Owner / Client
WBSETCL
Scope of Work
Type of Survey
Instrument &
Software tools used
Schedule
Time of
Year of
Completio Completion
n
3 months
2010
2010
Locations.
Route Alignment using Low
resolution Satellite Imagery for
510Km length.
Detailed Survey Using GPS, Total
Work Station, Digital Theodolites,
Survey Work for 765KV/400KV
profiling etc.
Transmission Line from Jabalpur Reliance Infrastructure Digitized Contouring at undulated
Bhopal - Indore
/ hilly locations.
Soil Resistivity measurement
Detailed Soil Investigation for
Normal and River Crossing
Locations.
Karnali Transmission
Company Ltd GMR
Marsyangdi
transmision co. (p) ltd
GMR
2.5 months
4 months
2010
2010
In Progress
Wardha Power
Company Limited
2 months
2010
2010
Locations.
Detailed Survey of Transmission PowerGrid Corporation
Lines associated with NR
of India Ltd, / SPIC
Strengthening scheme using
SMO
modern Techniques like Satellite
Imageries, Total Stations, GPS etc
3 Months
2010
Preliminary Survey of
REC Project / Reliance
Transmission Lines in the State of Power Transmission
Madhyapradesh using modern
Techniques like Satellite
Imageries, Total Stations, GPS etc
3 Months
2010
6 Months
2010
PowerGrid Corporation
of India Ltd / Electrical
Manufacturing
Company Ltd
6 Months
2009-10
6 Months
2009
Locations
Detailed Survey and Soil
PowerGrid Corporation
Investigation by using Modern
of India Ltd,
Survey Techniques like Satellite
Imageries, Total Stations, GPS etc.
of Transmission Lines associated
with Comprehensive Scheme for
Transmission System
Strengthening in NER under
Package - 7
6 Months
2009
6 Months
2008
6 Months
2008
profiling etc.
ERDAS Imagine, PLS
Digitized Contouring at undulated CADD.
/ hilly locations.
Soil Resistivity measurement
Detailed Soil Investigation for
Normal and River Crossing
Locations.
6 Months
2007
3 Months
2007
Maharastra State
Electricity
Transmission Company
Ltd.
4 Months
2006
6 Months
2006
3 Months
2006
Station, Geo-office,
Survey Office,
AutoCAD Civil 3D,
Gram ++ (IIT Bombay),
ERDAS, PLS CADD.
3 Months
2006