WORK PROCEDURE
FOR
WELDING OF FIRE WATER PIPELINE
PROJECT
PROCEDURE NO
: INDCON-PJPL-STN-MECH-WPS-06
OWNER
CONTRACTOR
00
12.11.07
Rev. No
Date
Submitted for
approval
description
Ajit
Amit
Prepared Checked
by
by
GSB
Approved
by
Approved by
IOCL
INDEX
Sl. No.
Description
Page No.
Purpose
03
Scope
03
References
03
List of Equipments
03
5
6
03
04 - 05
05
05
Documentation
05
10
06
11
07 08
12
09 10
2.0
3.0
PURPOSE
This procedure describes the steps to be followed for Qualification of WPS and PQR
of station piping.
SCOPE
This scope covers the work method for Qualification of WPS and PQR of fire water
pipeline to be used for Panipat Jalandhar LP Gas Pipeline Project.
REFERENCES
Following documents in totality or in part shall form the reference documents:
1. IOCL Specification
2. ASME Sec-IX - Qualification Standard for Welding Procedure
(Latest edition)
4.0
LIST OF EQUIPMENTS
Following equipments/instruments are to be used during welder qualification:
a. Welding Machine.
b. Grinding Machine.
c. Buffing Machine.
d. Tong tester.
e. Stop watch
5.0
a.
Before the fit up, pipe shall be checked for correct thickness, free from pitting
and dent, etc. Bevel ends shall be visually checked and repairing is carried out
as mentioned below.
a.
b.
c.
b.
Before fit-up, pipe ends inside / outside shall be cleaned by power wire brush
at least for one inch so that the welds are free from rust, paint and other foreign
matters.
c.
If any laminations, split ends or any other manufacturing defects in the pipe be
discovered, the length of the pipe shall be cut to the extent required with the
knowledge of IOCL site engineer & fresh bevel is to be prepared subjected to
100% LPT and visual inspection of a joint record shall be generated.
d.
e.
After alignment & fit up, pre heating shall be carried out (minimum 100
degree C) and the same shall be checked with thermo chalks / temperature
indicating pyrometer before starting the root run.
f.
Earthing clamps used for welding return circuit shall only be placed on bevel
area or circumferential welds.
g.
After completing every pass, the same shall be cleaned / flattened by grinding
and power brushing.
h.
Electrode starting & finishing points shall be staggered from pass to pass.
Interruption between first pass to second pass and to third pass shall be as per
the approved WPS. After completion of the third pass welding may be
suspended if required, so as to allow the weld joint to cool down provided the
thickness of the weld metal deposited shall be 50% of the pipe thickness or
minimum of 03 passes whichever is more. Upon restarting the welding preheating shall be carried out.
Welders shall be qualified as per the approved WPS and all the welders
should have identity cards duly signed by Indcon & IOCL.
j.
After completion of welding visual inspection shall be done and all the
surface defects shall be removed as per the specification. NDT shall be
carried out as per the approved NDT procedures. Repairs shall be done as per
approved WPS and if required it shall be tested for NDT.
7.
8.
9.
DOCUMENTATION
-
Note:
In case of conflict between the requirements of this procedure and that of the above
referred specifications the requirements of the latter shall govern, until and unless
specific intention is meant.
Client
Revision : 00
Date: 12 th Nov. 2007
Sl. No
Activity Description
Frequency of Inspt/Testing
Inspection category
INDCON
IOCL
At the Beginning
AP
Approval of WPS
Safety
Throughout
Legend
P
: Perform ,
RM : Random,
W
: Review Documents ,
AP : Approval,
: Witness,
For IOCL
Name:
Sign:
Name:
Sign:
Date:
Date:
Company name
Welding Procedure
Welding PQR No.
Welding Process
JOINT (QW-402)
Joint Design : As per fabrication drawing
Backing
: Without backing
Backing material : Weld metal
Retainers : Not required
64 deg + 2 deg
6.01 mm
1.
150 mm
1.5mm + 0.8mm
Approx 3-4mm
Any
TO
SA 106 Gr. B
P No.: 1
5.1
E 6010 & E 7018
4
1
2.5mm / 3.15mm
Maximum 32 mm
All
None
POSITIONS ( QW 405)
Position(s) of Groove
Welding Progression
Position of Fillet
All
Uphill (Vertical)
All
PREHEAT ( QW 406 )
Preheat Temp. Min.
Interpass Temp. Max.
Preheat Maintenance
50 C
250 C
Not Required
GAS ( QW 408 )
Percent Composition
Gas(es)
Mixture
Flowrate
Shielding N/A
N/A
N/A
Trailing
N/A
N/A
N/A
Backing
N/A
N/A
N/A
EP
See table
Not Applicable
Not Applicable
Not Applicable
TECHNIQUE ( QW 410 )
String OR Weave Bead
Orifice or Gas Cup Size
Initial & Interpass Cleaning
Method of Back Gouging
Oscillation
Electrode Spacing
Multiple or Single Pass ( Per Side )
Multiple or Single Electrodes
Travel Speed
Peening
Table :
Weld Layers
Root Run
1st Run
2nd Run
3rd Run
Class
Dia.
E 6010
E 7018
E 7018
E 7018
2.5 mm
3.15mm
3.15mm
3.15mm
CURRENT
Type
Amp.
Polar Range
EP
70-95
EP
100-120
EP
100-120
EP
100-120
Volt
Range
20-24
22-24
22-25
22-25
Travel
Speed
Range
-----
SMAW
E 7018
3.15 mm
EP
100-120
22-25
--
2nd Run
SMAW
E 7018
3.15 mm
EP
100-120
22-25
--
NOTE:
This welding procedure can be used where impact tests are not required.
APPROVED BY
JOINTS ( QW 402 )
6.01 mm
150 mm
1.5mm + 0.8mm
Approx 3-4mm
P No.
6.01 mm
DN 100
----
SMAW
SFA Specification
5.1
AWS Classification
E 6010 & E-7018
Filler Metal F No.
4
Weld Metal Analysis A No.
1
Size Of Filler Metal
2.5, 3.15 mm
Other (Electrode trade name)
Weld Metal Thickness
6.02 mm
POSITION (QW 405 )
Position of Groove
Weld Progression
Other
6G
Uphill
--
PREHEAT ( QW 406 )
Preheat Temperature (Min.)
16 C
250 C
-
Shielding
Trailing
Backing
Percent Composition
Gas
Mixture
Flow rate
NA
NA
NA
NA
NA
NA
NA
NA
NA
Current
DC
Polarity
EP-SMAW
Amps
80 160
Volt
10-24
Tungsten Electrode Size -Other
-TECHNIQUE ( QW 410 )
Travel Speed
String or Weave Bead
Oscillation
Multi pass or Single
pass (per side)
Single or Multiple
Electrodes
Other
60 90 mm / Min.
Root string, balance weave
Not applicable.
Multiple. No single pass is
greater than 13 mm
Single
-
Width
( mm )
Thickness
( mm )
Area
( mm )
Ultimate
Total Load
(Newton)
Ultimate
Tensile
Strength
(MPa)
PQR NO. 06
Date : 12.11.2007
Type of Failure &
Location
T1
T2
Result
Notch
Location
Specimen
Size
Test
Temp.
Impact Values
Joules
1
2
Comments :
Yes
N/A
No
Macro Results
OTHER TESTS
Type of Test
Mils
N/A
Shear
Penetration into
Parent Metal
Yes
No
N/A
Radiography
Visual inspection -
Welders Name
Test Conducted By
Clock No.
Stamp No.
Laboratory Test Report No.:
We certify that the statement in this record are correct and that the test welds were prepared, welded, and tested in
accordance with the requirements of Section IX of the ASME Boiler & Pressure Vessel Code.
Manufacturer: INDCON PROJECTS & EQUIPMENT LTD.
INSPECTION AGENCY