You are on page 1of 8

Week 1

Work

Description

Studied Invest Karnataka 2016


documents
Online Research to find
additonal Areas Of Intrest

Noted down the areas where new industry


clusters are coming up
Found out some new industrial clusters apart
from the ones in Invest Karnataka 2016
documents

Meeting With KIADB official in


Banglore

Attended the meeting along side Shabbir to


understand the process of gathering information
from officials

FIltering industrial allotment list


obtained from KIADB office
of 3 areas
i)Obadenahalli
ii)Ramanagara
iii)Devanahalli

Projects above a threshold size were looked into


and classified as
i) Production Commenced
ii) Under Construction
iii) No Activities on the ground
Online research done to arrive at preliminary
conclusions

Industrial Site Visit in Mysore


Information about 3 areas
gathered
from KIADB Office Mysore
i)Adakanahally
ii)Kadakola
iii)Kochanahalli

Filterd the newly allotted plots by


i) Project size ii) Industry type.
Visited ground sites of 3 prospects
i) Asian Paint
ii) Cheers Breweries
iii) Parle Agro Foods.

Week 2
District
BANGALORE RURAL

Industrial Area
BENGALURU HARDWARE PARK(Devanahalli)

BANGALORE RURAL

BENGALURU AEROSPACE PARK(Devanahalli)

BANGALORE RURAL

BENGALURU AEROSPACE PARK(Devanahalli)

RAMANAGARA

HAROHALLI II PHASE

RAMANAGARA

HAROHALLI II PHASE

RAMANAGARA

HAROHALLI II PHASE

RAMANAGARA

HAROHALLI II PHASE

Company
SHELL INDIA MARKETS PVT LTD

SITE NUMBER
7-P

TYCO ELECTRONICS CORPN. INDIA P LTD

61-P,62 & 63

HINDUSTAN AERONAUTICS LTD

58-B

ANTHEM BIOSCIENCES PVT LTD

276-P & 277-P

ARMA ENGINEERING PVT LTD

276-P2 & 277-P2

APOTEX PHARMACHEM INDIA PVT LTD

213 & 214-A

SBEE Cables

282 & 283

Industry
Status
TECHNOLOGY CENTRE FOR OIL & GAS Phase 1 Construction complete.
RELATED
Phase 2 constrcution going on
L&T has a dedicated MEP office
CONNECTORS, CABLE ASSEMBLIES &
OTHER ELECTRO

Construction Completed. Cooling towers


intalled on the industrial site

MFG,REPAIR & OVERHAUL OF


AIRCRAFT,ENGINES

No acquistion on ground. Farming still


going on ground

INDL.ENZYMES & BIO


PHARMACEUTICALS

15 bulidings coming up on the site.Many


buildings yet to kick off and some nearing
completion.Construction going on since 2
years.

AUTOMOTIVE PARTS/ALUMINIUM HDPC Construction completed. Plant up and


running since 1 year.Cooling towers
intalled on the industrial site
ACTIVE PHARMACEUTICAL
Land acquired and demarcated.
INGREDIENTS
Construction not started yet on the site

WIRES & CABLES

Land acquired and demarcated.


Construction not started yet on the site

Remarks
L&T has MEP contract there might be a scope if
they subcontract the work.

Name & Contact Designation

Talked with Tyco's Incharge of the facility. He told


Production has not commenced at the facility and
i should contact their head office at the Whitefield
road for any business proposals.
Project yet to kick off

Did visual inspection of site.Scope for MEP with Mr. Naveen current stage of construction .Met with the
9741100435
construction contracters Project Manager on Site
and obtained the contact of site in charge of
Anthem Biosciences
The plant has been up and running since one year
Project yet to kick off

Site in charge for anthem


Biosciences

Project yet to kick off