You are on page 1of 5

DETAILED ESTIMATE

The Deteiled Estimate for the Proposed Construction of Ground Floor & FIRST FLOOR R.C.C
Residential Building , Door No. 89, Ward No.8, Block No. 33, Plot No.HIG 727, Old
R.S.No: 268 ,New R.S.No. 268/1, New Housing Unit, Neelagiri Therkku Thottam Village,
Thanjavur Town, Taluk & District.
S.NO
1

DESCRIPTION OF WORK

QTY

UNITS

1.60

1.60

2.43

24.88

m3

Supplying and filling in foundation and


Basement with clean river sand in layers
of specified thickness well ramed, water and
consolidated watering etc.complete
complying with standard specification.
Column

Earth Work excavation for foundation in all


kinds of soil and full depth as may be directed
expect hard rock requiring blastering inclusive
of shoring, strutting and baling water wherever
necessary refilling the sides of foundation with
excavated earth in layers ,well rammed and
consolidated depositing the surplus earth within
the compound in places within initial leads and
lift and clearing, levelling the site complying
with standard specification.
Column

NO

P.C.C. in 1:5 :10 using 40mm gauge HBG


stone jully for foundation including de-watering
if necessary and laid in layers of specified
thickness complying with standard specification.
Column

1.60

1.60

1.60

1.60

0.23

0.23

2.36
2.36

m3

2.36
2.36

m3

R.C.C. 1:2:4 mix for all columns,


Tie Beam, Lintel Beam, Sunshade, Staircase
Rood slab using 20mm HBG metal including
MS & RTS steel, Centering, shuttering, etc.,
SUB STRUCTURE
Column Base

1.60 1.60

0.30

3.07

Trapezoidal Portion
Column Raising
Tie Beam 9"

4
4
1

1.60 (1.2
0.48 0.30
7.92
0.30

0.23
5.48
0.60

1.10

SUPER STRUCTURE
Roof beam
Roof slab G.F

1
1

7.92
2.44

0.45
0.18

0.82
0.67
10.25

First class brick work in cm 1:5 mix for

0.23
1.52

3.16
1.43

m3

S.NO

DESCRIPTION OF WORK
plinth & super structure using country bricks
of size 19x9x9 cm

NO

Basement Walls Around 9" Thick


Super Structure Toilet Walls Around 9" Thick
Super Structure Head Room Walls Around 9"
Thick
Super Structure Parapet Walls Around 9" Thick

QTY

UNITS

1
1

7.92
7.92

0.23
0.23

0.60
0.90

1.82
1.82

m3
m3

1
1

7.92
0.23
73.88 0.23

3.05
0.90

5.56
16.99
26.19

m3
m3
m2

1
1

2.44
1.98

3.71
3.92
7.63

m2

24.16
24.16
24.16

m2

3.24
-75.71
27.39

m2
m2

24.16
24.16
48.31

m2

0.54
-0.54
47.77

m2
m2

37.07

m2

85.00

m2

132.28

m2

Ceiling plastering with cm 1:3 over theR.C.C


Roof Surface inside the building 12mm thick
Toilet
Head Room

1.52
1.98

Inner wall plastering with cm.1:5 over the


20mm thick.
Toilet
Head Room

1
1

7.92
7.92

3.05
3.05

Deduction
Door (1x1x1)

0.76

2.13

NET WALL PLASTERING


8

Outer wall plastering with cm 1:5 over the brick


wall surface 20mm thick
Walls Allround
Head Room

1
1

7.92
7.92

3.05
3.05

Deduction
Ventilator (1x1x1)

0.90

0.60

NET WALL PLASTERING


9

White washing to the complete building


As per Plastering Quantity
1.00 23.89

10

11

12.18

One Coat Wall Putty & Primer and Application


of walls Including men and materials
As per the Plastering Quantity
Weathering course using Brick jelly lime
concrete over the R.C.C. roof surface
1:3 ratio Over the & Preesed Tiles
Main Building Roof Area

8.68 15.24

S.NO
DESCRIPTION OF WORK
NO
12 Floor finishing with Granite & Heavy parking Tiles
2.44m x 1.53m including Men & Materials using mix 1:4
Ground floor to First Floor Stair Case
Ground floor Parking Tiles
Staircase Granite Flooring
Add for Strutting 15%
13

Wall Tiles cm 1:3 over the building 12mm thick


Toilet
Ground Floor

1
1

1
1

8.68
2.13

2.44
8.68

15.24
6.01

1.52
15.24

14

Provision for Electrical Items

L.S

15

Provision for Plumbing Items Including water


supply arrangements & Sanitary Arrangements

L.S

16

Provision for Ramp & Sump

L.S

17

Provision for Ground Floor & First Floor Gyboard


False Ceiling

L.S

18

Provision for Compound wall & centering items

L.S

19

Provision For Ground Floor & First Floor Glass


Panelling

L.S

20

Provision for Elevation Work

L.S

21

Provision for R.C.C. Water Tank

L.S

22

Provision for Unforseen Items

L.S

2.13
2.13

QTY

UNITS

132.28
12.80
21.76
166.84

m2

7.90
281.76
289.66

m2

ABSTRACT ESTIMATE

The Abstract Estimate for the Proposed Construction of Ground Floor & First Floor R.C.C Residential
Building , Door No. 89, Ward No.8, Block No. 33, Plot No.HIG 727, Old R.S.No: 268 , New R.S.No. 268/1, New
Housing Unit, Neelagiri Therkku Thottam Village, Thanjavur Town, Taluk & District.

Item No

Quantity

Particulars of Item

Per

Rate

24.88

Earth Work Excavation

m3

2520.00

62705.66

2.36

Supplying and Sand filling

m3

2325.00

5475.84

2.36

P.C.C. for Mix 1:5:10

m3

5500.00

12953.60

10.25

R.C.C. of Mix 1:2:4

m3

4800.00

49177.84

26.19

First Class brick work

m3

10000.00

261914.80

7.63

Ceiling Plastering

m2

2000.00

15258.40

27.39

Inner Wall Plastering

m2

2130.00

58348.37

47.77

Outer Wall Plastering

m2

3135.00

149765.22

37.07

Two White Washing

m2

2220.00

82295.40

10

85.00

One Coat Wall Oil paint

m2

1000.00

85000.00

11

132.28

Weathering Course

m2

95.00

12566.90

12

166.84

Flooring Granite & Heavy Tiles

m2

80.00

13347.56

13

289.66

Wall tiles

m2

38.00

11007.19

14

L.S

Provision for Electrical Items and Fittings

45000.00

15

L.S

Provision for Plumbing Items & water Supply &


Sanitary Arrangements

100000.00

16

L.S

Provision for Ramp

Sq.ft

Amount

90000.00

17

L.S

Provision for Ground Floor & First Floor& Staircase


landing Gyboard False Ceiling

Sq.ft

400000.00

18

L.S

Provision for compound wall with centering works

Sq.ft

400000.00

19

L.S.

Provision For Ground Floor & First Floor Glass


Panelling, Staircase Glass handrails

Rft

200000.00

20

L.S.

Provision For Elevation work

Sq.ft

225000.00

21

L.S.

Provision For R.C.C. Water tank & Sump

litr

150000.00

22

L.S

Provision of unforseen item


TOTAL

2222.00
Rs:-

2432038.79
Say
Rs.24,32,000/-

Rupees Twenty Four lakhs Thirty Two Thousands Rupees Only

Date: 03.10.2015
Place: Thanjavur

Engineer: