Outline
PIL: The experts in process improvement technologies
Slide Number: 2
1. Overview of PIL
PIL: The experts in process improvement technologies
problems
and
enable
Technology
Process
Integration
Ltd
the
Software
solutions
Consultancy
partnerships
to
Training
leverage
2. NG Plant Design
Natural
Gas
Raw Gas
Clean
and safe
energy
fuel
Treated
to
remove
impurities
Inlet Facilities
Acid Gas
Removal
Dehydration Unit
Fractionation
Train
NGL Recovery
Metal Removal
Gas Sales
Slide Number: 4
Should be heated by
Utilities?
Which Utilities?
Slide Number: 5
High Energy
Prices
Pinch
Technology
Heat
recovery
280
F [t/h]
300
260
240
220
200
0
20
Days
40
60
i-HeatTM
Slide Number: 7
Steam Distribution
Steam pipeline
network
Processes
Process steam generators
Process steam heaters
Process steam drivers
Etc
Slide Number: 8
Slide Number: 9
Capital investment
Reliability
Ambient
Conditions
Daily
Seasonal
Leads to over-designs
and redundancies
Economics
Power tariffs
Fuel prices
Contractual
agreements
Capital cost
Slide Number: 10
Cogeneration
Analysis
Total Site
Analysis
Accurate model needs to
be developed to evaluate
different configurations
Slide Number: 11
Combined
Heat &
Power
(CHP)
Steam
Distribution
Individual
Processes
The Model
i-SteamTM
Slide Number: 12
Pinch Analysis
Process-to-process heat exchanger
Process
Utility Systems
Site-wide optimisation
Slide Number: 13
NG Processing
Plant
Condensate
Steam
Slide Number: 15
Co-generation
Plant
Agreed sources
Inlet facilities
Dehydration
units
NGL
recovery
units
Acid gas
removal units
Fractionation
units
Thirteen out of 23 units were selected for the energy optimisation study
Slide Number: 18
Utility Type
Utility
Hot
LP Steam
Cold
Air
Slide Number: 19
Heat
Exchanger
Duty [kW]
SH 01
SH 02
SH 03
Total
AC 01
AC 02
Total
1,865
20,950
2,452
25,267
19,490
3,012
22,502
Pinch
Duties
Existing [kW]
Target [kW]
Hot
25,267
20,030
Cold
22,502
17,265
PROJECT1
Reduce cross pinch heat transfer in AC 01
Slide Number: 21
SH 01
SH 01 removed
Slide Number: 22
Capital
Investment of
2.46 MM$
Energy
Saving of
0.62 MM$/yr
Simplified HEN:
Slide Number: 24
Heat Exchanger
Cross Pinch
Duty [kW]
SH 01
1,409
SH 02
642
PROJECT2
Reduce cross pinch heat transfer in SH 01 and SH 02
Slide Number: 25
Energy
Saving of
2.77 MM$/yr
Capital
Investment of
3.92 MM$
Air Cooler
Preheater
(heat recovered
from Process)
LP Steam
Reboiler
Slide Number: 27
Energy
Saving of
0.37Energy
MM$/yr
Energy Saving
Capital
Investment of
0.20 MM$
of 0.37 Saving
MM$/yr of
0.37 MM$/yr
HP Header
LP Steam
Import
Steam Turbine
Generators
LP Header
Process Steam
Consumers
Slide Number: 29
HP Header
HP Turbine
Power
Condensing
Turbine
LP Header
LP Steam
Export
Driver selection
Slide Number: 31
23 Individual
Processes
13 Process
Screening
11 Energy Saving
Projects
7 Cost-Effective Projects
7. Conclusions
Natural Gas processing plants used for removing impurities, such as water,
carbon dioxide and hydrogen sulphide.
THANK YOU
Slide Number: 34