Energy Optimisation in Natural Gas


Processing Plants
Contact: Leandro Labanca
Dr Yuhang Lou
Tel: 0161 974 0090
leandro.labanca@processint.com
www.processint.com
www.processint.com

+44 161 9740090

Station House, Stamford New Road, Altrincham, Cheshire, WA14 1EP, UK

Outline
PIL: The experts in process improvement technologies

1. Overview of Process Integration Ltd (PIL)


2. Natural Gas (NG) plant design

3. Heat Exchanger Network (HEN) design and optimisation


4. Utility system design and optimisation
5. Energy optimisation studies in NG plants

6. Industrial case study


7. Conclusions
8. Questions and Answers

Slide Number: 2

1. Overview of PIL
PIL: The experts in process improvement technologies

Spin-out company of The Centre for Process


Integration (CPI) of The University of Manchester
PIL provides:

Consultancy services and products to


solve business problems and improve
margins

Software to provide easy evaluation of


business

problems

and

enable

Technology

Process
Integration
Ltd

the
Software

solutions

Consultancy

partnerships

to

Training

leverage

knowledge and experience and provide a


competitive advantage
Slide Number: 3

Successfully applied Advanced Process


Improvement Technologies in flagship
projects across the world

PIL: The experts in process improvement technologies

2. NG Plant Design
Natural
Gas

Raw Gas

Clean
and safe
energy
fuel

Treated
to
remove
impurities

Inlet Facilities

Acid Gas
Removal

Dehydration Unit

Fractionation
Train

NGL Recovery

Metal Removal

Utilities & Offsites

Gas Sales
Slide Number: 4

PIL: The experts in process improvement technologies

3. HEN Design and Optimisation


A process has heating and cooling demans that need to
Process-to-Process
be satisfied
heat recovery?

Should be heated by
Utilities?
Which Utilities?

Which is the best


match?

How much duty?


What equipment to
choose?

Slide Number: 5

PIL: The experts in process improvement technologies

3. HEN Design and Optimisation


Environmental
Policies

High Energy
Prices

Pinch
Technology

Optimal design of HENs improves heat


recovery and reduces the operating costs
and carbon footprint.
Slide Number: 6

3. HEN Design and Optimisation


Capital
cost

Heat
recovery

280

F [t/h]

PIL: The experts in process improvement technologies

300

260
240
220
200
0

20

Days

40

60

Multiple operating scenarios


Accurate model needs to be developed
to evaluate different configurations and
operating conditions

i-HeatTM
Slide Number: 7

4. Utility System Design and Optimisation


PIL: The experts in process improvement technologies

Combined Heat and Power


Boiler
Gas Turbine
Steam turbine
Power and Steam
Letdown
Import / Export
Deaerator
BFW preheater
Etc

Meet energy and power demands on site

Steam Distribution
Steam pipeline
network
Processes
Process steam generators
Process steam heaters
Process steam drivers
Etc

Slide Number: 8

4. Utility System Design and Optimisation


PIL: The experts in process improvement technologies

Slide Number: 9

Meet energy and


power demands on
site
Different configurations can be
developed depending on:

Availability and costs of


resources

Capital investment

Reliability

4. Utility System Design and Optimisation


PIL: The experts in process improvement technologies

Requires stable and efficient performance


Designed to cope with changes in:
Process
Operations
Operating load
changes
Start-up / Shutdown
Maintenance cycles

Ambient
Conditions
Daily
Seasonal

Leads to over-designs
and redundancies

Economics
Power tariffs
Fuel prices
Contractual
agreements

Capital cost
Slide Number: 10

4. Utility System Design and Optimisation


PIL: The experts in process improvement technologies

Some methodologies to obtain improved designs

Cogeneration
Analysis

Total Site
Analysis
Accurate model needs to
be developed to evaluate
different configurations
Slide Number: 11

4. Utility System Design and Optimisation


PIL: The experts in process improvement technologies

The model should consider interactions with processes

Combined
Heat &
Power
(CHP)

Steam
Distribution

Individual
Processes

The Model
i-SteamTM
Slide Number: 12

5. Energy Optimisation Studies in NG


Plants
PIL: The experts in process improvement technologies

Pinch Analysis
Process-to-process heat exchanger

Heaters and coolers from site utilities


Individual process optimisation

Process

Utility Systems

Total Site Analysis


Co generation targets
Selection of mechanical drivers

Site-wide optimisation

Slide Number: 13

PIL: The experts in process improvement technologies

5. Energy Optimisation Studies in NG


Plants
Standard procedure for energy optimisation in
Natural Gas processing plants
1. Data collection
2. Data review and reconciliation
3. Process unit screening
4. Heat integration study for individual process units
5. Cross-process heat recovery
6. Energy optimisation for site-wide utility system
7. Economic evaluation of combined improvements
Slide Number: 14

PIL: The experts in process improvement technologies

6. Industrial Case Study


Project: New design of NG processing plant that imports steam at
various pressure levels from a co-generation plant nearby.
Objective: Heat integration and Energy Optimisation Study

NG Processing
Plant

Condensate
Steam

Slide Number: 15

Co-generation
Plant

6. Industrial Case Study


PIL: The experts in process improvement technologies

Step 1: Data collection


Process design information obtained from the client
Design information for 23 process units was received

Step 2: Data review and reconciliation


Agree hierarchy and priority for different data sources
Data required

Agreed sources

Process configuration, stream numbers and


heat exchanger duties

Process Flow Diagrams (PFD)

Processing capacity and


number of trains

Process Design Basis for individual units

Stream conditions and properties

Heat and Material Balance (H&MB)

Other equipment design information

Equipment Data Sheet


Slide Number: 16

6. Industrial Case Study


PIL: The experts in process improvement technologies

Inlet facilities

Dehydration
units

NGL
recovery
units

Acid gas
removal units

Fractionation
units

Step 3: Process unit screening

Process units containing heat exchangers were identified

Thirteen out of 23 units were selected for the energy optimisation study

Step 4: Heat integration study for individual process units

Three units discussed to demonstrate the benefits of heat integration


Slide Number: 17

PIL: The experts in process improvement technologies

6. Industrial Case Study Unit 1

Slide Number: 18

PIL: The experts in process improvement technologies

6. Industrial Case Study Unit 1

Utility Type

Utility

Hot

LP Steam

Cold

Air

Slide Number: 19

Heat
Exchanger

Duty [kW]

SH 01
SH 02
SH 03
Total
AC 01
AC 02
Total

1,865
20,950
2,452
25,267
19,490
3,012
22,502

6. Industrial Case Study Unit 1


PIL: The experts in process improvement technologies

Pinch analysis carried out to identify the minimum energy target


for both the hot and cold utilities
Hot Utility Target

Pinch

Cold Utility Target

Duties

Existing [kW]

Target [kW]

Hot

25,267

20,030

Cold

22,502

17,265

Saving Potential: 5,237 kW


Slide Number: 20

PIL: The experts in process improvement technologies

6. Industrial Case Study Unit 1

Four heat exchangers found to have cross pinch heat transfer

Design improvement achieved by reducing cross pinch duties within HEN

PROJECT1
Reduce cross pinch heat transfer in AC 01
Slide Number: 21

PIL: The experts in process improvement technologies

6. Industrial Case Study Unit 1


PROJECT1: New heat exchanger New HX 01 added to recover
heat between Hot Stream 2 and Cold Stream 2.

New Heat Exchanger

Air cooler duty reduced by 1,865.4 kW

SH 01

SH 01 removed
Slide Number: 22

6. Industrial Case Study Unit 1


PIL: The experts in process improvement technologies

Considering all trains:

Capital
Investment of
2.46 MM$

Energy
Saving of
0.62 MM$/yr

The project was found economically attractive

20-year Net Present Value (NPV) = 6.51 MM$

Internal Rate of Return (IRR) = 25.8%

PROJECT1 was recommended for further investigation.


Slide Number: 23

6. Industrial Case Study Unit 2


Unit 2 composed of 20 HXs
PIL: The experts in process improvement technologies

Practical constraints limiting opportunities of heat integration were considered

Simplified HEN:

Slide Number: 24

Heat Exchanger

Cross Pinch
Duty [kW]

SH 01

1,409

SH 02

642

6. Industrial Case Study Unit 2


PIL: The experts in process improvement technologies

PROJECT2
Reduce cross pinch heat transfer in SH 01 and SH 02

New Heat Exchangers


Duty reduced by 642 kW
Duty reduced by 2,051kW

Duty reduced by 1,409 kW

Slide Number: 25

6. Industrial Case Study Unit 2


PIL: The experts in process improvement technologies

Considering all trains:

Energy
Saving of
2.77 MM$/yr

Capital
Investment of
3.92 MM$

The project was found economically attractive

20-year Net Present Value (NPV) = 38.8 MM$

Internal Rate of Return (IRR) = 72.8%

PROJECT2 was recommended for further investigation.


Slide Number: 26

6. Industrial Case Study Unit 3


PIL: The experts in process improvement technologies

Pinch analysis: Existing HEN design meets energy targets.


Process modification: Pre-heating feed reduces reboiler LP steam
consumption by 2,198 kW.

Air Cooler

Preheater
(heat recovered
from Process)

LP Steam
Reboiler

Slide Number: 27

6. Industrial Case Study Unit 3


PIL: The experts in process improvement technologies

Considering all trains:

Energy
Saving of
0.37Energy
MM$/yr
Energy Saving

Capital
Investment of
0.20 MM$

of 0.37 Saving
MM$/yr of

0.37 MM$/yr

The project was found economically attractive

20-year Net Present Value (NPV) = 6.0 MM$

Internal Rate of Return (IRR) = 188.7%

PROJECT3 was recommended for further investigation.


Slide Number: 28

6. Industrial Case Study


Step 5: Cross-process heat recovery
PIL: The experts in process improvement technologies

Thermodynamically, there is potential to reduce utility usage


Practical constraints and operating independence of processes limited the
opportunities to recover heat across processes

Step 6: Energy optimisation for site-wide utility system


Process Steam
Generators

HP Header
LP Steam
Import

Steam Turbine
Generators

LP Header

Process Steam
Consumers
Slide Number: 29

6. Industrial Case Study


PIL: The experts in process improvement technologies

Co-generation plant model used to estimate the price of LP steam.

HP Header
HP Turbine

Power
Condensing
Turbine

LP Header

LP Steam
Export

Electricity = 0.07 $/kWh LP steam = 10.87 $/t


Slide Number: 30

PIL: The experts in process improvement technologies

6. Industrial Case Study


Other options to improve the overall performance and economics
of the natural gas processing plant

Driver selection

Optimisation of refrigeration systems

Chilled water integration

Slide Number: 31

6. Industrial Case Study Combined


improvements
PIL: The experts in process improvement technologies

Step: 7 Economic evaluation of combined improvements

23 Individual
Processes

13 Process
Screening

11 Energy Saving
Projects

7 Cost-Effective Projects

Combined overall performance of the site including the energy


saving projects:

Annual operating costs reduced by more than 16 MM$

20-year Net Present Value (NPV) = 284.1 MM$

Internal Rate of Return (IRR) = 137.8%


Slide Number: 32

PIL: The experts in process improvement technologies

7. Conclusions

Natural Gas processing plants used for removing impurities, such as water,
carbon dioxide and hydrogen sulphide.

Energy optimisation procedure has been developed that significantly


enhances the economic benefits:
Optimisation considering the integration between individual processes and
utility systems
Cost-effective projects identified and evaluated to save energy consumption in
individual process units.
Impact of energy saving projects evaluated on the utility system.
Industrial case study illustrates the benefits of the integrated procedure.

Advanced design tools for heat integration and energy optimisation


significantly improves the energy performance and process economics of a
NG Processing Plant.
Slide Number: 33

PIL: The experts in process improvement technologies

7. Questions and Answers