Professional Documents
Culture Documents
WHAT IS BIOMASS?
THERMAL APPLICATION
Chopped wood (Biomass) is fed into the top of the reactor. The reactor
we install is Open Top, Twin air entry, IISc design. After ignition, when
out the volatile matters of the wood in a gaseous form. This product is
known as producer gas. This gas is separated from the gas separation
unit and taken to the cooling and cleaning equipments. The residue from
Rs.2.00 lakh per 300 kWth on pro-rata basis, or in multiples there of for
GASIFICATION?
Biomass Gasification converts solid biomass into more
The ratio of air-to-fuel
PROCESS
connected to the bottom of the reactor. The gas is washed and cooled in
the scrubbers arranged in series to improve the gas quality. The gas
further treated in the chilled water scrubber where due to the water
temperature the tar particles present in the gas get condensed and
separated from the gas. The purified gas passed through fabric filters.
based power
generation
2.
power generation
runs like a petrol engine. The exhaust gas comes out from the engine
fed into a drier where we recover the exhaust gas temperature for drying
the cut Biomass for consumption.
POWER GENERATION
APPLICATION
The mechanical
Power Generation
thermal energy.
Approximately
OTHER BENEFITS
Thermal
APPLICATIONS
Thermal application
The cooled, purified and filtered gas suitably mixed with air in proper
composition in the carburetor and enters into the engine. The engine
3.
gasifier.
1.
Description
Application
WHAT IS BIOMASS
S.No
Furnace Oil in
! Vegetable drying,
Combined Cycle
Power generation and thermal application in industries.
GOVERNMENTS ASSISTANCE
To promote the non-conventional energy sources,
Government of India assist the entrepreneur through
attractive capital subsidy. *Central Financial Assistance
(subsidy) of Rs. 10.00 lakhs per 100 kWe on pro-rata
Water
Water
REACTOR
MOISTURE
TRAP
DIRECT
COOLER
WATER
SCRUBBER
MOISTURE
TRAP
Fabric Filter
CHILLED WATER
SCRUBBER
Engine
SCREW CONVEYOR
Sl.
1.
Burner
Project Address
Capacity
Installation Date
Application
4 MW
Under Implementation
Thermal
2.
4 MW
Under Implementation
Thermal
3.
100 kWe
2004
4.
5.
Indias First
2x10 kWe
2005
2x10 kWe
2005
12 kWe
2005
7.
12 kWe
2005
8.
2006
2x10 kWe
2006
10.
14x10 kWe
Under Implementation
11.
12 kWe
Under Implementation
6.
12.
1 MWe
Under Implementation
13.
12 kWe
Under Implementation
14.
12 kWe
03.03.2006
15.
12 kWe
Under Implementation
16.
12 kWe
Under Implementation
17.
Under Implementation
15 x 12 kWe