Project
Owner
Conntractor

C
D
E
F
M/S Indcon Projects & Equipment Ltd.

Job Procedure No. IPEL-PJPL-ST-CIVIL-07


:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
:I.O.C.L.
: M/s Indcon Projects & Equipment Ltd.

Job Procedure For :


Brick Masonry
NO: IPEL-PJPL-ST-CIVIL-07

43
0
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

Rev. No.

Reviewed &
approved by IOCL

Index
Sl. No.

Description

1
2
3
4
5
6
7
8

Page No.

Purpose
3
Scope
3
Controling Specficatio
3
Matertials
3
Procedure
4
Inspecition
4
ITP
IPEL-PJPL-ST-CIVIL-ITP-05 (Enclosed)
Formats
IPEL-PJPL-ST-CIVIL-FM-08 (Enclosed)

Purpose
The purpose of this procedure is to prepare the sequential system control on
the Brickworks to ensure that proper quality control is exercised at site to
achieve the desired product .

83
84

For
review &
12.11.03 Approval
Descriptio Prepared Checked Approved
Date
n
by IPEL
by IPEL
by IPEL

Scope

85
86

A.

All brick work will conform to Contract


specification PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV,
IS 1077-1976, IS - 2212 and AFC drawings.
Equipment Mixer machine .
Materials
All the materials will be tested as per relevant I.S. Codes.
Bricks:

B.

Bricks should beof class specified in schedule of rates & AFC drawing. It shall
meet the properties of the respective class specified in IS 1077.
Cement:

87
88
89
90
91
92
93

4
4

94
95

Unless otherwise specified cement will be ordinary portland cement


conforming to IS-269. Cement will be stored in godowns at site to protect from
dampness and will be made easily accessible for proper inspection and
accounting. MTC will be produced with every batch of cement.

96
97
98
99
100

C.

Sand:

D.

Sand used for the preparation of mortar will conform to contract


specification PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV
& IS 383.
Water:

Water used for masonry mortar will be clean and free from injurious amounts
of deleterious materials & conforming to IS-456.
Procedures:

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

This procedure covers supervision and method of record keeping of all brickwork
Reference-

Brick work will be as per approved construction drawings and


specification.Brick work will be done in cement mortar of specified and the
bricks will be soaked for at least 6 hours in water before use. The mortar shall
be used before it shows any signs of setting or stiffening. The mixing
operation will be carried out on a water tight platform. Cement and sand will
be mixed dry in required proportions to obtain a uniform colour. The required
quantity of water will then be added and the mortar mixed to produce a
workable consistency. Only as much quantity of cement mortar as would be
sufficient for 30 minutes of work will be mixed at a time.
Brick work shall be done in English bond with frog upwards unless otherwise
specified. No broken brick shall be used except at closures. Brick work shall
conform to IS-2212. The courses shall be truly horizontal and the work shall
be strictly in plumb.The mortar joints will not exceed a thickness of 10 mm
except where extra thickness is required for the purpose of bringing the brick
work to the required height or level or for making both faces even. The brick
work shall not be raised by more than 14 courses per day. Masonry will be
kept continuously wet while under construction and for a minimum period of
10 days after completion. Curing shall be continued twice a day for one month
after completion.

120

121
122
123
124
125
126
127
128
129
130
131

132

133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158

Construction of wall will be carried out regular and level course through out
their entire length and no portion of work shall be 0.90 meter lower than the
other. All cross walls, buttresses, counterforts and steps etc shalll be built up,
course by course, with the main walls embeded into them. Where such
bonding is not possible necessary grooves or toothing will be left in the brick
work for subsequent bonding.No mortar shall be allowed to stick to the
surface. The surface shall be rubbed down with brushes if necessary and
thoroughly washed. The joints in faces which are to be plastered or pointed be
raked out while the broken mortar is green and scaffolding shall be strong and
stiff.Holes left in brickwork to take the putlogs shall be properly bricked up
before plastering or pointing is done. Put logs holes shall not under any
circumstances be allowed in pillers and load bearing walls. Half brick work will
be reinforced with two numbers 6 mm dia. MS bars provided at every fourth
course with proper lapping as and when required.Continuous re-bars shall
have an overlapping length of 200 mm at every joint.
DPC:
The Damp Proof Course shall be laid at plinth level of masonry walls, flush
with the floor surface. The level of the surface of the plinth shall be checked
longitudinally & transversely. The last course of brick below damp proof
course shall be lid with frogs down-ward. D.P.C. Shall consist of plain cement
concrete of nominal mix 1:2:4 (1-cement: 2 coarse sand :3 crushed stone
aggregate) by volume with 10 mm and down sized graded aggregates.Side
form of wooden battens of 40 mm thickness shall be fixed on both sides to
confine the concrete so that the shuttering does not get disturbed during
compaction and leak through. The inner edge of the shuttering shall be oiled
to prevent concrete adhering to it. The surface shall be cleaned and the
masonry shall be wetted before concrete is laid. D.P.C. Shall be laid
in thickness 40 mm without any joints. If joints are unavoidable, it shall be
given at a place where DPC is to be discontinued such as sills of doors or
openings. A coat of hot bitumen of grade 80/100 conforming to IS-73 shall be
applied @ 1.5 kg/sqm over the dried up surface of cement concrete. A even
layer of coarse sand shall be spread over hot bitumen @ 0.75 kg/sqm.
6 Inspection:
No. of samples of bricks to be taken for testing shall be as per requirement of
IS-5454 and tested for compressive strength , water absorption etc. Bricks will
be checked for correct shapeand size. Brickwork will be checked for true line ,
level and joint. Cement, mortar used for brick work will be checked for correct
proportion.
7 Documentation:
ITP
IPEL-PJPL-ST-CIVIL-ITP-05
FORMATS:IPEL-PJPL-ST-CIVIL-FM-08

NOTE:

In case of any conflict between this procedure and contract


specification the later shall govern.

159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178

ITP07
A
1
2
3
4
5
6

B
C
D
E
F
G
M/S Indcon Projects & Equipment Ltd.
Inspection & Test Plan for Brick Masonary Works
Project:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Conntractor
M/S Indcon Projects & Equipment Ltd.

7
S.No
8
9

Quality of bricks

2
3

Cement mortar
proportioning Applying of water
proofing compound.
DPC

10
11

Activity Description

Records
Verificati
to be
Inspectio
on by
Submitte
n by IPEL TECPL d by IPEL
W
R Lab test report.

W
W

RM
RM

IPEL-PJPL-ST-CIVIL-FM-08

12
4
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

5
6
7
8

Check for bond / closures


thickness of joints and
masonary.
Lines, levels, and plumb in
brickwork
Raking of joints, keys in
brickwork
Curing
Check for Reinforcement, if appli
W - Witness
RM - Random
R - Review Documents

0
42
Rev. No.

RM

RM

W
W
W

RM
RM

IPEL-PJPL-ST-CIVIL-FM-08

For
review &
Approval

41

43
44

Date

Reviewed
&
Descriptio Prepared Checked Approved approved
n
by IPEL
by IPEL
by IPEL by IOCL
No. IPEL-PJPL-ST-CIVIL-ITP-07

FM08
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

B
C
D
E
F
G
H
M/S Indcon Projects & Equipment Ltd.
QUALITY ASSURANCE CARD FOR BRICKWORK
Project:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Contractor
M/S Indcon Projects & Equipment Ltd.
REPORT NO:
DATE:

STRUCTURE:
DRAWING NO.
TYPE OF BRICK:
MORTAR RATIO:

Sl. No.DESCRIPTIONLENGTH
1 BRICKWORK

LOCATION:
DATE:
BOTTOM LEVEL:
TOP LEVEL:

HEIGHT THICKNESS

QUANTITY

REMARKS

2 D. P. C.

The work at the above location was checked and found to be in accordance with relevant drawings
and specifications of the contractor.

IPEL

IOCL

IPEL-PJPL-ST-CIVIL-FM-08

44

FM09
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

B
C
D
E
F
PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
EFFLORESCENCE TEST FOR BRICKS
CLIENT :- IOCL
CONTRACT
M/S Indcon Projects & Equipment Ltd.

SL. NO.

OBSERVATION
SLIGHT/MODERATE/HEAVY/SEVERE

REPORT NO:
DATE:
LIMIT
WATER
ABSORPTION(%)

39
40
41
42
43
44
45
46
47
48
49

REMARK:

FOR IPEL

FOR IOCL
IPEL-PJPL-ST-FM-09

FM10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

A
B
C
D
E
F
PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
COMPRESSIVE STRENGTH TEST RECORD OF BRICKS AT SITE
CLIENT :- IOCL
CONTRACT
INDCON PROJECTS & EQUIPMENT LTD

REPORT NO:
DATE:

SR. NO. IDENTIFICATION MARKWEIGHT SIZE(cms) C/S AREA READING


COMPRESSIVE
2
kgs.
cm
Tons
STRENGTH(kg/cm2)

29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

IPEL

IOCL

IPEL-PJPL-ST-FM-11

llllll oioioi
Contract specification PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME
II of IV, IS1786-1985, IS456-2000 & IS1200, IS 2502 (latest).

BSORPTION(%)

L-ST-FM-09

AA

AB

AC

AD

AE

AF

AG

AH

AI

AJ

AK

AL

AM

AN

AO

AP

AQ

AR

AS

AT

AU

AV

AW

AX

AY

AZ

BA

BB

BC

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BR

BS

BT

BU

BV

BW

BX

BY

You might also like