specified date.

HRX09202 HRX

Administering survey questionnaire to


assess the Employee perception and
analysis of data as per schedule.

HRX08700 HRX

O
O

N
Time Index

Time Index
O

Y
%
Y

% replied

Number
C

Y
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

No. of days delayed


from scheduled date

HRX09203 HRX

Identification of areas for


improvement and action planning to
improve the EPS score by specific
date.

HRX09204 HRX

Implementation of action plan to


improve the EPS score by specific
date.

HRX09300 HRX

Improvement in the employee


satisfaction score on HR deliverables
measured through internal customer
perception survey.

HRX09301 HRX

Preparation and administering by


specific date survey questionnaire to
assess the satisfaction score on HR
deliverables.

HRX09302 HRX

Identification of areas for


improvement and action planning to
improve the satisfaction score on HR
deliverables by specified date.

HRX09303 HRX

Implementation of action plan to


improve the satisfaction score on HR
deliverables by specific date.

HRX09400 HRX

No. of 5S projects identified and


deployed as per plan in HR
department as per schedule.

Y
No. of days delayed
from scheduled date
Y

ICPS Score

No. of days delayed


from scheduled date
C

Y
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

Y
Time Index

HRX09600 HRX

Operating availability of fire safety


equipments.
Cost savings through rationalization
of security personnel.

HRX09700 HRX

Designing & implementing new


initiatives to safe guard Company
Properties by specified date.

HRX09701 HRX

Identification of initiatives/ formulation


of system and action plan for
protecting company properties.

HRX09702 HRX

Implementaion of action plan by


specific date for protecting company
properties.

HRX09800 HRX

Reply to Govt. Audit queries/


Inspection report paras/ Action Taken
Reports etc. furnished within specified
time (2 weeks)

HRX09900 HRX

Reply/settlement of Internal Audit


paras within specified time (4 weeks)

HRX09500 HRX

O.A. Factor

Rs.

Number
C

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
%

Y
%

HRX10000 HRX

Timely inputs to unit/corporate finance


for inter-unit re-conciliationof
accounts

Time Index
O

Y
Time Index

HRX10100 HRX
HRX10200 HRX

Timely inputs to unit/corporate finance


for BUDGET/FLASH/MIRs etc.
Improvement in Employee
Satisfaction Score

HRX10401 HRX

Implementation of Improvement
projects identified in the Position
Report as per schedule
Increase in no. of active Quality
Circles in the deptt.
Achieving Business excellence thru'
TQM at Deptt. level
Preparation of action plan based on
Position report

HRX10402 HRX

Implementation of Improvement
projects identified in the Position
Report as per schedule

HRX10201 HRX
HRX10300 HRX
HRX10400 HRX

HRX10700 HRX

Writing & getting the approval of the


relevant chapters of enablers / results
of TQM position report for the unit
within specified date.
Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal
Completion of KM Projects as per
schedule

HRX10800 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

HRX10900 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

HRX11000 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

HRX10403 HRX
HRX10500 HRX
HRX10600 HRX

O
O

Y
Score

Time Index
C

Number of new
circles

TQM Score

No. of days delayed


from scheduled date
Time Index

Y
No. of days delayed
from scheduled date

O
C
C
C

Y
No. of days delayed
from scheduled date
Number
Time Index

Y
N
Y

No. of days delayed


from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

HRX11100 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed


from scheduled date

HRX11200 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

HRX11300 HRX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

HRX11400 HRX

No. of Professional articles & papers


contributed in media/ conferences.

HRX11600 HRX

No. of abstracts made after reading


books / journals / articles in the area
of resopnsibility / job being performed
for improving and updating
knowledge / skills
Number of initiatives pertaining to
WIPS

HRX11700 HRX

Finalising system for evaluation of


training effectiveness by specified
date

HRX11800 HRX

Review and finalisation of


Normalisation design as per schedule

HRX11500 HRX

HRX11900 HRX

Review and revision of specific HR


systems to align with business
requirements eg. Manpower planning/
recruitment/ etc (to be mentioned in
action plan box)/ by specific date.

HRX11901 HRX

Preparation of revised policy/ scheme


(details to be given in action plan) for
approval by specific date

HRX11902 HRX
HRX12000 HRX

Isuue of detailed guidelines for


implementation of revised scheme
(details to be given in action plan) by
specific date
Adminstration and implementation of
MAP as per schedule

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

No. of articles

Number

C
O

Y
Number

No. of days delayed


from scheduled date
C

Y
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

Y
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

C
O

N
Time Index

HRX12100 HRX

Budget proposals/ Allocation and


Judicious spending

HRX12200 HRX

Acquisition of various
documents:modern methods to
enable faster availability of the
documents. Collection building
activity

HRX12201 HRX

Acquisition of Books

HRX12202 HRX

HRX12203 HRX

Acquisition of Periodicals
Acquisition of Standards/ Patents/
Reports/ Photocopies etc.

HRX12300 HRX
HRX12301 HRX

Technical processing of documents


Classification and Cataloguing

O
O

HRX12302 HRX
HRX12400 HRX
HRX12401 HRX
HRX12402 HRX

Online catalogue (OPAC). Provision


and maintenance for sharing within
the Unit/Outside units
Modernisation and Automation of
library/information services
Automation of library house keeping
operations

HRX12403 HRX

Automation of circulation system


Online catalogue. Conversion of card
catalogue

HRX12500 HRX

Maintenance/administration/upkeep
of various library/information
operation

HRX12600 HRX
HRX12601 HRX

Maintenance of systems
Stock verification and auditing of
library collection as per schedule

HRX12700 HRX

Interaction with other units of BHEL


for information resource sharing

Number

Y
Number
Number
Number
Number

Y
Y
Y

Number

Y
Y

Percentage of work

Number/percentage

Percentage of work

Number of documents

Percentage of work

Number of documents

Number of systems

No. of days delayed


from scheduled date

Number of queries
attended

Number
O

HRX12702 HRX

Interlibrary lending of
documents(manual/electronic
methods
Acquisition of databases at central
location for online resource sharing

HRX12703 HRX

Administration of LAN/VPN services

HRX12800 HRX

Harnessing Internet Sites for


exploring new avenues in literature
sources. E-governance and edelivery

HRX12701 HRX

Number of documents

N
Number
Timely updation

N
N

Number
C

HRX12801 HRX
HRX12802 HRX
HRX12803 HRX

HRX12804 HRX
HRX12900 HRX
HRX12901 HRX
HRX12902 HRX
HRX12903 HRX
HRX12904 HRX
HRX12905 HRX

Methods of e-delivery of
documents(procurement)
Downloading of free documents(ejournals)
Automated methods in dissemination
of information
Current awareness services:library
bulletin/ information brochures on
new services
Planning and development of digital
library as per schedule
Digitisation of existing resources as
per schedule
Acquisition of e-books as per
schedule
Replacing print versions with eversions of journals as per schedule
Training and education of users in eversions
% Improvement in internal customer
satisfaction score

HRX13000 HRX

Computerisation of documents

HRX13100 HRX

Completion of translation of technical


documents

HRX13200 HRX

Formatting/ Proof Reading and


preparing final version of translation
for despatch

HRX13300 HRX

Editing of translation job done by


others

O
O
C

Timely updation

N
N

No. of days delayed


from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

Number of programs

C
O
O

N
N
N
N
N
Y

Number of pages
converted into soft
copy vis--vis target
in a year

Number of pages
translated vis--vis
target in a year

Number of pages
formatted vis--vis
target in a year

Number of pages
edited vis--vis target
in a year

Number of words
compiled

HRX13600 HRX

HRX13700 HRX

Identification of OCR software/ test


use and installation on server for use
by various departments/Labs and
initial guidance as per schedule

HRX13500 HRX

Number

Number

Collection of subject specific


terminology from day to day
translations and development of
subject specific glossary to do any
future jobs more efficiently
Creation of database for Translation
jobs as per schedule
Database Maintenance and Data
Entry as per schedule

HRX13400 HRX

Number

No. of days delayed


from scheduled date
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

Y
Y

HRX13800 HRX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

HRX13900 HRX

Development of an on-line system by


specified date for RECHS Data
Management

HRX14000 HRX

Classification of activities as 'Core'&


'non-core' in accordance with Corp.
guidelines within specified days of
receipt of guidelines

HRX14200 HRX

Issue of Guidelines relating to


benefits payable for the suspension
period treated as on duty on
reinstatement.
Finalisation of stakeholder Grievance
Redressal system.

HRX14300 HRX

Reduction in time in review and


updation of BHEL CDA Rules in
accordance with instructions of
Central Vigilance Commission and
Department of Public Enterprises

HRX14400 HRX

Completion of all milestone for


finalization of an approach paper on
career planning in BHEL

HRX14401 HRX

To identify, collate and document


literature from various studies,
reports, journal paper, magazine
articles, and library collection.

HRX14402 HRX

To interact with various organization


and get details of the contemporary
career planning practices in those
organizations.

HRX14100 HRX

HRX14501 HRX

Compilation of inputs and draft


approach paper for approval by
specified date.
Preparing a career planning scheme
for implementation
Preparing career paths of different
functions

HRX14502 HRX

Compilation of inputs and draft report


for implementation by specified date.

HRX14600 HRX

Running Normalisation after carrying


out design changes, if required, and
posting results on e-MAP as per
schedule

HRX14403 HRX
HRX14500 HRX

Balanced Scorecard
Rating (5/4/3/2/1)

No. of days delayed


from scheduled date
C

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

O
C

N
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

N
Time Index

Y
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

N
No. of days delayed
from scheduled date

O
C
C

N
Time Index
No. of days delayed
from scheduled date
No. of days delayed
from scheduled date

Y
Y

Y
No. of days delayed
from scheduled date

HRX14601 HRX

Timely sanitisation of data on all the


decentralised servers and merging on
the central server

HRX14602 HRX

Conducting Test run and verifying


results by specified date before the
final run

No. of days delayed


from scheduled date
O
No. of days delayed
from scheduled date
O

HRX14603 HRX

HRX14700 HRX

Timely processing of Community


Development Initiatve proposals
received from Units for approval of
budget & Processing of
donations/financial assistance and
grants to various bodies within the
specified time.

HRX14800 HRX

HRX15000 HRX

HRX15100 HRX

Timely processing of Imports Ocean


freight/air freight/air agencies bills
involving huge amounts (involving
crores of value - audit resulting in
savings in lacs of rupees viz..
classification , currency exchange
rates etc..)

HRX15200 HRX

Appointment of implementation
partner by specified date for HRMS
including finalization of RFPs and
deliverables.

HRX15300 HRX

Processing of representation received


by CMD/Director during their visits to
Units & putting up recommendation
within 15 days of each Quarter.

Y
No. of days delayed
from scheduled date

Formulate strategy for classroomcum-distance learning - develop CBT


module

HRX15202 HRX

% cases processed
within specified time

HRX14900 HRX

HRX15201 HRX

No. of days delayed


from scheduled date

Review of Personnel Manual by


specified date to weed out redundant
rules and create a system for regular
updation of the print and soft versions

Finalization of tender document for


identification of implementation
partner for ERP-HR
Evaluation of tender & Selection of
Implementation partner for ERP-HR

Y
No. of days delayed
from scheduled date

Analysis of output of final run and


setting right abberations thru manual
over ride and posting of final results
on e-MAP by specified date

Preparing a scheme for competency


enhancement of HR personnel by
specified date

N
No. of days delayed
from scheduled date
N

Saving in Rupees

No. of days delayed


from scheduled date
C

N
No. of days delayed
from scheduled date

No. of days delayed


from scheduled date

% recommendations
put up within specified
time

HRX15400 HRX

HRX15500 HRX
HRX15600 HRX

HRX15700 HRX
HRX15800 HRX

Clearance of model contract proposal


received from Units within specified
time
Facilitation and implementation of the
system of assessing effectiveness of
trg. progs.
Creation of FAQ related to employee
benefits
Planning of activities related to house
keeping for the changing needs.
Management of small assets and
furniture within the budget

HRX16100 HRX

Processing of proposals under BHEL


Land Use Policy
Employees transportation
arrangement
Management of central mailing,
speed post and courier services

HRX16200 HRX

Timely ensuring the setting of


Question papers, evaluation of
Answer Sheets of Examination of
Apprentices / ETs.

HRX15900 HRX
HRX16000 HRX

Time Index
O

% of trg.progs.
covered by new
system

Date

Number of activities

No of days.

Timely organised

% completion on time

Time Index
O

N
Time Index

HRX16400 HRX

System for introducing Knowledge /


Experiences sharing and
Presentations forum for PASAA Trade
Apprentices.
Study and preparation of eMaterial for
training programmes.

HRX16500 HRX

Timely preparation and submission of


results of AITT examination to RDAT
Kanpur.

HRX16600 HRX

Facilitating and Guiding Syndicate


Presentations in training programmes

HRX16700 HRX

Pre-processes conductance for


startup of On-the-job training of
Apprentices.

HRX16300 HRX

C
C

N
Nos. of slides / pages
of Material.

Time Index

HRX17000 HRX

NOs. OF CUSTOMER / SPECIAL


TRAINING PROGRAMMES
DESIGNED AND ORGANIZED
MAINTENANCE OF ISO / HSE
SYSTEMS
Nos. of faculty sessions delivered in
training programmes.

HRX17100 HRX

INFRASTRUCTURE UPGRADATION
AS PER PLAN

HRX16800 HRX
HRX16900 HRX

Nos. of presentations

Time Index
O

N
Number

Nos. of NCRs

Nos. of Sessions.

Time Index
C

HRX17200 HRX

Submission of Forms to Provident


Fund organisation to obtain National
Social security Number to employees

No. of days delayed


from scheduled date
O

STRATION FUNCTION KRA MASTER - 2006-07


Special
KRA
(Y/N)

Universal Suggested Weightage for


KRA
category
(Y/N)
A
B
C

Source of Data for


Measurement

KRA Remarks

Status report on the


project.

IT Initiatives

Reports

Subsidies

MIR/ Monthly subsidy


payments.
HOD

CANTEEN

OTHERS

Feedback register &


report

CANTEEN

Report

CANTEEN

Report

CANTEEN

CANTEEN

Report
Report from Section
head.
Report from Section
head.

MIR on attendance.

ESTB.

ESTB.

ESTB.

ESTB.

ESTB.

ESTB.
ESTB.

ESTB.

ESTB.

ESTB.

ESTB.

ESTB.

ESTB.

Questionnaire to be
administered to
retired employees

Report

FINAL SETTLEMENT

MIR

HOD

HOD

HOD

Report by the section


head.
HOD

HOD

HOD

Report

HOD

Report

HOD

Report by the Section


I/C
HOD

FINAL SETTLEMENT

MIR/Reports from
Finance.

HOD

HOD

HOD

Report by Section
head.

HOD

Report from Finance


on estimated cost and
actual.
HOD

Record maintained by
Unit Head/Unit P&D HOD
Balance Score Card/
report by the section
head.

HOD

HOD

HOD

Concerned
Section/HR head

HOD

HOD

HOD

Report

HOD

Report

HOD

Report

HOD

Report

HOD

HOD

Report
MIR on man days
lost.

Report of each
meeting duly signed
by Unit HR head to be
prepared for
reference
IR

HOD

IR

Report of each
meeting duly signed
by Unit HR head to be
prepared for
reference
IR

MIR

IR

Report of each
meeting duly signed
by Unit HR head to be
prepared for
reference
IR

Status report

IR

Status report

SPORTS

MIR on contract
labour.

CONT. LAB

CONT. LAB

CONT. LAB

CONT. LAB
Office orders issued/
MIR on HR & report
by assessee.

MPP & RECTT

MPP & RECTT

MPP & RECTT

MPP & RECTT

Guidelines issued

Mile stone chart

MPP & RECTT

MPP & RECTT

MPP & RECTT

Report from Section


head.

Approval for
induction/ joining of
incumbent/ Report
from the Section
Head.

MPP & RECTT

MPP & RECTT

MPP & RECTT

MPP & RECTT

MPP & RECTT


MPP & RECTT
Report by Section
head.

MPP & RECTT

MPP & RECTT

MPP & RECTT

Office orders issued/


MIR on HR & report
by assessee.

Status report

MPP & RECTT

Report by Section
head.

TOWNSHIP

TOWNSHIP

TOWNSHIP

TOWNSHIP

MPP & RECTT

Report by Sectio
head on the
milestones achieved. TOWNSHIP

Finance

TOWNSHIP

TOWNSHIP

MIR on unauthorised
occupants.
TOWNSHIP

TOWNSHIP

MIR on evictions.

TOWNSHIP

TOWNSHIP

Report on date of
order and date of
implementation.
Report by Section
head

Report

TOWNSHIP

Status report

TOWNSHIP

Report on number
participants.
Report on number
participants.
Report on number
participants.

Qtrly Progress report

RAJBHASHA

Qtrly Progress report

RAJBHASHA

Report

RAJBHASHA

Report

RAJBHASHA

MIR

RAJBHASHA

MIR on training.

TRAINING

TRAINING

TRAINING

MIR

TOWNSHIP

RAJBHASHA
RAJBHASHA
RAJBHASHA

TRAINING

TRAINING

TRAINING
MIR on no. of trg.
Programmes
identified and
completed.

TRAINING

TRAINING

TRAINING

Date of Issue of
Annual Training
Programme Calendar -

Report by Section
head.

TRAINING

Result decalred by
RDAT.

TRAINING

Report by Section
head and Score card. TRAINING

TRAINING

TRAINING

Report on the mile


stones achieved.

TRAINING

TRAINING

Results declared by
the concerned
agencies.

MIR

TRAINING

Finance/Report by
section I/C

TRAINING

TRAINING

TRAINING

Report on the
developed system
and status as per mile
stone.
TRAINING

TRAINING

TRAINING

TRAINING

Report

No. of days taken


from request received -

Report

TRAINING

Report

TRAINING

Report from Section


head.

WELFARE

Report

WELFARE

Report

WELFARE

Report

WELFARE

Feed back report

OTHERS

TRAINING

OTHERS

OTHERS

Feedback Report

OTHERS

Dept. records

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

Dept. records

OTHERS

Dept. Records

OTHERS

Dept. record to be
maintained for receipt
& despatch
OTHERS

MIR

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

Audit committee as
per system developed
by Haridwar.
OTHERS

Internal customer
perception survey.

OTHERS

Report on number of
equipments installed
and their availability. OTHERS
MIR on Security man
power strength.
OTHERS

Report from Section


head.

OTHERS

OTHERS

Record maintained by
Audit deptt.
OTHERS

Record maintained by
Audit deptt.
OTHERS

OTHERS

Record maintained by
individual/ deptt.
OTHERS

Record maintained by
Unit/Corp. Finance
deptt.
OTHERS

Survey Report

OTHERS

Project report

OTHERS

Unit QA/QC

OTHERS

Quality Deptt.

OTHERS

Action plan document OTHERS

Project report

Date of finalisation of
Application document
(position report)
-

OTHERS

OTHERS

OTHERS

Project report

OTHERS

Project report

OTHERS

Project report

OTHERS

Project report

OTHERS

Project report

OTHERS

Project report

OTHERS

Project report

OTHERS

Publications

OTHERS

Records

OTHERS

Report

OTHERS

TRAINING

OTHERS

OTHERS

OTHERS

OTHERS

OTHERS

Acquisition
Records/Budget file

LIBRARY

N
N

N
N

L
L

L
L

M
M

Acquisition/accession
records
Acquisition/accession
records
Acquisition/accession
records
Acquisition/accession
records
Accession
Register/Catalogue
Catalogue/Shelf list

Database

LIBRARY

Database

LIBRARY

Database

LIBRARY

Database

LIBRARY

Database

LIBRARY

Service records/users
feedback
LIBRARY

Service records/users
feedback
LIBRARY

Audit records

LIBRARY

LIBRARY

LIBRARY
LIBRARY
LIBRARY
LIBRARY
LIBRARY
LIBRARY

Requests from
units/services
rendered

TIC records

LIBRARY

TIC records

LIBRARY

Log files

LIBRARY

TIC Records

LIBRARY

TIC Records

LIBRARY

TIC Records

LIBRARY

LAN/VPN log files

LIBRARY

TIC Homepage

LIBRARY

TIC Records/Report

LIBRARY

TIC Records/Report

LIBRARY

TIC Records/report

LIBRARY

TIC Records/Report

LIBRARY

TIC Records

LIBRARY

Questionnaire

LIBRARY

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Deptl. Database

TRANSLATION

Rating declared at
year end by
Corporate / Unit
Management

This KRA will be taken by


Head of Unit /Function /
Department , if covered under
MAP, and can be assigned a
weightage upto 100%

System
implementation date
as per unit balance
score card

Date as prescribed by
C.O.
-

circulation of
guidelines

Issue of Circular

Circulation of revised
CDA Rules
-

Final Document

Records/Relevant
document

Records/Relevant
document

Draft Paper
Approval of Finalized
Scheme
-

Relevant document

Eight major functions would be covered and the

Final Document

Records

No. of days delayed


from scheduled date

Records

Records

Relevant records

Scheme document

Record

Preparation of module
by target date
-

Payment Records

Status Report on the


Project

Status Report

Status Report

Quarterly Reports

Date of approval

Records
Date of issue of the
FAQ

Report

Need based requirements.

Report

Furniture is procured and distributed depending

date on which
complete proposal is
received
Corporate EMX

Report

essential service

Report

Essential service

Process Completion
Dates.

It is major activity and has dependency on other

Documentation
Slides / pages of
Materal.

It is Key activity of Training Workshop.

New key activity. This will inculcate learning and

Developmental activity for enhancing quality and

Nos. of days taken


from date of
examination to
sending of result.

Soft / Hard copies of


presentations

Very useful process in learning.

Activity duration.

It is Key activity to initiate training.

THESE ARE IMPORTANT PROGRAMMES.

PROGRAMME
CONDUCTANCE
DOCUMENTS

Audit Outcome

IT IS ESSENTIAL REQUIREMENT.

Faculty records.

Promote and motivate trainer competency.

COMPLETION OF
PLANNED
UPGRADATION

CRITICAL KRA

Map system

a new activity entrusted by Provident Fund orga

ns would be covered and their activities identified to make individual functional cases and then draw out a generic model of career planning

ed and distributed depending on departmental requirements based on SAC approval

and has dependency on other departments. It requires extensive chasing and monitoring.

his will inculcate learning and sharing culture.

ivity for enhancing quality and avaiability of material to participants.

Training Workshop.

s in learning.

initiate training.

ORTANT PROGRAMMES.

REQUIREMENT.

ate trainer competency.

usted by Provident Fund organisation

model of career planning scheme for the company.

MEDICAL FUNCTION KRA


KRA ID

Function ID KRA Description

KRA Unit of
Type measurement

Critical
KRA
(Y/N)

MEDICAL
HSX00100

HSX

Percentage Improvement in Quality


and accuracy of diagnosis/
treatment

HSX00200

HSX

Customer Satisfaction
Survey(Regular & Retired and NE
Patients)

Customer
satisfaction score

HSX00300

HSX

Percentage
reduction
as compared to
last year
OR %escalation
as compared to
last year

HSX00400

HSX

Reduction in cost of treatment


without compromising Quality.
A) In
house treatment
B) Referral treatment
CONTAINMENT in cost of
treatment without compromising
quality A)In house treatment
B)Referral treatment.
Implementation of OHS activities.

No of OHS
activities
implemented

HSX00500

HSX

Implementation of Family welfare


and immunization programs

Numbers of
Programes OR
Number of
beneficiaries

HSX00600

HSX

Reduction in inventory

No of days of
inventory

HSX00700

HSX

Increase in no of community health


programs

Programme Hours
(numbers
of programs X
number
of Hrs)

HSX00800

HSX

Increase in Revenue generation


from NE/ERNE patients

% increase over
previous
year

HSX00900

HSX

Increase in no of Preventive Health


Programs & awareness
programs/work shops/camps

Programme Hours
(numbers
of programs X
number
of Hrs)

HSX01000

HSX

Adaptation of new health care


practices

Numbers of new
programs
introduced.

HSX01100

HSX

Increase in No. of Education


Programs conducted for
paramedical staff

Programme Hours
(numbers
of programs X
number
of Hrs)

HSX01200

HSX

Increase in no of Quality
circles/OHSAS/ISO/5S
implementation

Programme Hours
(numbers
of programs X
number
of Hrs)

HSX01300

HSX

No. of Academic activities

No. of talks,
papers
presented/publish
ed no.
of CME hrs.
attended

HSX01400

HSX

Conducting annual Medical Audit


as per Corporate guidelines &
submission of report to CMS/CO by
28th February of the financial year .

No. of days
delayed from
scheduled date

HSX01500

HSX

Computerisation of basic health


data of all employees in the unit by
specified date.

% completion by
specified date

HSX01600

HSX

Increase in no. of new/ special


procedures/ surgeries conducted
over previous year.

Number
conducted

ADMINISTRATIVE

HSX01700

HSX

Introduction of cost effective new


techniques in medical purchases

Saving in Rs.

HSX01800

HSX

Vision for joint ventures

No. of joint
ventures.

HSX01900

HSX

Implementation of new programes


of Hospital Management System in
Medical department

No. of new
activities

HSX02000

HSX

Reply to Govt. Audit queries,


Inspection report paras, Action
Taken Reports etc. furnished within
specified time (2 weeks)

% responses sent
within specified
time

HSX02100

HSX

Reply/settlement of Internal Audit


paras within specified time (4
weeks)

% responses sent
within specified
time

HSX02200

HSX

Timely inputs to unit/corporate


finance for inter-unit reconciliationof accounts

Time Index

HSX02300

HSX

Finalisation of Functional scorecard


by specified date

No. of days
delayed from
scheduled date

HSX02400

HSX

HSX02500

HSX

Number of new
circles
TQM Score

HSX02600

HSX

Increase in no. of active Quality


Circles in the deptt.
Achieving Business excellence
thru' TQM at Deptt. level
Development of Knowledge
management Portal

No. of days
delayed from
scheduled date

HSX02700

HSX

Number

HSX02800

HSX

Time Index

HSX02900

HSX

Contributing case studies etc.for


Knowledge Management Portal
Completion of KM Projects as per
schedule
Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03000

HSX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03100

HSX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03200

HSX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03300

HSX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03400

HSX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

HSX03500

HSX

Providing and supervising


qualitative patient care in the
concerned area.

Customer
Satisfaction Score

HSX03600

HSX

HSX03700

HSX

HSX03800

HSX

No. of Reports
generated
No. of innovative
programmes
Saving in Rs.

HSX03900

HSX

Preparation of Reports/Data as per


plan.
Health care best practices
implemented as per plan.
Reduction in cost of patient care
without compromising quality.
Maintenance of inventory record.

HSX04000

HSX

HSX04100

HSX

Preventive community health


programmes
Safe disposal of bio-medical waste

HSX04200

HSX

HSX04300

HSX

HSX04400

HSX

HSX04500

HSX

Timely indent and distribution of


material
Quality improvement initiative as
per plan
Reduction in waiting time for
investigative procedures
No. of educational programmes for
subordinates

PARA-MEDICAL

C
O
O

C
C
C

Value of stock
inventory
No. of
Programmes
Satisfaction score
No. of emergency
indents made
Number of
initiatives
% reduction in
time
Number

HSX04600

HSX

No. of quality systems incorporated


QC/5S/TQM / OHSAS

No. of
programmes

HSX04700

HSX

HSX04800

HSX

Upkeep & maintenance of


equipments
Quality & accuracy of patient care
Nurses/Technicians /
Physiotherapists

No. of days of
break down
Satisfaction score
in %

HSX04900

HSX

HSX05000

HSX

HSX05100

HSX

Quality & upkeep of


Hospital/Dispensaries
Participation in implementation of
Computerisation
Timely inputs to unit/corporate
finance for BUDGET/FLASH/MIRs
etc.

HSX05200

HSX

HSX05300

Satisfaction score
in %
No. of
Programmes
Time Index

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

HSX

Preparation of action plan based


on Position report

No. of days
delayed from
scheduled date

HSX05400

HSX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

HSX05500

HSX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

Balanced
Scorecard Rating
(5/4/3/2/1)

L FUNCTION KRA MASTER - 2006-07


Special
KRA
(Y/N)

Universal
Suggested Weightage for
KRAs
category
(Y/N)
A
B
C

Source of Data for


Measurement

Verfication of 20 random
records 50% OP& 50% IP by
MS/Reviewer. Keeping in mind
clinical documentation, relevant
investigations & provisional
diagnosis with final treatment,
response to the treatment.
Remarks

Clinical Examination of patients.


Documentation of Clinical
notes, investigation.
Diagnosis
Provision/Final.
Relevance of
Format to be formed
Remarks

To set base
line Cleanliness 5 -S, disposal
of biomedical waste.
Records
Remarks

1.
Judicious referrals
2. Judicious
prescription.
3. Reduction in
frequency of follow up visits.
Title of the programsRemarks

Organisation participation &


maintenance
Health Data
Title
of the programs

Records
Remarks
1. Reduction local
purchase
2. Judicious use of Drugs &
investigation
3. Minimal

Title of the programs


Remarks
1. E-mail Communications,
publicity.

Records
Remarks
publicity of hospital profile
Competitive tariffs

Empanelments of non BHEL


Title of the programs
remarks
Awareness programs at work
place
Public lectures

Title of the programs


Remarks

Minimal
Invasive
surgery
Title
of the
programs

Title of the programs

Title of the Papers/talks/CME

Audit to be conducted as per


guidelines issued by CMS/CO.
Audot report duly signed by Unit
Medical Head & sent to
CMS/CO.

Details of the procedure

Records
Remarks
auto indenting
ecom/reverse action,
central purchasing.
QUE (Quality
Uniformity Economy)

Diagnostic centres &hospital


entered for joint ventures

Number of new data generated


through Hospital Management
System

Record maintained by Audit


deptt.

Record maintained by Audit


deptt.

Record maintained by
individual/ deptt.

Record maintained by Unit


Head/Unit P&D

Unit QA/QC

Quality Deptt.

Case Document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Source is data of satisfactory


score parameter outlined in the
format.

Periodical evaluation of
sectional performance
Title of the adopted best
practice
Judicious use of consumables
and energy.
Periodic verification of inventory
records.
Title of the programmes

Format of satisfactory score

Verification by Appraiser for


availability of items.
Tile of the innovation

As per satisfactory format and


360 Appraisal.
Titles

Titles

Timely initiative measures taken


for rectification
360 Appraisal

As per satisfactory format

Title of programmes and


implementation
Record maintained by
Unit/Corp. Finance deptt.

Project report

Action plan document

Project report

Rating declared at year end by


Corporate / Unit Management

KRA Remarks

This KRA will be taken by Head of Unit


/Function / Department , if covered
under MAP, and can be assigned a
weightage upto 100%

PLANNING & DEVELOPMENT FUNCTION K


KRA ID

FUNCTION

KRA Description

KRA
Type

KRA Unit of
Measurement

PDX00100

PDX

Development of Company/ Unit


/Product/Function level Balanced
Score Card by specified date.

No. of days
delayed from
scheduled date

PDX00200

PDX

Monitoring - Balanced Score Card- Quarterwise Data to be finalised by 7th of


subsequent month

Time Index

PDX00300

PDX

Formulation of Broad Objectivesfor


CO/Unit/Prod/Function by specified
date.(To be selected while fixing targets)

No. of days
delayed from
scheduled date

PDX00400

PDX

Formulation of Revenue Budget for CO/


Unit/ Div/Prod/Func by specified date.
(To be selected while fixing targets)

No. of days
delayed from
scheduled date

PDX00401

PDX

Preparation of monthwise budget after


Board approval.

No. of days
delayed from
scheduled date

PDX00500

PDX

Half Yearly Review of Operations

for CO/
Unit/ Div/Product / Function/ Dept
(To be selected while fixing
targets)

% of shortfall
made up in LE

PDX00600

PDX

Flash Report CO/Unit/

Div (To be
selected while fixing targets)

Variation in Flash
Vs Boardadopted figures in
April

PDX00700

PDX

Operations Planning & Monitoring

PDX00701

PDX

Operations planning & monitoring Turnover


for CO/ Unit/ Div/Product / Function/ Dept
(To be selected while fixing targets)

Achievement Vs
Targets.
Achievement Vs
Targets.

PDX00702

PDX

Operations planning & monitoring Project


deliveries for CO/ Unit/ Div/Product /
Function/ Dept (To be selected while fixing
targets)

Achievement Vs
Targets.

PDX00703

PDX

Operations planning & monitoring Materials


for CO/ Unit/ Div/Product / Function/ Dept
(To be selected while fixing targets)

Achievement Vs
Targets.

PDX00704

PDX

CLEARANCE OF LETTER OF CREDITS


(LCs) BY P&D within specified time.

% of LC's cleared
in the specified
time

PDX00800

PDX

Assessment of Plant Performance/ SIP

PDX00900

PDX

Submission of Management Information

Achievement Vs
Targets.
Time Index

PDX00901

PDX

Reports as per schedule.


Status of billing & valuation of Reciept cum
despatch report( RDR) by specified time.

Time Index

PDX01000

PDX

Time Index

PDX01001

PDX

Techology Gaps-Identification and bridging


of gaps
Identification of Technology Gaps &
preparing Business plans for identified
Products within specified schedule.

Time Index

PDX01002

PDX

Bridging of Technology / Business Gaps


through introduction of TCAs/PIRs/JVs/
Mergers & Acquisitions Projects.

Time Index

PDX01100

PDX

Formulation of Strategic / Business/


Divisional/Product Plan by specified
date.

No. of days
delayed from
scheduled date

PDX01200

PDX

Revisiting and Review of Strategic /


Divisional/Business/Product/
Functional Plans by specified date.

No. of days
delayed from
scheduled date

PDX01300

PDX

Environmental Information Compilation &


Analysis for Business Impact by specified
date.

No. of days
delayed from
scheduled date

PDX01400

PDX

Benchmarking of Company/Unit/Product
Performance

No. of days
delayed from
scheduled date

PDX01401

PDX

Analysis of company performance through


Benchmarking against international /
national companies

No. of days
delayed from
scheduled date

PDX01402

PDX

Development of action plan for


improvement.Detailed action plan for each
criteria with milestone dates to be prepared
by specified date.

No. of days
delayed from
scheduled date

PDX01500

PDX

Development /formulation of
Feasibility Reports (FRs)/Investment
proposals for CO/ Unit/Product/
Function level

Number of FRs
prepared Vs
Target

PDX01600

PDX

Annual Plans Formulation (Capital) for


CO/Unit/Product/Function by
specified date.

No. of days
delayed from
scheduled date

PDX01601

PDX

Formulation of Minor Capital Budget by


specified date ( including manufacturing
technology development) .

No. of days
delayed from
scheduled date

PDX01700

PDX

Capital Budget monitoring

Acheivment Vs
Targets

PDX01701

PDX

PDX

Capital Budget monitoring - Schemes /


M&R Items
Monitoring of Minor Capital Budget
including manufacturing technology
development.

PDX01702

PDX01703

PDX

Capitalisation of facilities by specified date

No. of days
delayed from
scheduled date

PDX01800
PDX01801

PDX
PDX

O
O

PDX01802

PDX

PDX01803

PDX

Procurement of Capital equipment


Freezing Specification and raisal of
Procurement Indents
Tender Evaluation & final recommendation
to release PO.
Co-ordination for Installation of major
facilities in stipulated time

Time Index
Acheivment Vs
Targets
Acheivment Vs
Targets
No. of days
delayed from
scheduled date

PDX01804

PDX

Planning/ indenting/ procurement coordination and allocation Office furniture to


fulfill requirements of executives within the
allocated budget

No. of Indents
converted to
SRV.

PDX01805

PDX

Small assets planning/ budgeting/


monitoring etc. to fulfill plant requirement
within the allocated budget

% of budgetted
amount
committed

PDX01900

PDX

Finalising Technology / Collaboration


(including MOUs/NDAs) agreement

Time Index

PDX01901

PDX

Execution & Monitoring of


TCAs(including TCAEE)/ MOUs/ NDAs

Time Index

O
O

Acheivment Vs
Targets
Acheivment Vs
Targets

including amendments/ extensions/


Purchase of Module documentation/
Royalty payment
PDX01902

PDX

Deputation of Engineers to Foreign


countries to Collaborators/ Business/
Training/ Sites etc.

Time Index

PDX01903

PDX

Coordination for deputation of experts

PDX01904

PDX

PDX01905

PDX

PDX02000

PDX

Co-ordination for Design deviations/design


vetting/Queries
Maintenance of computerized database of
documents received from collaborator
Finalising MOU with Govt. of India by
specified date.

No. of experts
deputed
No. of designs
changed
% of documents
computerised
No. of days
delayed from
scheduled date

PDX02001

PDX

Submission of draft MOU to Govt. of India

No. of days
delayed from
scheduled date

PDX02002

PDX

Defending MOU criteria/ targets/ finalisation


& approval for signing readiness.

No. of days
delayed from
scheduled date

O
O

PDX02003

PDX

Submission of MOU performance


evaluation report for previous year
(provisional/ audited) and/ or with case for
possible score/ rating improvement (as
necessary)

No. of days
delayed from
scheduled date

PDX02004

PDX

PDX02100

PDX

Monitoring MOU parameters to achieve the


MOU performance.
Preparation and sending replies for
Parliament questions to DHI & other
Ministries

Achievement Vs
Targets.
Time Index

PDX02200

PDX

Preparation of briefs for CMD/ Directors for


their evidence before Parliamentary
committees at Parliament house

Time Index

PDX02300

PDX

Effective planning of Parliamentary


Committees visits to BHEL Units/
finalization of logistics and preparation of
briefs.

Appraisers
Satisfaction
Score

PDX02400

PDX

Time Index

PDX02401

PDX

Organising Management Committee


Meetings
Finalisation of MCM calendar & formulation
of Monthly Agenda by specified date

No. of days
delayed from
scheduled date

PDX02402

PDX

Compilation & uploading of MCM Agenda


folder

No. of days
delayed from
scheduled date

PDX02403

PDX

Anaysis/ preparation of MCM backup


papers/ presentations/ and appraising Unit
Head

No. of days
delayed from
scheduled date

PDX02404

PDX

Regular monitoring with concerned


agencies for resolution of action points
raised in previous MCMs and presentation
of pending issues.

Time Index

PDX02405

PDX

Time Index

PDX02406

PDX

Preparation/ issue/ and dissemination of


MCM Minutes within specified time .
Smooth administration of Management
Committee meetings

Appraisers
Satisfaction
Score

PDX02407

PDX

Development of systems by specified date


to improve the efficiency of MCM
Secretariat.

No. of days
delayed from
scheduled date

PDX02408

PDX

Development of systems by specified date


to enable MC focus on long term/ critical
company isues.

No. of days
delayed from
scheduled date

PDX02409

PDX

Designing of a systemby specified date to


interlink the existing MIRs and generate
backup material for MCM.

No. of days
delayed from
scheduled date

PDX02410

PDX

Improving the MC Website through better


facilities/ content management/ and
updations/ modifications for effective
management of MC Meetings.

Satisfaction
Score (to be
obtained from
CMD&Directors)

PDX02411

PDX

Updation and review of operations review


formats by specified date for the MC
Meetings based on feedback from MC
Members and other users.

No. of days
delayed from
scheduled date

PDX02500

PDX

Reply to Govt. Audit queries/ Inspection


report paras/ Action Taken Reports etc.
furnished within specified time (2 weeks)

PDX02600

PDX

PDX02700

PDX

Time Index

PDX02800

PDX

Reply/settlement of Internal Audit paras


within specified time (4 weeks)
Timely inputs to unit/corporate finance for
inter-unit re-conciliation of accounts
Preparation for audit of the department for
ISO 9000 / TQM by internal as well as
external auditors.

No. of NCRs

PDX02900

PDX

PDX03000

PDX

No. of SMIs
reviewed
No. of NCRs

PDX03100

PDX

Time Index

PDX03200

PDX

Co-ordination for SMI's revision/ updating


etc.
1st level 5S audit (Internal self-assessment)
for P&D/ KWX department
Presentations for Investors/ other stake
holders/ agencies as per schedule
Facilitating Govt policies/ guidelines in
Company's favour

% decided in
Company favour /
no. attempted

PDX03201

PDX

Preparation & submission of Pre-budget


memorandum by specified date

No. of days
delayed from
scheduled date

PDX03202

PDX

Mobilising support through Industry


associations on various company issues

No. of issues
resolved vis--vis
target

PDX03300

PDX

Annual press Conference/ AGM Finalisation of CEO speech/ Material for


Q&As etc.

Satisfaction
Score (to be
obtained from
CMD&Directors)

PDX03400

PDX

Quality Inputs on Q&A/ Speeches/ Directors


Report/ Corporate-Profile etc for Top
Management

Satisfaction
Score (to be
obtained from
CMD&Directors)

PDX03500

PDX

Implementation of Improvement projects


identified in the Position Report as per
schedule

Time Index

PDX03600

PDX

PDX03700

PDX

Increase in no. of active Quality Circles in


the deptt.
Achieving Business excellence thru' TQM at
Deptt. level

Number of new
circles
TQM Score

PDX03701

PDX

Preparation of action plan based on


Position report

No. of days
delayed from
scheduled date

PDX03800

PDX

Development of Knowledge management


Portal

No. of days
delayed from
scheduled date

PDX03900

PDX

Number

PDX04000

PDX

Contributing case studies etc.for Knowledge


Management Portal
Completion of KM Projects as per schedule

Time Index

PDX04100

PDX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

PDX04200

PDX

Accomplishment of targets of
Unit/NC/Function/Department level Balance
Score Card

Balanced
Scorecard Rating
(5/4/3/2/1)

PDX04300

PDX

Completion of pilot on DTC at Bhopal for


Transformers including Jhansi range in
association with the consultant and
submission of report to Steering Committee

No. of days
delayed from
scheduled date

PDX04400

PDX

Implementation of DTC

No. of days
delayed from
scheduled date

PDX04401

PDX

Preparation of Process Manual for DTC for


implementation in units/products.

No. of days
delayed from
scheduled date

PDX04402

PDX

Collection and analysis of data for DTC

No. of days
delayed from
scheduled date

PDX04500

PDX

Implementation of PSM

No. of days
delayed from
scheduled date

PDX04501

PDX

Preparation of Process Manual for PSM for


implementation in units/products.

No. of days
delayed from
scheduled date

PDX04502

PDX

Collection and analysis of data for PSM

No. of days
delayed from
scheduled date

PDX04503

PDX

Providing inputs within specified time for


preparation of Process Manual for PSM

No. of days
delayed from
scheduled date

PDX04600

PDX

Completion of pilot on Lean Mfg and


submission of report to steering committee

No. of days
delayed from
scheduled date

PDX04601

PDX

Collection and analysis of data

for lean

No. of days
delayed from
scheduled date

manufacturing
PDX04602

PDX

Preparation of Process Manual for LM for


implementation in other units/products.

No. of days
delayed from
scheduled date

PDX04700

PDX

Implementation of PSM for Castings and


forgings

No. of days
delayed from
scheduled date

PDX04800

PDX

Preparation of Road map and submission to


Directors on Business and
organisation Initiatives in line with
recommendations of Task forces

No. of days
delayed from
scheduled date

PDX04900

PDX

Pre award discussion with Consultant ,


Finalisation of Deliverables, Obtaining
internal approvals and Placement of LOA
on Consultant

No. of days
delayed from
scheduled date

PDX05000

PDX

Submission of monthly progress reports to


top management, Orientation Programmes
at units, Structuring of initiative Teams/
Steering Committees

Time Index

PDX05100

PDX

Resolving interface issues within specified


time as per schedule of initiatives

% issues
resolved within
specified time

PDX05200

PDX

Liaison with consultant, arranging meetings,


co-ordination regarding programmes/ visit
schedules of different initiatives under
implementation with concerned Champions

Satisfaction score

PDX05300

PDX

Development of Departmental Procedures


within specified time for the processes
identified.

No. of days
delayed from
scheduled date

PDX05400

PDX

Providing timely inputs for comprehensive


examination of BHEL by Parliamentary
Committee on Public Undertakings (COPU)
by specified time after due approval of
competent authority.

Percentage
Submission of
inputs to COPU
in time as per
their demand.

PDX05401

PDX

Providing basic data, information etc to


Corp.P&D for comprehensive examination
of BHEL by Parliamentary Committee on
Public Undertakings (COPU)before
specified time.

Percentage
Submission of
inputs to Corp.
P&D before
specified time.

PDX05500

PDX

Development of Strategy Map of the


Company.

No. of days
delayed from
scheduled date

PDX05501

PDX

Identification of Strategic Initiatives to be


pursued for meeting the targeted strategic
objectives.

No. of days
delayed from
scheduled date

PDX05502

PDX

Mapping of interlinkages of the initiatives to


achieve the strategic objectives.

No. of days
delayed from
scheduled date

PDX05600

PDX

Conducting in-depth assessment including


determining the compatibility and worth of
the identified source.

No. of days
delayed from
scheduled date

PDX05601

PDX

Formation & coordination of internal task


force to supervise the process of due
diligence including defining the essential
requirements of the process.

No. of days
delayed from
scheduled date

PDX05602

PDX

Establish requirement of consultants for


Legal/ Finance/ technology functions etc,
receive offers from shortlisted firms &
appoint consultants to assist in due
diligence.

No. of days
delayed from
scheduled date

PDX05603

PDX

Quantify the degree of synergy between


BHEL and the target company , submit EOI/
NBB and perform due diligence.

No. of days
delayed from
scheduled date

PDX05604

PDX

Timely preparation of Valuation report.

No. of days
delayed from
scheduled date

PDX05700

PDX

Finalisation of the contours of the offer and


closure of the transaction for acquisition/
strategic alliance.

No. of days
delayed from
scheduled date

PDX05701

PDX

Timely Negotiation/ Finalization of


agreement with strategic partners, as
required.

No. of days
delayed from
scheduled date

PDX05702

PDX

Negotiate with owners of target company for


finalisation of Share Purchase Agreement &
Share Holders Agreement.

No. of critical
observations by
BoD

PDX05703

PDX

Negotiate the Term sheet of the financing


package to the best possible advantage of
BHEL.

Satisfaction score

PDX05704

PDX

Negotiate with lenders of the target


company so as to improve upon the existing
terms & conditions.

Satisfaction
Score

PDX05705

PDX

Submission of complete offer, incorporating


terms & conditions, special caveat etc.

No. of days
delayed from
scheduled date

PDX05800

PDX

Finalising Strategic Alliances including


taking financial stake to fulfill Strategic
Objectives as per plan.

Time Index

PDX05801

PDX

Development of systems & procedures to


establish the process of forming Strategic
Alliances

No. of days
delayed from
scheduled date

PDX05802

PDX

Identifiy & establish business gaps


(technology, market access, market share
etc.), analyse alternatives & prepare
proposal for further action to establish a
strategic alliance.

No. of days
delayed from
scheduled date

PDX05803

PDX

Obtain clearance of the Board of Directors


and GOI (where necessary)

No. of days
delayed from
scheduled date

PDX05804

PDX

Formation of specialist vehicle for the


acquisition, including SPVs, JVs etc.

No. of days
delayed from
scheduled date

PDX05900

PDX

Timely completion of Special Assignments


as identified in the year-beginning/ mid-year
and final review stages

Time Index

PDX06000

PDX

Providing supporting data and additional


inputs to the Parliament Secretariat and
Ministries as per their requirement with
respect to various Parliamentary / Ministries
activities for better management BHEL
interface.

Percentage
Submission of all
information &
documents in
time as per their
demand.

PDX06100

PDX

Time Index

PDX06200

PDX

Vetting of Technical Specification of


Capital items.
Timely inputs to unit/corporate finance for
BUDGET/FLASH/MIRs etc.

Time Index

PDX06300

PDX

Finalisation of Functional scorecard by


specified date

No. of days
delayed from
scheduled date

PDX06400

PDX

Preparation of Power Sector Annual Capital


Budget proposal for T&P items

No. of days
delayed from
scheduled date

PDX06500

PDX

Preparation of Power Sector Annual Capital


Budget proposal for Enabling Works (EW)

No. of days
delayed from
scheduled date

PDX06600

PDX

Preparation of Power Sector Supplementary


Capital Budget proposal for T&P items

No. of days
delayed from
scheduled date

PDX06700

PDX

Preparation of Power Sector Supplementary


Capital Budget proposal for Enabling Works
(EW)

No. of days
delayed from
scheduled date

PDX06800

PDX

Allocation and intimation of Sanction Nos.


after approval of the Budget for T&P items

No. of days
delayed from
scheduled date

PDX06900

PDX

Allocation and intimation of Sanction Nos.


after approval of the Budget for EW

No. of days
delayed from
scheduled date

PDX07000

PDX

Renewal of hiring rates for T&P items:


- Inter Regional
- BHEL Subcontractors and outside agencies

No. of days
delayed from
scheduled date

PDX07100

PDX

Periodic updation of inventory items (Major


T&Ps) on quarterly basis [web enabled
system]

No. of days
delayed from
scheduled date

PDX07200

PDX

Monitoring utilisation of capital T&P budget

PDX07300

PDX

Renewal of wireless licence(s)

Improvement in
utilisation
No. of days
delayed from
scheduled date

PDX07400

PDX

Preparation/modification of standard T&P


deployment modules

No. of days
delayed from
scheduled date

PDX07400

PDX

Preparation of deployment chart of major


T&P items (own or hired)

No. of days
delayed from
scheduled date

PDX07500

PDX

Special assignment on capability building in


Construction / Services technology

No. of days
delayed from
scheduled date

PDX07600

PDX

Score

PDX07700

PDX

Time Index

PDX07800

PDX

Improvement in Employee Satisfaction


Score
Timely inputs to unit/corporate finance for
inter-unit re-conciliationof accounts
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

PDX07900

PDX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

PDX08000

PDX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

PDX08100

PDX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

PDX08200

PDX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

MENT FUNCTION KRA MASTER - 2006-07


Critical
KRA (Y/N)

Special
KRA
(Y/N)

Universal
KRA (Y/N)

Suggested Weightage for


category
A
B
C
H

Source of Data for


Measurement

KRA
Remarks

H
Report sent to CO

L
Reports / Score
Card(s)

Date sent to CO

Date sent to CO
Y

M
report to Corporate
Office

LE Finalised
N

Board adopted figures


MCM Report

MCM Report

Document forwarded
to Finance

Reports sent to CO
Date of reports sent to
CO
MIR to unit
Finance,Purchase and
Commercial(MIR)
-

X
Business reports

X
Business reports

X
Date of submission

X
Approval of System by
approving Authority

X
Documents

X
Reports

X
Reports

Reports

Reports

Date of completion

Date of sanction
N

MIRs

MIRs

MIRs
N

N
N

N
N

N
N

X
X

H
H

M
M

MIRs
MIRs

Reports
N

Reports
N

X
Date of signing

X
Reports

M
Reports

Reports
Y

Approved Calendar &


Agenda

M
Questionnaire for
obtaining feed back to
be designed by the
deptt. by August'05

Record maintained by
Audit deptt.
Record maintained by
Audit deptt.
Record maintained by
individual/ deptt.

Questionnaire for
obtaining feed back to
be designed by the
deptt. by August'05
Y

Questionnaire for
obtaining feed back to
be designed by the
deptt. by August'05

Project report
N

Unit QA/QC
Quality Deptt.

X
Action plan document

Project report

Project report
Y

X
This KRA will
be taken by
Head of
Unit
/Function /
Department ,
if covered
under MAP,
and can be
Rating declared at
assigned a
year end by Corporate weightage
/ Unit Management
upto 100%

Reports & records in


corporate meetings
and discussions

Reports & records of


corporate steering
committee meetings
and discussions

Reports & records of


corporate meetings
and discussions

Records of steering
committee meetings

Reports & records of


corporate steering
committee meetings
and discussions

Reports & records of


corporate meetings
and discussions

H
Records of steering
committee meetings

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Reports & records of


corporate meetings
and discussions

Date of submission

Appraiser

Appraiser

Report.

Clearance of Corp.
Office.

M
Clearance from Corp.
Office.
-

Report

Report

LOI

Report

Report

Submission of bid.

Signing of agreement. -

Approval of
Management.

Approval of
Management.

Approval of
Management.

M
Date of submission of
bid.
-

H
Report

System approved by
competent authority

Report

Date of clearance.

Date of clearance.

H
Documents

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D

Appraiser

Proposal submission

Proposal submission
Y

Proposal submission

Proposal submission
Y

L
Intimation to Region
and Budget Approval

L
Intimation to Region
and Budget Approval

L
Letter from Finance
Deptt

L
Web Properties

Finance report
Timely Submission of
remittance fee

L
Issue date of module

L
Deployment chart
issue date

H
Report

Survey Report

Record maintained by
individual/ deptt.
Project report

Project report

Project report

Project report

Project report

Prefix "Development of " to KRA-DS

MARKETING FUNCTION KR
KRA ID

Function

KRA Description

Unit of Measurement

KRA
Type

MKX00100

MKX

Order Booking as per Budget

% Score = Actuals/Target

MKX00101

MKX

Timely obtaining & preparation of three tier


estimates: *

Delay in Days vs Norm


O
(NORM FOR OBTAINING
ESTIMATES IN NO. OF
DAYS PRIOR TO DUE
DATE - PRODUCTS = 3
DAYS; PROJECTS = 7
DAYS) Total Score =
SIGMA of (Scores)/ No. of
Bids

MKX00102

MKX

Preparation & furnishing clarifications to


Customers on the proposal as per Time
Specified by Customer

% of Total Clarifications
Submitted in Time; Total
Score = SIGMA of
(Scores)/ No. of Bids

MKX00103

MKX

% Score = Actuals/Target

MKX00104

MKX

Secure business for RLA / R & M /


Consultancy /other services
Timely preparation/ submission of TechnoCommercial proposals *

MKX00105

MKX

Timely finalization of strategic


vendors/service providers* Specified Time =
7 days before Submission date

% X1/X2 x 100 X1 = Total


time taken; X2 =
Specified Time

MKX00200

MKX

Price Recommendation Accuracy - Projects


where price recommended by marketing
Dept is within range {90% of L2 (for Bids
won} / 110% of L1 (for Bids lost)}

As a % of qualified
evaluated bids Product /
Projectwise accuracy
range as per Dept Plan

MKX00300

MKX

Orders booked through negotiated route

% Score = (Orders Booked O


thru Negotiation / Target)

MKX00301

MKX

Submission of Technical Parameters/ scope


& commercial terms of offer as per Time
Specified by Customer*

% X1/X2 x 100 X1 = No of O
offers submitted on time.
X2 = Total No of Offers;
Total Score = SIGMA of
(Scores)/ No. of Offers

Avg delay in days from


O
scheduled dates;
Measurement Criteria : L5
L4 L3 L2 L1 delay
days 0 1 2 3 4

MKX00302

MKX

Preparation & furnishing clarifications to


Customers on the proposal within Customer
Specified Time*

% X1/X2 x 100 X1 = No of O
Clarifications submitted on
time. X2 = Total No of
Clarifications; Total Score
= SIGMA of (Scores)/ No.
of Offers

MKX00400

MKX

Finalising / Signing of P.O / Contract


document within specified time {Specified
time = Within 30% of delivery /Contract
Period}

%Score= X1/X2 x 100 X1 O


= Total time taken from
LOA date. X2 = Specified
Time; Total Score =
SIGMA of (Scores)/ No. of
Contracts

MKX00401

MKX

Preparation of Draft Contract / P.O within


75% of Specified Time *{Specified time =
Within 30% of delivery /Contract Period}

% Score = X1/X2 x 100 X1 O


= Total time taken; X2 =
Specified Time; Total
Score = SIGMA of
(Scores)/ No. of Contracts

MKX00500

MKX

Placement of Internal Order within 1 week of % Score = X1/X2 x 100 X1 O


receipt of P.O / LOA/ LOI
= Total days taken; X2 = 7
Days; Total score = Sigma
of score / No of orders

MKX00600

MKX

Conversion of anticipated orders to firm


orders as per schedule to achieve T.O
budget of Unit/Regions

% Score = X1/X2 x 100 X1 O


= Value of Anticipated
Orders converted on time;
X2 = Target

MKX00700

MKX

Good Contracting -(No. of contracts signed


with 90% payment realisation on Supply &
balance 10% on completion of warrantee
period and/or a LD cap on delivery @ 10% of
the Contract Price)

%Score = Actuals/Target
Measurement Criteria :
L5 L4 L3 L2 L1 Criteria =
50% 45% 40% 30% 20%
Criteria definition : 50% of
all contracts signed in a
year by a particular
section/group with such
payment terms and/or LD
cap will constitute the
Target

MKX00800

MKX

Increase in Success Rate (Success


Rate=Orders Won/ Bids Submitted) *

% Measurement Criteria = O
100x{(X1-X2)/X2} where
X1=Current Year Success
Rate X2=Average
Success Rate of Last 5
Years

MKX00900

MKX

Increase in Bids Attempted to Total Potential % Measurement Criteria = O


(Vis--vis Bids Attempted/ Total Potential Last 100x{(X1-X2)/X2} where
Year)
X1=Current Year Bids
Attempted/ Total Bids
Potential X2=Last Year
Bids Attempted / Total Bids
Potential

MKX01000

MKX

MKX01100

MKX

MKX01101

MKX

Bringing the lost customer back in BHEL fold % X1/X2 x 100 X1 =


O
Actual; X2 = Target
Additional business secured through strategic As a percent of total orders O
tie-ups
received
Timely Negotiation/ Finalization of agreement % X1/X2 x 100 X1 = Total O
with strategic partners * Specified Time = 15 time taken;
X2 =
days before Submission date
Specified Time

MKX01200

MKX

Order booking from new


products/technology/services against target

% Score = Actuals/Target

MKX01300

MKX

Entry in New Market/New Customers

% Score = Actuals/Target

MKX01400

MKX

Increase in success rate of Pre-Qualification


bids over previous year

% Score = X1/X2 x 100 X1 O


= No of prequalifications
secured; X2 = Total No. of
Pre Q secured in previous
year

MKX01500

MKX

Creating Market Report -by specific date


(Country reports/ Competitors profile/
Customer Profiles/ Product reports/ demand
forecast e.t.c)

% Score = Actuals/Target

MKX01600

MKX

Highlighting of Identified Issues in


Seminars/ Business Forums/ Trade Bodies /
Adm. & Concerned Ministries

% Score = Actuals/Target

MKX01700

MKX

Promotional activities completed

% Score = Actuals/Target

MKX01800

MKX

Contribution by Business Sector/ Groups in


% Score = Actuals/Target
Product Committees & subsequent follow-up
till its implementation.

MKX01900

MKX

Reduction in delivery of Overdue Spares

% Score = X1/X2 x 100 X1 O


= No. of day by which
reduced; X2 = Target

MKX02000

MKX

% Score = Actuals/Target

MKX02001

MKX

% Score = Actuals/Target

MKX02100

MKX

New Marketing / business development


initiatives undertaken
Identify & introduce new Product /Service in
the Market
Proactive action to get BHEL qualified prior to
bidding

% Score = X1/X2 x 100 X1 O


= No of tenders got
qualified; X2 = Total No of
tenders attempted for
qualification

MKX02200

MKX

Analysis of tenders lost & strategy building


% reduction in tender lost
based on lessons learnt.
over previous year
Analysis of tender enquiries not participated. % reduction in enquiries
not participated over
previous year

MKX02300

MKX

MKX02400

MKX

Enhance Customer relations & secure


commendations
Market share enhancement for competitive
products

% Score = Actuals/Target

MKX02500

MKX

MKX02600

MKX

Create market /increase business through


Long-Term-Contracts{LTSA/ Rate contracts
e.t.c}

% Score = Actuals/Target

MKX02700

MKX

Timely collection of market intelligence

Time (Days for completion) O


/ No. of days delayed from
scheduled date

MKX02800

MKX

Increase in bids attempted over previous year % Measurement Criteria = O


100x{(X1-X2)/X2}
X1=Current Year Bids
Attempted; X2=Last Year
Bids Attempted

MKX02900

MKX

% Score = Actuals/Target

MKX03000

MKX

MKX03001

MKX

Long term strategic tie-ups for


JVs/Consortium/Representations/subcontracts
Cash Collection from Advance / Progress
payments w.r.t Budget
Submission of BGs / Required documents
incl. Invoice to Customer . *

MKX03002

MKX

Timely invoicing of final payments (Initial


Operations/ Guarantee test )

%Score = X1/X2 x 100 X1 O


= Total time taken; X2 =
Specified Time(as per LOA
/ Contract); Total score =
Sigma of score / No of
Orders

MKX03100

MKX

BG reduction as per target

% Score = Actuals/Target

MKX03200

MKX

Cash collection as per target

%Score = X1/X2 x 100 X1 O


= Actual Collection; X2 =
Target

% Measurement Criteria = C
100x{(X1-X2)/X2}
X1=Current Year Success
Rate; X2=Average
Success Rate of Last 3
Years
O

As a % of Revenue Budget O
%Score = X1/X2 x 100 X1 O
= Total time taken; X2 =
Specified Time(as per LOA
/ Contract)

MKX03201

MKX

Facilitating Timely Reconciliation of


outstandings between units and Customers*

% Score = X1/X2 x 100 X1 O


= No of MUs for whom
settlement achieved; X2 =
Total No of Units involved
per contract; Total score =
Sigma of score / No of
Contracts

MKX03300

MKX

Amount realised out of verified (other than


withheld) outstanding payments as at
beginning of financial year.

% Score = X1/X2 x 100 X1 O


= Actual Collection; X2 =
Target

MKX03400

MKX

Balance recovered from closed /


commissioned projects vs targets incl
withheld outstandings

% Score = X1/X2 x 100 X1 O


= Actual Collection; X2 =
Target

MKX03500

MKX

Timely approval of Billing break up as per


schedule / LC opening as per plan

% Score = X1/X2 x 100 X1 O


= Total time taken; X2 =
Specified Time(as per LOA
/ Contract); Total score =
Sigma of score / No of
Orders

MKX03501

MKX

Review & check billing schedule w.r.t


payment terms & timely submission for
approval

% Score = X1/X2 x 100 X1 O


= Total time taken; X2 =
Specified Time(as per LOA
/ Contract); Total score =
Sigma of score / No of
Orders

MKX03600

MKX

Obtaining documents / PAC from customer


for Project Import / Duty Exemption
Entitlement Certificate / Advance license as
per agreed schedule with internal customer

% Score = X1/X2 x 100m


X1 = Total time taken; X2
= Specified Time agreed
with internal customer;
Total score = Sigma of
score / No of Orders

MKX03700

MKX

Obtain Proposals for write-off from units/


Review & Check Completeness and coordinate for final approval of competent
authority

% Score = X1/X2 x 100 X1 O


= Actual amount writtenoff; X2 = Target

MKX03800

MKX

Contracts Closed within X Months reckoned % Score = 100 x [Total


from Date of Expiry of Warranty Period X = 6 Contracts Closed / Total
months after technical closure
Contracts targeted for
Closure]

MKX03801

MKX

Contracts Closed beyond X Months reckoned % Score = 100 x [Total


from Date of Expiry of Warranty Period X = 6 Contracts Closed / Total
months after technical closure
Contracts targeted for
Closure]

MKX03802

MKX

Obtaining No Dues Certificate from Units


(after Financial Reconciliation)

% Score = X1/X2 x 100 X1 O


= Actual; X2 = No of
Contracts for which NoDue-Cert as targeted

MKX03803

MKX

BG discharge of what is due*

% X1/X2 x 100 X1 = Actual O


value of BG discharged;
X2 = Value of BGs due for
discharge

MKX03900

MKX

Settlement of Govt. Audit Paras

% X1/X2 x 100 X1 = Actual O


Nos settled; X2 = Total
Nos. due for settlement

MKX03901

MKX

Preparation of Draft Reply in Consultation


with internal Audit

% X1/X2 x 100 X1 =
O
Actual; X2 = Total Nos. of
draft reply to be prepared

MKX04000

MKX

Resolution of contractual issues specified


within time

% Score = X1/X2 x 100 X1 O


= Total time taken; X2 =
Time specified by
external / Internal
customers

MKX04100

MKX
MKX

% Score = (Actual/Target)
x 100
% Score = (No. of
complaints resolved/Total
No. of complaints) x 100

MKX04200

Success rate in time extensions/ LD


reduction etc
Resolution of Customer complaints

MKX04300

MKX

Reply to Govt. Audit queries/ Inspection


report paras/ Action Taken Reports etc.
furnished within specified time (2 weeks)

MKX04400

MKX

MKX04500

MKX

Reply/settlement of Internal Audit paras


%
within specified time (4 weeks)
Preparation & submission of Monthly MIRs / Time Index
Broad Objective & Flash Result within
specified time Specified Time = 3 days before
Submission date

MKX04501

MKX

Timely preparation of Draft MIRs/ B.O/ Flash Time Index


results*Specified Time = 4 days before
Submission date

MKX04502

MKX

Providing data and inputs for AS-7 by the


scheduled date.

Delay in days from the due C


date the information
provided
L5=0 L4=0.5 L3=1 L2=1.5
L1=2

MKX04600

MKX

Formulation of Budget parameters/ Flash


Results/ MOU/ Annual & Strategic plans
within Specified Time Specified Time = 3
days before Submission date

Time Index

MKX04601

MKX

Timely preparation of Budget for Review &


Presentation by scheduled date Specified
Time = 3 days before Submission date

No. of days delayed from


scheduled date

MKX04602

MKX

Inputs to Corporate Office for preparation of


Strategic & Annual Plans by specified date.
Specified Time = Submission date

No. of days delayed from


scheduled date

MKX04700

MKX

MKX04800

MKX

MKX04900

MKX

MKX05000

MKX

MKX05100

MKX

MKX05101

Finalisation Balance Score Card by specified


date
Timely inputs to unit/corporate finance for
inter-unit re-conciliation of accounts
Timely inputs to unit/corporate finance for
BUDGET/FLASH/MIRs etc.

No. of days delayed from


scheduled date
Time Index

Time Index

Finalisation of Functional scorecard by


No. of days delayed from
specified date
scheduled date
Improvement in Employee Satisfaction Score Score

MKX

Implementation of Improvement projects


identified in the Position Report as per
schedule

Time Index

MKX05200

MKX

Percent increase in offers Submitted on


Electronic Media ( Offers submitted on
electronic media / Total No of Offers)

% Score = X1/X2 x 100 X1 C


= Offers submitted on
electronic media; X2 =
Total No. of offers

MKX05300

MKX

Increase in contributions from various orders % Score = Current Year


O
booked over previous year
Avg of contribution/ Avg of
last three years

MKX05400

MKX

MKX05401
MKX05500

MKX
MKX

Identifying & Organising Training Needs for


% Score = Actuals/Target
Capability Enhancement
No. of Training Mandays per Year *
Actual No / targets
Providing inputs for Quality Improvement
% Score = Actuals/Target
Initiatives (TQM; Certifications; Quality audits
e.t.c) by due date

MKX05600

MKX

Providing inputs for Development of


Actual No / targets
Knowledge Management system as per plan

MKX05700

MKX

Development of IT Initiatives as per MOU

Actual No / targets

MKX05800

MKX

Number of new circles

MKX05900

MKX

TQM Score

MKX05901

MKX
MKX

No. of days delayed from


scheduled date
Time Index

MKX05902

Increase in no. of active Quality Circles in


the deptt.
Achieving Business excellence thru' TQM at
Deptt. Level
Preparation of action plan based on Position
report
Implementation of Improvement projects
identified in the Position Report as per
schedule

MKX06000

MKX

MKX06100

MKX

MKX06200

MKX

MKX06300

MKX

% Score = Actual nos


accepted / Target
Development of Knowledge management
No. of days delayed from
Portal
scheduled date
Contributing case studies etc. for Knowledge Number
Management Portal
Completion of KM Projects as per schedule Time Index

Suggestions for improving productivity

O
C

C
C
C

MKX06400

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX06500

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX06600

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX06700

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX06800

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX06900

MKX

Implementation of Special Improvement


No. of days delayed from
Projects taken under IMPRESS as per
scheduled date
schedule (Registration No. & other details of
project to be specified in the boxes provided
against the KRA)

MKX07000

MKX

Accomplishment of targets of
Unit/NC/Function/Department level Balance
Score Card

Balanced Scorecard
Rating (5/4/3/2/1)

FUNCTION KRA MASTER - 2006-07


Critical Special
KRA
KRA
(Y/N)
(Y/N)

Universal
KRA
(Y/N)

Suggested Weightage

Source of Date for


Measurement

A
H

B
H

C
H

Budget

Commercial Register

Commercial Register

Budget

Departmental Plan

Departmental Plan

Commercial Register

Commercial Register /
Dept Plan

Commercial register

Commercial register

Commercial register

Commercial register

Commercial register

MIR/ Revenue Budget

Commercial Register

Commercial Register

Commercial Register

Departmental Plan

As per Dept Plan

As per Dept Plan

As per Dept Plan

Budget

As per Dept Plan

As per Dept Plan

As per Dept Plan

As per Dept Plan

Dept Plan & Product


Committee Minutes

MIR

Dept Plan

As per Dept Plan

Commercial Register

Commercial Register

Commercial Register

Departmental Plan

Departmental Plan

Departmental Plan

Project report

Commercial Register

Departmental Plan

MIR/ Revenue Budget

Commercial register

Commercial register

Dept Plans

Cash Collection Budget

Dept Plan

Dept. Cash Collection


Plan

Budget

Commercial register

Commercial register

Commercial register

MIR/ Departmental Plan

Unit Score card

Unit Score card

Departmental Plan

As per Dept Plan/


Finance

Finance Records/
Departmental Plan

Finance Records/
Departmental Plan

Commercial Register

Departmental Plan

Commercial Register

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.
Departmental Plan

Departmental Plan

Department register

Departmental Plan

Departmental Plan

Departmental Plan

Budget /MOU

Record maintained by
individual/ deptt.
Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D
Survey Report

Project report

MIR

Revenue budget &


Finance

As per Dept Plan

N
N

N
N

N
N

L
L

L
L

L
L

As per Dept Plan


CQA & DP

Corporate Engg.

Corporate IT/ Dept Plan

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Departmental Plan

Departmental Plan

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Rating declared at year


end by Corporate / Unit
Management

KRA Remarks

This KRA is not apprearing


for C level appraisee.

This KRA will be taken by


Head of Unit /Function /
Department , if covered
under MAP, and can be
assigned a weightage upto
100%

COMMERCIAL FUNCTION KR
KRA ID

CMX00100

Function KRA Description

CMX

CMX00101

ORDER BOOKING FOR MAIN


EQUIPMENT
L2 - SUCCESS RATE OF OFFERS

CMX

CMX00102
CMX
CMX00200

CMX

CMX00201
CMX

CMX00202
CMX

CMX00300
CMX

CMX00400
CMX

CMX00500

CMX

CMX00501
CMX

KRA Unit of Measurement


Type
O

L3 - TIMELY PREPARATION OF
ESTIMATES & SUBMISSION OF
COMPLETE OFFER
ORDER BOOKING THROUGH
NEGOTIATED ROUTE
L2 - FINALISATION OF TECHNICAL
PARAMETERS/SCOPE AND
COMMERCIAL CONDITIONS AS PER
PLAN
L3 -TIMELY PREPARATION AND
FURNISH CLARI-FICATIONS SOUGHT
BY CUSTOMERS ON THE PROPOSAL
SUBMITTED.
TENDERS PARTICIPATED WHERE
PRICE ASSESSMENT BY COMMERCIAL
IS WITHIN RANGE OF +/- 5% FOR
STANDARD PRODUCTS OF QUALIFIED
EVALUATED L1 OR L2 BIDDER .
TENDERS PARTICIPATED WHERE
PRICE ASSESSMENT BY COMMERCIAL
IS WITHIN RANGE OF + OR - 7% FOR
HYDRO PROJECTS OF QUALIFIED
EVALUATED L1 OR L2 BIDDER.
FINALISATION / SIGNING OF PO/
CONTRACT WITHIN SPECIFIED TIME
L2 -REVIEW & FINALISATION OF
CONTRACT TERMS WITH CUSTOMER
WITHIN 30% OF SPECIFIED TIME

AS A % OF BUDGET
VALUE OF OFFERS
CONVERTED INTO
ORDERS/TOTAL VALUE
OF OFFERS
SUBMITTED
Time Index

AS A % OF TOTAL
ORDER BOOKED
Time Index

Time Index
O

AS A % OF QUALIFIED
EVALUATED BIDS
O

AS A % OF QUALIFIED
EVALUATED BIDS
O

Time Index
Time Index

CMX00502
CMX

CMX00600
CMX
CMX00601
CMX

CMX00700
CMX
CMX00800

CMX

CMX00801

L3 - PREPARATION OF DRAFT
CONTRACT WITHIN 50% OF SPECIFIED
TIME

ANTICIPATED ORDER CONVERTED


INTO FIRM ORDERS WITHIN TIME
FRAME
L2 - PREPARE AND FURNISH
CLARIFICATIONS SOUGHT BY
CUSTOMERS ON THE PROPOSAL
SUBMITTED.
SUCCESS RATE OF
PREQUALIFICATION BIDS PREPARED
AND SUBMITTED
ORDER BOOKING FOR SPARES/ R&M/
O&M SERVICES.
L2 - ENHANCE SUCCESS RATE OF
OFFERS

CMX

CMX00802
CMX
CMX00900

CMX

CMX01000
CMX
CMX01001
CMX01100

L3 - TIMELY PREPARATION OF
ESTIMATES/ TECHNO-COMMERCIAL
BID
ISSUE OF WORK ORDERS/Contract
memo as per schedule
Arrange AMA approvals within specified
schedulefor aniticipated orders to initiate
Advance action of Long lead materials for
meeting tight delivery schedules.

CMX

CMX

L3 - PREPARE/CONSOLIDATE & SUBMIT


L1/L2 NETWORKS WITHIN 75% OF
SPECIFIED TIME.

CMX

CMX01200

CMX01201

AS A % OF TOTAL
ANTICIPATED ORDERS
Time Index

O
O

Preparation of AMA proposals within


specified schedules
Timely preparation and dissemination of
CIS
APPROVAL OF L1/L2 NETWORKS
WITHIN SPECIFIED TIME IN THE
CONTRACT

CMX

Time Index

% OF TOTAL PQ BIDS
SUBMITTED
AS A % OF BUDGET
VALUE OF OFFERS
CONVERTED INTO
ORDERS/TOTAL VALUE
OF OFFERS
SUBMITTED
Time Index

Time Index
Time Index

O
O

Time Index
Time Index
Time Index

O
Time Index
O

CMX01300

DRAWINGS APPROVAL WITHIN


SCHDULED TIME
CMX

CMX01400
CMX
CMX01500
CMX
CMX01501
CMX
CMX01502
CMX
CMX01600

VENDORS/QAP / TEST SCHEDULE


APPROVAL WITHIN SCHEDULED TIME
AS APPLICABLE
TIMELY APPROVAL OF BILLING BREAK
UP AS PER SCHEDULE

L2 -REVIEW AND CHECK BILLING


SCHEDULE COMPLIANCE WITH TERMS
OF PAYMENT/SUBMIT & OBTAIN
APPROVAL TIMELY
L3 - PREPARE BILLING SCHEDULE
WITHIN 75% OF SCHEDULED TIME IN
LINE WITH CONTRACT TERMS.

CMX

CMX

L3 -PREPARE AND SUBMIT DRAFT


DOCUMENTS TO CUSTOMER FOR
OBTAINING DEEC / PI DOCUMENTS
WITHIN 75% OF SPECIFIED TIME

CMX

OBTAINING DOCUMENTS FROM


CUSTOMERS FOR AVAILING EXPORT
INCENTIVE WITHIN 6 MONTHS FROM
RECEIPT OF PAYMENT

CMX

SUBMISSION OF ALL FINAL


DOCUMENTS INCLUDING AS BUILT
DRGS./ O & M/ MANUALS ETC.WITHIN
CONTRACT PERIOD/ AS PER
CONTRACT SCHEDULE

CMX01700

CMX01800

CMX01900

OBTAINING DOCUMENTS FROM


CUSTOMER FOR PROJECT
IMPORT/DUTY EXEMPTION
ENTITLEMENT CERTIFICATE.(AS PER
AGREED SCHEDULE WITH INTERNAL
CUST.)

CMX01601

CMX

CMX01901
CMX

Time Index

TO ACHIEVE GROSS BILLING WITH


RESPECT TO BUDGET TARGET
L2 -ARRANGE CUSTOMERS
CLEARANCE FOR DESPATCH ( WITHIN
1 MONTH OF HANDING OVER/
CONTRACT SCHEDULE WHICHEVER IS
LATER)

Time Index
O
Time Index
O
Time Index
O
Time Index
O
Time Index
O

Time Index
O

AS A % OF
COLLECTION OF ALL
DOCUMENTS DUE
Time Index

AS A % OF BUDGET
Time Index

CMX01902
CMX

L3 -ARRANGE BILLING AND SUBMIT


BILLS TO CUSTOMER WITHIN 7 DAYS
OF BILLABLE

CMX

SUBMISSION OF FINAL
SUPPLY/SERVICES BILLS WITHIN 30
DAYS OF COMPLETION OF ACTIVITIES.

CMX

CASH COLLECTION FROM ADVANCE/


PROGRESS. PAYMENT W.R.T. BUDGET

CMX02000

CMX02100

CMX02101
CMX

CMX02200

CMX

CMX02201
CMX
CMX02202
CMX
CMX02300

CMX

CMX02301
CMX
CMX02302

CASH COLLECTION FROM CURRENT


YEAR'S BILLING.W.R.T BUDGET
L-2 TIMELY VERIFICATION OF INVOICES
FOR REALISATION OF PAYMENTS
(WITHIN 45 DAYS OF RECEIPT OF BILL)
L3 - TIMELY FORWARDING OF
INVOICE'S ALONG WITH REQUIRED
DOCUMENTS (WITHIN 7 DAYS OF
BILLABLE)
CASH COLLECTION FROM YEAR END
COLLECTABLE OUTSTANDING
L2 - IDENTIFY REASONS FOR NON
PAYMENT/ CLEAR BOTTLENECKSOF
UNVERIFIED BILLS LATEST BY END OF
1ST QUARTER.

CMX

L3 - ARRANGE VERIFICATION OF
UNVERIFIED INVOICE'S LATEST BY
END OF 2 ND QUARTER.

CMX

BILLING OF DEFERRED DEBTS WITHIN


30 DAYS OF BECOMING DUE AS PER
CONTRACT

CMX02400

CMX02500

L3 -TIMELY ARRANGE BG's/REQUIRED


DOCUMENTS INCLUDING INVOICE AND
SUBMIT TO CUSTOMERS WITHIN 1
WEEK OF DUE DATE .

CMX

CMX02501
CMX
CMX02502
CMX

REALISATION OF MORE THAN 1 YEAR


OLD DUES
L2 - IDENTIFY REASONS FOR NON
PAYMENT/ CLEAR BOTTLENECKS OF
UNVERIFIED BILLS LATEST BY END OF
1ST QUARTER.
L3 - ARRANGE VERIFICATION OF
UNVERIFIED INVOICE'S LATEST BY
END OF 2 ND QUARTER.

Time Index
O
Time Index

AS A % OF REVENUE
BUDGET
Time Index

AS A % OF REVENUE
BUDGET
Time Index

O
Time Index
O

AS % OFYEAR END
OUTSTANDINGS
Time Index

O
Time Index
O
Time Index
O

AS A % OF 1 YEAR OLD
DUES
Time Index

O
Time Index
O

CMX02600
CMX
CMX02601
CMX

CMX

L3 - PREPARE DRAFT PROPOSALS


WITH ALL REQUIRED SUPPORTING
DOCUMENTS AS PER SCHEDULE.

CMX

CMX02701
CMX
CMX02702
CMX
CMX02800

REALIZATION OF WITHHELD
DUES/LIQUIDATION
L2 - IDENTIFY PENDING ISSUES AND
REACH SETTLEMENT WITH
CUSTOMERS FOR GETTING
PAYMENTS.
L3 - FULFILMENT OF SETTLEMENTS
REACHED AND FOLLOW UP FOR
REALISATION OF PAYMENTS.

CMX02900

CMX03200

CMX

CMX

L3 - ARRANGING DOCUMENTS FOR


LODGING FINAL CLAIMS

CMX
CMX
CMX

CMX03300
CMX
CMX03301
CMX

CMX03400

NUMBER OF PROVISIONAL
INSURANCE CLIAMS CONVERTED INTO
FINAL CLAIMS DURING THE YEAR

CMX02901

CMX03100

RETRIEVAL OF BANK GUARANTEES


CMX

CMX03000

L-2 REVIEW AND CHECK


COMPLETENESS OF PROPOSAL &
FINALISE AND CO-ORDINATE WITH
CONCERNED AGENCIES FOR FINAL
APPROVAL.

CMX02602

CMX02700

INITIATION OF PROPOSALS FOR WRITE


OFF

CMX

CMX03500
CMX

% OF CLAIMS SETTLED OUT OF TOTAL


CLAIMS DUE
COLLECTION OF TDS CERTIFICATES
FROM CUSTOMERS W.R.T.DUE
COLLECTION OF C/D/E1 FORMS
FINALISATION OF PROJECT
INSURANCE AS PER SCHEDULE

L3 - PREPARATION OF INSURANCE
TENDER IN LINE WITH CONTRACT
REQUIREMENTS 30 DAYS PRIOR TO
FINALISATION OF PROJECT
INSURANCE TENDER
Timely inputs to unit/corporate finance for
inter-unit re-conciliationof accounts
Preparation of monthly cash collection/
verification/ & old & w/h plan and
reconciliation plan

O
O
O

AS A % OF TOTAL
VALUE DUE FOR
WRITE OFF
AS A % OF TOTAL
VALUE DUE FOR
WRITE OFF

AS A % OF TOTAL
VALUE DUE FOR
WRITE OFF
AS A % OF TOTAL WITH
HELD DUES
AS A % OF TOTAL WITH
HELD DUES

AS A % OF TOTAL WITH
HELD DUES
AS A % OF TOTAL
VALUE OF BG's DUE
FOR RETRIEVAL
AS A % OF TOTAL NO.
OF PROVISIONAL
CLAIMS LODGED
AS A % OF TOTAL NO.
OF PROVISIONAL
CLAIMS LODGED
AS A % OF TOTAL
CLAIMS DUE
AS A % OF TOTAL TDS
DUE
AS A % OF TOTAL DUE
Time Index

O
Time Index
O

Time Index
Time Index

CMX03600
CMX03601

CMX

CMX03700
CMX03701

CMX

CMX03800
CMX03900
CMX04000

CMX
CMX

CMX

CMX

CMX

CMX04100
CMX
CMX04200
CMX

CMX04201

TIMELY REVIEW & SUBMISSION OF


MONTHLY PROGRESS REPORTS TO
BOTH INTERNAL & EXTERNAL
CUSTOMERS( BY 1ST WEEK OF EVERY
MONTH)

CMX

L3 -PREPARE PROGRESS REPORTS


AS PER SCHEDULE.(3 DAYS BEFORE
SUBMISIION)

CMX

PREPARATION OF MIR AS PER


SCHEDULE INCLUDING BROAD
OBJECTIVE & FLASH RESULTS.

CMX04300

CMX04301
CMX
CMX04400
CMX
CMX04401
CMX
CMX04402
CMX
CMX04500
CMX
CMX04600

Timely raising PVC & ERV claims


VERIFICATION OF PVC BILLS WITHIN
SPECIFIED PERIOD
Additional claim for extra work
Preparation & submission of claims for
extra work
Turn over against set completion
Turnover for SAS work
Time taken for cash collection of current
year billing
Linking of Payments with in 30 days after
receiving payment receipts from customer
end to ensure proper accounting.

CMX

L3 - TIMELY PREPARATION OF DRAFT


MIR's

FORMULATION OF STRATEGY FOR


FIXING BUDGET PARAMETERS &
PRESENTATION TO MANAGEMENT
L2 - TIMELY PREPARATION OF BUDGET
FOR REVIEW & PRESENTATION

L3 - TIMELY
COLLECTION/COMPILATION AND
PROVIDING DATA FOR PREPARATION
OF BUDGET.
Timely inputs to unit/corporate finance for
BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by
specified date

O
O
O
O
O
O
O

Time Index
Time Index
Rs. Crores
Time frame
% of budget
Rs Crs.
No. of days
Rs. Crs.

O
Time Index
O

Time Index
O
Time Index
O
Time Index
O
Time Index
O
Time Index
O
Time Index
O
Time Index
O
O

No. of days delayed from


scheduled date

CMX04700
CMX
CMX04701
CMX04800

CMX
CMX

CMX04900
CMX

CMX04901

No. of units commissioned as per Balanced


Score Card
To identify and monitor requirement of
inputs for all the commissioning projects
Timely preparation & monitoring
Department Balanced Score Cards
" CONTRACTS CLOSED WITHIN ""X""
MONTHS RECKONED FROM EXPIRY OF
WARANTEE PERIOD( 'X"" MEANS 6
MONTHS AFTER TECHNICAL
CLOSURE)"

CMX04902
CMX

CMX

"CONTRACTS CLOSED BEYOND ""X""


MONTHS RECKONED FROM EXPIRY OF
WARANTEE PERIOD('X"" MEANS 6
MONTHS AFTER TECHNICAL
CLOSURE)"

CMX05001

CMX05002

CMX

LIQUIDATION OF ALL SHORTAGES /


DAMAGES FOR ERECTION &
COMMISSIONING OF EQUIPMENT

CMX

CMX05500

CMX
CMX
CMX
CMX

CMX05501
CMX

Identify & monitor emrgency requirements


of customers
War on wastage by salvaging Site return
material.
Identify & monitor high value site returnable
materials
Supply completions of projects as per
target
Prepare & monitor critical supplies required
for completion of projects

AS A % OF TOTAL
PUNCH POINTS DUE
FOR CLOSURE

CMX05300

No. of days delayed from


scheduled date
AS A % OF TOTAL
CONTRACT DUE FOR
CLOSURE

AS A % OF TOTAL
CONTRACT DUE FOR
CLOSURE

SUCCESS RATE OF DELIVERY EXTN.


OBTAINED FROM CUSTOMER.
Meeting emergency/Forced Shut Down
requirements of customers.

Time Index

CMX

CMX

No. of units
commissioned/No. of
units planned

AS A % OF TOTAL
CONTRACT DUE FOR
CLOSURE

L-3 PHYSICAL & FINANCIAL


RECONCILLIATION/ OF CONTRACTS
AND ARRANGE RAISE BILLS AND
VERIFICATION WHERE REQUIRED.

CMX05100

CMX05401

L2 -CLOSURE OF PUNCH POINTS


CMX

CMX05400

O
L-3 PHYSICAL & FINANCIAL
RECONCILLIATION/ OF CONTRACTS
AND ARRANGE RAISE BILLS AND
VERIFICATION WHERE REQUIRED.

CMX05000

CMX05301

L2 -CLOSURE OF PUNCH POINTS


CMX

CMX05200

AS A % OF TOTAL
PUNCH POINTS DUE
FOR CLOSURE
AS A % OF TOTAL
CONTRACT DUE FOR
CLOSURE
% OF MDRs/SARs/CARs

O
O
O
O
O
O
O

AS A % OF VALUE OF
CASES SUBMITTED
% request met w.r.t total
No. request received
% emergency
requirements met
Rs lakhs
Time frame
No. of projects
% critical supplies
ensured for project
completion

CMX05600
CMX

Replacement action for


rejection/shortage/wrong supply within
specified time

CMX

Reply to Govt. Audit queries/ Inspection


report paras/ Action Taken Reports etc.
furnished within specified time (2 weeks)

CMX05700

CMX05800
CMX
CMX05900
CMX06000

CMX
CMX

CMX06001
CMX
CMX06100

CMX

CMX06200
CMX
CMX06201

Reply/settlement of Internal Audit paras


within specified time (4 weeks)
Review/ Updating of documents for ISO
audits
UPDATION OF SPARES CATALOGUE
BY END OF FIRST QUARTER
L3 - PREPARATION OF SPARES
CATALOGUE WHERE NOT AVAILABLE
BY END OF FIRST QUARTER
Preparation and updation of Product
brochures
RESOLUTION OF CUSTOMER
COMPLAINTS AS PER SYSTEM

CMX06202
CMX
CMX06300
CMX
CMX06301
CMX

CMX

CMX06401
CMX
CMX06500
CMX06600
CMX06700
CMX06701
CMX06800
CMX06900

%
O
O
O

O
O

L2 - TO RESOLVE TECHNICAL ISSUES


CMX

CMX06400

Time Index

CMX
CMX
CMX
CMX
CMX
CMX

O
L3 - TO RESOLVE MATERIAL
SUPPLYISSUES
IMPROVEMENT IN CUSTOMER
SATISFACTION INDEX ON PREIDENTIFIED COMMERCIAL ISSUES
L2- IMPLEMENT ACTION PLAN FOR
IMPROVEMENT BASED ON CUSTOMER
SURVEY REPORT WITH IN 3 MONTHS
OF GETTING SURVEY REPORT
Improvement in Employee Satisfaction
Score
Implementation of Improvement projects
identified in the Position Report as per
schedule
Managing & maintaining Knowledge
Management Portal
Customer/New entrants training
Arranging RLA/NFT Studies & Testing.
Preparation of RLA/NFT study reports by
specified date
liquidation of finished goods inventory
(FGI)
liquidation of overdue spares

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date
No of complaints
Resolved/(Total No of
complaints)
AS A % OF TOTAL NO.
OF TECHNICAL ISSUES
AS A % OF TOTAL NO.
OF MATERIAL SUPPLY
ISSUES
AS A %IMPROVEMENT
IN CSI
Time Index

Score
Time Index

O
O
O
O
O
O
O

Time frame
No of Trainings
No. of projects
No. of days delayed from
scheduled date
% of Total FGI
% of overdue spares

CMX06901
CMX07000

CMX
CMX

CMX07001
CMX
CMX07100
CMX07200

CMX
CMX

CMX07300

O
O
O

CMX

L1 - CREATE FORMAT & DEVELOP


SYSTEM FOR COLLECTION &
UPDATION OF INFORMATION WITHIN 3
MONTHS

CMX

L2 - COLLECTION OF INFORMATION OF
COMPETITORS WITHIN SPECIFIED
TIME

CMX07303
CMX
CMX07400
CMX

CMX

CMX07500
CMX
CMX

CMX07700

L-3 HALF YEARLY UPDATION OF


INFORMATION WITHIN SPECIFIED TIME
TO DEVELOP MODEL FOR ASSESSING
PREVALANT MARKET PRICE
LEVEL(PRODUCT WISE/PROJECT
WISE)
L2-GENERATE AND UPDATE DATA
BASE FOR ABOVE MODEL
OBTAINING ORDERS FROM NEW
TECHNOLOGY/PRODUCTS/SERVICES
ADDITIONAL BUSINESS SECURED
THROUGH STRATEGIC TIE UP (MOU)
PROACTIVE ACTION TO GET BHEL
QUALIFIED PRIOR TO BIDDING

CMX

CMX07800
CMX
CMX07900

CREATING DATA BASE OF CRITICAL


INFORMATION OF COMPETITORS
WITHIN SPECIFIED TIME

CMX07302

CMX07600

Vendor approval from Customers as per


schedule
Percentage of installed capacity utilisation.

CMX
CMX07301

CMX07401

Preparation of list for critical overdue


spares by specified date
liquidation of non-moving/slow moving/site
returned modules/ materials
Preparation of high value list of nonmoving/slow moving/ site returned
modules/ materials by specified date

CMX

TIMELY COMPLETION OF IDENTIFIED IT


INITIATIVE PROJECTS

No. of days delayed from


scheduled date
Time Index
% of utilization
% COMPLETION OF
DATA
No. of days delayed from
scheduled date

% COMPLETION OF
DATA
% UPDATION OF DATA

C
NO OF MODELS
C

C
C
C

COMPLETION OF IDENTIFIED
IMPROVEMENT PROJECTS

No. of days delayed from


scheduled date
% of total value

NO OF MODELS
AS A % OF TOTAL
ORDER BOOK BUDGET
AS A % OF TOTAL
ORDER RECEIVED
RATIO OF NO OF
TENDERS GOT
QUALIFIED TO NO OF
TENDERS ATTEMPTED
FOR QUALIFICATION
% COMPLETED

C
C

% COMPLETED

CMX08000

% INCREASE IN RETENTION OF
CUSTOMERS OVER PREVIOUS YEAR
CMX

CMX08100

NEW CUSTOMERS ADDED


CMX

CMX08200
CMX
CMX08300

CMX

CMX08400
CMX
CMX08500
CMX
CMX08600

CMX

CMX08700

CMX
CMX08900
CMX09000
CMX09001

CMX
CMX
CMX

CMX09002
CMX
CMX09100
CMX09200
CMX09300

CMX
CMX
CMX

Number
O

DEVELOPMENT OF SYSTEM BY
SPECIFIED DATEFOR ONLINE OFFER
SUBMISSION
DETAILED ANALYSIS OF TENDERS
LOST & LEARNINGS
ANALYSIS OF TENDER ENQUIRIES NOT
PARTICIPATED
DEVELOP SYSTEM FOR CAPTURING
TOTAL ACTUAL PROJECT COST IN
SPECIFIED TIME
SYSTEM FOR ACHIEVING PAPERLESS
COMMERCIAL OFFICE
% INCREASE IN MARKET
PENETRATION OVER PREVIOUS YEAR

CMX

CMX08800

RATIO OF NO OF
CUSTOMERS
RETAINED TO NO OF
CUSTOMERS
RETAINED IN
PREVIOUS YEAR

C
C
C

C
C

ANALYSIS OF INSURANCE CLAIMS


DISSALLOWED
Increase in no. of active Quality Circles in
the deptt.
Achieving Business excellence thru' TQM
at Deptt. level
Preparation of action plan based on
Position report
Implementation of Improvement projects
identified in the Position Report as per
schedule
Development of Knowledge management
Portal
Contributing case studies etc.for
Knowledge Management Portal
Completion of KM Projects as per schedule

C
O
C
C

No. of days delayed from


scheduled date
% OF TENDERS LOST
% OF TOTAL
ENQUIRIES NOT
PARTICIPATED
No. of days delayed from
scheduled date
% COMPLETION
RATIO OF TOTAL
ENQUIRIES
ATTEMPTED TO TOTAL
ENQUIRIES AVAILABLE
%AGE OF TOTAL
INSURANCE CLAIMS
DISALLOWED
Number oof new circles
TQM Score
No. of days delayed from
scheduled date
Time Index

C
C
C
C

No. of days delayed from


scheduled date
Number
Time Index

CMX09400
CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other details
of project to be specified in the boxes
provided against the KRA)

CMX09500

CMX09600

CMX09700

CMX09800

CMX09900

CMX10000

CMX

CMX10100
CMX
CMX10200
CMX

CMX10300
CMX
CMX10400

CMX10500

Development/ Maintainance and Updation


of ERP Systems
Creation & Updation of database for PGMA
based monitoring for billing/ cash
collection.
Creating database for customer's
complaints regarding critical quality
aspects-- recording the cause/ remedial
action taken and generating monthly
report.
Analysis of critical points/issue pertaining
to important /major contracts including
quality issues within specified time

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

Time frame
Time frame

C
Time Index
C

Time Index
C

CMX

Study/ analysis and preparation of plan for


growth of Business for various products by
specified date

CMX

Generate database for clearing PVC &


ERV claims by specified date

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date

CMX10600
CMX10700
CMX10800
CMX10900

CMX
CMX
CMX
CMX

CMX11000
CMX
CMX11100
CMX
CMX11200

CMX

CMX11300
CMX
CMX11400

CMX11700
CMX11800

Development of system for Contract


Closing of short cycle delivery products/
spares/ services by specified date
Development of ONLINE billing sytem for
BOIs by specified date
To develop a user friendly computerised
system to monitor erectability for ongoing
projects by specified date

CMX

Conversion of legacy system applications


to current technology within specified time.

CMX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

CMX11500

CMX11600

Create database of PREVIOUS YEARS


prices of OF SPARES bu specified date
Provide training/ guidance and help to
Contract Managers in Primavera.
To prepare a model & create data for
benchmarking by specified date
Development of Online Customer
Complaint System by specified date
Develop system for ONLINE RECEIPT OF
DAY BOOK NO. DETAIL FROM SITE TO
RAISE MRC INVOICES by specified date

CMX

Implementation of box-wise on-line


despatch system by specified date.
Implementation of on-line debtors
management system by specified date
analysis of MDRs and giving proposals for
remedial action
"Capability to quote competitively for EPC
contracts-Development of Data bank for
market price level

CMX

Roll out of implementation Plan based on


Pilots of cost effectiveness Initiatives- PSM
for PED & GT

CMX
CMX
CMX

CMX11900

CMX12000

CMX12100
CMX

To evolve strategic approach for EPC


business together with IS and corporate
P&D

C
C
C
C

No. of days delayed from


scheduled date
Nos. trained
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date

O
O
C

Balanced Scorecard
Rating (5/4/3/2/1)

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
time frame
Number of Offers made
to Sectors for STG based
EPC'S.

Entering into MOU with


Vendors as per schedule
C

Time Index
C

CIAL FUNCTION KRA MASTER - 2006-07


Critical
KRA
(Y/N)

Special Universal Suggested Weightage for Source of Data for


KRA
KRA
category
Measurement
(Y/N)
(Y/N)
A
B
C

REVENUE
BUDGET/MIR
RECORDS

RECORDS
Y

ORDER BOOK/
INTERNAL ORDERS
RECORDS

RECORDS
N

AS PER RECORDS
N

AS PER RECORDS
N

CONTRACT/PO
RECORDS

RECORDS
N

BUDGET& MIR

RECORDS
N

AS PER RECORDS

ORDER BOOK /
INTERNAL ORDERS
RECORDS

RECORDS
Y

Contract/PO
Records

Records
Contract
CONTRACT/ PO

X
RECORDS

DRG. SUBMISSION
SCHEDULE
N

QAP / TEST
N

CONTRACTS/RECOR
DS

RECORDS
N

X
RECORDS

M
CONTRACTS

RECORDS
N

M
AS PER RECORDS

H
AS PER ORDER

REVENUE
BUDGET/MIR
RECORDS

RECORDS
Y

M
CONTRACT

REVENUE
BUDGET/MIR
CONTRACT/RECORD
S

REVENUE
BUDGET/MIR
RECORDS

RECORDS
Y

MIR
RECORDS

X
MIR

H
CONTRACT

MIR
RECORDS

X
MIR

MIR/RECORDS
N

X
MIR/RECORDS

MIR/RECORDS

MIR/RECORDS
MIR/RECORDS

MIR/RECORDS

RECORDS

AS NPER RECORDS
N

AS NPER RECORDS

AS PER SITE
RECORDS
AS PER
FIN.RECORDS
AS PER FIN.
RECORDS
CONTRACT

RECORDS
N

Record maintained by
individual/ deptt.
Records

N
N

N
N

N
N

M
H

M
H

H
H

Contract
Contract
Contract
Contract
Records
MIR
Records
Records

H
RECORDS

M
RECORDS

X
RECORDS

H
RECORDS

X
RECORDS

X
RECORDS

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D

Unit scorecard
Y

Records
Unit scorecard
UNIT SCORE CARD

LIST OF PUNCH
POINTS
LIST OF CONTRACTS

H
UNIT SCORE CARD

LIST OF PUNCH
POINTS
LIST OF CONTRACTS

AS PER RECORDS

AS PER RECORDS
Records

Records
Records
Records
Records
Records

Records
N

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.

As per Finance records


AS PER RECORDS
AS PER RECORDS

Records
RECORDS

RECORDS

RECORDS

CUSTOMER
SATISFACTION
SURVEY
RECORD

N
N

N
N

N
N

X
H

M
H

M
M

Survey Report
Project report

Contract/Records
Records
Records
Records
Records

Records
Records
Records

Vendor list
Records
RECORDS

RECORDS
N

RECORDS

RECORDS

RECORDS
N

RECORDS
RECORDS

RECORDS
TENDER ENQUIRIES

PRODUCTIVITY
IMPROVEMENT PLAN
DEPT. SCORE CARD

RECORDS
N

RECORDS
N

RECORDS

RECORDS
RECORDS

RECORDS

RECORDS
RECORDS

RECORDS

Unit QA/QC
Quality Deptt.
Action plan document
Project report

Project report

Project report
N

Project report
N

Project report
N

Project report
N

Project report
N

Project report
N

Records
Records

Records
N

Records
N

Records

Records

Records
Records
Records
Records
Records

Records

Records
Records

Records

Rating declared at year


end by Corporate / Unit
Management
Records
Records
review
Based on Enquiry
receipt

The PSM initiative


aims at reducing the
Cycle time for
procurement and the
gains of Purchasing.
Recommendation for
EPC group

KRA Remarks

Prepare system to finalise schedule for


Product & Project.Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

Plan to meet schedule required by customer.


Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days
Plan to meet schedule required by customer.
Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days

Proposed uniform measurement over scale of


5: >80%--5/ 70-80%--4/ 60-70%--3/50-60%--2/
40-50%--1. Comparison with L2 bidder if order
won and L1 bidder if order lost

Proposed uniform measurement over scale of


5: >80%--5/ 70-80%--4/ 60-70%--3/50-60%-2/ 40-50%--1. Comparison with L2 bidder if
order won and L1 bidder if order lost
Events are i) Finalisation of technical portion
ii) Finalisation of commercial portion. Define
time for each event. Specified time - within
No of events is i) Finalisation of technical
15% of delivery period. Where Ia= No.of
portion ii) Finalisation of commercial portion.
events delayed/Total no of events. Ib=No
Define time for each event. Where Ia= No.of
days of delay/Total time planned in days.
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days

No of events is i) Finalisation of technical


portion ii) Finalisation of commercial portion.
Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days

No of events is i) Technical clarification ii)


Commercial clarification. Define time for each
event. Where Ia= No.of events delayed/Total
no of events. Ib=No days of delay/Total time
planned in days

Prepare system to finalise schedule for


Product & Project.Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is i) L1 network ii) L2 network.


Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days
No of events is i) L1 network ii) L2 network.
Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days

Events are no. of drgs requiring approval.


Scheduled time shall be w.r.t each drg/a lot of
drg. Define time for each. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days for all
events
No of events are i) QAP ii) Test schedule.
Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days
No of events are billing break up. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events are billing break up. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events are billing break up. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events are no of documents. Define time


for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events are no of documents. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is No of documents. Define time


for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events are no of despatch clearances.


Define time for each event. Where Ia= No.of
events delayed/Total no of events. Ib=No
days of delay/Total time planned in days

No of events are no of bills. Define time for


each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is i) No of BG's and invoices ii)


No of documents. Define time for each event.
Where Ia= No.of events delayed/Total no of
events. Ib=No days of delay/Total time
planned in days

No of events is No of invoices. Define time for


each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of invoices. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is No of invoices. Define time for


each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of invoices. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of invoices. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is No of invoices. Define time for


each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of invoices. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events is No of tenders. Define time for


each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of tenders. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

No of events are no of reports (identify). Define


time for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events are no of reports (identify). Define
time for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of MIR/Reports. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of MIR/Reports. Define time
for each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of products. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of products. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days
No of events is No of products. Define time for
each event. Where Ia= No.of events
delayed/Total no of events. Ib=No days of
delay/Total time planned in days

Targets to be set as follows: 100% cases-L5;


95-99% cases-L4;85-94% cases-L3; 75-84%
cases-L2;<75%cases-L1
Targets to be set as follows: 100% cases-L5;
95-99% cases-L4;85-94% cases-L3; 75-84%
cases-L2;<75%cases-L1

System shall mean the current system


prevalant in the unit/region/business sector

No of events is No of points/issues to be
improved. Define time for each event. Where
Ia= No.of events delayed/Total no of events.
Ib=No days of delay/Total time planned in days
Questionnaire developed by CQA to be
adopted .

SPECIFIED TIME CAN BE 6 MONTHS FROM


DATE OF CREATION OF SYSTEM

SPECIFIED TIME CAN BE 5 MONTHS FROM


DATE OF CREATION OF SYSTEM
SPECIFIED TIME CAN BE 1 MONTH FROM
DATE OF BECOMING DUE

TO DEFINE NEW
TECHNOLOGY/PRODUCTS/ SERVICES
STRATEGIC TIE-UP TO INCLUDE JV'S AND
CONSORTIUM

AS PER REWARD SCHEME CIRCULAR TO


BE ISSUED

RETAINED CUSTOMER MEANS ONE WHO


HAS NOT PLACED ANY ORDER ON OUR
COMPETITORS FOR LAST 3
CONSECUTIVE TENDERS FOR THE
PRODUCT/PROJECT/SERVICE
NEW CUSTOMER MEANS ONE WHO IS IN
BUSINESS & HAVE PLACED ORDER ON
BHEL AFTER A MINIMUM OF 3 YEARS
TIME FRAME MEANS EXPECTED
COMPLETION OF SYSTEM DEVELOPMENT
ACTION PLAN TO INCLUDE PRACTICING
OF LEARNINGS IN FUTURE TENDERS
ACTION PLAN TO INCLUDE PRACTICING
OF LEARNINGS IN FUTURE TENDERS

ACTION PLAN TO INCLUDE PRACTICING


OF LEARNINGS IN FUTURE INSURANCE
CLAIMS

This KRA will be taken by Head of Unit


/Function / Department , if covered under MAP,
and can be assigned a weightage upto 100%
IT (1900)
IT (12000)
new initiative

As there is no cohesive group in place to


address this Business , Extensive efforts are
made to make

As this is a company vide initiative and part fo


the balance score card the same is to be
included.

This is a part of capability building effort


emphasised in balance score card.

FINANCE & ACCOUNTS FUNCTION KRA MASTER


KRA ID

Function

FAX00100 FAX

KRA Description

KRA
Type

Creating a databank of post Audit


queries/ issues, latest Accounting
standards, updations of accounting
policy & manual and Account closing
instructions to eliminate qualifications in
statutory/CAG audit
C

Unit of
Measurement

No. of days delayed


from scheduled
date

Y
No. of days delayed
from scheduled
date

FAX00101 FAX

L3 Consolidation of Data on past years/


Qualification and issues/relevant
accounting standards applicable.
Implementation of advice and feedback O

No. of days delayed


from scheduled
date

FAX00102 FAX

L2 Analysis of Data receipt/


classification / codification and creation
of Data Base.Review and action on
feedback.
C

No. of days delayed


from scheduled
date

FAX00103 FAX

L1 Evaluation of issues/ decide on


improvement advice for corrective
action and ensure compliance through
feedback and continuous updation and
monitoring

FAX00200 FAX
FAX00300 FAX

FAX00301 FAX

Timely Finalisation of tax audit report


without adverse comments
Web enabling of financial data flow
between BHEL divisions
L3 Development of software and the
Compilation for linking trial balance for
quarterly operations with Corporate

Critical
KRA
(Y/N)

No. of days delayed


from scheduled
date
Y

Time Index

No. of days delayed


from scheduled
date
N

FAX00302 FAX

L2 Review of operating results

No. of days delayed


from scheduled
date
N

FAX00303 FAX

L1 Analyse the reasons for variance and


submit for Boards approval and
disseminate the decision of the Board
O

No. of days delayed


from scheduled
date
N

FAX00400 FAX

Timely completion of Monthly / Qly /


Annual Accounts

% reports delayed
O

FAX00500 FAX

Improvement of system for forecasting


of financial parameters (including
operating results) for planning/ capital
budgeting and evaluation of impairment
of assets/ etc.
C

FAX00600 FAX

Completion of statutory audit / Quarterly


Limited review within a specified time. O

FAX00601 FAX

L3 Preparation of schedules/ Valuation


of FG and WIP/Link sheet preparation

FAX00602 FAX

L2 Checking up by Internal Audit/ vetting


by Statutory Audit /Audit under Sec
619(3)
O

FAX00603 FAX

L1 Review of Initial observation/ making


necessary changes and Audit report
Finalisation
O

No. of days delayed


from scheduled
date
N

FAX00700 FAX

Deviation from qtrly/ half-yrly/ annual


unaudited published results wrt SEBI
norms

No. of days delayed


from scheduled
date
N

FAX00701 FAX

L2 Compilation of deviation with


reasons

No. of days delayed


from scheduled
date
N

FAX00702 FAX

L1 Analyse and submit the report to


SEBI after due approval wherever
necessary and disseminate information
for future compliance
O

FAX00800 FAX

Reduction in time taken for Inter-Unit


reconciliations within specified no. of
days from final inter-unit meet

No. of days delayed


from scheduled
date

FAX00900 FAX

Appointment of Statutory Branch &


Foreign Auditors by C&AG and fixation
of their remuneration within specified
time. Appointment of auditors for limited
review & cost audit and fixation of their
remuneration.
O
Interaction and Finalisation of detailed C
Audit Plan and Schedule of Audit

No.of Days

FAX00901 FAX

FAX01000 FAX

Data collection and processing within


specified time in respect of Gratuity/
Medical & Retirement benefits

FAX01001 FAX

L2 Acturial Valuation and finalisation

FAX01002 FAX

L3 Collection of data and processing


within specified time

Time Index
Y
% reports delayed
Y
No. of days delayed
from scheduled
date
N
No. of days delayed
from scheduled
date
N

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

No. of days delayed


from scheduled
date
O

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
Y

FAX

Transformation of Accounting System to


US GAAP in stages
C

No. of days delayed


from scheduled
date

FAX01200 FAX

Introduction of system for compiling


schedules for Balance Sheet items and
profit and loss account items and
continuous upgradation and
modification
C

No. of days delayed


from scheduled
date

FAX01201 FAX

L3 Review of accounts logical grouping/


development of software for linking of
account head with grouping/ listing of
the Schedules.
O

FAX01202 FAX

L2 Review the system check the


correctness of grouping/ ensure
periodical upgradation.

No. of days delayed


from scheduled
date
N

FAX01100

No. of days delayed


from scheduled
date

FAX01203 FAX

To develop a system for concurrent


Booking of Incidental charges for
Valuation of Receipts(SRVs)by specified
date.
C

FAX01300 FAX

Maintenance and ugradation of system


for segmental accounting in terms of
Accounting Standards 17.
C

No. of days delayed


from scheduled
date
Y
No. of days delayed
from scheduled
date

FAX01301 FAX

L3 Identify the segments/ grouping of


various account heads for segments/
develop software/ linking account heads
with the segmental grouping.
C

No. of days delayed


from scheduled
date
N

FAX01400 FAX

L2 Review the systems ensure


correctness of classification and
accounting.
Settlement of Internal Audit Points &
Audit Queries

FAX01500 FAX

Settlement of Outstanding IA Paras /


Draft Paras through replies at Audit
Committee Meeting of Govt. Audit and
thru discussions with RAOs
O

FAX01501 FAX

L2 Compilation of outstanding IR Paras


and finalise reply for Audit Committee
O

FAX01502 FAX

L1 Settle the Paras with Audit


Committee

FAX01302 FAX

O
O

Time Index

No. of days delayed


from scheduled
date
N
Time Index
N
Time Index

FAX01600 FAX
FAX01601 FAX

Preparation & Implementation of


Annual Internal Audit Programme
L2 Timely completion of audit assigned
and issue of audit report

O
O

% of completion of
Corp.Targets
Time Index

N
N

FAX01602 FAX

L1 Approval of audit program from


Dir(F) / BLAC and ensure completion of
100% audit program and feedback to
BLAC on important IA Paras
O

FAX01700 FAX

Procedure / System Studies and


Improvement on recommendation of
ULAC and BLAC during Internal Audit

FAX01701 FAX

L2 Identification of weakness in system /


procedure and recommend
modifications / improvement
O

FAX01702 FAX
FAX01800 FAX

L1 Review the system study report and


ensure compliance with due approval
Specific Savings effected based on
finding of Internal Audit

Time Index
N

No.of studies

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

Absolute amount

No. of days delayed


from scheduled
date

FAX01900 FAX

Computerisation of Bank Reconciliation


and manually fine tuning to enable
complete Reconciliation & avoid
blocking of funds.
O

FAX01901 FAX

L3 Develop software to match entries of


Companys bank book with that of
Banks bank book and
identify/categorise the mismatches
C

FAX01902 FAX

L2 Follow-up and settle the mismatches


with bank and corrective action
C

No. of days delayed


from scheduled
date
N

FAX01903 FAX

L1 Review and implementation

No. of days delayed


from scheduled
date
N

FAX02000 FAX

Development of system for periodical


review of various elements of working
capital to facilitate decision making and
reduction in working capital

FAX02001 FAX

L2 Developing software for various


components of Working Capital

FAX02002 FAX

L1 System for Integrating various


components of Working Capital to
facilitate decision making

FAX02100 FAX

Improvement in System for Online


Budgetary control of Misc. Expenses .

FAX02200 FAX

Preparation of MOU performance


evaluation alternatives & adjustments
for rating improvement to best possible
(if necessary)

FAX02300 FAX

Evolving a System for EVA as a regular


performance monitoring measure within
time specified
C

No. of days delayed


from scheduled
date
N

N
No. of days delayed
from scheduled
date
N

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

FAX02301 FAX

L2 Updation of template for compilation


of EVA and also gathering information
C

No. of days delayed


from scheduled
date
N

FAX02302 FAX

L1 Analysis and preparation of


performance report

No. of days delayed


from scheduled
date
N

FAX02400 FAX

Preparation of budget / flash results.


Updation of systems for preparation of
budget / flash reports.
O

FAX02401 FAX

L3 Collection/ compilation of data


through system integration

FAX02402 FAX

FAX02403 FAX

FAX02500 FAX

L2 Analysis of data and preparation of


Budget/flash formats
L1 Review of system deficiency and
improve after considering the
suggestion by feedback and finalise for
presentation to Board

No. of days delayed


from scheduled
date
N

FAX02600 FAX

Timely submission of information for


MOU / Scorecard

FAX02700 FAX

Creation of a compendium of past


Issues/ decisions taken etc for reference
in future to avoid re-examination
C

FAX02701 FAX

L3 Compilation of Data on past IA


issues/ decisions taken etc

N
No. of days delayed
from scheduled
date
N
No. of days delayed
from scheduled
date
Y

No. of days delayed


from scheduled
date
Y

FAX02703 FAX

L1 Evaluation of shortlisted Audit Issues


with a focus on avoiding their repetition O

FAX02900 FAX

No. of days delayed


from scheduled
date

L2 Analysis of Data wrt Audit Issues

Computeration of cost accounting


records/forms and complying with the
cost accounting rules

No. of days delayed


from scheduled
date

No. of days delayed


from scheduled
date
Y

FAX02702 FAX

FAX02800 FAX

Y
No. of days delayed
from scheduled
date
N

Improvement & Maintenance of Data


Bank for Finance and Non-Financial
parameters and circulation of trends for
last 10 years to facilitate decision
making.
O

Cost system improvement for


identifcation of cost at
DU/product/project and allocation of
common expenses on rational basis

No. of days delayed


from scheduled
date

% Completion

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
N

FAX03000 FAX

Review of sundry creditors' old balances


and reduction thereof (reduction in
opening balance of more than 3 years'
old outstanding)
O

% reduction

FAX03100 FAX

Introduction of systems audit by


enhancing skill of the internal
auditors/new software
packages/training/ cross functional
teams

Number of system
audits conducted

No. of days delayed


from scheduled
date

FAX03200 FAX

Developing a system to monitor pension


cases of transferee employees for easy
transfer of pension account from one
region to other and to facilitate
finalistaion of pension cases
C

No. of days delayed


from scheduled
date

FAX03300 FAX

Improvement in system of customer


collection at site and accountal thereof
including co-ordination with customer for
TDS certificate/ concessional forms at
site
C

No. of days delayed


from scheduled
date

FAX03400 FAX

Facilitation of financial system


upgradation from existing platform to
ERP platform by planned
guidelines/user manuals and data
transfer for switch-over/initialisation

FAX03500 FAX

Increase in effective utilisation of


company's resources from Internal Audit
findings i.t.o. absolute amount of
miscellaneous income
O

Rs in Lakhs

FAX03600 FAX

System for effective management


review and monitoring of all type of LCs C

No. of days delayed


from scheduled
date
N

FAX03700 FAX

Updation of manuals pertaining to


accounts and finance function

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

FAX03800 FAX

Preparation of system audit manual

FAX03900 FAX

Facilitate quick decision of vendor


registration by evaluating financial
soundness and recommendations
thereof within specified time

FAX04000 FAX

Improvement in system for monitoring


fixed assets movement

FAX04100 FAX

Web enabled Foreign Exchange


Exposure Information System

No. of days delayed


from scheduled
date
O

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

FAX04202 FAX

Reduction in interest cost and financial


charges. Monitoring and review of bank
charges for their rates & applicability.
O
L2 Preparation of rolling cash inflow
outflow plan on monthly basis as per
schedule for ensuing quarter
O
L1 Matching inflows and outflows
periodically with projections as per
schedule and deploy / borrow at
optimum rates
O

FAX04300 FAX

Analysis of information relating to Forex


and Financial Markets and updating
management for taking important
decisions like Forward Covers/ Options/
Swaps etc
O

Absolute Amount

FAX04301 FAX

L3 Collection of market data and


exposure of BHEL as per time schedule C

Time Schedule as
per policy

FAX04303 FAX

L2 Review of movements in the market


with respect to benchmark rates and
submit detailed analysis of risks and its
coverage
L1 Decide to cover the risk with
appropriate banker

Time Schedule as
per policy
Time Schedule as
per policy

FAX04400 FAX

Savings in import / export bills through


better FOREX rates through
negotiations with different bankers

% of imports/
exports.

FAX04500 FAX

Timely filing of online trade returns for


ensuring eligibility criterion for import /
export

% returns filed
within due date

FAX04600 FAX

Assessment and Finalization of Fund


Based and Non-Fund Based Limits
through consortium of bankers within
specified time at an optimum cost

FAX04601 FAX

L3 Collection and compilation of data for


various facilities
O

No. of days delayed


from scheduled
date
N

FAX04602 FAX

L2 Review of data and prepare the case


for various limits in standard formats
prescribed by the bank
O

No. of days delayed


from scheduled
date
N

FAX04603 FAX

L1 Finalise the terms and conditions/


limits/ rates/performance analysis of
banks and share among the banks

No. of days delayed


from scheduled
date
N

FAX04700 FAX

Optimum utilization of Fund/Non-Fund


Based limit to facilitate reduction in
interest and bank charges

No. of delays on
account of nonavailability of limits

FAX04800 FAX

Timely review with consortium of banks


within specified schedule .
O

FAX04200 FAX
FAX04201 FAX

FAX04302 FAX

Reduction w.r.t
previous year

% plans delayed
N
Time schedule
N

N
N

No. of days delayed


from scheduled
date

No. of days delayed


from scheduled
date
N

FAX04900 FAX

Evaluation of Lease Finance Proposal


for carrying out cost-benefit analysis
over outright purchase

FAX05000 FAX

Maximise return at minimum risk for


company's surplus funds by Investment C

FAX05300 FAX

Analysis/ submission and obtaining


sanction from banks/FI's for project
financing of customers
Timely Obtaining Best Credit Rating for
BHEL from Rating Agencies
Arranging Long-Term funds at optimum
rates

FAX05400 FAX

Specialised financial arrangements like


Equity/ Dis-investment/ Dividend Policy
Joint-venture / Export Credit etc

FAX05100 FAX
FAX05200 FAX

FAX05500 FAX

No. of delays on
account of nonavailability of limits

Interest Income

Sanction letter at
optimum rate

Rating Obtained

Funds Arranged

Tie-ups completed

C
O

No. of days delayed


from scheduled
date
Y
No.Of days from
request
N

No. of complaints
received from
overseas offices /
sites

FAX05600 FAX

System for E-Remittances to Suppliers


Timely arranging of Bank Guarantees
for customers

FAX05700 FAX

Timely remittance of funds to overseas


offices / sites to avoid hold-up in
operations

FAX05800 FAX

Improvement in system for Timely


preparation of statement of customer
allocation and preparation of monthly
accounts under centralised cash credit
system

FAX05900 FAX

Determination of advance tax liability


judiciously with reference to budgeted
figures and payment thereof with a view
to avoid Interest / Penalty
O

FAX06000 FAX

Developing format for collecting


information for ensuring availment of tax
concessions and timely finalisation /
submission of income tax and wealth
tax return
O

FAX06100 FAX

Developing data bank for timely


submission of relevant information for
expeditious completion of assessment /
queries by IT deptt./Excise/Central
Excise/Sales Tax/Service Tax (Within
one month of receipt of letter from
relevant deptt. )
C

FAX06200 FAX

Collection/remittance/assessment of
TDS

No. of days delayed


from scheduled
date
C

Interest savings in
Absolute amount

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date
N

Time Index

FAX06300 FAX

Timely collection of Export Incentive


claims

FAX06301 FAX

L3 Collection of PAC and lodgement of


claims within time schedule and obtain
approval of claims.

FAX06302 FAX

L2 Demand from JDGFT to DGFT for


fund allocation against approved claims
and get the fund allocated from DGFT
O

FAX06400 FAX

Web enabled system detailing the


formats for realisation of export
incentives by specified date

FAX06500 FAX

To introduce a system to ensure


supplier / sub vendor avail export
incentive benefit for terminal excise duty
/ duty drawback to avoid initial cash
outflow.
C

Y
Time Index

N
Time Index

N
No. of days delayed
from scheduled
date
N
Time Index

N
Time Index

FAX06501 FAX

L3 while scrutining the purchase


proposal/ identify the Pos where Project
import benefits are available/ evaluate
the porposal to ensure the supplier / sub
vendor avail the concessional benefits. O

FAX06502 FAX

L2 Review Purchase Order and check


the benefits are claimed as per EXIM
Policy.

FAX06503 FAX

Creating database of Non moving &


slow moving items as per corporate
guidline,generation of report and
comparision with departmental balance
score card on monthly basis.

% reduction wrt
Opening balance

No of appeals
settled and
disposed in BHEL's
favour
N

N
Time Index
N

FAX06600 FAX

Effective handling of Appeals before


Appellate and settlement thereof

No. of days delayed


from scheduled
date

FAX06700 FAX

Upgradation and Maintenance of


Intranet site for interactive resolution of :
i) Exim Policy : ii) Customs Duty : iii)
Service Tax iv) Sales Tax;v) Excise Duty,
vi) Income Tax
C

FAX06800 FAX

Providing online clarification on Indirect


Taxation to business sectors/Units
through e-mail/Intranet

No. of days delayed


from scheduled
date
N

Percentage of
issues resolved
over total issues

FAX06900 FAX
FAX07000 FAX

Liaising with ministries on problem


faced by the Units and expeditious
resolution of such issues
Completion of Tax Assessment : IT/
Excise/ Sales Tax/Service Tax

Time Index

N
N

FAX07001 FAX

L3 Compilation of necessary data from


units/consolidation and preparation of
return in format

Time Index
O

FAX07100 FAX

L1 Review and analyse the data wrt


compliance/adequacy and accuracy and
submit the return offer clarification /
details and follow up for assessment
O
Refund / Claims settled pertaining to
Direct/ Indirect Taxes
O

FAX07101 FAX

L3 Compilation of data for supporting


claims and refunds as per return

FAX07102 FAX

L2 Analyse and ensure


conformance/arranging expert opinions
in case of disputes/correctness and
validity of claims

FAX07002 FAX

N
Time Index
N
% of total pending
claim amount

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date

FAX07103 FAX

L1 Review and submit the claims in time


and expedite refunds by successfully
defending with IT authorities
O

FAX07200 FAX

Submission of Statutory Returns within


specified time limits as per respective
statute

FAX07300 FAX

Replies to queries from tax authorities :


IT/ Excise/ Sales tax/Service Tax within
specified days from date of receipt of
query

FAX07400 FAX

Introducing a system for tax planning


- indirect taxes by specified date
C

No. of days delayed


from scheduled
date
N

FAX07401 FAX

L3 Find out the areas for


improvement and collecting the
relevant data for further process

No. of days delayed


from scheduled
date
N

FAX07402 FAX

L2 Analyse the data and refer the


relevant case loss and tax
provisions. Prepare the
assessment/refund claims return
submissions etc for submitting same
to the tax Officials.

Absolute Amount

FAX07500 FAX

Online Compendium of
Tribunal/Supreme Court judgments on
Direct and Indirect tax matters
byspecified date

FAX07600 FAX
FAX07700 FAX

N
% submissions
delayed
Y

% replies within
specified time

No. of days delayed


from scheduled
date
C

Availment of CENVAT within due date O


Reduction in Adverse Comments CERA
& Excise Audit
O

N
Loss of MODVAT

No.Of Paras

FAX07800 FAX

Submission of Final Excise Return.

No. of days delayed


from scheduled
date
N

FAX07900 FAX

To upgrade the system to avoid


transport and handling charges/ cycle
time reduction/ for input sent to
subcontactors in consultation with
excise department.

Freight saved

FAX07901 FAX

L3 Identify the goods of the


subcontactors for which no further
manufacturing activity is required at our
factory in consultation with Ancillary
Development.
O

Freight saved

FAX07902 FAX

L2 To approach Excise Department for


necessary permission by submitting
require documents / forms / report etc.

Freight saved

Freight saved

FAX08000 FAX

L1 Discuss with the Commissionor for


getting speedy approval for each
financial year.
O
Availing of Concessional Tax in Sales
in course of Imports / Others
O

% of sales value

FAX08100 FAX

Finalisation of Tax Provision and


adjustment of deferred tax and provision
thereof in accounts
O

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

FAX08200 FAX

Timely computation/ creation and


withdrawal of Foreign Project reserve
under IT Act within specified time of
Annual Accounts

FAX07903 FAX

No. of days delayed


from scheduled
date
Y

No. of days delayed


from scheduled
date
Y

Computation of Deferred Tax Assets


and Liabilities
FAX08300 FAX

FAX08400 FAX

System for cost estimation

FAX08401 FAX

L3 Collect / estimate cost details for


various components under various
codes/ collection of actual cost data and
preparation of cost statement and
furnishing the same to Business sectors
as per AS-7
C

FAX08402 FAX
FAX08403 FAX

L2 Analyse the actual cost with estimate


to find out the reason for variance
C
L1 Advise corrective action
C

FAX08404 FAX

Development of system for automatic


Computation of Direct labour hour rate,
engineering rates and overhead
recovery rates and their reconciliation
with financial records.

Time Index

N
Time Index

Time Index
Time Index

N
N

FAX08500 FAX

Reduction in No.of cost audit


comments.

FAX08501 FAX

L3 Collection and compilation of cost


audit comments

No. of comments

No. of days delayed


from scheduled
date
N

FAX08502 FAX

L2 Analyse comments/ check from cost


records and give suggestions for
improvements
O

No. of days delayed


from scheduled
date
N

FAX08503 FAX

L1 Review of analysis and the


implementation of selected suggestions O

No. of days delayed


from scheduled
date
N

Web Enabled AS-7 accounting system

No. of days delayed


from scheduled
date
Y

FAX08601 FAX

L2 Integration of inputs from other depts C

No. of days delayed


from scheduled
date
N

FAX08602 FAX

L1 Designing inputs and outputs and the


system
C

No. of days delayed


from scheduled
date
N

FAX08700 FAX

Optimise return on investment of


gratuity / PF trust funds

% increase over
Govt. of India Bond
Interest Rate
N

FAX08701 FAX

L3 Review of directory of approved fund


managers and collection of quotations
and compare it with market rates within
prescribed time schedule
C

FAX08600 FAX

FAX08702 FAX

L2 Analyse risk vis--vis return

FAX08703 FAX

L1 Select proper investment with


respect to overall portfolio objective

FAX08800 FAX

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

No.of NCR

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

FAX08900 FAX

Implementation of NSSN
Timely Submission of Report and
Compliance of PF Act

FAX09000 FAX

Completion of annual a/cs of PF Trust /


Gratuity /Acs within due date and
issuance of PF statement

FAX09100 FAX

Bulk filing of Income Tax Returns of


employees by specified date

FAX09200 FAX

Number of errors in disbursements as a


% of number of employees
O

% reduction
compared to
previous year

No. of days delayed


from scheduled
date
N

FAX09300 FAX

System for On-Line information for


employee related payments

FAX09400 FAX

Systematic follow up and Facilitation for


realisation of sundry debtors including
liquidation of Old and Withheld o/s by
furninshing of necessary information to
commercial for reconciliation and
settlement
O

% reduction wrt
opening balance.

FAX09401 FAX

L3 Preparation of age-wise analysis of


statement and update data/additional
information for reconciliation.

% reduction wrt
opening balance.

FAX09402 FAX

L2 review meeting with customer and


reconcile the difference to enable early
settlement of outstanding.

No. of days delayed


from scheduled
date
N

FAX09600 FAX

Facilitating the Collection of TDS


certificates and Accountal thereof for
claiming credit
O
Reduction in average cycle time for
Raising of invoices on customer
C

FAX09500 FAX

Non-claiming TDS
certificate in
absolute value
N
% reduction

FAX09700 FAX

Reduction in average cycle time for final


Contract price reconciliation to facilitate
raising of final bill on customers
C

% reduction

FAX09800 FAX

Facilitate Collection of Concessional


Sales Tax Forms from
Customer/Suppliers.

Extra amt paid due


to non-collection
N

FAX09900 FAX

Develop data bank on customer


contract terms and conditions for
optimisation of revenue realisation and
improvement in future contracts.

100% realisation

FAX09901 FAX

L3 Study the terms and condtions of the


contract/ identify terms of the finance
implication. Compile and analyse the
data.
O

FAX09902 FAX

L2 Review the data/ obtain clarification


for ambigous terms and conditions.
Ensure realisation/ suggest
improvement in terms and conditions for
better realisation of revenue in exisiting
contracts as well as future contracts.
O

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

Time Index

FAX10000 FAX

Continuous review of Billing Rate


Schedule to optimise cah in flow
together with accommodating the total
excise duty payments over the entire
supplies.
O

Time Index

FAX10001 FAX

L3 Periodical compilation of data on


billing/ compare with estimated rate/
suggest for rate revision.

FAX10002 FAX

L2 Review the suggestion check the


data/ interact with the Commercial
group to revise the rate per kg and
obtain approval from the customer.

FAX10100 FAX

Reduction of Bank Guarantees for


proportionate execution of work against
advances from customers
O

Reduction in
Guarantee

FAX10200 FAX

Maintenance of system for identifying


expired Bank Guarantees and
facilitating return thereof

No. of days delayed


from scheduled
date
Y

FAX10300 FAX

Maintenance and improvement of


system that would reduce time cycle in
passing of suppliers bills/service
bills/freight bills and any other bills

N
Time Index

No. of days delayed


from scheduled
date
C

Y
Time Index

FAX10301 FAX

L3 Review the existing System. Identify


areas in which delys are taking place
and submit report to section head.
C
Time Index

FAX10302 FAX

L2 Analyse the reason for delay/ identify


the causes/ suggest for elemination of
factors that causes delay/ submit
recommendation.
C

Time Index

FAX10303 FAX

L1 Review the recomandation/


accept/modify the recommdation and
ensure implementaion.

N
No. of days delayed
from scheduled
date

FAX10400 FAX

System to recover LD imposition from


suppliers

FAX10401 FAX

L3 Development of suitable Software


linking SRV and Purchase Order finding
out the delay in supply calculating the
LD
C

FAX10402 FAX

L2 Review the softwar developed


Ensure recovery of LD from payment

FAX10403 FAX

L1 Periodical Review for the


effectiveness of the system as well
as recovery of the LD

N
No. of days delayed
from scheduled
date
N

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

FAX10500 FAX

Maintenance and improvementof


system for integration of issue and
accountal of Concessional sales tax
forms

FAX10501 FAX

L3 Development of Software for


compiling Purchase Order information
requiring 'C' Form issue.

FAX10502 FAX

No. of days delayed


from scheduled
date
C

No. of days delayed


from scheduled
date
N

L2 Implementation of system and issue


of 'C' Form
C

No. of days delayed


from scheduled
date
N

FAX10600 FAX

L1 Review the system effectiveness


Cycle time reduction for Issue of TDS
Certificates under Income-Tax Act.

No. of days delayed


from scheduled
date
N
No.of days from
year end
N

FAX10700 FAX

Final Material Accounting Statement


for material lying with sub-contractors
and Recovery
O

No of days from the


job completion .
N

FAX10800 FAX

Cycle time reduction in Passing of subcontractor Running and Final Bill

No. of days delayed


from scheduled
date
N

FAX10801 FAX

L3 Detailed scrutiny and checking with


contract & other relevant records

Avg No. of days


from submission of
bill
N

FAX10802 FAX

L2 Review of passed amount wrt to


records and approve as per DOP

Avg No. of days


from submission of
bill
N

Avg No. of days


from submission of
bill
N

FAX10503 FAX

FAX10803 FAX
FAX10900 FAX

L1 Review and Approve as per DOP


Timely remittance of statutory
deductions/ collections

FAX11000

Bank guarantees renewed/ lodged for


claim before expiry (applicable to
supplier/ sub-contractor's BG)

FAX11100

FAX11101

FAX11102

FAX11200

FAX

Time Index

% of expiring BGs.

No. of days delayed


from scheduled
date
N

FAX

Automatic Bill passing through system.

FAX

L3 Identify areas for computerisation/


sudy the system/ develop the software.

No. of days delayed


from scheduled
date
N

FAX

L2 Review the functioning of the


system/ improve/ modify on a continous
basis.
C

No. of days delayed


from scheduled
date
N

FAX

Review and Liquidation of Advances


and deposits paid to Suppliers/deposits
to various authorities
C

% of Liquidation on
total advance
outstanding for
more than one year N

FAX11300

FAX11301

FAX11302

No. of days delayed


from scheduled
date

FAX

Introduction of computerised
measurement book for Civil / Electrical
Work to reduce cycle time in preparation
and passing of Bills.
C

FAX

L3 Study the exisiting system/ develop


software in consultation with Civil /
Eelectrical Department

No. of days delayed


from scheduled
date
N

FAX

L2 Review the System to ensure cycle


time reduction.

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date

FAX11400

FAX11401

FAX

FAX

Developing online system for collection


of revenue like rent/ water charges/
electricity charges/ shop rent/ to enable
quicker realisation of revenue.
C

L3 Review the existing system/ develop


the software in coordination with HR
(Estate adminstration)
C

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date
N
% reduction over
last year
N

FAX11402

FAX

FAX11500

FAX

L2 Review the system developed to


ensure information inforation available
on online and for correctness of data.
Reduction in opening balance of
suspense head by periodical review

FAX

Review of PSL from the end of month


for price trend analysis for decision
making in respect of procurement and
sales estimation

FAX

Reduction in Insurance Premium


through systematic study of the insured
property/ risk needed/ fire prevention
measures and effective negotiation.
C

% of total insured
value compared to
prev. year
N
No. of days delayed
from scheduled
date

FAX

L3 Compilation of Insurance Property


clasification of property identification of
risk report of the fire prevention system
tabulation of rates
C

FAX

L2 Review the list of property in the risk


to be covered analyse the rate negotiate
put up recommendation
C

No. of days delayed


from scheduled
date
N

FAX11703

FAX

L1 Review the recommendation


negotiate if necessary approve the
proposal.

No. of days delayed


from scheduled
date
N

FAX11800

FAX

Identification of New Areas of Insurance


needs at an optimum premium on time C

Areas Added / Time Y

FAX

System / Procedure for Timely


arrangement of Insurance Coverage

No. of days delayed


from scheduled
date
Y

FAX11600

FAX11700

FAX11701

FAX11702

FAX11900

C
O

No. of days delayed


from scheduled
date

FAX12100 FAX
FAX12200 FAX

Insurance claim settled as % of final


claim lodged
Reduction in unpriced Stores Receipt
Voucher
Stock verification within specified time

FAX12300 FAX

Mechanisation of Fixed Asset


Verification system by introducing Bar
Coding system for all equipments (Fixed
assets) to ensure 100 % verification.
C

FAX12000 FAX

FAX12301 FAX

L3 list out all plant and equipment for


bar coding pasting bar code in all
equipments/ verify the assests with the
help of the barcode reader linked with
the computer.

FAX12302 FAX

L2 Reconcile the difference and take


appropriate action for nonreconciled
items.

O
O
O

% value of
insurance claim
amount.
% w.r.t. total no. of
SRVs
Time Index
No. of days delayed
from scheduled
date

N
N
N

N
No. of days delayed
from scheduled
date

No. of days delayed


from scheduled
date
N

FAX12400 FAX

Cost Reduction in Material/ Indirect


Material / Sub-Contracting & war on
wastages due to Finance Initiative

Increase in % of
savings of Total
Matl cost / sub-cont
cost over Pr.Year
N

FAX12500 FAX

Completion of special assignments

FAX12600 FAX

Savings through productivity


improvement projects of finance
department

Absolute Value Rs.


in lakhs
N

FAX12700 FAX

Identification of Critical Improvement


Areas through Internal Perception
survey of employees / Internal
customers

No.of Areas
identified and
agreed

FAX12701 FAX

L3 Prepare survey questionnaire and


get response

No. of days delayed


from scheduled
date
N

FAX12702 FAX

L2 Analyse the survey report/ prepare


areas for Improvement

No. of days delayed


from scheduled
date
N

No. of days delayed


from scheduled
date
N

FAX12703 FAX

L1 Action for improvement

FAX12800 FAX

Improvement of system to enable cycle


time reduction in clearance of purcahse
proposal and other proposals for
financial concurrence
C

Time Index

Reduction in avg
no. of days wrt
previous year

FAX12801 FAX

L3 Compile procedure guidelines issued


by various agencies and classify them.
Preparation of check list wrt to prevailing
guidelines and scrutiny/ where DOP
provides concur.
C

FAX12900 FAX

L2 Review and accord concurrence as


per DOP
Number of man hours saved through
computerisation.

FAX13000 FAX

Improvement of Tender conditions


(GTC) for cost reduction/ improved
service and risk mitigation by specified
date

FAX12802 FAX

FAX13100 FAX
FAX13200 FAX
FAX13300 FAX
FAX13400 FAX

Workshops/Technical forum discussion


for addressing issues like
Accounting/Taxation/ Auditing/
Fiancial/Legal/ Risk Mitigation and cost
management
Completion of arbitration cases within
the specified time
Evaluation of Capital Investments vis-vis DPR
Evaluation of capital proposals for
preparation of Annual Plan.

C
C

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date
N
Targetted Man hour
saved
N
No. of days delayed
from scheduled
date

No.Of W/Shops
% completion w.r.t
total

ROI

Time Index

Time Index

FAX13500 FAX

Compilation and submission through a


web enabled MIR, data of sectorwise/
project wise, order receipt/ execution &
outstanding position, for the purpose of
reconciliation of orders received &
outstanding in the records of Business
sectors & units

Y
No. of days delayed
from scheduled
date

FAX13600 FAX

Review and implementation of New /


revised accounting standards / changes
in SEBI guidelines / Companies Act with
respect to its impact on BHELs results
and development & issue of guidelines /
clarifications by specified date.
C

FAX13700 FAX

Reply to Govt. Audit queries/ Inspection


report paras/ Action Taken Reports etc.
furnished within specified time (2
weeks)
O

FAX13800 FAX

Reply/settlement of Internal Audit paras


within specified time (4 weeks)
O

Time Index
FAX13900 FAX

Timely inputs to unit/corporate finance


for inter-unit re-conciliationof accounts

FAX14000 FAX

Timely inputs to unit/corporate finance


for BUDGET/FLASH/MIRs etc.

Y
Time Index

FAX14100 FAX
FAX14200 FAX

Finalisation of Functional scorecard by


specified date
Improvement in Employee Satisfaction
Score

No. of days delayed


from scheduled
date
Y

Score

FAX14400 FAX

Implementation of Improvement projects


identified in the Position Report as per
schedule
O
Increase in no. of active Quality Circles
in the deptt.
O
Achieving Business excellence thru'
TQM at Deptt. level
C

FAX14401 FAX

Preparation of action plan based on


Position report

FAX14402 FAX

Implementation of Improvement projects


identified in the Position Report as per
schedule
C

FAX14201 FAX
FAX14300 FAX

FAX14500 FAX
FAX14600 FAX
FAX14700 FAX

FAX14800 FAX

FAX14900 FAX

FAX15000 FAX

Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal
Completion of KM Projects as per
schedule

Time Index
Y
Number of new
circles

TQM Score

No. of days delayed


from scheduled
date
Y
Time Index
Y

No. of days delayed


from scheduled
date
Y

Number

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C

Time Index

N
Y

No. of days delayed


from scheduled
date

N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date

FAX15100 FAX

FAX15200 FAX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C

FAX15300 FAX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
C

FAX15400 FAX

Correction in turnover/ Profit due to


timely pointing out of errors in
accounting entries in schedule audit.

FAX15500 FAX

Verification and vetting of - Write off


proposals/ Productivity improvement
projects (more than 10 lakhs) / Gratuity /
other assignments referred to IA.
O

FAX15600 FAX

Development of system for issue of


quarterly financial status reports for
projects, calculation of actual engg and
tss hourly rates for previous year and
pre-determined engg and tss hourly
rates for current financial year.

FAX15601 FAX

updation of projects master, outlay


master and budget master to facilitate
fsr run.

No. of days delayed


from scheduled
date

N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date

Rs in Lakhs

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

No. of days delayed


from scheduled
date
N

FAX15700 FAX

Development of system for


Reconciliation of admitted accounts and
cash receipt control accounts.
C

No. of days delayed


from scheduled
date
N

FAX15800 FAX

System for timely submission of eTDS(Quarterly/Annually) for Income Tax


and Employment Tax Return
C

No. of days delayed


from scheduled
date
Y
No. of days delayed
from scheduled
date

FAX15900 FAX

Development of system for automatic


Updation of fixed assets records and
preparation of depreciation schedule
inline with relevant Accounting
standards.

FAX16000 FAX

Identification of weaknesses in system /


procedure and recommended
modification /improvement
O

FAX16100 FAX

Preparation of systems audit manual

FAX16200 FAX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

FAX16300 FAX

MONITORING ACCOUNTING OF
EXPENDITURE BOOKED TO
PROJECTS IDENTIFIED UNDER
ACCOUNTING STANDARD 26

FAX16301 FAX
FAX16400 FAX

Revision of Internal Audit Manual

FAX16600 FAX

Developing a system by specified date


for capturing comments of Statutory
Auditors on adequacy of coverage by
IA.

FAX16700 FAX

Development of template/application
package by specified date for
preparation and issue of IA Report,
monitoring/tracking and disposal of the
report para wise.

FAX16800 FAX

Intra-Net site development by specified


date for status of Works Bills giving
details of Party, Contract, etc. in
coordination with Computer Deptt

FAX16900 FAX

Data collection and timely


Remittance /Reimbursement of
Statutory deduction /court attachment
and other out side Financial Agency/
Bank /Housing Finance
Companies/Club/Socities payments
within specified time

FAX17000 FAX

Development of system for online


Priced store ledger by specified date

FAX17100 FAX

N
No. of days delayed
from scheduled
N
date

Balanced
Scorecard Rating
(5/4/3/2/1)

NO. OF
PROJECTS

NO. OF
PROJECTS &
VALUE

No. of comments

IDENTIFYING PIRS AND OBTAINING


JUSTIFICATION FOR INCLUSION AND
RETENTION UNDER AS-26
O
Comments by Statutory Auditors on
O
adequacy of coverage by IA.

FAX16500 FAX

No. of days delayed


from scheduled
date

No. of days delayed


from scheduled
date
N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date

N
No. of days delayed
from scheduled
date

% remittances/
reimbursements
done within
specified time

No. of days delayed


from scheduled
date
N

Development of online System for Bank


guarantees accepted by BHEL from
Fabricators by specified date.
C

No. of days delayed


from scheduled
date
N

FAX17200 FAX

Development of Computer System for


timely resolution of
Employees/Dept/Contract related issues
on Pay, Time & Wages, TA/LTC/PF,
Works Bills and Miscellaneous bills by
specified date
C

FAX17300 FAX

Review and follow up of collectible


sundry debtors to reduce the amount of
outstandings
O

No. of days delayed


from scheduled
date

N
% of Target Amount
achieved
N
Time Index

FAX17400 FAX

Consolidation of O/s report on monthly


basis and review of billing plan
Reduction / Liquidation of BGs as a
percentage of what is due.

FAX17500 FAX

Timely processing of Imports Ocean


freight/air freight/air agencies bills
involving huge amounts (involving
crores of value - audit resulting in
savings in lacs of rupees viz..
classification , currency exchange rates
etc..)
O

Time Index

FAX17600 FAX

DEVELOPMENT OF WEB BASED MIR


SYSTEM FOR DEBTORS
MANAGEMENT
C

Time Index

FAX17601 FAX

COLLECTION AND INTEGRATION OF


DATA AND SUBMISSION TO
CORPORATE OFFICE AS PER
SCHEDULE
O

FAX17301 FAX

O
O

N
%

Saving in Rupees

N
Time Index

FAX18000 FAX

Development of system for early issue


of
Annualinteraction
P.F.Statements
to members.
Effective
with Statutory/Govt
Auditors for Audit plan and work
Timely Completion and release of
Directors' Report
Monitoring of PR/BOI wrt billing and
cost

FAX18100 FAX

Preparation of Cost Proforma and


Annexures for Completion of Cost Audit O

No. of days delayed


from scheduled
date
N

FAX18200 FAX

Issuing Guidelines / Clarifications on


Forex Issues and Foreign Currencies
Rates

No. of days

FAX18300 FAX

Number of Non-Compliance of Statutory


Provisions, Management Policies &
Procedures pointed out.
O

Number of NonCompliances
pointed out

FAX18400 FAX

Coordination of Monthly DO for


Director / Finance

No. of days delayed


from scheduled
date
N

FAX17700 FAX
FAX17800 FAX
FAX17900 FAX

O
O
O

N
Auditors perception N
No. of days Prior to
Board Meeting
N

Timely completion

Time Index

FAX18500 FAX

Development of system of remittances


of TDS/TCS through internet banking
facility

FAX18600 FAX

Improvement in impementation of eremittances/EFT

FAX18700 FAX

System improvement to adhere to


changes in statutory provisions relating
to Payroll,PF etc.

FAX18800 FAX

System improvement to adhere to


changes in Cormpan policies relating to
Payroll,PF etc.
O

Number of days
taken to modify the
program
N

FAX18900 FAX

Planning of fund for meeting the loan


requirement & final settlement

Number of times
the shortage of
fund

FAX19000 FAX

Receipt of interest on investment &


maturity amount

Date of payment of
Interest &
maturity date
N

FAX19100 FAX

Transfer of PF accumulations and


settlement of pension

No of cases

FAX19200 FAX

Calculation of pre-determined hourly


rates, periodical review of utilized hours
vis-a-vis budgeted hours and calculation
of final absorption rate.
O

Time Schedule

Issue of quarterly Financial Status


Reports in respect of completed,
ongoing and terminated projects.

number of days
since receipt of time
booking for the last
month of the
quarter, budget and
outlay inputs in
respect of new
projects added.
N

FAX19300 FAX

Target date /
Months for
implementation.

Number of months
to modify the
program

FAX19400 FAX

FAX19500 FAX
FAX19600 FAX

System improvement for prompt


scrutiny and admission of bills from
employees against Departmental
Advances for settlement and
recoupment of imprest cash account.
System improvement for prompt
scrutiny and payment of bills from
subcontractors/ fabricators.
System improvement for clearance of
advances within specified time.

number of days
from the date of
submission of bills. N

No. of days from


which bills are
received.

No. of days from


the date of receipt
of all clear
proposals

Time Schedule

Time Schedule

Time Schedule

FAX20000 FAX

System improvement for Checking and


vetting of Insurance, Security,Transport,
AMC and other Misc. proposals.
Development of systems and procedure
for VAT
Development of systems and procedure
for Service Tax
Development of systems and procedure
for Fringe Benefit Tax

FAX20100 FAX

Facilitating introduction/implementation
of e-procurement / Reverse Auction

Time Schedule

FAX20200 FAX

Facilitating the improvement of Vendor


Base to reduce the dependence on
Single/very few sources of suppliers

Time Schedule

FAX19700 FAX
FAX19800 FAX
FAX19900 FAX

ON KRA MASTER - 2006-07


Special
KRA
(Y/N)

Universal
KRA
(Y/N)

Suggested Weightage
for category
A
B
C

Source of Data for


Measurement

Audit Report

Register

Data Base

Report

Report

System

System

Operating Results

Board Approval

Trial Balance

System

Audit Report

Completed
Schedules

Completed
Schedules duly
initial by Internal
Audit.

Audit Report

Audit Report

Unaudited
Accounts

Deviation Report

Register.

Appointment Order.

Input Data

REM

REM

Accounts

System

System

System

Actual booking of
Incidental expences
Vs Provisional
Booking.

System

System

System

Register

Minutes of the Audit


Committee
Meeting

Register

Minutes of the Audit


Committee
Meeting

Approved Annual
Audit Programme.

MIR

MIR

Audit Report

Audit Report

Audit Report

Register

System

System

System

REM

System

System

System

System

MOU Evaluation
Report

System

System

EVA Performance
Report

Booklet

Booklet

Booklet

Booklet

Booklet

MOU / Scorecard

IA Report

Database

Report

REM

Cost Reprots

System

Accounts Ledger

Reports

System

System

System

Register of
miscellaneous
income

System

System

System

Updated Manual

System

System

Ledger

MIR

MIR

Register

Register

Analysis Report

Action Report

Register

Acknowledgement
from DGFT

Agreement

Register

Standard Format

Approval Letter

Register

MOM

proposals of users

Deployment of
Surplus

Project Report

Credit Rating

Financial Position

REM

System

Bank Guarantee

Register

System/ Register

Approved Budget

Acknowledgement
from IT Dept

Acknowledgement
from IT Dept

Relevant
Documents

System

Register

Correspondence
with DGFT

System

System

System

System

Reduction in Slow
& non moving
Inventory.

Register

System

System

Register

Assessment Order

Return

Assessment order

Refund Order

Data Sheet

Refund Claim
Letter

Refund Order

Returns

Correspondence
file

Assessment/Refun
d Order

Assessment/Refun
d Order

Assessment/Refun
d Order

System

Returns

Register

Register

Register

Register

Register

Register

Register

Consolidated
Annual Accounts

Actual Date

Cost Report

Cost Report

N
N

N
N

X
H

M
X

X
X

Cost Report
Cost Report

Time Index

Audit Report

Register

Analysis Report

Analysis Report

Completion Date

REM

REM

MIR

Report

Report

Approval Note

NSSN Regn
PF Inspection
Report

Audit Report

Tax Return

System

System

Ledger

Reconciliation
Statement

Liquidation of
Withheld
outstanding

Register.

System

Register

Assessment Order.

Ledger

Analysis Report

Review Report

Variation Rate per


Kg.

Rate Revision
Letter

Approval Letter
from Customer

Periodic Invoices
for completion

System

System

Report

Recommendation
Note

System

System

System

System

System

System

System

C' Form Register

System

System/ Register

SRV/Register

Register.

Register.

Register.

Register.

Cash Book

Register

System

System

System

System

System

System

System

System

System

System

REM

Ledger

Ledger

Register

Recommendation
Report

Approval Note

Covers Obtained

Policy

Register

N
N

N
N

L
L

M
M

H
H

System
MIR

Verification Report

Verification Report

Reconciliation
Statement

Register

Register

Register

Survey Report

Survey Report

Feed back on
Survey Report

Action Taken
Report

Computerised File
Movement System

Check List

Proposal Approval

MIR

Format

Decisions

Register.
Capital Budget
Report.

Annual Plan

MIR

Guidelines issued

Record maintained
by Audit deptt.

Record maintained
by Audit deptt.

Record maintained
by individual/ deptt.

Record maintained
by Unit/Corp.
Finance deptt.

Record maintained
by Unit Head/Unit
P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan
document

Project report

REM

Case Document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Based on the
observations made
during balance
sheet ( Schedule )
audit

Documents from
Commercial,IED
and HR

FSR - quarterly
FSR engg & tss
hourly rates - Note
for obtaining the
approval of the
competent
authority.

Quarterly FSR
report

General ledger

Acknowledgement
from IT/ET dept

Register/computer
system

Submission
of
system
Systems audit
manual for
approval

Rating declared at
year end by
Corporate / Unit
Management

APPROVED PIRS
& VALUE

APPROVED PIRS
Report 619(3A)/
CARO

Date of completion
of job against target

Balance sheet and


619(3A) report by
Statutory Auditor.

Actual and
satisfactory
implementation of
computer package.

Report

Records

Satisfactory
implementation of
the System

Satisfactory
implementation of
the system.

System

MIRs

MIRs

MIRs

Payment Records

SYSTEM

SYSTEM

N
N

N
N

M
H

M
H

H
H

System / Statement
issue date
Auditors
Date of Board
Meeting

Report

Schedule given by
Corproate Finance

As per past
experience.

Audit Report

Copies of DO
Letters

e-tax remittance

Correspondence
with banks.

Latest amended
Income Tax Act,
1961 as well as
departmental
circular issued by
establishment
section

from the date of


receipt of hr circular
in computer section

Loan request of
members & Claim
for Final settlement

Covering letter,
counterfoil of
cheque receipt

request for transfer


of PF & Receipt of
claim with the
required documents
for pension

Receipt of
approved R&D
Budget/Availability
of Final Ledger of
Final
Accounts/Completi
on of Govt. Audit.

FSR quarterly
output.

identified vouchers
for this purpose.

identifying the
respective
vouchers.

Advance register

Record of receipt of
proposals

KRA Remarks

Action to be taken by Unit Finance with


the help of other functions and
coordinated by Internal Audit with
Statutory Auditors wrt adequacy of
Internal Audit Coverage/ Qualifications
in Annual Accounts etc

31st October for Corp & 1st September


for Unit
Action taken by all units with support
from Information Technology Group

Approval of Concerned Debit


Accepting Department Consent to be
obtained and to be sent only with
Inter Unit Accounts.

To follow up with CAG's Office/ Coordination with Board.

Unit HR / Fin to furnish the data to


Corporate Office for consolidation
and submission to Actuary-Provide
required clarification to Actuary..

Streamlining the information for


enabling conversion with the help of
Consultant

Classification of Revenues/ expenses/


assets & liabilities according to
segments.

This KRA has to be taken care by all


depts to ensure compliance.
This is an attempt to settle audit paras
remaining after replies at RAO level
with Higher Govt. Authority viz./Audit
Committee

AAP has to be approved by BLAC.


Once approved any change requires
consent from BLAC/ hence the
importance

During BLAC meetings specific system


studies are required to be made and
reported to BLAC

These are direct contributions


emanating from Audit Observations

Very useful in identifying errors of bank


charges on time and quick remedial
actions result in savings of interest

Used for optimising the extent of


working capital requirement to
maximise EVA

To take immediate corrective action


before incurrence of expenditure
For defending the Organisations level
of achievement vis--vis MOU
parameters
EVA recognise one of the most
important ratio for performance
analysis

Budget / Flash summary results is a


major role in performance
improvement / enhancing stake holders
value.

Scheduled date will be no. of days from


completion of Govt. Audit
(Timely submission of MOU Score
Card)

Scheduled date being end of the month

Earlier than 31st October

Streamlining the system for expediting


completion of Assessments

Early resolution of issues

To take up with supplier for availing


Duty Drawback / Terminal Excise
Dutyand pass on the benefits to BHEL
by way of deductions in Bill amount.

Releasing cash in-flow from blocked


funds

End of the month

No. of days from the end of the


contract.

within 3 days from balancesheet


finalisation

Critical in nature,all costing and price


estimated are based on these
information.

December

Realisation of withheld & outstanding


debts will enhance profit by reversal of
provisions which would have been
made for such debts and also reduce
sundry debtors.

Non-collection of Concessional Sales


Tax Forms will attract additional tax
which will affect the profitability of
the Company. The comml support is
reqd.
Non-scrutiny of the sales contract in
some cases will result in nonrealisation of revenues further in
certain cases the terms and conditions
should be interpretated correctly so to
avoid short collection of sales
revenue.

Some of the Units follow raising of


invoice on rate per kg. (TO BE
COMPLETED)

In most of the sale contracts customers


are levying LD for delay in
supply/erection. In order to pass on
the LD to our suppliers this KRA is
suggested.

MM to take up with Sub Contracting for


furnishing final Material Accounts
Reconcilatin Statement.
Avg No. of days from receipt of
complete Bill in accounts dept.

Major Units are having Township where


the recovery of rent/ electricity/ water
charges another dues forms an
important works of Accounts Section.
This development of system would
ensure 100% recovery as well as
quicker realisation.

Development of System

Since material Cost on Sub-Contracting


forms a substantial part of revenue, its
reduction will enhance profitability.
Every Fin. dept. will mantain a seperate
register to record savings through such
efforts.
HOD with Assign Special
Assignments

Financial concurrence is the most


important activity of Finance. All
proposals involving financial
implications require financial
concurrence.

..

Targets to be set as follows: 100%


cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1
Targets to be set as follows: 100%
cases-L5; 95-99% cases-L4;85-94%
cases-L3; 75-84% casesL2;<75%cases-L1

Questionnaire developed by CQA to be


adopted .

This KRA will be taken by Head of


Unit /Function / Department , if covered
under MAP, and can be assigned a
weightage upto 100%

Nil

--

Nil

MATERIALS MANAGEMENT FUNCT


KRA ID

Function

MMX

Issue of enquiry within specified days


of receipt of PI

% of Material procured (by value) as


per PO delivery schedule & terms.

% Reduction in rejections over


previous year.

% Clearance of bills under objection


within specified time

% achieved / target

% rate contracts finalised/


target

% of consignments

% reduction/ target

% reduction in number of items where


bin stock does not match actual stock
compared to earlier year.

% reduction in no. of stockouts of


stock items

MMX

MMX00500
MMX
MMX00600
MMX
MMX

MMX00800
MMX
MMX00900
MMX
MMX01000

MMX

MMX01100
MMX
MMX01200

MMX

MMX01300
MMX
MMX01400

Time Index

MMX

MMX

MMX00700

Unit of Measurement

MMX00300
MMX00400

KRA
Type

Placement of PO / Contract within


specified days of receipt of PI./
request (days to be specified in Action
plan box)

MMX00100

MMX00200

KRA Description

MMX

% achievement of BOIs / Subcontract


itemsT/O vis a vis the target.
Number of Rate contracts / long term
contracts / MOU's entered w.r.t.
target.
% of cases where Documents/test
certifcates (specified in P.O.) for
material procured are readily available
and accountal of material is not held
up.
% increase in liquidation of rejected
material compared to earlier year.
Cost reduction through economic
buying w.r.t. Target set for the year.
% reduction of advance outstanding
with vendors / contractors at the year
end
Direct material consumption as % of
GTO net of excise.

Time Index

MMX01500
MMX

MMX01600
MMX
MMX01700
MMX
MMX01800
MMX

MMX01900
MMX
MMX02000
MMX
MMX02100

MMX

MMX02200
MMX
MMX02300
MMX
MMX02400
MMX02500
MMX02600

MMX
MMX
MMX

MMX02700
MMX
MMX02800
MMX02900
MMX03000
MMX03100

MMX
MMX
MMX
MMX

% achievement of scrap sales /


surplus disposal against the target for
the year.

% Reduction of average number of


days from DB/CN/DRS ( receipt at the
first point in the plant/site) to SRV
clearances in the year

% reduction in days over last


year

% Reduction in average time taken to


settle insurance claims compared to
previous year.

% reduction of cut bits / scrap during


the year (by value).

% reduction of cycle time for issue of


materials(including to sub contractors)
[Issue voucher stage to issue
accountal stage)

% reduction over last year

No. of days delayed from


scheduled date

% consignments collected from


transporters' godown within specified
time after retirenment of LR (L3 only)
% Stock verification completed within
specified time (For L3 only)
Procurement of capital equipment as
per schedule planned / budgetted.
Errection / Commissioning by vendor
of major capital facilities / BOI's
purchased/ acquired as per schedule.
% of Air consignments cleared within
free time
% of Sea consignments cleared within
free time
% availment (by value) of all
applicable duty concessions.
% of duty free licenses (including
EPCG) obtained within specified target
time.
Project imports registered with custom
within specified time.
% reduction in demurrage paid over
previous year.

No. of days delayed from


scheduled date

% closure of customs' bonds in time.

% of customs/insurance/excise cases
settled in the year.

MMX03200
MMX

MMX

Reduction of Old Production inventory


(WIP/FG) w.r.t opening Production
inventory
% Reduction in inventory of non
moving (NM) items.
% Reduction in inventory of slow
moving (SM) items
% liquidation of year end SIT/material
with fabricators.
% of indents raised within specified
time

MMX

% material availability with reference


to 100% completion / commissioning
projects

MMX03300
MMX
MMX03400
MMX03500
MMX03600
MMX03700

MMX
MMX
MMX

MMX03800

MMX03900
MMX
MMX04000
MMX04100
MMX04200
MMX04300

MMX04600
MMX04700
MMX04800

Arrange advance manufacturing


action/ Stocking proposals within
specified time

Days

Rs.Lakhs

No. of days delayed from


scheduled date

MMX

% Material clearance with reference to


Plan / CCSR
% Material Matching with reference to
Turnover Budget
% reduction of indirect material
consumption w.r.t. budget.
% Reduction in no. of NCRs reported
in Audits
Timely generation/Submission of
Management Information
Reports(MIR)

MMX

% of eligible vendors registered within


6 months of application

MMX

% increase of A & A1 vendors as a %


of total number of vendors

MMX

% increase of material categories that


have at least 3 vendors.

MMX

Updation of product Material Directory


as per schedule

No. of days delayed from


scheduled date

Number of reverse / forward auctions


conducted.

No. of auctions

Reduction in delivery time for identified


Subcontracting items

No of items

MMX
MMX
MMX
MMX

MMX04400
MMX04500

Reduction in Material inventory as no


of days of Shop Material
Consumption.

MMX04900

No. of days delayed from


scheduled date

MMX
MMX05000

MMX

MMX

Identification of new items for bulk


buying for common rate contract at
corporate level.
No. of new IT initiatives introduced in
MM function.
Implementation of identified (by
Corporate MM)best MM practice in the
year.

MMX

No. of items for which Technical &


commercial terms finalised with
vendors w.r.t. total items.

MMX05100
MMX
MMX05200

MMX

MMX05300

MMX05400
MMX05500

Number

No. of items

Number

Number

Integration of existing IT Systems/Subsystems on scheduled date

No. of days delayed from


scheduled date

MMX

Reply to Govt. Queries/ Audit Paras /


Inspection report/ Action Taken
Reports etc. furnished within specified
time (2 weeks)

MMX

Reply/settlement of Audit paras within


specified time (4 weeks)

Timely inputs to unit/corporate finance


for inter-unit re-conciliationof accounts

Timely inputs to unit/corporate finance


for BUDGET/FLASH/MIRs etc.

Finalisation of Functional scorecard by


specified date

No. of days delayed from


scheduled date

Score

MMX05900

MMX06100
MMX
MMX06200
MMX
MMX06300
MMX
MMX

MMX06401
MMX

MMX06601

MMX

MMX

MMX06600

Number

Arrange / Participate in Exhibition /


Product display for development of
new sources.

MMX05800

MMX06500

MMX
MMX05700

MMX06400

No. of items

Organise professional
lecture/seminars.
Digitization of vendor records (out of
total registered vendors) for inter-unit
usage.

MMX

MMX05600

MMX06000

MMX
MMX
MMX

Improvement in Employee Satisfaction


Score
Implementation of Improvement
projects identified in the Position
Report as per schedule
Increase in no. of active Quality
Circles in the deptt.
Achieving Business excellence thru'
TQM at Deptt. level
Preparation of action plan based on
Position report

Time Index

Time Index

Time Index
O
O

Number of new circles

TQM Score

No. of days delayed from


scheduled date

MMX

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

MMX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)
Timely finalisation of material budget.

Timely completion of BOI contracts for


closure of customer contracts.

MMX
MMX06700
MMX06800
MMX06900

MMX
MMX

MMX07000

MMX07100

MMX07200

MMX07300

MMX07400

MMX07500

MMX07600
MMX07700

Time Index

Implementation of Improvement
projects identified in the Position
Report as per schedule
Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal
Completion of KM Projects as per
schedule

MMX06602

MMX
MMX

C
O

No. of days delayed from


scheduled date

Number

Time Index
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date
C

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date

MMX07800
MMX07900
MMX08000
MMX08100

MMX
MMX
MMX
MMX

MMX08200
MMX

MMX08300
MMX
MMX08400
MMX
MMX08500

Compliance with system on


management of hazardous waste
Timely finalisation of long term
contracts / MOU
Identification and implemetation of 5S
projects
Compliance with system on
management of shelf-life materials.
Critical review of identified Policies /
Systems / Procedures / Practices with
a view to improve MM function

No. of NCRs.

No. of days delayed from


scheduled date

Number

No. of NCRs.

Number

No. of days delayed from


scheduled date

Timely renewal of statutory licences


for storage of explosives /
inflamables / hazardous materials.

% improvement of vendor satisfaction


index.

Import substitution of critical items.

Rs. Lakhs

MMX
No. of days delayed from
scheduled date

Ensure timely receipt of engineering


doucments from vendors

MMX

% of SAR's / CAR's w.r.t. BOIs


resolved within specified time.

MMX

Development of PVC formula for high


value items on rate contract.

Number

MMX08600
MMX
MMX08700
MMX08800

MMX08900
MMX
MMX09000

MMX

MMX09100
MMX

MMX09200

MMX

No. of days delayed from


scheduled date

Preparation of contract agreements &


coordination with sub-contractors for
signing in time.

Resolution of contractual issues /


disputes in time.

No. of days delayed from


scheduled date

% of BOI amendment proposals to


PO's / Contracts cleared in time.

Identification of inactive vendors and


weeding out / delisting of such
vendors to maintain healthy vendor
base

Number

No. of days delayed from


scheduled date
MMX09300

Rationalisation and updation of


material category list of vendors for
indirect materials as per schedule

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

MMX

MMX09400

Balanced Scorecard Rating


(5/4/3/2/1)

MMX
No. of days delayed from
scheduled date

Conducting Vendor satisfaction survey


and preparing action plan for
implementation by specified date

Tiimely Arrangement of annual


sanctions for items, such as coal, from
Government.

No. of days delayed from


scheduled date

Obtaining in time NOC from Ministry of


Shipping (Transchart)

No. of days delayed from


scheduled date

Secure in time Technical Clearance


from DGFT/ Ministry of HI for Import.

No. of days delayed from


scheduled date

No. of vendors reviewed

MMX

Quarterly analysis and review of


Performance Rating of Vendors having
"B" & "C" rating (below 80 %)for
remedial measures

MMX

Reduction in cost of BOIs as a % of


material budget

% of material budget

MMX

Development of additional vendors for


single source items

number of identified items

MMX

ESTABLISHING AWAY CENTRE


FABRICATION

NUMBER OF VENDORS

MMX

% of vendors' / transporters' /
contractors' bills processed and sent
to finance in specified time

no of firms.

MMX

Enlistment during the year of


additional Sources / Vendors for
identified items / services

MMX09500
MMX
MMX09600
MMX
MMX09700
MMX
MMX09800
MMX

MMX09900

MMX10000
MMX10100
MMX10200

MMX10300

MMX10400

MMX10500
MMX

% CASES OF TRANSIT DAMAGES


REPORTED WITHEN IN 7 DAYS OF
RECIEPT

GEMENT FUNCTION KRA MASTER - 2006-07


Critical
Special
KRA (Y/N) KRA (Y/N)

Universal
KRA
(Y/N)

Suggested Weightage for


category
A
B
C

Source of Data For


Measurement

Computer report

Department report.
Y

M
Department Reports

Finance report.

Record maintained
by Unit/Corp.
Finance deptt.

Record maintained
by Unit Head/Unit
P&D

Record maintained
by Audit deptt.
Record maintained
by Audit deptt.
Record maintained
by individual/ deptt.

Survey Report

Project report
N

Unit QA/QC
Quality Deptt.
Action plan
document

M
Project report

Project report

Project report

H
Project report

H
Project report

H
Project report

H
Project report

H
Project report

Section report

M
Source
Development Cell
report

Rating declared at
year end by
Corporate / Unit
Management

Departmental record
Y

H
Amount realised

NOC( for ports &


units) taken from
Transchart
% increase over last
year achievement.

Section report
N

PO values and
turnover completion
PMD
REPORTS
/APPROVALS

DEPTT RECORD
N

H
No of firms added.

H
DEPTT RECORD

KRA Remarks

Vendors have been getting


registered since several years.In
order to maintain healthy and
capable vendor base , it is also
necessary to weed out / delist
inactive vendors in a planned
manner.

a) So far there has been thrust


on direct materials. It is
proposed to provide impetus to
PMD activity for indirect
materials also. b) KRA required
for "Buying" and "Vendor
Development" departments.

This KRA will be taken by Head


of Unit /Function / Department ,
if covered under MAP, and can
be assigned a weightage upto
100%
This will help in finding out
vendors' level of satisfaction and
their expectations from BHEL in
order to bridge the gap and
achieve business excellence.

ERECTION & CONSTRUCTION F


KRA id

Function
ID

KRA Description

KRA
Type

Unit of Measurement

CSX00100

CSX

Establishing the new sites as


per plan

Time Index

CSX00101

CSX

Preparation of resource
planning within 'X' days of LOI

Time taken for completion /


Time allocated ('X' days) X 100

CSX00102

CSX

Deployment of resources as per


plan ('X' days)

Time taken for completion /


Time allocated ('X' days) X 100

CSX00103

CSX

Establishment of site
infrastructure as per schedule

Time Index

CSX00200

CSX

Timely finalisation of subcontracts

Time Index

CSX00201

CSX

Submission of sub-contract(s)
specifications for tendering 75
days before commencement of
work as per L2 schedule

Time Index

CSX00202

CSX

Finalisation of tender
document(s) for floating NIT 70
days before planned
commencement of work at site

Time Index

CSX00203

CSX

Floating of tender enquiries/


evaluation of technical & price
bids and finalisation of subcontracts

Time Index

CSX00300

CSX

Optimisation of number of
vendors in Services where
number of vendors are less than
seven

Total increase required in


identified Services / Total no. of
services X 100

CSX00301

CSX

Identification of potential
vendors in services where the
number of vendors are less than
seven and subsequent
enlistment as per procedure

Total number of potential


vendors identified / Total number
of minimum potential vendors to
be identified X 100

CSX00400

CSX

Submission of Annual
Performance Reports of
Vendors

Time Index

CSX00401

CSX

Review of Performance
Evaluation Reports received
from site and updation of
vendors list as per Policy
guidelines

Time Index

CSX00500

CSX

% increase in number of
milestones achieved in a project
with respect to project schedule

[(No. of milestones achieved /


No. of milestones planned) - 1]
X 100

CSX00501

CSX

Timely preparation and review


of action plan for the milestones
which can be advanced

Time taken for completion /


Time allocated

CSX00502

CSX

Timely implementation of action


plan for advancement of
identified milestones

Time taken for implementation /


Time allotted

CSX00503

CSX

Erection checks of equipment


and systems for completion

No. of days saved / No. of days


planned

CSX00504

CSX

Reporting of non-conformities to
MUs within three days of
occurrence

Average no. of days of delay for


reporting after the occurrence

CSX00505

CSX

Assess and prioritise integration


of inputs (including customer
inputs) for erection activities/
ahead of plan

No. of days saved / No. of days


planned

CSX00506

CSX

Preparation of joint protocols


(after ensuring adherence to
quality plans) of the equipment/
systems erected)

No. of protocols completed / No.


of protocols to be completed X
100

CSX00507

CSX

% Success rate of milestones


advanced

No. of milestones advanced /


No. of milestones planned for
advancement X 100

CSX00600

CSX

No. of units commissioned as


per Balanced Score Card

No. of units commissioned / No.


of units planned for
commissioning X 100

CSX00601

CSX

Finalisation of erection/
commissioning procedures and
obtaining their approval from
customer/ consultants

Nos. approved / Nos. planned X


100

CSX00602

CSX

Finalisation of erection/
commissioning check list as per
plan

Nos. finalised / Nos. planned X


100

CSX00603

CSX

Deployment of T&P and IMTEs


at site for erection/
commissioning as per plan

No. of T&Ps and instruments


deployed / Total No. planned X
100

CSX00604

CSX

Planning of inputs for course


correction for erection and
commissioning the projects as
per schedule

Time Index

CSX00605

CSX

Outsourcing of expert services


for erection/ commissioning as
per requirement

No. of requirements met / No. of


requirements as per plan X 100

CSX00700

CSX

Reduction in cycle time of


identified processes

Days reduced / Previous best X


100

CSX00701

CSX

No. identified

CSX00702

CSX

Identification of processes
targeting cycle time reduction
Evaluation of alternatives to
existing processes/ to achieve
cycle time reduction

Nos. evaluated / Nos. identified


X 100

CSX00703

CSX

Timely execution of action


plan for cycle time reduction

Days reduced / Previous best X


100

CSX00800

CSX

Enhancement in customer
satisfaction score

Increase in CSI

CSX00801

CSX

No. of Meets

CSX00802

CSX

No. of Customer meets


conducted
% of feedback incorporated
resulting out of customers
meets

No. of feedback implemented /


No. of feedback accepted for
implementation X 100

CSX00803

CSX

Registration/ followup and


resolution of customer
complaints

No. of complaints resolved /


Total no. of complaints
registered X 100

CSX00804

CSX

Implementation of Improvement
Projects

No. of projects implemented /


No. of projects planned X 100

CSX00805

CSX

Proactive customer visits to


enhance customer relationship

No. of visits undertaken / No. of


visits planned X 100

CSX00900

CSX

Completion of Reliability Run /


Trial operation of the Unit(s) as
per target

No. of reliability run completed /


No. of reliability run planned X
100

CSX00901

CSX

Resolution of non-conformities
observed during trial operation

No. of Non conformities


resolved / Total no. of nonconformities X 100

CSX00902

CSX

Resolution of technical issues


for system stabilization

No. of Systems stabilized / No.


of systems requiring stabilization
X 100

CSX00903

CSX

Resolution of generic erection


issues

No. of issues resolved / No. of


issued identified X 100

CSX01000

CSX

Preparation and submission


of project completion reports
30 days before site closing

Time Index

CSX01100

CSX

% reduction in time for


budgetted monthly cash
collection

Time Index

CSX01101

CSX

Submission of Erection/
Construction/ supply invoices
within 10 days of completion of
activities

Time Index

CSX01102

CSX

Timely verification of invoices for


realisation of payment

Time Index

CSX01200

CSX

No. of provisional insurance


claims converted to final claims
during the year

% of total no. of provisional


claims lodged

CSX01201

CSX

CSX01202

CSX

Arranging documents for lodging


final claims
% of claims settled out of total
claims due

% of total no. of final claims


lodged
% of total claims settled

CSX01300

CSX

Settlement of audit paras

% of audit paras settled

CSX01400

CSX

Timely closing of sub-contracts


as per plan

Time Index

CSX01401

CSX

Material reconciliation as per


plan

No. of days delayed from


scheduled date

CSX01402

CSX

Obtain time extension as


applicable as per plan
Processing and verification of
final bills as per plan
% reduction in time for achieving
site closure with respect to plan

CSX01403

CSX

CSX01500

CSX

CSX01501

CSX

Identification of 80% pending


points within 25 days of
completion of trial operations
and balance 20% progressively
within 60 days

Time Index

CSX01502

CSX

Preparation of action plan for


resolution within 7 days of
identification of pending points

No. of days delayed from


scheduled date

CSX01503

CSX

Liquidation of pending points


within 90 days of action plan

No. of days delayed from


scheduled date

CSX01504

CSX

Diversion of surplus materials as


per contract within 120 days
from completion of trial run

No. of days delayed from


scheduled date

CSX01505

CSX

Timely release of manpower as


per plan

Time Index

CSX01506

CSX

Timely submission of as-built


marked up drawings

Time Index

CSX01600

CSX

% reduction in wastages

% of amount of BSC

CSX01601

CSX

Number of improvements in
erection processes

Number

CSX01602

CSX

Optimisation of T&P deployment

Total no. of days actually utilised


/ Total No. of days of availability

CSX01700

CSX

IT Initiatives taken

% completed

CSX01800

CSX

Suggestions given for system/


product improvement

Nos. accepted

CSX01900

CSX

% increase in budget

CSX01901

CSX

Enhancement of physical
turnover
Acheivement of physical
turnover

% of Budget

O
O

No. of days delayed from


scheduled date
No. of days delayed from
scheduled date
No. of days reduced / No. of
days planned X100

CSX01902

CSX

Preparation and finalisation of


quarterly resource plan within
specified days

Actual days taken / Specified


days

CSX01903

CSX

Initiatives taken for


enhancement of physical
turnover

No. of initiatives

CSX02000

CSX

% of Budget

CSX02100

CSX

Achievement of financial
turnover
Identification and realization of
unpaid old outstandings

% amount realized

CSX02200

CSX

% reduction in downtime of
Cranes by implementing
MMS (Mandatory
Maintenance System) over
the prescribed 'X' days

% reduction

CSX02201

CSX

Updation of history cards of all


Cranes incorporating details of
breakdown maintenance/
overhauls and quarterly
submission to Hq. within first 10
days of each quarter

No. of days delayed from


scheduled date

CSX02202

CSX

Preparation and submission of


details to Hqrs/ in the prescribed
format/ of routine maintenance
carried out on Cranes before
10th of every month.

No. of days delayed from


scheduled date

CSX02203

CSX

Preparation of action plans after


analysing the updated history
cards and reports of cranes for
breakdown/ overhaul and
routine maintenance within
specified time

No. of action plans prepared

CSX02204

CSX

Implementation of action plans


within specified time (quarterly)

% of action plans implemented


as identified for every quarter

CSX02300

CSX

Nos. developed / Nos. planned

CSX02301

CSX

Development of Standard L2
Network for EPC contracts
Timely conversion of standard
L2 network for EPC contract to
site specific

No. of days delayed from


scheduled date

CSX02400

CSX

Nos. developed / Nos. planned

Development of Standard L3
Network for EPC contracts

CSX02401

CSX

Timely conversion of standard


L3 network for EPC contract to
site specific

No. of days delayed from


scheduled date

CSX02500
CSX02600

CSX
CSX

Timely submission of MIRs


Utilisation of Capital Budget
(Planned / Non-Planned)

O
O

% submissions delayed
% utilised against sanction

CSX02700

CSX

Reply to Govt. Audit queries/


Inspection report paras/ Action
Taken Reports etc. furnished
within specified time (2 weeks)

CSX02800

CSX

Reply/settlement of Internal
Audit paras within specified time
(4 weeks)

CSX02900

CSX

Timely inputs to unit/corporate


finance for inter-unit reconciliationof accounts

Time Index

CSX03000

CSX

Timely inputs to unit/corporate


finance for
BUDGET/FLASH/MIRs etc.

Time Index

CSX03100

CSX

Finalisation of Functional
scorecard by specified date

No. of days delayed from


scheduled date

CSX03200

CSX

Improvement in Employee
Satisfaction Score

Score

CSX03201

CSX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

CSX03202

CSX

Increase in no. of active Quality


Circles in the deptt.

Number of new circles

CSX03300

CSX

Achieving Business excellence


thru' TQM at Deptt. level

TQM Score

CSX03301

CSX

CSX03302

CSX

Preparation of action plan based


on Position report
Implementation of Improvement
projects identified in the Position
Report as per schedule

No. of days delayed from


scheduled date
Time Index

CSX03400

CSX

CSX03500

CSX

Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal

No. of days delayed from


scheduled date
Number

CSX03600

CSX

Completion of KM Projects as
per schedule
Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

Time Index

CSX03700

CSX

Ia = No. of projects planned


Ib = Sum of No. of days delay
/ Sum of total No. of days
planned

CSX03800

CSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

No. of days delayed from


scheduled date

CSX03900

CSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

No. of days delayed from


scheduled date

CSX04000

CSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

No. of days delayed from


scheduled date

CSX04100

CSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

No. of days delayed from


scheduled date

CSX04200

CSX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. and
other details of project to be
specified in the boxes provided
against the KRA)

No. of days delayed from


scheduled date

CSX04300

CSX

Achieveing Materials
Management Effectiveness

Effectiveness index = 1/n


(Cn)

CSX04301

CSX

Regularisation in Road Permits


Form Counterfoils within X days

No. of forms regularised within


stipulated time (X days) /Total
no of consignment received in X
days

CSX04302

CSX

Reduction in
Demmurages/Wharfage in
consignments within X days

No. of consignments not


incuring demmurage in X days /
Total no of consignment
received in X days

CSX04303

CSX

Generation of Pending Materials


List within "X" days

No. of reports generated within


stipulated time (X days) / Total
no of reports required to be
generated

CSX04304

CSX

Material verification within "X"


days of receipt

No. of consignments verified


within stipulated time (X days)
/Total no of consignment
received

CSX04305

CSX

Raising of MDRs within "X" days


of verification

No. of MDRs raised within


stipulated time (X days) /Total
no of MDRs raised

CSX04400

CSX

Percentage reduction in time


taken in submission of technical
information and relevant data
(project plans, manpower,
infrastructure, T&P, subcontracting, etc) for tender
preparation by Marketing

% Reduction in time

CSX04401

CSX

Reduction in time towards


collection of the key data
required for techno commercial
ofers and its compilation with
respect to time schedule

Time Index

CSX04402

CSX

Reduction in time towards


preparation of technical
information (estimation of
manpower, infrastructure, T&P
and sub-contracting
requirements) with respect to
time schedule

Time Index

CSX04500

CSX

Percentage reduction in outages


of T&P / Erection Equipment

CSX04501

CSX

Regular updation of history


cards of cranes and lifting
tackles and submission by 7th
of every month

No. of days delayed from


scheduled date

CSX04502

CSX

Development of MMS tool for


preventive maintenance of
erection T&P as per plan

No. of days delayed from


scheduled date

CSX04503

CSX

Implementation of Mandatory
maintenance systems (MMS) for
erection T&P and heavy duty
cranes

No. of equipments covered


under MMS

CSX04504

CSX

Regular updation of history


cards of electrical equipment
like welding generator,
transformer rectifier and
submission by 7th of every
month

% submissions delayed

CSX04600

CSX

Effective control in the area of


welding, heat treatment and
NDT by reducing a number of
defective joints through
monitoring, improved
procedures and resource
planning

% reduction in defective joints

CSX04601

CSX

Timely preparation of project/


work specific procedures for
welding, NDT and heat
treatment for their effective
implementation

Time Index

CSX04602

CSX

Timely availability of resoruces


for welding, NDT and heat
treatment works (I.e.,
deployment of equipments and
consumables)

Time Index

CSX04603

CSX

% Deployment of approved
welders on the job by ensuring
welders test

CSX04604

CSX

Timely replacement of nonperforming welders, identified


during reviews, as per plan

Time Index

CSX04605

CSX

Review the process of welding,


NDT, heat treatment to ascertain
% reduction in defective joints

% reduction in defective joints

CSX04700

CSX

% saving in cost by providing


experts for short periods for
SAS/ Construction Jobs to avoid
deputation of supervisory
personnel on a regular basis

% amount saved

CSX04800

CSX

Timely interaction with


advocates/ legal experts for
resolution of legal matters/
arbitration pertaining to
contractrs

Time Index

CSX04900

CSX

Acquiring additional technical


skills for multi-skilling

No. of skills added

CSX05000

CSX

Resolution of customer
complaitns, including
observations as per prevailing
system

% of complaints resolved

CSX05001

CSX

Segregation of customer
complaints and observations

Number

CSX05002

CSX

Preparing relevant reply to the


observations and responding to
customer withing specified
period as per plan

% resolved

CSX05003

CSX

Analysing complaints area-wise/


function-wise and interacting
with concerned engineers/
engineering centre for proper
disposition

% complaints dispositioned

CSX05004

CSX

Responding to customers for


given disposition

% complaints resolved

CSX05100

CSX

Preparation of customer project


related capital investment
budget as per schedule

No. of days delayed from


scheduled date

CSX05200

CSX
Accomplishment of targets of
Unit/NC/Function/Department
level Balance Score Card

Balanced Scorecard Rating


(5/4/3/2/1)

& CONSTRUCTION FUNCTION KRA MASTER - 2006-07


Suggested Weightage
for category
Critical Special KRA Universal
A
B
KRA (Y/N)
(Y/N)
KRA
(Y/N)
C
Y

Source of Data for


Measurement

Customer order / L1
schedule

Customer order / L1
schedule

Deployment plan

Deployment plan

Deployment plan as per


sl.no.3

Deployment plan as per


sl.no.3/ L2 schedule

Deployment plan as per


sl.no.3/ Site Plan

Deployment plan as per


sl.no.3/ Site Plan

Approved vendors list

Approved vendors list

Approved vendors list/


Evaluation reports

Approved vendors list/


Evaluation reports

L2/ L3 schedule

L2/ L3 schedule

L2/ L3 schedule

Action plan

SAR/ CAR/ Other reports

L2/ L3 schedule

FQPs

L2/ L3 schedule

L2/ L3 schedule/ BSC

Controlled Documents as
per ISO

Controlled Documents as
per ISO

Departmental Procedure

L2/ L3 schedule/ Catchup


plan

Deployment plan

Benchmark/ Report

Analysis of benchmarks

Project review reports

Benchmark/ Report

Customer Perception
Survey Report/ Feedbacks
through Customer Meets

Plan/ Compliance Report

Feedback report/ Status


report

Customer Complaint
databank/ SOMS

Improvement Projects plan/


BSC/ Customer Perception
Survey Report

Feedback report

Final protocol

Customer punch list

Customer punch list

Customer punch list/


Feedback from other
projects

Site execution documents

Budget / BSC

Departmental Procedure

Departmental Procedure

Site records

Site records

Site records

Audit records

Regional Plan

Contract closing plan

Contract closing plan

Contract closing plan

Site closing plan

Site closing plan

Site closing plan

Action Plan

Site Action Plan

Regional Plan

Site Action Plan

BSC

Completion reports

T&P Log

BSC

BSC/ Records

Regional Budget

Regional budget

Site Plan

Site Plan

Regional budget

Finance records

History cards

History cards

Monthly reports

History cards and monthly


reports

Action Plans

Available site specific L2


schedule and records
Standard L2 network

Y
Y

Available site specific L3


schedule and records

Standard L3 network

L
H

M
M

M
M

Records
Approved Capital budget

Record maintained by Audit


deptt.

Record maintained by Audit


deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance deptt.

Record maintained by Unit


Head/Unit P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Material despatch
documents

Material despatch
documents

Material despatch
documents

Material despatch
documents

Material despatch
documents

Material despatch
documents

Tender schedule

Manufacturing Units and


Marketing

Tender schedule

Departmental Procedure

History Cards

Manufacturer's Guidelines

MMS Manual

History Cards

Project Schedule

Site Action Plan

Deployment Plan and site


requirement

Deployment Plan and site


requirement

Deployment Plan and site


requirement

Erection Schedule

SAS/ Customer requirement

Legal cases/ arbitration


issues

Site development plans

Departmental Plan

Complaint Register

Complaint Register

Complaint Register

Complaint Register

Project Schedule

X
Rating declared at year end
by Corporate / Unit
Management

Remarks

Where Ia = Total no. of sites delayed in opening /


Total no. of sites to be opened.
Ib = Total no. of days of delay / Total time planned
in days
X' days will be decided as per contractual
requirements
Pro-active measures where required to be covered
under the same KRA
X' days will be decided as per plan
Resources: HR/ T&P/ vendors/ sub-contractors
Note: CFX to communicate Deployment Plan to
SCP & Sites.
Infrastructure includes Office/ Stores/ Open Stores/
Residential accommodation/ communication/
transport/ field hostel/ Watch & Ward and banking
arrangements/ etc.
Where Ia = Total no. of sub-contracts delayed in
finalisation / Total no. of sub-contracts to be
finalised.
Ib = Total no. of days
of delay / Total time planned in days
Where Ia = Total no. of specifications delayed in
submission / Total no. of specifications to be
submitted.
Ib = Total no. of days of delay / Total time planned
in days
Where Ia = Total no. of tender documents delayed
in finalisation/ Total no. of tender documents to be
finalised.
Ib = Total no. of days of
delay
Where Ia = Total no. of tenders delayed in
finalisation / Total no. of tenders to be finalised. Ib =
Total no. of days of delay / Total time planned in
days
Services means vendors doing E&C of Boiler/ TG
etc. and also suppliers of different products.

Example: No. of Services = 3 (Boiler/ TG/ C&I)


Existing Vendors (5/ 3/ 2 respectively)
Min. Required vendors = 7 in each service
Hence/ Gap = 2/ 4/ 5 respectively
Potential vendors identified = 0/ 3/ 5 respectively
Total no. of potential vendors identifie

Ia = No. of vendors evaluated / Total no. of


vendors working
Ib = Sum No. of days of delay / Sum No. of
days planned

Ia = No. of Vendor List updated / No. of List


planned for updation
!b = Sum of delays in days / Sum of the
planned days

Site will prepare and review an Integrated Action


Plan for all the milestones identified for
advancement

Site will prepare an Integrated Action Plan for all


the milestones identified for advancement

Where Ia = Total no. of inputs delayed / Total no. of


inputs to be given. Ib = Total no. of days of delay /
Total time planned in days

Conductance of Customer Perception Survey by an


external agency

As per reward scheme circular to be issued

Ia = Actual cash collection / Budgeted cash


collection. Ib = Total no. of days delayed in
collection / Total time allocated
Note: The time allocated is defined in the contract
Where Ia = total no. of invoices delayed / total no.
to be invoiced. Ib = total no. of days delayed / total
days planned
Where Ia = total no. of verification of invoices
delayed / total no. invoices to be verified. Ib = total
no. of days delayed / total days planned

Where Ia = total no. of sub-contracts closure


delayed / total no. sub-contracts to be closed. Ib =
total no. of days delayed / total days planned

Where Ia = Total No. of pending points delayed for


identification / Total no. of pending points to be
identified. Ib = Total no. of days delayed / total days
planned (60 days)

Where Ia = Total No. of manpower release delayed/


Total no. of manpower identified for release. Ib =
Total no. of days delayed / total days planned
Where Ia = Total No. of marked up drawings
delayed in submission/ Total no. of marked up
drawings to be submitted. Ib = Total no. of days
delayed / total days planned

Nos. accepted by HoF

Budget as finalised by the Regional Hqrs.


Budget as finalised by Corporate Office

Every quarter the resource plan must be reviewed

Budget as finalised by the Regional Hqrs.

Annual overhaul period/ if any/ will not be


accounted as downtime.
'X' days to be picked up from downtime details as
furnished by CFX for respective cranes

- Prescribed formats will be furnished by CFX


along with history card of Crane
- Prescribed formats for the old running cranes will
be furnished by CFX latest by 10th of July 2004

#NAME?

Standard L2 Network (on Primavera) to be


developed for different Unit capacities
Timely conversion means one week ahead of
contractual commitment for submission

Standard L3 Network (on Primavera) to be


developed package-wise for different Unit
capacities

Timely conversion means the readiness of the L3


networks two weeks ahead of start of erection
activities in respective packages

As per Departmental Procedure

Targets to be set as follows: 100% cases-L5; 9599% cases-L4;85-94% cases-L3; 75-84% casesL2;<75%cases-L1

Targets to be set as follows: 100% cases-L5; 9599% cases-L4;85-94% cases-L3; 75-84% casesL2;<75%cases-L1

Cn=Factor from the Child KRA and n= total no


of child KRAs selected

Factor for Cn in KRA CSX4400


'X days' is as defined in the DP

Factor for Cn in KRA CSX4400


'X days' is as defined in the DP

Factor for Cn in KRA CSX4400


'X days' is as defined in the DP

Factor for Cn in KRA CSX4400


'X days' is as defined in the DP

Factor for Cn in KRA CSX4400


'X days' is as defined in the DP

( CSX04501 + CSX04502) X 100

Ia = Total no. of inforamtion and data collected /


total No. of information to be collected
Ib = Total no. of days reduced / total no. of days
planned

Ia = Total no. of data prepared / Total no. of data to


be prepared
Ib = Total no. of days reduced / total no. of days
planned

L5 = 100%
L1 = 80%
% reduction in outages = (1-total No. of equipment
under breakdown in one month / total no. of
equipment available at site) X 100
L5 = Four days early
L3 = As per Schedule (no delay)
L1 = 4 days delay
L5 = Four days early
L3 = As per Schedule (no delay)
L1 = 4 days delay
L5 = 100% covered
L1 = 80% covered

L5 = Four days early


L3 = As per Schedule (no delay)
L1 = 4 days delay

Total no. of defective joints / total no. of joints


welded X 100

Where Ia = No. of procedures implemented / total


no. of procuedures to be implemented
Ib = Total no. of days of delay / total days planned
for making procuedures

Where Ia = No. of resoruces deployed / total no. of


resources to be deployed
Ib = No. of days delayed for deployment / total no.
of days allotted for deployment

No. of approved welders deployed / No. of welders


to be deployed X 100
Total no. of welders replaced / total no. of welders
to be replaced X No. of days delayed / total no. of
days for replacement as per plan

Total no. of defective joints / total no. of joints


welded X 100

Amount saved = (1-Cost of Deputation for short


periods / Cost of deputation to be incurred in case
of posting) X 100

Ia = No. of documents or replies prepared / Total


no. of documents or replies to be prepared
Ib = No. of days delayed in preparing documents /
total no. of days available
No. of skills developed to work independently

This KRA will be taken by Head of Unit /Function /


Department , if covered under MAP, and can be
assigned a weightage upto 100%

C0MMISSIONING / TECHNICAL SERVIC


KRA ID

Function KRA Description

TSX00100 TSX

Commissioning of units as per Site Plan

KRA
Type

TSX00103 TSX

Timely planning/ monitoring/ and controlling inputs for


commissioning activities to achieve the targets
Erection/Pre-Commissioning checks of equipments and
systems for conducting trial runs/ as per plan
Timely reporting of non-conformities to manufacturing units
within specified time

TSX00104 TSX

Assess and prioritise for integration of inputs (including


customer's inputs) for starting pre-commissioning/milestone
activities/ ahead of plan

TSX00105 TSX

Completion of milestone and commissioning activities/ as per


plan

TSX00106 TSX

Preparation of joint protocols (after ensuring adherence of


performance to specifications) of the equipments/systems
commissioned.

TSX00101 TSX
TSX00102 TSX

O
O
O

TSX00201 TSX

Reduction of time taken for re-commissioning of units after


overhaul/ performance evaluation and troubleshooting/ postwarranty jobs
Reduction of time taken for re-commissioning of units after
overhauling jobs

TSX00202 TSX

Reduction in response time for performance evaluation and


troubleshooting activities

TSX00300 TSX

Improvement over contractual time for execution of RLA / R&M


services

TSX00301 TSX

Reduction in response time for preparation and submission of


technical specifications for RLA jobs

TSX00302 TSX

Reduction in cycle time of RLA activities at site

TSX00303 TSX

Reduction in time taken for submission of RLA reports

TSX00304 TSX

Reduction in time taken for execution of R&M works at site

TSX00200 TSX

C
C

TSX00400 TSX

Optimisation/ Preparation and Conductance of PG/PE Test as


per plan

TSX00402 TSX

Procedure for TG Performance Guarantee/Performance


Evaluation Tests - Preparation/ Submission and approval by
Customer/Consultant
Finalisation of procedure with customer and for Conductance
of functional tests as per contract.

TSX00403 TSX

Deployment of Instruments and ensure comprehensive system


readiness at site for PG/PE test conductance as per plan

TSX00404 TSX

Conductance of functional tests as per contract.

TSX00500 TSX

No. of units commissioned as per Balanced Score Card


Finalization of commissioning procedures and obtaining their
approval from customer / consultant

Finalization of commissioning checklists as per plan


Assessment of IMTEs requirement at site for commissioning
and deployment as per plan
Planning of inputs and course correction for commissioning the
projects as per schedule
Release of project specific erection/ commg manual as per
plan.
Outsourcing of expert services for commissioning as per
requirements
Reduction in Cycle Time of identified Processes

TSX00401 TSX

TSX00501 TSX
TSX00502 TSX
TSX00503 TSX
TSX00504 TSX
TSX00505 TSX
TSX00506 TSX
TSX00600 TSX
TSX00601 TSX

O
O

O
O
O
O
C
C

TSX00602 TSX
TSX00603 TSX

Identification of processes targetting cycle time reduction


Evaluation of alternatives to existing processes/ to achieve
cycle time reduction
Timely execution of Action Plan for cycle time reduction

TSX00700 TSX

Enhancement in customer satisfaction score

TSX00701 TSX

Number of Customer Meets conducted

TSX00702 TSX

% of feedback incorporated resulting out of customer meets

TSX00703 TSX

Registration/ follow-up and resolution of customer complaints


Implementation of O&M improvement projects/ in consultation
with Customer

TSX00704 TSX

C
C

TSX00705 TSX
TSX00706 TSX
TSX00800 TSX
TSX00801 TSX

Extending support to customer for Optimising O&M practices


Proactive planned customer visits to enhance customer
relationship
Completion of reliability run / trial operation of the units/ as per
target

C
C
O

Resolution of non conformities observed during commissioning


Resolution of technical issues during Erection / Commissioning
/ Unit Stabilization
Optimisation of the equipment/system to achieve performance
specifications
Completion of reliability run of the equipment/system/unit as
per target
Suggestions to MUs/PEM/Region/Site/TS(HQ) for
improvement in products/systems
Man-hours of customer training conducted as per
contracts/plan

TSX01200 TSX

Inputs to manufacturing units for as built drawings


Preparation and submission of unit completion reports within
specified time

TSX01300 TSX

Optimal utilization of expert services of the Group for


commissioning/recommissioning/ trouble shooting/overhauling
jobs/PG/PE Tests

TSX01301 TSX

Assistance to sites for commissioning/ overhauling/PG/PE


Tests

TSX01400 TSX

Arranging Purchase of T&P/ IMTEs etc. as per plan

TSX01500 TSX

Development of expertise within the Group to meet the current


and future needs in identified areas

TSX01501 TSX

Develop multi-skilled manpower through training and work


experience/ to optimise human resources

TSX01600 TSX

Upgradation of facilities (IMTE & PG Test instruments) to meet


new standards

TSX00802 TSX
TSX00803 TSX
TSX00804 TSX
TSX00900 TSX
TSX01000 TSX
TSX01100 TSX

O
O
O
C
O

TSX01602 TSX

Identification of facilities needing upgradation to meet new


standards
Processing/ submission of IMTE/ T&P budget proposals for
timely procurement

TSX01603 TSX

Calibration/ rectification /upgradation and arranging


procurement of IMTEs/PG Test instruments as per plan

TSX01601 TSX

TSX01604 TSX
TSX01700 TSX
TSX01800 TSX
TSX01900 TSX

Timely disposal of unusable/obsolete instruments & material


through CMTD (Corporate Office) & MSTC Ltd.
National / International Accreditations achieved/ revalidated
Upgradation of EDP/IT infrastructure to meet operational
requirements
Development/ improvement of products with vendor
partnerships

TSX02100 TSX

Evaluation of Vendor Performance as per plan/ and generation


of feedback
Formation of strategic business alliance as per plan/ with
detailed breakup of activities
Number of accepted suggestions given for system / product
improvement

TSX02200 TSX

Technology and Process Improvements for Erection/


Commissioning/ Trouble-Shooting/ PG/PE Tests/ Servicing/
R&M/ Performance Monitoring

TSX01901 TSX
TSX02000 TSX

TSX02201 TSX
TSX02202 TSX
TSX02203 TSX

TSX02204 TSX
TSX02300 TSX
TSX02301 TSX
TSX02302 TSX
TSX02303 TSX
TSX02304 TSX

TSX02305 TSX
TSX02306 TSX
TSX02307 TSX

Completion of Special Improvement Projects in the processes


as per plan/ incorporating new technologies
Identification/ application of new tools/ technologies for
execution of processes
Cost saving through Process Improvements/ Productivity
Measures
Promote HSE Management Programmes for process
improvements
Performance monitoring of BHEL supplied thermal / gas /
nuclear sets
Web-based reporting of performance of BHEL sets
Proactive assistance to customers/ based on performance
monitoring reports / feedbacks
Generation of Failure analysis reports for incorporating
improvement in the processes/ products and systems
Timely submission of MIRs / Query-Based Replies
Upgradation/ Development of Software for faster data
processing and analysis of Performance Monitoring of BHEL
sets
Performance monitoring of BHEL supplied Captive Power
Plant

O
C
O
C

O
C
C

C
C
O

C
O
O
O
O
O

C
O
O

TSX02309 TSX

Performance monitoring of BHEL supplied Hydro Power Plant


Performance monitoring of BHEL supplied Gas based Power
Plant
Performance monitoring of BHEL supplied Overseas Project
Power Plant

TSX02400 TSX

Development of knowledge management system as per plan

TSX02308 TSX

O
O

TSX02402 TSX

Number of programmes / workshop conducted for knowledge


sharing
No of technical papers presented (Inhouse/ National/
International fora) / published (in Journals)

TSX02403 TSX

Dissemination of status of projects/ and innovative


technologies implemented at sites/ through in-house
publications

TSX02401 TSX

C
C

TSX02406 TSX
TSX02500 TSX
TSX02600 TSX

Capturing the Best Practices within (of) the organization /


competitors / Consultants / Customers
Sharing and adoption of Best Practices and implementing the
same succesfully/ as per plan
Imparting advanced technical education to internal / external
customers
Patenting New Technology
Generation of business in new areas

O
C
C

TSX02601 TSX

Execution of AMC and O&M contracts/ as per plan

TSX02602 TSX

TSX02603 TSX

Execution of Slow Speed Balancing contracts as per plan


Pre-outage survey / health monitoring / condition assessment
conducted at operating units

TSX02604 TSX

Order booking for O&M and LTSA contracts

TSX02605 TSX

Execution of New Business Contracts as per plan

TSX02606 TSX

TSX02607 TSX

New Marketing initiatives undertaken


Timely Preparation of estimates and Offer submission to
Customer

TSX02700 TSX

Technical inputs /assistance for SAS/ PPI/ R&M/ O&M jobs

TSX02800 TSX

Project cycle time reduction through re-visiting exercises


Assistance to sites for resolution of technical issues leading to
contract closing

TSX02404 TSX
TSX02405 TSX

TSX02900 TSX

TSX03100 TSX
TSX03200 TSX
TSX03201 TSX

Planning/ Conducting of Milestone /Quality / Safety Audits as


per Plan
Recommendation of corrective actions based on Milestone
/Quality / Safety Audit Reports
No. of design audits conducted for new products / systems /
services
Number of papers edited / approved / published
Publication of 'Feedback' journal

TSX03300 TSX

Preparation and issue of technical documentation

TSX03000 TSX
TSX03001 TSX

C
C

O
O
O
C
O

TSX03301 TSX

Preparation and issue of product-specific Erection Manuals

TSX03302 TSX

Preparation and issue of product-specific Commissioning


Documents

TSX03303 TSX

Preparation and issue of product-specific Servicing Documents

TSX03304 TSX

Web-hosting of technical documents

TSX03305 TSX

TSX03400 TSX

Preparation and issue of HSE Manuals


Preparation and issue of repair & maintenance procedures for
tools & plants

TSX03500 TSX

Resolution of generic problems

TSX03501 TSX

Formulation of Action Plan for resolution of identified generic


problems

TSX03502 TSX

Implementation of Action Plans for resolution of generic


problems

TSX03503 TSX

Performance analysis of the equipment / system after


implementation of Action Plan for resolution of generic problem

TSX03600 TSX

Reply to Govt. Audit queries/ Inspection report paras/ Action


Taken Reports etc. furnished within specified time (2 weeks)

TSX03800 TSX

Reply/settlement of Internal Audit paras within specified time (4


weeks)
Timely inputs to unit/corporate finance for inter-unit reconciliationof accounts

TSX03900 TSX

Timely inputs to unit/corporate finance for


BUDGET/FLASH/MIRs etc.

TSX04000 TSX

Finalisation of Functional scorecard by specified date

TSX04100 TSX

Improvement in Employee Satisfaction Score


Implementation of Improvement projects identified in the
Position Report as per schedule

TSX03700 TSX

TSX04101 TSX

O
O

TSX04200 TSX
TSX04300 TSX

Increase in no. of active Quality Circles in the deptt.


Achieving Business excellence thru' TQM at Deptt. level

O
C

TSX04301 TSX

Preparation of action plan based on Position report


Implementation of Improvement projects identified in the
Position Report as per schedule

TSX04500 TSX
TSX04600 TSX

Development of Knowledge management Portal


Contributing case studies etc.for Knowledge Management
Portal
Completion of KM Projects as per schedule

TSX04700 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX04800 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX04900 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX05000 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX05100 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX05200 TSX

Implementation of Special Improvement Projects taken under


IMPRESS as per schedule (Registration No. & other details of
project to be specified in the boxes provided against the KRA)

TSX04302 TSX
TSX04400 TSX

C
C

Timely preparing inspection procedures and conducting


inspections for the precision instruments & calibration
equipments
Preparation of Technical specifications for advance
instrumentation to meet new standards.

TSX05600 TSX

Performance monitoring of NON -BHEL supplied Power Plant


in India and Abroad for Bench marking BHEL Sets
Performance
Interaction with CEA/PGCIL/CERC / Heavy Industry / MOP and
other Govt. Agencies to resolve issues

TSX05700 TSX

Issues resolution through task force and action plan finalisation

TSX05800 TSX

Study of tender documents and submission of comments

TSX05300 TSX
TSX05400 TSX

TSX05500 TSX

TSX05900 TSX

Process improvements based on Benchmarking of project


activities

TSX05901 TSX

Benchmarking of project activities

TSX06200 TSX

Timely commissioning of BOP packages in BHEL scope as per


plan
Timely preparation and submission of Project completion
reports
Development of Detailed Project Specific
Erection/Commissioning L3 Networks

TSX06300 TSX

Timely Pre-Commissioning /Commissioning of Boiler Sub


systems

TSX06400 TSX

Timely Pre-Commissioning /Commissioning of Turbine Sub


systems

TSX06500 TSX

Timely Pre-Commissioning /Commissioning of generator Sub


systems

TSX06600 TSX

Timely Pre-Commissioning /Commissioning of Electricals Sub


systems

TSX06000 TSX
TSX06100 TSX

TSX06700 TSX
TSX06800 TSX

TSX06900 TSX
TSX07000 TSX

TSX07100 TSX
TSX07200 TSX

TSX07201 TSX
TSX07202 TSX
TSX07300 TSX

Timely Pre-Commissioning /Commissioning of C&I Sub


systems
Extending Assistance to customer to meet contactual
obligations regarding O&M/ Availability

Accomplishment of targets of Unit/NC/Function/Department


level Balance Score Card
% of commissioning action request resolved within specified
time. (Time to be specified in action plan box)
Execution of CONTRACTUAL CONDITION MONITORING
through vibration.noise and other accessable techniques
Completion of slow speed balancing jobs to satisfaction of
customer

Identification of Customers for Slow speed balancing


Execution and completion of Slow speed balancing job to
satisfaction of customer
Preparation of estmates for construction power and estimates
for electrical and C & I jobs for sites

O
O
O

O
O

C
O

O
O

O
O
O

TSX07400 TSX

Technical scrutiny/making of technical specification of MMDs

TSX07401 TSX

Scrutiny of technical offers of MMDs/Instruments

TSX07402 TSX

Inspection /testing of new procured MMDs/Instruments and


repaired MMDs

TSX07403 TSX

Inhouse / Outside repair of MMDs

TSX07404 TSX

Calibration /Rectification /Procurement of PG Test Instruments

TSX07500 TSX

Microfilming of drawings/documents.

TSX07600 TSX

Number of Standardization Meetings conducted/Attended

TSX07700 TSX

Scanning of drawings/documents and creating soft copy

TSX07800 TSX

Timely supply of prints to users


System administration of Drawing Management System and
On-line Print Requisition System

TSX07900 TSX

NG / TECHNICAL SERVICES FUNCTION KRA MASTER - 2006-07


Unit of Measurement

Time Index

Critical
KRA
(Y/N)

Special Universal Suggested Weightage for


category
KRA
KRA
A
B
C
(Y/N)
(Y/N)

No. of days reduced

No. of days reduced

Time Index
Time Index

Days
Time Index

%
Y

N
N

N
N

N
N

M
M

M
H

X
M

N
N

N
N

N
N

M
X

H
M

X
L

Number

%
%

%
%

%
%
%
%
%
%
%
Number
%
%
%

Number
%

Days
%
%
%
%
%
%
Number
%
%
Time Index

% Mandays utilised /
available
%

%
% Expertise developed /
areas identified
% manpower trained in more
than one skill

Time Index
%

%
%
%
Number

Y
Y

N
N

N
N

H
X

X
M

X
M

Y
Y

N
N

N
N

M
M

L
M

L
L

%
%
%

%
Rupees
%

No.of reports generated


%
Number
Number
Time Index
%

Number
Number
Number
Number
%

Number
Rupees

Y
N
Y

N
N
N

N
N
N

M
H
M

M
H
X

X
X
X

Rupees

Rupees

No.of Sites

Rupees

Rupees

Y
Y
Y

N
N
N

N
N
N

H
L
L

M
M
H

L
L
M

Number
Number

%
%

%
%
%
%
%
%

No. of days delayed from


scheduled date
Number
Number
Number
%

%
N

%
Number
%
%

Time Index
Time Index

No. of days delayed from


scheduled date

Score
Time Index

Number of new circles


TQM Score

N
Y

N
N

Y
Y

M
H

X
X

X
X

No. of days delayed from


scheduled date
Time Index

No. of days delayed from


scheduled date
Number

N
Y

N
N

Y
Y

M
X

M
M

M
H

Time Index
No. of days delayed from
scheduled date

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date

No. of days delayed from


scheduled date

Number
Number

%
%
%

%
Y

Number of jobs

No of rotors

Number of rotors

No of rotors

Time Index
Number
%

Balanced Scorecard Rating (5/


%

Time Index

Time Index
Y

No.of pages

% in specified targeted time

% availability of system

Time Index

Time Index

% repairs completed within sp


Time Index

Number
Number

R - 2006-07
Source of Data for
Measurement

KRA Remarks

L2/L3 schedule /
SOMS / Site Plan
L2/L3 schedule /
SOMS / Score Card [2 -(Actual time / Scheduled time)] x 100
Completion Report /
Protocols
SAR/CAR/Other
No of days after occurrence to be
Reports
specified
Completion
schedule / SOMS

No of days saved

L2 network/ Balance
Score Card

Protocols

[No of protocols completed / No of trial


runs completed] x100

Protocols

No. of days saved

Protocols

No. of days saved

Average of [{(Prev.3 Years Average - No.


Benchmark data /
of days taken to respond) / Prev.3 Years
Completion Reports Average}] x 100
External / Internal
[2 - (Cumulative no. of days
Work Orders/
taken/Cumulative no. of days as per
Completion Reports schedule)] x 100
Benchmark data/
Job Completion
Reports

Average of [(Benchmark time - No. of


days taken to respond) / Benchmark time
x 100]

Benchmark data/
Job Completion
Reports

[2 - (No. of days taken/No. of days as per


schedule)] x 100

Benchmark data/
Job Completion
Reports

[2 - (No. of days taken/No. of days as per


benchmark)] x 100

Benchmark data/
Job Completion
Reports

[2 - (No. of days taken/No. of days as per


schedule)] x 100

Annual
Plan/Balanced
Score Card
Document Issue
Register
Procedure Report

[Nos conducted / Total planned] x 100


No. of documents approved by customer /
consultant
[No of Procedure finalised / No of tests as
per contract]x 100

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
DP/ L1/L2 schedule 100
[No of tests conducted / No of tests as per
Protocols
contract] x 100
L2/L3 schedule /
SOMS / Balanced
Score Card
Document Issue
Register
Document Issue
Register

[No. of units commissioned / No of units


planned for commissioning] x 100
[Nos. approved / Nos. planned] x 100

[Nos. finalised / Nos. planned] x 100


(No of instruments deployed / Total no to
DP/ L1/L2 schedule be deployed as per plan)x 100
L2/L3 Net work/Daily [2 - (Actual time taken / Scheduled time)] x
Report
100
Document Issue
[No. released / No. planned] x 100
Register
[No. of requirements met / No. of
Deployment plan
requirements as per plan] x 100
Bench Mark/Report [Days reduced/Previous best] x 100
Analysis of
Nos. identified
BenchMarks
Project Review
Reports
[Nos. evaluated / Nos. identified] x 100
Bench Mark/Report [Days reduced/Previous best] x 100
Customer
satisfaction survey
report/ Feedbacks
received through
Customer Meets
Plan / Compliance
Report
Feedback / status
Report

[Increase in Score / Previous Score] x 100


No of meets
[No. of feedbacks implemented / No. of
feedbacks accepted for implementation] x
100

Customer Complaint (No of complaints resolved / Total no of


register / SOMS
complaints registered) x 100
[No of projects implemented / No of
Completion Report projects planned] x 100

Report

No. of days of support extended


[No of visits undertaken / No of visits
Report
planned] x 100
[No. of reliability runs completed / No. of
Protocols
reliability runs planned] x 100
SAR/CAR/Other
(No of non- conformities resolved/Total no
Reports
of non- conformities reported) x 100
Punch Lists (internal [No of issues closed/ No of issues raised]
& external)
x 100
Completion Report

(Nos. completed / Nos. envisaged) x 100

Completion Report

(Nos. completed / Nos. envisaged) x 100

Suggestion Reports No of suggestions given


[Man hrs achieved/ Man hrs planned] x
Training Reports
100
[2 - (No. of days taken / No. of days
Markedup drawings planned)] x 100
Unit Completion
Report
Job completion
reports/ Protocols

[No. of days deployed / No. of days


requested] x 100

Completion Reports/
Balance score Card
Plan/ Indents/
Inspection reports

[No of site man-days assisted / No of site


man-days planned] x 100
{No. of items purchased/No. of items
planned} x 100

Annual Plan/
Training Reports

[No. of expert capabilities developed / No.


of expert capabilities planned to be
developed] x 100

Plans/ Training
Reports/
Departmental
reports

[No of persons developed / No planned] x


100

Budgetary
approvals/ IMTE
inventory register

[Capital budget spent / Capital budget


sanctioned] x 100

Current Standards/
Current Contract
Conditions/ NCRs/
Inventory Status
Proposals/
Approvals

[No. of facilities identified for upgradation /


No. of facilities not meeting new
standards] x 100

L2/L3 schedule/
[2- (Actual time taken / Scheduled time)] x
IMTE / T&P register 100

DISPOSAL
REPORT
Accreditation
Certificates
Project status
Report
Completion reports
Plan Document/
Vendor Performance
Feedback Reports
Strategic business
alliance reports
Annual Plan/MSX
Report

[2- (Actual time taken / Scheduled time)] x


100
(No of accreditations obtained / No of
accreditations planned) x 100
[No. of projects completed / No. of
projects planned] x 100
No of new products (or/ variants)
introduced

[Improvement in vendor rating / Previous


year's vendor rating] x 100
[No. of activities completed / No. of
activities planned] x 100
[No. accepted / No. submitted] x 100

Annual Plan/
[Number achieved / Number planned] x
Balance Score Card 100
Annual
Plan/Balance Score [Projects completed/Projects Planned] x
Card
100
Execution /
completion Reports [No executed / No planned] X 100
Financial Reports

Budget

[No of imrovement projects implemented /


Completion Report No of imrovement projects planned] X 100
Daily/monthy/annual
Reports
No. of Reports generated
System Log
On-line availability of system
MIRs
Failure analysis
reports
Copy of MIRs

No. of responses

Implementation /
Status Reports
Daily/monthy/annual
Reports
Daily/monthy/annual
Reports
Daily/monthy/annual
Reports
Daily/monthy/annual
Reports

[No. of activities completed in time / No. of


activities planned] x 100

Plan/ KMOs' report

No. of reports

No. of Reports generated


No. of Reports generated
No. of Reports generated
No. of Reports generated
[No. of activities completed / No. of
activities planned] x 100

Training reports

[No.of programmes conducted / No of


programmes planned] x 100

Individual report

No. of papers presented

Copies of in-house
journals

No. of journals published

Implementation
Report
Implementation
Report
Reports
List of patents
Financial Report
Plan/ Financial
Report
Plan/ Financial
Report

[No. of Best Practices captured / No. of


Best Practices planned to be captured] x
100
[No. of Best Practices implemented / Nos.
planned] x 100
[Man hrs achieved/ Man hrs planned] x
100
No. of patents applied for
Turnover from new businesses

Turnover from AMC & O&M Contracts


Turnover from Slow Speed Balancing
Contracts
No.Of Units where Survey/Condition
Assessment reports Assessment conducted
Balance Score card Value of orders received
Plan/ Financial
Report
Turnover from New Business Contracts
[No. of Initiatives Taken/ No. of Initiatives
Reports
Planned] x 100
(No. of Offers submitted in time / No. of
Offer Report
Offers) x 100
MIRs/ MoMs
Report
Protocols/ Balance
Score card

[No. of responses / No. of requests] x 100


[Days reduced / Currently benchmarked
time cycle] x 100
[Mandays executed / Mandays planned] x
100

Audit Plan/ L2/L3


Network/ Audit
Report

[No of audits conducted / No of audits


planned] x 100

Report
Audit Reports
Publications
Plan / Journal

No of days after completion of audit


[No of audits conducted / No of audits
planned] x 100
No of papers
No. of issues

Document Issue
Register

[No. of documents issued / No. of


documents to be issued as per plan] x 100

Document Issue
[No. of product-specific Erection Manuals
Register/ Document issued / Nos. to be issued as per Plan] x
Issue Plan
100
Document Issue
[No. of product-specific Commissioning
Register/ Document Documents issued / Nos. to be issued as
Issue Plan
per Plan] x 100
Document Issue
[No. of product-specific Servicing
Register/ Document Documents issued / Nos. to be issued as
Issue Plan
per Plan] x 100

System Log/ Plan


Document Issue
Register

[No. of documents hosted / Total no. of


documents to be hosted as per Plan] x
100
(2-(Actual time/Scheduled time)) X 100

Copy of Procedures No. of procedures


[No of issues resolved / No. of issues
Completion Report identified] x 100
Generic problems
register/ Action Plan [No. of Action Plans formulated / No. of
documents
generic problems identified] x 100
Implementation
Reports/ Action
Plans

[No. of Action Plans implemented / Nos.


formulated] x 100

Analysis Reports/
Implementation
Reports

[Nos. analysed / Nos. implemented] x 100

Record maintained
by Audit deptt.

Targets to be set as follows: 100% casesL5; 95-99% cases-L4;85-94% cases-L3;


75-84% cases-L2;<75%cases-L1

Record maintained
by Audit deptt.
Record maintained
by individual/ deptt.

Targets to be set as follows: 100% casesL5; 95-99% cases-L4;85-94% cases-L3;


75-84% cases-L2;<75%cases-L1

Record maintained
by Unit/Corp.
Finance deptt.
Record maintained
by Unit Head/Unit
P&D
Survey Report
Project report

Questionnaire developed by CQA to be


adopted .

Unit QA/QC
Quality Deptt.
Action plan
document
Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report
PROCEDURE
DOCUMENTS
SPECIFICATION
SHEETS
monthy/annual
Reports

(NO. OF DOCUMENTS
PREPARED/DOCUMENTS
PLANNED)X100
(NO. OF SPECF PREPARED/
PLANNED)X100

Task force report

No. of Reports generated


(No. of issues resolved / No of issues
referred) x 100
(No. of action plans finalised / No of
issues referred) x 100

Reports

(Number of documents submitted after


comments)/(Number of document
received for comments)x100

MOM / Replies

Reports

(Number of process improvement


completed/ Number of process
improvement planned )x100

Reports

(Number of activities Bench Marked)/


(Number ofactivities Planned to be Bench
Marked )x100

L2/L3 schedule /
SOMS / Site Plan
Project Completion
Report

[No. of Packages commissioned / No of


Packages planned for commissioning] x
100
No of days after trial operation

L3 Network

Nos. developed

Annual Plan/MSX
Report

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
100

Annual Plan/MSX
Report

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
100

Annual Plan/MSX
Report

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
100

Annual Plan/MSX
Report

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
100

Annual Plan/MSX
Report
Site records
Rating declared at
year end by
Corporate / Unit
Management
CAR received from
site

[2 - (Cumulative actual time taken /


Cumulative time required as per norms)] x
100
(No. of days services provided / No. of
days planned) x 100
This KRA will be taken by Head of Unit
/Function / Department , if covered under
MAP, and can be assigned a weightage
upto 100%
-

Number of job
executed / under
progress
Completion of
balancing.

No of
rotors/customers
identified
No of rotors
balanced.

Number achieved

Relevant records
being maintained for
this purpose
Relevant records
being maintained for
this purpose
Relevant records
being maintained for
this purpose
Relevant records
being maintained for
this purpose
Relevant records
being maintained for
this purpose
No. of microfilms
produced.
Mother KRA
Departmental
Records
Number of
drawings/documents
scanned
Departmental
records
Availibility of system
for use

In these meets Standards are reviewed


and collective decisions are taken for
revision/reaffirmation.

For customers/other BHEL units


For various user departments
On-line submission of drawings and print
requisitions

PUBLICITY/PUBLIC RELATIONS FUNCTIO


KRA ID

Function ID

KRA Description

PRX00100

PRX

PRX00101

PRX

MEDIA COMMUNICATION PLAN TO


ESTABLISH LONG TERM TRUST
AMONGST STAKEHOLDERS
% INCREASE IN +ve MEDIA
COVERAGE OVER LAST YEAR

PRX00102

KRA
Type

Unit of Measurement

No. of days delayed


from scheduled date
O
O

PRX

% INCREASE IN RATIO OF +ve


MEDIA COVERAGE TO -ve MEDIA
COVERAGE OVER LAST YEAR

PRX00103

PRX

RELEASE OF PRESS NOTES &


ENSURING MEDIA COVERAGE

PRX00104

PRX

AIR-TIME COVERAGE

RS. EARNED
(NOTIONAL)
RS. EARNED
(NOTIONAL)

PRX00105

PRX

TOP MANAGEMENT INTERVIEWS

NO. OF INTERVIEWS
No. of days delayed
from scheduled date

PRX00200

PRX

PRX00201

PRX

PRX00300

PRX

CONCEPTUALIZATION &
FINALIZATION OF PUBLICITY PLAN
BY SPECIFIED DATE
IMPLEMENTATION OF APPROVED
PLAN
CONCEPTUALIZATION OF
ADVERTISEMENTS

PRX00301

PRX

RELEASE OF ADVERTISEMENTS

PRX

RELEASE OF STATUTORY
NOTICES/TENDERS WITHIN
SPECIFIED TIME

PRX

IDENTIFYING EXHIBTIONS FOR


PARTCIPATION FOR BUSINESS
GROWTH

Number

PRX

NUMBER OF NEW/SPECIFIC
EXHIBITS (MODELS/DISPLAY
PANELS ETC.) CREATED

Number

RUPEES

Number

Number

Number

PRX00302

PRX00400

PRX00401

PRX00402

PRX

PRX00403

PRX

PRX00500

PRX

PRX00501

PRX

SAVINGS IN SETTING OF
EXHIBITIONS THRU IN-HOUSE
DESIGNS
NUMBER OF BUSINESS ENQUIRIES
GENERATED
CONCEIVING OF NEW CORPORATE
FILMS
COMPLETION OF NEW CORPORATE
FILMS

O
O

Number

Number

Number
Time Index

PRX00600

PRX

PRX00601

PRX

PRX00602

PRX

PRX00603

PRX

IDENTIFYING THE NEED OF


COMMUNICATION THRU
PUBLICATIONS
DATA COLLECTION FOR DIRECT
MAILERS TO CUSTOMERS
LAYOUT/ DESIGN/ PRINTING &
DISPATCH OF DIRECT MAILER
DATA COLLECTION FOR ENGG.
NEWS LETTER

Number

Number

O
O

Time Index
Number
Time Index

PRX00604

PRX

PRX00605

PRX

LAYOUT/ DESIGN/ PRINTING &


DISPATCH OF ENGG. NEWS LETTER
DATA COLLECTION FOR IN-HOUSE
JOURNALS

O
O

Number
Time Index

PRX00606

PRX

PRX00607

PRX

LAYOUT/ DESIGN/ PRINTING &


DISPATCH OF IN-HOUSE JOURNALS
DATA COLLECTION FOR PRODUCT /
CORPORATE PUBLICATIONS

PRX

LAYOUT/ DESIGN/PRINTING OF
PRODUCT/CORPORATE
PUBLICATIONS

PRX

VALUE ADDITION TO TECHNICAL


ARTICLES CONTRIBUTED TO
NATIONAL/INTERNATIONAL
JOURNALS WITHIN SPECIFIED TIME

% ON TIME

PRX

% SATISFACTION LEVEL IN
READERSHIP SURVEY (MIN.
SAMPLE SIZE 1% OF CIRCULATION)

PRX

HOSPITALITY & PROTOCOL FOR


SATISFACTION OF STAKEHOLDERS
TO BUILD LONG TERM
RELATIONSHIP

% SATISFACTION

Number

RUPEES

PRX00608

PRX00609

PRX00610

PRX00700

PRX00701

PRX

PRX00702

PRX

PRX00703

PRX

PRX00704

PRX

PRX00705

PRX

% INCREASE IN COMFORT LEVEL


BASED ON GUEST FEEDBACK
(FEEDBACK BASED ON MIN. 20% OF
OCCUPANCY)
CORRECTIVE ACTION FINALIZED
FOR IMPROVING GUESTS'
COMFORT
% CORRECTIVE ACTION
IMPLEMENTED/TAKEN BASED ON
FEEDBACK SURVEY
% OCCUPANCY ON
BUSINESS/OFFICIAL VISITS OF
GUEST HOUSES/TRANSIT FLATS
TOTAL MONEY SAVED ON HOTEL
BILLS BY LODGING EMPLOYEES IN
GUEST HOUSES/TRANSIT FLATS
WHILE ON TOUR

O
O

Number
Time Index

PRX01000

PRX

% SATISFACTION LEVEL IN
STAKEHOLDERS FOR
CONDUCTING THEIR VISITS
% SATISFACTION THROUGH
RANDOM SURVEY OF PARTCIPANTS
DURING EVENT MANAGEMENT
SYSTEM FORMULATION WITHIN
SPECIFIED TIME FOR
IMPROVEMENT IN SATISFACTION
LEVEL BASED ON FEEDBACK FROM
PARTICIPANTS
THE
EVENT
CREATING NEWDURING
SYSTEMS
WITHIN
SPECIFIED TIME FOR BETTER
DOWNWARD/UPWARD
COMMUNICATION WITHIN THE
ORGANISATION
CREATION OF LAN DATABASE
WITHIN SPECIFIED TIME FOR
INFORMATION SHARING

PRX01001

PRX

NUMBER OF PHOTOS ON-LINE

Number

PRX01002

PRX

MEDIA PRESS NOTES ON-LINE

Number

PRX01003

PRX

MEDIA REPORTING ON-LINE

COL.CM. OF
REPORTAGE/DAY

PRX01004

PRX

PRODUCT CATALOGS/CDs ON-LINE

Number

PRX

HOSTING OF INHOUSE JOURNALS


ONLINE

PRX00706

PRX

PRX00800

PRX

PRX00801

PRX00900

PRX01005

PRX

PRX

%
No. of days delayed
from scheduled date

C
No. of days delayed
from scheduled date
C
C

No. of days delayed


from scheduled date

Time Index
O

PRX01006

PRX

PRX01100

PRX

PRX01101
PRX01102

PRX
PRX

% Updations of On -line information


available for the BHEL employees
(telephone directory, fax Nos., Mobile
Nos. , public utility Nos. etc.) carried out
within specified time of the
change/event.
NEW ON-LINE COMMUNICATION
INITIATIVES
NO. OF WEB BASED APPLICATIONS
DEVELOPED
PERCENT UP-TIME

PRX01103

PRX

HOSTING TIME OF CONTENT

TIME IN MINS.

PRX01104

PRX

NO. OF WEB BASED QUERIES

Number

PRX

USER SATISFACTION LEVEL OF


WEB SURFERS ON WEB PAGE
QUALITY (FEEDBACK TO BE BASED
ON MI. 20% HITS TO ON-LINE
FEEDBACK FORM)

PRX01105

Number

C
O

Number
%

PRX01200

PRX01300

PRX01400

PRX

% SATISFACTION LEVEL OF
COMFORT IN HOLIDAY HOMES
(FFEDBACK SURVEY BASED ON
MIN. SAMPLE SIZE OF 20%
OCCUPANCY)

PRX

DATA COLLECTION/ LAYOUT/


PRINTING & DISPATCH OF
TELEPHONE DIRECTORY/
GREETING CARDS/ DIARY &
CALENDARS

PRX

CONCEIVING AND PLANNING FOR


CORPORATE IDENTITIES FOR
ANNUAL DISTRIBUTION BY
SPECIFIED DATE

PRX

DATA COLLECTION/ LAYOUT/


PRINTING AND DESPATCH OF DIARY

PRX

DATA COLLECTION/ LAYOUT/


PRINTING AND DESPATCH OF
CALENDARS

PRX

DATA COLLECTION/ LAYOUT/


PRINTING AND DESPATCH OF
TELEPHONE DIRECTORY

%
Time Index

O
No. of days delayed
from scheduled date
O
Time Index

PRX01401

PRX01402

PRX01403

PRX01404

PRX

PRX01500

PRX

PRX01501

PRX

DATA COLLECTION/ LAYOUT/


PRINTING AND DESPATCH OF
GREETING CARDS
NUMBER OF MEMENTOS
CORPORATIZED
ON-SCHEDULE PROCUREMENT &
DISTRIBUTION OF CORPORATE
MEMENTOS BY SPECIFIED DATE.

O
Time Index
O
Time Index
O
Time Index
O
O

Number

No. of days delayed


from scheduled date
No. of days delayed
from scheduled date

PRX01502

PRX

PRX01503

PRX

EMPANELMENT OF SUPPLIERS BY
SPECIFIED DATE FOR
PROCUREMENT OF SOUVENIRS
DEVELOPMENT OF DESIGN FOR
CORPORATISED MEMENTOS

PRX

IMPROVING COMPETENCIES OF
EMPLOYEES THROUGH TRAINING
PROGRAMMES

PRX

SYSTEM DEVELOPMENT BY
SPECIFIED DATE FOR INFORMATION
SHARING/REPORTING

PRX

Reply to Govt. Audit queries/ Inspection


report paras/ Action Taken Reports etc.
furnished within specified time (2
weeks)

PRX01600

PRX01700

PRX01800

O
O

Number

% COVERED
No. of days delayed
from scheduled date

PRX01900

PRX

Reply/settlement of Internal Audit paras


within specified time (4 weeks)

PRX

Timely inputs to unit/corporate finance


for inter-unit re-conciliationof accounts

%
Time Index

PRX02000

O
Time Index

PRX02100

PRX

PRX02200

PRX

PRX02300

PRX

PRX02400

PRX

PRX02500

PRX

PRX02501

PRX

PRX02502

PRX

PRX02600

PRX

PRX02700

PRX

PRX02800

PRX

PRX02900

PRX03000

PRX03100

PRX

PRX

PRX

Timely inputs to unit/corporate finance


for BUDGET/FLASH/MIRs etc.
Finalisation of Functional scorecard by
specified date
Implementation of Improvement
projects identified in the Position Report
as per schedule
Increase in no. of active Quality Circles
in the deptt.
Achieving Business excellence thru'
TQM at Deptt. level
Preparation of action plan based on
Position report
Implementation of Improvement
projects identified in the Position Report
as per schedule
Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal
Completion of KM Projects as per
schedule
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)

O
O

No. of days delayed


from scheduled date
Time Index

O
O

Number of new circles

TQM Score

No. of days delayed


from scheduled date
Time Index

C
O

No. of days delayed


from scheduled date

Number

Time Index
No. of days delayed
from scheduled date

C
No. of days delayed
from scheduled date

C
No. of days delayed
from scheduled date

PRX03200

PRX03300

PRX

PRX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)
Implementation of Special Improvement
Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)

No. of days delayed


from scheduled date

C
No. of days delayed
from scheduled date

C
No. of days delayed
from scheduled date

PRX

Implementation of Special Improvement


Projects taken under IMPRESS as per
schedule (Registration No. & other
details of project to be specified in the
boxes provided against the KRA)

PRX

Achieving ISO 9000:2000 certification


at Deptt. level by specified date

PRX

DEVELOPING CRITERIA FOR


EMPANELMENT & EVALUATION OF
AGENCIES/SERVICE PROVIDERS BY
SPECIFIED DATE

PRX03700

PRX

DEVELOPMENT OF SYSTEM BY
SPECIFIED DATE FOR ENHANCING
NEGOTIATION CAPABILITIES
LEADING TO COST REDUCTION

PRX03701

PRX

COST SAVING EFFECTED THROUGH


NEGOTIATIONS

RS SAVED

PRX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

Balanced Scorecard
Rating (5/4/3/2/1)

PRX

% satisfaction level of authors regarding


editorial improvements effected on their
articles for publishing

% satisfaction level of
100% author base

PRX

Creating a resource bank for sharing of


resources like hi-resolution images,
digitized blow-ups/ posters with Units
(Rs.2,000/- each)to synergize the PR
function across various units

Number

Score

PRX03400

PRX03500

PRX03600

PRX03800

PRX03900

PRX04000
PRX04100

PRX

Improvement in Employee Satisfaction


Score

No. of days delayed


from scheduled date
No. of days delayed
from scheduled date

C
No. of days delayed
from scheduled date

LATIONS FUNCTION KRA MASTER - 2006-07


Critical
KRA
(Y/N)

Special
KRA
(Y/N)

Universal Suggested Weightage for Source of Data for


KRA (Y/N) category
Measurement
A
B
C

DEPTT. RECORDS

NEWS COVERAGE

NEWS COVERAGE

NEWSPAPERS
CARRYING
PRESNOTES

DATA LOG

DATA LOG

DEPTT. RECORDS

PUBLICITY PLAN
PERFORMANCE
DATA

DATA LOG

RELEVANT
NEWSPAPERS
CUTTING

TRADE/BUSINESS
BODIES &
ASSOCIATIONS

DATA LOG

COST COMPARISON
WITH MARKET RATE

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATALOG

DATALOG

DATALOG

SURVEY FEEDBACK

SURVEY FEEDBACK

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATALOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATALOG

Data log

Y
N

N
N

N
N

X
X

H
M

XX
X

DATA LOG
DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

DATA LOG

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance
deptt.
Record maintained by
Unit Head/Unit P&D

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Quality Deptt.

Rating declared at year


end by Corporate / Unit
Management

Feedback from Authors

Y
Y

Level 5: 200, Level 4:


190, Level 3: 180,
Level 2: 170, Level 1:
160

Survey Report

KRA Remarks

Targets to be set as follows:


100% cases-L5; 95-99%
cases-L4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

Targets to be set as follows:


100% cases-L5; 95-99%
cases-L4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

This KRA will be taken by


Head of Unit /Function /
Department , if covered
under MAP, and can be
assigned a weightage upto
100%

PROJECT MANAGEMENT FUNCTION KRA MAS


KRA ID

Function KRA Description

KRA Type Unit of


Measurement

Critical
KRA
(Y/N)

Special
KRA
(Y/N)

PMX00100PMX

Timely finalisation of L1 Network O


with customer

Time Index

PMX00101PMX

Preparation of Draft L1 network O

Time Index

PMX00102PMX

Finalisation of Draft L1 network O


with concerned executing
agencies

Time Index

PMX00200PMX

Timely finalisation of L2 Network O


with customer (matching with
L1)

Time Index

PMX00201PMX

Preparation of Draft L2 network O

Time Index

PMX00202PMX

Finalisation of Draft L2 network O


with Executing agencies

Time Index

PMX00300PMX

Monitoring/follow up of
Engineering
drawings/Documents
submission and raise timely
alarms for preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00301PMX

Ensuring timely submission of


master list of Engineering
drawings/Documents

Time Index

PMX00302PMX

Reviewing/Finalising
Engineering
drawings/Documents
submission schedule with
executing agencies

Time Index

PMX00303PMX

Finalise Engineering
drawings/Documents/O&M
manuals/final documents
submission schedule with
cutomer

Time Index

PMX00304PMX

Submission of engineering
drawings/documents to
customer

Time Index

PMX00305PMX

Follow up with customer for


approval/comments of
drawings/documents from
customer (on exception basis)

percentage of
drawings
approved/
commented

PMX00400PMX

Monitoring/follow up O & M
O
manuals and all final documents
submission and raise timely
alarms for preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00401PMX

Ensuring timely submission of


O
master list of O & M manuals
Reviewing/Finalising O & M
O
manuals and all final documents
submission schedule with
executing agencies / customer

Time Index

Time Index

PMX00500PMX

Monitoring/follow up Supplies
from units and raise timely
alarms for preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00501PMX

Regular monitoring/follow up
O
with manufacturing units and
raise timely alarms in respective
areas

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00502PMX

Review of detailed
O
manufacturing plan of units and
raise timely alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00503PMX

Coordination with customers


intradeptt for timely Inspection
at units/BO

Percentage of
inspection
arranged in
time

PMX00402PMX

PMX00600PMX

Monitoring/follow up BOI/BOP
Supplies and raise timely
alarms for preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00601PMX

Coordination with
O
customers/suppliers/intradeptt
for timely Inspection at venders
works

Percentage of
inspection
arranged in
time

PMX00602PMX

Regular monitoring/follow up
O
with concerned agencies and
raise timely alarms in respective
areas

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00700PMX

Follow up for Resolution of


O
Interface inputs and raise timely
alarms for preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00701PMX

Finalise Interface inputs


submission schedule with
concerned,Regular
monitoring/follow up with
concerned agencies and raise
alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00800PMX

Monitoring/follow up of
construction milestones and
raise timely alarms for
preventing delay

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00801PMX

Identify critical pending inputs


O
(supply/ cutomer inputs/ drawing
document etc) for milestones
within specified time

% of inputs
Y
identified within
specified time

PMX00802PMX

Regular monitoring/follow up
with concerned agencies and
raise alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX00900PMX

Ensuring Timely submission of O


Reports to Customer/Ministry as
per scheduled/agreed dates

% of reports
submitted
within agreed
dates

PMX00901PMX

Freezing of format/content of
O
progress report within specified
time

Time Index

PMX00902PMX

Ensuring Timely availability of


O
reports from executing agencies
for submission to customers

% of reports
availability
within
prescribed
norm

PMX01000PMX

Acievement of Budgeted
Physical Turnover

% age
achievementactual/Budget

PMX01001PMX

Regular monitoring/follow up
with concerned agencies and
raise alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01100 PMX

Acievement of Budgeted
financial Turnover

% age
achievementactual/Budget

PMX01101 PMX

Regular monitoring/follow up
with concerned agencies and
raise alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01102 PMX

Engineering Support for


Turnover

% age
achievementactual/target

PMX01103 PMX

Engineering Support to
Turnover

% age
achievementactual/target

PMX01104 PMX

Engineering support for


Turnover

% age
achievementactual/target

PMX01200PMX

Acievement of Billing

% age
achievementactual/Budget

PMX01201PMX

Ensuring timely
submission/approval of billing
schedule from customer

Time Index

PMX01202PMX

Ensuring timely availability of


documents from concerned for
raising bills within specified no.
of days from completion of
activity

% of
documents
availability
within
prescribed
norm

PMX01203PMX

Ensuring timely submission of


O
Equipment Performance BG as
per format agreed with
customer (7 days before raising
bill)

% submission
within
prescribed
norm.

PMX01204PMX

Regular monitoring/follow up
with concerned agencies and
raise alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01300PMX

Acievement of cash collection

% age
achievementactual/Budget

PMX01301PMX

Ensuring timely verification of


bills

% of Bills
verified within
prescribed
norm

PMX01302PMX

Cash collection for withheld


outstandings ( as at end of
previous year)

Rs crores

PMX01303PMX

Regular monitoring/follow up
with concerned agencies and
raise alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01400PMX

Ensuring Timely availability of


inputs for floating of enquiries
for erection subcontracts

Time Index

PMX01500PMX

Coordinating and monitoring for O


timely PG Test of BHEL/BOP
packages and raising timely
alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01501PMX

Coordination and monitoring for O


timely submission/approval of
PG test procedure

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01502PMX

Follow up with concerned


agencies for Ensuring early
liquidation of punch points for
taking up PG test and raise
timely alarms

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01600PMX

Ensuring Technical closure of


identified contracts

% age
N
achievementactual/planned

PMX01601PMX

Consolidation/communication of O
punch points of all concerned
agencies within 2 months of trial
operation of set

%
N
Communication
done within
prescribed
norm

PMX01602PMX

Regular review and follow up


O
with concerned regarding
contract closing and raise timely
alarms for preventing delay

% of Alarms
(exception
reports) raised
within
prescribed
norm for
corrective
action

PMX01700PMX

Ensuring Timely shipment of


material from Port to overseas
projects by Coordination with
mfg units/ROD

Time Index

PMX01701PMX

Ensuring timely submission of


package details for shipment
and finalisation of shipping
arrangement by ROD ( one
month before shipment)

% Arranged
within
prescribed
norm

PMX01702PMX

Follow up with concerned


agencies for ensuring timely
availability of identified
packages for each shipment
and raising alarm signals

% of alarms
(exception
reports raised
within
prescribed
norm for
corrective
action

PMX01703PMX

Ensuring Timely availability of all O


documents for customs
clearance of cargo(4 days
before arrival of ship)

% Availability of N
documents
within
prescribed
norm

PMX01704PMX

Ensuring timely finalisation of


insurance/ECGC cover.(within
15 days before shipment)

% finalisation
within
prescribed
norm

PMX01705PMX

Ensuring approval of statutory


authority as required(within 15
days before shipment)

% Approvals
within
prescribed
norm

PMX01800PMX

Ensuring timely
O
Submission/approval of
Contract coordination procedure

Time Index

PMX01900PMX

Ensuring Timely availability of


O
required inputs for preparation
of technical specifications/
procedures from other agencies

Time Index

PMX02000PMX

Ensuring Timely response to


O
customers enhancing customer
satisfaction ( Initial Response to
go within 3 days)

% Initial
responses
within
prescribed
norm

PMX02001PMX

Contact concerned agencies for O


quick feedback within 2 days of
receipt of letter

% Contact
established
within
prescribed
norm

PMX02100PMX

Improvement in customer
satisfation index (CSI) wrt
previous year

Percentage of
action points
taken/total
action points

PMX02200PMX

Reduction in no. of customer


complaints

% Reduction
over last year

PMX02201PMX

Analyse/ communication to
O
concerned agencies and putting
action plan for implementation

% complaints N
for which action
plan
implemented

PMX02300PMX

Ensuring Timely
review/resolution of critical
issues and putting up focussed
issues for MCM

Percentage of
issues
resolved/total
issues
reviewed in
PRE-MCM
review

PMX02301PMX

Preparation/Communication of O
PRE-MCM agenda points to
concerned 15 days before MCM

Time Index

PMX02302PMX

Preparation/Communication of
MCM agenda points to
concerned(at least 7 days
before MCM)

Time Index

PMX02400PMX

Review and submission of


various MIRs like monthly DHI
reports/ fortnightly reports to
CMD on projects.

Time Index

PMX02500PMX

Coordination with various units O


for signing of MOU for PP & SIP

No. of days
N
delayed from
scheduled date

PMX02600PMX

Organizing review meetings with O


CEA as per schedule
Coordination with various
O
executing agencies for
consolidating project information
as per CEA format 1 week
before Meeting date

Time Index

No. of days
N
delayed from
scheduled date

PMX02700PMX

Developing IT based systems


for enhancing Project
management capability

Time Index

PMX02701PMX

Identification of systems to be
developed and Preparation of
action plan for development of
system by specified date

No. of days
N
delayed from
scheduled date

PMX02702PMX

Develop the system by


scheduled date

No. of days
N
delayed from
scheduled date

PMX02703PMX

Implementation of system by
scheduled date

No. of days
N
delayed from
scheduled date

PMX02800PMX

Develop systems by scheduled


date for sharing of Knowledge

No. of days
N
delayed from
scheduled date

PMX02801PMX

Documenting unique
experiences during project
execution which can be shared
with others for their benefit (At
least 1 per project)

Number

PMX02601PMX

PMX02900PMX

Develop a system within


C
specified time for
Documentation of project history
record of delays and conflicts
and its resolution

No. of days
N
delayed from
scheduled date

PMX03000PMX

Development of system by
specified date for improving
External customer satisfation
index (CSI)

No. of days
N
delayed from
scheduled date

PMX03001PMX

Development of questionaire
with consultant

No. of days
N
delayed from
scheduled date

PMX03002PMX

Identify list of customers to be


covered and conductance of
survey by consultant

No. of days
N
delayed from
scheduled date

PMX03003PMX

Analysis of customer feedback C


and development of action plan
for improvenment

No. of days
N
delayed from
scheduled date

PMX03100PMX

Development of system for


improving Internal customer
satisfation index (CSI)

No. of days
N
delayed from
scheduled date

PMX03101PMX

Development of questionaire
with consultant

No. of days
N
delayed from
scheduled date

PMX03102PMX

Conductance of survey by
consultant

No. of days
N
delayed from
scheduled date

PMX03103PMX

analysis of feedback and


development of action plan for
improvenment

No. of days
N
delayed from
scheduled date

PMX03200PMX

Develop a system for


registering/resolution of
customer complaints

No. of days
N
delayed from
scheduled date

PMX03300PMX

Develop a system for early


contract closing

No. of days
N
delayed from
scheduled date

PMX03400PMX

Reply to Govt. Audit queries/


Inspection report paras/ Action
Taken Reports etc. furnished
within specified time (2 weeks)

% of Replies
within
prescribed
norm

PMX03500PMX

Reply/settlement of Internal
O
Audit paras within specified time
(4 weeks)

% of Replies
within
prescribed
norm

PMX03600PMX

Timely inputs to unit/corporate


finance for inter-unit reconciliation of accounts

Time Index

PMX03700PMX

Timely inputs to unit/corporate


finance for
BUDGET/FLASH/MIRs etc.

% Inputs
furnished in
time

PMX03800PMX

Finalisation of Functional
scorecard by specified date

No. of days
Y
delayed from
scheduled date

PMX03900PMX

Increase in no. of active Quality O


Circles in the deptt.
Achieving Business excellence C
thru' TQM at Deptt. level

Number

TQM Score

PMX04001PMX

Preparation of action plan


based on Position report

No. of days
Y
delayed from
scheduled date

PMX04002PMX

Implementation of Improvement C
projects identified in the Position
Report as per schedule

Time Index

PMX04100PMX

Development of Knowledge
management Portal

No. of days
Y
delayed from
scheduled date

PMX04200PMX

Contributing case studies etc.for C


Knowledge Management Portal

Number

PMX04300PMX

Completion of KM Projects as
per schedule

Time Index

PMX04000PMX

PMX04400PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX04500PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX04600PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX04700PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX04800PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX04900PMX

Implementation of Special
Improvement Projects taken
under IMPRESS as per
schedule (Registration No. &
other details of project to be
specified in the boxes provided
against the KRA)

No. of days
N
delayed from
scheduled date

PMX05000PMX

Develop system for capturing


total actual project cost in
specified time

No. of days
N
delayed from
scheduled date

PMX05100PMX

ISO coordination work in


projects deptt/assistance in
audit

Time Index

PMX05200PMX

Organising customer training


programme as per contractual
obligation

% adherence to N
contractual
requirement

PMX05300PMX

Accomplishment of targets of
Unit/NC/Function/Department
level Balance Score Card

Balanced
Scorecard
Rating
(5/4/3/2/1)

PMX05400PMX

ABSORPTION OF NEW
C
TECHNOLOGY WITH
RESPECT TO TURBO
GENERATOR SUPPLIED FOR
KUDANKULAM NUCLEAR
POWER PROJECT - 2 X 1000
MWe.- SUPPLIES BY RUSSIA

Time Index

PMX05500PMX

ABSORPTION OF NEW
C
TECHNOLOGY WITH
RESPECT TO KAIGA
NUCLEAR PROJECT UNITS 3
& 4 - SUPPLY BY M/S. OJSC
TURBOATOM, UKRAINE.

Time Index

PMX05600PMX

Improvement in Employee
Satisfaction Score

Score

UNCTION KRA MASTER - 2006-07


Universal
Suggested Weightage for
KRA
category
(Y/N)
A
B
C

Source of Data
for
Measurement

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

As per agreed
schedule and
actual dates as
per record to be
maintained by
appraisee

KRA Remarks

Taskforce Recommendations

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Record

Record

Record

As per record of
receipt and
forwarding note

Criteria:
drawings to be
forwarded to
customer within
48 hrs of receipt
from concerned
agency
As per record of
receipt of
exception report
Criteria :
comments/approv
al within 10 days
of receipt of
exception report
from concerned
agency

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Record

Record

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Record

Record

Record

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Record

Record

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Record

Record
Criteria :
fortnightly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

To be
renumber
ed as
PMX0070
1

Record

Record

as per agreed
date

as per agreed
date

as per agreed
date

Budget

Record
Criteria : monthly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Budget

Record
Criteria : monthly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Approved Billing
Schedule

Earlier E-MAP
included above KRA.
Hence this request for
new KRA.

Unit of
Measure
ment to
be
changed
to "% age
achievem
entactual/tar
get

Approved BBU

Above KRA was used Unit of


in earlier eMaps
Measure
ment to
be
changed
to "% age
achievem
entactual/tar
get

Approved Billing
Schedule

Earlier Emap cycles


included the above
KRA. Hence this
request for New KRA

Budget

as per agreed
schedule

Record

as per agreed
date

Unit of
Measure
ment to
be
changed
to "% age
achievem
entactual/tar
get

Record
Criteria : monthly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Budget

Record

Record

Record
Criteria : monthly
ecception reports
to be generated
by appraisee
(with or without
exceptions)

Sch.input date
and Record of
actual dates

Agreed sch date


and record of
actual
datesRecord

Record

Record

To be
renumber
ed as
PMX0150
2.

Plan given by
Marketing group

Prtocol signed
with customer at
site

Record

Record

Record

To be
Renumbe
red as
PMX0170
1.

Alarms raised to
be recorded
systematically by
appraisee

To be
Renumbe
red as
PMX0170
2.

Record

To be
Renumbe
red as
PMX0170
3.

Record

To be
Renumbe
red as
PMX0170
4.

Record

To be
Renumbe
red as
PMX0170
5.

Scheduled
contractual date
and Record for
actual date

Agreed input
schedule and
Record for actual
dates

Record of letters
received from
customer

Record

Record

Criteria :
Customer survey
report
Record

Criteria : Letters
addressed to
ED/GGM.
Record

Record

Record

Record

Record

Record

Record

Record

Record

Record

Record

Record

Record

Record
Criteria : at
least one per
person during the
year

Record

Record
Criteria :CQA to
appoint agency
and questionnaire
to be approved
by D(HR)

Record

Record

Record

Record
Criteria :CQA to
appoint agency
and questionnaire
to be approved
by concerned

Record

Record

Record

Record

Record

Record
maintained by
Audit deptt.

Targets to be set as
follows: 100% casesL5; 95-99% casesL4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

Record
maintained by
Audit deptt.

Targets to be set as
follows: 100% casesL5; 95-99% casesL4;85-94% cases-L3;
75-84% casesL2;<75%cases-L1

Record
maintained by
individual/ deptt.

Record
maintained by
Unit/Corp.
Finance deptt.

Record
maintained by
Unit Head/Unit
P&D

Unit QA/QC

Quality Deptt.

Action plan
document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

As per
deptt.record

Since
coordinati
on work
will
involve
more than
1 result
area, Unit
of
measure
ment has
to be
Time
Index.

Project report

Rating declared
at year end by
Corporate / Unit
Management

This KRA will be taken


by Head of Unit
/Function /
Department , if
covered under MAP,
and can be assigned a
weightage upto 100%

Project schedule

This
PSSR
project
specific.
Clarificati
on to be
given by
PSSR as
to how
this will be
measured
.

Schedule as
agreed in action
plan

This
PSSR
project
specific.
Clarificati
on to be
given by
PSSR as
to how
this will be
measured
.

Survey Report

Recommendations

VIGILANCE FUNCTION KRA MASTER - 2006-0


KRA ID

Function

KRA Description

KRA
Type

Unit of
Measurement

Critical
KRA
(Y/N)

Special Universal
KRA
KRA
(Y/N)
(Y/N)

VGX00100

VGX

Percentage of complaints
processed within 1 month of its
receipt.

Yes

VGX00200

VGX

Percentage of investigations
completed within 6 months from
the date of registration.

Yes

VGX00300

VGX

Percentage of investigation
reports processed for FSA within
1 month of its receipt.

Yes

VGX00400

VGX

Percentage of enquiry reports


processed for SSA within 1 month
of its receipt.

Yes

VGX00500

VGX

No. of Vigilance inspections /


surprise checks completed vis-vis annual plan.

Number

Yes

VGX00600

VGX

Completion of System Study


during the year vis--vis annual
plan

Number

Yes

VGX00700

VGX

Number of training programmes


conducted vis--vis annual plan.

Number

Yes

VGX00800

VGX

Inspection of purchase orders /


contracts as per the guidelines
suggested by CTE/CVC.

Number

Yes

VGX00900

VGX

Identifying employees working in


sensitive areas for period more
than 10 years and taking up with
the Unit Management (under
intimation to CVO) on a monthly
basis for their rotation.

Number

Yes

VGX01000

VGX

No. of Vigilance Committee


Meeting minutes sent to CVO

Number

Yes

VGX01100

VGX

No. of Property Returns


scrutinised

Number

Yes

VGX01200

VGX

Timely submission of
Monthly/Quarterly/Annual reports

Time Index

Yes

VGX01300

VGX

Timely processing of vigilance


clearance within specified time

Time Index

Yes

VGX01400

VGX

Updation of Vigilance Home page

Number

Yes

VGX01500

VGX

Identifying material codes with


less than 3 registered vendors
and taking up with the Unit
Management on a montlhy basis
for registration of additional
vendors.

Number

Yes

VGX01600

VGX

Reply to Govt. Audit


queries/ Inspection report
paras/ Action Taken
Reports etc. furnished
within specified time (2
weeks)

VGX01700

VGX

Reply/settlement of
Internal Audit paras within
specified time (4 weeks)

VGX01800

VGX

Timely inputs to
unit/corporate finance for
inter-unit re-conciliationof
accounts

Time Index

VGX01900

VGX

Timely inputs to
unit/corporate finance for
BUDGET/FLASH/MIRs
etc.

Time Index

VGX02000

VGX

Finalisation of Functional
scorecard by specified
date

No. of days
delayed from
scheduled
date

VGX02100

VGX

Improvement in Employee
Satisfaction Score

Score

VGX02200

VGX

Implementation of
Improvement projects
identified in the Position
Report as per schedule

Time Index

VGX02300

VGX

Increase in no. of active


Quality Circles in the deptt.

Number of new
circles

VGX02400

VGX

Achieving Business
excellence thru' TQM at
Deptt. level

TQM Score

VGX02500

VGX

Preparation of action plan


based on Position report

No. of days
delayed from
scheduled
date

VGX02600

VGX

Implementation of
Improvement projects
identified in the Position
Report as per schedule

Time Index

VGX02700

VGX

Development of
Knowledge management
Portal

No. of days
delayed from
scheduled
date

VGX02800

VGX

Contributing case studies


etc.for Knowledge
Management Portal

Number

Completion of KM Projects
as per schedule
Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

Time Index

No. of days
delayed from
scheduled
date

VGX

Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

No. of days
delayed from
scheduled
date

VGX03200

VGX

Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

No. of days
delayed from
scheduled
date

VGX03300

VGX

Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

No. of days
delayed from
scheduled
date

VGX03400

VGX

Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

No. of days
delayed from
scheduled
date

VGX02900

VGX

VGX03000

VGX

VGX03100

VGX03500

VGX

Implementation of Special
Improvement Projects
taken under IMPRESS as
per schedule (Registration
No. & other details of
project to be specified in
the boxes provided against
the KRA)

VGX03600

VGX

Accomplishment of targets C
of
Unit/NC/Function/Departm
ent level Balance Score
Card

No. of days
delayed from
scheduled
date

Balanced
Scorecard
Rating
(5/4/3/2/1)

ASTER - 2006-07
Suggested Weightage for
category
A
B
C

Source of Data for


Measurement

KRA Remarks

Complaint Register

Case Register

Case Register

Case Register

Annual Plan

Annual Plan

Annual Plan

Annual Plan

Monthly Performance
Report

Annual Plan

Annual Plan

Annual Plan

Record maintained by
Department

Annual Plan

Monthly Performance
Report

Record maintained
by Audit deptt.

Record maintained
by Audit deptt.

Record maintained
by individual/
deptt.

Record maintained
by Unit/Corp.
Finance deptt.

Record maintained
by Unit Head/Unit
P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan
document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Rating declared at
year end by
Corporate / Unit
Management

This KRA will


be taken by
Head of
Unit
/Function /
Department ,
if covered
under MAP,
and can be
assigned a
weightage
upto 100%

HEALTH / SAFETY / ENVIRONME


KRA ID

Function

KRA Description

KRA
TYPE

HSE00100

HSE

Carryout External audit of ISO 14001 / OHSAS 18001for compliance. O

HSE00101

HSE

Monitor compliance of HSE audit NCRs with the depts.

HSE00200

HSE

Risk/ Hazard analysis thro' Safety Management Tools on hazardous


operations.

HSE00201

HSE

Provide technical inputs to Deptt. to prevent Hazards

HSE00300

HSE

Improvement projects on fire protection systems.

HSE00301

HSE

Provide technical inputs for Establishment of project for fire protection C


system

HSE00302

HSE

Monitor the fire protection system and evaluate the effectivenes.

HSE00400

HSE

Savings through Health/ Safety/ Environmental (HSE) measures.

HSE00401

HSE

Identify new HSE projects

HSE00402

HSE

Execute and commission HSE projects

HSE00500

HSE

HSE Improvement projects/ Management programmes

HSE00501

HSE

HSE project for waste minimisation

HSE00600

HSE

HSE Consultancy Services/ Projects to other units and industries

HSE00601

HSE

Preparation and submission of Technical offers for HSE Consultancy O


Projects

HSE00602

HSE

Completion of HSE consultancy works as per schedule

HSE00700

HSE

HSE Knowledge Management portal

HSE00800

HSE

Organising HSE Seminar(s)

HSE00801

HSE

Mobilising nominations/ faculty/ infrastructure for HSE Seminar(s)

HSE00802

HSE

Conducting HSE seminar and documenting new learnings

HSE00900

HSE

Development of HSE manuals/ posters/ training modules/ safety


instructions/ web site information

HSE01000

HSE

Introduction/ revision of WMI

HSE01100

HSE

Improvement in PPE specification

HSE01200

HSE

Standardisation of system for tracking HSE performance

HSE01201

HSE

Collecting HSE data for tracking of HSE performance

HSE01202

HSE

Compilation of HSE data and reporting for improvement/


conservation

HSE01300

HSE

Publishing technical papers on HSE

HSE01400

HSE

Presenting Techinical Papers on HSE at Symposia / Seminars

HSE01500

HSE

Getting Factory/ Environmental Licenses in time

HSE01501

HSE

Complying all conditions for Factory License

HSE01502

HSE

Complying all conditions of Water Consent

HSE01503

HSE

Complying all conditions of Air Consent

HSE01504

HSE

Complying all conditions of Hazardous waste Rules

HSE01600

HSE

Compliance with HSE Statutory requirements

HSE01601

HSE

Settlement of HSE non compliances from Statutory authorities

HSE01700

HSE

Compliance follow up of work environment findings

HSE01800

HSE

Updating of HSE legislations as and when changes occur

HSE01900

HSE

Performance of HSE inspections

HSE02000

HSE

Statutory inspection of Cranes and Pressure Vessels

HSE02001

HSE

Preparing calender of inspections and physical inspections of Cranes O


and Pressure Vessels

HSE02002

HSE

Report generation of Cranes and Pressure Vessels inspection

HSE02003

HSE

Compliance followup of Cranes and Pressure Vessels

HSE02100

HSE

Carrying out Internal audits of ISO 14001/ OHSAS 18001/ Fire/


Electrical/ Radiation/ etc

HSE02200

HSE

Mock Drills for Emergency Plan

HSE02201

HSE

Performance of Safety function in the mock drill

HSE02202

HSE

Performance of Health Services function in the mock drill

HSE02203

HSE

Performance of Fire Services function in the mock drill

HSE02300

HSE

Investigation of accidents / incidents

HSE02301

HSE

Analysis of root causes of accidents / incidents and communication to O


departments

HSE02302

HSE

Monitoring implementation of remedial measures of accidents /


incidents

HSE02400
HSE02500

HSE
HSE

O
O

HSE02600

HSE

Quality inspection of Safety items at suppliers works/ inplant.


Programs conducted for employee/ customer/ supplier/ contractor
training
Organisation of H/S/E promotional celebrations

HSE02700

HSE

Creating awareness through competitions/ seminars/ posters/


ciruculars/ multimedia/ intranet etc.

HSE02800

HSE

Participation in safety awards at National / State levels

HSE02900

HSE

Updation of HSE L1/ L2/ L3 and other documents

HSE03000

HSE

Updation of database/Information (like Databases / Intranet sites etc.) O


in System

HSE03100

HSE

CSC meetings as per requirements

HSE03200

HSE

Management reviews performed

HSE03300

HSE

Finalisation of Functional scorecard by specified date

HSE03301

HSE

Accomplishment of targets of Unit/NC/Function/Department level


Balance Score Card

HSE03400

HSE

Increase in no of Preventive Health Programs & awareness


programs/work shops/camps

HSE03500

HSE

Increase in no. of innovative health care practices

HSE03600

HSE

Improvement in quality of OHS tests for better repeatability

HSE03700

HSE

Work environment monitoring of physical & chemical hazards in


workplace

HSE03701

HSE

Conduct study, Analyse results and suggest remedial measures

HSE03702

HSE

Performance Monitoring of ETPs & STPs

HSE03703

HSE

Performance Monitoring of Ambient Air and Stack emissions

HSE03704

HSE

Performance Monitoring of Drinking water quality

HSE03705

HSE

Report Status of Env. Monitoring to Departments

HSE03800

HSE

Conduct study, Analyse results and suggest remedial measures

HSE03900

HSE

Carry out radiological investigations as per plan

HSE04000

HSE

Carry out ECG investigations as per plan

HSE04100

HSE

Carry out toxicological investigations as per plan

HSE04200

HSE

Carry out biochemical investigations as per plan

HSE04300

HSE

Ensuring Occupational Health check up for workers

HSE04301

HSE

Planning of OHS activities & cascading down to the levels.

HSE04302

HSE

Execution Occupational Health screening activities

HSE04303

HSE

Analysis of Occupational Health screening data/ preparation of


reports

HSE04400

HSE

Environmental Monitoring of Work Areas

HSE04401

HSE

Performance Monitoring of ETPs & STPs

HSE04402

HSE

Performance Monitoring of Ambient Air and Stack emissions

HSE04403

HSE

Performance Monitoring of Drinking water quality

HSE04404

HSE

Report Status of Env. Monitoring to Departments

HSE04500

HSE

Identify Occupational Hazards at Work Place

HSE04501

HSE

Monitor occupational hazards at work place

HSE04502

HSE

Report Corrective Actions on occupational hazards at work place

HSE04600

HSE

Reduction in prevalence of occupational health deviation in high


noise exposed groups

HSE04700

HSE

Reduction in prevalence of occupational health deviation in statutory


groups exposed to respiratory hazards

HSE04800

HSE

Reduction in prevalence of occupational health deviation in other


statutory hazard exposed groups

HSE04900

HSE

To uphold BHEL's commitment to UN's Global Compact Programme O


on Human Rights,Labour,Environment & Anti-corruption and promote
sustainable growth beside encouraging good corporate citizenship.

HSE05000

HSE

Improvement in HSE performance through controls/ Operational


Control Procedures/ improvement projects

HSE05100

HSE

Implementation of PPE usage

HSE05200

HSE

Projects for conservation of natural resources (e.g.specific


consumption (per unit of production) of water/ power/ paper/ oil
/wood/ copper etc.)

HSE05201

HSE

Implementation of the projects for conservation of natural resources

HSE05202

HSE

Project for waste minimisation and management

HSE05300

HSE

Investigation of accidents and incidences/ analysis and


implementation of recommendations

HSE05301

HSE

Implementation of control measures for accident prevention

HSE05400

HSE

Redeployment of persons as indicated by occupational health


evaluation.

HSE05500

HSE

Compliance of Inspection/ Audit NCRS

HSE05600

HSE

Compilation of HSE performance data and submission to HSE dept.

HSE05700

HSE

Compliance of HSE statutory requirements

HSE05800

HSE

Compliance of HSE non conformances from statutory authorities

HSE05900

HSE

HSE Training

HSE06000

HSE

HSE06001

HSE

Operation and Maintenance of treatment plants and recovery


systems
Performance of ETPs

HSE06002

HSE

Performance of STPs

HSE06003

HSE

Performance of Recovery systems

HSE06100

HSE

Organising and conducting a certified HSE training course

HSE06200

HSE

Reply to Govt. Audit queries/ Inspection report paras/ Action Taken


Reports etc. furnished within specified time (2 weeks)

HSE06300

HSE

Reply/settlement of Internal Audit paras within specified time (4


weeks)

HSE06400

HSE

Timely inputs to unit/corporate finance for inter-unit re-conciliationof


accounts

HSE06500

HSE

Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc. O

HSE06600
HSE06700

HSE
HSE

Improvement in Employee Satisfaction Score


Implementation of Improvement projects identified in the Position
Report as per schedule

O
O

HSE06800

HSE

Increase in no. of active Quality Circles in the deptt.

HSE06900

HSE

Achieving Business excellence thru' TQM at Deptt. level

HSE07000

HSE

Preparation of action plan based on Position report

HSE07100

HSE

Implementation of Improvement projects identified in the Position


Report as per schedule

HSE07200

HSE

Development of Knowledge management Portal

HSE07300
HSE07400

HSE
HSE

Contributing case studies etc.for Knowledge Management Portal


Completion of KM Projects as per schedule

C
C

HSE07500

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

HSE07600

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

HSE07700

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

HSE07800

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

HSE07900

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

HSE08000

HSE

Implementation of Special Improvement Projects taken under


C
IMPRESS as per schedule (Registration No. & other details of project
to be specified in the boxes provided against the KRA)

ETY / ENVIRONMENT FUNCTION KRA MASTER - 2006-07


Unit of Measurement

Critical
KRA
(Y/N)

Special
KRA
(Y/N)

Universal
KRA
(Y/N)

Suggested Weightage
for category
A
B
C

100XNo.conducted/ No. required to


be conducted

100XNo.complied/ Total No.

100X No. Analyed / No. planned

100 x No. of technical guidance


provided/ nos planned

100 X No. of projects completed /


No. planned

100 x No. of technical guidance


provided/ nos planned

% reduction in cases of fire over last N


year

100 X savings realised/ Benchmark

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

100 X projects implemented/ planned N

100 X projects implemented/ planned N

Time Index

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

100 X No. improved/ No. planned

Time Index

Time Index

Time Index

Nos publised/nos planned

nos presented/nos planned

No.of licenses delayed from Zero


date

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. complied/ No. reported

100 X No. updated/ No. changed

% completed / planned

Nos. completed/ Nos planned

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

Nos complied/ Total nos.

Nos completed/ nos planned.

No. conducted/ No. planned

% of non performance/ required


performance rate

% of non performance/ required


performance rate

% of non performance/ required


performance rate

No. investigated / total occurences

No. of days delayed from scheduled


date

nos monitored/ nos to be monitored

Delayed days/days for inspection


100 X No. conducted/ No. planned

N
N

N
N

M
H

M
M

H
L

No. of days delayed from scheduled


date

% no. completed / no. as per plan

no. participated / no. eligible for


participation

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

no. held / no. required to be held

No. performed/ No. required

No. of days delayed from scheduled


date

Balanced Scorecard Rating


(5/4/3/2/1)

% increase

% increase

% improvement

No. of tests conducted/ nos as per


schedule

No. of tests conducted/ nos as per


schedule
100 X Surveys conducted/ Planned

100 X Surveys conducted/ Planned

100 X Surveys conducted/ Planned

No. of days delayed from scheduled


date

No. of tests conducted/ nos as per


schedule

% completed/ planned

% completed/ planned

% completed/ planned

% completed/ planned

% completed/ planned

No. of days delayed from scheduled


date

No. screened/ No.to be screened

No. of days delayed from scheduled


date

100 X Surveys conducted/ Planned

100 X Surveys conducted/ Planned

100 X Surveys conducted/ Planned

100 X Surveys conducted/ Planned

No. of days delayed from scheduled


date

No. of Deptt's covered/ nos planned

Nos complied/ Total no of non


compliance
Nos complied/ Total no of non
compliance

Occ. Health Deviation Prevalence


Index (Noise)

Occ. Health Deviation Prevalence


Index (Respiratory)

Occ. Health Deviation Prevalence


Index (General)

Number

% improvement/ Benchmark

% implemented/ total

% Savings realised/ Benchmark

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

% accidents investigated within


specified time

% implemented/ planned

% redeployed/ required to be
redeployed

% compliance

Nos sent in time/ Total nos to be sent N

% compliance

% compliance

Nos conducted/ nos planned

% improvement/ Benchmark

% improvement/ Benchmark

% improvement/ Benchmark

% improvement/ Benchmark

Number of days delayed from


scheduled date
%

Time Index

Time Index

Score
Time Index

Y
Y

M
X

X
M

X
M

Number of new circles

TQM Score

Y
Y

M
X

M
M

M
H

No. of days delayed from scheduled


date
Time Index

No. of days delayed from scheduled


date
Number
Time Index

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

No. of days delayed from scheduled


date

Source of Data for


Measurement

KRA Remarks

Records

(Nos. conducted/ Nos


required)x100

Records

(Nos complied/ Total Nos)


x 100

Records

(Nos of hazardous
operations analysed/ Nos
of hazardous operations
No.of safety instructions/
planned for analysis) x 100
standards issued

Records
Records

(No of projects completed/


Nos planned ) x 100

Records

Nos of technical inputs


given

Records

Reduction of fire as
compared to last year.

Finance data/ MIRs

(Savings realised/ Savings


planned) x 100

Records

Days delayed

Records

Days delayed

Records

No. implemented /
No.Planned

Records
Records

Nos given/ nos planned

Records

Days delayed

Records

Days delayed

Records

Nos completed/ nos


planned

Records

Nos conducted/ nos


planned

Records

Days delayed

Records

Days delayed

Records

Days delayed

Records

Nos introduced or revised/


nos planned

Records

No. improved / no. planned

Records

Days delayed

Records

Days delayed

Records

Days delayed

Title of the papers

No. of papers published v/s


planned

Title of the papers/talks Score L5: 4 L4: 3 L3: 2


L2: 1 L1: 0
License copy
No.of licenses delayed
from Zero date
Records

Nos.complied /
Nos.reported

Records

Nos.complied /
Nos.reported

Records

Nos.complied /
Nos.reported

Records

Nos.complied /
Nos.reported

Legislations/ records

Reports submitted/
Reports to be submitted

Records

L5=100% cases/ L4= 9599%/ L3=85-94%/ L2= 7584%/ L1=<75%


Nos complied/ Total non
conformances

Records
Records
Records
Records
Records

Nos updated / Nos.


changed
% completed / planned
Nos. completed/ Nos
planned
Completion date

Records

Delayed days/days for


report generation

Records

Nos complied/ Total nos.

Records

Nos completed/ nos


planned.

Audit report
Audit report

No Completed/ No.
Planned

Audit report
Audit report
Records

No. investigated / total


occurences

Records

Delayed days

Records

% implemented / total

Records
Training Records

Delayed days/days for


inspection
No. of programs conducted

Records

no. organised / mo.


Planned (National Safety/
Environment/ Occupational
%
no. completed
/ no.Fire
as
Health/
Road Safety/
per
plan
Safety Day/ etc.)

Records
Records
Records

participated / no. eligible


for participation (Includes
preparation of
Nos updated in time/ Total
participation)
nos.

Records

Schedule to be prepared
by the department.

Minutes of meeting

no. held / no. required to


be held
No. performed/ No.
required
Delayed days

Minutes of meeting
Record maintained by
Unit Head/Unit P&D

Rating declared at year This KRA will be taken by


end by Corporate / Unit Head of Unit /Function /
Management
Department , if covered
under MAP, and can be
assigned a weightage upto
100%
Title of the programs
Title of the programs
Records

Score L5: 4 L4: 3 L3: 2


L2: 1 L1: 0 remarks
Awareness programs at
Score
L5: 4Public
L4: 3 lectures.
L3: 2
work place
L2: 1 L1: 0 Remarks
Minimal
Invasive
surgery
Test-retest
repeatability

Records
Time frame
Records

Annual plan to be
developed for total
monitoring of workplace
As
per plan
hazards/
including
prioritisation.
No.of surveys conducted/
Nos.planned

Records

No.of surveys conducted/


Nos.planned

Records

No.of surveys conducted/


Nos.planned

Records

Nos reported/ Nos


generated

Time frame

As per plan

Records

% completion

Records

% completion

Records

% completion

Records

% completion

Records

No. checked/No.to be
checked
As per plan

Records
Records
Records

index = No. screened/


No.to be screened
As per plan

Records

No.of surveys conducted/


Nos.planned

Records

No.of surveys conducted/


Nos.planned

Records

No.of surveys conducted/


Nos.planned

Records

No.of surveys conducted/


Nos.planned

Records

Nos reported/ Nos


generated

Records

Nos identified/ No of depts

Records

Nos complied/ Total nos of


Non compliances
Nos complied/ Total nos of
Non compliances

Records
Records

Presbycusis correction to
be applied. Weighting to be
given for severe / profound
hearing loss. If there are
more than one high noise
exposed groups/ average
of OHDPI for the groups to
be averaged.

Records
Records
No. of Convention
/Workshops/Seminars
organised by
G.C.Society
Records
Records
Records

If there are more than one


respiratory hazard exposed
groups/ average of OHDPI
If
are more
than one
forthere
the groups
to be
general
hazard
exposed
averaged.
groups/ average of OHDPI
BHEL has taken leading
for the groups to be
role as its nominee is
averaged.
Secretary to G.C.Society &
representing at
national/international levels
%
= No. of
on Improvement
behalf of all Indian
parameters
showing
organisations,
committed
improvement
*100/ Total
to
UNGC.
%
no.ofofemployees
parameterswearing
identified
recommended PPEs
Environmental indices

Records

Example L5 -on time/ L4 5 days delay and so on

Records

Example L5 -on time/ L4 5 days delay and so on

Records

Nos completed/ Total


occurences

Records

Nos completed/ nos


planned
% of persons redeployed /
persons required to be
redeployed
Nos complied/ Total nos

Records
Records
Records

Nos sent in time/ Total nos


to be sent

Records

Nos complied/ Total nos

Records

Nos complied/ Total nos

Records

Nos conducted/ nos


planned
Records
No.of samples complied /
Nos.analysed
Records
No.of samples complied /
No.of samples analysed
Records
No.of samples complied /
Nos. analysed
Records
No.of samples complied /
Nos.analysed
Records from Individual and from Department
Record maintained by
Audit deptt.
Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.
Record maintained by
Unit/Corp. Finance
deptt.
Survey Report
Project report
Unit QA/QC
Quality Deptt.
Action plan document
Project report

Project report
Project report

Project report

Project report

Project report

Project report

Project report

SERVICE AFTER SALES FUNCTION KR


KRA ID

Function

KRA Description

KRA Unit of
Critical
Type Measurement KRA (Y/N)

SAX00100

SAX

Turnover as per Budget (inclusive of


Servicing/ RLA and R&M)

Rs in Lacs

SAX00200

SAX

% increase in order booking (Rs in


Lacs) over previous year

SAX

Completion of survey and


submission of report in time on
market availability of SAS business
as per plan
(INCREASE
IN MARKET SHARE IN EXISTING
PRODUCT)

Time Index

SAX

Timely review of survey reports/


assessment of market potential
available and submission of action
plan
(INCREASE IN MARKET
SHARE IN EXISTING PRODUCT)

% As defined
under Remarks
Column

SAX

Review of action plan for increase in


market share from existing and
implementation as per plan
(INCREASE IN MARKET SHARE
IN EXISTING PRODUCT)

% As defined
under Remarks
Column

SAX

Completion of survey and


submission of report in time on New
area in servicing business as per
plan
(ENTRY INTO NEW
AREA IN SERVICING BUSINESS)

Time Index

SAX00201

SAX00202

SAX00203

SAX00204

SAX

Timely review of survey reports/


assessment of New area business
availablity and preparation of action
plan
(ENTRY INTO NEW AREA
IN SERVICING BUSINESS)

% As defined
under Remarks
Column

SAX00206

SAX

Review of action plan for Entry into


new area in servicing business and
implementation as per plan
(ENTRY INTO NEW AREA IN
SERVICING BUSINESS)

% As defined
under Remarks
Column

SAX00300

SAX

% increase in price for repeat job


from customer as per plan

% As defined
under Remarks
Column

SAX00301

SAX

Timely capture of data for increase in


offered price to customer

% As defined
under Remarks
Column

SAX00302

SAX

Negotiation with customer against


offer

% As defined
under Remarks
Column

SAX00400

SAX

% achievement of orders against


offers submitted in competetive
bidding as per plan

% As defined
under Remarks
Column

SAX00401

SAX

Analysis of orders lost in competetive


bidding in previous year(s)

% As defined
under Remarks
Column

SAX00402

SAX

Implementation of analysis in offers


submitted in bidding

% As defined
under Remarks
Column

SAX00500

SAX

% of customers retained

% As defined
under Remarks
Column

SAX00501

SAX

Timely preparation of repository of


customers who have awarded jobs to
SAS on a regular basis

% As defined
under Remarks
Column

SAX00502

SAX

Timely review of repository of


customers who have awarded jobs to
SAS on a regular basis

% As defined
under Remarks
Column

SAX00205

SAX

Timely preparation and


implementation of action plans for
retention of targetted customers in
the year

Time Index

SAX00600

SAX

% reduction in time for submission of


techno commercially correct offer
from the date of receipt of enquiry
as per plan

% As defined
under Remarks
Column

SAX00601

SAX

% reduction in time from defined


time in preparation of job details and
estimate for Customer offer

% As defined
under Remarks
Column

SAX00602

SAX

% reduction in time from defined


time in review of job details/
estimate and submission of offer to
Customer

% As defined
under Remarks
Column

SAX00700

SAX

% As defined
under Remarks
Column

SAX00503

KRA : % reduction in Transfer-in


over previous year as per plan

SAX00701

SAX

Collection of data of "Transfer In"


services in previous year(s) in
targetted area and preparation of
action plan for reduction of "Transfer
In"

SAX00702

SAX

Timely review and approval of action


plan for reduction in "Transfer In"

Time Index

SAX00703

SAX

Achievement of success by task


perfomer in targetted area bringing
reduction in "Transfer In"

% As defined
under Remarks
Column

SAX00800

SAX

% reduction in time in award of


subcontract from defined time as per
plan

% As defined
under Remarks
Column

SAX00801

SAX

Reduction in time from defined time


in preparation of job details and
estimate for subcontracting

% As defined
under Remarks
Column

SAX

% reduction in time from defined


time in review of subcontracting job
details and estimate and release to
indenting department

% As defined
under Remarks
Column

SAX00802

% As defined
under Remarks
Column

SAX00803

SAX

SAX00804

SAX

SAX00900

SAX

SAX00901

% reduction in time for floating of


tender enquiry to submission of
Comparative Statement of Tenders
(CST) received

Time Index

Time Index

% Improvement in performance of
targetted vendors from "Satisfactory"
to "Good" as per plan

% As defined
under Remarks
Column

SAX

Timely identify and prepare MOM


with target vendor(s) for performance
improvement

Time Index

SAX00902

SAX

Assess target vendor(s)'s


performance result after job
performance and submit report

Time Index

SAX01000

SAX

% increase in number of vendors


where number of regd. Vendors are
less than five

SAX01001

SAX

Timely preparation/ getting approval


of action plan and implementation for
increase in number of vendors
where number of regd. Vendors are
less than five

% As defined
under Remarks
Column

SAX01100

SAX

% reduction in cycle time of


overhauling of a product / system wrt
contract schedule as per plan

% As defined
under Remarks
Column

SAX

Capture data and submit report in


time for determining potential
products / systems for reduction in
cycle time

% As defined
under Remarks
Column

SAX01101

KRA :Timely floating of tender


enquiry/evaluation and
placement of LOI on vendor.

SAX01102

SAX

Timely Review of report and


submission of action plan for
reduction in cycle time of overhauling
of a product / system wrt contract
schedule

SAX01103

SAX

Implementation of action plan(s)


resulting in % reduction in time cycle

% As defined
under Remarks
Column

SAX01200

SAX

% reduction in response time to


resolve technical/contractual
problem(s)

SAX01201

SAX

Timely analysis/ preparation &


communication of action plan for
resolution of problem(s)

Time Index

SAX

% reduction in number of defects


over previous year in post overhaul
operation resulting in outage during
Defect Liability Period/ as per plan

% As defined
under Remarks
Column

SAX01301

SAX

Timely capture of data for


preparation of action plan(s) to
achieve reduction in number of
defects over previous year

% As defined
under Remarks
Column

SAX01302

SAX

Timely preparation of action plan(s)


for achieving reduction in number of
defects over previous year

Time Index

SAX01303

SAX

Implementation of action plan for


achieving reduction in number of
defects over previous year

% As defined
under Remarks
Column

SAX01400

SAX

% improvement in number of trouble


shooting jobs completed successfully
in first attempt/ wrt previous years

% As defined
under Remarks
Column

SAX01401

SAX

Capture data and submit report(s) in


time for all troubleshooting jobs
attempted in previous year(s)

Time Index

SAX

Timely Review of report and


submission of action plan(s) for
troubleshooting jobs which failed in
first attempt

Time Index

SAX01300

SAX01402

Time Index

SAX01403

SAX

% of trouble shooting jobs completed


successfully in first attempt

% As defined
under Remarks
Column

SAX01500

SAX

% increase in number of customer


complaints resolved over previous
year(s)/ as per plan

% As defined
under Remarks
Column

SAX01501

SAX

Timely collection of data on customer


complaints in previous year(s) and
submit report

Time Index

SAX01502

SAX

Timely evolve action plan(s) for


achieving planned reduction in
customer complaints

Time Index

SAX01503

SAX

Implementation of action plan(s) by


task performer for reduction of
customer complaints

SAX01600

SAX

% improvement in average
resolution time of customer
complaints with respect to previous
year

SAX01601

SAX

Timely collection of data on delayed


resolution of customer complaints in
previous year(s) and submit report(s)

Time Index

SAX01602

SAX

Timely evolve action plan(s) for


achieving improvement in resolution
time of customer complaints

Time Index

SAX01603

SAX

Analysis of problem and


implementation of action plan
by task performer

Time Index

SAX01700

SAX

% adherence to monthly target of


cash collection as per target

% As defined
under Remarks
Column

SAX01701

SAX

Timely raising bills on customer

Time Index

SAX01702

SAX

Timely verification of bills from


customer

Time Index

SAX01703

SAX

Timely cash collection against


verified bills

% As defined
under Remarks
Column

SAX01800

SAX

% reduction in non realisables

% As defined
under Remarks
Column

SAX01801

SAX

Proposal for write off / withdrawals


for closing of non realisables

% As defined
under Remarks
Column

SAX01900

SAX

% improvement in timely processing


of subcontractor bills for set
overhauled/ as per plan

SAX01901

SAX

Timely capture information regarding


time taken in processing of
subcontractor bills from the date of
receipt for the job in previous year(s)
and submit action plan

% As defined
under Remarks
Column

SAX01902

SAX

Implementation of action plan by


task performer for improvement

Time Index

SAX02000

SAX

% reduction in number of reworks to


total number of service jobs
executed in the current year/
compared to previous year as per
plan

% As defined
under Remarks
Column

SAX02001

SAX

Timely compilation of report and


release thereafter of Technical
Instruction to avoid recurrence

% As defined
under Remarks
Column

SAX02002

SAX

Timely preparation of action plan for


reduction in number of reworks to
previous year

Time Index

SAX02003

SAX

Implementation of action plan by


task performer for reduction in
number of reworks as per plan

% As defined
under Remarks
Column

SAX02100

SAX

% improvement in timely availability


of calibrated IMTEs/ T&Ps as per
site execution plan

Time Index

SAX02101

SAX

Timely capture of data on non


availability of calibrated IMTE/T&Ps
at site in previous year(s)

% As defined
under Remarks
Column

SAX02102

SAX

Timely prepare and implement action


plan to ensure 100% availability of
calibrated IMTE/T&P as per site
execution plan

Time Index

SAX02200

SAX

% Reduction in reduntant/
obselete/beyond economic repairs
T&P/IMTE as per plan

% As defined
under Remarks
Column

SAX

Timely audit of T&P/IMTE and


prepare list of reduntant/
obsolete/beyond economic repairs
T&P/IMTE

% As defined
under Remarks
Column

SAX02202

SAX

Timely review the list & submit


proposal for disposal of reduntant/
obselete/beyond economic repairs
T&P/IMTE

% As defined
under Remarks
Column

SAX02203

SAX

Disposal of reduntant/
obselete/beyond economic repairs
T&P/IMTE as plan

% As defined
under Remarks
Column

SAX02300

SAX

Upgradation of T&P/IMTE as per


plan

% As defined
under Remarks
Column

SAX02301

SAX

Submit report on T&P/IMTE for


upgradation in time

% As defined
under Remarks
Column

SAX02201

SAX02302

SAX

Timely review report &


finaliseT&P/IMTE for upgradation &
submit proposal(s)

Time Index

SAX02400

SAX

Procurement of new T&Ps / IMTEs


as per plan

% As defined
under Remarks
Column

SAX02401

SAX

Timely identification and submission


of proposal for procurement of new
T&Ps / IMTEs for procurement

Time Index

SAX02500

SAX

% As defined
under Remarks
Column

SAX02501

SAX

Time Index

SAX02600

SAX

Timely review and release of new


technical instructions/ procedures

Time Index

SAX02601

SAX

Timely identification and preparation


of new technical instructions /
procedures

Time Index

SAX02700

SAX

Timely availability of service / repair


procedures/ drawings/ manuals/ QPs
etc. in deptt

Time Index

SAX02701

SAX

Timely identification and submission


of list of documents not available in
deptt compared to master list(s)

% As defined
under Remarks
Column

SAX02800

SAX

% increase in digitisation of
drawings/documents for servicing as
per plan/target

% As defined
under Remarks
Column

SAX02801

SAX

Timely creation of list of


drawings/documents pending
digitisation

% As defined
under Remarks
Column

Identification of Non-Plan T&Ps/


IMTEs for procurement
Submission of proposals for
procurement of Non-Plan
T&P/IMTE as per plan

SAX

% improvement in time for


submission of "Service Protocols"
over previous year(s) from defined
time as per plan

Time Index

SAX02901

SAX

Timely collection of data on delay in


submission of "Service Protocols"
from defined time in previous year(s)
and submission of action plan

% As defined
under Remarks
Column

SAX02902

SAX

Implementation of action plan by


task performer for improvement as
per plan

Time Index

SAX

% improvement in time for


submission of "Completion Report"
over previous year(s) from defined
time as per plan

Time Index

SAX03001

SAX

Timely collection of data on delay in


submission of Completion reports
from defined time in previous year(s)
and submission of action plan

Time Index

SAX03002

SAX

Implementation of action plan by


task performer for improvement as
per plan

Time Index

SAX03100

SAX

% achievement in no of Systems
undertaken for Improvement as per
plan

% As defined
under Remarks
Column

SAX03101

SAX

Timely identification of systems for


improvement

Time Index

SAX03102

SAX

Timely preparation of action plan for


system improvement

Time Index

SAX02900

SAX03000

SAX03103

SAX

Timely implementation of action plan


for system improvement and
feedback

Time Index

SAX03200

SAX

% reduction in number of financial


audit paras over previous year(s) as
per plan

% As defined
under Remarks
Column

SAX03201

SAX

Preparation of report on issues


involved/ brought out in financial
audit paras in previous year(s) and
submit action plan in time

% As defined
under Remarks
Column

SAX03202

SAX

Implement action plan in time for


reduction in number of financial audit
paras as per plan

% As defined
under Remarks
Column

SAX03300

SAX

% reduction in number of quality


audit paras over previous year as per
plan

% As defined
under Remarks
Column

SAX03301

SAX

Preparation of report on issues


involved/ brought out in quality audit
paras in previous year (s) and submit
action plan for eliminating
recurrence of quality para(s) in time

% As defined
under Remarks
Column

SAX03302

SAX

Implement action plan in time for


reduction in number of quality audit
paras as per plan

% As defined
under Remarks
Column

SAX03400

SAX

Timely review of Quality Systems for


SAS for determining revision
requirement

% As defined
under Remarks
Column

SAX03401

SAX

Timely revision of identified Quality


Systems for SAS

% As defined
under Remarks
Column

SAX03500

SAX

Organising Training of SAS


personnel

% As defined
under Remarks
Column

SAX03501

SAX

Timely identification of training needs


of SAS personnel

% As defined
under Remarks
Column

SAX03502

SAX

Training imparted by task performer


to BHEL/SAS personnel

% As defined
under Remarks
Column

SAX03600

SAX

No of technical articles contributed in


In-house / National / International
journals

% As defined
under Remarks
Column

SAX03700

SAX

Overhauling of sets as per schedule

Number

SAX03800

SAX

No of RLA studies conducted as per


plan

Number

SAX03801

SAX

Timely subcontracting for RLA


studies

Time Index

SAX03802

SAX

Timely conductance of RLA studies

Time Index

SAX03900

SAX

Reply to Govt. Audit queries/


Inspection report paras/ Action Taken
Reports etc. furnished within
specified time (2 weeks)

% As defined
under Remarks
Column

SAX04000

SAX

Reply/settlement of Internal Audit


paras within specified time (4 weeks)

% As defined
under Remarks
Column

SAX04100

SAX

Timely inputs to unit/corporate


finance for inter-unit re-conciliationof
accounts

Time Index

SAX04200

SAX

Timely inputs to unit/corporate


finance for BUDGET/FLASH/MIRs
etc.

Time Index

SAX04300

SAX

Finalisation of Functional scorecard


by specified date

No. of days
delayed from
scheduled date

SAX04400

SAX

SAX04401

SAX

SAX04500

SAX

SAX04600

SAX

SAX04601

SAX

SAX04602

Improvement in Employee
Satisfaction Score
Implementation of Improvement
projects identified in the Position
Report as per schedule
Increase in no. of active Quality
Circles in the deptt.
Achieving Business excellence thru'
TQM at Deptt. level

Score

Time Index

Number

TQM Score

Preparation of action plan based on


Position report

No. of days
delayed from
scheduled date

SAX

Implementation of Improvement
projects identified in the Position
Report as per schedule

Time Index

SAX04700

SAX

Development of Knowledge
management Portal

No. of days
delayed from
scheduled date

SAX04800

SAX

Contributing case studies etc.for


Knowledge Management Portal

Number

SAX04900

SAX

SAX05000

SAX

SAX05100

SAX05200

SAX05300

SAX05400

Time Index

No. of days
delayed from
scheduled date

SAX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

SAX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

SAX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

SAX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days
delayed from
scheduled date

SAX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

SAX

Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

SAX05500

SAX05600

Completion of KM Projects as per


schedule
Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

C
No. of days
delayed from
scheduled date

Balanced
Scorecard Rating
(5/4/3/2/1)

ES FUNCTION KRA MASTER - 2006-07


Special
KRA (Y/N)

Universal Suggested Weightage for


KRA
category
(Y/N)
A
B
C

Budget
Ratio of Current year's
order booking to
Previous year's actual
order booking

Source of Data for


Measurement

Index= (Total no of
action plans accepted /
Total no of action plans
submitted ) X (Total no
of action plans
submitted in time /
Total no of action plans
submitted Best = 1
(L5)/ Worst = 0 (L1)
% = {(No of orders as
per plan - No of orders
received) / No of orders
as per plan)}

Index= (Total no of
action plans accepted /
Total no of action plans
submitted ) X (Total no
of action plans
submitted in time /
Total no of action plans
submitted Best = 1
(L5)/ Worst = 0 (L1)

% = {(No of orders as
per plan - No of orders
received) / No of orders
as per plan)}

% =100 X (New price Old price) / Old price

Ratio of time taken to


defined time

%= (Sum total of
offered prices - Sum
total of received
prices) / Sum total of
offerred prices Note :
for assigned customers

Ratio of Orders
received to Offers
submitted in
competetive bidding

Ratio of number of
analysis accepted on
first submission to Total
numbers submitted

Ratio of Orders
received to Offers
submitted in
competetive bidding
Ratio of number of
customers retained to
number targetted
Ratio of time taken to
defined time
Ratio of time taken to
defined time

I = (No of action plans


delayed in
implementation/ Total
no of action plans
required to be
implemented) X ( Total
delay / Total time as per
norms)
% = (No of days taken
for submission of
techno commercially
correct offer from
enquiry receipt date Defined time) / Defined
time Note** : Offers
resulting in customer
queries related to offer
shall be evaluated
equivalent to L1 in
criteria level

% = (No of days taken


for preparation of
techno commercially
correct offer from
enquiry receipt date Defined time) / Defined
time Note** : Offers
resulting in customer
queries related to offer
shall be evaluated
equivalent to L1 in
criteria level

% = (No of days taken


in review of techno
commercially correct
offer from receipt date Defined time) / Defined
time Note** : Offers
resulting in customer
queries related to offer
shall be evaluated
equivalent to L1 in
criteria level

(TIPrsnt - TIPrvs) /
TIPrvs
TI="Transfer
In" in targetted area

Ratio of No of plans
approved to number of
plans submitted

Sum total of (Target of


reduction assigned Target of reduction
achieved) / Target of
reduction assigned

Index = (No achieved


on or before time / Total
targetted nos) X (Total
achieved time / Total
target time) Note :
Best=1/ Worst=0

% = (No of days taken


for preparation of job
details and estimate
from receipt of
customer's scope of
work - Defined time) /
Defined time Note ** :
Documents returned
with comments after
review will be
considered at L1 level

Sum total of (Target of


reduction assigned Target of reduction
achieved) / Target of
reduction assigned
Note** : Reviewed jobs
which later result in
issues raised by
subcontractor within the
ambit of overall scope /
terms and conditions
etc/ of the contract will
be considered at L1
level

Index= ( Total no of
tenders delayed in
finalization/ Total no of
tenders to be finalised)
x ( Total no of days of
delay/ Total time
planned in days)

Ratio of vendor
performances improved
to Total no of vendors
targetted

I = (No of MOMs
delayed from targetted
time/ Total no of
targetted vendors) X
(Total delay / Total time
as per norms) Best =
0
I = (No of reports
delayed from defined
time/ Total no of
reports) X (Total delay /
Total time as per norms)
Best = 0

% = No of vendors
added toTotal no of
existing vendors

Index=(Time taken /
Defined time) +
(Registration to be
increased as per plan No of new registrations)
/ Registration to be
increased as per plan
Best : 1

Ratio of Reduction in
completion time to
Scheduled time

Ratio of time taken to


defined time

I = ( No of action Plans
delayed/ Total no of
action plans to be
made) x ( Total delay /
Total time as per
Norms)

[Sum total of {(Target of


% reduction to be
achieved - Target of %
reduction achieved) /
Target % reduction to
be achieved}] / Total no
of target product and or
systems assigned
Best= 0
% Reduction of
average response time /
Average response time
of previous year

100 * ( DPrvs DPrsnt) / DPrvs


D=post overhaul defect
Best = 100

Ratio of time taken to


defined time

100 * ( DPrvs DPrsnt) / DPrvs


D=post overhaul defect
Best = 100

(Nos successful in first


attempt) / (Total
attempted numbers )

I = (No of action plans


delayed/ Total no action
plans) X (Total delay /
Total time as per norms)

(Nos successful in first


attempt) / (Total
attempted numbers )

Ratio of No of customer
complaints registered
and resolved in present
year to that of previous
year(s)

I = (No of reports
delayed/ Total no
reports) X (Total delay /
Total time as per norms)

I = (No of action plans


delayed/ Total no action
plans) X (Total delay /
Total time as per norms)

(Customer complain in
current year - Customer
complain in previous
year ) / Customer
complain of previous
year

% = (Previous year
resolution time Present resolution time)
/ (Previous year
resolution time

I = (No of reports
delayed/ Total no
reports) X (Total delay /
Total time as per norms)

I = (No of action plans


delayed/ Total no action
plans) X (Total delay /
Total time as per norms)

I = (No of action plans


delayed in
implementation/ Total
no of plans) X (Total
delay / Total time as per
norms)

Ratio of cash collection


on monthly basis to
Monthly target

I = (No of bills delayed/


Total no of bills raised)
X (Total delay / Total
time as per norms)

I = (No of bill
verifications delayed/
Total no of bills) X (Total
delay / Total time as per
norms)

Ratio of cash collected


on monthly basis to As
assigned on Monthly
basis

(Numbers closed) /
(Number planned)

Ratio of No of
proposals submitted
and got approved to
Total no of proposals
submitted

%= (Average time
last year - average
time in current year )
/ Average time in last
year

Ratio of time taken to


defined time

I = (No of bills delayed/


Total no of bills raised)
X (Total delay / Total
time as per norms)

Ratio of number of
reworks done in the
current year to that of
the previous year

Ratio of time taken to


defined time

I = (No of action plan


preparations delayed/
Total no action plans to
be made) X (Total delay
/ Total time as per
norms)

%= (Sum total of
Assigned nos - Sum
total of achieved nos) /
Sum total of Assigned
nos Best = 0; Worst 1

I = (No of IMTE and


T&P delayed/ Total nos
issued) X (Total delay /
Total time as per norms)

Ratio of time taken to


defined time

I = (No of IMTE and


T&P delayed/ Total nos
issued) X (Total delay /
Total time as per norms)

Ratio of no of T&P
disposed to Total
identified for disposal

Ratio of time taken to


defined time

Ratio of time taken to


defined time

Ratio of no of T&P
disposed to Total
identified for disposal

No upgraded by no
planned

Ratio of time taken to


defined time

I = (No of proposals
delayed/ Total no of
proposals) X (Total
delay / Total time as per
norms)

(Nos procured) / (Nos


planned)
I = (No of T&P/IMTE
proposals submitted/
Total no of proposals as
per plan) X (Total
delay / Total time as per
norms)

No of proposal
submitted to Nos
identified
No of proposal
submitted to No of
proposal planned

I = (No of releases
delayed/ Total no of
instructions released) X
(Total delay / Total time
as per norms)

I = (No of tech
instruction or procedure
preparation delayed /
Total no identified) X
(Total delay / Total time
as per norms)

I = (No of documents
delayed/ Total no of
documents) X (Total
delay / Total time as per
norms)

Ratio of time taken to


defined time

Ratio of no of drawings
or documents digitised
to total no as per plan

Ratio of time taken to


defined time

I = (No of Service
Protocols delayed/
Total no of Service
Protocols) X (Total
delay / Total time as per
norms)

Ratio of time taken to


defined time

I = (No of
implementations
delayed/ Total no of
implementations) X
(Total delay / Total time
as per norms)

I = (No of Completion
reports delayed/ Total
no of Completion
reports) X (Total delay /
Total time as per norms)

I = (No of Completion
reports delayed/ Total
no of Completion
reports) X (Total delay /
Total time as per norms)

I = (No of
implementations
delayed/ Total no of
implementations) X
(Total delay / Total time
as per norms)

(Number achieved) /
(Number planned)

I = (No of systems
identified for
improvement/ Total no
as per plan) X (Total
delay / Total time as per
norms)

I = (No of action plan


preparations delayed/
Total no of action plans
to be prepared) X (Total
delay / Total time as per
norms)

I = (No of action plan


implementation
delayed/ Total no
assigned) X (Total delay
/ Total time as per
norms)

(ParaPrevs ParaCurrent) /
ParaPrevs

Ratio of time taken to


defined time

(ParaPrevs ParaCurrent) /
ParaPrevs

(ParaPrevs ParaCurrent) /
ParaPrevs

Ratio of time taken to


defined time

(ParaPrevs ParaCurrent) /
ParaPrevs

Ratio of time taken to


defined time

Ratio of time taken to


defined time

(Number organised) /
(Number planned)

Ratio of defined time to


time taken for
identification

(Number imparted) /
(Number planned)

Number Contributed /
Number targetted

Nos as per Unit / Deptt


Balanced Score Card

Nos as per Unit / Deptt


Balanced Score Card

I = (No of
subcontracting delayed/
Total no of
subcontracts) X (Total
delay / Total time as per
norms)

I = (No of RLA studies


delayed/ Total no of
RLA studies) X (Total
delay / Total time as per
norms)

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.

Record maintained by
individual/ deptt.

Record maintained by
Unit/Corp. Finance
deptt.

Record maintained by
Unit Head/Unit P&D

Survey Report

Project report

Unit QA/QC

Quality Deptt.

Action plan document

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

Rating declared at year


end by Corporate / Unit
Management

Y
Y

KRA Remarks

This KRA will be taken by Head


of Unit /Function / Department ,
if covered under MAP, and can
be assigned a weightage upto
100%

MAINTENANCE FUNC
KRA ID

Function

KRA Description

MWX00100

MWX

MWX00101

MWX

Implementation of the identified improvement projects as per plan.


Identification of improvement projects/ Formulation of scheme and Monitoring
the progress for timely completion

MWX00102

MWX

Execution of projects as per schedule

MWX

% of modernisation/ up-gradation/ reconditioning/ retrofitting jobs of identified


m/c tools/ equipment/ plant facilities done within specified time, with reverse
engg., manufacture of parts, schedule optimisation using prima vera.

MWX00200

MWX00201

MWX

MWX00202

MWX

Identification of M/c & equipments through RCA / Past performance /


Behaviour for modernisation / up-gradation / reconditioning / retrofitting
projects & documentation there.Formulation of scheme/ getting approval for
implementation of modernisation/ upgradation/ reconditioning/ retrofitting
projects by scheduled date and monitoring for timely completion.
Processing for external support / enquiry/ evaluation of offers and award of
work contract / placement of PO by scheduled date

MWX00300

MWX

Implementation of the identified energy conservation projects including


technological up-gradation and documentation as per plan.

MWX00301

MWX

MWX00302
MWX00303

MWX
MWX

Identification of energy conservation projects and resource management by


scheduled date.
Formulation of scheme and getting approval. Monitoring the progress of
projects for timely completion
Execution of projects.

MWX00400

MWX

Implementation of 5-S technique activities in identified areas by specified


date.

MWX00401

MWX

Identification of areas/ development of plan/ monitoring progress for timely


completion for implementation of 5-S technique by specified date

MWX00402
MWX00500

MWX
MWX

Execution of plan as per schedule.


Savings from Indegenisation/import substitution of spare parts.

MWX00501

MWX

Survey/ identification of possible sources & feasibility study and


documentation of identified parts by specific date

MWX00502

MWX

Initiation of procurement actions by specified date.

MWX00600

MWX

Development & Implementation of special IT initiatives as per plan.

MWX00601

MWX

Identification of key areas where applications are to be developed and


monitor their implementation as per schedule.

MWX00602

MWX

Formulate strategy and coordinate with designated agencies for design and
development of the applications identified by specified date.

MWX00603

MWX

Develop application and ensure implementation by specified date.

MWX00700

MWX

Identification/ development and implementation of facility projects.

MWX00701

MWX

Identification of facility improvement projects/ Formulation of scheme and


monitoring progress as per schedule.

MWX00702
MWX00703

MWX
MWX

Formulation of scheme and getting approval. Monitoring the progress of


projects for timely completion as per schedule.
Execution of projects as per schedule.

MWX00800

MWX

Conceptulisation & implementing the concept of OEE by specific date

MWX00801

MWX

Develop a plan and scheme for the implementation of the OEE on the
identified machines / Plants & Equipment by specified date

MWX00900

MWX

Savings from In-house development & utilisation of rectification techniques for


specialised jobs -( PCBs / modules / drives / servo motors / telephone
exchange / instrumentation etc.)

MWX00901

MWX

Analysis of bottlenecks/ identification and formulation of plans of required


techniques and monitoring for timely completion

MWX00902
MWX00903

MWX
MWX

Identification of the required techniques/ Regular Review and assistance in


execution of the projects as per plan.
Implementation of the projects as per plan.

MWX01000

MWX

Condition Monitoring for identified machine tools/ Service Plants & submission
of report by scheduled date.

MWX01001

MWX

Identification of the deviations and ascertain the required parameters to be


maintained and arrange for the execution by scheduled date.

MWX01002

MWX

Take corrective actions by specific date

% of reconditioning / modification / Overhaul / major repair of Construction


Equipment / mobile cranes/ Vehicles/ Serv. & AC plant / machine / system etc
as per plan. (Reverse engg/ development of spares drawings/ etc)

MWX01100

MWX

MWX01101

MWX

MWX01102

MWX

MWX01200

MWX

Analysis/ identification/ Regular review and coordination for implementation of


reconditioning / retrofitting works and documentation by specific date.
Regular monitoring and coordination to ensure implementation of
reconditioning / retrofitting projects by specified dates.
Increase in Mean Time Between Failure (MTBF) of identified Critical &
Important Plant and Machinery.

MWX01201

MWX

Root cause analysis of breakdowns of identified machines/ corrective &


preventive measures/ resource management and documentation by specified
date

MWX01202
MWX01300

MWX
MWX

Initiate timely corrective & preventive measures & resource management for
execution as per plan.
Savings accrued through various improvement projects.

MWX01301

MWX

Regular review for achieved savings and corrective action as per plan.

MWX01302

MWX

MWX01400

MWX

Monitoring/ arranging for vetting and preparation of statement by specified


date for savings achieved.
% Reduction in consumption of raw materials/ for power & fuel/ and other
consumables per unit of Output (GTO-ED) / Shop turnover

MWX01401

MWX

Review the performance of equipments and consumption of raw materials/


power/ fuel/ and consumables by specified date.

MWX01402

MWX

Generation of awareness for optimal use of plant/ equipment and raw


material for energy conservation.

MWX01403
MWX01500
MWX01501

MWX
MWX
MWX

Regular maint. to avoid leakages and ensuring operation of the plant


efficiently / near rated capacity.
Savings accrued through various energy Conservation projects.
Regular review for achieved savings and corrective action as per plan.

MWX01502
MWX01600
MWX01601

MWX
MWX
MWX

MWX01700
MWX01701
MWX01702

MWX
MWX
MWX

MWX01800

MWX

Monitoring/ arranging for vetting and preparation of statement of savings


achieved by specific date.
Implementation of training plan.
Coordinate for the deputation of concerns for identified training needs.
% of preventive maintenance jobs completed effectively on time ( Machines /
equipment ).
Periodic review of PM schedules and priortise the work on criticality.
Arranging the timely PM completion as per the schedules.
% of preventive maintenance jobs completed on time ( services plant / AC
plant & equipment ).

MWX01801
MWX01802

MWX
MWX

MWX01900

MWX

Periodic review of PM schedules and priortise the work on criticality.


Arranging the timely PM completion as per the schedules.
% of preventive maintenance jobs completed on time (Services / Crane & rail
track).

MWX01901

MWX

Periodic review of PM schedules and priortise the work on criticality.

MWX01902

MWX

MWX02000

MWX

Arranging the timely PM completion as per the schedules.


Reduction in number of NCRs issued due to non compliance of statutory and
other related rules and regulations.

MWX02001
MWX02002
MWX02100
MWX02101

MWX
MWX
MWX
MWX

MWX02102

MWX

MWX02200

MWX

MWX02201

MWX

Time reduction in awarding the work/ after approval from the competent
authority as per plan.
Periodic monitoring for pending proposal. Coordinate with the associated
sections/ Deptt. for resolution of the bottlenecks.

MWX02202

MWX

Initiate action for the timely award of the work. Report generation of the
pending status by specified date.

MWX02300

MWX

% of Maintenance jobs completed as per schedule (like Communication/


Annex / Over Head Elect .Maint / CMWS / FE PROJECTS etc.)

MWX02301

MWX

Periodic review of pendancy of complaints. Management and coordination


with associated agencies.

MWX02302

MWX

Daily review of complaints & resource management & meeting the


requirements at the earliest and documentation. Resolution of complaints
within specified time

MWX02400

MWX

% of Maintenance jobs completed as per schedule (Vent system / AC/


WC/DC etc.)

MWX02401

MWX

MWX02402

MWX

Periodic review of pendancy of complaints. Management and coordination


with associated agencies .
Daily review of complaints & resource management & meeting the
requirements at the earliest and documentation..

MWX02403

MWX

Resolution of complaints within specified time.

Monitoring review and arranging the suitable compliance to resolve the NCR.
Taking corrective and preventive action for resolution/
% achievement of capitalization targets for plant and equipment.
Review of the targeted completions
Take the action for the timely capatilization of the projects. Generation of the
periodic reports.

MWX02500

MWX

% of work contract completed as per schedule


monitoring for pending Work . Coordinate with the associated sections/ Deptt.
for resolution of the bottlenecks.
Initiate action for the timely completion of the work. Report generation of the
pending status

MWX02502

MWX

MWX02503

MWX

MWX02600

MWX

MWX02601

MWX

MWX02602
MWX02603
MWX02700

MWX
MWX
MWX

MWX02701

MWX

% of major maint. jobs ( major overhaul) completed as per target.


Identification of m/c & equipments for major overhauls. Formulation of
scheme/ getting approval for major overhauls by specific date.
Floating of the enquiry/ evaluation of offers and award of work contract / PO
by scheduled date.
Implementation of projects as per plan.
% utilization of allocated budget.
Periodic review of utilisation of the Allocation/ commitments made.
Coordination with the Fin and other Deptt.

MWX02702

MWX

Regular review for pending Work . Coordinate with the associated


agencies/Deptt. for resolution of the bottlenecks for utilisation of the budget.
Report generation of the staus of the utilisation of the budget by specified
date.

MWX02800
MWX02801

MWX
MWX

MWX02802

MWX

Reduction in accidents during erection / commissioning activities / prod. Shop


and other maintenance works by strict adherence to safety provisions.
Review the vulnerable / accident prone areas.
Ensurance of the usage of PPE/ work permit system / generation of the
safety awareness

MWX02803

MWX

Analysis of the past accidents and take precautionary measures to avoid


repetition. Put up analysis by specific date

MWX02900

MWX

% of repair/ modification/ erection/ maintenance of pipe lines & ventilation


system as per schedule.

MWX02901

MWX

Analysis & regular review of maintenance of pipe lines & ventilation system by
specific date

MWX02902

MWX

Daily monitoring maintenance of pipe lines & ventilation system & resource
management for early resolution of breakdowns. coordination with associated
agencies and documentation.

MWX03000
MWX03001

MWX
MWX

% Resolution of complaints as per schedule (Electrical -BM / telecom/ Civil/


gases/AC/WC/DC etc)
Analysis & regular review of complaints

MWX03002

MWX

Resolution of complaints within specified time.

MWX03100
MWX03101

MWX
MWX

MWX03102

MWX

MWX03200
MWX03201

MWX
MWX

MWX03300

MWX

MWX03400

MWX

MWX03401

MWX

MWX03402

MWX

Compliance to statutory rules / acts and regulations in all relevant areas..


Review the status of compliance wrt to rules.
Take corrective action for compliance & status report of compliance
submitted to the higher ups by specified date.
Resolution of NCR's issued with respect to ISO 9001/ ISO 14001 & OHSAS
18001 within specific time.
Taking corrective and preventive action for resolution as per plan
Initiate action for the timely clearance of the bills as per plan. Status
generation for perusal.

% clearance of SRVs/ ACCEPTANCE within specified time.


Periodic review for pending SRVs . Coordinate with the associated sections/
Deptt. for clearing the SRVs.
Report generation of the pending status. Initiate action for the timely
clearance of SRVs
% reduction in downtime of critical AC plant / Cranes / construction equipment
/ mat. handling equipment / Loco engines etc as compared to total productive
time.
Regular review of breakdown and coordination with associated agencies as
per schedule.
Quick resolution of breakdowns and preparation status report as per
schedule.
% completion of reclamation of oils as per plan.
Review the quantity of the oil reclaimed as per plan.
Collection of the oil and sending to the reclamation center.

MWX03500

MWX

MWX03501

MWX

MWX03502
MWX03600
MWX03601
MWX03602

MWX
MWX
MWX
MWX

MWX03700

MWX

MWX03800

MWX

Suggestions generated / received & implemented (create conducive


environment)
% improvement of relevant quality measurement parameters (QTM) from
target

MWX03801
MWX03802
MWX03900

MWX
MWX
MWX

Review and monitoring the QTM index for defined parameters and suggest
course correction by due date.
Activity completion as per plan. Online data generation.
No of machines covered under OEE as per plan

MWX03901

MWX

MWX03902
MWX04000

MWX
MWX

Identify the machines for OEE. Review of the performance by specified date.
Prepare the implementation plan for the identified machines and its
implementation.
% of bills cleared within specified time.

MWX04001

MWX

Periodic review of pending bills. Coordination with other Deptt.as per schedule

MWX04002

MWX

MWX04100

MWX

Resolution of the bottlenecks after consultations with concerned departments.


Reply to Govt. Audit queries/ Inspection report paras/ Action Taken Reports
etc. furnished within specified time (2 weeks)

MWX04200

MWX

Reply/settlement of Internal Audit paras within specified time (4 weeks)

MWX04300

MWX

Timely inputs to unit/corporate finance for inter-unit re-conciliation of accounts

MWX04400

MWX

Timely inputs to unit/corporate finance for BUDGET/FLASH/MIRs etc.

MWX04500
MWX04600

MWX
MWX

MWX04601

MWX

Finalisation of Functional scorecard by specified date


Improvement in Employee Satisfaction Score
Implementation of Improvement projects identified in the Position Report as
per schedule

MWX04700
MWX04800

MWX
MWX

Increase in no. of active Quality Circles in the deptt.


Achieving Business excellence thru' TQM at Deptt. level

MWX04801

MWX

MWX04802
MWX04900
MWX05000
MWX05100

MWX
MWX
MWX
MWX

Preparation of action plan based on Position report


Implementation of Improvement projects identified in the Position Report as
per schedule
Development of Knowledge management Portal
Contributing case studies etc. for Knowledge Management Portal
Completion of KM Projects as per schedule

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX05700

MWX

Implementation of Special Improvement Projects taken under IMPRESS as


per schedule (Registration No. and other details of project to be specified in
the boxes provided against the KRA

MWX05900

MWX

Measurement and monitoring of environmental parameters (stack emissions/


sound levels/ radiation/ etc) and corrective/ preventive actions for sustenance

MWX06000

MWX

Preparation of specifications/ evaluation of offers for all capital items by


specified date

MWX06100

MWX

% increase in turnover from products/services offered to external agencies

MWX05200

MWX05300

MWX05400

MWX05500

MWX05600

MWX06200

MWX

MWX06300

MWX

RLA study of Plant and Machinery (Boilers/ turbines/ generators/ etc) and
corrective actions as per plan
Conducting periodic audits of identified OEE machines/ review of practices
and propose areas of improvement/corrective actions

MWX06400

MWX

Development of Area-wise Action Plan (AAP)/ Departmental action plan


(DAP)/ balance score card within stipulated time

MWX06500

MWX

Develop vendors for outsourcing (selective tie-up) as per plan

MWX06600

MWX

Development/implementation of reward scheme for OEE as per plan

MWX06700

MWX

MWX06800

MWX

Implementation of the identified technology development projects as per plan.


Reduction in Mean Time To Repair (MTTR) of identified Critical & Important
Plant and Machinery.

MWX06801

MWX

Root cause analysis of breakdowns of identified machines and


documentation by specified date.

MWX06802
MWX06900

MWX
MWX

Execution of corrective and preventive measures and documentation by


specified date.
Reduction in % breakdown time of other important machines.

MWX06901

MWX

Analysis & regular review of breakdown of m/cs and documentation by


specified date.

MWX06902

MWX

MWX07000

MWX

MWX07001
MWX07002

MWX
MWX

MWX07100

MWX

Analysis & regular review of breakdown of m/cs and documentation by


specified date.
Quick resolution of breakdowns as per schedule.
% reduction in downtime of Panel AC / oil chillers of CNC machines as
compared to total productive time.

MWX07101

MWX

Regular review of breakdown of ACs /plants / chillers & documentation of


analysis by specified date.

MWX07102

MWX

Quick resolution of breakdowns and preparation status report as per


schedule.

MWX07200

MWX

MWX07300

MWX

Resolution of breakdowns in the specified time.


% reduction in breakdown of CNC / Critical and important machine as per
plan.

Generation of part programs for new components and validation of the


program (Tool path simulation) by specified date
% Availability of DNC networking and associated equipment for networking of
machine tools

MWX07400

MWX

Reduction in % breakdown time for electronic / CNC breakdown on CNC


machines as a % of total productive time.

MWX07401

MWX

Analysis & regular review of breakdown of m/cs and documentation by


specified date.

MWX07402

MWX

reduction in time for resolution of breakdowns.

MWX07500

MWX

Adoption of Eco-friendly Air conditioning & refrigeration system.

MWX07501
MWX07502

MWX
MWX

MWX07600

MWX

MWX07601

MWX

Analysis/ identification/ Regular review the Eco-friendly Air conditioning &


refrigeration system and put up report by specified time.
Implementation of projects.
Generation of power from DG Set / Thermal Power Station as per requirement
to restrict Max. Demand / penalty charge.
Regular review for power generation/ equipment health and raw material as
per plan.

MWX07602

MWX

Upkeep & operation of equipments/ adhering to PM schedules/ timely


procurement actions for raw material & record generation. Adherence to
statuary rules and regulations.

MWX07700

MWX

MWX07701

MWX

Availability of utility services at optimal level (Power generation/ Distribution


and other electrical services etc. )
Regular review of availability of service / plants & coordination with
associated agencies for ensuring the availability of raw material / input.
Quick resolution of breakdowns / repair. Optimum / efficient utilisation of
services & plants. Timely readiness of standby equipments to meet
emergency requirement.
% Reduction in downtime of electrical power supply to production blocks and
other installations.
Analysis & regular review of electrical Power supply to production blocks and
other installations put up report as per schedule.

MWX07702

MWX

MWX07800

MWX

MWX07801

MWX

MWX07802

MWX

MWX07900

MWX

MWX07901

MWX

MWX08000

MWX

Quick resolution of breakdowns..


Reduction in restoration time of TPS / DG set as per plan after planned
shutdown.
Arranging the resources and ensuring scheduled completion within specified
time.
Conducting timely Energy Audits as per statutory requirement and taking
adequate measures to realise planned objectives

MWX08100

MWX

Development of new drawings for damaged parts by reverse engineering as


per mutually agreed plan

MWX08200

MWX

Erection and commissioning of new machines / plant / facilities as per plan.


Documentation of test records/ corrective action for problems faced

MWX08201

MWX

Arranging drawing / foundation detail and other infrastructural facilities


required. Get the layout approval as per schedule

MWX08202

MWX

MWX08300

MWX

Arranging site for machine / plant installation. resource management and


coordination with concerned agencies for timely completion of activities for
timely completion of activities.
% of machines / plant / facilities (old /re-location / up-rooting etc) erected and
commissioned as per plan

MWX08301

MWX

Arranging drawing / foundation detail and other infrastructural facilities


required. Get the layout approval by specified date.

MWX08302

MWX

Arranging site for machine / plant Installation. resource management and


coordination with concerned agencies for completion of activities by specified
date

MWX08400

MWX

Issuance of available drawings within 24 hours

MWX08500

MWX

% adharance to quality of gases with respect to purity and pressure as per


standard norms.

MWX08501

MWX

Arrange samples for testing to ascertain the quality of gases. prepare the
status report. Initiate corrective and preventive action to avoid non-conformity
ascertain the quality of gases.

MWX08600

MWX

MWX08601

MWX

Availability of utility services at max. level of requirement( All Gases / air etc. )
Regular review of availability of service / plants & coordination with
associated agencies for ensuring the availability of raw material / input.

MWX08602

MWX

Quick resolution of breakdowns / repair. Optimum / efficient utilisation of


services & plants. Timely readiness of standby equipments to meet
emergency requirement.

MWX08700

MWX

Ensuring safe operation of boilers/service plants as per statutory requirements

MWX08800

MWX

Achieving 100% calibration of temp. & pressure instruments as per schedule.

MWX08900
MWX09000

MWX
MWX

MWX09001

MWX

Timely calibration of master lab Equipment/ instruments & other associated


accessories.
% availability of all exchanges.
Regular review of breakdown of and Coordination with associated agencies
and documentation as per schedule.

MWX09002
MWX09100

MWX
MWX

Resolution of breakdowns within specified time and preparation status report


% availability of PA systems/FAX machines
Leveling/alignment /machining/ scrapping of CI bed plates in-situ condition as
per plan

MWX09200

MWX

MWX09300

MWX

MWX09301

MWX

Timely issuance & monitoring of monthly/ quarterly PM schedules by given


date.
Arranging the timely issuance of PM the schedules and modify check list/ if
required.

MWX09400

MWX

Development of system for approved contractors list category-wise & valuewise by specified date

MWX09401

MWX

Development of transparent system covering capability/ statuary and


performance of the contractors by specified date

MWX09500

MWX

Development of the system for continuous evaluation of contractor's


performance.

MWX09501

MWX

Development of transparent system for performance evaluation of the


contractors.

MWX09600

MWX

System development for identification of training need within specified time.

MWX09700

MWX

Development/Updation of category-wise & value-wise approved contractors


list for increasing the contractor base.

MWX09701

MWX

MWX09800

MWX

MWX09801

MWX

MWX09900

MWX

Generate section-wise inventory list and analyse it w.r.t. Budget in given time
identify and analyse the slow moving & non moving items by specified date.
Reduction in number of stock-outs for Fast Moving Stock items through auto
indenting system.

MWX09901

MWX

Analyze report and take appropriate action for reduction of stock outs.

MWX09902

MWX

MWX10000

MWX

Identify the stockouts and prepare the analysis of the consumption pattern.
Modify the ordering pattern.
% Reduction in cycle time from Material Purchase Requisition/ Purchase
Indent to PO stage.

MWX10001
MWX10002

MWX
MWX

Periodic monitoring for conversion of PI to PO and generate report by specific


date
Conversion of the material requisition to PI.

Arranging the performance feedback. Analysis and initiate corrective action.


Addition / deletion of the contractor based on analysis.
Optimal maintenance spares inventory as a %age of Gross Block as per
target.

Design of civil foundations for special machines and other structures as per
plan
Upgradation of public utility services with quality standard

MWX10100
MWX10200

MWX
MWX

MWX10201
MWX10202

MWX
MWX

MWX10300

MWX

Identification/ allocation of the resource management by scheduled date


Execution of projects as per plan.
Structural stability analysis & upgradation of structures in the plant and
building as per schedule.

MWX10301

MWX

Identification of competent person / agency and award of work by specified


date.

MWX10302

MWX

Execution & obtain the report for taking corrective action/ if any. and
documentation by specified date

MWX10400

MWX

% of foundation laying jobs through in-house efforts / with external support for
machines completed as per the plan

MWX10401

MWX

Arranging drawing / foundation detail and other infrastructural facilities


required. Get the layout approval as per schedule.

MWX10402

MWX

Arranging site for machine / plant installation. Resource management and


coordination with concerned agencies for timely completion of activities as
scheduled.

MWX10500

MWX

% completion of assigned civil work through in-house efforts / with external


support as per plan ensuring adherence to quality checks .

MWX10501

MWX

Arranging drawing / foundation detail and other infrastructural facilities


required. Get the layout approval as per schedule.

MWX10502
MWX10600

MWX
MWX

Arranging site for machine / plant installation. resource management and


coordination with concerned agencies for timely completion of activities.
Savings by producing manure as per plan.

MWX10700

MWX

Identification & implementation of rain water harvesting projects as per plan.

MWX10800

MWX

Development & implementation of system to prevent roof leakage / building


seepage as per schedule.

MWX10900

MWX

Clean and Green environment by upgrading horticulture activities / tree


plantation (aesthetic improvement).

MWX11000

MWX

Developing system for reduction in no. of reportable accidents w.r.t prev. year.

MWX11001

MWX

Root cause analysis of accidents reports to be put up within specified time.

MWX11002
MWX11100

MWX
MWX

Implementation of corrective and preventive measures as per schedule.


% Reduction in down time of vehicles.

MWX11101

MWX

Analysis & review of breakdown of vehicles documentation as per schedule.

MWX11102

MWX

MWX11200

MWX

Quick resolution of breakdowns.


Assess effectiveness in increase in Mileage (km/litre) on vehicles after
overhauled / reconditioned (Av. of Test drives)

MWX11201

MWX

Analysis of fuel consumption pattern and initiate corrective and preventive


measures as per plan.

MWX11202
MWX11300

MWX
MWX

Initiate corrective & preventive measures/ if required by specific date


% of average availability of vehicles in running condition on monthly basis

MWX11400

MWX

Repair & overhauling of jobs as per agreed plan for motors/ generators / servo
motors / welding set / transformers/ coils etc. as per agreed plan

MWX11500

MWX

MWX11600

MWX

Rewinding jobs done as per norm / agreed plan for motors/ generators / servo
motors / transformers/ coils etc. (by reverse engg and documentation of the
same)
Inspection/testing of lifting tackles (wire rope slings/ etc) and lifting machines
(cranes/ lifts/ etc) as per statutory requirements

MWX11700

MWX

Development of IT initiatives to track machine performance (breakdown


records & repair undertaken etc) and creation of history card.

MWX11701

MWX

Formulation of the scheme & monitor their implementation in stipulated time

MWX11702

MWX

Develop application and implement.

MWX11800

MWX

% achievement of accuracy on the reconditioned machines on all


parameters as per test charts/ agreed norms through system / quality
improvement initiatives.

MWX11801

MWX

Formulation of the accuracy test requirement and initiate corrective action and
documentation.

MWX11802

MWX

Execution of measurements and report generation as per schedule.

MWX11900

MWX

Identification & implementation of Water / oil conservation projects as per


schedule.

MWX11901

MWX

Identification of improvement projects and resource management.

MWX11902

MWX

MWX12000

MWX

Execution of projects as per schedule.


Geometrical/Position accuracy measurement for identified machine tools
through in-house efforts / external support.

MWX12001
MWX12002

MWX
MWX

MWX12100

MWX

MWX12200

MWX

Identification of the deviations and ascertain the required parameters to be


maintained and arrange for the execution.
Measurement of Geometrical accuracies.
% Breakdown time after reconditioning / retrofitting within specified time (6
Months after stabilisation period of 3 months)
No. of non-conformity in the quality of potable / DM water to standards /
norms.

MWX12201
MWX12300
MWX12301

MWX
MWX
MWX

Arrange samples for testing to ascertain the quality of water. prepare the
status report. Initiate Corrective and preventive action to avoid non-conformity.
Tonnage of scrap collection / utilized for reuse.
Identify the unclaimed scraps and despatch for further use.

MWX12400

MWX

Repair of Machine Tool Accessories / portable tools within specified time.

MWX12500

MWX

Improvement in surroundings / aesthetic look of the areas as per plan


(changing look/improving appearance indoor/outdoor).

MWX12600
MWX12700

MWX
MWX

Adherence and compliance to safety norms of gas cylinders/pressure vessels


Manufacture of lifting tackles (wire rope slings) as per requirement

MWX12800

MWX

Accomplishment of targets of Unit/NC/Function/Department level Balance


Score Card

MWX12900
MWX13000

MWX
MWX

Timely inputs to unit/corporate finance for inter-unit re-conciliationof accounts


Contributing case studies etc.for Knowledge Management Portal

NTENANCE FUNCTION KRA MASTER - 2006-07


KRA
Type

Unit of
Measurement

Critical
KRA
(Y/N)

Special
KRA
(Y/N)

Universal
Suggested Weightage for
KRA (Y/N) category
A
B
C

% Completion

% Completion

% Completion

% Completion

Time Index

O
O

Time Index

% Completion

No. of days
delayed from
scheduled date

N
N

N
N

N
N

H
H

H
H

H
H

N
Y

Y
N

N
N

M
X

M
X

H
H

C
O

Time Index

Time Index
No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
Rs.lakhs date
scheduled
No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

O
O

% Completion

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% completion

No. of days
delayed from
scheduled date

N
N

Y
N

N
N

M
X

H
H

H
X

C
O

No. of days
delayed from
scheduled date

Time Index
No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

Savings/ Rs.
Lakhs

No. of days
delayed from
scheduled date

N
N

Y
N

N
N

M
X

H
H

X
X

C
C

No. of days
delayed from
scheduled date

Time Index
No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% Completion

No. of days
delayed from
scheduled date

Time Index

Increase of MTBF
in 'Hrs.

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date
Rs.lakhs

N
Y

Y
N

N
N

H
X

H
H

X
X

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% reduction

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

N
Y
N

N
N
N

N
N
N

X
X
M

H
X
M

X
H
M

N
N
N

Y
N
N

N
N
N

M
X
L

X
M
L

X
X
M

O
O
O

O
O
O

% operational
efficiency
achieved
Kwh
Time Index
No. of days
delayed from
scheduled date
%
%

O
O
O

% completion
Time Index
Time Index

Y
N
N

N
N
N

N
N
N

X
M
M

X
M
X

M
H
X

% completion

O
O

No. of days
delayed from
scheduled date
Time Index

N
N

Y
N

N
N

M
M

M
X

H
X

% completion

No. of days
delayed from
scheduled date

N
N
Y
N

Y
N
N
N

N
N
N
N

M
X
X
M

M
M
X
H

M
X
M
H

No. of days
delayed from
scheduled date

% complaints
resolved in
specified time

O
O

O
O
O
O
O

O
O

Time Index
No. of NCR's
No. of days
delayed from
scheduled date
Time Index
% achievement
Time Index
Time Index
% reduction in
days over last
year
Time Index
No. of days
delayed from
scheduled date
Time Index

Time Index
O

O
O

No. of days
delayed from
scheduled date
Time Index
% complaints
resolved in
specified time

N
N
Y

N
N
N

N
N
N

M
X
X

M
H
X

X
H
H

Y
N

N
N

N
N

X
M

X
M

H
H

No. of days
delayed from
scheduled date

Reduction in
average time to
resolve
breakdowns

Y
N

N
N

N
N

X
M

M
M

X
H

O
O

O
O
O
O
O
O

% completion
Time Index
%

% completion
Time Index
Time Index
Time Index
%
Time Index
Time Index

O
O

% reduction over
last year

Time Index
No. of deviations
reported

No. of days
delayed from
scheduled date
Time Index

O
O

% completion
Time Index
% complaints
resolved in
specified time

O
O

O
O
O
O

% compliance
Time Index
No. of days
delayed from
scheduled date
Time Index
Time Index
%

Y
N

N
N

N
N

X
M

X
H

H
H

Y
N

N
N

N
N

X
M

X
H

H
H

N
N
N
N

N
N
N
N

N
N
N
N

M
X
M
M

X
X
M
X

X
H
X
X

N
N
Y

Y
N
N

N
N
N

M
M
X

H
X
X

H
X
H

N
Y

N
N

N
N

X
M

H
M

X
H

%
O
O
O

O
O
O
O
O
O

Time Index
Time Index

% reduction
Time Index
Time Index
% reclaimed
% reclaimed

%
No. of
suggestion /
employee

% improvement

C
O
O

O
O
O
O
O
O

No. of days
delayed from
scheduled date
Time Index
Number
No. of days
delayed from
scheduled date
Time Index
%
Time Index
% bills not cleared
%

O
O

%
Time Index

Y
Y

Y
N

Y
Y

M
H

L
M

L
L

Time Index
O

O
O
O

No. of days
delayed from
scheduled date
Score
Time Index

O
C

No of new Circles
TQM Score

N
Y

N
N

Y
Y

X
M

M
X

M
X

No. of days
delayed from
scheduled date

Y
Y
N
Y

N
N
N
N

Y
Y
Y
Y

X
X
L
M

M
X
M
M

X
M
H
M

C
O
C
C

Time Index
Time Index
Number

Time Index
No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% compliance

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of new
vendors
developed

No. of days
delayed from
scheduled date

Time Index

Time Index

Reduction of
MTTR in 'Hrs.

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date
% reduction

N
Y

Y
N

N
N

H
X

X
X

X
H

No. of days
delayed from
scheduled date
% resolved in
specified time

% reduction

Time Index

N
N

Y
N

N
N

H
H

H
X

H
X

% reduction

No. of days
delayed from
scheduled date

% reduction in
time over last
year

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date

% reduction

No. of days
delayed from
scheduled date
% reduction over
last year

% completion

Time Index

N
N

Y
N

N
N

M
M

M
X

M
X

Kwh

% reduction in
time over last
year

Reduction in Days

O
O
O
O

No. of days
delayed from
scheduled date

Time Index

% downtime
%

O
O

Time Index
%

O
O
O

O
O

% availability
Time Index

Time Index
Time Index

% completion

% Completion

No. of days
delayed from
scheduled date

% of job
Completed as per
schedule

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

Time Index

%
O

% achievement
%

O
%
O
O

Time Index
%

O
O

No. of deviations
reported

% completion

Y
Y

Y
N

N
N

X
X

M
M

H
M

No. of days
delayed from
scheduled date
C
O
O

%
Time Index

O
O

N
N

N
N

N
N

M
X

X
X

X
H

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

%
%
Time Index

O
O

Time Index

No. of days
delayed from
scheduled date
% Inventory/
gross block

No. of days
delayed from
scheduled date

% reduction

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% reduction

N
N

Y
N

N
N

H
X

H
H

H
X

O
O

No. of days
delayed from
scheduled date
%

O
O

No. of days
delayed from
scheduled date

Y
N

Y
N

N
N

X
H

X
H

H
H

N
N

Y
N

N
N

M
M

M
X

M
X

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% completion

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% completion

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date
Savings/ Rs.

N
N

Y
N

N
N

X
X

M
X

X
H

O
O
O

%
No. of days
delayed from
scheduled date
Time Index
Time Index

%
O

% completion

% completion

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date
% reduction

N
Y

Y
N

N
N

M
X

X
X

X
H

No. of days
delayed from
scheduled date

% reduction in
average
breakdown time

% Improvement

No. of days
delayed from
scheduled date

O
O

No. of days
delayed from
scheduled date
% availability

N
Y

Y
N

N
N

M
X

M
X

H
M

% completion

% completion

% completion

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

% achievement

No. of days
delayed from
scheduled date

Time Index

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

No. of days
delayed from
scheduled date

N
N

Y
N

N
N

M
X

H
H

H
X

N
N
N

N
N
N

N
N
N

X
X
X

M
X
M

M
M
M

Y
N

N
N

N
N

M
M

M
H

H
H

O
O
O
O

Number
No. of days
delayed from
scheduled date
Number
%
Number
Number

O
O
O

Tones
Tones
No. of days
delayed from
scheduled date

O
O
O

No. of areas
%
%
Balanced
Scorecard Rating
(5/4/3/2/1)

C
Time Index
C

Number

Source of Data for


Measurement

KRA Remarks

S (%X * Wx) X - %
Project completedWx
- Average weightage

S (X-Wx)*100/XX Mile stonesWx Milestone not comp.

S (%X * Wx) % X - %
Project completedWx
- Average weightage

As per plan

As per plan

..

S (X-Wx)*100/XX System Developped /


ImlementedWx - Not
comp. / imlemented in
time

S (%X * Wx) %X - %
Project completedWx
- Average weightage

As per plan

As per plan

S (%X * Wx) % X - %
Project completedWx
- Average weightage

As per plan

As per plan

As per plan

As per plan

As per plan

As per plan

As per plan

As per plan

As per plan

S (X-Wx)*100/XX No. of complaintsWx No. of complaints


delayed

S (X-Wx)*100/XX No. of complaintsWx No. of complaints


delayed

S (X-Wx)*100/XX No. of milestonesWx No. of milestones


delayed

As per plan

Audit report from


safety deptt.

S (X-Wx)*100/XX No. of complaintsWx No. of complaints


delayed

S (X-Wx)*100/XX No. of complaintsWx No. of complaints


delayed

As per audit
observation

As per audit
observation

S (X-Wx)*100/XX No. of SRVsWx - No.


of SRVs delayed

As per plan

As per plan

RMX report
As per plan

As per plan

Report generated

Record maintained by
Audit deptt.

Record maintained by
Audit deptt.
Record maintained by
individual/ deptt.
Record maintained by
Unit/Corp. Finance
deptt.
Record maintained by
Unit Head/Unit P&D
Survey Report
Project report
Unit QA/QC
Quality Deptt.

Action plan document


Project report

Project report

Project report

Project report

Project report

Project report

Project report

Project report

As per plan

As per plan

As per plan

As per plan

As per plan

S (X-Wx)*100/XX No. of projectsWx Project not completed

As per plan

S (X-Wx)*100/XX Planned hrs.Wx - Non


available Hrs.

As per plan

S (X-Wx)*100/XX No. of drawings


developped Wx - No.
of delay

S (%X * Wx) %X - %
Project completedWx
- Average weightage

S (X-Wx)*100/XX No. of drawings


issued Wx - No. of
delay
S (X-Wx)*100/XX No. of samplesWx No. of samples below
norms

S (X-Wx)*100/XX Planned hrs.Wx - Non


available Hrs.

S (X-Wx)*100/XX No. of instrument


dueWx - No. of
instruments delayed
S (X-Wx)*100/XX No. of instrumentWx No. of delayed cases
As per plan

On line issuance of
PM schedule & check
lists

As per plan

As per plan

As per plan

As per plan

Stock out as per plan

Deviation from min.


level

As per plan

As per plan

As per plan

S (X-Wx)*100/XX No. of milestonesWx No. of milestones


delayed

S (X-Wx)*100/XX No. of milestonesWx No. of milestones


delayed

As per plan
S (X-Wx)*100/XX No. of projectsWx No. of projects
delayed
S (X-Wx)*100/XX No. of milestonesWx No. of milestones
delayed
S (X-Wx)*100/XX No. of milestonesWx No. of milestones
delayed

As per plan

As per plan

As per test report

As per plan
S (X-Wx)*100/XX No. of jobs.Wx - Job
not completed on due
date.
S (X-Wx)*100/XX No. of jobs.Wx - Job
not completed on due
date.

As per plan

S (X-Wx)*100/XX No. of parametersWx


- No. of deffective
parameters

As per plan

As per plan

Report generated
from sample testing

As per plan
S (X-Wx)*100/XX No. of jobs.Wx - Job
not completed on due
date.
S (X-Wx)*100/XX No. of projectsWx Project not completed

Rating declared at
year end by Corporate
/ Unit Management
This KRA will be taken by Head of Unit /Function / Department , if covered under MAP, and can be ass
Record maintained by
individual/ deptt.

overed under MAP, and can be assigned a weightage upto 100%

LAW / LEGAL FUNCTION KRA M


KRA ID

Function KRA Description

Unit of Measurement

Critical
KRA
(Y/N)

Vetting/drafting of legal documents


O
within specified time
Drafting / vetting of commercial
O
contracts/ legal instruments such as
gurantee bonds/ POAs/ BGs/
undertakings etc. within specified time

% of cases cleared within


scheduled time.
% of cases completed in (7)
days

LWX00102 LWX

Identification of legal issues and


providing applicable case laws within
seven days required for
vetting/drafting of legal documents

% of cases not completed in


(7) days.

LWX00200 LWX

Legal Opinion/Advice Rendered within O


specified time
Analysis of the facts and the
O
determination of issues involved within
specified time

%cases completed in 7days. Y


% of cases completed in 7
days.

LWX00202 LWX

Identification of various applicable


laws inclusive of case laws within
specified time for rendering legal
opinion

% of cases completed in 5
days

LWX00300 LWX

Timely and accurate drafting/vetting of


petitions/ plaints/ applications/ replies/
returns/ written statements/ claim
Identification
of legal issues
and etc.
statements/ rejoinders/
affidavits
providing
laws
which are applicable
time boundcase
as per
required
for finalising
of
directions
the Courts\Tribunals.
Appearingof
before
the Quasi-judicial
petitions/replies etc.
Authorities
Extending adequate assistance to
Management for resolving disputes
through mediation and compromise.
Preparation/updation of database
regarding court cases/legal matters as
per schedule.

% of cases cleared within


scheduled time

% of cases completed in 7
days.

Number of appearances

Number of disputes handled


for resolution.

No. of days delayed from


scheduled date

Monitoring and follow up of Important


Court Cases at Units and providing
necessary
and guidance
Number
of assistance
innovative practices
within
given
frameon the basis of
proposed
fortime
adoption
case laws / new legislation with
Publishing
legal
compendium
as a
reference toofthe
enlisted
areas with
per
by end
of improvise
Feb.
viewschedule
to streamline
and
the
existing
process.
Conducting meetings viz. Board
Meetings/ Annual General Meeting/
Audit
Committee
Meetings/
Investor
Collection
of information
/ documents
Grievance
Committee
Meetings/
pertaining to Agenda for the aforesaid
Share Transfer
Committee
Meetings
by specified
date. Meetings.

Time Index

No. of new practices


proposed

No. of days delayed from


scheduled date
Time Index

Time Index

LWX00100 LWX
LWX00101 LWX

LWX00201 LWX

LWX00301 LWX
LWX00302 LWX
LWX00304 LWX
LWX00400 LWX

LWX00401 LWX
LWX00500 LWX
LWX00600 LWX
LWX00700 LWX
LWX00701 LWX

KRA
Type

LWX00702 LWX

Timely circulation of Notice & Agenda O


for conducting meetings of the Board
of Directors/ Board Level Audit
Committee and Investors /
Shareholders Grievance Committee
as per schedule.

Time Index

LWX00703 LWX

Preparation & issue of Notice calling


the AGM & Annual Report as per
scheduled date

No. of days delayed from


scheduled date

LWX00800 LWX

Timely preparation of minutes of the


meetings of AGM / Board / BLAC /
SGC / STC Committees.

Time Index

LWX00900 LWX

Timely compliance with all related


O
provisions of Companies Act including
filing of statutory returns and forms.

Time Index

LWX00901 LWX

Updation & maintenance of Statutory


Registers and Records

No. of days delayed from


scheduled date

LWX01000 LWX

Compliance with corporate


governance provisions as per SEBI
guidelines

No. of deviations pointed out Y


by authorities

LWX01100 LWX

Timely compliance with listing


agreements with stock exchanges

No. of days delayed from


scheduled date

LWX01200 LWX

Monitoring of shareholder grievances


redressal
Timely compliance with all other
related laws other than Companies
Act.

% grievances redressed/ total Y

% deviations noted

LWX01400 LWX

Timely compliance with provisions of


Depository Laws/ NSDL and CDSL
Business Rules.

Time Index

LWX01500 LWX

Timely appointment of bankers/


printing of dividend warrants and
dispatch of dividend

No. of days delayed from


scheduled date

LWX01300 LWX

LWX01600 LWX

Advising Management on matters


relating to Company Law and other
related laws

LWX01700 LWX

Reply to Govt. Audit queries/


O
Inspection report paras/ Action Taken
Reports etc. furnished within specified
time (2 weeks).

LWX01800 LWX

Reply/settlement of Internal Audit


paras within specified time (4 weeks)

LWX01900 LWX

Development of Knowledge
management Portal
Contributing case studies etc.for
Knowledge Management Portal
Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from


scheduled date
Number

No. of days delayed from


scheduled date

LWX02200 LWX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from


scheduled date

LWX02300 LWX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from


scheduled date

LWX02400 LWX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from


scheduled date

LWX02500 LWX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

No. of days delayed from


scheduled date

LWX02000 LWX
LWX02100 LWX

Score (Assessment by users) Y

LWX02600 LWX

Implementation of Special
Improvement Projects taken under
IMPRESS as per schedule
(Registration No. & other details of
project to be specified in the boxes
provided against the KRA)

LWX02700 LWX

No. of days delayed from


scheduled date

Timely inputs to unit/corporate finance O


for inter-unit re-conciliationof accounts

Time Index

LWX02800 LWX

Timely inputs to unit/corporate finance O


for BUDGET/FLASH/MIRs etc.

Time Index

LWX02900 LWX

Finalisation of Functional scorecard


by specified date
Improvement in Employee
Satisfaction Score

No. of days delayed from


scheduled date
Score

Increase in no. of active Quality


Circles in the deptt.
Achieving Business excellence thru'
TQM at Deptt. level
Implementation of Improvement
projects identified in the Position
Report as per schedule

Number of new circles

TQM Score

Time Index

Preparation of action plan based on


Position report
Accomplishment of targets of
Unit/NC/Function/Department level
Balance Score Card

No. of days delayed from


scheduled date
Balanced Scorecard Rating
(5/4/3/2/1)

LWX03000 LWX

LWX03100 LWX
LWX03200 LWX
LWX03201 LWX

LWX03202 LWX
LWX03300 LWX

LWX03400 LWX

Reply to Govt. Audit queries/


O
Inspection report paras/ Action Taken
Reports etc. furnished within specified
time (2 weeks)

LWX03500 LWX

Completion of KM Projects as per


schedule

Time Index

UNCTION KRA MASTER - 2006-07


Special Universal
Suggested Weightage for
KRA
KRA
category
A
(Y/N)
(Y/N)
B
C

Source of Data for Measurement

Concerned Unit/ Department from


whom references are received
Concerned Unit/ Department from
whom references are received

Concerned Unit/ Department from


whom references are received

Concerned Unit/ Department from


whom references are received
Concerned Unit/ Department from
whom references are received

Concerned Unit/ Department from


whom references are received

Concerned Unit/Department/
advocates engaged.

Concerned Unit/ Department.

Case files

Records of meetings

Concerned Units\Departments.

Completion of assignment

Activity Chart for Meetings in line


with Secretarial Standards &
Companies
Act.
Secretarial Standards
/ provisions
of Companies Act & Listing
Agreement.

Secretarial Standards / provisions


of Companies Act & Listing
Agreement.

21 clear days as per Companies


Act

Within 30 days after the concerned


meeting in compliance with the
statutory provisions provided under
Companies Act.

As per the provisions of


Companies Act

As per the provisions of


Companies Act and SEBI Rules &
Regulations.

Within the stipulated time as per


listing agreement

Provisions of Listing agreement

Listing agreement & SEBI


requirement
Legal provisions

Provisions of Depository Laws and


Business rules of NSDL & CDSL

Provisions of Companies Act &


Listing Agreement

Questionairre to be designed and


feedback taken from Director's &
ED's (at least 10)

Record maintained by individual/


deptt.

Record maintained by Unit/Corp.


Finance deptt.

Record maintained by Unit


Head/Unit P&D
Survey Report

Unit QA/QC

Quality Deptt.

Project report

Action plan document

Rating declared at year end by


Corporate / Unit Management

Record maintained by Audit deptt.

Project report

KRA Remarks

All activities relating


to implementation
of
- companies act
and coordination of
various board level
committees

"1. Forms / Returns


from the Directors.
2. Board / AGM
Resolutions."

To be prepared
based upon
Secretarial records
& factual
information relating
to Board / BLAC
etc.
"a) Forms /
Returns from the
Directors
b) Finance data
from Corporate
Finance
c) Board agenda &
minutes."
RTA is required to
provide the data.
Information from all
the Units / Divisions
/ Departments
RTA is required to
provide the data.
1. Finance dept. in
arranging funds for
distribution of
dividend. 2. RTA
for processing and
despatch of
Dividend Warrants.

Targets to be set as
follows: 100%
cases-L5; 95-99%
cases-L4;85-94%
cases-L3;
Targets to 75-84%
be set as
casesfollows: 100%
L2;<75%cases-L1
cases-L5; 95-99%
cases-L4;85-94%
cases-L3; 75-84%
casesL2;<75%cases-L1

Questionnaire
developed by CQA
to be adopted .

This KRA will be


taken by Head of
Unit /Function /
Department , if
covered under
MAP, and can be
assigned a
weightage upto
100%

You might also like