You are on page 1of 3

Phillip Morris

Quantity Surveyor
Profile:

Key Project Experience:

Self-motivated with
excellent communication
skills, I consider myself to
be a very effective and cooperative team player.

May 2008 May 2009 Balfour Beatty Regional Civil


Engineering

My experience with various


forms of Contracts on
numerous projects has
taught me the importance
of effective management
procedures which will
ultimately ensure
profitability, quality and
client continuity.

Overview: Removal of an existing bridge deck and


replacement with a two-span continuous composite deck of
steel beams/RC slab, approximately 35m long. The works
include demolition, mini-piling, concrete retaining walls,
structural steel, reinforced concrete bridge works, and
concrete repairs.
Contract: NEC3 Main option B
Client: Blaenau County Borough Council
Tender Value: 1.7 million
Final Account: 2.5 million
Project Duration: 52 Weeks
Responsibilities & Achievements: Key responsibilities were
subcontract payments, placing subcontract orders, on site
measurement and record keeping.

Qualifications:
Glamorgan University
CertHE Quantity Surveying
Swansea Metropolitan
University
BA(Hons) Tourism
Management
A Level Physical Education
Advanced AVCE Information
& Communication
Technology
Advanced AVCE Travel &
Tourism
Training:
Various professional body
training courses attended,
from general contract
administration to change
management.
Hobbies
Fishing, Tennis, Football,
Golf, Travel and Reading.

Trainee Quantity Surveyor Foundry Bridge Abertillery


2.5 Million

June 2009 September 2010 Balfour Beatty Regional


Civil Engineering
Assistant Quantity Surveyor M4 Variable Speed Limit
Project 18 Million
Overview: The Project involved the design and construction of
32 MS4 variable message signs, 5 new super span gantries,
refurbishment of 13 existing gantries and associated
technology equipment.
Contract: NEC3 Main Option D
Client: Welsh Assembly Government/Atkins
Tender value: 15 Million
Final Account: 18 Million
Project Duration: 60 Weeks
Responsibilities & Achievements: Key responsibilities were to
be involved in Subcontract management from procurement
through to final accounting. Negotiation and agreement of
variations, Payment claims, on site re-measurement and
assisting in monthly forecasting and cost reporting.
October 2010 August 2011 Balfour Beatty Regional
Civil Engineering
Assistant Quantity Surveyor - M5 Jct 12 Improvements
3.5 Million
Overview: To provide improved Traffic Flow to and from the M5
to Gloucester. Works included a new round-about
configuration, establishment of Traffic Lights & filter lanes,
adaption of slip roads including new road construction,
Phillip Morris CV
Page | 1

Other
D.O.B: 14/05/1984
Phone: (+971)56 5246309

resurfacing & anti skid works and all associated works


including road markings, signage and barrier works.
Contract: Emac Area 2
Client Name: Highways Agency
Contract Value: 3.5 Million
Project Duration: 18.5 Weeks

Email:
morrisio84@gmail.com
Linked in:
https://ae.linkedin.com/in/p
hillip-morris-14440364
Home Address
Apartment 507,
European Building, Canal
Residence, Sports City,
Dubai, UAE
References
Available upon request

Responsibilities & Achievements: Responsibility for all change


management; subcontract management including tender
evaluation and recommendations; management of
subcontract progress claims and change control; Cost
management and reporting to the project board on financial
forecasting. Sole interface with client representatives.
Preparation and involvement of external audit procedure.
September 2011 May 2015 EM Highway Services Ltd
Quantity Surveyor Managing Agent Contract Area 1
Overview: EM Highways provide the Highways Agency with
single-point responsibility for the integrated maintenance,
operation and improvement of the Road Network, mainly the
A30 and A38 trunk roads within Area 1. Schemes range in
value from 500,000 up to 5,000,000 and include Road
Widening, Bridges, Drainage and Geotechnical projects.
Contract: MAC Area 1
Client Name: Highways Agency
Contract Value: 40 million per annum
Project Duration: 5 Years
Responsibilities & Achievements: Undertaking the process of
pricing target costs for the Maintenance and Management of
major Highway network operations and improvement
schemes. Estimating, negotiating prices, identifying and
agreement of varied and additional works, through to the
satisfactory settlement of final accounts. Other duties include
the preparation and management of the appropriate Contract
documents and reporting to Senior Management on a monthly
basis.
May 2015 Present. Overseas AST Construction
Company LLC.
(Dubai, UAE)
Project Quantity Surveyor
Empower District Cooling Project
Overview: Construct, Complete and Maintain the Chilled
Water piping Networks at the Madinat Jumeirah 4, TECOM
Phase 1 and TECOM Phase 2 District Cooling Projects
Contract: FIDIC 1987 with Particular Conditions
Client Name: Emirates Central Cooling System Corporation
(EMPOWER) Contract Value: 46.9 Million AED Remeasureable Project
Project Duration: 7 Months
Madinat Jumeirah Phase IV Road Widening Project
Overview: Widening of Mina Al Salam entrance road to two
lanes from existing one lane entrance, Construction of
Jason Davies CV
Page | 2

additional lane on Main Jumeirah road by removing existing


landscaped area.
Contract: FIDIC 1999 Short Form of Contract with Particular
Conditions
Client Name: Madinat Jumeirah LLC
Contract Value: 4.7 Million AED Lump Sum Project
Project Duration: 3 Months
Responsibilities & Achievements: Coordinating all
management of change/ EOT from initiation/identification
through to negotiation and settlement; Cost management and
reporting to the project board on financial forecasting. Sole
interface with client representatives. Management of
subcontractor progress claims and change control.

Jason Davies CV
Page | 3

You might also like