ITEM

PARTICULARS

UNIT

BATTERBOARD
Measure
Total Perimeter
No. of Outer Corner
No. of Inside Corner

m
units
units

Computed Length
CL=TP+(OC)(2M)-(IC)(2M)
Batterboard: Using 2"x2"x12"
Req'd no. 2"x2"x12"
Formula=(CL/1.2)/3
CWN=(BF/1000)(45)
#16 GI Tie Wire (BF/4000)(45)
B
B.1

B.2

C
C.1

m
pcs

kgs
kgs

EXCAVATION
WALL FOOTING
Width
Depth
Length
Volume

m
m
m
cu.m.

Total Volume

cu.m.

COLUMN FOOTING
Width
Depth
Length
Number CF-1
Volume

m
m
m
units
cu.m.

Total Volume

cu.m.

CONCRETE WORKS FOOTINGS


WALL FOOTINGS
Width
Thickness
Length
Area
Volume

m
m
m
sq.m.
cu.m.

Total Volume
Total Area
Materials
3/4" Gravel Bed = [(Total Area)(0.05)]+10%
Concrete Mixture: Class B - 2,000 to 2,500 PSI
Portland Cement = (Vol.)(7 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)
C.2

cu.m.
bags
cu.m.
cu.m.

WALL FOOTINGS
Width
Thickness
Length
Area
Volume

m
m
m
sq.m.
cu.m.

Total Volume
Total Area

cu.m.
cu.m.

Materials
3/4" Gravel Bed = [(Total Area)(0.05)]+10%
Concrete Mixture: Class B - 3,000 to 3,500 PSI
Portland Cement = (Vol.)(7 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)
D
D.1

cu.m.
cu.m.

cu.m.
bags
cu.m.
cu.m.

CONCRETE WORKS
CONCRETE WORKS - COLUMN
COLUMN 1

D.2

Width
Thickness
Length
No.
Volume

m
m
m
units
cu.m.

Total Volume

cu.m.

Materials
Concrete Mixture: Class B - 3,000 to 3,500 PSI
Portland Cement = (Vol.)(8.5 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)

bags
cu.m.
cu.m.

CONCRETE WORKS - BEAMS

BEAM 1

D.3

Width
Thickness
Length
No.
Volume

m
m
m
units
cu.m.

Total Volume

cu.m.

Materials
Concrete Mixture: Class B - 3,000 to 3,500 PSI
Portland Cement = (Vol.)(8.5 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)

bags
cu.m.
cu.m.

CONCRETE WORKS - SHORED SLABS


SLAB 1

D.4

Width
Thickness
Length
No.
Volume

m
m
m
units
cu.m.

Total Volume

cu.m.

Materials
Concrete Mixture: Class B - 3,000 to 3,500 PSI
Portland Cement = (Vol.)(8.5 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)

bags
cu.m.
cu.m.

CONCRETE WORKS - ON GRADE SLABS


SLAB G1
Width
Thickness
Length
No.
Volume

m
m
m
units
cu.m.

Total Volume

cu.m.

Materials

3/4" Gravel Bed = [(Total Area)(0.05)]+10%


Concrete Mixture: Class B - 2,000 to 2,500 PSI
Portland Cement = (Vol.)(7 Bags/Cu.m.)
White Sand = (Vol.)(.50 Cu.m./Cu.m.)
3/4" Gravel = (Vol.)(.99 Cu.m./Cu.m.)
E

bags
cu.m.
cu.m.

FORMWORKS
COLUMNS
Facing Area (Manually Computed)
Facing Member (2"x2") = (FA)(10.76 Bf/Sq.m.)
Support & Brace (2"x2" & 2"x3") = (FA)(18.83)

sq.m.
bf
bf

BEAM BOTTOMS (HEIGHT FROM FLOOR = 3-4M)


Facing Area (Manually Computed)
Facing Member (2"x2") = (FA)(21.52 Bf/Sq.m.)
Support & Brace (2"x2" & 2"x3") = (FA)(29.60)

sq.m.
bf
bf

BEAM SIDES (HEIGHT FROM FLOOR = 3-4M)


Facing Area (Manually Computed)
Facing Member (2"x2") = (FA)(10.76 Bf/Sq.m.)
Support & Brace (2"x2" & 2"x3") = (FA)(18.83)

sq.m.
bf
bf

SLAB THICKNESS (HEIGHT FROM FLOOR = 3-4M)


Facing Area (Manually Computed)
Facing Bracing & Support (2"x2") = (FA)(32.28 Bf/Sq.m.)

sq.m.
bf

TOTALS
Facing Members (2"x2" Wood)
Support & Brace (2"x2" & 2"x3")
OTHER MATERIALS
Total Facing Area
Number of Uses
Req'd. Area = TFA/NU
Plywood 4'x8'x1/4" Ordinary = RA/2.98
LUMBER
Facing Member = Total Bf/Nu
Supports & Braces = Total Bf/Nu
Total
CONSUMABLE
Cwn = (TBF)(45/2500)
#16 GI Tie Wire = (TBF)(45/4000)

bf
bf

sq.m
uses
sq.m.
sheets

bf
bf
bf

kgs
kgs

QTY