The Plinth Area Rates for the purpose of preparation of Rough Cost Estimate for
Building Schemes during the year 2011-2012 are approved and furnished in Annexure
I, II, III, IV & V.
Engineers of Building Organisation are requested to adopt the above rates with effect
from
01.12.2011
in the preparation
schemes.
The receipt of ths
circular
its enclosures
may
be
acknowledged.
Encl.: Annexures-I, II, III, IV & V.
~r En'
~-in-Chief (Buildings) &.
Chief Engmeer (General), PWD.
~ief
E eer (uildings), Chennai Region &.
~~\~ T~iChY
,0/,Region, Trichy.
PWD, Madurai Region, Madurai.
:A'
To
(Buildings),
(Buildings),
;t~,
eli,
, :Jc: Velfore,
'
ANNEXURE - I
PLINTH AREA RATES FOR THE YEAR 2011-2012
FOR THE PREPARATION OF ROUGH COST ESTIMATE
,j...I
VlL.
::l
L.0
a.
L.
0c:790
:J
L.
:J
Q)
..c:
"0
L.
"0
III
c:!:
u..
OJ
:Vu::
J715
OJ
OJ
VI
....
05060
O..c:
VI,j...I
:p
Ul:J
:J
I:J
:p
Q)o
:J
VI
,!!!
For works
in Moffusil
u::tj
L.
:J2
~ Erode
4710
775
...
4195
4950
775
Residential
2585
6895
7050
2465
4700
4805
5170
3995
1680
4295
750
2185
2235
4475
7225
6565
6880
2655
1720
7400
4930
5290
Non-Residential
735
O..c:
Q)
u::
a.tj
~tj
Tiruppur
and
a::
...
'2
!:Type
(L
For
a::
Hospital
~
of Coimbatore
Building
~"2
Madurai
andworks In Corporation Limits
In Chennai,
c:
III
2080
1600
1600
(other than corporation
In Trichy, Salem,
(RateFramed
in Rupees per 1 sq.m.)
Note:(1)
(2)
(3)
For the calculation of Roof finishing cost, Plinth area at Ground level
of the building is to be taken.
(4)
For School Buildings - the Super Structure cost will be 80% of Super
Structure cost of Non-Residential Buildings.
(5)
For stilt floor towards Car parking, Garages, Cycle shed, Staircase
Head Rooms etc., - the plinth area rate will be 65% of Super
Structure cost of Non-residential building.
(6)
For basement floor, an extra 25% over the super structure cost of
respective type of building is to be added.
,.
(7)
(8)
(9)
The additional rates allowed in the schedule of rates for works in Jails,
Reserve forests, Hills and other Special tracts etc., shall be added to
the above plinth area rates for works in respective areas.
(10)
For works in the belt area of Chennai City, the plinth area rate
applicable for Chennai City shall be adopted.
(11)
For works in coastal area a rate of Rs.67/m2 over the basic rate as
approved in the table above, (for the total plinth area) shall be added
for providing concrete of higher grade.
(12)
(13)
All the above provisions shall be added only on the basic rates as
approved in the table above.
(14)
PROVISIONSINCLUDED IN FOUNDATIONRATE:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
..
IL
.
l'
(15)
(a)
(b)
(c)
This rate is inclusive of provision for Anti skid ceramic tile flooring
and glazed tile dadooing in Toilets.
(d)
(a)
one sq.m.
In Foundation:-
plinthType
areaofat
at
plinth
area
Rate Ground
in
level
foundation
Rupees per
raft
(Floating
Raft)
For strip
raft
stubapplicable
arrangements
combined
footing
Area
tocolumn
which
2465
1640
415
635
Ground level
npthcase
of
reless
ered)
floor
area
plinth
area
at
plinth
area
attreatment
plinth
area
plinth
area
atat
in level
additional
340 Rate
0.3m
extra
160
330
Ground
level
Ground
For
Anti-termite
Rupees
per
Type
of
foundation
for
every
one
every
Pile
Foundation
every
additional
floor
over
For
every
additional
0.3
m
depth
Ground
level
Area
to
wh
ich
245 applicable
Ground
level
10045
70 at
155
7380
5745
Respective
plinth area
plinth area at
Ground
level
pile
foundation
towards
Deduct
extra
forrate
every
oneout,
Note: If (e)
bored
cast
insitu
piles
are
proposed
extraBentonite
10% overetc.
the
(a)
Upto
4
storeys
for
aworked
depth
of add
one. sq.m.
(b)
IN SUPER STRUCTURE:-
Buildings
the
SI.NoNon-residential
be
to
than
initial
over
Rate
&
600
x every
600Rs.1350/m2
In1Residential
Rs.1210/m2
NILof work
Rs.565/m2
Description
Rs.310/m2
For
additional
m
Flooring:(Actual
area
of
Rs.140/m2
Buildings
Rs.785/m2
Rs.925/m2
Rs.565/m2
RS.425/m2
In6 Hospital
less
less
than
305
x
305
x
mm
Ceramic
tiles (not
(ii) (c)
(e)
Marble
(not less
(d) height
Marble(White)
(macrona)
(not
,.
(f)
(iv)
Rs.640/m2
Rs.1350/m2
Rs.925/m2
Rs.785/m2
Rs.360/m2
Rs.995/m2
Rs.570/m2
Rs.1065/m2
. Rs.360/m2
Not recommended
one sq.m.
psum
orated board
ated Gypsum
(2)
ANNEXURE - II
OPTIONAL ITEMS
Wall
Ceiling
area25mm
proposed
Rate
in etc.,
board
board
1065
thick
without
area
with
with
925
Wall
below
A.C.
False
Rupees
per Sections
proposed
Description
ofG.I.
work
Gypsum
Wall
Panelling
using
G.I.Channel
Ceiling
area
proposed
Ceiling
area
proposed
panelling
False
ceiling
using
Channel
plain
ceiling
panelling
Area
toWall
which
855
applicable
1280
1065 Sectionsetc.,
1175
proposed
25mm
thick
below ifR.C.C.
50mm
sections
etc., board)
(if
proposed):Gypsum
(with
Gypsum
proposed:(a)
(i)
Glass
woolwith plain
(b) Without
Wall
panelling
board
using
G.!.wool
channel
(iii)
with
Glass
for Eng~r-iq-Chief
(Buildings) &.
,Chief Engineer (Buildings), Chennai Region
\0
~.'
&.
ANNEXURE - III
ELECTRICAL, WATER SUPPLY AND SANITARY ITEMS OF WORKS
SI.No.
Description
(1)
Rate in
Rupees per
one sq.m.
of work
Area to which
applicable
3820
(b)
rs)
rs)
I
as
Note:
Rate
Rs.31.80
Rs.19.10 lakhs
room,
etc.,
are
not
included
in
the
above
rates.
2.
(iii)
1. Rates
Provision
are
for
inclusive
civil works
of service
such connection
as, construction
charges
of transformer,
payable to TNEB.
MV panel
(ii)
With transformer
transformer
500
(i)
With
upto
250
lakhs
of work
High upto
Tension Supply:-
Rs.10.18 lakhs
Rs.11.45 lakhs
RS.13.97Iakhs
Rs.22.94 lakhs
Note:
1. Cost 'of construction
Rs.11.45 lakhs
RS.13.97Iakhs
not included in the above rates.
6)
(7)
(8)
(9)
Rs.3.83 lakhs
Rs.19.10 lakhs
Rs.2.52 lakhs
Rs.1.26 lakhs
Type of
Buildings3
320
Residential
Non&
245
320630
555
405
Water
Internal
Hospital
(10) Electrical
Supply,
Sanitary
Arrangements
Arrangements
Arrangements
Rate inArrangements
rupees per one sq.m.
Water Supply
Sanitary
Electrical
New
New
campus
campus
Within
campus
campus
Within
existing
Electrical
existing
420
155
475
85
245
Non215
&Within
Residential245
(11)Electrical
External
Water
existing
Arrangements
Sanitary
well
well
Arrangements
Hospital
well
Supply,
Sanitary
developed
developed
area
basis.
towards
external
water
supply
and
arrangements.
provision
towards
external
electrification
arrangements.
floor area
area
alone
be taken
into account,
for provision
making
respective
floor
alone
shallshall
be sanitary
taken
into
account
for making
te in rupees per one sq.m.
3
1.
above upper
rate
is
applicable
only
for
ground
and
first
floors
on
plinth
2.
3. The
For every
floor
over
the
basic
ground
and
first
floor,
50%
20%
of
Water SupplV
10
ANNEXURE - IV
OTHER PROVISIONS
51.No.
the
b
enorms
Rate
to
is
For
with
from
level
Provision
on
1.50m
made
of
! the
Description
ofwall
work
Pavement
alround
the beam,
building
prestigious
Rs.24,650!Heritage
Not
exceeding
total
Rs.2055!
Advertisement
Construction
ofCharges
compound
to
a work
normal
ground
Rs.1410!
Soil
investigation
(minimum)
With
stub
column,
plinth
etc.,
load
bearing
foundation
with
brick
in 1% of
Finishing
Elevation
Rs.1200!
RM.
Rs.405!
Rs.750!
sq.m.
RM.
Approach
Road
11
00
lakhs and above
unction
ontingencies
Non-Residential (12)
(7)
works
Labour
Welfare
Fund
forWater
Provision
can
be
for laying
Price
Clause
completion
Rs.9,850jUnforseen
Items,
Petty
Supervision
To
be %
made
only forcost
works
@
2.5
5.0
Per
ONE
year
ofincluded
period
of
costing
over
Rs.l0.00
lakhs
3.0
0.3
1.5
of pit
building
Rain
Harvesting
Provision
for
Lawn
(optional)
foundation
stone
at
Rs.13,000j(Rs.3,OOOj+ Rs.l0,OOOj-)
(a) Residential
12
,..
....
,.
ANNEXURE
- V
MOFFUSIL
COIMBAORE
VELLORE,
TRICHY, SALEM,
7570
9090
5680
5285
5310
8680
7960
8340
7220
NON
7580
4630
RESIDENTIAL
7225
5170
5420
5055
HOSPITAL
3610
5050
3780
4510
4725
6895
RESIDENTIAL
5935
6220
5960
5040
5570
6565
5320
7935
r?
6880
5060
4815
8270
5410
3445
7580
4930
7220
6565
7220
5655
4805
4590
4295
Type
of
building
TIRUNELVELI
HUKUDI
CTS
&.
DISTRICTS
DE,
CHENNAI,
&.
TIRUPPUR
MADURAI,
TE(a)
IN RUPEES
PER
1 SQ.M.
FOR
EVERY
FLOOR
(a)
Load
bearing
(upto
G
+mofussil
1.
For
calculating
the
rates, the
respective
floor area has to be considered.
bearinq
(upto
GG
+
percentage
over
the
rate
is to be qiven.
(i)
upto
two
Floors
(i)
(a)Load
Load
bearing
(upto
+2)
2)
woks in special tracts like Jails, reserve forest, hill areas etc., the respective
--- - -2.- For
-
i)
:Ii
( ,"-lIIe
\V
\1\
nf'
(J"/
/~~
13
,\
extra
"