You are on page 1of 108

COMPARATIVE STATEMENT

Construction of compound wall at Maravapatty Pu school inKothalothu pt

113000

Sl.No. DESCRIPTION OF WORK

Name of the Scheme: CSIDS-2013-2014


Rate Quated by ARUNKUMAR
$PREMA ENGINEERING
ANDIPATTY
Qty

SUPPLY AND FIXING OF STEEL GRILL GATE OF


SIZE(3.10X2.1M)

Rate

Amount

13500/-(Rupeesthirteen thousands five


hundrad only)

Rate Quated byVELLAPPAN


GRILL WORKS
Rate

Amount

14000/-(Ruppes Fourteen
thousandsonly)

total

Amount the three Quadation received,


The lowest rate quoated by ARUNKUMAR $PREMA ENGINEERING ANDIPATTY
Less Estimate rate is recommended for Approval

2013-2014
Rate Quated MATHI
ENGINEERING WORKS
Rate

Amount

15000/-(RupeesFifteen thousands
only)

adation received,

RING ANDIPATTY

mmended for Approval

Quantity Executed of
supplied
Up to
date
1

Since Last
Certificate
2

Rate

Per

Amount

Items
Up to Date
3

Total

6
114556.59

114556.59

Add in Col 7 Total upto date in last certificate Voucher No


Total Value of work done upto date agreeing with total of col 6
Deduct.
Fines and other deductions upto date (to be specified in
remarks column.
Amount of Previous payments as per last certificate
Voucher No.
Payments Now made Rs .. (in
words.
Balance Due

Signature of Contractor .. Dated.. Certif


proceeding claim is correct that the necessary measurement have been made by me on 19 and that the work h
satisfactorily performed vide page ...

CHECK MEASUREMENTS CERTIFICATE


Certified that the Work was / Material Work duly check measured by me on (Date)..

CHAIRMAN COMMISSIO
COMPLETION CERTIFICATE
Certified that the work has been completed in accordance with the plan estimate in substancial and satisfactory manner
Rs.

Ps.

Allotment for the year


Expenditure including this Bill

CHAIRMAN COMMISSIO

Balance available
Pay Rupees
Station

CHAIRMAN COMMISSIO

Date

Received Rupees..................................(..........................................................................) only as fina


settlement of all demands................................................................

CLASSIFICATION
Head of Account

Amount
Rs.

Ps.

CHAIRMAN COMMISSIO

Amount

Remarks

Since Last Certificate


7
114556.59

8
0

114556.59

.. Certified that the


19 and that the work has been

ATE

..

CHAIRMAN COMMISSIONER

satisfactory manner

CHAIRMAN COMMISSIONER

CHAIRMAN COMMISSIONER

.) only as final payment in

CHAIRMAN COMMISSIONER

Final CONTRACT CERTIFICATE


M.F.Form No:83

Voucher No:

PU.Form No:55
Construction of compound wall at Maniyarampatty Pu school
inKothalothu pt

Name of Scheme :CSIDS-2013

How Executed: .0.18 % Less Tender Value

Authority: 08/131407AEE/RD/PKM/NOS

Name of Contractor. P.PANDI. Maravapatty

Esti amt:113000/-

Last Certificate Granted for this if any Voucher No:

Month:

Quantity Executed or
Supplied
Up to Date

Amount
Items

Rate

Per

Since Last
Certificate

12.06

Up to Date

12.06

3 and depositing on
Earthwork excavation
bank with initial leads of 10m and lifts of
2m In hard stiff clay, stiff black cotton
soil, hard red earth,shale murrams, gravel
stoney earth and earth muds with 50%
fair sized boulders and hard gravelly soils
as pe

83

1000.98

2.01

2.01

Cement concrete 1:5:10mix using 40mm


ISS HBG metal for foundation including
watering whenever necessary and laid in
layers not more than 15cm thick
compacting etc., complete complying
with std. Specifications and as directed.
Rate for 10 cum.

2173

4367.73

13.77

13.77

Random rubble Masonry in cm 1:5


including consolidation as per standard
specification

2196

30238.92

10.00

Brick work in CM 1 : 5 using country


bricks ground moulded of size 23 x 11 x 7
cm including cost and conveyance of
materials to site and all other labour
charges as per standard specification.

3313

33130.00

10.00

0.78

0.78

Reinforced cement concrete 1:2:4 mix


using 20 mm HBG metal for all RCC items
of works excluding cost of reinforcement
and fabricating charges, centering and
shuttering but including curing and
providing fixtures like fan clamps in the
RCC floor or Roof sl

102.80

102.80

Supply and fabrication of steel including


cast and all other labour charges etc
comlete

95.35

Plastering in CM 1 : 5, 12 mm thick ,
including cost and conveyance of all
materials to site and all other labour
charges including curing etc., as per
standard specification.

96.5

9201.28

95.35

95.35

Painting two coat withplastic emulsion


best approved first quality of Snow Cem
Powder of approved colour over the
priming coat etc., complete complying
with standard specification ( The paint
should be got approved by the depa

150

14302.50

1.00

1.00

Provision for steel gate

13500

13500.00

95.35

TOTAL

3921

3058.38

56

5756.80

114556.59

oucher No:

Name of Scheme :CSIDS-2013-14

uthority: 08/13407AEE/RD/PKM/NOS

sti amt:113000/-

onth:
Amount

Remarks

Since Last
Certificate

1000.98

4367.73

30238.92

33130

3058.38

5756.8

9201.275

14302.5

13500
114556.59

COMPLETION REPORT
Construction of compound wall at Maravapatty Pu school inKothalothu pt
113000

Work Value:

Name of the Scheme: CSIDS 2013-2014

Sl No

Description of Work

As per Original Estimate

During Execution

Quantity
3

Rate
4

Amount
5

Quantity
6

Rate
7

Amount
8

11.25

83.7

942

12.06

83

1000.98

Earthwork excavation and depositing on bank with initial


leads of 10m and lifts of 2m In hard stiff clay, stiff black
cotton soil, hard red earth,shale murrams, gravel stoney
earth and earth muds with 50% fair sized boulders and
hard gravelly soils as pe

Cement concrete 1:5:10mix using 40mm ISS HBG metal


for foundation including watering whenever necessary and
laid in layers not more than 15cm thick compacting etc.,
complete complying with std. Specifications and as
directed. Rate for 10 cum.

1.88

2173.96

4087

2.01

2173

4367.73

Random rubble Masonry in cm 1:5 including consolidation


as per standard specification

13.80

2196.4

30310

13.77

2196

30238.92

Brick work in CM 1 : 5 using country bricks ground moulded


of size 23 x 11 x 7 cm including cost and conveyance of
materials to site and all other labour charges as per
standard specification.

8.98

3313.61

29756

10.00

3313

33130.00

Reinforced cement concrete 1:2:4 mix using 20 mm HBG


metal for all RCC items of works excluding cost of
reinforcement and fabricating charges, centering and
shuttering but including curing and providing fixtures like
fan clamps in the RCC floor or Roof sl

0.83

3921.94

3255

0.78

3921

3058.38

Supply and fabrication of steel including cast and all other


labour charges etc comlete

150.00

56.95

8542

102.80

56

5756.80

Plastering in CM 1 : 5, 12 mm thick , including cost and


conveyance of all materials to site and all other labour
charges including curing etc., as per standard specification.

86.50

96.73

8367

95.35

96.5

9201.28

Painting two coat withplastic emulsion best approved first


quality of Snow Cem Powder of approved colour over the
priming coat etc., complete complying with standard
specification ( The paint should be got approved by the
depa

86.50

150

12975

95.35

150

14302.50

Provision for steel gate

13500

13500.00

10

Provision for Name board

500

11

Provision for Photos

500

12

Contigencies and other unforeseen items

266

0.00

113000

114556.59

13500

Total
As Per Estimate Amount
As Per Execution
Difference

113000
114556.59
-1556.59

As per More
As per Less
Difference

M.Book No:
More

Less

Remarks

(+)
9

(-)
10

11

59.0

280.7

71.08

3374.0

196.62

2785.20

834.3

1327.5

500.00
500.00
266.00
5875.5

4318.90

5875.49
4318.90
1556.59
-

320183785.xlsx

DATA - BUILDING
Quantity

Description

EATHAKKOVIL-PT-2013-2014(New

Rate

per

Cement Mortar 1 : 2 ( 1 Cum )


720.00 Kg
1.00 Cum

Cement

4.73

Sand

248.30

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 3 ( 1 Cum )


480.00 Kg
1.00 Cum

Cement

4.73

Sand

248.30

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 4 ( 1 Cum )


360.00 Kg
1.00 Cum

Cement

4.73

Sand

248.30

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 5 ( 1 Cum )


288.00 Kg
1.00 Cum

Cement

4.73

Sand

248.30

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Pointing 1 : 3 ( 10 Sqm / 1 Sqm )


0.04 Cum
0.038 Kg

Cement Mortar 1:3

2564.11

Water Proofing Compound

Cum

42.35

Kg

2.20 No.

Mason II nd Class

326.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Earth Work SS 20 A ( 1 Cum)


1.00 Cum

From Schedule of Rate

44.60

Page 21

Cum

320183785.xlsx

Total
Earth Work SS 20 B - Narrow Drain (1 Cum)
1.00 Cum

From Schedule of Rate

41.85

Cum

1.00 Cum

50 % Extra

20.93

Cum
Total

Earth Work SS 20 B - Building (1 Cum)


1.00 Cum

From Schedule of Rate

41.85

Cum

1.00 Cum

100 % Extra

41.85

Cum
Total

Earth Filling (1 Cum)


1.00 Cum

Refilling Charges

14.70

Cum
Total

Well Gravel Filling (1 Cum)


1.00 Cum

Cost of Well Gravel

1.00 Cum

Filling Charges

115.60

Cum

2.54

Cum
Total

1.00 Cum

Stacking Charges

3.05

Cum
Total

Red Gravel Filling (1 Cum)


1.00 Cum

Cost of Red Gravel

1.00 Cum

Filling Charges

153.30

Cum

2.54

Cum
Total

1.00 Cum

Stacking Charges

3.05

Cum
Total

Sand Filling (1 Cum)


1.00 Cum

Cost of Sand

1.00 Cum

Filling Charges

117.05

Cum

13.00

Cum
Total

Plain Cement Concret 1:5:10 (10 Cum / 1 Cum)


9.00 Cum

40 mm ISS HBG

781.00

Cum

4.50 Cum

Cement Mortar 1:5

1655.13

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.

Page 22

320183785.xlsx

Total
Plain Cement Concret 1:4:8 (10 Cum / 1 Cum)
9.00 Cum

40 mm ISS HBG

781.00

Cum

4.50 Cum

Cement Mortar 1:4

1996.00

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Plain Cement Concret 1:3:6 (10 Cum / 1 Cum)


9.00 Cum

40 mm ISS HBG

781.00

Cum

4.50 Cum

Cement Mortar 1:3

2564.11

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Plain Cement Concret 1:3:6 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

1073.00

Cum

4.50 Cum

Cement Mortar 1:3

2520.76

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Random Rubble Masonry 1:5 (10 Cum / 1 Cum)


10.00 Cum

Rough Stone

371.00

Cum

1.00 Cum

Bond Stone

494.00

Cum

3.40 No.

Cement Mortar 1 : 5

1655.13

No.

7.10 No.

Masson I st Class

363.00

No.

10.60 No.

Masson II nd class

326.00

No.

14.10 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Brick Work CM 1:5 (100 Cft / 1 Cum)


1300 No.

Country Bricks

4031.20

1000 No.

0.708 Cum

Cement Mortar 1 : 5

1655.13

Cum

1.00 No.

Masson I st Class

363.00

No.

3.00 No.

Masson II nd class

326.00

No.

2.00 No.

Mazdoor Category I

228.00

No.

Page 23

320183785.xlsx

6.00 No.

Mazdoor Category II

206.00

No.
Total

Brick Work CM 1:3 (100 Cft / 1 Cum)


1300 No.

Country Bricks

4031.20

1000 No.

0.708 Cum

Cement Mortar 1 : 3

2564.11

Cum

1.00 No.

Masson I st Class

363.00

No.

3.00 No.

Masson II nd class

326.00

No.

2.00 No.

Mazdoor Category I

228.00

No.

6.00 No.

Mazdoor Category II

206.00

No.
Total

Brick Partition Wall CM 1:3 (10 Sqm / 1 Sqm)


1.10 Cum

Brick Work 1 : 3

1.00 No.

Masson I st Class

3565.00

Cum

363.00

No.
Total

Honey Comb Brick Work CM 1:5 (1 Cum)


1.00 Cum

Brick Work 1 : 5

3337.59

Cum

0.30 Cum

BW1:5 Less for Honey Comb

3337.59

Cum
Total

Plain Cement Concret 1:2:4 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

1073.00

Cum

4.50 Cum

Cement Mortar 1:2

3700.35

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Centering & Shuttering (Steel) - small culvert & concrete side wall
1.00 Sqm

As per DRDA

93.00

Sqm
Total

Centering & Shuttering (Steel) - Other than Plinth Beam (1 Sqm)


1.00 Sqm

As per DRDA

330.00

Sqm
Total

Steel Fabrication (1 MT / 1 Kg)


1.00 MT

Cost of Steel

51009.30

MT

0.01 MT

Cost of Binding Wire

48000.00

MT

Page 24

320183785.xlsx

35.00 No.

Fitter Ist Class

322.00

No.
Total

Reinforced Cement Concret 1:2:4 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

1073.00

Cum

4.50 Cum

Sand

248.30

Cum

3231 Kg

Cement

4.734

Kg

3.50 No.

Masson II nd class

326.00

No.

21.20 No.

Mazdoor Category I

228.00

No.

35.30 No.

Mazdoor Category II

206.00

No.
Total

Reinforced Cement Concret 1:1.5:3 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

4.50 Cum

Sand

4308 Kg

Cement

3.50 No.

1073.00

Cum

248.30

Cum

4.73

Kg

Masson II nd class

326.00

No.

21.20 No.

Mazdoor Category I

228.00

No.

35.30 No.

Mazdoor Category II

206.00

No.
Total

Plastering 1:5 - 12 mm (10 Sqm / 1 Sqm)


0.14 Cum

Cement Mortar 1 : 5

1655.13

Cum

1.10 No.

Masson I st Class

363.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Plastering 1:3 - 10 mm (10 Sqm / 1 Sqm)


0.10 Cum

Cement Mortar 1 : 3

2564.11

Cum

1.10 No.

Masson I st Class

363.00

No.

1.10 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Weathering Course Concretet (10 Cum / 1 Cum)


12.80 Cum

Brick Jelly 20 mm

587.80

Cum

1217.80

Cum

5.00 Cum

Slacked Lime

1.80 No.

Masson I nd class

363.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.

Page 25

320183785.xlsx

Total

Granolithic Floor Finishing (10 Sqm / 1 Sqm)


PCC 1:2:4 Using 10 - 12 mm ISS HBG - 10 Cum
9.00 Cum

10 - 12 mm ISS HBG

870.50

Cum

4.50 Cum

Cement Mortar 1 : 2

3657.00

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

For 25 mm Thick (10 Sqm / 1 Sqm)


0.25 Cum

PCC 1:2:4 10-12 mm

1.00 LS

Rubbing & Lining

3181.80
4.83

Cum
LS
Total

Roof Tiles (10 Sqm / 1 Sqm)


250.00 No.
Machine Pressed Tiles
0.12 Cum

12401.60

Cement Mortar 1 : 3

10.00 Sqm

Pointing 1 : 3

1.152 Kg

Water proofing compound

1000 No.

2564.11

Cum

116.20

Sqm

42.35

Kg

1.10 No.

Masson I st Class

363.00

No.

2.10 No.

Masson II nd class

326.00

No.

2.20 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Glazed Tiles (10 Sqm / 1 Sqm) 0.15 x 0.15m


450.00 No.

Glazed Tiles

0.10 Cum

Cement Mortar 1 : 2

4.00 Kg

White Cement

1.10 No.

9.90

No.

3700.35

Cum

23.00

Kg

Masson I st Class

363.00

No.

4.10 No.

Masson II nd class

326.00

No.

2.70 No.

Mazdoor Category I

228.00

No.

3.30 No.

Mazdoor Category II

206.00

No.
Total

Ceramic Tiles (10 Sqm / 1 Sqm) 0.30 x 0.30


115.00 No.

Ceramic Tiles

0.21 Cum

Cement Mortar 1 : 3

4.00 Kg

White Cement

1.10 No.
2.70 No.

44.00

No.

2564.11

Cum

23.00

Kg

Masson I st Class

363.00

No.

Masson II nd class

326.00

No.

Page 26

320183785.xlsx

2.70 No.

Mazdoor Category I

228.00

No.

3.30 No.

Mazdoor Category II

206.00

No.
Total

Cuddappa Slab (10 Sqm / 1 Sqm)


10.50 Sqm
0.12 Cum
10.00 Sqm

Cuddappa Slab
Cement Mortar 1 : 3
Pointing 1 : 3

342.00

Sqm

2564.11

Cum

116.20

Sqm
Total

White Wash 2 Coat (100 Sqm / 1 Sqm)


0.07 Cum

Shell Lime

1080.40

Cum

1.00 L.S

Gum, Kanji Water, Brush

15.00

L.S

1.60 No.

Masson II nd class

326.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

2.70 No.

Mazdoor Category II

206.00

No.
Total

Colour Wash 2 Coat (1 Sqm)


1.00 Sqm

Rate of White Wash

1.00 Sqm

50 % Extra

12.82

Sqm

6.41

Sqm
Total

Cement Paint 2 Coat (10 Sqm / 1 Sqm)


3.23 Kg

Cement Paint

44.00

Kg

0.50 No.

Painter I st class

293.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

0.80 No.

Mazdoor Category II

206.00

No.
Total

Priming coat for plastic emulsion paint


10.00 Sqm

Through scrapping of plastered surface

1.50

Kg

23.00

Kg

1.80 Kg

White Cement

0.25 No.

Painter I st class

293.00

Each

0.25 No.

Mazdoor Category I

228.00

Each

0.40 No.

Mazdoor Category II

206.00

Each
Total

Emulsion Paint 2 Coat (10 Sqm / 1 Sqm)


10.00 Sqm

Priming Coat

269.05

10 Sqm

0.98 Lit

Primer

136.00

Lit

1.40 Lit

Plastic Emulsion 1st Quality

315.15

Lit

2.20 No.

Painter I st class

293.00

No.

Page 27

320183785.xlsx

Sundries, Brush, Sand Paper, Putty,


Plaster of Paris
Total

Enamel Paint 2 Coat (10 Sqm / 1 Sqm)


2.22 Lit

Enamel paint

254.10

Lit

1.10 No.

Painter I st class

235.00

No.

1.00 LS

Brush,soap,putty etc.

0.20

LS
Total

Fixing Charges - MS Door - (1Sqm)


1.00 Sqm

Schedule of Rate 2012 - 13

Sqm
Total

Fixing Charges - MS Window & Ventilator- (1Sqm)


1.00 Sqm

Schedule of Rate 2012 - 13

94.00

Sqm
Total

Mangalore tiles
160.00

Nos. Mangalore tiles

7431.40

1000/Nos.

0.09

Cum CM 1:3

2564.11

Cum

0.50

Nos. Carpenter 1st class

284.00

Each

0.50

Nos. Mason 1st class

326.00

Each

1.10

Nos. Mazdoor Category I

228.00

Each

2.20

Nos. Mazdoor Category II

206.00

Each

242.88

Sqm

14.5996

Each

Mangalore tiles over Ceiling tiles


10.00
166.00

Sqm Mangalore tiles


Nos. Ceiling tiles

0.50

Nos. Mason 2nd class

261.00

Each

2.20

Nos. Mazdoor Category II

206.00

Each

100.00

Lit

293.00

Each

Black board paint


2.55
1.20

Lit Black oxide enamel paint


No. Painter I st class
Sundries

LS

Painting one coat with Cement for priming coat for the base of oil bound distember
10.00 Sqm

Clean removal of cement plaster from walls

Page 28

1.50

Kg

320183785.xlsx

1.80 Kg

White Cement

23.00

Kg

0.25 No.

Painter I st class

293.00

Each

0.25 No.

Mazdoor Category I

228.00

Each

0.40 No.

Mazdoor Category II

206.00

Each
Total

Cement paint
10.00

Sqm One priming coat using white cement

269.05

Sqm

3.00

Kg Cement Paint

44.00

Kg

0.50

Nos. Painter I st class

293.00

Each

0.50

Nos. Mazdoor Category I

228.00

Each

0.80

Nos. Mazdoor Category II

206.00

Each

269.05

Sqm

78.50

Kg

Oil bound distember


10.00

Sqm One priming coat using white cement

1.34

Kg Oil bound distember

0.50

Nos. Painter I st class

293.00

Each

0.50

Nos. Mazdoor Category I

228.00

Each

0.80

Nos. Mazdoor Category II

206.00

Each

31.50

Sqm

254.10

Kg

293.00

Each

28.50

Sqm

254.10

Kg

293.00

Each

Old wood work


10.00

Sqm Removal of old paint surface from wood work

2.20
1.20

Lit Synthetic enamel paint


Nos. Painter I st class
Sundries

Old iron work


10.00

Sqm Removal of old paint surface from iron work

1.89
1.10

Lit Synthetic enamel paint


Nos. Painter I st class
Sundries

RCC Precast Slab1:2:4 with Nominal Reinforcement - 50 mm Thick (1 Sqm)


Cost of Mould - 5 Uses / 1 Use
0.0048 Cum
3.50 Rm

Cost of CW incl. labour etc.,


CW Reeper (50 x 25 mm)

Page 29

28790.00

Cum

63.80

Rm

320183785.xlsx

0.0048 Cum

Labour Charges

4239.00

Cum
Sub Total

Main Data
0.03 Cum

CC 1:2:4 (10-12 mm ISS HBG)

3181.80

Cum

0.60 Sqm

Moulding Charges

76.37

Sqm

3.00 Kg

Steel

62.76

Kg
Total

RCC Jalli 1:2:4 with Nominal Reinforcement - 50 mm Thick (1 Sqm)


Labour for Wrought & Put up - 1 Cum
4.50 Nos.

Carpenter I Class

237.00

Nos.

13.20 Nos.

Carpenter II Class

218.00

Nos.

Mazdoor Category II

165.00

Nos.

8.80 Nos.

Sub Total
Cost of Mould - 5 Uses / 1 Use
0.0408 Cum
3.50 Rm
0.0408 Cum
L.S

CW Scantlings
CW Reapers 50 x 25 mm
Labour for Wrought & Putup
Sundries for Nails

28790.00

Cum

63.80

Rm

5396.10

Cum

--

L.S
Sub Total

Main Data
0.0216 Cum

CC 1:2:4 (10-12 mm ISS HBG)

1.00 Use

Moulding Charges-1Use

3.00 L.S

Finishing & Fixing Charge

3181.80

Cum

323.88

Use

--

L.S
Total

Page 30

320183785.xlsx

EATHAKKOVIL-PT-2013-2014(New)

Amount

Rate / Unit

3408.70
248.30

3657.00

3657.00
43.35
3700.35

3700.35

2272.46
248.30

2520.76

2520.76
43.35
2564.11

2564.11

1704.35
248.30

1952.65

1952.65
43.35
1996.00

1996.00

1363.48
248.30

1611.78

1611.78
43.35
1655.13

1655.13

102.56
1.61
717.20
114.00

116.20

226.60
1161.97

44.60

44.60

Page 31

320183785.xlsx

44.60

44.60

41.85
20.93

62.78

62.78

41.85
41.85

83.70

83.70

14.70
14.70

14.70

115.60
2.54

118.14

118.14
3.05

121.19

121.19

153.30
2.54

155.84

155.84
3.05
158.89

158.89

117.05
13.00

130.05

130.05

7029.00
7448.08
586.80
4035.60

2200.41

2904.60

Page 32

320183785.xlsx

2200.41

22004.08

7029.00
8981.99
586.80
4035.60

2353.80

2904.60
23537.99

7029.00
11538.51
586.80
4035.60

2609.45

2904.60
26094.51

9657.00
11343.44
586.80
4035.60

2852.74

2904.60
28527.44

3710.00
494.00
5627.44
2577.30
3455.60

2198.37

3214.80
2904.60
21983.74

5240.56
1171.83
363.00
978.00

3337.59

456.00

Page 33

320183785.xlsx
3337.59

1236.00
9445.39

5240.56
1815.39
363.00
978.00

3565.00

456.00
1236.00
10088.95

3921.50
363.00

428.45

4284.50

3337.59
1001.28

2336.32

2336.32

9657.00
16651.56
586.80
4035.60

3383.56

2904.60
33835.56

93.00
93.00

330.00
330.00

135.00

330.00

51009.30
480.00

62.76

Page 34

320183785.xlsx

11270.00

62.76

62759.30

9657.00
1117.35
15296.52
1141.00

3931.73

4833.60
7271.80
39317.27

9657.00
1117.35
20395.36
1141.00

4441.61

4833.60
7271.80
44416.11

231.72
399.30
114.00

97.16

226.60
971.62
256.41
399.30
250.80

113.31

226.60
1133.11
7523.84
6089.00
653.40
4035.60

2120.64

2904.60

Page 35

320183785.xlsx
2120.64

21206.44

7834.50
16456.48
586.80
4035.60

3181.80

2904.60
31817.98
795.45
4.83

80.03

800.28
3100.40
307.69
1161.97
48.79
399.30

643.10

684.60
501.60
226.60
6430.95
4455.00
370.03
92.00
399.30

794.83

1336.60
615.60
679.80
7948.33

5060.00
538.46
92.00
399.30

826.54

880.20

Page 36

320183785.xlsx
826.54
615.60
679.80
8265.36

3591.00
307.69

506.07

1161.97
5060.67
75.63
15.00
521.60

12.82

114.00
556.20
1282.43
12.82
6.41

19.24

19.24

142.12
146.50
114.00

56.74

164.80
567.42

15.00
41.40
73.25
57.00 269.05
82.40
269.05
269.05
133.28
441.21
644.60

149.15

Page 37

320183785.xlsx
149.15
3.31
1491.45

564.10
258.50
0.30

82.29

822.90

0.00
0.00

94.00
94.00

0.00

94.00

1189.02
230.77
142.00
163.00

242.88

250.80
453.20
2428.79
2428.79
2423.53
130.50

543.60

453.20
5436.02
255.00
351.60
2.30

60.89

608.90

d distember
15.00

Page 38

320183785.xlsx

41.40
73.25
57.00 269.05
82.40
269.05

269.05
132.00
146.50
114.00

82.64

164.80
826.35

269.05
105.19
146.50
114.00

79.95

164.80
799.54

31.50
559.02
351.60

94.29

0.80
942.92

28.50
480.25
322.30

83.16

0.55
831.60

qm)

138.19
223.30

76.37

Page 39

320183785.xlsx
76.37
20.35
381.84

95.45
45.82

549.25

188.28
329.55

1066.50
2877.60

5396.10

1452.00
5396.10

1174.63
223.30

323.88

220.16
1.33
1619.42

68.73
323.88

552.31

5.05
397.66

Page 40

ABSTRACT TENDER REGISTER


Construction of compound wall at Maravapatty Pu school inKothalothu pt
Total No of Tenders Received : TWO
Date of Tender:
Number of Calls: Single call

Sl.No
Name of Contractor/Tenderer
.

Mrs K.KANTHASAMY Contructor


Maravapatty

Name of the Scheme: CSIDS-2013-2014


113000/-

Whether Registered Contractor or not


and if Registered the serial no in the
Register of Contractor

Tender
Precentage

Amount of
Deposits

Recommendation of the
Executive authority and
panchayat union if there
is one

Yes

0.19% less
Est.Rate

Rs:1130/-Ch.No:12028/27/8/13

UT OF TWO TENDERS LOWEST R


Mrs P.PANDI Contructor IS---01
Estimate Rates Please MAY BE
APPROVAL
2

Mr-V.Kubenderan.Contructor
y Maravapatty

Yes

.024% above
Est.Rate

Rs.1130/-Ch.No:

2014

Recommendation of the
Orders of the authority
Executive authority and
component to accept the
anchayat union if there
tender
is one
6

T OF TWO TENDERS LOWEST RATE QUOATED BYMrs P.PANDI Contructor IS---019.% LESS Then The
Estimate Rates Please MAY BE Recommended
APPROVAL

COMPARATIVE STATEMENT
Construction of compound wall at Maravapatty Pu school inKothalothu pt

113000

Name of the Scheme: CSIDS-2013-2014


As per Estimate

Sl.No. DESCRIPTION OF WORK

Rate Quated by P.PANDI

Qty

Rate

Amount

Rate

Amount

Earthwork excavation and depositing on bank with initial leads of


10m and lifts of 2m In hard stiff clay, stiff black cotton soil, hard
red earth,shale murrams, gravel stoney earth and earth muds with
50% fair sized boulders and hard gravelly soils as pe

11.25

83.70

941.63

83.00

933.75

Cement concrete 1:5:10mix using 40mm ISS HBG metal for


foundation including watering whenever necessary and laid in
layers not more than 15cm thick compacting etc., complete
complying with std. Specifications and as directed. Rate for 10
cum.

1.88

2173.96

4076.18

2173.00

4074.38

Random rubble Masonry in cm 1:5 including consolidation as per


standard specification

13.80

2196.40

30310.32

2196.00

30304.80

Brick work in CM 1 : 5 using country bricks ground moulded of


size 23 x 11 x 7 cm including cost and conveyance of materials to
site and all other labour charges as per standard specification.

8.98

3313.61

29744.45

3313.00

29738.98

Reinforced cement concrete 1:2:4 mix using 20 mm HBG metal for


all RCC items of works excluding cost of reinforcement and
fabricating charges, centering and shuttering but including curing
and providing fixtures like fan clamps in the RCC floor or Roof sl

0.83

3921.94

3235.60

3921.00

3234.83

150.00

56.95

8542.50

56.00

8400.00

Supply and fabrication of steel including cast and all other labour
charges etc comlete

7
8

Plastering in CM 1 : 5, 12 mm thick , including cost and


conveyance of all materials to site and all other labour charges
including curing etc., as per standard specification.
Painting two coat withplastic emulsion best approved first quality
of Snow Cem Powder of approved colour over the priming coat
etc., complete complying with standard specification ( The paint
should
total be got approved by the depa

As Per Estimate
As Quated By P.PANDI
Difference
Less Estimate Rate

86.50

96.73

8367.15

96.50

8347.25

86.50

150.00

12975.00

150.00

12975.00

98192.82

98008.98

98192.82

As Per Estimate

98008.98

As Quated By Mr-V.Kubenderan

183.84

Difference
0.19 %

Above Estimate Rate

Amount the two tender received


The lowest rate quoated by P.PANDI Maravapatty Contructor

0.19% Less Estimate rate is recommended

013-2014
Rate Quated V.Kubenderan
Rate

Amount

85.00

956.25

2174.00

4076.25

2197.00

30318.60

3314.00

29747.96

3925.00

3238.13

57.00

8550.00

97.00

8390.50

152.00

13148.00
98425.68

98192.82
98425.68

-232.86
-0.24 %

nder received,

ecommended for Approval

ANNEXURE
Construction of compound wall at Maravapatty Pu school inKothalothu pt

Amount of Sanctioned Estimate and Ref.No

113000/-

Scheme and Year

Comparative Value Work

98192.82

Rates Adopated in the Sanctioned Estimate

2012-2013

Date of Tender Received

No of Tender Received

Name of the Lowest Bitter

Whether he has Remitted E.M.D if so by what means

Whether he is Registered Contractor in the P.U.Office

10

Subsisting contract value including this work

11

How the extra cost above the actual work met out

12

Money limit of the Contractor

13

Whether the Steel or Cement involved if so the arrangement


made to produce the same

14

Remarks

Name of the Scheme: CSIDS-20


2014

TWO
Mr P.Pandi
Rs1130/-Ch.No:Yes P.No
Nil
-Rs.5.00 Lakhs
By Departmental
0.19%Less Tender Value

The Lower Rate Quoated by P.PANDI. Contructor 0.19% less Estimate Rate may be Recommened for
Approvel

113000/-

Name of the Scheme: CSIDS-20132014


98192.82
2012-2013

TWO
Mr P.Pandi

s1130/-Ch.No:Yes P.No
Nil
-Rs.5.00 Lakhs
By Departmental
0.19%Less Tender Value
Rate may be Recommened for

DATA
KOTHALOTHU-PT-2013-2014(New)
Qty
Cement Mortar 1:2 (1Cum)
720.00 Kg
1.00 Cum

Description of work

Rate

Cost of Cement

Per
4.72

Cost of Sand

221.50

Kg

3398.11

Cum

221.50

Total for concrete works


1.00 Cum

Mixing Charges

Amount

3619.61

43.35

Cum

Total for Mortar

35.90
3655.51

Cement Mortar 1:3 (1Cum)


480.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.72
221.50

Kg

2265.41

Cum

221.50

Total for concrete works


1.00 Cum

Mixing Charges

2486.91
43.35

Cum

Total for Mortar

43.35
2530.26

Cement Mortar 1:4 (1Cum)


360.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.72
221.50

Kg

1699.06

Cum

221.50

Total for concrete works


1.00 Cum

Mixing Charges

1920.56
43.35

Cum

Total for Mortar

43.35
1963.91

Cement Mortar 1:5 (1Cum)


288.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.72
221.50

Kg

1359.24

Cum

221.50

43.35
1.00 Cum

Mixing Charges

43.35

Cum

Total for Mortar

1580.74
43.35
1624.09

Pointing 1:3 (10Sqm / 1 Sqm)


0.04 Cum
0.038 Kg

Cement Mortar 1:3 (1Cum)

2530.26

Cum

101.21

Water Proofing Compound

42.35

Kg

1.61

2.20 No.

Mason II Class

326.00

No.

717.20

0.50 No.

Mazdoor Category - I

228.00

No.

114.00

206.00

No.

226.60
1160.62

44.60

Cum

44.60

41.85
20.93

Cum
Cum

41.85
20.93
62.78

1.10 No.

Mazdoor Category - II
Total
Earth work SS 20 A (1Cum)
1.00 Cum
From schedule of rate
Earth work SS 20 B- Narrow Drain (1Cum)
1.00 Cum
From schedule of rate
1.00 Cum
50% Extra
Total

Earth work SS 20 B Building ( 1 Cum)


1.00 Cum

From schedule of rate

41.85

Cum

41.85

1.00 Cum

100% Extra

41.85

Cum

41.85
83.70

Earth Filling (1Cum)


1.00 Cum

Refilling charges

12.20

Cum

12.20

115.60

Cum

100.40

Well Gravel Filling (1Cum)


1.00 Cum

Cost of Well Gravel

1.00 Cum

Stacking Charges

3.05

Kg

3.05

1.00 Cum

Filling charges

2.54

No.

2.54
105.99

Red Gravel Filling (1Cum)


1.00 Cum

Cost of Red Gravel

153.30

Cum

1.00 Cum

Stacking Charges

3.05

Kg

3.05

1.00 Cum

Filling charges

2.54

No.

2.54

Total

118.80

124.39

Sand Filling (1Cum)


1.00 Cum

Cost of Sand

1.00 Cum

Filling charges

117.05

Cum

117.05

13.00

Cum

13.00

Total

130.05

Plain Cement Concrete 1:5:10 (10Cum / 1 Cum)


9.00 Cum

40mm ISS HBG

788.80

Cum

7099.20

4.50 Cum

CM 1:5

1580.74

Cum

7113.35

1.80 No.

Mason II Class

326.00

No.

586.80

17.70 No.

Mazdoor Category - I

228.00

No.

4035.60

14.10 No.

Mazdoor Category - II

206.00

No.

2904.60

Total

21739.55

Plain Cement Concrete 1:4:8 (10Cum / 1 Cum)


9.00 Cum

40mm ISS HBG

788.80

Cum

7099.20

4.50 Cum

CM 1:4

1920.56

Cum

8642.50

1.80 No.

Mason II Class

326.00

No.

586.80

17.70 No.

Mazdoor Category - I

228.00

No.

4035.60

14.10 No.

Mazdoor Category - II

206.00

No.

2904.60

Total

23268.70

Plain Cement Concrete 1:2:4(10Cum / 1 Cum)


9.00 Cum

20mm ISS HBG

1080.80

Cum

9727.20

4.50 Cum

CM 1:2

3619.61

Cum

16288.25

1.80 No.

Mason II Class

326.00

No.

586.80

17.70 No.

Mazdoor Category - I

228.00

No.

4035.60

14.10 No.

Mazdoor Category - II

206.00

No.

2904.60

Total

33542.45

Brick Work CM1:5(100cft/1 cum)


1300.00 Cum
0.708 No.

Country Bricks

3998.20

1000 nos

4766.65

CM 1:5

1624.09

No.

1149.86

1.00 No.

Mason I Class

363.00

No.

363.00

3.00 No.

Mason II Class

326.00

No.

978.00

2.00 No.

Mazdoor Category - I

228.00

No.

456.00

6.00 No.

Mazdoor Category - II

206.00

No.

1236.00

Total

8949.50

Plastering 1:5 - 12mm (10Sqm - 1 Sqm)


0.14 Cum

CM 1:5

1624.09

Cum

227.37

1.10 No.

Mason I Class

363.00

Cum

399.30

0.50 No.

Mazdoor Category - I

228.00

No.

114.00

1.10 No.

Mazdoor Category - II

206.00

No.

226.60

Total

967.27

Random Rubble Masonry 1:5 (10 Cum / 1 Cum)


10.00 Cum
Rough Stone
1.00 Cum
Bond Stone
3.40 No.
Cement Mortar 1 : 5
7.10 No.
Masson I st Class
10.60 No.
Masson II nd class
14.10 No.
Mazdoor Category I
14.10 No.
Mazdoor Category II

378.80
501.80
1624.09
363.00
326.00
228.00
206.00

Cum
Cum
No.
No.
No.
No.
No.
Total

3788.00
501.80
5521.92
2577.30
3455.60
3214.80
2904.60
21964.02

Plain Cement Concret 1:2:4 (10 Cum / 1 Cum)


9.00 Cum
20 mm ISS HBG
4.50 Cum
Cement Mortar 1:2
1.80 No.
Masson II nd class
17.70 No.
Mazdoor Category I
14.10 No.
Mazdoor Category II

1080.80
3619.61
326.00
228.00
206.00

Cum
Cum
No.
No.
No.
Total

9727.20
16288.25
586.80
4035.60
2904.60
33542.45

Centering & Shuttering (Steel) - small culvert & concrete side wall
1.00 Sqm
As per DRDA

93.00

Sqm

93.00

Centering & Shuttering (Steel) - Other than Plinth Beam (1 Sqm)


1.00 Sqm
As per DRDA
Steel Fabrication (1 MT / 1 Kg)
1.00 MT
Cost of Steel
0.01 MT
Cost of Binding Wire
35.00 No.
Fitter Ist Class
Reinforced Cement Concret 1:2:4 (10 Cum / 1 Cum)
9.00 Cum
20 mm ISS HBG
4.50 Cum
Sand
3231 Kg
Cement
3.50 No.
Masson II nd class
21.20 No.
Mazdoor Category I
35.30 No.
Mazdoor Category II
Reinforced Cement Concret 1:1.5:3 (10 Cum / 1 Cum)
9.00 Cum
20 mm ISS HBG
4.50 Cum
Sand
4308 Kg
Cement
3.50 No.
Masson II nd class
21.20 No.
Mazdoor Category I
35.30 No.
Mazdoor Category II

330.00

50994.60
48000.00
322.00

Total

93.00

Sqm
Total

330.00
330.00

MT
MT
No.
Total

50994.60
480.00
11270.00
62744.60

1080.80
221.50
4.72
326.00
228.00
206.00

Cum
Cum
Kg
No.
No.
No.
Total

9727.20
996.75
15249.03
1141.00
4833.60
7271.80
39219.38

1080.80
221.50
4.72
326.00
228.00
206.00

Cum
Cum
Kg
No.
No.
No.
Total

9727.20
996.75
20332.04
1141.00
4833.60
7271.80
44302.39

Rate / Unit

3619.61
3655.51

2486.91
2530.26

1920.56
1963.91

1580.74
1624.09

116.06

44.60

62.78

83.70

12.20

105.99

124.39

130.05

2173.96

2326.87

3354.25

3162.37

96.73

2196.40

3354.25

135.00

135.00

330.00

62.74

3921.94

4430.24

320183785.xlsx

DATA - BUILDING
Quantity

Description

KOTHALOTHU-PT-2013-2014(Ne

Rate

per

Cement Mortar 1 : 2 ( 1 Cum )


720.00 Kg
1.00 Cum

Cement

4.72

Sand

221.50

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 3 ( 1 Cum )


480.00 Kg
1.00 Cum

Cement

4.72

Sand

186.50

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 4 ( 1 Cum )


360.00 Kg
1.00 Cum

Cement

4.72

Sand

186.50

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Cement Mortar 1 : 5 ( 1 Cum )


288.00 Kg
1.00 Cum

Cement

4.72

Sand

186.50

Kg
Cum

Total for concrete Works


1.00 Cum

Mixing Charges

43.35

Cum
Total for Mortar

Pointing 1 : 3 ( 10 Sqm / 1 Sqm )


0.04 Cum
0.038 Kg

Cement Mortar 1:3

2495.26

Water Proofing Compound

Cum

42.35

Kg

2.20 No.

Mason II nd Class

326.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Earth Work SS 20 A ( 1 Cum)


1.00 Cum

From Schedule of Rate

44.60

Page 57

Cum

320183785.xlsx

Total
Earth Work SS 20 B - Narrow Drain (1 Cum)
1.00 Cum

From Schedule of Rate

41.85

Cum

1.00 Cum

50 % Extra

20.93

Cum
Total

Earth Work SS 20 B - Building (1 Cum)


1.00 Cum

From Schedule of Rate

41.85

Cum

1.00 Cum

100 % Extra

41.85

Cum
Total

Earth Filling (1 Cum)


1.00 Cum

Refilling Charges

14.70

Cum
Total

Well Gravel Filling (1 Cum)


1.00 Cum

Cost of Well Gravel

1.00 Cum

Filling Charges

115.60

Cum

2.54

Cum
Total

1.00 Cum

Stacking Charges

3.05

Cum
Total

Red Gravel Filling (1 Cum)


1.00 Cum

Cost of Red Gravel

1.00 Cum

Filling Charges

153.30

Cum

2.54

Cum
Total

1.00 Cum

Stacking Charges

3.05

Cum
Total

Sand Filling (1 Cum)


1.00 Cum

Cost of Sand

1.00 Cum

Filling Charges

117.05

Cum

13.00

Cum
Total

Plain Cement Concret 1:5:10 (10 Cum / 1 Cum)


9.00 Cum

40 mm ISS HBG

788.80

Cum

4.50 Cum

Cement Mortar 1:5

1545.74

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.

Page 58

320183785.xlsx

Total
Plain Cement Concret 1:4:8 (10 Cum / 1 Cum)
9.00 Cum

40 mm ISS HBG

788.80

Cum

4.50 Cum

Cement Mortar 1:4

1885.56

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Plain Cement Concret 1:3:6 (10 Cum / 1 Cum)


9.00 Cum

40 mm ISS HBG

788.80

Cum

4.50 Cum

Cement Mortar 1:3

2451.91

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Plain Cement Concret 1:3:6 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

1080.80

Cum

4.50 Cum

Cement Mortar 1:3

2451.91

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Random Rubble Masonry 1:5 (10 Cum / 1 Cum)


10.00 Cum

Rough Stone

378.80

Cum

1.00 Cum

Bond Stone

501.80

Cum

3.40 No.

Cement Mortar 1 : 5

1589.09

No.

7.10 No.

Masson I st Class

363.00

No.

10.60 No.

Masson II nd class

326.00

No.

14.10 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Brick Work CM 1:5 (100 Cft / 1 Cum)


1300 No.

Country Bricks

3998.20

1000 No.

0.708 Cum

Cement Mortar 1 : 5

1589.09

Cum

1.00 No.

Masson I st Class

363.00

No.

3.00 No.

Masson II nd class

326.00

No.

2.00 No.

Mazdoor Category I

228.00

No.

Page 59

320183785.xlsx

6.00 No.

Mazdoor Category II

206.00

No.
Total

Brick Work CM 1:3 (100 Cft / 1 Cum)


1300 No.

Country Bricks

3998.20

1000 No.

0.708 Cum

Cement Mortar 1 : 3

2495.26

Cum

1.00 No.

Masson I st Class

363.00

No.

3.00 No.

Masson II nd class

326.00

No.

2.00 No.

Mazdoor Category I

228.00

No.

6.00 No.

Mazdoor Category II

206.00

No.
Total

Brick Partition Wall CM 1:3 (10 Sqm / 1 Sqm)


1.10 Cum

Brick Work 1 : 3

1.00 No.

Masson I st Class

3532.62

Cum

363.00

No.
Total

Honey Comb Brick Work CM 1:5 (1 Cum)


1.00 Cum

Brick Work 1 : 5

3305.91

Cum

0.30 Cum

BW1:5 Less for Honey Comb

3305.91

Cum
Total

Plain Cement Concret 1:2:4 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

1073.00

Cum

4.50 Cum

Cement Mortar 1:2

3619.61

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

Centering & Shuttering (Steel) - small culvert & concrete side wall
1.00 Sqm

As per DRDA

93.00

Sqm
Total

Centering & Shuttering (Steel) - Other than Plinth Beam (1 Sqm)


1.00 Sqm

As per DRDA

330.00

Sqm
Total

Steel Fabrication (1 MT / 1 Kg)


1.00 MT

Cost of Steel

50994.60

MT

0.01 MT

Cost of Binding Wire

48000.00

MT

Page 60

320183785.xlsx

35.00 No.

Fitter Ist Class

322.00

No.
Total

Reinforced Cement Concret 1:2:4 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

4.50 Cum

Sand

3231 Kg

Cement

3.50 No.

1073.00

Cum

221.50

Cum

4.72

Kg

Masson II nd class

326.00

No.

21.20 No.

Mazdoor Category I

228.00

No.

35.30 No.

Mazdoor Category II

206.00

No.
Total

Reinforced Cement Concret 1:1.5:3 (10 Cum / 1 Cum)


9.00 Cum

20 mm ISS HBG

4.50 Cum

Sand

4308 Kg

Cement

3.50 No.

1073.00

Cum

186.50

Cum

4.72

Kg

Masson II nd class

326.00

No.

21.20 No.

Mazdoor Category I

228.00

No.

35.30 No.

Mazdoor Category II

206.00

No.
Total

Plastering 1:5 - 12 mm (10 Sqm / 1 Sqm)


0.14 Cum

Cement Mortar 1 : 5

1589.09

Cum

1.10 No.

Masson I st Class

363.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Plastering 1:3 - 10 mm (10 Sqm / 1 Sqm)


0.10 Cum

Cement Mortar 1 : 3

2495.26

Cum

1.10 No.

Masson I st Class

363.00

No.

1.10 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Weathering Course Concretet (10 Cum / 1 Cum)


12.80 Cum

Brick Jelly 20 mm

560.80

Cum

1215.20

Cum

5.00 Cum

Slacked Lime

1.80 No.

Masson I nd class

363.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.

Page 61

320183785.xlsx

Total

Granolithic Floor Finishing (10 Sqm / 1 Sqm)


PCC 1:2:4 Using 10 - 12 mm ISS HBG - 10 Cum
9.00 Cum

10 - 12 mm ISS HBG

878.30

Cum

4.50 Cum

Cement Mortar 1 : 2

3619.61

Cum

1.80 No.

Masson II nd class

326.00

No.

17.70 No.

Mazdoor Category I

228.00

No.

14.10 No.

Mazdoor Category II

206.00

No.
Total

For 25 mm Thick (10 Sqm / 1 Sqm)


0.25 Cum

PCC 1:2:4 10-12 mm

1.00 LS

Rubbing & Lining

3172.00
4.83

Cum
LS
Total

Roof Tiles (10 Sqm / 1 Sqm)


250.00 No.
Machine Pressed Tiles
0.12 Cum

Cement Mortar 1 : 3

10.00 Sqm

Pointing 1 : 3

1.152 Kg

Water proofing compound

12375.20

1000 No.

2495.26

Cum

115.92

Sqm

42.35

Kg

1.10 No.

Masson I st Class

363.00

No.

2.10 No.

Masson II nd class

326.00

No.

2.20 No.

Mazdoor Category I

228.00

No.

1.10 No.

Mazdoor Category II

206.00

No.
Total

Glazed Tiles (10 Sqm / 1 Sqm) 0.15 x 0.15m


450.00 No.

Glazed Tiles

0.10 Cum

Cement Mortar 1 : 2

4.00 Kg

White Cement

1.10 No.

9.90

No.

3662.96

Cum

23.00

Kg

Masson I st Class

363.00

No.

4.10 No.

Masson II nd class

326.00

No.

2.70 No.

Mazdoor Category I

228.00

No.

3.30 No.

Mazdoor Category II

206.00

No.
Total

Ceramic Tiles (10 Sqm / 1 Sqm) 0.30 x 0.30


115.00 No.

Ceramic Tiles

0.21 Cum

Cement Mortar 1 : 3

4.00 Kg

White Cement

1.10 No.
2.70 No.

44.00

No.

2495.26

Cum

23.00

Kg

Masson I st Class

363.00

No.

Masson II nd class

326.00

No.

Page 62

320183785.xlsx

2.70 No.

Mazdoor Category I

228.00

No.

3.30 No.

Mazdoor Category II

206.00

No.
Total

Cuddappa Slab (10 Sqm / 1 Sqm)


10.50 Sqm
0.12 Cum
10.00 Sqm

Cuddappa Slab
Cement Mortar 1 : 3
Pointing 1 : 3

342.00

Sqm

2495.26

Cum

115.92

Sqm
Total

White Wash 2 Coat (100 Sqm / 1 Sqm)


0.07 Cum

Shell Lime

1080.40

Cum

1.00 L.S

Gum, Kanji Water, Brush

15.00

L.S

1.60 No.

Masson II nd class

326.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

2.70 No.

Mazdoor Category II

206.00

No.
Total

Colour Wash 2 Coat (1 Sqm)


1.00 Sqm

Rate of White Wash

1.00 Sqm

50 % Extra

12.82

Sqm

6.41

Sqm
Total

Cement Paint 2 Coat (10 Sqm / 1 Sqm)


3.23 Kg

Cement Paint

44.00

Kg

0.50 No.

Painter I st class

293.00

No.

0.50 No.

Mazdoor Category I

228.00

No.

0.80 No.

Mazdoor Category II

206.00

No.
Total

Priming coat for plastic emulsion paint


10.00 Sqm

Through scrapping of plastered surface

1.50

Kg

23.00

Kg

1.80 Kg

White Cement

0.25 No.

Painter I st class

293.00

Each

0.25 No.

Mazdoor Category I

228.00

Each

0.40 No.

Mazdoor Category II

206.00

Each
Total

Emulsion Paint 2 Coat (10 Sqm / 1 Sqm)


10.00 Sqm

Priming Coat

269.05

10 Sqm

0.98 Lit

Primer

136.00

Lit

1.40 Lit

Plastic Emulsion 1st Quality

315.15

Lit

2.20 No.

Painter I st class

293.00

No.

Page 63

320183785.xlsx

Sundries, Brush, Sand Paper, Putty,


Plaster of Paris
Total

Enamel Paint 2 Coat (10 Sqm / 1 Sqm)


2.22 Lit

Enamel paint

254.10

Lit

1.10 No.

Painter I st class

235.00

No.

1.00 LS

Brush,soap,putty etc.

0.20

LS
Total

Fixing Charges - MS Door - (1Sqm)


1.00 Sqm

Schedule of Rate 2012 - 13

Sqm
Total

Fixing Charges - MS Window & Ventilator- (1Sqm)


1.00 Sqm

Schedule of Rate 2012 - 13

94.00

Sqm
Total

Mangalore tiles
160.00

Nos. Mangalore tiles

14535.20

1000/Nos.

2495.26

Cum

0.09

Cum CM 1:3

0.50

Nos. Carpenter 1st class

284.00

Each

0.50

Nos. Mason 1st class

326.00

Each

1.10

Nos. Mazdoor Category I

228.00

Each

2.20

Nos. Mazdoor Category II

206.00

Each

355.92

Sqm

14.5996

Each

Mangalore tiles over Ceiling tiles


10.00
166.00

Sqm Mangalore tiles


Nos. Ceiling tiles

0.50

Nos. Mason 2nd class

261.00

Each

2.20

Nos. Mazdoor Category II

206.00

Each

100.00

Lit

293.00

Each

Black board paint


2.55
1.20

Lit Black oxide enamel paint


No. Painter I st class
Sundries

LS

Painting one coat with Cement for priming coat for the base of oil bound distember
10.00 Sqm

Clean removal of cement plaster from walls

Page 64

1.50

Kg

320183785.xlsx

1.80 Kg

White Cement

23.00

Kg

0.25 No.

Painter I st class

293.00

Each

0.25 No.

Mazdoor Category I

228.00

Each

0.40 No.

Mazdoor Category II

206.00

Each
Total

Cement paint
10.00

Sqm One priming coat using white cement

269.05

Sqm

3.00

Kg Cement Paint

44.00

Kg

0.50

Nos. Painter I st class

293.00

Each

0.50

Nos. Mazdoor Category I

228.00

Each

0.80

Nos. Mazdoor Category II

206.00

Each

269.05

Sqm

78.50

Kg

Oil bound distember


10.00

Sqm One priming coat using white cement

1.34

Kg Oil bound distember

0.50

Nos. Painter I st class

293.00

Each

0.50

Nos. Mazdoor Category I

228.00

Each

0.80

Nos. Mazdoor Category II

206.00

Each

31.50

Sqm

254.10

Kg

293.00

Each

28.50

Sqm

254.10

Kg

293.00

Each

Old wood work


10.00

Sqm Removal of old paint surface from wood work

2.20
1.20

Lit Synthetic enamel paint


Nos. Painter I st class
Sundries

Old iron work


10.00

Sqm Removal of old paint surface from iron work

1.89
1.10

Lit Synthetic enamel paint


Nos. Painter I st class
Sundries

RCC Precast Slab1:2:4 with Nominal Reinforcement - 50 mm Thick (1 Sqm)


Cost of Mould - 5 Uses / 1 Use
0.0048 Cum
3.50 Rm

Cost of CW incl. labour etc.,


CW Reeper (50 x 25 mm)

Page 65

28790.00

Cum

63.80

Rm

320183785.xlsx

0.0048 Cum

Labour Charges

4239.00

Cum
Sub Total

Main Data
0.03 Cum

CC 1:2:4 (10-12 mm ISS HBG)

3172.00

Cum

0.60 Sqm

Moulding Charges

76.37

Sqm

3.00 Kg

Steel

62.74

Kg
Total

RCC Jalli 1:2:4 with Nominal Reinforcement - 50 mm Thick (1 Sqm)


Labour for Wrought & Put up - 1 Cum
4.50 Nos.

Carpenter I Class

237.00

Nos.

13.20 Nos.

Carpenter II Class

218.00

Nos.

Mazdoor Category II

165.00

Nos.

8.80 Nos.

Sub Total
Cost of Mould - 5 Uses / 1 Use
0.0408 Cum
3.50 Rm
0.0408 Cum
L.S

CW Scantlings
CW Reapers 50 x 25 mm
Labour for Wrought & Putup
Sundries for Nails

28790.00

Cum

63.80

Rm

5396.10

Cum

--

L.S
Sub Total

Main Data
0.0216 Cum

CC 1:2:4 (10-12 mm ISS HBG)

1.00 Use

Moulding Charges-1Use

3.00 L.S

Finishing & Fixing Charge

3172.00

Cum

323.88

Use

--

L.S
Total

Page 66

320183785.xlsx

KOTHALOTHU-PT-2013-2014(New)

Amount

Rate / Unit

3398.11
221.50

3619.61

3619.61
43.35
3662.96

3662.96

2265.41
186.50

2451.91

2451.91
43.35
2495.26

2495.26

1699.06
186.50

1885.56

1885.56
43.35
1928.91

1928.91

1359.24
186.50

1545.74

1545.74
43.35
1589.09

1589.09

99.81
1.61
717.20
114.00

115.92

226.60
1159.22

44.60

44.60

Page 67

320183785.xlsx

44.60

44.60

41.85
20.93

62.78

62.78

41.85
41.85

83.70

83.70

14.70
14.70

14.70

115.60
2.54

118.14

118.14
3.05

121.19

121.19

153.30
2.54

155.84

155.84
3.05
158.89

158.89

117.05
13.00

130.05

130.05

7099.20
6955.85
586.80
4035.60

2158.21

2904.60

Page 68

320183785.xlsx

2158.21

21582.05

7099.20
8485.00
586.80
4035.60

2311.12

2904.60
23111.20

7099.20
11033.59
586.80
4035.60

2565.98

2904.60
25659.79

9727.20
11033.59
586.80
4035.60

2828.78

2904.60
28287.79

3788.00
501.80
5402.92
2577.30
3455.60

2184.50

3214.80
2904.60
21845.02

5197.66
1125.08
363.00
978.00

3305.91

456.00

Page 69

320183785.xlsx
3305.91

1236.00
9355.74

5197.66
1766.64
363.00
978.00

3532.62

456.00
1236.00
9997.30

3885.88
363.00

424.89

4248.88

3305.91
991.77

2314.14

2314.14

9657.00
16288.25
586.80
4035.60

3347.23

2904.60
33472.25

93.00
93.00

330.00
330.00

135.00

330.00

50994.60
480.00

62.74

Page 70

320183785.xlsx

11270.00

62.74

62744.60

9657.00
996.75
15249.03
1141.00

3914.92

4833.60
7271.80
39149.18

9657.00
839.25
20332.04
1141.00

4407.47

4833.60
7271.80
44074.69

222.47
399.30
114.00

96.24

226.60
962.37
249.53
399.30
250.80

112.62

226.60
1126.23
7178.24
6076.00
653.40
4035.60

2084.78

2904.60

Page 71

320183785.xlsx
2084.78

20847.84

7904.70
16288.25
586.80
4035.60

3172.00

2904.60
31719.95
793.00
4.83

79.78

797.83
3093.80
299.43
1159.22
48.79
399.30

641.33

684.60
501.60
226.60
6413.34
4455.00
366.30
92.00
399.30

794.46

1336.60
615.60
679.80
7944.60

5060.00
524.00
92.00
399.30

825.09

880.20

Page 72

320183785.xlsx
825.09
615.60
679.80
8250.90

3591.00
299.43

504.97

1159.22
5049.65
75.63
15.00
521.60

12.82

114.00
556.20
1282.43
12.82
6.41

19.24

19.24

142.12
146.50
114.00

56.74

164.80
567.42

15.00
41.40
73.25
57.00 269.05
82.40
269.05
269.05
133.28
441.21
644.60

149.15

Page 73

320183785.xlsx
149.15
3.31
1491.45

564.10
258.50
0.30

82.29

822.90

0.00
0.00

94.00
94.00

0.00

94.00

2325.63
224.57
142.00
163.00

355.92

250.80
453.20
3559.21
3559.21
2423.53
130.50

656.64

453.20
6566.43
255.00
351.60
2.30

60.89

608.90

d distember
15.00

Page 74

320183785.xlsx

41.40
73.25
57.00 269.05
82.40
269.05

269.05
132.00
146.50
114.00

82.64

164.80
826.35

269.05
105.19
146.50
114.00

79.95

164.80
799.54

31.50
559.02
351.60

94.29

0.80
942.92

28.50
480.25
322.30

83.16

0.55
831.60

qm)

138.19
223.30

76.37

Page 75

320183785.xlsx
76.37
20.35
381.84

95.16
45.82

548.69

188.23
329.21

1066.50
2877.60

5396.10

1452.00
5396.10

1174.63
223.30

323.88

220.16
1.33
1619.42

68.52
323.88

552.01

5.05
397.45

Page 76

2012 - 2013

LEAD STATEMENT
Material Name

Source

KOTHALOTHU-PT-2013-2014(New)
Distance
in Km

Cost
@ Quarry

Conveyance

Total Cost
@
Work Site

Cement

andipatti

4700

19.60

4719.60

Steel

andipatti

50975

19.60

50994.60

Kunnur Vadaveeranaickanpatty

15

110.00

111.50

221.50

Sand for filling

Local

110.00

7.80

117.80

Well Gravel

Local

107.80

7.80

115.60

Red Gravel

Nakkalakaradu

130.00

46.80

176.80

ISS - HBG - 40 mm

Nakkalakaradu

742.00

46.80

788.80

ISS - HBG - 20 mm

Nakkalakaradu

1034.00

46.80

1080.80

ISS - HBG - 10 & 12mm

Nakkalakaradu

831.50

46.80

878.30

Rough Stone for Masonary

Nakkalakaradu

332.00

46.80

378.80

Bond Stone for Masonary

Nakkalakaradu

455.00

46.80

501.80

Brick Jelly - 20 mm

K.P.PATTI

550.00

10.80

560.80

Country Bricks (23 x 11 x 7 cm)

K.P.PATTI

3985.00

13.20

3998.20

Pressed Tiles ( 20x20x2 cm)

andipatti

12340.00

35.20

12375.20

Mangaloore tiles (Class 'A')

andipatti

7405.00

35.20

7440.20

Best mangalore Ceiling tiles (Market rate)

andipatti

14500.00

35.20

14535.20

Local

1075.00

5.40

1080.40

andipatti

1180.00

35.20

1215.20

Sand for Mortor

Shell Lime
Slacked Lime

2012 - 2013

Certified that the leads are shortest and rates furnished are true and correct to the best of my knowledge & belief

2012 - 2013

HU-PT-2013-2014(New)
Unit
MT
MT
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
1000 Nos.
1000 Nos.
1000 Nos.
1000 Nos.
Cum
Cum

ef

2012 - 2013

SCHEDULE A
Name of the Work :Consruction of compound wall at Maravapatty Pu school inKothalothu pt
ESTIMATE: RS/Sl. No.

Probable
Quantity

11.25

1.88

13.80

8.98

0.83

150.00

86.50

WORK VALUE : Rs.


Description of work
Earthwork excavation and depositing on bank with
initial leads of 10m and lifts of 2m In hard stiff clay, stiff
black cotton soil, hard red earth,shale murrams, gravel
stoney earth and earth muds with 50% fair sized
boulders and hard gravelly soils as pe

Cement concrete 1:5:10mix using 40mm ISS HBG


metal for foundation including watering whenever
necessary and laid in layers not more than 15cm thick
compacting etc., complete complying with std.
Specifications and as directed. Rate for 10 cum.
Random rubble Masonry in cm 1:5 including
consolidation as per standard specification
Brick work in CM 1 : 5 using country bricks ground
moulded of size 23 x 11 x 7 cm including cost and
conveyance of materials to site and all other labour
charges as per standard specification.
Reinforced cement concrete 1:2:4 mix using 20 mm
HBG metal for all RCC items of works excluding cost
of reinforcement and fabricating charges, centering and
shuttering but including curing and providing fixtures
Supply
fabrication
of steel
including
like fan and
clamps
in the RCC
floor
or Roof cast
sl and all
other labour charges etc comlete
Plastering in CM 1 : 5, 12 mm thick , including cost
and conveyance of all materials to site and all other
labour charges including curing etc., as per standard
specification.

TNBPSS
No.

Rate
Words

86.50

LS

Painting two coat withplastic emulsion best approved


first quality of Snow Cem Powder of approved colour
over the priming coat etc., complete complying with
standard specification ( The paint should be got
approved by the depa

Provision for steel gate

CSIDS-2013-14

Fig

Unit in Words

Amount in
Rupees

SPECIFICATION REPORT

The specification report to accompany the estimate forConstruction of compound wall at Maravapatty PU School in
ESTIMATE Rs: 00000/Name of scheme:- CSIDS- 2013-2014
The Estimate cost of the proposed structure has been prepared for Rs. 00000/Rupees One lacks and Fourty thousand only), based on PWD schedule of rate for the year 2012-2013
The administrative approval obtained from The District Collector
Vide No. ______________ Dated _______________ .
The following provisions are made in this estimate.
Earthwork excavation in all classes of soil as per SS 20 B for for Corewall
Plain cement concrete 1:5:10 using 40 mm ISS HBG metal to CC ROAD
Supplying and filling in well gravel complete complying with standard specification.
Plain cement concrete 1:3:6 using 40 mm ISS HBG metal to CC ROAD

Centering and shuttering including necessary supports for plain surface in foundation
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick
and conveyance of materials to site and all other labour charges including consolidation as per standard specificatio
Plain Cement Concrete 1:2:4 using20 mm HBG metal for basement and flooring layers not more than 15 cm thick in
conveyance of materials to site and all other labour charges including consolidation as per standard specification
Supply and fixing of 150mm PVC pipe including all other labour charges as per standard specification.

Plastering in CM 1:5 12mm Thick


Necessary provisions for Tar pad
Necessary Lump Sum Provisions are made for Name board & Photos
The entire work will be carried out as per TNSS & SSRB and other relevant particulars
given time to time. The expenditure will be meet out under -CSIDS- 2013-2014

DATA
KOTHALOOTHU 2012-2013
Qty
Cement Mortar 1:2 (1Cum)
720.00 Kg
1.00 Cum

Description of work

Rate

Cost of Cement

Per
4.58

Cost of Sand

210.75

Kg

3295.87

Cum

210.75

Total for concrete works


1.00 Cum

Mixing Charges

Amount

3506.62

37.70

Cum

Total for Mortar

37.70
3544.32

Cement Mortar 1:3 (1Cum)


480.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.58
210.75

Kg

2197.25

Cum

210.75

Total for concrete works


1.00 Cum

Mixing Charges

2408.00
37.70

Cum

Total for Mortar

37.70
2445.70

Cement Mortar 1:4 (1Cum)


360.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.58
210.75

Kg

1647.94

Cum

210.75

Total for concrete works


1.00 Cum

Mixing Charges

1858.69
37.70

Cum

Total for Mortar

37.70
1896.39

Cement Mortar 1:5 (1Cum)


288.00 Kg
1.00 Cum

Cost of Cement
Cost of Sand

4.58
210.75

Kg

1318.35

Cum

210.75

Total for concrete works


1.00 Cum

Mixing Charges

1529.10
37.70

Cum

Total for Mortar

37.70
1566.80

Pointing 1:3 (10Sqm / 1 Sqm)


0.04 Cum
0.038 Kg

Cement Mortar 1:3 (1Cum)

2445.70

Cum

97.83

Water Proofing Compound

35.00

Kg

1.33
574.20

2.20 No.

Mason II Class

261.00

No.

0.50 No.

Mazdoor Category - I

181.00

No.

90.50

165.00

No.

181.50
945.36

37.00

Cum

37.00

34.75
17.38

Cum
Cum

34.75
17.38

1.10 No.

Mazdoor Category - II
Total
Earth work SS 20 A (1Cum)
1.00 Cum
From schedule of rate
Earth work SS 20 B- Narrow Drain (1Cum)
1.00 Cum
From schedule of rate
1.00 Cum
50% Extra

Total

52.13

Earth work SS 20 B Building ( 1 Cum)


1.00 Cum

From schedule of rate

36.40

Cum

36.40

1.00 Cum

100% Extra

36.40

Cum

36.40
72.80

Earth Filling (1Cum)


1.00 Cum

Refilling charges

12.20

Cum

12.20

100.40

Cum

100.40

Well Gravel Filling (1Cum)


1.00 Cum

Cost of Well Gravel

1.00 Cum

Stacking Charges

3.05

Kg

3.05

1.00 Cum

Filling charges

2.54

No.

2.54
105.99

Red Gravel Filling (1Cum)


1.00 Cum

Cost of Red Gravel

118.80

Cum

1.00 Cum

Stacking Charges

3.05

Kg

3.05

1.00 Cum

Filling charges

2.54

No.

2.54

Total

118.80

124.39

Sand Filling (1Cum)


1.00 Cum

Cost of Sand

1.00 Cum

Filling charges

117.05

Cum

117.05

11.30

Cum

11.30

Total

128.35

Plain Cement Concrete 1:5:10 (10Cum / 1 Cum)


9.00 Cum

40mm ISS HBG

717.30

Cum

6455.70

4.50 Cum

CM 1:5

1529.10

Cum

6880.94

1.80 No.

Mason II Class

261.00

No.

469.80

17.70 No.

Mazdoor Category - I

183.00

No.

3239.10

14.10 No.

Mazdoor Category - II

165.00

No.

2326.50

Total

19372.04

Plain Cement Concrete 1:4:8 (10Cum / 1 Cum)


9.00 Cum

40mm ISS HBG

717.30

Cum

6455.70

4.50 Cum

CM 1:4

1858.69

Cum

8364.09

1.80 No.

Mason II Class

261.00

No.

469.80

17.70 No.

Mazdoor Category - I

183.00

No.

3239.10

14.10 No.

Mazdoor Category - II

165.00

No.

2326.50

Total
Plain Cement Concrete 1:3:6 (10Cum / 1 Cum)

20855.19

9.00 Cum

20mm ISS HBG

982.30

Cum

8067.60

4.50 Cum

CM 1:3

2318.30

Cum

10432.35

1.80 No.

Mason II Class

261.00

No.

392.40

17.70 No.

Mazdoor Category - I

183.00

No.

2708.10

14.10 No.

Mazdoor Category - II

165.00

No.

1945.80

Total

23546.25

Plain Cement Concrete 1:3:6 (10Cum / 1 Cum)


9.00 Cum

40mm ISS HBG

717.30

Cum

6455.70

4.50 Cum

CM 1:3

2408.00

Cum

10835.99

1.80 No.

Mason II Class

261.00

No.

469.80

17.70 No.

Mazdoor Category - I

183.00

No.

3239.10

14.10 No.

Mazdoor Category - II

165.00

No.

2326.50

Total

23327.09

Plain Cement Concrete 1:2:4(10Cum / 1 Cum)


9.00 Cum

20mm ISS HBG

982.30

Cum

8840.70

4.50 Cum

CM 1:2

3506.62

Cum

15779.80

1.80 No.

Mason II Class

261.00

No.

469.80

17.70 No.

Mazdoor Category - I

183.00

No.

3239.10

14.10 No.

Mazdoor Category - II

165.00

No.

2326.50

Total

30655.90

Brick Work CM1:5(100cft/1 cum)


1300.00 Cum
0.708 No.

Country Bricks

#REF!

CM 1:5

1000 nos

#REF!

1529.10

No.

1082.60

1.00 No.

Mason I Class

291.00

No.

291.00

3.00 No.

Mason II Class

261.00

No.

783.00

2.00 No.

Mazdoor Category - I

183.00

No.

366.00

6.00 No.

Mazdoor Category - II

165.00

No.

990.00

Total

#REF!

R.R. 1:5 (10cum / 1 cum)


10.00 Cum

Rough Stone

344.30

Cum

3443.00

1.00 Cum

Bond stone

456.30

Cum

456.30

3.40 No.

CM 1:5

1566.80

No.

5327.12

7.10 No.

Mason I Class

243.00

No.

1725.30

10.60 No.

Mason II Class

261.00

No.

2766.60

14.10 No.

Mazdoor Category - I

183.00

No.

2580.30

14.10 No.

Mazdoor Category - II

165.00

No.

2326.50

Total

18625.12

Plastering 1:5 - 12mm (10Sqm - 1 Sqm)


0.14 Cum

CM 1:5

1566.80

Cum

219.35

1.10 No.

Mason I Class

291.00

Cum

320.10

0.50 No.

Mazdoor Category - I

183.00

No.

91.50

1.10 No.

Mazdoor Category - II

165.00

No.

181.50

Total
Centering & Shuttering (Steel) - Plinth Beam (1Sqm)
1.00 Sqm
As per DRDA
144.00
Centering & Shuttering (Steel) - Other than Plinth Beam (1Sqm)
1.00 Sqm
As per DRDA
330.00
Steel Fabrication (1MT - 1 Kg)
1.00 MT
Cost of steel
50992.60
0.01 MT
Cost of Binding wire
48200.00
35.00 No.
Fitter - I class
258.00
Total
Reinforced Plain Cement Concrete 1:2:4 (10Cum / 1 Cum)
9.00 Cum
20mm ISS HBG
982.30
4.50 Cum
Sand
210.75
3231.00 Kg
Cement
4.58
3.50 No.
Mason II Class
261.00
21.20 No.
Mazdoor Category - I
183.00
35.30 No.
Mazdoor Category - II
165.00
Total

812.45

Sqm

144.00

Sqm

330.00

Mt
No.
No.

50992.60
482.00
9030.00
60504.60

Cum
Cum
Kg
No.
No.
No.

8840.70
948.38
14790.23
913.50
3879.60
5824.50
35196.90

Rate / Unit

3506.62
3544.32

2408.00
2445.70

1858.69
1896.39

1529.10
1566.80

94.54

37.00

52.13

52.13

72.80

12.20

105.99

124.39

128.35

1916.78

2085.52

2354.63

2298.67

3065.59

#REF!

1862.51

1862.51

80.61

144.00
330.00

60.50

3519.69

KOTHALOOTHU 2012-2013
Sl.

Material Name

No.

Source

Distance in Km

Cost @ Quarry

Conveyance

Cement

Pt.Union Office

4560

17.60

Steel

Pt.Union Office

50975

17.60

Sand for Mortar

Kunnur

15

110.00

100.75

Sand for Filling

Local

110.00

7.05

Well - Gravel

Local

98.00

7.05

Red - Gravel

NAKKALAKARADU

111.00

42.30

ISS - HBG 40mm

NAKKALAKARADU

675.00

42.30

ISS-HBG 20mm

NAKKALAKARADU

940.00

42.30

ISS - HBG 10mm & 12mm

NAKKALAKARADU

756.00

42.30

10

Rough stone for Masonary

NAKKALAKARADU

302.00

42.30

11

Bond stone for Masonary

NAKKALAKARADU

414.00

42.30

12

Brick jelly - 20mm

Aundipatti

500.00

19.40

13

Country Bricks (23 x 11 x 7cm)

Aundipatti

3625.00

23.80

14

Pressed Tiles (20 x 20 x 2 cm)

Aundipatti

7920.00

15.80

15

Shell Lime

Local

1075.00

4.85

16

Slacked Lime

Aundipatti

1075.00

19.40

17

Mangalor Tils

Aundipatti

Certified that the leads are shortest and rates furnished are and correct to the best of my knowledge & belief

dge & belief

Total cost at work


site

Unit

4577.60

MT

50992.60

MT

210.75

M3

117.05

M3

105.05

M3

153.30

M3

717.30

M3

982.30

M3

798.30

M3

344.30

M3

456.30

M3

340.60

M3

3648.80

1000 Nos.

7935.80

1000 Nos.

1079.85

M3

1094.40

M3

0.00

1000 Nos.

Detailed Estimate
Name of the Scheme

CSIDS-2013-14

Name of the Work

Construction of compound wall at Maravapatty Pu school


inKothalothu pt

Estimate Amount

Rs.113000/-

Sl.
No

Description

No

Measurement
B

Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard
requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the s
of foundation with
Drain wall

25

0.75
Total in Cum

Plain Cement Concrete 1:510 using 40 mm HBG metal for basement and flooring layers not more than 15 cm t
including cost and conveyance of materials to site and all other labour charges including consolidation as
standard specification
Core wall

25.00

0.75
Total in Cum

Random rubble Masonry in cm 1:5 including consolidation as per standard specification


1
1

x
x
Total

1
1

25.00
25.00

0.6
0.45

Brick work in CM 1 : 5 using country bricks ground moulded of size 23 x 11 x 7 cm including cost and conveyanc
materials to site and all other labour charges as per standard specification.
1
1
1
1
1

x
2
25.00
0.08
x
1
25.00
0.23
pillar
x
9
0.38
0.115
x
2
0.45
0.45
D/F GATE
X
-1
4.00
0.23
Total
Reinforced cement concrete 1:2:4 mix using 20 mm HBG metal for all RCC items of works excluding cos
reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtu
like fan clamps in the RCC floor or Roof sl
1
x
1
25.00
0.3
Total
Supply and fabrication of steel including cast and all other labour charges etc comlete

Plastering in CM 1 : 5, 12 mm thick , including cost and conveyance of all materials to site and all other la
charges including curing etc., as per standard specification.
Core wall

25.00
Total in Sqm

Painting two coat withplastic emulsion best approved first quality of Snow Cem Powder of approved colour over
priming coat etc., complete complying with standard specification ( The paint should be got approved by the dep
1

9
10
11
12

Provision for steel gate


Provision for Name board
Provision for Photos
Contigencies and other unforeseen items

25.00

ound wall at Maravapatty Pu school

Measurement

Quantity

pth as may be directed except in hard rock


wherever necessary and refilling the sides

0.6

11.25

Total in Cum

11.25

d flooring layers not more than 15 cm thick


ur charges including consolidation as per
0.10
Total in Cum

1.88
1.88

0.23
0.92

3.45
10.35
13.80

ard specification

11 x 7 cm including cost and conveyance of


n.
0.11

0.41
8.63
0.59
0.73
-1.38
8.98
all RCC items of works excluding cost of
t including curing and providing fixtures
1.5
1.5
1.8
1.5

0.11

0.83
0.83

harges etc comlete


150
150

of all materials to site and all other labour


3.46
Total in Sqm

86.50
86.50

w Cem Powder of approved colour over the


aint should be got approved by the depa
3.46

86.50
LS
LS
LS
LS

ABSTRACT
Name of the Scheme

CSIDS-2013-14

Name of the Work

Construction of compound wall at Maravapatty Pu school inKothalothu pt

Location

Kothaloothu

Estimate Amount

113000

Sl. No

Quantity

Description

Rate

11.25

Earthwork excavation and depositing on bank with initial


leads of 10m and lifts of 2m In hard stiff clay, stiff black
cotton soil, hard red earth,shale murrams, gravel stoney
earth and earth muds with 50% fair sized boulders and
hard gravelly soils as pe

83.70

1.88

Cement concrete 1:5:10mix using 40mm ISS HBG metal


for foundation including watering whenever necessary
and laid in layers not more than 15cm thick compacting
etc., complete complying with std. Specifications and as
directed. Rate for 10 cum.

2173.96

13.80

Random rubble Masonry in cm 1:5


consolidation as per standard specification

2196.40

8.98

Brick work in CM 1 : 5 using country bricks ground


moulded of size 23 x 11 x 7 cm including cost and
conveyance of materials to site and all other labour
charges as per standard specification.

3313.61

0.83

Reinforced cement concrete 1:2:4 mix using 20 mm HBG


metal for all RCC items of works excluding cost of
reinforcement and fabricating charges, centering and
shuttering but including curing and providing fixtures like
fan clamps in the RCC floor or Roof sl

3921.94

150.00

Supply and fabrication of steel including cast and all


other labour charges etc comlete

56.95

86.50

Plastering in CM 1 : 5, 12 mm thick , including cost and


conveyance of all materials to site and all other labour
charges including curing etc., as per standard
specification.

96.73

86.50

Painting two coat withplastic emulsion best approved


first quality of Snow Cem Powder of approved colour
over the priming coat etc., complete complying with
standard specification ( The paint should be got
approved by the depa

150.00

LS

Provision for steel gate

11
12
13

LS
LS
LS

Provision for Name board


Provision for Photos
Contigencies and other unforeseen items

Total

including

AE/UE
Panchayat Union,
Andipatti

ol inKothalothu pt

Per

Amount

942

4087

30310

29756

3255

8542

8367

12975

13500
500
500
266
113000

AE/UE
Panchayat Union,
Andipatti

AUNDIPATTY PANCHAYAT UNION

ESTIMATE

Name of Scheme:

Name of Work:

Name of Panchayat:

Estimate Amount:

CSIDS-2013-14
Construction of compound wall at Maravapatty Pu school
inKothalothu pt

Kothaloothu

113000

ATTY PANCHAYAT UNION

ESTIMATE

CSIDS-2013-14
Construction of compound wall at Maravapatty Pu school
inKothalothu pt

Kothaloothu

113000

You might also like