You are on page 1of 51

Jurong Aromatics Complex Project

JES-47~1
Rev. : 0
Page : 1 of 51

Engineering Standard
BUILDINGS

BUILDINGS
(Doc. No. : JES-47A1)

Contract No.
Project Title
Project Location
OWNER'S Name

:
:
:
:

JAC0701
Jurong Aromatics Complex Project
Jurong Island, in Singapore
Jurong Aromatics Corporation Pte Ltd.

02 May 201 1

Issued for Construction

1 29 Dec 2010 1

Revised as Marked

29 Feb 2008

Revised as Marked

A
Rev

31 Jan 2008
Date

Issue for Comments


Description

Jurong Aromatics Corporation Pte Ltd.

SJ

SJH

SJH

SJH
Prp'd

WSH

GDY
Chk'd

SY H

GDY

SHK

SYH
Rev'd

I
Owner

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 2 of 51

TABLE OF CONTENTS

1.

GENERAL

2.

BUILDING DESIGN

3.

MAIN CONTROL BUILDING

4.

SUBSTATION

5.

CANTEEN BUILDING

6.

MAINTENANCE WORKSHOP AND WAREHOUSE

7.

GATE HOUSE

8.

FIELD OPERATOR HOUSE

9.

LABORATORY BUILDING

10.

COMPRESSOR SHELTER

11.

CAR PARKING

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
1.
1.1

JES-47A1
Rev. : 0
Page : 3 of 51

GENERAL
Scope
This Engineering Standard describes the minimum requirements for the architectural, civil,
structural and mechanical work in the design and construction of the various buildings including
the following:
Main Control Building
Substation
Canteen Building
Maintenance Workshop
Warehouse
Gate House
Field Operator House
Laboratory Building
Compressor Shelter
Car parking

1.2

References
Refer to Engineering Standard JES-40A2 : General Civil Design Criteria for a listing of Codes,
Regulations, Design Standards and general criteria applicable to this Standard. Reference
should also be made to the following documentation:

1.2.1

1.2.2

Reference Codes
CP 56 (1991)
CP 82 (1999)
CP 90 (2001)
CP 05 (1998)
CP 10 (2005)

:
:
:
:
:

CP 13 (1999)

Engineering Standard Numbers :


JES-41A5
JES-41A6
JES-43A1
JES-46A1

1.2.3

Code of Practice for internal plastering


Code of Practice for Waterproofing of reinforced concrete Buildings
Code of Practice for design and installation of partition walls
Code of Practice for Wiring of Electrical Equipment of Buildings
Code of Practice for the Installation and Servicing of Electrical Fire
Alarm System
Code of Practice for Mechanical Ventilation and Air-conditioning in
Buildings

:
:
:
:

Drainage
Roads and Paving
Concrete Structures and Foundations
Structural Steelwork Design

Geotechnical Report

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

1.3

JES-47A1
Rev. : 0
Page : 4 of 51

Design Loadings
Loads and forces to be used in the design shall be in accordance with Engineering Standard
JES-40A2 : General Civil Design Criteria and ANSI A58.1.

2.

BUILDING DESIGN

2.1

General Requirements
-

2.2

MAIN CONTRACTOR shall include design and construction of buildings in section 1.1
together with all the necessary services, facilities, system works and drainage from there,
in his scope of work. The design shall be subject to the APPROVAL of OWNER.
The sizes of the buildings and shelters shall be based on the equipment to be served,
material stored, and personnel access and space requirements.
All buildings, to which personnel are regularly assigned shall have lavatory facilities.

Aesthetic Design Considerations


The aesthetic appearance of all buildings shall be carefully considered and developed to be
complimentary to nearby Buildings. Particular areas for further consideration shall consist of, but
not be limited to, the following:
-

2.3

Commonality of masonry finishes where appropriate.


Commonality of colors.
Continuation of the feature bands in the masonry cladding particularly at wall parapet
coping and above/below windows.
Commonality of door finishes/styles as appropriate.
Commonality of external glazing types as appropriate.
The use of dark colored base plinths for buildings where the ground floor is raised above
grade level.
The use of complimentary metal wall cladding design, color and trims/flashings.
External building signs and OWNERs Logo shall be made of enameled aluminum. MAIN
CONTRACTOR shall submit details of all signs including location, size, letter style, text
mounting method to OWNER for approval.
All internal rooms shall be identified by means of signs made of rigid colored plastic
sheet with a clear plastic laminated cover. MAIN CONTRACTOR shall submit a schedule
of all signs including location, size, letter style, text mounting method to OWNER for
approval.

Blast Resistant Design


Blast Resistant Design shall be applied for Main Control Building and Substations as follows:

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
2.3.1

JES-47A1
Rev. : 0
Page : 5 of 51

Applicable Codes and Standards


Blast resistant design shall be in accordance with Design of Blast Resistant Buildings in
Petrochemical Facilities, ASCE, and standards, specifications and publications referred therein
shall be construed as applicable codes and standard for blast resistant design.

2.3.2

Blast Pressure and Duration


Blast pressure and duration are under the influence of various factors such as explosion types,
building sizes, distances between a structure and a potential source and so on. Blast resistant
buildings should be designed based on blast pressure and duration predicted by Quantitative
Risk Assessment (QRA).If these are not available, the basis for blast load may be developed
from the references, SG-22 and CIA 1992. According to both documents, blast overpressures for
buildings spaced 30 meters from vapor cloud explosion hazard is specified as commonly used
criteria as follows:
- Side-on overpressure
- Duration

:
:

3 psi (21 kPa)


100 milliseconds

These blast loading have been widely used in the past for blast resistant design throughout the
industry, so it will be applied to the blast resistant buildings of JAC Project.
2.3.3

Resistance Analysis Methods


MAIN CONTRACTOR shall use dynamic analysis methods appropriate for specific blast design.
The selected methods shall adequately model the dynamic response of structure to the applied
blast loads and the structural component interaction.
For the Project, the equivalent static design method, which is one of analysis methods provided
in Chapter 6 of the ASCE Report, will be used with blast loads.
a)

b)

Equivalent Static Loads


Equivalent static loads may be used to represent the dynamic effects of the blast loading
on each structural component. The equivalent static loads shall be dynamic resistance (R)
required for components to withstand the specified blast loading without exceeding the
deformation limits specified in specification.
Dynamic resistance
Required dynamic resistance (R) in the direction of blast loads shall be calculated as
followings in accordance with the procedure outlined in ASCE Manual 42.

R=

+
2 ( + 0.7 )
m

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

t0
, = 2 m 1
T

Where:

c)

JES-47A1
Rev. : 0
Page : 6 of 51

: Peak blast pressure

: Max displacement factor = Xm/Xy

to

: Duration of blast load

: Fundamental period

: Span

: Ratio of reinforcement

: Effective depth of element

: Energy absorption factor ( 2m 1 )

Deformation Limits
The deformation limits for blast resistant buildings and structures are as follows:
- Maximum dynamic displacement factor, m shall not exceed the following limits:
Structural steel
Reinforced concrete loaded primarily in flexure
Reinforced concrete subjected mainly to axial compression and/or shear
Reinforced masonry, where permitted
Girder for a rigid frame that resists both vertical and lateral loads

5.0
3.0
1.5
2.0
1.0

- Plastic rotation gradient = X m / l S (or tangent of the angle of rotation) at a structural


joint shall not exceed the following limits:
Structural steel
Reinforced concrete
Reinforced masonry
Where:

lS

0.040
0.025
0.015

: segment length between plastic or design hinges in the element


Under consideration, inch (mm)

2.3.4

Xm

: m R / Ke

Ke

: effective elastic stiffness or structural element, psi/inch (kPa/mm)

Load Combination
a)

Normal Loading
Normal (conventional) loading condition, as specified by applicable building codes,
specification, or standards shall be considered for all blast-resistant building.

b)

Blast Loading
Blasting loading condition shall include load combination as follows:

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 7 of 51

U(t)= D + aL + R(t)
Where,

c)

2.3.5

U(t)
D
R(t)
a

:
:
:
:

Total applied time dependent load or its effect


Static dead load
Time dependent blast load or its effect
Reduction factor applied to conventional live load expected
to occur simultaneously with blast load. It shall be taken as
zero if doing so will result in more severe condition. (1 for
floors other than roof, 0 for roof)

Wind, earthquake or other extreme loads shall not be considered in combination with blast
loading.

Additional Structural Design Requirements


Design and construction of blast resistant building shall comply with the following general
requirements:
a)
b)
c)

d)

e)

2.3.6

Blast resisting components of building shall be of reinforced concrete structure.


Lateral load carrying system shall be shear walls or rigid frames with ductile connections.
Materials of limited ductility such as unreinforced concrete and unreinforced masonry are
not permitted for blast resisting structural elements. When such materials are used for
non-structural functions in a blast resistant building, consideration shall be given to their
collateral damage due to the blast-induced motion of the building.
Reinforced concrete for roof slab and external walls shall be double reinforced. The
amount of reinforcement on each face shall be between 0.25 percent and 2 percent of the
effective cross-sectional area. Slabs and walls shall be a minimum of 5 inches (125
millimeters) and 8 inches (200 millimeters) in average thickness, respectively.
Frames and shear walls shall be designed in accordance with Special Provision for
Seismic Design, ACI 318 Chapter 21, except as modified in the Specification.

Doors and Openings


a)
b)
c)
d)
e)

For doors in external blast resistant walls, their frames and anchorage shall be designed
statically for 4.0 psi (28 kPa) pressure inward and outward.
Exterior doors shall open outward and shall be supported on all edge by the door frames.
Each such door shall be recessed no more than one-half its width into the building.
Latch and hinge mechanisms shall be capable of withstanding the door rebound loading.
Openings in the exterior blast-resistant wall, excluding doors, shall be kept to a minimum
in numbers and total area.
Windows are normally not permitted in exterior blast-resistant walls. Where local
requirements mandate such windows in blast resistant buildings, they shall be qualified by
tests for blast-resistance, subject to OWNERs approval, and shall be limited to rear wall,
not facing a blast source. The windows inward and outward pressure shall be taken same
value as that for doors in above Clause 2.3.6 a).

Jurong Aromatics Corporation Pte Ltd.

JES-47A1
Rev. : 0
Page : 8 of 51

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

2.4

Foundations and Concrete Work


Design shall be in accordance with Engineering Standard JES-43A1 : Concrete Structures and
Foundations

2.5

Steel Framed Building and Masonry Building

2.5.1

Steel framed buildings


Steelwork framed structures shall be designed in accordance with Engineering Standard JES46A1 : Structural Steelwork Design. Roof and wall cladding shall generally be coated profiled
insulated metal sheet or single sheet. Drainage shall be through one or more roof drains leading
into stainless steel pipe downspouts or through leaders and gutters. Insulation shall be provided
as required to suit building use and local climatic data.

2.5.2

Masonry buildings
Masonry buildings shall be one of the two following types:
a)

Load bearing exterior masonry walls. Joists and flat metal roof deck supported by exterior
walls and interior columns as required.

b)

Non-load bearing exterior masonry walls. Joists and flat metal roof deck supported by
steel column and beam frame system.

Lateral bracing
systems:

shall

be

accomplished

by

means

of

one

of

the

two

following

a)

Exterior masonry walls parallel to wind direction to act as shear walls resisting total
horizontal force of wind. Roof deck to act as a diaphragm transmitting horizontal force of
wind to shear walls.

b)

Where a steel column and beam frame system is employed for support of roof deck,
braced frames or rigid frames may be utilized to resist total horizontal wind force.
Design of concrete masonry walls shall be in accordance with BS 5628 and shall resist
lateral forces from wind loading as detailed in Engineering Standard JES-40A2 : General
Civil Design Criteria.
Exterior concrete masonry walls shall not be less than 200mm thick and shall be
constructed with common bond or equal approved.

2.6

Openings

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
2.6.1

JES-47A1
Rev. : 0
Page : 9 of 51

Doors
In general, 900mm 2100mm single doors shall be used, with larger doors as required for
moving large equipment into or out of the building.
Internal doors shall be hollow metal or pressed tube industrial doors, timber door plywood faced
(internal only) or anodized aluminum framed glass doors. Hinged doors shall swing out.
External doors of all buildings shall be galvanized steel door with frames. These doors shall
swing out and shall be provided with door closers. Personnel doors shall be equipped with quick
opening panic bar hardware equipment in the building, unless other means are provided or
agreed upon by OWNER and MAIN CONTRACTOR. All ironmongery for the buildings shall be
stainless steel to the OWNER approval.

2.6.2

Windows
Windows shall be epoxy powder coated aluminum framed, color may be black. In walls of
pressurized rooms, fixed sash shall be used. In other walls, sliding and/or projected sash shall
be used
Where windows are permitted and used in process or hazardous areas they shall be fixed steel
commercial frames with wire reinforced clear glass.

2.6.3

Glazing
Unless specified otherwise:

2.7

a)

All exterior window glass shall be high reflective glass 5mm thick unless otherwise noted.

b)

All exterior doors except for blast resistance doors shall be glazed with heat absorbing
float glass 5mm thick.

Plumbing
Plumbing systems shall be furnished and installed complete where required, including all
fixtures, waste, drain and vent lines. Cold/hot water service shall be provided to each appliance
with the distribution piping work. See Table below for sanitary fixture requirements (for each sex).
TABLE OF SANITARY FIXTURES
Number of
Persons

Water Closet

1-10
11-20
21-50
Jurong Aromatics Corporation Pte Ltd.

1
2
2

Number of Fixtures
Urinal
1
1
2

Lavatory*
1
2
3-5

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

(*)

1 Lavatory required for each 10 persons.

Note:

Hot automatic air blower for hand drying shall be provided for every toilet.

2.8

Heating, Ventilating and Air Conditioning

2.8.1

General
a)

b)

Heating, ventilating and air conditioning systems shall be designed in accordance with
the American Society of Heating, Refrigerating and Air Conditioning Engineers Standards
(ASHRAE), and shall comply with all local laws and codes governing such installations.
R134a shall be used and other refrigerant may be used, subject to agreement with
OWNER.

i.
ii.
iii.

2.8.3

Control Rooms
Office Areas
MCC/Switchgear

Summer
20-25C/5015RH
20-25C
Max. 30C

Winter
20-25C/50%15RH
20-25C
Min. 5C

Ventilating equipment shall be sized to maintain the requirements of ASHRAE Standard


62-1, Ventilation for Acceptable Indoor Air Quality, where applicable and according to the
following minimum outside air requirements for ventilation:
i.
ii.
iii.

2.8.2

The following room temperatures shall be maintainable:


Area

c)

JES-47A1
Rev. : 0
Page : 10 of 51

Mechanically ventilated switch rooms and locker rooms: 10 air changes/hour


Toilets : 1.4m3/hr per water closet or urinal.
Compressor, pump, and blower rooms: 10 air changes/hour

Control Rooms
a)

A central air conditioning system with air cooled condensing unit shall maintain the
specified indoor design conditions and shall be pressurized to 2.5-mm WG.

b)

The system shall be completed with ducted supply, return, exhaust and automatic control
system.

Offices, Lockers and Toilets


a)

Office rooms, meeting rooms and the others shall be air conditioned by means of split
unit type air conditioner or multi zone type air conditioner with direct expansion cooling
unit. The indoor unit shall be either of the following type as required in the detail design.
- Ceiling mounted cassette type fan coil unit or floor/wall mounted type fan coil unit.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

2.8.4

b)

All condensing units shall be installed on top of the roof. The building design shall provide
accessibility for carrying out routine maintenance.

c)

Ventilation of toilets and lockers shall be by motor driven, exhaust fans. Make-up air shall
be thru louvered or undercut doors.

MCC and Switchgear Rooms


a)

The switchgear rooms in substations shall be air-conditioned to maintain the specified


indoor design conditions.

b)

Switchgear rooms located in hazardous areas and housing general purpose nonexplosion-proof switchgear and equipment shall be ventilated by means of fans of nonoverloading type designated to maintain a positive pressure air system in accordance
with NFPA 496 and shall be pressurized to 2.5-mm WG. Relief to atmosphere shall be
through an adjustable relief damper and by leakage.

c)

2.8.5

JES-47A1
Rev. : 0
Page : 11 of 51

Ventilation of switchgear rooms located in non-hazardous areas shall be by wall or roof


mounted exhaust air fans and weatherproof louvers.

Maintenance Workshops, Pump Shelters, Compressor Shelters

Ventilation of hot and cold oil, pump, compressor, and blower rooms shall be provided by
exhaust fans located high in the exterior walls or roof. Outside air supply shall be through
louvers with a horizontal throw located low in exterior walls.

3.

MAIN CONTROL BUILDING

3.1

General Description
The Main Control Building (MCB) shall be a two story blast resistant building, generally consist
of an in-situ reinforced concrete structure that comprises; foundations, supporting frame, floor or
roof slabs and beams.
The 1st floor level shall be raised 300mm above the finish grade level.
Thermal insulation shall be provided to all surfaces of the external envelope to ensure that the
following minimum U values are maintained.
Walls 0.60W/m2C
Roofs 0.45W/m2C
A small section of the roof structure shall be extended to provide and enclosed reinforced
concrete chamber of maximum height 1.8m, complete with blast/suction proof valves, exhaust

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 12 of 51

air louvers and a fresh air intake stack with chemical filter inside. The entire installation shall be
sized to suit the requirements of the HVAC design.
Each working floor area shall be divided or fire compartmented by full height walls to provide the
following areas:-

Control Room
Engg Station Room
Office
Meeting Room
Technology Manager Room
Senior Operation Manager Room
Shift Foreman Room
Division Leader Room
Doc. Room
Toilet
Locker Room
Shower Room
Cleaner Room
Dining Room & Operators Lounge
Pantry
Store
Fax/Copy
Server Room
AC Plant Room
Inst. Aux. Room
Electrical Room
Battery Room
UPS Room
Gas Extinguishing System Cylinder Room
Telecommunication Room

Access flooring systems that form cabling voids between the flooring panels and the supporting
RC slabs shall be provided to rooms in accordance with Section 3.2.11
3.2

Building Components

3.2.1

External Walls
The external wall of buildings shall be in-situ reinforced concrete designed to withstand pressure
as specified in clause 2.3. The outer faces shall be painted on fair faced smooth concrete and
the inner faces shall be lined with dense concrete block walls or vapor sealed insulated gypsum
wall boards secured to screw and plug fixed battening at 600mm centers.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
3.2.2

JES-47A1
Rev. : 0
Page : 13 of 51

Internal Walls
The dense concrete block work or lightweight partitioning to a nominal thickness of 100mm from
a steel stud and plaster board system, comprises of two 12.0mm gypsum wall boards secured
to each face of boxed galvanized metal studs, fixed at 600mm centers and mounted on a sole
plate.

3.2.3

Internal Windows
Glazed openings provided in the Control Room walls shall be from stainless steel sections,
screw and plug fixed into the opening reveals.

The frames shall be glazed in 3mm clear glass using stain-free, non-setting putty, except that
transparent, laminated Georgian polished wire glass with fire-resisting properties shall be used
for the internal windows between the control room and the operators room. These glass panes
shall be fixed with screwed metal bolts.
3.2.4

External Windows
External widows shall not be permitted for blast resistance designed buildings unless required
by special purpose.

3.2.5

External Doors
All external doors shall be 2-hour fire rated designed to resist an explosion pressure.
Doors and frames shall be designed for the same forces as applied normally to the walls in
which the doors are mounted in accordance with Section 2.3
Construction shall be from flush finished painted galvanized steel sheet, secured to a fabricated
steel section framework, provided with an insulating core from non-combustible materials to
satisfy the requirements of the standard NFPA fire test.
All doors are to be hung in profiled galvanized steel frames, securely fixed into formed rebated
openings in the reinforced concrete walls. Each door leaf shall be provided with frame mounted
air sealer stripping to maintain an air tight seal.
Double leaf equipment access doors shall be provided with a vertical removable steel bearer,
mounted at the meeting stiles to provide additional support against the design overpressure,
this bearer shall be capable of transmitting the overpressure, this bearer shall be capable of
transmitting the overpressure design forces, from the door into the reinforced concrete wall
structure. One leaf may also be used as a personnel door but the other leaf and over panel
when not in use shall be bolted to the frame.
0
All doors are to be single swing opening outwards to the following sizes including frames:-

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
-

Personnel
First Aid Access
Equipment Access

JES-47A1
Rev. : 0
Page : 14 of 51

0.9m x 2.1m
1.5m x 2.1m
1.8m x 2.1m*

Note:
The opening height for doors marked thus * are to be a minimum of 2.7m. Frames are to be
provided with a removable transom that will enable fixing in of an over door panel. This panel
shall be constructed from materials consistent with those of the door and shall be designed to
withstand the same design pressures.
3.2.6

Internal Doors
All internal doors shall be capable of maintaining the fire integrity of the wall or partition into
which they are to be mounted with a minimum fire rating of hour, with the exception of the
toilet cubicle doors, where no fire rating is necessary. Doors shall generally be of timber
construction, flush pattern, solid cored, finished in wood veneer facings and provided with
hardwood lapping. All doors shall be hung in profiled galvanized pressed steel frames, securely
fixed back to walls or the building fabric.
Each door enclosing an air conditioned space or opening onto a corridor shall be provided with
frame mounted air sealer strips, interconnecting doors between similar areas need not be air
sealed. All doors are to be single swing, where possible opening in the direction of egress from
the building, to the following basic size, 0.9m x 2.1m high.
Doors specifically for equipment access shall be constructed from similar materials as for other
internal doors and provide a minimum opening size of 1.8m x 2.1m* (Refer to note* clause
3.2.5).

3.2.7

Floors
All areas shall be in-situ reinforced concrete slabs, finished in accordance with clause 3.2.12
and supported directly over RC walls or by RC beams spanning the walls.
Where cable voids are required to suit electrical or instrument equipment, areas are to be
provided with a full access raised modular flooring system, comprising 600mm square panels
set to line and level on adjustable pedestals placed to suit the 600mm modular grid.

3.2.8

Roof
Roof construction shall be from an in-situ reinforced concrete slab supported by RC beams
spanning the load bearing RC walls.
The top surface of the slabs shall be formed to falls and finished with a constant thickness finish
comprised of the following duplicate waterproofing system:-

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 15 of 51

Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR

Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.

Water Proof Membrane


MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval

Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.

Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and
will allow the rainwater to pass the waterproofing membrane below

Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protecting the
insulation layer.

Urethan Waterproofing

The water-proofing shall be suitably raised upon the internal face of parapet walls.
3.2.9

Drainage and Sewerage


Roof rainwater shall be directly trapped through parapet walls by external stainless steel hopper
heads and drained out by stainless steel pipes to the storm water drainage system. Stainless
steel down pipes shall be suitably fixed to building fronts.

3.2.10

Suspended Ceilings
All areas occupied by personnel to be provided with acoustic patterned or smooth mineral fiber
tile. Toilet area to be provided with washable, moisture proof mineral fiber tiles. All ceiling tiles
shall be laid on exposed grid type suspension system.

3.2.11

Sanitary Ware
All fittings shall be from white glazed vitreous china , fired clay or stainless steel supplied as
matching suites from a single manufacturer.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 16 of 51

W.C.s shall be from vitreous china complete with a low level flushing cistern and connecting
fitments including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet
and common manual operation type.
Cleaner room sinks shall be in fired clayware, cleaners sink pattern, approx. size 0.61 x 0.30 x
0.23 deep, complete with wall mounted chromium plated bib taps, hinged bucket grating,
hardwood pad and floor support legs in stainless steel.
3.2.12

Finishes
In general the internal finishes shall be as follows:Office
Meeting Room
Technology Manager Room
Senior Operation Manager Room
Division Leader Room
Corridor
Doc. Room
Dining Room & Operators Lounge
Fax/Copy
Pantry
Store
Shift Foreman Room
Control Room
Engg Station Room
Server Room
Inst. Aux. Room
Telecommunication Room
Electrical Room
Battery Room
UPS Room
AC Plant Room
Gas Extinguishing System Cylinder Room
Toilet
Locker Room
Shower Room
Cleaner Room
Stairs and Landing
NOTE 1:- With non slip nosing.

Jurong Aromatics Corporation Pte Ltd.

F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F3 (a) W1 C3
F1 W1 C1
F2/F3 (a) W1 C1
F2/F3 (a) W1 C1
F2/F3 (a) W1 C1
F2/F3 (a) W1 C3
F2/F3 (a) W1 C3
F3 (a) W1 C3
F3 (a) W1 C3
F3 (a) W1 C3
F3 (a) W1 C3
F3 (a) W1 C3
F6 (b) W4 C2
F1 W1 C1
F6 (b) W4 C2
F6 (b) W4 C2
F1 W1 C1 or C3 (See Note 1)

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 17 of 51

FLOORS
F1
F2
F3(a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 2
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish. Where ceramic tiles are
specified, coved ceramic base shall be used except for the toilets where ceramic tiles shall be
used.
NOTE 3
Any un-finished concrete surfaces under access flooring shall be sealed by the application of
an epoxy based dust proofing paint.
WALLS
W1
W2
W3
W4

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster
Glazed ceramic wall tiles

C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber tiles with
suspended ceiling system
Acrylic emulsion paint on fair faced concrete

CEILINGS

3.3

Special Requirements

3.3.1

Air Conditioning
a)
b)

A central air conditioning system with air cooled condensing unit shall maintain the
specified indoor design conditions.
The system shall be completed with ducted supply, return, exhaust and automatic control
system.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
3.3.2

JES-47A1
Rev. : 0
Page : 18 of 51

Emergency Escape Routes


Maximum travel distance from the means of exit to any point in the building shall be 15m. All
doors shall open in the direction of the escape route and be so positioned so as not to block any
stairway. Signs shall be supplied and erected to indicate clearly the route of escape in case of
emergency.

4.

SUBSTATIONS

4.1

General Description
Substations shall be of single storey, blast resistant building. The 1st floor level shall be raised
300mm above the finish grade level .

The construction shall consist of generally in-situ reinforced concrete foundations, columns,
floor or roof slabs and beams. On two ends of the switchgear room a single door shall be
installed as personnel door, and on the front end a double door shall be installed sized for the
passage of the largest piece of equipment.
The layout and design of substations, including drainage systems, cabling, etc. shall be such as
to allow for future horizontal extension.

The working floor area shall be divided or fire compartmented by full height walls to provide the
following areas :
-

Switchgear Room
FAR Room
UPS Room
Battery Room
Gas Extinguishing System Cylinder Room
Air Lock

4.2

Building Components

4.2.1

External Walls
The External wall shall be in-situ reinforced concrete designed to withstand pressure as specify
in clause 2.3. The outer face shall be colored painted on fair faced surface. The transformer
partition walls shall be in-situ reinforced concrete minimum 200mm thickness and shall be
extended not less than 600mm for transformer side and height. The transformer partition walls
shall be fair faced finish.

4.2.2

Interior Walls and Partitions


Internal walls shall be non-load bearing dense concrete blocks, 200mm thick (no fire resistance

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 19 of 51

requirement).
4.2.3

External Doors
All external doors shall be 2-hour fire rated designed to resist an explosion pressure.
Doors and frames shall be designed for the same forces as applied normally to the walls in
which the doors are mounted in accordance with Section 2.3.6
Construction shall be from flush finished painted galvanized steel sheet, secured to a fabricated
steel section framework, provided with an insulating core from non-combustible materials to
satisfy the requirements of the standard NFPA fire test.
All doors are to be hung in profiled galvanized steel frames, securely fixed into formed rebated
openings in the reinforced concrete walls. Each door leaf shall be provided with frame mounted
air sealer stripping to maintain an air tight seal.
Double leaf equipment access doors shall be provided with a vertical removable steel bearer,
mounted at the meeting stiles to provide additional support against the design overpressure,
this bearer shall be capable of transmitting the overpressure design forces, from the door into
the reinforced concrete wall structure. One leaf may also be used as a personnel door but the
other leaf and over panel when not in use shall be bolted to the frame.
0
All doors are to be single swing opening outwards to the following sizes including frames:-

Personnel
First Aid Access
Equipment Access

0.9m x 2.1m
1.5m x 2.1m
1.8m x 2.1m*

Note:
The opening height for doors marked thus * are to be a minimum of 2.7m. Frames are to be
provided with a removable transom that will enable fixing in of an over door panel. This panel
shall be constructed from materials consistent with those of the door and shall be designed to
withstand the same design pressures.
4.2.4

Floors
All areas shall be in-situ reinforced concrete slabs, finished in accordance with clause 4.2.7 and
supported directly over RC walls or by RC beams spanning the walls.
Where cable voids are required to suit electrical or instrument equipment, areas are to be
provided with a full access raised modular flooring system, comprising 600mm square panels
set to line and level on adjustable pedestals placed to suit the 600mm modular grid.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
4.2.5

JES-47A1
Rev. : 0
Page : 20 of 51

Roofs
Roof construction shall be from an in-situ reinforced concrete slab supported by RC beams
spanning the load bearing RC walls.
The top surface of the slabs shall be formed to falls and finished with a constant thickness finish
comprised of the following duplicate waterproofing system:-

Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR

Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.

Water Proof Membrane


MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval

Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.

Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and
will allow the rainwater to pass the waterproofing membrane below

Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protecting the
insulation layer.

Urethan Waterproofing

The water-proofing shall be suitably raised upon the internal face of parapet walls.
4.2.6

Drainage and Sewerage


Roof rainwater shall be directly trapped through parapet walls by external stainless steel hopper
heads and drained out by stainless steel pipes to the storm water drainage system. Stainless
steel down pipes shall be suitably fixed to building fronts. Transformer pits shall discharge to
drainage system through adjacent reinforced concrete trapped gullies.

4.2.7

Finishes

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 21 of 51

In general the internal finishes shall be as follows:Switchgear Room


FAR Room
UPS Room
Battery Room
Gas Extinguishing System Cylinder Room
Air Lock

F3(a) W1 C3
F2/F3(a) W1 C1
F3(a) W1 C3
F3(a) W1 C3
F3(a) W1 C3
F3(a) W1 C3

FLOORS
F1
F2
F3(a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non- slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 2
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish. Where ceramic tiles are
specified, coved ceramic base shall be used except for the toilets where ceramic tiles shall be
used.
NOTE 3
Any un-finished concrete surfaces under access flooring shall be sealed by the application of an
epoxy based dust proofing paint.
WALLS
W1
W2
W3
W4

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster
Glazed ceramic wall tiles

C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber tiles with
suspended ceiling system
Acrylic emulsion paint on fair faced concrete

CEILINGS

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
4.3

Special Requirements

4.3.1

Transformer Compounds

JES-47A1
Rev. : 0
Page : 22 of 51

Suitable concrete pads or pedestals shall be provided for mounting transformers and earthing
resistors.
Pedestals for transformers equal or greater than 2MVA shall be located inside reinforced
concrete pits, having sufficient volume to contain the transformer total oil quantity, filled with
25/50mm graded pebbles. The pit shall have a sloping bottom with a suitable fire trapped
drainage facility, connected to the AOC drainage system.
The entire area around transformers rated below 2MVA shall have a common 200mm perimeter
kerb and the void between the kerbs and the equipment pads shall be filled with graded pebbles
laid on unpaved soil, having a total volume sufficient to contain any one transformer oil.
A common demountable fence with lockable access doors shall be provided. Concrete fire wall
shall be provided between HV terminal boxes, between adjacent transformers and between all
transformers, such walls shall be fire-resistant.
4.3.2

Handrailing and Fencing


Handrailings for platforms shall be painted galvanized steel. Removable sections shall be
provided in front of the switchgear room double doors.

Fencing shall be galvanized coated welded steel mesh, in removable galvanized steel framed
panels. Gates shall be provided where required.
4.3.3

Cable Entries through Walls and Floors in the Field Auxiliary Room(FAR) and Switchgear Room
The cable entries for electrical and instrument cables shall be distributed over the exterior walls
of the electrical and instrument equipment room.
Equipments ducts or cables into Switchgear Room through the wall shall be suitably sealed.
0
No piping for drainage or utilities except for instrument air supply shall be routed through the
cable void or the instrument equipment, battery room or electrical room. No electric cables,
except for instrument/computer electricity supply and illumination, shall be routed through the
cable void.
The proper level and detailing of cable entries into the wall void shall be made at such a level
and detail so as to prevent penetration of rain water, fire-fighting water, oil, liquefied gas or other
liquids, finding its way into the void.
Cable support shall be provided for cables entering through cable transits to ensure that cables

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 23 of 51

enter horizontally by utilizing a concrete support which shall extend approximately 1000mm from
the building.
4.3.4

Approach Ramps
Approaches to the main entrances of Field Auxiliary Room(FAR) shall be ramps with a slope of
not more than 1 in 8 with a non-slip finish on the top surface.

4.3.5

Air Conditioning
The substations shall be air-conditioned by packaged air conditioner with air cooled condensing
unit to maintain the specified indoor design conditions.
A small section of the roof structure shall be extended to provide an enclosed reinforced
concrete chamber of maximum height 1.8m, completed with blast/suction proof valves, exhaust
air louvers and a fresh air intake stack with chemical filter inside. The entire installation shall be
sized to suit the requirements of the HVAC design.

5.

CANTEEN BUILDING

5.1

General Description
The Canteen Building is contained within a two storey concrete framed building.

Thermal insulation shall be provided to all surfaces of the external envelope to ensure that the
following minimum U values are maintained.
Walls 0.60W/m2C
Roofs 0.45W/m2C
The Canteen Building shall comprise the following :
-

Kitchen Room with small Store Room


Staff Canteen
Toilet
Storage
Gas Store
Water Heater Room
Washing-up Room

5.2

Building Components

5.2.1

External Walls

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

5.2.2

JES-47A1
Rev. : 0
Page : 24 of 51

External Walling shall be formed from 200mm thickness dense concrete block except for Staff
Canteen which shall be aluminum frame and glass with sliding door.
Interior Walls and Partitions
Internal walls shall be 200mm thickness dense concrete blocks by full height walls.

5.2.3

Doors
Main entrance at north and south of staff canteen shall be double glass doors (swing type) with
heat absorbing glass.
Generally doors to be zero fire rated wooden doors except doors to Gas Store shall be 1 hour
fire resistant (steel door), solid core, plywood faced, hardwood lipped all round. Doors shall be
hung in profiled galvanized pressed steel frames.
Single doors and the actives leaves of double doors shall be provided with self closers.

5.2.4

Floors
All area shall be in-situ reinforced concrete slabs, finished in accordance with clause 5.2.9 and
supported directly over R.C. beams

5.2.5

Roof
Roof to be composite insulated metal roof sheeting to give U value of 0.45W/m2 C . The floor
above corridor shall be slab concrete and surrounded by a concrete parapet.

5.2.6

Suspended Ceilings
Ceiling shall be provided with acoustic patterned or smooth, washable, moisture proof mineral
fibre tiles, all attached to a support/suspension system, galvanized pressed steel components:
screw and plug fixed to the concrete soffits.

5.2.7

Sanitary Ware
All fittings shall be from white glazed vitreous china, fired clay or stainless steel supplied as
matching suites from a single manufacturer.
W.C s shall be from vitreous china complete with a low level flushing cistern and connecting
fitment s including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 25 of 51

and common manual operation type.


Cleaners room sinks shall be in fired clayware, cleaners sink pattern, approx. size 0.61 x 0.30
x 0.23 deep, complete with wall mounted chromium plated bib taps, hinged bucket grating,
hardwood pad and floor support legs in stainless steel.
Drainage of Kitchen Room shall be lined to grease tap provided in each room prior to draining
out to sanitary system.
5.2.8

Air Conditioning
STAFF CANTEEN AND TOILETS

5.2.9

a)

The Canteen shall be air-conditioned by packaged air conditioner with air cooled
condensing unit to maintain the specified indoor design conditions.

b)

The system shall be completed with ducted supply, return, exhaust and automatic control
system.

c)

Ventilation of toilets shall be by motor driven, exhaust air fans. Make-up air shall be thru
louvered or undercut doors.

d)

Remote located, individual offices will be air conditioned by thru-wall (window type) or split
type air conditioning units.

Finishes
In general the internal finishes shall be as follows:Kitchen Room
Staff Canteen
Storage
Gas Store
Store Rooms
Water Heater Room
Toilets
Washing up Room
Board Room
Directors Room
Meeting Room
Reception Room
Locker
Shower Room
Toilet
Walkway

Jurong Aromatics Corporation Pte Ltd.

F6 (b) W4 C2
F5 W1 C1
F3(a) W1 C3
F3(a) W1 C3
F3(a) W1 C3
F3(a) W1 C1
F6 (b) W4 C2
F6 (b) W4 C2
F4 W1 C1
F4 W1 C1
F4 W1 C1
F4 W1 C1
F1 W1 C1
F6(b) W4 C2
F6(b) W4 C2
F5 W1 C1

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 26 of 51

FLOORS
F1
F2
F3(a)
F3(b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 1
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish. Where ceramic tiles are
specified, coved ceramic base shall be used except for the toilets where ceramic tiles shall be
used.
.
WALLS
W1
W2
W3
W4

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster
Glazed ceramic wall tiles

C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber files with suspended
ceiling system
Acrylic emulsion paint on fair faced concrete

CEILINGS

6.

MAINTENANCE WORKSHOP AND WAREHOUSE

6.1

General Description
MAINTENANCE WORKSHOP:
The Maintenance Workshop shall be housed within a single span steelwork portal framed
structure, and shall be provided with a two storey construction along one side to accommodate
offices and ancillary accommodation located on both floors.
The structural steel frame of the Maintenance Workshop shall be also designed for support a full
length Electrical Overhead Traveling crane with an auxiliary hoist of 30 ton capacity, having a lift
height

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 27 of 51

of 7m. The height to eaves will be approximately 10m, subject to confirmation by MAIN
CONTRACTOR, and the roof pitch shall be not less than 6.
MAIN CONTRACTOR shall be responsible for supply and installation Electrical Overhead
Traveling crane with an auxiliary hoist of 30 ton capacity completed with runway beam and all
auxiliary facilities required e.g. Electrical power supply etc..
WAREHOUSE:
The Warehouse consists of machine and spare parts storage, chemical storage,
loading/unloading bay and office.

The machine and spare parts storage shall be housed within a single span steelwork portal
framed structure and shall have an elevated floor to allow loading and unloading. The external
walls and roof of machine and spare parts storage shall be of insulated profiled metal sheeting
with a concrete masonry dado wall to a height of 2.1m.
The machine and spare parts storage shall contain within it suitably sized and air conditioned
rooms cover two storey of the storage for all environmentally sensitive instrumentation and
electrical spares.

The chemical storage shall be housed within a single span steelwork portal framed structure.
Within the chemical storage shall be an elevated foam storage vessel with access provision for
the foam tender beneath the vessel to cover the oil storage area.
The chemical storage should have kerbed floor to contain any spillage.
External walls and roof of chemical storage shall be of insulated profiled metal sheeting with a
concrete masonry dado wall to a height of 2.1m.
Thermal insulation of these buildings shall be provided to the walls and roof to ensure the
following minimum U values are maintained.
Walls
Roof

- 0.6W/m2C
- 0.45W/m2C

The floors shall be reinforced concrete slab with a epoxy paint coating on concrete hardener for
heavy duty purpose to the Warehouse and Maintenance Workshop.
The officers shall consist of in-situ reinforced concrete slabs supported by structural steelwork
beams and load bearing concrete masonry walls.
Each area shall be divided or fire compartmented by full height, walls to provide the following
Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 28 of 51

areas:
MAINTENANCE WORKSHOP
-

Offices
Meeting Room
Supervisor Room
Coffee Room / Pantry
Operation & Maintenance of Electrical and Instrument
Operation & Maintenance of Mechanical
Tool Room
Staff Facilities (Toilets, Showers, Locker Rooms)

WAREHOUSE All at approx. 1.2m above grade


-

Machine and spare parts storage area


Chemical Storage Area
Loading/Unloading Area between machine and spare parts storage and chemical storage
Forklift Park/Charging Area
Offices (Air Conditioned)
Toilet Facilities

6.2

Building Components

6.2.1

External Walls
Shall be profiled metal sheeting, with insulation and internal lining sheet to give 0.6W/m2 C U
value above dado wall.
Dado wall to be provided at a height of 2.1m framed in 200mm dense concrete blocks plus
50mm rockwool insulation board with 25mm air gap and 100mm internal dense concrete block

Two-storey areas shall be of dense concrete cavity block work construction to give 0.6W/m2C
U value. Wall thickness shall be designed to meet slenderness and stability requirements.
6.2.2

Internal Walls
Shall be 200mm dense concrete block with plastering and painting in Maintenance Workshop,
Warehouse and enclosing walls of office areas, staircase and corridors. Wall bracing shall be
provided if necessary to meet slenderness requirements.
Division walls of offices at 1st floor level shall be lightweight partitioning to a nominal thickness
of 100 mm from a steel stud and plasterboard system, comprising of two 12.0mm gypsum wall
boards secured to each face of galvanized metal studs, at 600 centers.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

6.2.3

JES-47A1
Rev. : 0
Page : 29 of 51

External Doors
The Warehouse is to be provided with 3 No. electrical sliding doors, 5m wide x 4m high, top
hung with guides cast-in to RC slab.
Doors to be flush finished painted galvanized steel sheet secured to a fabricated steel section
framework, with insulation core to give required U value.
The chemical storage is to be provided with one electrical sliding door, 5m x 4m high.

All external doors shall be rated 1 hour fire resistance. Construction shall be from flush finished
painted galvanized steel sheet, secured to a fabricated steel section framework with insulation
core.
Doors shall be hung in profiled galvanized steel frames, fixed to walls with galvanized steel lugs.
Single doors and the active leaves of double doors shall be provided with self closers, panic
latches and wind hooks.
All door sizes shall be :-

Single doors
First Aid Access
Equipment Doors

:
:
:

0.9m x 2.1m
1.5m x 2.1m
1.8m minimum x 2.5m depending on the largest piece of
equipment.

Equipment doors shall be single swing, comprising a single active leaf, and a fixed side panel.
Frames shall be provided with a removable transom that will enable fixing in of an over door
panel.
All ironmongery fittings of the same kind shall be of one make and type. They shall be stainless
steel and shall be fixed with non-corroding screws.
6.2.4

Internal Doors
Doors to offices shall be 1/2 hour fire resistant, solid core; plywood faced, hardwood lipped all
round. Doors shall be hung in profiled galvanized pressed steel frames.
Door to offices to have 150mm width x 300mm depth viewing panels with 5mm polished plate
glass.
Door to Instrument/Electrical Equipment Storage of Warehouse, 2nd Floor Corridor and 1st

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 30 of 51

Floor Offices of Maintenance Workshop shall be 1 hours fire resistant steel door.
6.2.5

Windows
External windows shall be aluminum windows to offices, with 14mm thick double glazing,
comprising 2 light reflective, heat absorbing glass units.

6.2.6

Floors
1st floors shall be reinforced concrete slab with epoxy paint coating on concrete hardener for
heavy duty purpose to the Warehouse and Maintenance Workshop

1st floor to offices shall consist of in-situ reinforced concrete slabs supported by structural
steelwork beams and load bearing concrete masonry walls with finishes in accordance with
Section 6.2.11
6.2.7

Roof
Roof to be composite insulated metal roof sheeting shall be give U value of 0.45W/m2 C.
Roof over offices at first floor shall be reinforced concrete and surrounded by a concrete parapet.
Finish shall be of constant thickness and shall consist of the following duplicate waterproofing
system:

- Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR
- Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.
- Water Proof Membrane
MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval
- Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.
- Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and
will allow the rainwater to pass the waterproofing membrane below
- Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protect the
Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 31 of 51

insulation layer.
- Urethan Waterproofing

The water-proofing shall be suitably raised upon the internal face of parapet walls.
6.2.8

Suspended Ceilings
All areas occupied by personnel to be provided with acoustic patterned or smooth mineral fiber
tile. Toilet area to be provided with washable, moisture proof mineral fiber tiles. All ceiling tiles
shall be laid on exposed grid type suspension system.

6.2.9

Sanitary Ware
All fittings shall be from white glazed vitreous china, fired clay or stainless steel supplied as
matching suites from a single manufacturer.
W.C s shall be from vitreous china complete with a low level flushing cistern and connecting
fitment s including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet
and common manual operation type.
Cleaners room sinks shall be in fired clayware, cleaners sink pattern, approx. size 0.61 x 0.30
x 0.23 deep, complete with wall mounted chromium plated bib taps, hinged bucket grating,
hardwood pad and floor support legs in stainless steel.

6.2.10

Air Conditioning
OFFICES, LOCKERS AND TOILETS
a)

The office rooms shall be air-conditioned by packaged air conditioner with air cooled
condensing unit to maintain the specified indoor design conditions.

b)

The system shall be completed with ducted supply, return and exhaust filters and
automatic control system.

c)

Ventilation of toilets and lockers shall be by motor driven, exhaust air fans. Make-up air
shall be thru louvered or undercut doors.

d)

Remote located, individual offices will be air conditioned by split type air conditioning units.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
6.2.11

JES-47A1
Rev. : 0
Page : 32 of 51

Finishes
In general the internal finishes shall be as follows:Offices
Rest Rooms
Workshops
Corridors
Pantry
First Aid Room
Store Rooms
Electrical Switch room
A C Plant Room
Locker
Toilet
Stairs and Landings
Laundry Room
Server Room
Warehouse
Chemical Store

F1 W1 C1
F1 W1 C1
F3(b) W3
F1 W1 C1
F1 W1 C1
F1 W1 C1
F3(a) W1 C3
F3(a) W1 C3
F3(a) W1 C3
F1 W1 C1
F6(b) W4 C2
F1 W1 C1 or C4 (See Note 1)
F1 W1 C1
F1 W1 C1
F3(b) W3
F3(b) W3

NOTE 1:- With non slip nosing.


FLOORS
F1
F2
F3 (a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 2
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish. Where ceramic tiles are
specified, coved ceramic base shall be used except for the toilets where ceramic tiles shall be
used.
WALLS
W1
W2

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
W3
W4

JES-47A1
Rev. : 0
Page : 33 of 51

Epoxy paint on cement plaster


Glazed ceramic wall tiles

CEILINGS
0
C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber files with suspended ceiling
system
Acrylic emulsion paint on fair faced concrete

7.

GATE HOUSE

7.1

General Description
The gate houses shall be concrete frame buildings, with an eaves height of 3.0 having a roof
pitch of not less than 6.

Thermal insulation shall be provided to the walls and roof to ensure the following minimum U
values are maintained.
Walls
Roof

0.6W/m2 C
0.45W/m2 C

The floors shall be reinforced concrete slab with a screed finish.


7.2

Building Components

7.2.1

External Walls
Construction under windows to be a dado wall to be provided at a height of 0.9m framed in
200mm dense concrete blocks plus 50mm rockwool insulation board with 25mm air gap and
100mm internal dense concrete block
Where no windows wall construction to be taken full height.

7.2.2

Internal Walls
Shall be 200mm dense concrete block with plastering and painting.

7.2.3

External Doors
All external doors shall be rated 1 hour fire resistance, with top half double glazed. Construction
shall be from flush finished painted galvanized steel sheet, secured to a fabricated steel section
framework with insulation core.
Doors shall be hung in profiled galvanized steel frames, fixed to walls with galvanized steel lugs.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 34 of 51

Single doors and the actives leaves of double doors shall be provided with self closers, panic
latches and wind hooks.
7.2.4

Internal Doors
Generally doors to be zero fire rated except doors to offices shall be 1 hour fire resistant, solid
core, plywood faced, hardwood lipped all round. Doors shall be hung in profiled galvanized
pressed steel frames.
Doors to offices to have 150mm width x 300mm depth viewing panels with 5mm polished plate
glass.

7.2.5

Windows
External windows shall be aluminum windows to offices, with 14mm thick double glazing,
comprising 2 heat reflective, heat absorbing glass units.

7.2.6

Floors
All area shall be in-situ reinforced concrete slabs with screed and finished in accordance with
clause 7.2.11.

7.2.7

Roof
Roof shall be in situ concrete slab supported on concrete frames. The top surface of this slab
formed to fall and finished with a constant thickness finish comprised of following duplicate
waterproofing system:

- Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR
- Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.
- Water Proof Membrane
MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval
- Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 35 of 51

- Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and will
allow the rainwater to pass the waterproofing membrane below
- Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protecting the
insulation layer.
- Urethan Waterproofing
The water-proofing shall be suitably raised upon the internal face of parapet walls.
7.2.8

Suspended Ceilings
All offices, locker rooms, toilets and ancillary accommodation shall be provided with acoustic
patterned or smooth, washable, moisture proof mineral fiber tiles, all attached to a
support/suspension system, galvanized pressed steel components; screw and plug fixed to the
concrete soffits.

7.2.9

Sanitary Ware
All fittings shall be from white glazed vitreous china, fired clay or stainless steel supplied as
matching suites from a single manufacturer.
W.C. s shall be from vitreous china complete with a low level flushing cistern and connecting
fitments including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet
and common automatic type, high level flushing cistern, approx. size 0.6 deep x 0.4m wide.

7.2.10

Air Conditioning
OFFICES, LOCKERS AND TOILETS
Remote located, individual offices and ancillary accommodation will be air conditioned by split
air conditioning units.
Ventilation of toilets and lockers shall be by motor driven, exhaust air fans. Make-up air shall be
thru louvered or undercut doors.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
7.2.11

JES-47A1
Rev. : 0
Page : 36 of 51

Finishes
In general the internal finishes shall be as follows:Offices
Staff Rooms/Waiting
Guard Room/Reception
Corridors
Store
Toilets
Server Room

F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F3(a) W1 C3
F6 (b) W4 C2
F2/3(a) W1 C1

FLOORS
F1
F2
F3 (a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 1
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish. Where ceramic tiles are
specified, coved ceramic base shall be used except for the toilets where ceramic tiles shall be
used.

WALLS
W1
W2
W3

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster

W4

Glazed ceramic wall tiles

CEILINGS
C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber tiles with suspended ceiling
system
Acrylic emulsion paint on fair faced concrete

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

8.

FIELD OPERATOR HOUSE

8.1

General Description

JES-47A1
Rev. : 0
Page : 37 of 51

The Field Operator House shall be a single concrete framed building, with an eaves height of
3.0m.
Thermal insulation shall be provided to the walls and roof to ensure the following minimum U
values are maintained.
Walls
Roof

0.6W/m2 C
0.45W/m2 C

A small section of the roof structure shall be extended to provide an enclosed reinforced
concrete chamber of maximum height 1.8m, complete with blast/suction proof valves, exhaust
air louvers and a fresh air intake stack with chemical filter inside. The entire installation shall be
sized to suit the requirements of the HVAC design.
The buildings shall provide the accommodation as indicated on the above drawing.
8.2

Building Components

8.2.1

External Walls
Construction under windows to be a dado wall to be provided at a height of 0.9m framed in
200mm dense concrete blocks plus 50mm rockwool insulation board with 25mm air gap and
100mm internal dense concrete block
Where no windows wall construction to be taken full height.

8.2.2

Internal Walls
Shall be 200mm dense concrete block with plastering and painting in all areas.
.

8.2.3

General Doors
All external doors shall be rated 1 hour fire resistance. Construction shall be from flush finished
painted galvanized steel sheet, secured to a fabricated steel section framework with insulation
core to give required U values.
Doors shall be hung in profiled galvanized steel frames, securely fixed into walls by using
galvanized steel lugs. Fixing of frames shall be such as to ensure solid, void free, water-proof
joints.
Doors shall be hung in profiled galvanized steel frames, fixed to walls with galvanized steel lugs.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 38 of 51

Single doors and the actives leaves of double doors shall be provided with self closers, panic
latches and wind hooks.
All door sizes shall be:-

Single doors: 0.9m x 2.1m

Equipment doors will be single swing, comprising a single active leaf, and a fixed side panel.
All ironmongery fittings of the same kind shall be of one make and type. They shall be stainless
steel aluminum and shall be fixed with non-corroding screws.
8.2.4

Windows
External windows may be aluminum or steel windows to offices, with 14mm thick double glazing,
comprising 2 reflective, heat absorbing glass units.

8.2.5

Floors
1st floor slab to ancillary accommodation to be reinforced concrete slab with screed and finishes
in accordance with Section 8.2.10

8.2.6

Roofs
Roof shall be in situ concrete slab supported on concrete frames. The top surface of this slab
formed to fall and finished with a constant thickness finish comprised of following duplicate
waterproofing system:-

- Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR
- Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.
- Water Proof Membrane
MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval
- Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.
- Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and
Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 39 of 51

will allow the rainwater to pass the waterproofing membrane below


- Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protect the
insulation layer.
- Urethan Waterproofing
8.2.7

Suspended Ceilings
All areas occupied by personnel to be provided with acoustic patterned or smooth mineral fiber
tile. Toilet area to be provided with washable, moisture proof mineral fiber tiles. All ceiling tiles
shall be laid on exposed grid type suspension system

8.2.8

Sanitary Ware
All fittings shall be from white glazed vitreous china, fired clay or stainless steel supplied as
matching suites from a single manufacturer.
W.C. s shall be from vitreous china complete with a low level flushing cistern and connecting
fitments including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet
and common manual operation type.
Cleaners room sinks shall be in fired clayware, cleaners sink pattern, approx. size 0.61 x 0.30
x 0.23 deep, complete with wall mounted chromium plated bib taps, hinged bucket grating,
hardwood pad and floor support legs in stainless steel.

8.2.9

Air Conditioning
OFFICES AND TOILETS
A split air conditioning system with air cooled condensing units shall maintain the specified
indoor design conditions, each unit completed with individual automatic controls.
Ventilation of toilets and lockers shall be by motor driven, exhaust air fans. Make-up air shall be
thru louvered or undercut doors.

8.2.10

Finishes
In general the internal finishes shall be as follows:-

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

Offices
Pantry
Toilets
Corridor

JES-47A1
Rev. : 0
Page : 40 of 51

F1 W1 C1
F1 W1 C1
F6 (b) W4 C2
F1 W1 C1

FLOORS
F1
F2
F3 (a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

NOTE 1
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish.
Where ceramic tiles are specified, coved ceramic base shall be used except for the toilets
where ceramic tiles shall be used.

WALLS
W1
W2
W3
W4

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster
Glazed ceramic wall tiles

CEILINGS

9.
9.1

C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber tiles with suspended ceiling
system
Acrylic emulsion paint on fair faced concrete

LABORATORY BUILDING
General Description
Laboratory building shall be a single storey concrete frame, structure with dense concrete block.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 41 of 51

Thermal insulation shall be provided to all surfaces of the external envelope to ensure that the
following minimum U values are maintained:
Walls
Roofs

0.60W/m2 C
0.45W/m2 C

Each area shall be divided or fire compartmented by full height walls to provide the following
areas:LABORATORY BUILDING (1ST FLOOR LEVEL)
9.2

Manager Office
Shift Office
Chemist
Technician
Library
Meeting Room
Mess Room
Wet Laboratory and Catalyst
Mercury
GC Laboratory Room
Gas Shelter
Hydrocarbon Laboratory
Sample Reception
Atomic Absorption Spectrometer (AAS)
Restrained Sample
Chemical Store
Glass Ware Room
Glass Ware Store Room
Toilet
Electrical Control Room

Building Components

9.2.1 External Walls


0
The External Walls shall be of dense concrete block construction to give 0.6W/m2 C U value.
Wall thickness shall be designed to meet slenderness and stability requirements.
Part of external walls such as the wall of the gas shelter shall be concrete wall for the
installation of laboratory equipment and/or gas tubing manifold according to the requirement of
the laboratory equipment.
9.2.2

Internal Walls

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 42 of 51

Shall be 200mm dense concrete block with plastering and painting in laboratory areas and
enclosing walls of office areas, staircase and corridors. Wall bracing shall be provided if
necessary to meet slenderness requirements.

Division walls of offices and laboratories at 1st floor level shall be lightweight partitioning to a
nominal thickness of 100mm from a steel stud and plasterboard system, comprising of two
12mm gypsum wall boards secured to each face of galvanized metal studs, at 600 centers.
9.2.3

External Doors
Doors to be flush finished painted galvanized steel sheet secured to a fabricated steel section
framework, with insulation core to give U value.
All external doors shall be rated 1 hour fire resistance. Construction shall be from flush finished
painted galvanized steel sheet, secured to a fabricated steel section framework with insulation
core.
Doors shall be hung in profiled galvanized steel frames, fixed to walls with galvanized steel lugs.
Single doors and the actives leaves of double doors shall be provided with self closers, panic
latches and wind hooks.
All doors are to be single swing opening outwards to the following sizes:- Single Doors

0.9m x 2.1m

- First Aid Access

1.5m x 2.1m

- Equipment Doors

1.8m minimum x 2.5m depending on the largest piece of equipment

Equipment doors shall be single swing, comprising a single active leaf, and a fixed side panel.
Frames shall be provided with a removable transom that will enable fixing in of an over door
panel.
All ironmongery fittings of the same kind shall be of one make and type. They shall be stainless
steel aluminum and shall be fixed with non-corroding screws.
9.2.4

Internal Doors
Doors to offices shall be 0.5 hour fire resistant, solid core, plywood faced, hardwood lipped all
round. Doors shall be hung in profiled galvanized pressed steel frames.
Doors to office to have 150mm width x 300mm depth viewing panels with 6mm polished plate
Georgian wired glass.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
9.2.5

JES-47A1
Rev. : 0
Page : 43 of 51

Windows
External windows shall be aluminum windows to offices, with 14mm thick double glazing,
comprising 2 light reflective, heat absorbing glass units. All external windows shall be sunlight
protection coating and/or film.

9.2.6

Floors
1st floor slab to be reinforced concrete slab with finishes in accordance with Section 9.2.11.

9.2.7

Roof
Roof shall be in situ concrete slab supported on concrete frames. The top surface of this slab
formed to fall and finished with a constant thickness finish comprised of following duplicate
waterproofing system:

- Lightweight Foam Concrete


The lightweight concrete screed shall comprise Type I or Type II cement to ASTM C 150,
foaming emulsion and water. Installed dry density shall be approximately 550 kg/m3, or
recommended by the roofing system VENDOR
- Sand/Cement Screed
20mm sand/cement screed applied under the waterproofing membrane.
- Water Proof Membrane
MAIN CONTRACTOR shall submit the product data sheet of the roof waterproofing
membrane for OWNER approval
- Rigid Insulation
The insulation shall be minimum thickness approx. 50mm rigid rockwool panels, as
recommended by roofing system VENDOR.

- Slip Membrane
A slip membrane will allow the screed to thermally move on the rigid insulation below and
will allow the rainwater to pass the waterproofing membrane below
- Screed Concrete
40mm concrete screed placed on the slip membrane shall be permanently protecting the
insulation layer.
- Urethan Waterproofing
9.2.8

Suspended Ceilings
All areas occupied by personnel to be provided with acoustic patterned or smooth mineral fiber

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 44 of 51

tile. Toilet area to be provided with washable, moisture proof mineral fiber tiles. All ceiling tiles
shall be laid on exposed grid type suspension system.
Height of suspended ceiling for all laboratory rooms shall be 3meters from finished floor.
9.2.9

Sanitary Ware
All fittings shall be from white glazed vitreous china, fired clay or stainless steel supplied as
matching suites from a single manufacturer.
W.C. s shall be from vitreous china complete with a low level flushing cistern and connecting
fitments including P trap.
Wash hand basins shall be in vitreous china complete with chromium plated pillar taps, trapped
waste pipe connection and wall mounting brackets, approx. size 0.55 x 0.4m.
Urinals shall be the wall hung vitreous china with flushing rim type, complete with trapped outlet
and common manual operation type.
Cleaners room sinks shall be in fired clayware, cleaner s sink pattern, approx. size 0.61 x 0.30
x 0.23 deep, complete with wall mounted chromium plated bib taps, hinged bucket grating,
hardwood pad and floor support legs in stainless steel.

9.2.10

Air Conditioning
GENERAL
a) Separate heating and ventilation systems shall be provided for laboratories and office
accommodation.
b) The following minimum room temperatures shall be maintainable:
Area
i.
ii.

Laboratory Rooms
Office Areas

Summer
20-25C
20-25C

Winter
20-25C
20-25C

LABORATORY ROOMS
a) A central air conditioning system with air cooled condensing unit shall maintain the specified
indoor design conditions.
b) The system shall be completed with ducted supply, return and exhaust filters and automatic
control system.
OFFICES, LOCKERS AND TOILETS
Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 45 of 51

a) A separate air conditioning system with air cooled condensing unit shall maintain the
specified indoor design conditions.
b) The system shall be completed with ducted supply, return and exhaust filters and automatic
control system.
c) Ventilation of toilets and lockers shall be by motor driven, exhaust air fans. Make-up air shall
be thru louvered or undercut doors.
9.2.11

Finishes
Manager Office
Shift Office
Chemist
Technician
Library
Meeting Room
Mess Room
Wet Laboratory and Catalyst
Mercury
GC Laboratory Room
Gas Shelter
Hydrocarbon Laboratory
Sample Reception
Atomic Absorption Spectrometer (AAS)
Restrained Sample
Chemical Store
Glass Ware Room
Glass Ware Store Room
Toilet
Electrical Control Room
Corridor

F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F1 W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F3(a) W1 C3
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6(a) W1 C1
F6 (b) W4 C2
F3(a) W1 C3
F1 W1 C1

FLOORS
F1
F2
F3 (a)
F3 (b)
F4
F5
F6 (a)
F6 (b)

Vinyl tiles on screed


Vinyl tiles on access flooring
Epoxy paint coating on concrete steel trowel finish
Epoxy paint coating on concrete hardener
500mm x 500mm carpet tiles on screed
Marble tiles on sand/cement bed
300mm x 300mm Non-slip ceramic tiles on sand/cement bed
200mm x 200mm Non-slip ceramic tiles on sand/cement bed

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 46 of 51

NOTE 1
The junction of walls and floors is to be finished by a 100mm minimum height Vinyl skirting
carried out in materials consistent with the surrounding floor finish.
Where ceramic tiles are specified, coved ceramic base shall be used except for the toilets
where ceramic tiles shall be used.
skirting shall be used.
WALLS
W1
W2
W3
W4

Acrylic emulsion paint on cement plaster


Acrylic emulsion paint on fair faced concrete
Epoxy paint on cement plaster
Glazed ceramic wall tiles

CEILINGS
C1
C2

C3

Acoustic mineral fiber tiles with suspended ceiling system


Moisture resistant, washable surface mineral fiber tiles with suspended ceiling
system
Acrylic emulsion paint on fair faced concrete

9.2.12 Laboratory Furniture


The Laboratory furniture shall be furnished in accordance with the following requirements:
a) Base Units
-

Cabinet bases shall be free standing modularized design with provision for a 200 mm. utility
raceway for service lines and drains behind cabinets.

Chemical resistant acrylic finish coat and heat cure shall be applied for Cabinet base
components, a multi-step cleaning and treatment to ensure permanent bonding of the
chemical resistant finishing coat to metal surface

Shelves shall be roll-out type for bases of less than 600 mm. in width. Otherwise, half
depth shelves resting on adjustable shelf clips shall be provided.

All non-chromed or non-stainless steel components shall receive a chemical resistive


coating before assembly.

Chemical resistant surfaces shall be tested using ten drops of the chemicals listed below
and then covered by a watch glass for one hour. After the surface has been washed with
soap and water, rinsed and dried, it shall show No Effect other than a slight change in
gloss which is visible only from a grazing angle.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS
Acetone
Carbon tetrachloride
Ethyl alcohol
Ethyl Ether
Formic acid, 88%
Glacial acetic acid
Hydrochloric acid, 37%

JES-47A1
Rev. : 0
Page : 47 of 51

Hydrogen peroxide,5%
Nitric acid, 25%
Sodium hydroxide,10%
Sodium hydroxide,25%
Sulfuric acid, 85%
Xylene

No Effect shall mean Chemical caused no alterations to surface .


-

Base moldings to cover unit base and shims shall be provided in black vinyl, covered at the
bottom to provide a watertight seal when cemented against base and floor. They shall be
installed continuously around the base after installation and leveling of unit.

b)

Furniture worktops

Worktops and sinks shall be suitable for heavy work loads, severe chemical attack, physical
shock, and mechanical abrasion.

Worktops, sink basins, and cup sinks shall not depend on surface coatings for resistance to
chemical attack.

Worktops shall lock in place with service shelving without cementing.

Waterproof cement such as RTV silicone or resin shall be used to join adjacent worktops
and sealing sinks or cup sinks.

Worktops shall be tested using ten drops of the chemicals shown in Table I and then
covered by a watch glass for 24 hours. After the surface has been washed with soap and
water, rinsed, and dried, it shall meet or exceed the spot test results as shown in Table I.

Worktops shall be min. 25mm thickness Trespa or Ceramite or equivalent.

Worktops shall have a elevated edge around entire worktops so that the possibly spilled
chemicals and/or samples do not fall to the floor.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 48 of 51

TABLE I
SPOT TEST RESULTS
Chemical
Acetic acid, 50%
Acetone
Aqua Regia
Benzene
Chloroform
Forma1dehyde, 40%
Formic acid, 88%
Furfural
Hydrochloric acid, 37%
Nitric acid, 40%
Nitric acid, 70%
Phenol, 90%
Potassium hydroxide, 10%
Sodium hydroxide, 50%
Sulfuric acid, 70%
Sulfuric acid, 96%
Toluene
Xylene

Result
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect
No Effect

c) Wall and Floor Storage Units


-

Design, construction, and finish of wall and floor storage cabinets shall, match those of the
base units.

- Sliding glass doors shall be made of double strength safety grade glass set into a protective
channel so that glass is not in contact with the metal frame.
- All joints in solvent storage cabinets shall be sealed to prevent leaks.
- Solvent storage cabinets shall be provided with minimum of two outlets with flash arrestors and
bung seals capable of being connected to the lab exhaust system to prevent accumulation of
hazardous fumes.
-

Solvent storage cabinets shall be provided with self closing doors, which can be fastened
open by a chain-latch and fusible-link assembly. Link shall melt at 70oC to release and close
doors in case of fire.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 49 of 51

Interiors of acid storage cabinets shall be lined with acid resistant, fiberglass reinforced
cement (free of asbestos).

d) Fume Hoods
-

Fume hoods shall be able to introduce untempered outside air into a hood exhaust to limit
the percentage of conditioned air removed from the laboratory. Descriptive type names in
common use are: auxiliary air, balanced air, controlled air, make up air, induced air

Fume hood structures shall be constructed of highly fume and heat resistant materials.

Hood base unit shall meet design, construction, and finish specifications for base units.

Constant equalized air flow rate though the hood shall be maintained bypass flow of outside
air into the good as the flow of conditioned air through the hood face is decreased by the
closing sash.

Hoods shall be equipped with two sets of adjustable baffles: An upper baffle to adjust the
flow of exhaust air, and a lower baffle to control air flow across the word surface.

All non chromed or non stainless steel metal components shall receive a chemical resistant
coating be fore assembly.

- Front panel mounted control knobs for gas, air, water, steam, and vacuum fixtures shall be
provided, and front (outside) panel mounted and color coded.
- Electrical control switches for hood light and fan blower shall be provided and front (outside)
panel mounted.
- Electrical outlets shall be front (outside) panel mounted and meet Underwriter Laboratories
(UL) approval.
- Hood lamp shall be vapor proof with shatterproof globe and meet UL approval
- Fume hoods shall be equipped with spark-protected, closed lighting fixtures.
- Face velocity range shall be 23 to 45 meters per minute.
- Fume hoods shall be provided with vent collars in the roof of the fume hood chamber for
connection to the exhaust system.
- Fume hood fans shall not be the motor-in-channel type but must have an electric motor that
is separate from the fan and housing.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 50 of 51

All exhaust fans, motors and blowers shall be designed to be externally mounted at
discharge end of exhaust duct.

The exhaust system for fume hoods shall be equipped with a low velocity perforated box
diffuser for smell trapping.

- Where required by law, scrubbers shall be provided to limit the release of toxic or noxious
fumes. Scrubbers shall activate automatically upon switching on the fan motor. For
Perchloric acid and Tetraethyl lead fume hood blower shall be sufficient to maintain a
minimum face velocity of 45 meters per minute with the fully opened.
e) Sinks
-

Sinks shall be highly resistant to chemical, mechanical, and thermal shock.

Drain troughs shall be constructed of cast epoxy resin with no joints and installed with a
minimum 1:50 slope.

Sinks outlets shall be included strainer and plug.

Drum trap and sink outlet assembly connections, shall be provided for every sink. The drum
be easily removed from the rest of the trap for cleaning without removing inlet or outlet
connections

f) Fixtures for Fluids

10.

Valve bodies shall be of red brass allow. Handles, ground key cocks, and turrets shall be
brass drop forgings. Operating parts shall be made of solid brass or other metal suitable for
the application. Fixtures shall be chrome-plated with color coded identification buttons to
identify service

Self-closing distilled water fixtures shall be of chemically inert metallurgy and not
contaminate the water supply.

COMPRESSOR SHELTERS
The Compressor Shelters shall be housed within a single span steelwork portal framed structure
and covered with metal roof sheeting.
The sizes of Shelters shall be based on the equipment to be served, material stored, and
personnel access and space requirement.
Shelters shall be open on all four sides from grade to a minimum of 2.4m above the operating
platform level.

Jurong Aromatics Corporation Pte Ltd.

Jurong Aromatics Complex Project


Engineering Standard
BUILDINGS

JES-47A1
Rev. : 0
Page : 51 of 51

Provide electric overhead crane, electric hoist and runway beams above each compressor to
facilitate removal of compressor and motor for maintenance. Crane capacity shall be adequate
to handle the heaviest compressor component to be removed.
If a peaked roof is used a continuous ridge ventilator must be provided. If flat shed type roof is
used the high point of the roof must be ventilated or the side wall deft open up to the high point.
If operating floor is elevated it shall be either grating or a raised lug pattern floor plate.

11.

CAR PARKING
The Car parking shall be steelwork sheltered and covered with metal roof sheeting.
The Car parking shelter shall be provided with gutter and drain, lighting for vehicles.
The design shall be subject to the approval of OWNER and MAIN CONTRACTOR shall include
the construction of these buildings in his Scope of Work.

Jurong Aromatics Corporation Pte Ltd.