HOSPITAL COMPLEX FOR PAKISTAN KIDNEY & LIVER INSTITUTE AND RESEARCH CENTER

Volume - II a
Bill of Quantities (ADDENDUM #1)
for
Electrical Works
FINAL DESIGN AND TENDER DOCUMENTS
February 29, 2016

- arcop JV
Design Architect

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center
Lahore, Pakistan.

S. NO.

Content

PAGE NO.

DESCRIPTION

GRAND SUMMARY

Page 1 of 1

BILL OF QUANTITIES - DIVISION 14 - CONVEYING EQUIPMENTS

Page 1 of 2

BILL OF QUANTITIES - DIVISION 25 - INTEGRATED AUTOMATION (BMS)

Page 1 of 14

BILL OF QUANTITIES - DIVISION 26 - ELECTRICAL

Page 1 of 67

BILL OF QUANTITIES - DIVISION 27 - COMMUNICATION

Page 1 of 18

BILL OF QUANTITIES - DIVISION 28 - ELECTRONIC SAFETY & SECURITY

Page 1 of 8

BILL OF QUANTITIES - DIVISION - MISCELLANEOUS ITEMS

Page 1 of 15

LIST OF APPROVED MANUFACTURER

Page 1 of 13

arcop

Page 1 of 1

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center
Lahore, Pakistan.

Bill of Quantities

ELECTRICAL WORKS
GRAND SUMMARY
(ADDENDUM # 1)

DIVISION #

DIVISIONS

DIVISION 14

CONVEYING EQUIPMENTS

DIVISION 25

INTEGRATED AUTOMATION (BMS)

DIVISION 26

ELECTRICAL

DIVISION 27

COMMUNICATIONS

DIVISION 28

ELECTRONIC SAFETY & SECURITY

MISC. ITEMS

MISCELLANEOUS ITEMS

PARKING BUILDING
(P2, P1 & Ground to
First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor
& Ground to 10th Floor)

AMOUNT
Rs.
(1)

AMOUNT
Rs.
(2)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor /
Sub-Station, Lower Ground,
Ground & First Floor)
AMOUNT
Rs.
(3)

AMOUNT
Rs.

(1+2+3)

TOTAL OF DIVISION 14 TO MISC.


Note:
Contractor is advised to confirm the cable running lengths and termination as per site conditions before procurement of cables / commencement of work.
The electrical contractor is to ensure the length limit for IT copper cables which should not exceed from 90 meter. If the length exceeds the limit then the electrical contractor should inform the architect and electrical consultant to
rectify the issue.
Owner can supply any material of Contractor scope at any stage and its cost will be completely deleted from Contractor scope without any kind of adjustment.
Contractor should mark the selected brands and vendors in approved manufacturers list with submission of Tender Documents. Cost must be as per latest model and advanced technology.
Owner / Consultant have all the rights to select any brand / vendor from provided approved manufacturer list, Contractor shall not finalize any brand / vendor without written approval from consultant / owner.
Cost of Shifting of material from warehouse or from any where at site must be included in quoted price and no other charges will be claimed.
Preparation of shop drawings is compulsory before execution of work as per requirement of consultant's design and site during project execution with coordination of all other services.
Submission of As-built drawings (2 sets) after work completion of each floor and 3 sets & soft copy of complete electrical works after final commissioning of project. Approval of final bills are subject to approval of As-built drawings.
Cable penetrations through walls should be effectively sealed with FM approved fire-rated sealants of equipment fire-rating as the walls. Cable trenches which cross under the base of such walls should also be similarly sealed.
Insulation Resistance Test , Earthing Resistance Test and Fluke testing reports are mandatory and final bill will not be processed by client / consultant until or unless reports received.
Phase balancing is in the scope of contractor. Proper load balancing, charts to be provided for each Distribution board.
Contractors are reequired to include all applicable Taxes, levies etc. as per prevailing Government rules and requlations, in the given quotation.
All the taxes / levies which are included in the given quotation shall be mentioned clearly.
After Bid opening / Bid disclosure no deviation in the provided data from the contractor shall be accepted.

arcop

Page 1 of 1

DIVISION 14
CONVEYING EQUIPMENT

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center
Lahore.
(ADDENDUM # 1)

ITEM

14 00 00

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Bill of Quantities
Division 14 : Conveying Equipment
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

CONVEYING EQUIPMENTS
Supply, installation, testing and commissioning of Electric Passenger /
Hospital Bed / Service Elevators to carry the specified load serving landing
complete with gearless electric motor, VVVF drive controller, car and
landing doors assemblies, automatic push button control system, landing
controls alarm, telephone and all additional features, interior design
complete, including complete connections and control panel ventilation
installation, elevator car guides, buffers, suspension system , counterweight
and safety speed governor system, complete and fitted in to elevator shaft
all as described in the specification as per code EN-81.

14 00 00.13

VL-01 to VL-03
13-Persons (1000 Kg), Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed

No.

14 00 00.16

SL-01-01 to SL-01-02
18-Persons (1350 Kg). Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed

No.

14 00 00.19

SL-02-01 to SL-02-02 Fire Rated


21-Persons (1600 Kg), Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed

No.

14 00 00.23

BL-01 to BL-02
1750 Kg, Gearless Motor with VVVF control
Capsule Elevator, 1.0 m/sec speed

No.

14 00 00.26

SRV-01
2000 Kg, Gearless Motor with VVVF control
Capsule Elevator, 1.0 m/sec speed

No.

14 00 00.29

SL-03-02 to SL-03-04
21-Persons (1600 Kg). Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed

No.

14 00 00.33

CL-01 to CL-04
1600 Kg, Gearless Motor with VVVF control
Passenger Elevators, 1.75 m/sec speed

No.

Note:
- All the elevators are based on latest versions of EN-81 standard and EN-8158 for SL-02-01 and SL-02-02.
- All the civil work related with elevators must be carried out by civil
contractor.
- Refer specification sheet of individual elevators attached in
specifications.The Bidder shall provide the complete Technical Literature.

arcop

Page 1 of 2

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center
Lahore.
(ADDENDUM # 1)

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Bill of Quantities
Division 14 : Conveying Equipment
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Supply, installation, testing and commissioning of electric moving escalator


specified size complete with electric motor, VVVF drive controller, pallets,
balustrades, skirt plate, hand rail guide, PVC hand rail, comb, floor plate,
exterior Hairline finish cladding for entire pallets drive and control panel,
safeties as mentioned in schedule, power and control wiring and cables
ready to operate. Complete accessories as per selection mentioned in
specifications as per EN-115.

14 00 00.36

Indoor Type Escalator, 0.5 m/sec speed (9000 Kg) with VVVF control
Horizontal Distance 40', 18' Rise, 30 deg Inclination.
Balustrade Height 3'-4" , W-1000 (Compact Type)

No.

Note:
- All the escalators are based on latest versions of EN-115 standard.
- All the civil work related with escalators must be carried out by civil
contractor.
- Refer specification sheet of individual escalators attached in
specifications.

Total 14 00 00
( CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 14

arcop

Page 2 of 2

DIVISION 25
INTEGRATED AUTOMATION (BMS)

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 08 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

COMMISSIONING OF INTEGRATED AUTOMATION


Supply, installation, testing and commissioning of Integrated Automation
(BMS), comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-02)

25 08 00.13

All Integrated Automation control system with automation server, enterprise


server, network operator workstation, DDC controllers, network architecture
and smart structure shall perform all monitoring and controls as specified in
the Technical Specifications.

Job

25 08 00.16

All required interfacing and interconnection work with high performance


Ethernet network based on TCP/IP protocol.

Job

25 08 00.19

Programming, testing and commissioning of the complete system as per


client's requirements permissible for the FACP with training sessions of
maintenance personnel's.

Job

25 08 00.23

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Total 25 08 00
( CARRIED FORWARD TO SUMMARY)

arcop

Page 1 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 32 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT


(VERTICAL TRANSPORT SYSTEM)
Supply, installation, testing and commissioning of Integrated Vertical
Transportation System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer's instructions,
devices and equipment as per specifications and drawings to complete the
system.
(For Detail Refer Drawing # BMS-08)

25 32 00.13

Ethernet Dual-speed HUB with multiport I/O as per the drawing.

No.

12

25 32 00.16

24-port Network Switch for device communication with main server system.

No.

Control Panel/Gateway for communication of vertical transport system.


25 32 00.19

Elevators

No.

17

25 32 00.23

Escalators

No.

25 32 00.26

Supply and wiring for Vertical Transport System with 4 Pair Shielded
Communication wire in 25mm dia pvc conduit and other accessories.
Complete in all respect, as per drawings.

Rm.

250

25 32 00.29

Supply and wiring for interconnecting Vertical Transport System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

1,050

Note:
* Control Panel/Gateway is only applicable if the provided Vertical
Transport Panel not workable.
* BMS Contractor is advise to verify the cable running length and
termination as per site conditions before commence of work.
* BMS Contractor is also advise to verify control panel before bidding.
* BMS Contractor shall provide technical data for all the equipment used.

Total 25 32 00
( CARRIED FORWARD TO SUMMARY)

arcop

Page 2 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

25 32 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT


(PARKING MANAGEMENT SYSTEM)
Supply, installation, testing and commissioning of Integrated Parking
Management System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer's instructions,
devices and equipment as per specifications and drawings to complete the
system.
(For Detail Refer Drawing # BMS-07)

25 32 13.13

16-Port Local Area Network Switch for interconnecting main PC in Parking


management room to BMS Server at First Floor.

Job.

25 32 13.16

System Manager Module to directly communicate to Public Address System.

No.

25 32 13.19

Supply and wiring for interconnecting Parking Management System from its
main controller to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

625

Note:
* BMS Contractor shall provide technical data for all the equipment used.

Total 25 32 13
( CARRIED FORWARD TO SUMMARY)

arcop

Page 3 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

25 36 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR POWER METERS


(ENERGY MANAGEMENT SYSTEM)
Supply, installation, testing and commissioning of Integrated Energy
Management System, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer's instructions,
devices and equipment as per specifications and drawings to complete the
system.
(For Detail Refer Drawing # BMS-03)

25 36 13.13

Energy Analyser in Distribution Panels for measuring the required electrical


parameters including its required rating Current Transducer.
Class 0.2 (current according to IEC 61557-12)
Class 0.2 (voltage according to IEC 61557-12)
Class 0.5 (power factor according to IEC 61557-12)
Class 0.5S (reactive energy according to IEC 62053-24)
Class 0.2 (active power according to IEC 61557-12)
Class 0.2 (active energy according to ANSI C12.20)
Class 0.2S (active energy according to IEC 62053-22)
Power quality monitoring IEC 62586
Programmablity (logic and math functions)
Voltage sag and swell detection
Waveform capture
Harmonic distortion
Up to the 63rd harmonic
Power quality measurement IEC 61000-4-30 : class S
Compliance report EN 50160
Safety Construction CSA C22.2 No 61010-1 : CAT III, 347...600 V ed. 3
UL 61010-1 : CAT III, 347...600 V ed. 3
EN 61010-1 : CAT III, 400...690 V ed. 3
IEC 61010-1 : CAT III, 400...690 V ed. 3
IP30 (body) conforming to IEC 60529
IP54 (front) conforming to IEC 60529

No.

75

15

25 36 13.16

Electronic Relay in Distribution Panels for measuring the required electrical


parameters and controlling the circuit breaker.
Zelio Timer Relays to master your time in all simplicity !
A complete range of Timers combining simplicity, reliability and flexibility
Zelio Timers Relays is a complete and high performance electronic timers
offer. Its designed for hard-wired logic automated system to complement
industrial programmable logic controllers(PLC).
Industry, infrastructure, building, etc.
Standard motor protection
Line protection
Motor overload, stalling, loss of phase protection

No.

22

arcop

Page 4 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

25 36 13.19

Gateway in Distribution Panels for communication and data exchange


between devices and BMS server.
MODBUS RTU OVER TCP/IP
Ethernet ModbusTCP/IP to RS485 or RS232 gateway
RS485 or RS232 Modbus serial master to Ethernet ModbusTCP/IP
10/100Base-Tx Ethernet port
RS485 / RS232 serial port, optically isolated
2-wire and 4-wire compatibility
Support for serial master to ModbusTCP/IP routing
P30, DIN rail mounted enclosure
Web Interface for configuration, diagnostic and maintenance
Advanced security through ModbusTCP/IP filtering with configurable access
levels (read-only or full access)
Secure user interface including user's name & password log-in.
User interface in English, French, German, and Spanish
Control power through PoE (Power over Ethernet) or 24 Vdc power source
Rated for use in industrial environments (-25 to 70oC)

No.

22

25 36 13.23

24-Port Local Area Network Switch for gateway communication with BMS
server.
10BASE-T: cavo a 2 coppie UTP/STP CAT3, CAT4 o
CAT5 EIA/TIA 568 100 (100 M)
100BASE-TX: cavo a 2 coppie UTP/STP CAT5 EIA/TIA 568 100.

No.

25 36 13.26

Supply and wiring for RS-485 or Belden Cable in 25mm dia PVC conduit and
other accessories from individual device to gateway. Complete in all
respect, as per drawings.

Rm.

300

3,750

500

25 36 13.29

Supply and wiring for CAT-6 Cable in 25mm dia pvc conduit and other
accessories from individual gateway to network switch. Complete in all
respect, as per drawings.

Rm.

150

1,900

350

25 36 13.33

Supply and wiring for interconnecting Energy Management System from its
main controller/PC to BMS Server with control cable in 25mm dia pvc
conduit and other accessories. Complete in all respect, as per drawings.

Job.

25 36 13.36

Software: Struxuwrae Power Monitoring System 7.2 or latest version SPM


Complete software with 75 device for Energy analyzer, Server, Engineering
and web client license.

Job.

25 36 13.39

Programmable Logic Controller PLC (40 I/Os) with accessories for Substation1.

No.

25 36 13.43

Control Panel

No.

Note:
* BMS Contractor is advise to verify the cable running length and
termination as per site conditions before commence of work.
* BMS Contractor shall provide technical data for all the equipment used.
Total 25 36 13
( CARRIED FORWARD TO SUMMARY)

arcop

Page 5 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

25 36 26

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR LIGHTING RELAYS


(LIGHTING CONTROL SYSTEM)
Supply, installation, testing and commissioning of Integrated Lighting Control
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-06)

25 36 26.13

16-Port Local Area Network Switch for integration and interconnecting main
Lighting Control PC/Touch Screen to BMS Server.

Job.

25 36 26.16

Network Bridge for seperating individual sub-stations/network cloud or


where applicable.

No.

25 36 26.19

Supply and wiring for CAT-5e Cable in 25mm dia pvc conduit and other
accessories from relay to relay and from touch screen to relay. Complete in
all respect, as per drawings.

Rm.

550

2,500

175

25 36 26.23

Supply and wiring for interconnecting Lighting Control System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

440

750

100

Note:
* BMS Contractor is advise to verify the cable running length and
termination as per site conditions before commence of work.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 36 26
( CARRIED FORWARD TO SUMMARY)

arcop

Page 6 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 36 29

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR UPS MONITORS (UNINTERRUPTIBLE POWER


SUPPLY)
Supply, installation, testing and commissioning of Integrated UPS System,
comprising of following equipments including all accessories required for the
completion of the system in all respects with manufacturer's instructions,
devices and equipment as per specifications and drawings to complete the
system.
(For Detail Refer Drawing # BMS-05)

25 36 29.13

16-Port Local Area Network Switch for integration and interconnecting main
UPS to BMS Server.

Job.

25 36 29.16

System Manager Module to directly communicate to UPS.

No.

25 36 29.19

Supply and wiring for interconnecting UPS System to BMS Server with control
cable in 25mm dia pvc conduit and other accessories. Complete in all
respect, as per drawings.

Rm.

225

100

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of UPS.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 36 29
( CARRIED FORWARD TO SUMMARY)

arcop

Page 7 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 36 33

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR DIESEL GENERATOR SETS (6 No. 2000kVA)


Supply, installation, testing and commissioning of Integrated Diesel
Generator Sets, comprising of following equipments based on
communication protocol Modbus RTU including all accessories required for
the completion of the system in all respects with manufacturer's instructions,
devices and equipment as per specifications and drawings to complete the
system.

25 36 33.13

16-Port Local Area Network Switch for integration and interconnecting main
Access Control System PC/Controller to BMS Server at First Floor.

Job.

25 36 33.16

System Manager Module to directly communicate to Access Control


System.

No.

25 36 33.19

Fuel Tank Sensors to directly communicate with Diesel underground and


day tank pumps including all its controls etc..

Job.

25 36 33.23

Supply and wiring for all Control cables required to complete the system
from its main controller / PC to BMS Server in 25mm dia pvc conduit and
other accessories. Complete in all respect, as per drawings.

Job.

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Access Control System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 36 33
( CARRIED FORWARD TO SUMMARY)

arcop

Page 8 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 38 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(FIRE ALARM SYSTEM)
Supply, installation, testing and commissioning of Integrated Fire Alarm
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-04)

25 38 00.13

16-Port Local Area Network Switch for interconnecting main Fire Alarm
PC/Panel to BMS Server.

Job.

25 38 00.16

System Manager Module to directly communicate to Public Address System.

No.

25 38 00.19

Supply and wiring for interconnecting Fire Alarm System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

225

100

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Fire Alarm System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 38 00
( CARRIED FORWARD TO SUMMARY)

arcop

Page 9 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 38 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(PUBLIC ADDRESS SYSTEM)
Supply, installation, testing and commissioning of Integrated Public Address
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-05)

25 38 13.13

16-Port Local Area Network Switch for integration and interconnecting main
Public Address PC/Amplifierl to BMS Server at First Floor.

Job.

25 38 13.16

System Manager Module to directly communicate to Fire Alarm System.

No.

25 38 13.19

Supply and wiring for interconnecting Public Address System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

225

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Public Address System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 38 13
( CARRIED FORWARD TO SUMMARY)

arcop

Page 10 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 38 16

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(VIDEO SURVEILLANCE)
Supply, installation, testing and commissioning of Integrated Video
Survellance, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-05)

25 38 16.13

16-Port Local Area Network Switch for integration and interconnecting main
Video Survellance PC/NVR to BMS Server.

Job.

25 38 16.16

System Manager Module to directly communicate to Video Survellance.

No.

25 38 16.19

Supply and wiring for interconnecting Video Survellance from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

1,125

225

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Video Survellance.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 38 16
( CARRIED FORWARD TO SUMMARY)

arcop

Page 11 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

25 38 19

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(ACCESS CONTROL SYSTEM)
Supply, installation, testing and commissioning of Integrated Access Control
System, comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions, devices and
equipment as per specifications and drawings to complete the system.
(For Detail Refer Drawing # BMS-05)

25 38 19.13

16-Port Local Area Network Switch for integration and interconnecting main
Access Control System PC/Controller to BMS Server.

Job.

25 38 19.16

System Manager Module to directly communicate to Access Control


System.

No.

25 38 19.19

Supply and wiring for interconnecting Access Control System from its main
controller/PC to BMS Server with control cable in 25mm dia pvc conduit
and other accessories. Complete in all respect, as per drawings.

Rm.

225

225

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Access Control System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total 25 38 19
( CARRIED FORWARD TO SUMMARY)

arcop

Page 12 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 25 : Integrated Automation (BMS)


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

LOCAL SUPPLIES AND SERVICES TO COMPLETE JOB OF INTEGRATED


AUTOMATION FOR ALL SYSTEMS

Engineering, Programming, commissioning and Handing over of all above


systems comprising of following equipments based on communication
protocol Modbus RTU including all accessories required for the completion
of the system in all respects with manufacturer's instructions.

Job.

BMS Computer
HP Prodesk 400 G2
Micro tower Business PC
Intel core i5-4590S processor atleast 3.7 GHz
Max turbo frequency (3.0 GHz base frequency) 6 MB cache, 4 cores, 4
threads intel HD Graphics 4600 supports DDR3 memory upto 1600 MT/s data
rate.
Memory 2 GB PC3-10600 Memory (1x2GB)
Hard Disk 500 GB 7200 RPM SATA-6G
HP Optical drives: HP Supermulti DVD-RW
Display HP 18.5" LCD Display
Operating system windows 7 professional with genuine liscense

No.

HP ProLiant DL 160 Generation 8


Processor: (1) Intel Xeon E5-2603 (1.8 GHz / 4 core / 10 MB / 6.4 GT-s QPI /
80W) Memory: 4 GB Hard disk: HP 500 GB 6G SATA 7.2K rpm LFF (3.5 inch) SC
midline NIC: HP 361i integrated dual port gigabit. Server adaptor HP Optical
drives: HP 9.5mm SATA DVD ROM Optical drive storage controller HP Power
supplies: 500W Platinum FIO Power Supply with backplane form factor: 1U
Rack.

No.

Note:
* BMS Contractor is advise to verify need of System Manager Module and
the brand of Public Address System.
* BMS Contractor shall provide technical data for all the equipment used.
* BMS Contractor will submit detail description of all items required to
complete job.

Total
( CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 25

arcop

Page 13 of 14

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Summary of Cost

(ADDENDUM # 1)

Lahore.

DESCRIPTION

25 08 00

COMMISSIONING OF INTEGRATED AUTOMATION

25 32 00

INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT


(VERTICAL TRANSPORT SYSTEM)

25 32 13

INTEGRATED AUTOMATION FOR CONVEYING EQUIPMENT


(PARKING MANAGEMENT SYSTEM)

25 36 13

INTEGRATED AUTOMATION FOR POWER METERS


(ENERGY MANAGEMENT SYSTEM)

25 36 26

INTEGRATED AUTOMATION FOR LIGHTING RELAYS


(LIGHTING CONTROL SYSTEM)

25 36 29

INTEGRATED AUTOMATION FOR UPS MONITORS (UPS SYSTEM)

25 36 33

INTEGRATED AUTOMATION FOR DIESEL GENERATOR SETS


(6 NO. 2000kVA)

25 38 00

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(FIRE ALARM SYSTEM)

25 38 13

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(PUBLIC ADDRESS SYSTEM)

25 38 16

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(VIDEO SURVEILLANCE)

25 38 19

INTEGRATED AUTOMATION FOR ELECTRONIC SAFETYAND SECURITY SYSTEM


(ACCESS CONTROL SYSTEM)

Division 25 : Integrated Automation (BMS)

PARKING BUILDING
(P2, P1 & Ground to First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

AMOUNT
Rs.

AMOUNT
Rs.

LOCAL SUPPLIES AND SERVICES TO COMPLETE JOB OF INTEGRATED


AUTOMATION FOR ALL SYSTEMS
TOTAL OF DIVISION - 25

arcop

Page 14 of 14

DIVISION 26
ELECTRICAL

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

MEDIUM VOLTAGE CABLES


Supply, installation, testing, commissioning and termination of following
8.7/15kV, Cu/XLPE/SWA/PVC (MV Cables) in already installed Cable trench /
Cable ladder / Cable tray / Duct Bank. Complete in all respects.

26 05 13.13

From Energy Center-1 To Sub Station-1


3C, 300 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

410

26 05 13.16

From Sub Station-1 To Energy Center-1


3C, 300 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

410

26 05 13.19

From Grid Station Feeder-1 To Energy Center


3C, 300 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

725

26 05 13.23

From Grid Station Feeder-7 (Backup Feeder) To Energy Center


3C, 300 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

750

26 05 13.26

3C, 120 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

10

26 05 13.29

From Step up Transformer to MV Switch. (5 No.)


3C, 150 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

125

26 05 13.33

From MV Switch to Step down Transformer (4 No.)


3C, 240 Sq.mm 8.7/15kV, Cu/XLPE/SWA/PVC

Rm.

60

60

Job.

15KV CABLE TERMINATION KITS


Supply, installation, testing and commissioning of 15KV, XLPE-CU, MV Cable
Termination Kit at both ends with 3M, Raychem or equivalent approved
brand termination kit etc.
26 05 13.36

3C, 300 Sq.mm 15KV, Cable Termination kits including all termination
accessories like HT tape etc.

43

Note: Contractor is advised to confirm the cable running lengths and


termination as per site conditions before commencement of work.

Total Rs. Section- 26 05 13


(CARRIED FORWARD TO SUMMARY)

arcop

Page 1 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

26 05 19

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES


Supply, installation, testing & commissioning of following items including all
material, tools, labor & accessories required for completion of work as per
description & drawings. Complete in all respects.

26 05 19.13

Circuit wiring from DB to switch board including any wiring from switch
board to switch board with 2x2.5 Sq.mm + ECC 1x2.5 Sqmm, 1-core PVC
wires in 25mm dia of pvc conduit exposed / concealed as shown on
drawings. Complete in all respects.

No.

24

483

36

26 05 19.16

Wiring for light point from switch board/ Dimmer board to first light point with
1.5 Sq.mm common neutral of 2.5 Sq.mm and common ECC of 2.5 Sq.mm +
wires in 25mm dia of exposed / concealed PVC conduit as shown on
drawings.

No.

116

2,368

187

26 05 19.19

Same as above item but wiring from light point to point.

No.

58

2,216

136

26 05 19.23

Wiring for Group Control Light fixtures From DB to first light point with 2x2.5
Sq.mm + ECC 1x2.5 Sq.mm in 25mm dia PVC conduit exposed / concealed
as shown on drawings. Complete in all respects.

No.

132

152

26

26 05 19.26

Same as above item but from light point to point.

No.

1,120

2,373

311

26 05 19.29

Emergency Circuit wiring from DB to switch board including any wiring from
switch board to switch board with 2x2.5 Sq.mm + ECC 1x2.5 Sqmm, 1-core
PVC wires in 25mm dia of pvc conduit exposed / concealed as shown on
drawings. Complete in all respects.

No.

278

26 05 19.33

Emergency Wiring for light point from switch board/ Dimmer board to first
light point with 1.5 Sq.mm common neutral of 2.5 Sq.mm and common ECC
of 2.5 Sq.mm + wires in 25mm dia of exposed / concealed PVC conduit as
shown on drawings.

No.

525

26 05 19.36

Same as above item but wiring from light point to point.

No.

606

26 05 19.39

Wiring for Group Control Emergency & Exit Light fixtures from DB to first light
point with 2x2.5 Sq.mm + ECC 1x2.5 Sq.mm in 25mm dia PVC Conduit as
exposed / concealed shown on drawings. Complete in all respects.

No.

48

79

26 05 19.43

Same as above item but wiring from light point to point.

No.

528

507

71

arcop

Page 2 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Wiring of 13A/15A Switch Socket unit (for Normal Power) from DB to first
outlet with following size of wires in 25mm dia PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
26 05 19.46

2x4 Sq.mm Cu/PVC + ECC 1x4 Sq.mm Cu/PVC

No.

42

1,268

29

26 05 19.49

Same as item above but wiring from outlet to outlet.

No.

168

5,603

102

Wiring of 13A Flat Pin Switch Socket unit (for UPS Power) from DB to first outlet
with following size of wires in 25mm dia PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
26 05 19.53

2x4 Sq.mm Cu/PVC + ECC 1x4 Sq.mm Cu/PVC

No.

711

10

26 05 19.56

Same as item above but wiring from outlet to outlet.

No.

1,264

30

No.

34

No.

36

210

12

No.

16

26

17

No.

Wiring of 20A Switch Socket unit (for Hand Dryer) from DB to first outlet with
following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
26 05 19.59

2x4 Sq.mm Cu/PVC + ECC 1x4 Sq.mm Cu/PVC


Wiring of 20A DP Isolator Switch from DB to first outlet with following size of
wires in 25mm dia size PVC conduit of exposed / concealed as shown on
drawings. Complete in all respects.

26 05 19.63

2C, 4 Sq.mm Cu/PVC/PVC + ECC 1x4 Sq.mm Cu/PVC


Wiring of 20A 4P Isolator from DB to first outlet with following size of wires in
25mm dia size PVC conduit of exposed / concealed as shown on drawings.
Complete in all respects.

26 05 19.66

4C, 4 Sq.mm Cu/PVC/PVC + ECC 1x4 Sq.mm Cu/PVC


Wiring of 32A 4P Isolator from DB to first outlet with following size of wires in
38mm dia size PVC conduit of exposed / concealed as shown on drawings.
Complete in all respects.

26 05 19.69

4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/PVC

arcop

Page 3 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

No.

14

No.

No.

No.

29

No.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

Wiring of 40A 4P Isolator from DB to first outlet with following size of wires in
38mm dia size PVC conduit of exposed / concealed as shown on drawings.
Complete in all respects.
26 05 19.73

4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC


Wiring of 63A 4P Isolator from DB to first outlet with following size of wires in
38mm dia size PVC conduit of exposed / concealed as shown on drawings.
Complete in all respects..

26 05 19.76

4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC


Wiring of 125A 4P Isolator from DB to first outlet with following size of wires in
50mm dia size PVC conduit of exposed / concealed as shown on drawings.
Complete in all respects.

26 05 19.79

4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1x25 Sq.mm Cu/PVC


Wiring of 16A, 3-pin Industrial Socket unit for UPS from DB to first outlet with
following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
Note: Wires Color of UPS circuits should be different from RAW power circuits.

26 05 19.83

2x4 Sq.mm Cu/PVC + ECC 1x4 Sq.mm CU/PVC


Wiring of 32A, 3-pin Industrial Socket unit for UPS / IDF Racks from DB to first
outlet with following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
Note: Wires Color of UPS circuits should be different from RAW power circuits.

26 05 19.86

2C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC


Wiring of 16A, 5-pin Industrial Socket unit for IDF Racks from DB to first outlet
with following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
Note: Wires Color of UPS circuits should be different from RAW power circuits.

26 05 19.89

2C, 4 Sq.mm Cu/PVC/PVC + ECC 1x4 Sq.mm Cu/PVC

arcop

Page 4 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

No.

No.

QUANTITY

Wiring of 32A, 5-pin Industrial Socket unit for UPS from DB to first outlet with
following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
Note: Wires Color of UPS circuits should be different from RAW power circuits.
26 05 19.93

4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/PVC


Wiring of 63A, 5-pin Industrial Socket unit for UPS from DB to first outlet with
following size of wires in 25mm dia size PVC conduit of exposed /
concealed as shown on drawings. Complete in all respects.
Note: Wires Color of UPS circuits should be different from RAW power circuits.

26 05 19.96

4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC


Supply, installation, testing, commissioning and termination of following size
of CU/PVC/PVC & CU/XLPE/PVC Cables for Distribution Board in already
installed PVC conduit / Cable tray, including all accessories, Complete in all
respect as shown on drawing.

26 05 19.99

From UMDB to UPS & UPS to UMDB


2 No. 4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

30

26 05 19.103

From TAP OFF UNIT to SMDB-LGA


2 No. 4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

10

26 05 19.106

From TAP OFF UNIT to SMDB-LGB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.109

From TAP OFF UNIT to SMDB-GA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.113

From TAP OFF UNIT to SMDB-FA


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.116

From TAP OFF UNIT to SMDB-SA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.119

From TAP OFF UNIT to SMDB-SB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.123

From TAP OFF UNIT to SMDB-TA


4C, 70 Sq.mm Cu/XLPE/PVC + ECC 1C, 35 Sq.mm Cu/ PVC

Rm.

10

arcop

Page 5 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.126

From TAP OFF UNIT to SMDB-TB


2 No. 4C, 150 Sq.mm Cu/XLPE/PVC + ECC 1C, 70 Sq.mm Cu/ PVC

Rm.

10

26 05 19.129

From TAP OFF UNIT to SMDB-4


4C, 95 Sq.mm Cu/XLPE/PVC + ECC 1C, 50 Sq.mm Cu/ PVC

Rm.

10

26 05 19.133

From TAP OFF UNIT to SMDB-5


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.136

From TAP OFF UNIT to SMDB-6


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.139

From TAP OFF UNIT to SMDB-7


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.143

From TAP OFF UNIT to SMDB-8


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.146

From TAP OFF UNIT to SMDB-9


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.149

From TAP OFF UNIT to SMDB-ROOF-A


4C, 95 Sq.mm Cu/XLPE/PVC + ECC 1C, 50 Sq.mm Cu/ PVC

Rm.

20

26 05 19.153

From TAP OFF UNIT to SMDB-ROOF-B


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

20

26 05 19.156

From TAP OFF UNIT to USMDB-LGA


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

15

26 05 19.159

From TAP OFF UNIT to USMDB-LG-B


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.163

From TAP OFF UNIT to USMDB-GA


4C, 70 Sq.mm Cu/XLPE/PVC + ECC 1C, 35 Sq.mm Cu/ PVC

Rm.

15

26 05 19.166

From TAP OFF UNIT to USMDB-GB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.169

From TAP OFF UNIT to USMDB-FA


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.173

From TAP OFF UNIT to USMDB-FB


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.176

From TAP OFF UNIT to USMDB-SA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

arcop

Page 6 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.179

From TAP OFF UNIT to USMDB-SB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.183

From TAP OFF UNIT to USMDB-TA


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.186

From TAP OFF UNIT to USMDB-TB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.189

From TAP OFF UNIT to USMDB-4


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.193

From TAP OFF UNIT to USMDB-5


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.196

From TAP OFF UNIT to USMDB-6


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.199

From TAP OFF UNIT to USMDB-7


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.203

From TAP OFF UNIT to USMDB-8


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.206

From TAP OFF UNIT to USMDB-9


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.209

From TAP OFF UNIT to USMDB-OT


2 No. 4C, 185 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.213

From TAP OFF UNIT to USMDB-OT-1


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

15

26 05 19.216

From TAP OFF UNIT to USMDB-OT-2


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.219

From TAP OFF UNIT to SMDB-HVAC-LGA


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.223

From TAP OFF UNIT to SMDB-HVAC-LGB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.226

From TAP OFF UNIT to SMDB-HVAC-GA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.229

From TAP OFF UNIT to SMDB-HVAC-GB


4C, 70 Sq.mm Cu/XLPE/PVC + ECC 1C, 35 Sq.mm Cu/ PVC

Rm.

15

arcop

Page 7 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.233

From TAP OFF UNIT to SMDB-HVAC-FA


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.236

From TAP OFF UNIT to SMDB-HVAC-FB


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

15

26 05 19.239

From TAP OFF UNIT to SMDB-HVAC-SB


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.243

From TAP OFF UNIT to SMDB-HVAC-TA


4C, 70 Sq.mm Cu/XLPE/PVC + ECC 1C, 35 Sq.mm Cu/ PVC

Rm.

15

26 05 19.246

From TAP OFF UNIT to SMDB-HVAC-TB


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.249

From TAP OFF UNIT to SMDB-HVAC-4


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.253

From TAP OFF UNIT to SMDB-HVAC-5


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.256

From TAP OFF UNIT to SMDB-HVAC-6


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.259

From TAP OFF UNIT to SMDB-HVAC-7


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.263

From TAP OFF UNIT to SMDB-HVAC-8


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.266

From TAP OFF UNIT to SMDB-HVAC-9


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.269

From TAP OFF UNIT to DB-LGA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.273

From TAP OFF UNIT to DB-LA


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.276

From TAP OFF UNIT to DB-MB


4C, 35 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.279

From TAP OFF UNIT to DB-CAFE


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.283

From TAP OFF UNIT to DB-MKL


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

arcop

Page 8 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.286

From TAP OFF UNIT to DB-HS


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.289

From TAP OFF UNIT to DB-LGB


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.293

From TAP OFF UNIT to DB-SS


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.296

From SMDB LGB to DB-ISOLATORS-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

70

26 05 19.299

From SMDB LGB to DB-ISOLATORS-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

70

26 05 19.303

From SMDB-LG-B to DB-DK


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

20

26 05 19.306

From TAP OFF UNIT to DB-LG-RT


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

20

26 05 19.309

From TAP OFF UNIT to UDB-LGA


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

26 05 19.313

From TAP OFF UNIT to UDB-LA


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

26 05 19.316

From TAP OFF UNIT to UDB-MB


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.319

From TAP OFF UNIT to UDB-CAFE


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

26 05 19.323

From TAP OFF UNIT to UDB-MKL


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.326

From TAP OFF UNIT to UDB-LGB


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.329

From TAP OFF UNIT to UDB-SS


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.333

From USMDB-LG-B to UDB-DK


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

26 05 19.336

From TAP OFF UNIT to UDB-RT


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

arcop

Page 9 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.339

From TAP OFF UNIT to UDB-CLB


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.343

From TAP OFF UNIT to UDB-HS


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

15

26 05 19.346

From SMDB-GA to DB-GA-1


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.349

From TAP OFF UNIT to DB-GA-2


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.353

From TAP OFF UNIT to DB-GA-3


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.356

From TAP OFF UNIT to DB-EXT-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.359

From TAP OFF UNIT to DB-EXT-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

26 05 19.363

From TAP OFF UNIT to DB-EXT-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.366

From TAP OFF UNIT to DB-MMD


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

20

26 05 19.369

From TAP OFF UNIT to DB-SCC


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

20

26 05 19.373

From TAP OFF UNIT to DB-XR


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

25

26 05 19.376

From TAP OFF UNIT to DB-GB-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.379

From TAP OFF UNIT to DB-GB-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.383

From TAP OFF UNIT to DB-DIA


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

10

26 05 19.386

From TAP OFF UNIT to DB-TR1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.389

From TAP OFF UNIT to DB-TR2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

arcop

Page 10 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.393

From TAP OFF UNIT to DB-PET-CT


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

10

26 05 19.396

From TAP OFF UNIT to DB-CT (4 Nos.)


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

40

26 05 19.399

From TAP OFF UNIT to DB-XR1 (5 Nos.)


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

75

26 05 19.403

From TAP OFF UNIT to DB-SPECT (2 Nos.)


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

25

26 05 19.406

From TAP OFF UNIT to DB-MRI (2 Nos.)


4C, 70 Sq.mm Cu/XLPE/PVC + ECC 1C, 35 Sq.mm Cu/ PVC

Rm.

20

26 05 19.409

From TAP OFF UNIT to UDB-GA1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

26 05 19.413

From TAP OFF UNIT to UDB-GA2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.416

From TAP OFF UNIT to UDB-GA3


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

26 05 19.419

From TAP OFF UNIT to UDB-DIA


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.423

From TAP OFF UNIT to UDB-SSC


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

26 05 19.426

From TAP OFF UNIT to UDB-MMD


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.429

From TAP OFF UNIT to DB-FA-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.433

From TAP OFF UNIT to DB-FA-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.436

From TAP OFF UNIT to DB-FA-3


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.439

From TAP OFF UNIT to DB-END (16 Nos.)


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

80

26 05 19.443

From TAP OFF UNIT to DB-ERCP (4 Nos.)


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

arcop

Page 11 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.446

From TAP OFF UNIT to DB-OT (1 to 6)


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

90

26 05 19.449

From TAP OFF UNIT to UDB-FA-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

26 05 19.453

From TAP OFF UNIT to UDB-FA-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

26 05 19.456

From TAP OFF UNIT to UDB-FA-3


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

26 05 19.459

From TAP OFF UNIT to DB-SA-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

26 05 19.463

From TAP OFF UNIT to DB-SA-2


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

26 05 19.466

From TAP OFF UNIT to MDB-2


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.469

From TAP OFF UNIT to LIT-1


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

10

26 05 19.473

From TAP OFF UNIT to DB-RAD (3 Nos.)


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

45

26 05 19.476

From TAP OFF UNIT to DB-SB-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.479

From TAP OFF UNIT to DB-SB-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.483

From TAP OFF UNIT to DB-SICU (58 Nos.)


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

290

26 05 19.486

From TAP OFF UNIT to UDB-SA-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.489

From TAP OFF UNIT to UDB-SA-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.493

From TAP OFF UNIT to UDB-SA-3


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.496

From TAP OFF UNIT to UDB-SB-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

arcop

Page 12 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.499

From TAP OFF UNIT to UDB-SB-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.503

From TAP OFF UNIT to UDB-OT (18 Nos)


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

270

26 05 19.506

From TAP OFF UNIT to UDB-TO-H


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

15

26 05 19.509

From TAP OFF UNIT to DB-ME-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.513

From TAP OFF UNIT to DB-ME-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.516

From TAP OFF UNIT to DB-SD


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.519

From TAP OFF UNIT to DB-CA-TA


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

15

26 05 19.523

From TAP OFF UNIT to DB -WASH


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.526

From TAP OFF UNIT to ISOLATOR -1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

70

26 05 19.529

From TAP OFF UNIT to ISOLATOR -2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

70

26 05 19.533

From TAP OFF UNIT to MDB-1


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.536

From TAP OFF UNIT to MDB-2


4C, 300 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

15

26 05 19.539

From TAP OFF UNIT to DB-OFF


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.543

From TAP OFF UNIT to DB-TB-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

15

26 05 19.546

From TAP OFF UNIT to UDB-WASH


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.549

From TAP OFF UNIT to UDB-CA-TA


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

arcop

Page 13 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.553

From TAP OFF UNIT to UDB-SD


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.556

From TAP OFF UNIT to UDB-ME-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.559

From TAP OFF UNIT to UDB-ME-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.563

From MDB-1 to UDB-1


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

10

26 05 19.566

From MDB-2 to UDB-1


4C, 240 sq.mm Cu/XLPE/PVC + ECC 1C, 70 sq.mm PVC

Rm.

10

26 05 19.569

From TAP OFF UNIT to UDB-OFF


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.573

From TAP OFF UNIT to DB- TB-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.576

From TAP OFF UNIT to DB-4-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.579

From TAP OFF UNIT to DB-4-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

10

26 05 19.583

From TAP OFF UNIT to DB- ISO (2 Nos)


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

20

26 05 19.586

From TAP OFF UNIT to UDB-4-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.589

From TAP OFF UNIT to UDB-4-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.593

From TAP OFF UNIT to UDB- SICU (23 Nos)


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

115

26 05 19.596

From TAP OFF UNIT to DB-5-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.599

From TAP OFF UNIT to DB-5-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.603

From TAP OFF UNIT to DB-ISO (10 Nos.)


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

100

arcop

Page 14 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.606

From TAP OFF UNIT to DB-SB (115 Nos.)


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

1,725

26 05 19.609

From TAP OFF UNIT to DB- 6-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.613

From TAP OFF UNIT to DB- 6-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.616

From TAP OFF UNIT to DB-7-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.619

From TAP OFF UNIT to DB-7-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.623

From TAP OFF UNIT to DB-8-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.626

From TAP OFF UNIT to DB-8-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.629

From TAP OFF UNIT to DB-9-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.633

From TAP OFF UNIT to DB 9-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.636

From TAP OFF UNIT to DB-RB-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.639

From TAP OFF UNIT to DB-RB-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

10

26 05 19.643

From TAP OFF UNIT to ISOLATOR for Lifts (10 Nos.)


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

250

26 05 19.646

From TAP OFF UNIT to UDB-5-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.649

From TAP OFF UNIT to UDB-5-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.653

From TAP OFF UNIT to UDB-6-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.656

From TAP OFF UNIT to UDB-6-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

arcop

Page 15 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.659

From TAP OFF UNIT to UDB-7-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.663

From TAP OFF UNIT to UDB-7-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.666

From TAP OFF UNIT to UDB-8-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.669

From TAP OFF UNIT to UDB-8-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.673

From TAP OFF UNIT to UDB-9-1


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.676

From TAP OFF UNIT to UDB-9-2


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1C, 6 Sq.mm Cu/ PVC

Rm.

10

26 05 19.679

From TAP OFF UNIT to DB-MCC-LGA-1


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

26 05 19.683

From TAP OFF UNIT to DB-MCC-LGB-1


4C, 25 Sq.mm Cu/XLPE/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

26 05 19.686

From TAP OFF UNIT to DB-MCC-LGB-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.689

From TAP OFF UNIT to DB-MCC-LGB-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

26 05 19.693

From TAP OFF UNIT to DB-MCC-GA-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.696

From TAP OFF UNIT to DB-MCC-GB-1


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

40

26 05 19.699

From TAP OFF UNIT to DB-MCC-GB-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

30

26 05 19.703

From TAP OFF UNIT to DB-MCC-FA-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.706

From TAP OFF UNIT to DB-MCC-FA-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

26 05 19.709

From TAP OFF UNIT to DB-MCC-FB-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

arcop

Page 16 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.713

From TAP OFF UNIT to DB-MCC-FB-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.716

From TAP OFF UNIT to DB-MCC-FB-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

45

26 05 19.719

From TAP OFF UNIT to DB-MCC-SB-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

30

26 05 19.723

From TAP OFF UNIT to DB-MCC-TA-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.726

From TAP OFF UNIT to DB-MCC-TA-2


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1C, 25 Sq.mm Cu/ PVC

Rm.

35

26 05 19.729

From TAP OFF UNIT to DB-MCC-TB-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

26 05 19.733

From TAP OFF UNIT to DB-MCC-TB-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

26 05 19.736

From TAP OFF UNIT to DB-MCC-4-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

35

26 05 19.739

From TAP OFF UNIT to DB-MCC-4-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1C, 16 Sq.mm Cu/ PVC

Rm.

40

26 05 19.743

From TAP OFF UNIT to DB-MCC-5-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.746

From TAP OFF UNIT to DB-MCC-5-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.749

From TAP OFF UNIT to DB-MCC-6-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.753

From TAP OFF UNIT to DB-MCC-6-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

45

26 05 19.756

From TAP OFF UNIT to DB-MCC-7-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

26 05 19.759

From TAP OFF UNIT to DB-MCC-7-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.763

From TAP OFF UNIT to DB-MCC-8-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

35

arcop

Page 17 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.766

From TAP OFF UNIT to DB-MCC-8-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.769

From TAP OFF UNIT to DB-MCC-9-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.773

From TAP OFF UNIT to DB-MCC-9-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1C, 10 Sq.mm Cu/ PVC

Rm.

40

26 05 19.776

From SMDB-LGA to FP-B1-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

86

26 05 19.779

From SMDB-LGA to FP-B1-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

97

26 05 19.783

From SMDB-LGA to FP-B1-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

132

26 05 19.786

From SMDB-LGA to FP-B1-4


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

185

26 05 19.789

From SMDB-LGA to FP-B2-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

96

26 05 19.793

From SMDB-LGA to FP-B2-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

107

26 05 19.796

From SMDB-LGA to FP-B2-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

142

26 05 19.799

From SMDB-LGA to FP-B2-4


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

195

26 05 19.803

From USMDB-LGA to UFP-B1-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

89

26 05 19.806

From USMDB-LGA to UFP-B1-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

100

26 05 19.809

From USMDB-LGA to UFP-B1-3


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

135

26 05 19.813

From USMDB-LGA to UFP-B1-4


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

188

26 05 19.816

From USMDB-LGA to UFP-B2-1


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

99

arcop

Page 18 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 05 19.819

From USMDB-LGA to UFP-B2-2


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

110

26 05 19.823

From USMDB-LGA to UFP-B2-3


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

145

26 05 19.826

From USMDB-LGA to UFP-B2-4


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

198

26 05 19.829

From SMDB-HVAC-LGA to HFP-B1-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

92

26 05 19.833

From SMDB-HVAC-LGA to HFP-B1-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

103

26 05 19.836

From SMDB-HVAC-LGA to HFP-B1-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

138

26 05 19.839

From SMDB-HVAC-LGA to HFP-B1-4


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

191

26 05 19.843

From SMDB-HVAC-LGA to HFP-B2-1


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

102

26 05 19.846

From SMDB-HVAC-LGA to HFP-B2-2


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

113

26 05 19.849

From SMDB-HVAC-LGA to HFP-B2-3


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

148

26 05 19.853

From SMDB-HVAC-LGA to HFP-B2-4


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/PVC

Rm.

201

26 05 19.856

From LV Panel-1 To SMDB-EC-G


4C, 50 Sq.mm Cu/XLPE/PVC + ECC 1x25 Sq.mm Cu/ PVC

Rm.

45

26 05 19.859

From LV Panel-1 To MCC-EC-LG1


3x4C, 240 Sq.mm Cu/XLPE/PVC + ECC 2x70 Sq.mm Cu/ PVC

Rm.

45

26 05 19.863

From LV Panel-1 To MCC-EC-LG2


3x4C, 240 Sq.mm Cu/XLPE/PVC + ECC 2x70 Sq.mm Cu/ PVC

Rm.

45

26 05 19.866

From LV Panel-2 To MCC-EC-F1


3x4C, 240 Sq.mm Cu/XLPE/PVC + ECC 2x70 Sq.mm Cu/ PVC

Rm.

45

26 05 19.869

From LV Panel-2 To MCC-EC-F2


3x4C, 240 Sq.mm Cu/XLPE/PVC + ECC 2x70 Sq.mm Cu/ PVC

Rm.

45

arcop

Page 19 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

26 05 19.873

From SMDB-EC-G To DB-EC-P


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

55

26 05 19.876

From SMDB-EC-G To DB-EC-LG


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

45

26 05 19.879

From SMDB-EC-G To DB-EC-G


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

40

26 05 19.883

From SMDB-EC-G To DB-EC-FF


4C, 10 Sq.mm Cu/PVC/PVC + ECC 1x10 Sq.mm Cu/PVC

Rm.

45

26 05 19.886

From SMDB-EC-G To USMDB-EC-G


4C, 16 Sq.mm Cu/PVC/PVC + ECC 1x16 Sq.mm Cu/ PVC

Rm.

25

26 05 19.889

Form USMDB-EC-G To UDB-EC-G


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

45

26 05 19.893

Form USMDB-EC-G To UDB-EC-FF


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

40

26 05 19.896

Form USMDB-EC-G To UDB-EC-LG


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

45

26 05 19.899

Form USMDB-EC-G To UDB-EC-P


4C, 6 Sq.mm Cu/PVC/PVC + ECC 1x6 Sq.mm Cu/ PVC

Rm.

55

26 05 19.903

Form Energy Center-1 To MDB-02


2 No. 4C, 300 Sq.mm Cu/XLPE/PVC + ECC 2x70 Sq.mm Cu/ PVC

Rm.

400

26 05 19.906

Form Generator (4 Nos.) To ACB Motorized Panel (4 Nos.)


28 No. 1C, 300 Sq.mm Cu/XLPE/PVC + ECC 3x70 Sq.mm Cu/ PVC

Rm.

90

26 05 19.909

Form ACB Motorized Panel (4 Nos.) To Step-up Transformers (4 Nos.)


28 No. 1C, 300 Sq.mm Cu/XLPE/PVC + ECC 3x70 Sq.mm Cu/ PVC

Rm.

120

26 05 19.913 1C, 6 Sq.mm Cu/PVC

Rm.

10

26 05 19.916 1C, 10 Sq.mm Cu/PVC

Rm.

10

26 05 19.919 1C, 25 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.923 1C, 50 Sq.mm Cu/XLPE/PVC

Rm.

10

arcop

RATE
Rs.

AMOUNT
Rs.

Page 20 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

26 05 19.926 1C, 150 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.929 1C, 185 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.933 1C, 240 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.936 1C, 300 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.939 3.5C, 95 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.943 3.5C, 120 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.946 3.5C, 240 Sq.mm Cu/XLPE/PVC

Rm.

10

26 05 19.949 3.5C, 300 Sq.mm Cu/XLPE/PVC

Rm.

10

RATE
Rs.

AMOUNT
Rs.

Note: Contractor is advised to confirm the cable running lengths and


termination as per site conditions before commencement of work.

Total Rs. Section- 26 05 19


(CARRIED FORWARD TO SUMMARY)

arcop

Page 21 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 26

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

GROUNDING & BONDING FOR ELECTRICAL SYSTEMS


Supply, installation, testing and commissioning of following items for Earthing
/ Grounding System for lightning protection and grounding of other systems
including all material, boring, labor, tools, transportation, accessories etc.
Complete in all respects with detailed test reports.

26 05 26.13

Chemical Enhanced Earth using 38 mm dia 10'-0" long copper pipe filled
with soil conditioning material including 6" dia, 11' deep boring and back
filled chemical to enhance conductivity. Complete with thermo weld joint,
13" dia heavy duty Cast Iron round cover as per details given in drawings.

No.

29

26 05 26.16

20mm dia 6'-0" long Tin platted copper Rod encased in raft as per details.
Complete in all respects.

No.

26 05 26.19

20mm dia 10'-0" long Tin platted copper Rod. Complete with thermo weld
joint, 13" dia heavy duty Cast Iron round cover as per details given in
drawings.

26 05 26.23

Earth Connecting Point (ECP.A) or Equipotential bar made with 200mm wide,
50mm high and 8mm thick tin plated Copper, as shown in drawings. Bar
shall be provided with holes suitable for installation of 4 No. 70 sqmm bare
copper conductor. ECP shall be enclosed in appropriate size of powder
coated metal enclosure with front accessible cover.

No.

26 05 26.26

Earth Connecting Point (ECP.B) or Equipotential bar made with 300mm wide,
50mm high and 8mm thick tin plated Copper, as shown in drawings. Bar
shall be provided with holes suitable for installation of 4 No. 70 sqmm bare
copper conductor. ECP shall be enclosed in appropriate size of powder
coated metal enclosure with front accessible cover.

No.

40

64

26 05 26.29

Earth Test Point (ETP) or Equipotential bar made with 150mm wide, 50mm
high and 8mm thick tin plated Copper, as shown in drawings. Bar shall be
provided with holes suitable for installation of 2 No. 70 sqmm bare copper
conductor. ECP shall be enclosed in appropriate size of powder coated
metal enclosure with front accessible cover.

26 05 26.33

Earthing Mesh (600mm x 600 mm 5mm Thick Perforated Cu Plate), work


includes digging, excavation and backfilling as per description shown in
drawings.Each Mesh shall be connected using 70 sqmm bare copper
conductors with the earthing rods.

No.

arcop

28

Page 22 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 26.36

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Earthing Mesh (900mm x 900 mm 5mm Thick Perforated Cu Plate), work


includes digging, excavation and backfilling as per description shown in
drawings.Each Mesh shall be connected using 70 sqmm bare copper
conductors with the earthing rods.

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

RATE
Rs.

AMOUNT
Rs.

Stranded bare copper conductors of following sizes in appropriate size of


UPVC conduit laid in floor/raft from Earth Station to ECP to as shown in
drawings. Complete in all respects including termination at ECP.
26 05 26.39

95 Sq.mm Bare Copper Conductor

Rm.

750

26 05 26.43

70 Sq.mm Bare Copper Conductor

Rm.

1,150

485

Supply, installation, testing & commissioning of following size of single core


PVC cables in appropriate size of exposed / concelled PVC conduit from
ECP to several equipments as per details given below, including all
material, labor, tools, transportation, accessories etc. Complete in all
respects with detailed test reports.
26 05 26.46

1C, 120 Sq.mm PVC (Green)

Rm.

26 05 26.49

1C, 95 Sq.mm PVC (Green)

Rm.

100

160

26 05 26.53

1C, 70 Sq.mm PVC (Green)

Rm.

2,150

895

26 05 26.56

1C, 35 Sq.mm PVC (Green)

Rm.

500

23

26 05 26.59

1C, 16 Sq.mm PVC (Green)

Rm.

1,755

108

26 05 26.63

Supply & installation of KS-Copper Clips for Connecting 70 Sq.mm Bare


Copper conductor to Earthing Plate. Complete with all respects. As per
Detail Drawing.

No.

12

28

26 05 26.66

Supply & installation of Copper Holder For Mounting of 95 Sq.mm Bare


Copper conductor. Complete with all respects. As per Detail Drawing.

No.

230

100

arcop

265

Page 23 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 26.69

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Supply & installation of M.S 16 SWG Box With Cover For Thermo Weld
Connection 150 x 150 x 100mm. Complete with all respects. As per Detail
Drawing.

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Providing and making of Copper to Steel, Thermo Weld connection of


following conductors. as per detail Drawing & Specification. Complete in all
respects.
26 05 26.73

3x70 Sq.mm Bare Cu. Conductor to 20mm Dia copper Rod

No.

22

26 05 26.76

1x70 Sq.mm Bare Cu. Conductor to 20mm Dia copper Rod

No.

26 05 26.79

1x95 Sq.mm Bare Cu. Conductor to 20mm Dia copper Rod

No.

26 05 26.83

95 Sq.mm Bare Cu. Conductor to 95 Sq.mm Bare Cu. Conductor

No.

26 05 26.86

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown & approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately & to be attached with the BOQ.

Job

Note: Contractor is advised to confirm the cable running lengths &


termination as per site conditions before commencement of work.

Total Rs. Section- 26 05 26


(CARRIED FORWARD TO SUMMARY)

arcop

Page 24 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

26 05 33

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS


Supply and installation of following size of PVC / UPVC conduit including all
accessories such as junction box, bend, socket etc. Complete in all
respect.

26 05 33.13

25mm dia PVC Conduit

Rm.

1,000

2,500

1,500

26 05 33.16

32mm dia PVC Conduit

Rm.

500

1,500

850

26 05 33.19

38mm dia PVC Conduit

Rm.

1,500

26 05 33.23

38mm dia UPVC Conduit (Class-D)

Rm.

500

850

650

26 05 33.26

50mm dia UPVC Conduit (Class-D)

Rm.

350

1,450

1,200

26 05 33.29

100mm dia UPVC Conduit (Class-D)

Rm.

550

1,200

26 05 33.33

150mm dia UPVC Conduit (Class-D)

Rm.

1,550

3,400

Supply and Installation of following M.S powder coated Floor / Wall Pull
Boxes for data / voice / power / UPS circuits, recessed on wall or column as
per design drawings. Complete in all respect.
26 05 33.36

200mm200mm75mm

No.

30

395

15

26 05 33.39

300mm300mm75mm

No.

22

174

26 05 33.43

300mm150mm100mm

No.

15

111

26 05 33.46

300mm300mm150mm

No.

No.

288

22

Supply and installation of following type of Linear Outlet Boxes without face
plates made of Aluminum, mounted on wall or punched in furniture as per
design drawings. The linear outlet boxes are to be provided appropriate size
knock outs.
26 05 33.49

Linear Outlet Box (Type-A)

(600mm)

arcop

Page 25 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 33.53

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Supply and installation of 250mm x 250mm x 56mm Floor Box (imported)


Clipsal or equivalent, 16 SWG G.I Sheet Steel with all accessories. Complete
in all respects.
Note: Excluded of all Sockets & Face plates.

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

168

QUANTITY

RATE
Rs.

AMOUNT
Rs.

Supply & installation following sizes of Anodized Aluminium Channel with


cover including all installation accessories such as angle iron mounting
brackets (red oxide coated), bends, tees, rawal bolts e.t.c. Complete in all
respect.
26 05 33.56

100mm x 75 mm Aluminum Channel with cover

Rm.

985

26 05 33.59

Making of RCC Man hole 8' x 8' (LW) 8' Depth make with 6 inch RCC Wall,
heavy duty 2'-6" Square RCC cover and monkey ladder, including Ground
Excavation of Man Holes as per Drawing & details. Complete in all respects.
(Refer Details A & B)

No.

18

22

26 05 33.63

Excavation in ordinary soil up to 2400mm depth x 1800mm wide including


back filing after laying of cables & UPVC pipes as mentioned on drawings Cubic
and then compressing it. The work also includes the site preparation. Meter
Complete in all respects.

26 05 33.66

Supply and installation of Insulation rubber mat laying in MV/LV rooms


(where ever required), including all materials, equipments, labor, tools,
transportation, accessories etc. Complete in all respects. Contractor will
submit shop drawings for approval from consultant / architect before
commencement of work.
Thickness: 0.140 in (3.5 mm)
Hardness: 75 Shore A

400

Sq.ft.

2,700

2,500

Note: Contractor is advised to confirm the sizes, running lengths and


termination as per site conditions before commencement of work. All the
conduits / cable tray crossings through partition walls shall be properly
sealed by fire retardant material after installation.

Total Rs. Section- 26 05 33


(CARRIED FORWARD TO SUMMARY)

arcop

Page 26 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 05 36

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

1,250

450

CABLE TRAYS FOR ELECTRICAL SYSTEMS


Supply and installation of following sizes 14 SWG Perforated G.I Cable Tray &
Ladder with 16 SWG G.I Cover as per details given in the drawings and
specifications. Complete with all supporting hangers, brackets, elbows, tee
& mounting accessories etc.

26 05 36.13

6" x 3" Cable Tray 14 SWG & Cover 16 SWG

Rm.

26 05 36.16

6" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

1,800

26 05 36.19

9" x 3" Cable Tray 14 SWG & Cover 16 SWG

Rm.

150

26 05 36.23

12" x 3" Cable Tray 14 SWG & Cover 16 SWG

Rm.

505

26 05 36.26

12" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

1,800

37

26 05 36.29

15" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

125

26 05 36.33

18" x 3" Cable Tray 16 SWG & Cover 18 SWG

Rm.

900

26 05 36.36

18" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

26 05 36.39

18" x 4" Cable Tray 14 SWG & Cover 16 SWG (with Two Partition)

Rm.

26 05 36.43

18" x 6" Cable Tray 14 SWG & Cover 16 SWG

Rm.

26 05 36.46

21" x 4" Cable Tray 14 SWG & Cover 16 SWG

26 05 36.49

26 05 36.53

250

350

150

Rm.

130

24" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

325

30" x 4" Cable Tray 14 SWG & Cover 16 SWG

Rm.

45

arcop

15

Page 27 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

26 05 36.56

Heavy Duty 12" x 6" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

25

26 05 36.59

Heavy Duty 18" x 4" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

750

26 05 36.63

Heavy Duty 18" x 6" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

355

26 05 36.66

Heavy Duty 24" x 4" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

250

26 05 36.69

Heavy Duty 24" x 6" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

550

26 05 36.73

Heavy Duty 30" x 4" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

75

950

26 05 36.76

Heavy Duty 36" x 4" Cable Ladder 14 SWG & Cover 16 SWG

Rm.

150

550

RATE
Rs.

AMOUNT
Rs.

Note: Contractor is advised to confirm the quantities, sizes and running


lengths as per site conditions before commencement of work.

Total Rs. Section- 26 05 36


(CARRIED FORWARD TO SUMMARY)

arcop

Page 28 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 09 23

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

LIGHTING CONTROL DEVICES


Supply, installation, testing and commissioning of following items for
complete Lighting Control System (KNX Based) including all labour, tools,
installation accessories etc. Complete in all respect as shown on drawing.

26 09 23.13

LCD Color Touch Screen of size 16.25 cm diagonally for switching, dimming
and event scheduling having 256 MB RAM, 2No. Ethernet connection ports.

No.

26 09 23.16

PC Interface Unit operating at 15-36V DC for interfacing between Lighting


Control System and serial network having 2 No. Ethernet connection ports.

No.

26 09 23.19

KNX Power Supply unit for providing power to relays for each floor, including
all accessories.
Note: Power Supply will be installed in Distribution Board.

No.

24

KNX Intelligent Lighting Control Switch for Lighting Control System including
all accessories and equipments etc.
26 09 23.23

KNX 4 Gang Push Button / Control Switch

No.

13

26 09 23.26

KNX 8 Gang Push Button / Control Switch

No.

26

26 09 23.29

Conventional Ceiling Mounted I.R Motion Sensor (Ocupancy Sensor) for


Lights having following specifications:
Coverage Range : 360
Operating Voltage : 230 V AC
Timing Range : 5 sec to 20 minutes
Connection : Parallel
Switching Mode : Auto
IP Value : IP 21 (min)

No.

104

26 09 23.33

KNX Line Coupler

No.

26 09 23.36

Spacelynk Controller

No.

arcop

Page 29 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 09 23.39

Supply & Wiring of KNX control cable for system wiring from Relay to Lighting
control switches in 25mm dia PVC Conduit as shown in the drawings.
Complete in all respects. (Basic Rate 250/= per meter)

Rm

8,500

26 09 23.43

Programming, testing and commissioning of complete system upto the


entire satisfaction of client and consultant including following:
- Intelligent Lighting Control System Schedule (Software + Manual)
- Documentation
- Web based featuring an extensive schedule Program
- Manual Setting in DB with accessories and tagging

Job

26 09 23.46

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) System Control Relays, Dimmers and Power Supply units shall be installed
in with respective distribution boards as shown in single line diagrams.
3) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.

Total Rs. Section- 26 09 23


(CARRIED FORWARD TO SUMMARY)

arcop

Page 30 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 12 00

26 12 00.13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

DRY TYPE, MEDIUM VOLTAGE TRANSFORMERS

Supply, installation, testing, commissioning and top supervision of execution


works of 2500 kVA ANAF Dry Type 11kV/0.4kV Step Down Power Transformer
including all protection devices CTs, PTs, relay, enclosure etc. Complete in
all respects, and having following specifications.
Supply Frequency (HZ)
50 HZ
HV winding connection Delta
LV winding connection
Star
Vector group reference
Dyn 11
Impedance at 75 C
6%
Ambient Temperature
45 deg C
HV Tapping (% of no-loads volts) 2.5% , 5%,-7.5%
Method of Cooling
ANAF (natural + forced ventilation for at least
40% extra rating)
Enclosure
IP-31
Secondary voltage at:
. Full load
380 V
. No load
400 V
. HV Insulation Level
12 KV
. Impulse KV Peak
75 BIL . Winding Material (HV/LV) Cu/Cu
. Insulation Class
F
Paint finish color
Manufacturer Standard
HV conductor and type
Cu / Top entry Cable
LV conductor type
Cu / Top entry bus-way / Cables
(Refer Specifications)

No.

arcop

Page 31 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 12 00.16

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Supply, installation, testing, commissioning and top supervision of execution


works of 2000 kVA Dry Type 0.4kV/11kV Step Up Power Transformer including
all protection devices CTs, PTs, relay, enclosure etc. Complete in all
respects, and having following specifications.
Supply Frequency (HZ)
50 HZ
HV winding connection Delta
LV winding connection
Star
Impedance at 75 C
6%
Ambient Temperature
45 deg C
HV Tapping (% of no-loads volts) 2.5% , 5%,-7.5%
Method of Cooling
Natural ventilation
Enclosure
IP-31
Secondary voltage at:
. Full load
380 V
. No load
400 V
HV Insulation Level
12 KV
. Impulse KV Peak
75 BIL . Winding Material (HV/LV) Cu/Cu
. Insulation Class
F
Paint finish color
Manufacturer Standard
HV conductor and type
Cu / Top entry Cable
LV conductor type
Cu / Top entry bus-way / Cables
(Refer Specifications)

UNIT

No.

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) The transportation and placement of Transformers upto foundation pad is
also included in the work scope.

Total Rs. Section- 26 12 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 32 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 13 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

MEDIUM VOLTAGE CIRCUIT BREAKER SWITCHGEAR


Supply, installation, testing and commissioning of following 11 kV MV
Switchgears, including all material and required installation accessories. Any
associated material required to complete the testing & commissioning shall
be included in the scope of works. Complete in all respects.
Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) The transportation and placement of Switchgear Panels upto foundation
pad is also included in the work scope.
3) Contractor have to provide all the accessories / device required for
completion of system.

26 13 00.13

Supply, installation, testing and commissioning of following 11KV MV


Switchgears (Cassette Type) comprising with metering, motor mechanisam,
phase reversal and all protection devices CTs, PTs, Overcurrent, earthing
switch & Earth Fault Relay including complete interlocking facility by adding
blocking coils, UVT, coils etc. Panel shall have provision for cable entry from
top. Complete with all respects having following specifications:
The Cu Bus Bars shall be Tin Plated using Electroplating Method and covered
with Heat Shrink Color Coded Sleeves. Complete in all respect.
Breaker type: VCB
Rate Voltage: 17.5kV
Rated Current : 800A TP
BIL: 95kV
Supply Frequency: 50 Hz
Rated Power Frequency Withsatnd Voltage: 28 kV
Rated Short Circuit Breaking Current Rating : 25KA for 3 sec.
MV Panel must be Type Tested with operator safety IAC qualification AFLR
Cable entry from the Top
Refer Drawings and Specifications.

No.

arcop

Page 33 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

26 13 00.16

Supply, installation, testing and commissioning of following 11KV MV


Switchgears (Cassette Type) comprising with motor mechanisam, phase
reversal and all protection devices CTs, PTs, Overcurrent, earthing switch,
Earth Fault Relay & directional relay including complete interlocking facility
by adding blocking coils, UVT, coils etc but without metering. Panel shall
have provision for cable entry from top. Complete with all respects having
following specifications:
The Cu Bus Bars shall be Tin Plated using Electroplating Method and covered
with Heat Shrink Color Coded Sleeves. Complete in all respect.
Breaker type: VCB
Rate Voltage: 17.5kV
Rated Current : 800A TP
BIL: 95kV
Supply Frequency: 50 Hz
Rated Power Frequency Withsatnd Voltage: 28 kV
Rated Short Circuit Breaking Current Rating : 25KA for 3 sec.
MV Panel must be Type Tested with operator safety IAC qualification AFLR
Cable entry from the Top
Refer Drawings and Specifications.

No.

26 13 00.19

Supply, installation, testing and commissioning of following 11KV MV


Switchgears (Cassette Type) comprising with motor mechanisam, phase
reversal and all protection devices CTs, PTs, Overcurrent, earthing switch &
Earth Fault Relay including complete interlocking facility by adding blocking
coils, UVT, coils etc but without metering. Panel shall have provision for cable
entry from top. Complete with all respects having following specifications:
The Cu Bus Bars shall be Tin Plated using Electroplating Method and covered
with Heat Shrink Color Coded Sleeves. Complete in all respect.
Breaker type: VCB
Rate Voltage: 17.5kV
Rated Current : 800A TP
BIL: 95kV
Supply Frequency: 50 Hz
Rated Power Frequency Withsatnd Voltage: 28 kV
Rated Short Circuit Breaking Current Rating : 25KA for 3 sec.
MV Panel must be Type Tested with operator safety IAC qualification AFLR
Cable entry from the Top
Refer Drawings and Specifications.

No.

RATE
Rs.

AMOUNT
Rs.

22

Total Rs. Section- 26 13 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 34 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 24 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

SWITCHBOARDS & PANEL BOARDS


Supply, installation, testing and commissioning of following LV Panels and
Distribution Boards made with 14/16 SWG sheet steel housing (14 SWG for
floor standing & 16 SWG for wall mounted) with approved color and having
specified circuit breakers as shown on drawing. (Refer Single Line Diagram)
Note:
1) Cost of Intelligent Lighting Control Relay and Power Supply unit should be
included in cost of Distribution Board.
2) Safety locking arrangement is required for main incoming circuit breakers
of all distribution boards.
3) All the Panels should be front accessible and maintainable.

26 24 00.13

LV Panel -1

No.

26 24 00.16

LV Panel -2

No.

26 24 00.19

UMDB

No.

26 24 00.23

SMDB-LGA

No.

26 24 00.26

USMDB-LGA

No.

26 24 00.29

SMDB-LGB

No.

26 24 00.33

USMDB-LGB

No.

26 24 00.36

SMDB-HVAC-LGA

No.

26 24 00.39

SMDB-HVAC-LGB

No.

26 24 00.43

DB-CAF

No.

26 24 00.46

DB-MKL

No.

26 24 00.49

DB-LA

No.

26 24 00.53

DB-FP-B1-1

No.

26 24 00.56

DB-FP-B1-2

No.

arcop

Page 35 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.59

DB-FP-B1-3

No.

26 24 00.63

DB-FP-B1-4

No.

26 24 00.66

DB-LG-A

No.

26 24 00.69

DB-MB

No.

26 24 00.73

DB-LG-B

No.

26 24 00.76

DB-DK

No.

26 24 00.79

DB-RT

No.

26 24 00.83

DB-HS

No.

26 24 00.86

DB-CLB

No.

26 24 00.89

DB-S/S

No.

26 24 00.93

UDB-LGA

No.

26 24 00.96

UDB-FP-B1-1

No.

26 24 00.99

UDB-FP-B1-2

No.

26 24 00.103 UDB-FP-B1-3

No.

26 24 00.106 UDB-FP-B1-4

No.

26 24 00.109 UDB-LA

No.

26 24 00.113 UDB-MKL

No.

26 24 00.116 UDB-CAF

No.

26 24 00.119 UDB-MB

No.

26 24 00.123 UDB-DK

No.

arcop

Page 36 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.126 UDB-LG-B

No.

26 24 00.129 UDB S/S

No.

26 24 00.133 UDB-CLB

No.

26 24 00.136 UDB-HS

No.

26 24 00.139 UDB-RT

No.

26 24 00.143 SMDB-GA

No.

26 24 00.146 USMDB-GA

No.

26 24 00.149 SMDB-HVAC-GA

No.

26 24 00.153 SMDB-GB

No.

26 24 00.156 USMDB-GB

No.

26 24 00.159 SMDB-HVAC-GB

No.

26 24 00.163 DB-GA-1

No.

26 24 00.166 DB-GA-2

No.

26 24 00.169 DB-GA-3

No.

26 24 00.173 DB-MMD

No.

26 24 00.176 DB-XR

No.

26 24 00.179 DB-TR

No.

26 24 00.183 DB-EXT-1

No.

26 24 00.186 DB-EXT-2

No.

26 24 00.189 DB-EXT-3

No.

arcop

Page 37 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.193 DB-SCC

No.

26 24 00.196 DB-DIA

No.

26 24 00.199 DB-GB-1

No.

26 24 00.203 DB-GB-2

No.

26 24 00.206 DB-PET-CT

No.

26 24 00.209 DB-SPECT

No.

26 24 00.213 DB-MRI

No.

26 24 00.216 DB-XR

No.

26 24 00.219 DB-CT

No.

26 24 00.223 UDB-GA-1

No.

26 24 00.226 UDB-GA-2

No.

26 24 00.229 UDB-GA-3

No.

26 24 00.233 UDB-SSC

No.

26 24 00.236 UDB-MMD

No.

26 24 00.239 UDB-DIA

No.

26 24 00.243 UDB-GB-1

No.

26 24 00.246 UDB-GB-2

No.

26 24 00.249 USMDB-FA

No.

26 24 00.253 SMDB-FB

No.

26 24 00.256 USMDB-FB

No.

arcop

Page 38 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.259 USMDB-OT-1

No.

26 24 00.263 SMDB-FA

No.

26 24 00.266 SMDB-HVAC-FA

No.

26 24 00.269 SMDB-HVAC-FB

No.

26 24 00.273 DB-END

No.

16

26 24 00.276 DB-FB2

No.

26 24 00.279 DB-FA1

No.

26 24 00.283 DB-FA2

No.

26 24 00.286 DB-FA3

No.

26 24 00.289 DB-FB1

No.

26 24 00.293 UDB-FA1

No.

26 24 00.296 UDB-FA2

No.

26 24 00.299 UDB-FA3

No.

26 24 00.303 UDB-FB1

No.

26 24 00.306 UDB-FB2

No.

26 24 00.309 DB-OT

No.

26 24 00.313 DB-ERCP-1, 2, 3, 4

No.

26 24 00.316 SMDB-SA

No.

26 24 00.319 SMDB-SB

No.

26 24 00.323 USMDB-SA

No.

arcop

Page 39 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.326 USMDB-SB

No.

26 24 00.329 USMDB-OT-1

No.

26 24 00.333 DB-SA1

No.

26 24 00.336 DB-SA2

No.

26 24 00.339 MDB-SA-2

No.

26 24 00.343 DB-LIT

No.

26 24 00.346 DB-RAD

No.

26 24 00.349 DB-SB-1

No.

26 24 00.353 DB-SB-2

No.

26 24 00.356 DB-SICU

No.

18

26 24 00.359 UDB-SA3

No.

26 24 00.363 DB-SU-1

No.

26 24 00.366 UDB-SA1

No.

26 24 00.369 UDB-SA2

No.

26 24 00.373 UDB-SB1

No.

26 24 00.376 DB-SB2

No.

26 24 00.379 UDB-SA3

No.

26 24 00.383 UDB-SICU

No.

18

26 24 00.386 DB-CSS-D

No.

26 24 00.389 UDB-CSS-D

No.

arcop

Page 40 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.393 DB-O.T

No.

18

26 24 00.396 DB-O.T-1

No.

26 24 00.399 SMDB-TA

No.

26 24 00.403 SMDB-TB

No.

26 24 00.406 USMDB-TA

No.

26 24 00.409 USMDB-TB

No.

26 24 00.413 SMDB-HVAC-TA

No.

26 24 00.416 SMDB-HVAC-TB

No.

26 24 00.419 USMDB-OT

No.

26 24 00.423 DB-ME-1

No.

26 24 00.426 DB-ME-2

No.

26 24 00.429 DB-SD

No.

26 24 00.433 DB-CA-TA

No.

26 24 00.436 DB-WASH

No.

26 24 00.439 DB-TB-1

No.

26 24 00.443 DB-OFF

No.

26 24 00.446 MDB-1

No.

26 24 00.449 MDB-2

No.

26 24 00.453 UDB-WASH

No.

26 24 00.456 UDB-CA

No.

arcop

Page 41 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.459 UDB-SD

No.

26 24 00.463 UDB-ME-1

No.

26 24 00.466 UDB-ME-2

No.

26 24 00.469 UDB-TB-1

No.

26 24 00.473 UDB-1

No.

26 24 00.476 UDB-OFF

No.

26 24 00.479 SMDB-4

No.

26 24 00.483 DB-4-1

No.

26 24 00.486 DB-4-2

No.

26 24 00.489 DB-SICU

No.

23

26 24 00.493 USMDB-4

No.

26 24 00.496 UDB-4-1

No.

26 24 00.499 UDB-4-2

No.

26 24 00.503 DB-ISO

No.

26 24 00.506 SMDB-ROOF-A

No.

26 24 00.509 DB-RA-1

No.

26 24 00.513 DB-RA-2

No.

26 24 00.516 SMDB-5

No.

26 24 00.519 USMDB-5

No.

26 24 00.523 DB-5-1

No.

arcop

Page 42 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.526 DB-5-2

No.

26 24 00.529 DB-ISO-1

No.

26 24 00.533 DB-ISO-2

No.

26 24 00.536 DB-SB

No.

115

26 24 00.539 UDB-6-1

No.

26 24 00.543 UDB-6-2

No.

26 24 00.546 DB-7-1

No.

26 24 00.549 DB-7-2

No.

26 24 00.553 UDB-7-1

No.

26 24 00.556 UDB-7-2

No.

26 24 00.559 DB-8-1

No.

26 24 00.563 DB-8-2

No.

26 24 00.566 UDB-8-1

No.

26 24 00.569 UDB-8-2

No.

26 24 00.573 DB-9-1

No.

26 24 00.576 DB-9-2

No.

26 24 00.579 UDB-9-1

No.

26 24 00.583 UDB-9-2

No.

26 24 00.586 SMDB-ROOF-B

No.

26 24 00.589 DB-RB-1

No.

arcop

Page 43 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.593 DB-RB-2

No.

26 24 00.596 DB-EXT-1

No.

26 24 00.599 DB-EXT-2

No.

26 24 00.603 DB-EXT-3

No.

26 24 00.606 MCC-LG-A1

No.

26 24 00.609 MCC-LG-A2

No.

26 24 00.613 MCC-LG-B1

No.

26 24 00.616 DB-HFB

No.

26 24 00.619 MCC-GA-1

No.

26 24 00.623 MCC-GA-2

No.

26 24 00.626 MCC-GB-1

No.

26 24 00.629 MCC-GB-2

No.

26 24 00.633 MCC-FA-1

No.

26 24 00.636 MCC-FA-2

No.

26 24 00.639 MCC-FA-3

No.

26 24 00.643 MCC-FB-1

No.

26 24 00.646 MCC-FB-2

No.

26 24 00.649 MCC-SA-1

No.

26 24 00.653 MCC-SA-2

No.

26 24 00.656 MCC-SB-1

No.

arcop

Not Included
(By Others)

Page 44 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.659 MCC-SB-2

No.

26 24 00.663 MCC-TA-1

No.

26 24 00.666 MCC-TB-1

No.

26 24 00.669 MCC-TB-2

No.

26 24 00.673 MCC-4-1

No.

26 24 00.676 MCC-4-2

No.

26 24 00.679 MCC-5-1

No.

26 24 00.683 MCC-5-2

No.

26 24 00.686 MCC-6-1

No.

26 24 00.689 MCC-6-2

No.

26 24 00.693 MCC-7-1

No.

26 24 00.696 MCC-7-2

No.

26 24 00.699 MCC-8-1

No.

26 24 00.703 MCC-8-2

No.

26 24 00.706 MCC-9-1

No.

26 24 00.709 MCC-9-2

No.

26 24 00.713 FP-B1-1

No.

26 24 00.716 FP-B1-2

No.

26 24 00.719 FP-B1-3

No.

26 24 00.723 FP-B1-4

No.

arcop

Page 45 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 24 00.726 FP-B2-1

No.

26 24 00.729 FP-B2-2

No.

26 24 00.733 FP-B2-3

No.

26 24 00.736 FP-B2-4

No.

26 24 00.739 UFP-B1-1

No.

26 24 00.743 UFP-B1-2

No.

26 24 00.746 UFP-B1-3

No.

26 24 00.749 UFP-B1-4

No.

26 24 00.753 UFP-B2-1

No.

26 24 00.756 UFP-B2-2

No.

26 24 00.759 UFP-B2-3

No.

26 24 00.763 UFP-B2-4

No.

26 24 00.766 HFP-B1-1

No.

26 24 00.769 HFP-B1-2

No.

26 24 00.773 HFP-B1-3

No.

26 24 00.776 HFP-B1-4

No.

26 24 00.779 HFP-B2-1

No.

26 24 00.783 HFP-B2-2

No.

26 24 00.786 HFP-B2-3

No.

26 24 00.789 HFP-B2-4

No.

arcop

Page 46 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

26 24 00.793 LV PANEL-1 + PFI PANEL

No.

26 24 00.796 LV PANEL-2 + PFI PANEL + BUS COUPLER

No.

26 24 00.799 SMDB-EC-G

No.

26 24 00.803 USMDB-EC-G

No.

26 24 00.806 DB-EC-LG

No.

26 24 00.809 DB-EC-G

No.

26 24 00.813 DB-EC-FF

No.

26 24 00.816 DB-EC-P

No.

26 24 00.819 UDB-EC-LG

No.

26 24 00.823 UDB-EC-FF

No.

26 24 00.826 UDB-EC-P

No.

26 24 00.829 MCC-EC-LG1

No.

26 24 00.833 MCC-EC-LG2

No.

26 24 00.836 MCC-EC-F1

No.

26 24 00.839 MCC-EC-F2

No.

26 24 00.843 MDB-02

No.

26 24 00.846 HVAC-2

No.

No.

26 24 00.849

Adjustable 4000A Motorized ACB (Draw out Type) breaker including its
enclosure with all other required accessories for Generators.

RATE
Rs.

AMOUNT
Rs.

Not Included
(By Others)

Total Rs. Section- 26 24 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 47 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 25 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

ENCLOSED BUS ASSEMBLIES


Supply, installation, testing and commissioning of following imported TP+N+E
Compact Busway (Bus Tie Duct B.T.D) including elbows, flange ends,
mounting accessories, complete in all respects and having following
specifications. (Refer attached Drawing)
Material : Aluminium
Type : Compact
Make: Gersan / Schneider / Pogliano / EAE
Busway from 2500 kVA Transformer-1 to Main LV Panel

26 25 00.13

Aluminium Feeder Straight Lengths 5000 AMP TP+N+E

Rm.

55

50

26 25 00.16

Elbow 5000 AMP TP+N+E

No.

26 25 00.19

Flanged End, 5000 AMP (For Transformer Connection)

No.

26 25 00.23

Flanged End, 5000 AMP (For Panel Connection)

No.

26 25 00.26

Copper coupling connections with Transformer and Busway

Job.

Busway from 2500 kVA Transformer-2 to Main LV Panel


26 25 00.29

Aluminium Feeder Straight Lengths 5000 AMP TP+N+E

Rm.

65

45

26 25 00.33

Elbow 5000 AMP TP+N+E

No.

26 25 00.36

Flanged End, 5000 AMP (For Transformer Connection)

No.

26 25 00.39

Flanged End, 5000 AMP (For Panel Connection)

No.

26 25 00.43

Copper coupling connections with Transformer and Busway

Job.

26 25 00.46

Aluminium Feeder Straight Lengths 4000 AMP TP+N+E

Rm.

10

26 25 00.49

Elbow 4000 AMP TP+N+E

No.

arcop

Page 48 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.53

Flanged End, 4000 AMP (For Transformer Connection)

No.

26 25 00.56

Flanged End, 4000 AMP (For Panel Connection)

No.

26 25 00.59

Copper coupling connections with Transformer and Busway

Job.

26 25 00.63

Aluminium Feeder Straight Lengths 3200 AMP TP+N+E

Rm.

10

26 25 00.66

Elbow 3200 AMP TP+N+E

No.

26 25 00.69

Flanged End, 3200 AMP (For Transformer Connection)

No.

26 25 00.73

Flanged End, 3200 AMP (For Panel Connection)

No.

26 25 00.76

Copper coupling connections with Transformer and Busway

Job.

26 25 00.79

Aluminium Feeder Straight Lengths 2500 AMP TP+N+E

Rm.

155

75

26 25 00.83

Elbow 2500 AMP TP+N+E

No.

26 25 00.86

Flanged End, 2500 AMP (For Panel Connection)

No.

26 25 00.89

End Feed Unit 2500 AMP TP+N+E

No.

26 25 00.93

Tee Unit 2500 AMP TP+N+E

No.

26 25 00.96

Aluminium Feeder Straight Lengths 2000 AMP TP+N+E

Rm.

225

26 25 00.99

Elbow 2000 AMP TP+N+E

No.

26 25 00.103 Flanged End, 2000 AMP (For Panel Connection)

No.

26 25 00.106 End Feed Unit 2000 AMP TP+N+E

No.

26 25 00.109 Tee Unit 2000 AMP TP+N+E

No.

arcop

Page 49 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.113 Aluminium Feeder Straight Lengths 1600 AMP TP+N+E

Rm.

250

26 25 00.116 Elbow 1600 AMP TP+N+E

No.

10

26 25 00.119 Flanged End, 1600 AMP (For Panel Connection)

No.

26 25 00.123 End Feed Unit 1600 AMP TP+N+E

No.

26 25 00.126 Tee Unit 1600 AMP TP+N+E

No.

26 25 00.129 Aluminium Feeder Straight Lengths 1250 AMP TP+N+E

Rm.

275

95

26 25 00.133 Elbow 1250 AMP TP+N+E

No.

26 25 00.136 Flanged End, 1250 AMP (For Panel Connection)

No.

26 25 00.139 End Feed Unit 1250 AMP TP+N+E

No.

26 25 00.143 Tee Unit 1250 AMP TP+N+E

No.

26 25 00.146 Aluminium Feeder Straight Lengths 1000 AMP TP+N+E

Rm.

150

26 25 00.149 Elbow 1000 AMP TP+N+E

No.

26 25 00.153 End Feed Unit 1000 AMP TP+N+E

No.

26 25 00.156 Tee Unit 1000 AMP TP+N+E

No.

26 25 00.159 Aluminium Feeder Straight Lengths 800 AMP TP+N+E

Rm.

225

26 25 00.163 Elbow 800 AMP TP+N+E

No.

26 25 00.166 End Feed Unit 800 AMP TP+N+E

No.

26 25 00.169 Tee Unit 800 AMP TP+N+E

No.

arcop

Page 50 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.173 Aluminium Feeder Straight Lengths 630 AMP TP+N+E

Rm.

65

26 25 00.176 Elbow 630 AMP TP+N+E

No.

26 25 00.179 End Feed Unit 630 AMP TP+N+E

No.

26 25 00.183 Tee Unit 630 AMP TP+N+E

No.

26 25 00.186 Aluminium Feeder Straight Lengths 500 AMP TP+N+E

Rm.

255

26 25 00.189 Elbow 500 AMP TP+N+E

No.

26 25 00.193 End Feed Unit 500 AMP TP+N+E

No.

26 25 00.196 Tee Unit 500 AMP TP+N+E

No.

26 25 00.199 Aluminium Feeder Straight Lengths 400 AMP TP+N+E

Rm.

665

26 25 00.203 Elbow 400 AMP TP+N+E

No.

23

26 25 00.206 End Feed Unit 400 AMP TP+N+E

No.

26 25 00.209 Tee Unit 400 AMP TP+N+E

No.

26 25 00.213 Aluminium Feeder Straight Lengths 300 AMP TP+N+E

Rm.

310

26 25 00.216 Elbow 300 AMP TP+N+E

No.

12

26 25 00.219 End Feed Unit 300 AMP TP+N+E

No.

26 25 00.223 Tee Unit 300 AMP TP+N+E

No.

26 25 00.226 Aluminium Feeder Straight Lengths 200 AMP TP+N+E

Rm.

115

26 25 00.229 Elbow 200 AMP TP+N+E

No.

arcop

Page 51 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.233 End Feed Unit 200 AMP TP+N+E

No.

26 25 00.236 Tee Unit 200 AMP TP+N+E

No.

26 25 00.239 Aluminium Feeder Straight Lengths 160 AMP TP+N+E

Rm.

100

26 25 00.243 Elbow 160 AMP TP+N+E

No.

26 25 00.246 End Feed Unit 160 AMP TP+N+E

No.

26 25 00.249 Tee Unit 160 AMP TP+N+E

No.

26 25 00.253 Aluminium Feeder Straight Lengths 125 AMP TP+N+E

Rm.

125

26 25 00.256 Elbow 125 AMP TP+N+E

No.

26 25 00.259 End Feed Unit 125 AMP TP+N+E

No.

26 25 00.263 Tee Unit 125 AMP TP+N+E

No.

26 25 00.266 Aluminium Feeder Straight Lengths 100 AMP TP+N+E

Rm.

200

26 25 00.269 Elbow 100 AMP TP+N+E

No.

10

26 25 00.273 End Feed Unit 100 AMP TP+N+E

No.

26 25 00.276 Tee Unit 100 AMP TP+N+E

No.

26 25 00.279 Aluminium Feeder Straight Lengths 80 AMP TP+N+E

Rm.

400

26 25 00.283 Elbow 80 AMP TP+N+E

No.

26 25 00.286 End Feed Unit 80 AMP TP+N+E

No.

26 25 00.289 Tee Unit 80 AMP TP+N+E

No.

arcop

Page 52 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.293 Aluminium Feeder Straight Lengths 63 AMP TP+N+E

Rm.

1,000

26 25 00.296 Elbow 63 AMP TP+N+E

No.

40

26 25 00.299 End Feed Unit 63 AMP TP+N+E

No.

18

26 25 00.303 Tee Unit 63 AMP TP+N+E

No.

26 25 00.306 Aluminium Feeder Straight Lengths 40 AMP TP+N+E

Rm.

775

26 25 00.309 Elbow 40 AMP TP+N+E

No.

47

26 25 00.313 End Feed Unit 40 AMP TP+N+E

No.

19

26 25 00.316 Tee Unit 40 AMP TP+N+E

No.

26 25 00.319 25A DP Tap Off Unit (MCB Icu = 10kA)

No.

26 25 00.323 32A DP Tap Off Unit (MCB Icu = 10kA)

No.

26 25 00.326 40A DP Tap Off Unit (MCB Icu = 10kA)

No.

26 25 00.329 25A TP Tap Off Unit (MCCB Icu = 15kA)

No.

261

26 25 00.333 40A TP Tap Off Unit (MCCB Icu = 15kA)

No.

65

26 25 00.336 63A TP Tap Off Unit (MCCB Icu = 15kA)

No.

51

26 25 00.339 80A TP Tap Off Unit (MCCB Icu = 15kA)

No.

26 25 00.343 100A TP Tap Off Unit (MCCB Icu = 25kA)

No.

12

Supply, testing and commissioning of following TAP OFF Units including


circuit breakers (MCB / MCCB) as per mentioned ratings, to be installed on
Bus Way Turnking inuding all installation accessories as shown on drawing.

arcop

Page 53 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 25 00.346 125A TP Tap Off Unit (MCCB Icu = 25kA)

No.

26 25 00.349 160A TP Tap Off Unit (MCCB Icu = 25kA)

No.

26 25 00.353 200A TP Tap Off Unit (MCCB Icu = 25kA)

No.

26 25 00.356 250A TP Tap Off Unit (MCCB Icu = 25kA)

No.

26 25 00.359 300A TP Tap Off Unit (MCCB Icu = 25kA)

No.

26 25 00.363 400A TP Tap Off Unit (MCCB Icu = 35kA)

No.

11

26 25 00.366 500A TP Tap Off Unit (MCCB Icu = 35kA)

No.

26 25 00.369 630A TP Tap Off Unit (MCCB Icu = 35kA)

No.

26 25 00.373 800A TP Tap Off Unit (ACB Icu = 65kA)

No.

26 25 00.376 1000A TP Tap Off Unit (ACB Icu = 65kA)

No.

26 25 00.379 1250A TP Tap Off Unit (ACB Icu = 65kA)

No.

26 25 00.383 1600A TP Tap Off Unit (ACB Icu = 65kA)

No.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the running lengths, quantities and
termination as per site conditions before commencement of work.

Total Rs. Section- 26 25 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 54 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

26 27 26

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

WIRING DEVICES
Supply and Installation of following 10 Amp, gang type switches, 13/15/20
Amp switch socket outlets & Industrial Sockets make Clipsal / MK / Philips
and Isolators make Riva / Legrand, recessed on wall or column as per
design drawings. (Selected Series for Switch socket outlet is Clipsal C-Vivace
or equivalent)

26 27 26.13

10A, 220V One Gang Switch Unit

No.

50

960

52

26 27 26.16

10A, 220V One Gang By-Pass Switch Unit

No.

114

26 27 26.19

10A, 220V Two Gang Switch Unit

No.

36

605

33

26 27 26.23

10A, 220V Three Gang Switch Unit

No.

16

240

18

26 27 26.26

13A, International Switch Socket Unit

No.

230

3,585

89

26 27 26.29

13A, 3-Pin Flat Simplex Switch Socket Unit

No.

124

26 27 26.33

13A, 3-Pin Flat Simplex Switch Socket Unit with Earth Leakage Interrupter

No.

264

26 27 26.36

13A, 3-Pin Flat Duplex Switch Socket Unit

No.

30

4,773

40

26 27 26.39

15A, Round Simplex Switch Socket Unit

No.

90

112

42

26 27 26.43

20A, 3-Pin Switch Socket Unit for Hand dryer

No.

16

34

26 27 26.46

20A DP Isolator Switch Unit

No.

36

210

12

26 27 26.49

20A 4P Isolator Unit

No.

26

17

arcop

Page 55 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 27 26.53

20A, 4P Weather Proof Isolator

No.

16

26 27 26.56

32A 4P Isolator Unit

No.

26 27 26.59

40A 4P Isolator Unit

No.

26 27 26.63

63A 4P Isolator Unit

No.

14

26 27 26.66

125A 4P Isolator Unit

No.

26 27 26.69

16A, 3-Pin (Single Phase) Industrial Socket unit with plug top and back box.

No.

26 27 26.73

32A, 3-Pin (Single Phase) Industrial Socket unit with plug top and back box.

No.

29

26 27 26.76

16A, 5-Pin (Three Phase) Industrial Socket unit with plug top and back box.

No.

26 27 26.79

32A, 5-Pin (Three Phase) Industrial Socket unit with plug top and back box.

No.

26 27 26.83

63A, 5-Pin (Three Phase) Industrial Socket unit with plug top and back box.

No.

Total Rs. Section- 26 27 26


(CARRIED FORWARD TO SUMMARY)

arcop

Page 56 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 33 53

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

UNINTERRUPTIBLE POWER SUPPLY (UPS)


Supply, installation, testing and commissioning of following UPS at site as per
following specifications, including all installation accessories. Complete in all
respect.

26 33 53.13

Rating : 350 KVA Modular Type UPS for Normal Power (each 20KVA Modules)
True Online Double Conversion Pure sine wave Microcontroller based.
Input voltage : 400 V AC
Input frequency : 50 Hz
Output voltage : 400 Volts
Three Phase IN & Three Phase Out
Output p.f : 0.9 (Built in PFC)
Backup Time: 10 mins at full load.
Batteries : Dry Sealed Maintenance Free
Voltage Regulated 5 years
Overload 110 % for 10 min
Capacity : 125% for 1 min
Operating Temp : 0 to 40 degC
Mounting : Cabinet Mounting
User friendly LCD display for real time UPS status
Cold start of load during power failure
Transient/Surge Suppressor EMI/RFI Filter
Built-in manual and static by-pass switch
Remote & local emergency power off function
RS-232/RJ-45 connectivity with power management software
Provision for external battery bank
UPS & Advance Automatic Battery Management system for temperature
compensated battery charging and battery testing on user defined time.
Power Chute Network Shutdown.
SNMP Management Card
Ready to synchronize in RPA

No.

arcop

Page 57 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 33 53.16

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Rating : 350 KVA Modular Type UPS for O.T (each 20KVA Modules)
True Online Double Conversion Pure sine wave Microcontroller based.
Input voltage : 400 V AC
Input frequency : 50 Hz
Output voltage : 400 Volts
Three Phase IN & Three Phase Out
Output p.f : 0.9 (Built in PFC)
Backup Time: 10 mins at full load.
Batteries : Dry Sealed Maintenance Free
Voltage Regulated 5 years
Overload 110 % for 10 min
Capacity : 125% for 1 min
Operating Temp : 0 to 40 degC
Mounting : Cabinet Mounting
User friendly LCD display for real time UPS status
Cold start of load during power failure
Transient/Surge Suppressor EMI/RFI Filter
Built-in manual and static by-pass switch
Remote & local emergency power off function
RS-232/RJ-45 connectivity with power management software
Provision for external battery bank
UPS & Advance Automatic Battery Management system for temperature
compensated battery charging and battery testing on user defined time.
Power Chute Network Shutdown.
SNMP Management Card
Ready to synchronize in RPA

UNIT

No.

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

arcop

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Page 58 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 33 53.19

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Rating : 10 KVA
True Online Double Conversion Pure sine wave Microcontroller based.
Input voltage : 400 V AC
Input frequency : 50 Hz
Output voltage : 400 Volts
Three Phase In & Three Phase Out
Output p.f : 0.9 (Built in PFC)
Backup Time: 10 mins at full load.
Batteries : Dry Sealed Maintenance Free
Voltage Regulated 10 years
Overload : 110 % for 10 min
Capacity : 125% for 1 min
Operating Temp : 0 to 40 degC
Mounting : Cabinet Mounting
User friendly LCD display for real time UPS status
Cold start of load during power failure
Transient/Surge Suppressor EMI/RFI Filter
Built-in manual and static by-pass switch
Remote & local emergency power off function
RS-232 connectivity with power management software
Provision for external battery bank
UPS & Advance Automatic Battery Management system for temperature
compensated battery charging and battery testing on user defined time.
Power Chute Network Shutdown.
SNMP Management Card
Ready to synchronize in RPA

UNIT

No.

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Installation works includes wiring / cabling from DB to UPS and
workstations.

Total Rs. Section- 26 33 53


(CARRIED FORWARD TO SUMMARY)

arcop

Page 59 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 41 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

FACILITY LIGHTNING PROTECTION SYSTEM


Supply, installation, testing and commissioning of following item for
complete Lightning Protection System including all materials, equipments,
boring, labor, tools, transportation, supports, accessories etc. Complete in all
respects.

26 41 00.13

Supply, installation, testing and commissioning of Early Streamer Emission


(ESE) having following specifications:
Make : As per approved manufacturer's list
Type : Generation 2 or Equivalent
Reaction time : 45 - 50 micro seconds
Maximum Discharge Rating : 180 to 200 kA
Material : Stainless Steel or as per manufacturer's specifications
Length : 400mm or as per manufacturer's specifications
Level of Protection: Level 1
Protection Radius : 79 m
Mounting height (from Roof top to tip of ESE) : 5m or as specified
Note: The work is included with all mounting, fixing and support accessories
and material required for the completion of above mention task.

Job

26 41 00.16

5 meter high 125mm dia GI pipe to be used as mast for installation of ESE
lightning arrestor. Complete with all supports, angles, brackets, wire guides
nuts & bolts etc.

Job

26 41 00.19

Surge / Stroke Counter for indicating the number of strokes arrested by the
ESE.

No.

Supply, installation, testing and commissioning Stranded bare copper


conductors of following sizes in appropriate size of PVC Conduit (Class-D)
laid in floor / Surface on wall from Earth Station to Earth Connecting Points /
Lightning Arrestor shown in drawings. Complete in all respects including
termination at ECP.
26 41 00.23

95 Sq.mm Bare Copper Conductor

Rm.

600

200

26 41 00.26

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown & approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately & to be attached with the BOQ.

Job.

Note:
1. Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2. Contractor is advised to inform missing items (if any) in BOQ at time of
submitting this tender. No escalation will be considered at time of execution
of work.
Total Rs. Section- 26 41 00
(CARRIED FORWARD TO SUMMARY)

arcop

Page 60 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 51 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

INTERIOR LIGHTING
Supply and installation of following Interior light fixtures complete with
ballast, starter p.f.i capacitor and specified lamps. (Subject to approval of
Architect / Consultant)
Note: Color temperature will be as per Architect.

26 51 00.13

Surface Down Light DN024 Fixture with 15W LED Philips or equivalent Color
4000K CRI 83

No.

223

16

26 51 00.16

Recessed Down Light DN281B Fixture with 11.5W LED Philips or equivalent
Color 4000K CRI 80

No.

1,425

26 51 00.19

Recessed Down Light MICRO DN280B Light Fixture with 7W LED Philips or
equivalent Color 3000K CRI 80

No.

18

26 51 00.23

Recessed Down Light DN282B Fixture with 17W LED Philips or equivalent Color
4000K CRI 83

No.

3,064

26 51 00.26

Recessed Down Light DNO63B Fixture with 12W LED Philips or equivalent
Color 4000K CRI 83

No.

454

26 51 00.29

Recessed Down Light ECO ACCENT RS291 LED40 Light Fixture with 27W LED
Philips or equivalent Color 3000K CRI 80

No.

185

26 51 00.33

Ceiling Light ECB300 with 18W LED Bulb Philips or equivalent Color 4000K CRI
83 (IP65)

No.

281

26 51 00.36

Hanging Light LT0B50, 34W Philips or equivalent Color 4000K CR183


(Moonlight type)

No.

22

26 51 00.39

Planter VOYA UPLITE LED, BBP330 15.8W Philips or equivalent 3000K

No.

84

26 51 00.43

Wall mounted 18W LED Light Fixture IP-65

No.

84

26 51 00.46

Recessed mounted 60W LED HYGEIA Light Panel (1200X600mm) Fixture


Philips or equivalent Color 4000K CRI 80

No.

220

26 51 00.49

Surface mounted WT118C LED 36W L1200 Pacific Light Philips or equivalent
Color 4000K CRI 80

No.

123

127

26 51 00.53

Surface mounted Pacific 18W LED Light Fixture Philips or equivalent Color
4000K CRI 80

No.

473

266

arcop

Page 61 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 51 00.56

Wall mounted Pacific 18W LED Light Fixture Philips or equivalent Color 4000K
CRI 80

No.

120

26 51 00.59

Surface mounted Dura Care Bedhead 20W LED Light Fixture Philips or
equivalent Color 4000K CRI 80

No.

138

26 51 00.63

Philips HYGEIA CR 308B 36W or equivalent

No.

48

26 51 00.66

Recessed mounted (600X600) COREVIEW LED26S W80L120 TROFFER 40W LED


Light Panel Philips or equivalent Color 4000K CRI 80

No.

745

33

26 51 00.69

Recessed mounted (600X600) RC160V LED25S/840 PSU W60L60 45W LED Light
Panel Philips or equivalent Color 4000K CRI 80

No.

1,417

26 51 00.73

Recessed mounted CR652B CLEANROOM TROFFER 38W LED Light Panel


Philips or equivalent Color 4000K CRI 80

No.

304

27 51 00.76

Philips Down Light 11W IP65 or equivalent

No.

156

No.

242

72

Note:
1) The Bidder shall provide the complete Technical Literature of light fixtures.
2) All light fixtures subject to approval of Architect / Consultant.

Total Rs. Section- 26 51 00


(CARRIED FORWARD TO SUMMARY)
26 52 00

EMERGENCY LIGHTING
Supply and installation of following Emergency light fixtures complete with
ballast, starter p.f.i capacitor and specified lamps. (Subject to approval of
Architect / Consultant)
Note: Color temperature will be as per Architect.

26 52 00.13

LED base self contained recessed ceiling / wall mounted emergency light
fixture rectangular / round shape (non maintained) with 1x3W LED 2 hours
battery backup. (Pierlite Type SSR or equivalent)
Note:
1) The Bidder shall provide the complete Technical Literature of light
fixtures.
2) All light fixtures subject to approval of Architect / Consultant.
Total Rs. Section- 26 52 00
(CARRIED FORWARD TO SUMMARY)

arcop

Page 62 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

26 53 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

EXIT LIGHTING
Supply and installation of following Exit lighting fixtures complete with
ballast, starter p.f.i capacitor and specified lamps. (Subject to approval of
Architect / Consultant)
Note: Color temperature will be as per Architect.

26 53 00.13

Ceiling Mounted Emergency Exit Sign in Green Color with 8W LED, including
Battery Backup

No.

21

123

22

26 53 00.16

Ceiling Mounted Emergency Exit Sign in Green Color with 8W LED, including
Battery Backup and Directional Arrow

No.

15

25

No.

Note:
1) The Bidder shall provide the complete Technical Literature of light
fixtures.
2) All light fixtures subject to approval of Architect / Consultant.

Total Rs. Section- 26 53 00


(CARRIED FORWARD TO SUMMARY)
26 55 36

OBSTRUCTION LIGHTING
Supply and installation of following 220V, LED base Aircraft warning light with
flasher complete with control box, photo switch sensor e.t.c., to be installed
in already installed 32mm dia GI Pipe including all installation accessories as
shown on drawing complete in all respect.

26 55 36.13

Philips type XGP 500 OBSTIVISION

Note:
1) The Bidder shall provide the complete Technical Literature of light
fixtures.
2) All light fixtures subject to approval of Architect / Consultant.

Total Rs. Section- 26 55 36


(CARRIED FORWARD TO SUMMARY)

arcop

Page 63 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

26 56 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

EXTERIOR LIGHTING
Supply and installation of following External light fixtures complete with
ballast, starter p.f.i capacitor and specified lamps. (Subject to approval of
Architect / Consultant)

26 56 00.13

Pole Mounted Metal Canopy Post Top Luminaire 4x15W Philips GARDCO 301
Up/Down Light (IP-65)

No.

52

26 56 00.16

Pole Mounted Philips 54W Slim Pole LED Light fixture with 8 Meter High Light
Pole (IP-65)

No.

31

26 56 00.19

Pole Mounted Philips 30W Slim Pole LED Light fixture with 8 Meter High Light
Pole (IP-65)

No.

23

26 56 00.23

Post Top Luminaire Philips LINEA 165 30W LED with 4 Meter High Light Pole (IP65)

No.

26 56 00.26

Pedestrian Philips Smart 20W LED Bollard II BCP 150/151 800mm high (IP-66)

No.

54

26 56 00.29

Wall Recessed High Level (H.L) Niche Light Philips Master 6W GU10 LED Spot
Lamp with Holder

No.

41

26 56 00.33

Wall Recessed Low Level (L.L) Niche Light Philips Master 6W GU10 LED Spot
Lamp with Holder

No.

48

26 56 00.36

Wall Recessed Philips EFIX 10W LED Light (IP-65)

No.

78

26 56 00.39

In-ground LED Up-Lighter Philips VAYA with High Power 35W LED Lamp (IP-67)
to wash Tree

No.

22

26 56 00.43

In-ground LED Up-Lighter Philips VAYA with High Power 35W LED Lamp (IP-67)
to wash Column

No.

14

26 56 00.46

Surface Wall Washer 40W Philips VAYA Linear BCP 422 (IP-66)

No.

26 56 00.49

Surface Flood Light Philips TANGO 40W LED BVP 281 (IP-66)

No.

10

26 56 00.53

Surface Ceiling mounted 15W LED Downlight Philips Green Space SM291C
(IP-65)

No.

26 56 00.56

Surface Ceiling mounted LED Round Panel Downlight Philips Surface


Essential Bright DN024B (IP-44)

No.

26 56 00.59

Ceiling Recessed 38W LED COB Downlight Philips SM291C (IP-65)

No.

26 56 00.63

Surface Flood Light 100W LED Philips VAYA FlLOOD HP (IP-66)

No.

Note:
1) The Bidder shall provide the complete Technical Literature of light fixtures.
2) All light fixtures subject to approval of Architect / Consultant.
Total Rs. Section- 26 56 00
(CARRIED FORWARD TO SUMMARY)

arcop

Page 64 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

26 60 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

PARKING GUIDENCE SYSTEM


Supply, installation, testing and commissioning of Parking Guidence System
comparising of following Items including but not limited to the description
given here under including all power and communication accessories,
housings, mounting brackets etc. required for completion of the system.

26 60 00.13

Addressable Micro-Processor based Central Control Unit having self


powered built in batteries for 24 Hrs backup with charging unit complete
with all installation accessories

No.

26 60 00.16

Addressable Micro-Processor based Zone Control Panel having minimum 60


devices per Zone Control Unit having self powered built in batteries for 24 Hrs
backup with charging unit complete with all installation accessories.

No.

26 60 00.19

Out Door / Indoor LED Main Floor Displays having indications of total number
of occupancies and vacancies of vehicles for each floor entry & some exit
point.

No.

26 60 00.23

Addressable Type Ultra Sonic / Optical Sensor for Vehicle occupancy.

No.

366

26 60 00.26

LED Indicator, Green / Red illumination color Guidence Lamp communicates


with ultra sonic sensor for each parking light.

No.

366

26 60 00.29

Supply of Parking Guidance System Indoor LED Display having arrows for 1
way direction indication.

No.

20

26 60 00.33

Supply of Parking Guidance System Indoor LED Display having arrows for 2
way direction indication.

No.

28

26 60 00.36

Supply of Parking Guidance System Indoor LED Display having arrows for 3
way direction indication.

No.

26 60 00.39

Work Station with Client Software (Core i7 Ultra Slim Desktop PC with Genuine
Windows 8 Prof 64bit, 8, 2TB HDD & DVD Writer) including Keyboard & mouse.

No.

26 60 00.43

16-Port Local Area Network Switch for interconnecting floor PCs with main
PC in Parking management room.

No.

arcop

Page 65 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 26 : Electrical
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

26 60 00.46

5A Signage Power Switch Socket make MK / Clipsal excluding back boxes,


recessed on wall or column as per design drawings.

No.

26

26 60 00.49

3 x 2.5 Sq.mm Single Core PVC insulated wires for Zone Controllers and
Display Units upto controller (CCU) in 100mm x 75mm Aluminium Channel /
trunking suspended from wall / slab / beem or 25mm dia MS conduit.
Complete in all respects.

Rft.

2,483

26 60 00.53

4 x 1.0 Sq.mm multicore PVC insulated twisted pair wire or Cat-6 Cable for
Ultra Sonic Sensors in looping arrangement from controller to sensor and
guidence lamp in 100mm x 75mm Aluminium Channel / trunking suspended
from wall / slab / beem or 25mm dia MS conduit. Complete in all respects.

Rft.

4,650

26 60 00.56

Supply and wiring for interconnecting Parking Management System from its
main controller to BMS Server with control cable in 25mm dia PVC conduit
and other accessories. Complete in all respect, as per drawings.

Job.

26 60 00.59

Programming, testing and commissioning of the complete system including


Hardware and Software integral to Building Management System as per the
client requirements, Operating Software with training sessions of
maintenance personnel's. (Refer Specification)

Job

26 60 00.63

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown & approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately & to be attached with the BOQ.

Job

Note:
1) Contractor is advised to confirm the running lengths and termination as
per site conditions before commencement of work.
2) The Bidder shall provide the complete Technical Literature for the system
offered.

Total Rs. Section- 26 60 00


(CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 26

arcop

Page 66 of 67

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Summary of Cost

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

26 05 13

MEDIUM VOLTAGE CABLES

26 05 19

LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26

GROUNDING & BONDING FOR ELECTRICAL SYSTEMS

26 05 33

RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 36

CABLE TRAYS FOR ELECTRICAL SYSTEMS

26 09 23

LIGHTING CONTROL DEVICES

26 12 00

DRY TYPE, MEDIUM VOLTAGE TRANSFORMERS

26 13 00

MEDIUM VOLTAGE CIRCUIT BREAKER SWITCHGEAR

26 24 00

SWITCHBOARDS & PANEL BOARDS

26 25 00

ENCLOSED BUS ASSEMBLIES

26 27 26

WIRING DEVICES

26 33 53

UNINTERRUPTIBLE POWER SUPPLY (UPS)

26 41 00

FACILITY LIGHTNING PROTECTION SYSTEM

26 51 00

INTERIOR LIGHTING

26 52 00

EMERGENCY LIGHTING

26 53 00

EXIT LIGHTING

26 55 36

OBSTRUCTION LIGHTING

26 56 00

EXTERIOR LIGHTING

26 60 00

PARKING GUIDENCE SYSTEM

Division 26 : Electrical

PARKING BUILDING
(P2, P1 & Ground to First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

AMOUNT
Rs.

AMOUNT
Rs.

TOTAL OF DIVISION - 26

arcop

Page 67 of 67

DIVISION 27
COMMUNICATIONS

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 15 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

COMMUNICATION SERVICE CABLING


Supply, wiring, tagging and termination of following items for Voice and Data
Communication System including all material, labor, tools, accessories etc.
Complete in all respects. Quantities for cables shown in BOQ are estimated
and taken from drawings. Contractor is advised to take measurement at site
before commencement of works. Different colors of voice and data cables
shall be used.

27 15 00.13

CAT-6, UTP Cable for Voice Communication System from Communication


Rack to each workstation / outlet in 25 mm PVC conduit / channel as per
drawings including termination and tagging at both ends. Complete in all
respects.

Coil

111

27 15 00.16

CAT-6a, UTP Cable for Data Communication System from Communication


Rack to each workstation / outlet in 25 mm PVC conduit / channel as per
drawings including termination and tagging at both ends. Complete in all
respects.

Coil

573

11

No.

425

35

27 15 00.23 3 meter long.

No.

2,670

40

27 15 00.26 1 meter long.

No.

3,800

60

8C, 9/125 um Single Mode OS2 type Fiber Optic Cable from server to data
switch in 25mm dia PVC conduit / already installed Ladder, as shown in
27 15 00.29 drawings including termination and tagging at both ends, as per standard
specifications with all termination accessories up to entire satisfaction of IT
Engineer,

Rm.

400

350

6C, 125um Single Mode OS2 type Fiber Optic Cable for Data Transmission /
Networking from Server Room to each Communication Racks in 25 mm dia
PVC conduit / already installed Cable trays, as per drawings including
termination and tagging at both ends. Complete in all respects.

Rm.

5,740

678

Following CAT-6, factory certified Patch Cords of specified color having RJ45 connectors at both ends for Voice Communication.
27 15 00.19 1 meter long.
Following CAT-6a, factory certified Patch Cords of specified color having RJ45 connectors at both ends for Data Communication.

27 15 00.33

arcop

Page 1 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

27 15 00.36

50 Pair, CAT-5 shielded, 0.6 mm dia, twisted pair telephone cable to be


installed in 38mm dia PVC conduit / channel from Control room to
Communication rack as per drawings including connection, labeling and
tagging. Complete in all respects.

Rm.

1,950

775

27 15 00.39

25 Pair, CAT-5 shielded, 0.6 mm dia, twisted pair telephone cable to be


installed in 25mm dia PVC conduit / channel from Control room to
Communication racks as per drawings including connection, labeling and
tagging. Complete in all respects.

Rm.

885

225

27 15 00.43

10 Pair, CAT-5 shielded, 0.6 mm dia, twisted pair telephone cable to be


installed in 25mm dia PVC conduit / channel from Control room to
Communication racks as per drawings including connection, labeling and
tagging. Complete in all respects.

Rm.

645

350

Allow for any other item or labour required for completion of system not
covered in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such items
27 15 00.46
shall be covered in this item but complete description, item rates, quantity
required and brands shall be mentioned separately and to be attached
with the BOQ.

Job

RATE
Rs.

AMOUNT
Rs.

Note: Contractor is advised to confirm the cable running lengths and


termination as per site conditions before commencement of work.

Total Rs. Section- 27 15 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 2 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 15 43

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

COMMUNICATION FACEPLATES AND CONNECTORS


Supply, installation, testing and commissioning of of following items for Voice
and Data Communication System including all material, labor, tools,
accessories etc. Complete in all respects.
(Selected Series for Simplex / Duplex Face plates is Clipsal C-Vivace or
equivalent)

Simplex Face plate having 1 Gang Cat-6 RJ-45 I/O for Voice, white / off
27 15 43.13 white finish, complete with shuttered click-ins, labels and all accessories
including back box, recessed on wall or column as per design drawings.

No.

39

10

Simplex Face plate having 1 Gang Cat-6a RJ-45 I/O for Data, white / off
27 15 43.16 white finish, complete with shuttered click-ins, labels and all accessories
including back box, recessed on wall or column as per design drawings.

No.

314

Duplex Face plate with 2 Gang Cat-6 RJ-45 I/O for Voice, white/off white
27 15 43.19 finish, complete with shuttered click-ins, labels and all accessories including
back box. recessed on wall or column as per design drawings.

No.

193

15

Duplex Face plate with 2 Gang Cat-6a RJ-45 I/O for Data, white/off white
27 15 43.23 finish, complete with shuttered click-ins, labels and all accessories including
back box. recessed on wall or column as per design drawings.

No.

1,785

30

No.

20

27 15 43.29 24-Port CAT-6a Patch Panel for Data

No.

12

27 15 43.33 48-Port CAT-6a Patch Panel for Data

No.

82

No.

114

Following CAT-6, Patch Panel equipped with RJ-45 I/Os for Voice
Communication System including all labeling and all mounting accessories.
Complete in all respects.
27 15 43.26 24-Port CAT-6 Patch Panel for Voice
Following CAT-6a, Patch Panel equipped with RJ-45 I/Os for Data
Communication System including all labeling and all mounting accessories.
Complete in all respects.

27 15 43.36

Front Cable Organizer for Voice & Data patch panels / wiring blocks with
complete labeling and dressing for incoming cable management.

arcop

Page 3 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Following Main / Sub-Main Telephone Junction Boxes (MTJB/SMTJB) made


with 16 SWG sheet steel housing, powder coated paint of approved color,
consisting of specified Distributor Blocks / Tag Blocks for incoming and
outgoing PTCL lines from ONU. Item includes all interconnecting jumper
wiring and termination.
27 15 43.39 MDF-PTCL (2x500 Pair wiring tag blocks )

No.

26 15 43.43 SMDF-PTCL (1x500 Pair wiring tag blocks )

No.

27 15 43.46 MDF-PABX (1x100 Pair wiring tag blocks )

No.

27 15 43.49 MDF-PABX (1x50 Pair wiring tag blocks )

No.

27 15 43.53 MDF-PABX (1x25 Pair wiring tag blocks )

No.

Tag block for telephone network having 2x50 Pair Connecting Block, CRONE
27 15 43.56 make including testing and termination at both ends, installed inside
Communication Rack. Complete in all respects.

No.

Tag block for telephone network having 1x50 Pair Connecting Block, CRONE
27 15 43.59 make including testing and termination at both ends, installed inside
Communication Rack. Complete in all respects.

No.

Tag block for telephone network having 1x25 Pair Connecting Block, CRONE
27 15 43.63 make including testing and termination at both ends, installed inside
Communication Rack. Complete in all respects.

No.

Tag block for telephone network having 1x10 Pair Connecting Block, CRONE
27 15 43.66 make including testing and termination at both ends, installed inside
Communication Rack. Complete in all respects.

No.

27 15 43.69 3 meter long.

No.

1,250

32

27 15 43.73 Fiber Optic LC connectors

No.

1,075

27 15 43.76 IP Phone Medium End

No.

267

Following factory certified Fiber Optic Patch Cords (Multi mode) having
connectors at both ends.

arcop

Page 4 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

27 15 43.79 IP Executive Phone

No.

149

27 15 43.83 PC Based Operator Console with Headphone & Mic

No.

27 15 43.86 Analogue Phone Sets of good quality

No.

375

CHASSIS BASED LAN SWITCH WITH 8 LINE CARD SLOTS:


Chassis Based Core Switch for 10,000 plus nodes network with Redundant
power, management and/or switch fabric.
27 15 43.89
GigE RJ45/SFP, 1GigE & 10 GigE SFP+ based line cards
Advanced L3 routing, Multicast, IPv4 and IPv6 support
Universal Network Profiles: policy based access

No.

Not Included
(By Others)

Aggregation Switch with 1/10G SFP Modules:


Gigabit Ethernet L3 fixed configuration chassis in 1U form factor with 24
100/1000 Base-X SFP ports, 4 10G fixed SFP+ ports
27 15 43.93 Advanced L3 routing, Multicast, IPv4 and IPv6 support
Optional backup power
Stackable Switch
Universal Network Profiles(UNP): Policy based access

No.

Not Included
(By Others)

L2 Stackable Gigabit Ethernet LAN switch:


48-port 10/100/1000 BaseT with two GigE SFP+
27 15 43.96 802.3at PoE+ support and SFP port versions
Optional backup power
Universal Network Profiles(UNP): Policy based access

No.

119

Not Included
(By Others)

L2 Stackable Gigabit Ethernet LAN switch:


24-port 10/100/1000 BaseT with two GigE SFP+
27 15 43.99 802.3at PoE+ support and SFP port versions
Optional backup power
Universal Network Profiles(UNP): Policy based access

No.

Not Included
(By Others)

NETWORK MONITORING AND REPORTING SYSTEM:


Network Management System that can monitor the proposed Network LAN,
27 15 43.103 WLAN and 3rd Party devices.
Reporting loging and performance management features (HW not
included)

No.

Not Included
(By Others)

Voice Solution:
Supply/Installation, Testing & Commissioning of Hybrid PABX having 1500 lines
(700 IP + 700 Analog + 100 Digital) with 6 PRI slots and 32 Analog Trunks. Also
supporting SIP and H323 with 50 SIP extensions and 10 SIP Trunks.

No.

Not Included
(By Others)

27 15 43.106

arcop

Page 5 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

27 15 43.109 Gateway Firewall (UTM) for internet security with 3 years bundle

No.

Not Included
(By Others)

27 15 43.113 Datacenter Firewall (UTM) for network security with 3 years bundle

No.

Not Included
(By Others)

27 15 43.116 SMB Firewall (UTM) for network security with 3 years bundle

No.

Not Included
(By Others)

27 15 43.119 1G SM SFP

No.

264

Not Included
(By Others)

27 15 43.123 10G SM SFP

No.

26

Not Included
(By Others)

Communication Rack 42U (Floor Mounted), 19 inches suitable for installation


of standard patch panels and etc. Complete with floor base, vertical cable
managers. Rack shall be equipped with power distribution units (PDUs) with
at least 5 imported power sockets etc. Complete in all respects.

No.

24

Communication Rack 22U (Wall Mounted), Complete with vertical cable


27 15 43.129 managers. Rack shall be equipped with power distribution units (PDUs) with
imported power sockets etc. Complete in all respects.

No.

Testing and commissioning of all above items termination and connectivity


at both ends, including submission of detailed test report from the Principals.

Job.

Allow for any other item or labour required for completion of system not
covered in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such items
27 15 43.136
shall be covered in this item but complete description, item rates, quantity
required and brands shall be mentioned separately and to be attached
with the BOQ.

Job

27 15 43.126

27 15 43.133

Total Rs. Section- 27 15 43


(CARRIED FORWARD TO SUMMARY)

arcop

Page 6 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 32 16

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

No.

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

89

WIRELESS TRANSCEIVERS
Supply, installation, testing, commissioning and termination of following
items for Wireless Transceivers including all material, accessories etc.
Complete in all respects.

27 32 16.13

Motorola GM-338 Base Radio with complete standard accessories


Frequency :136-174Mhz
Make: Motorola
Channels: 128 Nos
Includes:Diamond Base Antenna BC-100
30Amp Power Supply
Cable 100feets with PL-259 connector
Features: Advance Signaling capability
Excellent Audio Technology
Programmable Channel Spacing
Large Control Buttons
Dual Priority Scan
14 Characters 1-line Alphanumeric Display
Remote Mount Control Head

Motorola GP-338 Walkie Talkie with complete standard accessories


Frequency :136-174Mhz
Make: Motorola
Channels: 128 Nos
Features: Battery Strength Indicator
Name & Tone Tagging
27 32 16.16 Received Signal Strength Indicator
Colck and Reminder Alarm
Call Alert
Voice Selective Call
Channel Scan
Time Out Timer
PL/dPL
Busy Channel Lockout

arcop

Page 7 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Motorola GM-338 Mobile Radio with complete standard accessories


Frequency :136-174Mhz
Make: Motorola
Channels: 128 Nos
Includes:Mobile Antenna MC-101
Features:27 32 16.19
Advance Signaling capability
Excellent Audio Technology
Programmable Channel Spacing
Large Control Buttons
Dual Priority Scan
14 Characters 1-line Alphanumeric Display
Remote Mount Control Head

No.

27 32 16.23 Warranty of complete Walkie Talkie System

No.

Management Server with Management & Client Software


27 32 16.26 Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

Supply, wiring, tagging and termination of Cat-6 UTP cable from PABX to
27 32 16.29 Wireless Radio Communication System in 25mm dia PVC Conduit as per
drawing including termination. Complete in all respects.

Rm.

250

Installation, programming, testing and commissioning of the complete


system as per the Client requirement.

Job

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
27 32 16.36
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

27 32 16.33

Not Included
(By Others)

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. Section- 27 32 16


(CARRIED FORWARD TO SUMMARY)

arcop

Page 8 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 51 16

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

IP PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM


Supply, installation, testing and commissioning of following items for Public
Address & Voice Evacuation System as described below including all
accessories. Complete with mounting brackets, wiring, adapters etc.

27 51 16.13

IP Based Network Controller Public Address System routes up to 28


simultaneous audio channels, delivers power to the system, reports faults,
and controls the system with PA System Software DVD with system software
for Controller to used for system configuration, diagnostics and logging.
Complete in all respects including all accessories required for completion of
system.

No.

27 51 16.16

Call Station Basic has a microphone on a flexible stem, a push-to-talk


button, a speaker, and a headset socket, operating at 220V, AC suitable for
rack mounting. Complete in all respects including all accessories.

No.

12

27 51 16.19

Call Station Keypad with 8 programmable buttons and status indicators, up


to 16 keypads can be connected to a call station including all accessories.
Complete in all respect.

No.

12

27 51 16.23

Call station Remote for remote locations with microphone on a


flexible stem, push-to-talk button, monitoring loudspeaker, to be connected
to a interface unit via a CAT-6 cable. Complete in all respects including all
accessories required for completion of system.

No.

22

27 51 16.26

Call Station Interface Compact unit with mounting clamp, interface


between Praesideo network and a remote CAT-6 connected call station up
to 1000 m away. Complete in all respects including all accessories required
for completion of system.

No.

22

27 51 16.29

IP Based Power Amplifier (2 x 250 W) 2-channel power amplifier with network


connection, 2 x 250 W, rack unit 2 RU, operating at 220V, AC suitable for rack
mounting. Complete in all respects including all accessories.

No.

28 51 16.33

IP Based Power Amplifier (2 x 125 W) 4-channel power amplifier with


network connection, 4 x 125 W, rack unit 2 RU, operating at 220V, AC
suitable for rack mounting. Complete in all respects including all
accessories.

No.

13

27 51 16.36

Network Cable Assembly of different size as per system requirment, including


all accessories. Complete in all respect.

No.

75

11

arcop

Page 9 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

No.

12

22

27 51 16.46

6W Recessed / Surface Ceiling mount Speakers (indoor) intended for high


quality speech with sealed enclosure protective against moisture and dust
and built-in twiter transformer. The speaker shall have output power
adjustments for full, half and quarter power outputs, including back boxes if
required.

No.

619

12

27 51 16.49

12W Wall mounted Speakers intended for high quality speech and music
reproduction with sealed enclosure protective against moisture and dust.
The speaker shall have output power adjustments for full, half and quarter
power outputs, including back boxes if required.

No.

114

10

29

27 51 16.53

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

27 51 16.56

Work Station with Client Software (Core i7 Ultra Slim Desktop PC with Genuine
Windows 8 Prof 64bit, 8, 2TB HDD & DVD Writer) including Keyboard & mouse.

No.

27 51 16.59

Volume control 100 W, MKD/E2 installation type, builtin


24 VDC override relay, power-save version, 10 attenuation steps of 2 dB and
off, white RAL 9010, supplied with surface mounting box

No.

27 51 16.63

CobraNet Interface, converts 4 audio channels from PA System to CobraNet


on standard 100Base-T Ethernet and 4 audio channels back, powered from
network, rack unit 2 RU. Complete in all respects including all accessories.

No.

27 51 16.66

Systems Equipment Rack for complete Public Address System in Control


Room as shown in drawings. Rack design shall be approved by consultant
and architect.

No.

27 51 16.69

Supply and wiring of Cat-6 Cable for IP Public Address System from System to
Amplifier, amplifier to main control room and amplifier to microphone
locations for announcement in 25mm dia PVC Conduit, as per drawings
including termination. Complete in all respects.

Rm.

2,100

27 51 16.39

Network Splitter, Compact unit with mounting clamp, provides


2 protected tap-off network outputs on the main network, powered from
other network, can accept external power supply, including all accessories.
Complete in all respect.

27 51 16.43 Micro Phone Outlet including face plates and all other accessories.

RATE
Rs.

AMOUNT
Rs.

22

3,500

1,500

arcop

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

Not Included
(By Others)

QUANTITY

Page 10 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

27 51 16.73

Supply and Wiring of 2C, 2.5 Sq.mm flexible imported Speaker Cable for
Public Address System from Speaker to Speaker as per zoning layout shown
in drawings in 25mm dia PVC Conduit. Complete in all respects.

Rm.

3,100

27 51 16.76

Supply and Wiring of 8C, 9/125 um Single Mode OS2 type Fiber Optic Cable
for Public Address System from Main ELV Room to communication rack of
ELV at each floor in 25mm dia PVC conduit / already installed Cable trays,
as per drawings including termination. Complete in all respects.

Rm.

27 51 16.79

Programming, software, testing and commissioning of the complete system


as per the Client requirement.

Job.

27 51 16.83

Allow for any other item or labour required for completion of system not
covered in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such items
shall be covered in this item but complete description, item rates, quantity
required and brands shall be mentioned separately and to be attached
with the BOQ.

Job

RATE
Rs.

AMOUNT
Rs.

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

12,500

950

1,250

80

RATE
Rs.

AMOUNT
Rs.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.

Total Rs. Section- 27 51 16


(CARRIED FORWARD TO SUMMARY)

arcop

Page 11 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 52 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

PATIENT MONITORING & TELEMETRY SYSTEM


Supply, installation, testing, commissioning and termination of following
items for Patient Monitoring & Telemetry System including all material,
accessories etc. Complete in all respects.

27 52 13.13

20 Multi Touch Display Screen, Max. Resolution 1920 x 1080, Max. Display
Colour 16.7 million colours, thinkness 0.225 x 0.225 mm, Multitouch 10 points,
windows 8

No.

78

27 52 13.16

Server Machine, Intel Xeon E5-2609 v2 (4 core, 2.5 GHz, 10MB, 80W) 1GB
RAM, 500GB HDD with 17 " Display

No.

27 52 13.19

PC, Core i5, 3.2 GHz Proecessor, 4GB RAM, 500GHDD, Windows 7 License,
Client PC for Nursing Station

No.

12

27 52 13.23

Door Signage Software for Server License

No.

27 52 13.26

Door Signage Client Software basic (Video / Image / Text / RSS / Date / Time
Features Included only) for each screen

No.

78

27 52 13.29

Signage Client basic (Video / Image / Text / RSS / Date / Time Features
Included only) for Nursing Station

No.

12

27 52 13.33

Supply, wiring, tagging and termination of Cat-6 UTP cable for Patient
Monitoring & Telemetry System in 25mm dia PVC Conduit from Staff base
control room to each screen as per drawing including termination.
Complete in all respects.

Rm.

2,580

27 52 13.36

Upgrade Assurance Manufacture Support for one year to fix bugs and to
upgrade software version.

Job

27 52 13.39

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

27 51 16.43

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.
Total Rs. Section- 27 52 13
(CARRIED FORWARD TO SUMMARY)

arcop

Page 12 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 52 23

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

NURSE CALL SYSTEM


Supply, installation, testing and commissioning of following items for
Addressable Nurse Call System including but not limited to the description
given here under including all power and communication and controlling
accessories, housings, mounting brackets, suspension rods etc. required for
completion of the system.

27 52 23.13

Connection Module
For Fitting in a Double Switchbox; for connecting a PAT, PAT-L or a DZT-IP;
with 1 diagnostic call input; including 1 port for connecting a multimedia
terminal or a patient's notebook.
(Type: SM, Model: FC010300-A)

No.

240

27 52 23.16

Connection module light SM-B


For fitting in a double switchbox; for connecting a BT-B; with 1 diagnostic call
input; including a call/cancel-combination. 4 ports for connecting Visocall
IP-Basic components.
(Type: SM-B, Model: FC011300-A)

No.

240

27 52 23.19

Patient Handsets
Patient handset, for operation from patients bed - including nurse call
button. Optional: controlling room light. (Type: BT-B, Model: FC011200-D)

No.

240

27 52 23.23

Bracket for Handset


Cradle for PAT, PAT-L and BT-B, Including silent / loud shift.
(Type: K-PAT, Model: FC010240--)

No.

240

27 52 23.26

Communication Terminal
Room terminal with speech function, for fitting in patient rooms and other
important rooms, as a communication centre for nursing staff.
(Type: KMT, Model: FC010110-B)

No.

27 52 23.29

Mounting Frame DR-KMT


For countersunk mounting of room and communication terminals on a
double switchbox. (Type: DR-KMT, Model: FC010191-A)

No.

27 52 23.33

Call / Cancel Unit Wall mounted Pull Button


For calling the nurse, for mounting on a single switchbox, connected to the
IO-Bus. (Type: ZT-IO, Model: FC010410-C)

No.

125

27 52 23.36

Call and Cancel Button


For calling the nurse and cancelling a call, for mounting on a single
switchbox, connected to the IO-Bus.
(Type: RAT-IO, Model: FC010440-A)

No.

125

arcop

Page 13 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

27 52 23.39

Room Signal Lamp Module


For Optical indication of calls, presences and reminders. Can be configured
as a room lamp, a direction lamp and as a ward lamp.
(Type: LM-IO, Model: FC010900-A)

No.

168

27 52 23.43

Staff Terminal
For use as a communications and information centre within a ward and for
use in the relevant staff room. The messages are displayed on a clearly
arranged touch screen.
(Type: ST-TOUCH, Model: FC010000-A)

No.

33

27 52 23.46

Switch 9-Ports SWI9R-2IO


System-Switch SW19 - For Connecting Visocall IP devices. 1 Uplink-Port, 8
Downlink-Ports, 4 ports for IO-Bus. Redundant version.
(Type: SW19R-2IO, Model: FC010005--)

No.

17

27 52 23.49

Mounting Rack 19" f. SWI 9


Mounting-rack suitable for fitting up to 8 system switches.
(Type: SW19-RACK, Model: FC010009--)

No.

27 52 23.53

Stations Switch, HP2610-IP


Ward switch, for connecting SW19 System switches.
(Type: ST-SWITCH, Model: FC010091-B)

No.

27 52 23.56

Server Switch, HP-E2910-24G


Powerful backbone switch, located between management center and
ward switches. (Type: SRV-SWITCH, Model: FC010092-B)

No.

27 52 23.59

Management Center including configuration


System-Server for Visocall IP, required for a running system. Used for firmware
upload, start-up and system configuration. Provides also possible
interconnections with 3rd party systems by additional software licenses.
Includes required hard disk and configuration.
(Type: MC-IP, Model: FC010090-E)

No.

27 52 23.63

USB-Dongle MLU-60 short


Software-Dongle for Visocall IP Management Center.
(Type: USB-DONGLE, Model: FC010089--)

No.

27 52 23.66

Distributor Circuit Board for Text Displays


For fitting in a Double Switchbox; for connecting up to 2 text terminals. (Type:
VTXT-IP, Model: FC010815-A)

No.

33

27 52 23.69

Text Display (Wall Mounted)


Display in corridor for displaying of emergency calls, calls reminders, date
and time; for wall-mounting, adjustable.
(Type: TXT-W, Model: FC008811-F)

No.

33

arcop

Page 14 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

27 52 23.73

Input Output Module


Interface to 3rd-Party systems, 3 non-floating inputs, 3 floating outputs.
(Type: IO-M-P, Model: FC010501-C)

No.

240

27 52 23.76

Latching Relay VISOCALL


Used for controlling of 2 independent lights (e.g. room light and reading
light). Controlled by patient handsets PAT, PAT-L or BT-B. 230V/8A (Type: SSRIO, Model: FC010504--)

No.

168

27 52 23.79

Power Supply E-TOP240-24


For Supplying the Visocall IP System with power on a ward-by-ward basis,
10A (Type: E-TOP240-24, Model: FC008726--)

No.

90

27 52 23.83

Mains Cable
Power Supply cable for connecting to 230V; approx. 2.5 m
(Type: ZUB NG KAB, Model: DF020231-A)

No.

90

27 52 23.86

SW-License Ward Control Panel


Software license for ward control panel - first license in the system.
Information about events from one ward.
(Type: SWP-IP/SLS, Model: FC010050--)

No.

27 52 23.89

SW-License Event Database


Software license for logging and analyzing all events of the system.
(Type: SWP-IP/EDB, Model: FC010056--)

No.

27 52 23.93

SW-License Service Monitor


Software license for service and maintenance software.
(Type: SWP-IP/MON, Model: FC010063--)

No.

27 52 23.96

SW-License Audio Manager


Software license for pre-recorded announcements.
(Type: SWP-IP/AM, Model: FC010065--)

No.

27 52 23.99

Wall Box H1
For cavity wall mounting, for installation of buttons and lamps.
(Type: H1, Model: FC88011--)

No.

293

Wall Box H2
27 52 23.103 For cavity wall mounting, for installation of connection modules, room
terminals and communication terminals. (Type: H2, Model: FC88013--)

No.

240

Cables and Installation accessories (RJ-45 Plug Cat-5e)


27 52 23.106 Shielded connector plug, to be crimped on the Visocall IP data cable
CAT5e. (Type: RJ45-IP, Model: MM010008-A)

No.

2,000

arcop

Page 15 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Supply, wiring and termination of Cat-6 UTP Cable for Nurse Call System in
27 52 23.109 25mm dia PVC Conduit as per drawings including termination. Complete in
all respects.

Rm.

3,360

Supply, wiring and termination of consisting of 2.5 Sq.mm T+E (Twin+Earth)


27 52 23.113 Cable in 25mm dia PVC Conduit for Network Splitter & Call Point. Complete
in all respects as shown in drawings.

Rm.

1,680

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job.

Allow for any other item or labour required for completion of system not
covered in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such items
27 52 23.119
shall be covered in this item but complete description, item rates, quantity
required and brands shall be mentioned separately and to be attached
with the BOQ.

Job

27 52 23.116

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. Section- 27 52 23


(CARRIED FORWARD TO SUMMARY)

arcop

Page 16 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

27 53 13

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 27 : Communications
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

MASTER CLOCK SYSTEM


Supply, installation, testing and commissioning of the following items for
Digital Master Clock System including all accessories, complete in all
respects.

27 53 13.13 Master Clock System including all accessories. Complete in all respects.

No.

27 53 13.16 Round Slave Clock 12 Inch with adapter etc. Complete in all respects.

No.

298

27 53 13.19

Digital Slave Clock 12 Inch length with adapter etc. Complete in all
respects.

No.

27 53 13.23

GPS Time Receiving Processor including all accessories. Complete in all


respects.

No.

(Rate Only)

27 53 13.26 GPS Arrial, including all accessories. Complete in all respects.

No.

(Rate Only)

Management Server with Management & Client Software


27 53 13.29 Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

Not Included
(By Others)

Supply and wiring of consisting of 3 No. 1C, 2.5 Sq.mm PVC cable in 25mm
dia PVC Conduit, Complete in all respects as shown in drawings.

Rm.

8,950

Supply and wiring of Cat-6 UTP Cable for Master Clock System in 25mm dia
27 53 13.36 PVC Conduit as per drawings including termination. Complete in all
respects.

Rm.

10,500

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

Allow for any other item or labour required for completion of system not
covered in BOQ or specifications / drawings in accordance with the same
standards and brands shown and approved by consultant. All such items
27 53 13.43
shall be covered in this item but complete description, item rates, quantity
required and brands shall be mentioned separately and to be attached
with the BOQ.

Job

27 53 13.33

27 53 13.39

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
Total Rs. Section- 27 53 13
(CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 27

arcop

Page 17 of 18

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Summary of Cost

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

27 15 00

COMMUNICATION SERVICE CABLING

27 15 43

COMMUNICATION FACEPLATES AND CONNECTORS

27 32 16

WIRELESS TRANSCEIVERS

27 51 16

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM

27 52 13

PATIENT MONITORING & TELEMETRY SYSTEM

27 52 23

NURSE CALL SYSTEM

27 53 13

MASTER CLOCK SYSTEM

Division 27 : Communications

PARKING BUILDING
(P2, P1 & Ground to First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

AMOUNT
Rs.

AMOUNT
Rs.

TOTAL OF DIVISION - 27

arcop

Page 18 of 18

DIVISION 28
ELECTRONIC SAFETY & SECURITY

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

28 13 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
RATE
Rs.

AMOUNT
Rs.

QUANTITY

IP BASED ACCESS CONTROL SYSTEM


WITH FEATURES OF BIO METRIC,RFID AND KEYPAD
Supply, installation, testing and commissioning of following items for IP
Access Control System (with features of Bio Metric,RFID & Keypad) as
described below including all accessories. Complete with mounting
brackets, wiring, adapters etc.

Proximity Door Access Controller suitable for 2 doors / 2 readers for door
access (connecting to readers at upto 100m), monitoring, store at least
28 13 00.13 10,000 events, provided with power supply unit & battery back-up for atleast 8 hours. Built-in interfacing with TCP / IP switch for LAN/WAN networking
and telephone dialer.

No.

78

28 13 00.16

Proximity Card Reader 125KHz, (for outside door) reading range 6",
operating at low voltage DC supply, with mounting base suitable for interior
and exterior environment including Door Interface Unit (DIU), dual color LED
and speaker for comprehensive audible feed back to user.

No.

78

28 13 00.19

Proximity Cards ISO credit card standard size and thickness, thin, flexible
polyvinyl chloride laminated, passive type, easy printable on both sides.

No.

500

28 13 00.23 Magnetic Drop Bolt Lock (Single Door) with holder and fixing accessories.

No.

71

71

28 13 00.26 Magnetic Drop Bolt Lock (Double Door) with holder and fixing accessories.

No.

16

Push Button (Exit Switch) suitable for installation on BS standard size back box
connected to door controller for access.

No.

78

85

12

Access Control and Time Management Software along with Security Control
system features a password protected user logon system suitable to
28 13 00.33 interface with CCTV, Public Address and Fire Alarm. It provide cardholder
management, full alarm and event processing, multi division supports,
alarms alerting via SMS and calls on mobile and detailed audit rail records.

Job

Management Server with Management & Client Software


28 13 00.36 Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

No.

28 13 00.29

28 13 00.39

Work Station with Client Software (Core i7 Ultra Slim Desktop PC with Genuine
Windows 8 Prof 64bit, 8, 2TB HDD & DVD Writer) including Keyboard & mouse.

arcop

85

12

100

Not Included
(By Others)

Page 1 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

Supply and Wiring of CAT-6, UTP Cables from Door Controller to all devices
28 13 00.43 as shown in the schematic diagram in 25mm dia PVC Conduit, including
termination and tagging at both ends. Complete in all respects.

Rm.

6,230

750

Supply and Wiring of 3C, 2.5 Sq.mm Flexible PVC Cable for Access Control
28 13 00.46 System using shown in drawings in 25mm dia PVC Conduit / already installed
Aluminium Chanel with cover. Complete in all respects.

Rm.

2,225

350

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job.

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
28 13 00.53
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

28 13 00.49

RATE
Rs.

AMOUNT
Rs.

Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) The Bidder shall provide the complete Technical Literature for the system
offered.
3) Client have option to select Push Button or Card Reader type Access
System.

Total Rs. Section- 28 13 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 2 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

28 23 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

IP BASED VIDEO SURVEILLANCE


Supply, installation, testing and commissioning of following items for IP Based
CCTV System including but not limited to the description given here under
including all power and communication accessories, housings, mounting
brackets, suspension rods etc. required for completion of the system.

28 23 00.13

Wall / Ceiling mounted PTZ Camera IP 2MP 37X Speed Dome IR Camera,
100m IR distance, 37X, H.264, TDN, WDR, HLC, wall mounting bracket, Edge
storage 32G, ONVIF Profile S, IP66, DC12V alongwith all mounting
accessories complete in all respects.

No.

28 23 00.16

Surface/Recessed Ceiling mounted Dome fixed type PoE I.P camera with
day and night feature with 2MP with live and recording quality of minimum
15 fps, Varifocal Lens 3.3-12mm, along with all mounting accessories
complete in all respect.

No.

290

18

28 23 00.19

Surface/Recessed Ceiling mounted WDR Dome fixed type PoE I.P camera
with day and night feature with 2MP with live and recording quality of
minimum 15 fps, Varifocal Lens 3.3-12mm, along with all mounting
accessories complete in all respect.

No.

45

28 23 00.23

Wall bracket box Camera, type PoE I.P camera with day and night feature
having 2MP Resolution with live/recording quality of min 15 fps, Varifocal
Lens 2.8-12mm, along with all mounting accessories complete in all respect.

No.

27

48

28 23 00.26

Network Video Recorder (NVR) with 64 channel Video input. The NVR shall
be equipped with LAN / WAN facility. NVR should have minimum 15 days
storage capacity on 25 frame per second with 60 TB HDD or higher if
required to cater 100% cameras, RW CD Drive. Complete with all
connecting cords and accessories including SFP modules.

No.

28 23 00.29

PTZ Controller with all accessories. Complete in all respect.

No.

28 23 00.33

16 Port KVM/ Switch with 16 VGA In & 16 HDMI Out

No.

28 23 00.36

10/100 4 port unmanageable Active Switch for security system integration


(TCP-IP switch)

No.

No.

No.

28 23 00.39 Media Converter


28 23 00.43

42" Master LED Color Screen to be installed in racks with all connecting cords
and mounting stands.

arcop

Page 3 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

28 23 00.46

32" LED Color Screen to be installed in control Room in racks with all
connecting cords and mounting stands.

No.

28 23 00.49

Work Station (Core i7 Ultra Slim Desktop PC with Genuine Windows 8 Prof
64bit, 8, 2TB HDD & DVD Writer) including Video Management System lisence
(Branded), Keyboard & mouse.

No.

28 23 00.53

High End Video Management Server including license of 350 Cameras


expendable upto 700 Cameras with Client + Management software

No.

Software for Video Surveillance Integrated with Access Control System, easy
to add on access control software, support Web Server and Web Camera,
Record user defined pre-alarm recording time, User defined map and
28 23 00.56
camera display, Event Log display, Event Map Display, Recording images
logs when events occur, Real Time Surveillance screen including per
camera license.

Job

28 23 00.59

Wall Mounted Communication Rack 27U, 19 inches suitable for installation of


standard patch panels and etc. Complete with floor base, vertical cable
managers. Rack shall be equipped with power distribution units (PDUs) with
at least 5 imported power sockets etc. Complete in all respects.

No.

28 23 00.63

Floor Mounted Communication Rack 42U, 19 inches suitable for installation of


standard patch panels and etc. Complete with floor base, vertical cable
managers. Rack shall be equipped with power distribution units (PDUs) with
at least 5 imported power sockets etc. Complete in all respects.

No.

28 23 00.66

Design, built & establish of Security Command & Control Center with Video
Wall Solution of 12Nos, 42" Slim LED Screens for Video Wall including all
Controllers, Matrix, PCs, Graphic Cards complete in all respect and
accessories.
For 42" LCD Screen.
- One Door for Troubleshooting & Maintenance.
- Space for 1 no. 42 U-Rack for the entire system.
Workstation Desk:
- Metal Structure Curve Type with Paint Finish.
- Available Wall Dimension: Size 35'W x 5'H
- 4Sitting Spaces for system supervisor / operators.
- Spaces for 4 no. workstation PC at bottom.
Cable Management:
- Internal Cabling Management for UTP, Video & Power Cable.
- PVC Channel for Electrical wiring.
- PVC Cut Channel for Video for Communication Cable.

Job.

arcop

Not Included
(By Others)

Page 4 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)
RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

QUANTITY

Supply & Wiring of complete Networking of CCTV System in Security Control


room. Wiring including GigaBit Network Switches, NVRs, Workstations and
Matrix Switches using Cat-6 cables in 25mm dia size of PVC conduits as
shown in layouts and schematic diagram. Complete in all respects.

Job

Supply & Wiring of CAT-6 cable for CCTV system in 25mm dia PVC conduit
28 23 00.73 from each camera to Network Switch and cameras to Giga Bit Network
Switch as per drawings including terminations. Complete in all respects.

Coil

12

54

14

Supply and Wiring for 62um 6C, Multi mode OM3/OM4 type Fiber Optic
28 23 00.76 Cable in 25mm dia PVC Conduit / already installed Cable tray including
termination and tagging at both ends. Complete in all respects.

Rm.

890

1,100

250

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
28 23 00.83
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

28 23 00.69

28 23 00.79

RATE
Rs.

AMOUNT
Rs.

Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) The Bidder shall provide the complete Technical Literature for the system
offered.

Total Rs. Section- 28 23 00


(CARRIED FORWARD TO SUMMARY)

arcop

Page 5 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

28 31 00

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

IP BASED FIRE DETECTION & ALARM


Supply, installation, testing and commissioning of IP Based Intelligent
Addressable Fire Alarm System comprising of following equipments
including all accessories required for the completion of the system in all
respects.

28 31 00.13

Addressable Fire Alarm Control Panel of 8-Loops Expendible upto 10-loops


having maximum 200 devices per loop. The FACP shall be self powered with
built in 12V batteries for 24 Hrs backup with charging unit. It can be
programmed using Windows based software for peripheral devices like
display unit, printers etc.

No.

28 31 00.16

Addressable Fire Alarm Control Panel of 2-Loops Expendible upto 4-loops


having maximum 200 devices per loop. The FACP shall be self powered with
built in 12V batteries for 24 Hrs backup with charging unit. It can be
programmed using Windows based software for peripheral devices like
display unit, printers etc.

No.

28 31 00.19

Fire Repeater Panel along with termination of all Control / Signal cables
complete in all aspects. Panel to have all loops marked in distinguishable
colors with individual LED's.

No.

28 31 00.23

Addressable Optical Smoke Detectors incorporating a pulsing LED located in


labyrinth with in the housing of the detector. Sensing of the detector shall be
adjustable via software between 0-90 seconds. The detector shall have built
in short circuit isolators on both inputs.

No.

1,440

13

28 31 00.26

Addressable Multi Detectors incorporating a pulsing LED located in labyrinth


with in the housing of the detector. Sensing of the detector shall be
adjustable via software between 0-90 seconds. The detector shall have built
in short circuit isolators on both inputs.

No.

117

187

28 31 00.29

Addressable Heat Detectors incorporating a pulsing LED located in labyrinth


with in the housing of the detector. Sensing of the detector shall be
adjustable via software between 0-90 seconds. The detector shall have built
in short circuit isolators on both inputs.

No.

25

11

28 31 00.33

Addressable Break Glass Type Manual Call Point having a built in short circuit
isolator and built in microprocessor to ensure a response time of max 1
second. It also incorporates an indication LED , flashed after pressing the
button to acknowledge the activation and a key operation facility for
testing purposes.

No.

60

arcop

Page 6 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Division 28 : Electronic Safety and Security


(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
RATE
Rs.

AMOUNT
Rs.

QUANTITY

28 31 00.36

Addressable Type Indoor Loop Powered electronic sounder with flasher and
minimum sound out put 100 dB at 1 meter with frequencies for variety of
sounds as required. Souder shall be loop wired and loop signaled , built in
short circuit isolator, configured via software.

No.

86

28 31 00.39

Line Isolator (an isolator module automatically isolates wire to wire short
circuits on a signalling line circuit loop)

No.

115

11

28 31 00.43

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

28 31 00.46

Work Station with Client Software (Core i7 Ultra Slim Desktop PC with Genuine
Windows 8 Prof 64bit, 8, 2TB HDD & DVD Writer) including Keyboard & mouse.

No.

28 31 00.49

Supply and wiring for complete Fire Alarm System using 2C, 1.5 sqmm fire
resistance cable in 25mm dia PVC conduit from Fire Alarm Control Panel to
all sensors & devices including all installation accessories, complete in all
respect.

Rm.

36,260

4,250

28 31 00.53

Programming, testing and commissioning of the complete system as per


client's requirements permissible for the FACP with training sessions of
maintenance personnel's.

Job

28 31 00.56

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Not Included
(By Others)

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. Section- 28 31 00


(CARRIED FORWARD TO SUMMARY)
TOTAL OF DIVISION - 28

arcop

Page 7 of 8

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Summary of Cost

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

28 13 00

ACCESS CONTROL SYSTEM

28 23 00

VIDEO SURVEILLANCE

28 31 00

FIRE DETECTION & ALARM

Division 28 : Electronic Safety and Security

PARKING BUILDING
(P2, P1 & Ground to First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

AMOUNT
Rs.

AMOUNT
Rs.

TOTAL OF DIVISION - 28

arcop

Page 8 of 8

DIVISION
MISCELLANEOUS ITEMS

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

FUEL TRANSPORTATION SYSTEM

Fabrication and installation of 2,000 Liters Over head Diesel Storage Day
Tank, Horizontal Cylindrical Shape, made with 6mm thick MS Sheet including
all safety valves, filling, Stand, level indicators etc. Tank shall be painted
with red oxide primer and Bitumen Coating for anti corrosion. Complete in
all respects.

Job

Fabrication and installation of 3,000 Liters Over head Diesel Storage Day
Tank, Horizontal Cylindrical Shape, made with 6mm thick MS Sheet including
all safety valves, filling, Stand, level indicators etc. Tank shall be painted
with red oxide primer and Bitumen Coating for anti corrosion. Complete in
all respects.

Job

Fabrication and installation of 20,000 Liters Under Ground Diesel Storage


Tank, Vertical Cylindrical Shape, made with 6mm thick MS Sheet including
all safety valves, filling, Air Ventilation, Stand, level indicators etc. Tank shall
be painted with red oxide primer and Bitumen Coating for anti corrosion.
Complete in all respects.

Job

Supply, installation and testing of complete fuel transportation system from


Underground Diesel Storage Tanks to Day Tank-1 to Day Tank-5.
Work included but not limited to following for completion of system
2 No. Diesel Transfer Electric Pump (1 Stand-By)
Suction pipe 38 mm
Supply pipe 38 mm
Over flow pipe 50 mm
Non Return Valves, gate valves, strainer etc
Level Controller in both tanks
Motor starter panel
Control Wiring for level controller.

Job

Supply, installation and testing of complete Fuel piping system from 3,000
liters Fuel Tank No.1 , 2, 3 & 4 to Diesel Generator-1, 2, 3 & 4. Complete with
valves, brackets, connectors and all necessary accessories to complete the
system as described in the Specifications and Drawings. Complete in all
respect.

Job

Supply, installation and testing of complete Fuel piping system from 2,000
liters Fuel Tank No.1 to Diesel Generator-9. Complete with valves, brackets,
connectors and all necessary accessories to complete the system as
described in the Specifications and Drawings. Complete in all respect.

Job

arcop

Page 1 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

Supply, installation and testing of complete fuel transportation system from


Tanker point (outside the building) to underground 20,000 Liters Diesel
storage Tank.
Work included but not limited to following for completion of system
2 No. Diesel Transfer Electric Pump (1 Stand-By)
Suction pipe 38 mm
Supply pipe 38 mm
Over flow pipe 50 mm
Non Return Valves, gate valves, strainer etc
Level Controller in both tanks
Motor starter panel
Control Wiring for level controller.

Job

Dirty Lube Oil Drainage Systems along with M.S collection box approximate
size 2' x 2' x 6'' from all Diesel Generators to Drain Tank using appropriate size
of MS piping including, valves, bends, supports. Complete in all respects.

Job

Automatic Control Panel for Diesel Pumps including level indication and
control switches H-O-A to be provided for auto/manual operation and
control with ON/OFF Push Buttons. Cables & conduits are also inclusive.
Complete in all respects.

Job

RATE
Rs.

AMOUNT
Rs.

Total Rs. (Fuel Transporatation System)

arcop

Page 2 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

DELAYED EGRESS LOCK SYSTEM


Supply, installation, testing and commissioning of Delayed Egress Lock
System including all material, accessories etc. Complete in all respects.
1

Controller 6 digital input and out put LON base

No.

15

Magnetic lock 1200Lbs 24V AC/DC operated

No.

15

Key operated Switch for alarm reset

No.

15

Buzzer with flasher 24V AC/DC operated

No.

15

magnetic Switch : for door indication

No.

15

Enclosure with circuit breaker power Supply 24/6 amp DC/AC and relays if
required.

No.

15

FAS Control relay for Fire Indication

No.

15

Key operated switch to bypass the system for maintenance

No.

15

Supply, wiring, tagging and termination of Cat-6 UTP cable for Delayed
Egress Lock System in 25mm dia PVC Conduit as per drawing including
termination. Complete in all respects.

Rm.

825

10

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

11

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.
Total Rs. (Delayed Egress Lock System)

arcop

Page 3 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

IP PAGING SYSTEM
Supply, installation, testing, commissioning and termination of following
items for IP Paging System including all material, accessories etc. Complete
in all respects.
1

SnowNotify Suite for upto 10 concurrent IP/SIP links


SnowNotify Software Server - Base License upto 250 Clients

No.

Client License for Text pop-up


SnowNotify Client Application for Android OS Text messaging pop-up

No.

600

Client End Device for paging

No.

600

Integrating with PABX

Job

On-Site Installation Services

Job

Annual Maintenance Support for SnowNotify to fix and help on all issues
includes Bug Fixing and Minor upgrades

Job

Add-on Feature License


SnowNotify for Text-to-Speech (add-on of SnowNotify Client)

No.

600

Server Expansion Licenses


SnowNotify Software Server add-on 250 clients and 05 IP/SIP links

No.

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

10

Supply, wiring, tagging and termination of Cat-6 UTP cable for IP Paging
System in 25mm dia PVC Conduit as per drawing including termination.
Complete in all respects.

Rm.

1,500

Job

11

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.
Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Not Included
(By Others)

Total Rs. (IP Paging System)

arcop

Page 4 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Q-MANAGEMENT & DISPLAY MONITORING SYSTEM


Supply, installation, testing, commissioning and termination of following
items for Q-Management and Display Monitoring System including all
material, accessories etc. Complete in all respects.
1

TDU-Kiosk 15 inch Touch Screen

No.

Soft TSU

No.

15

Active Controller

No.

Active Hub

No.

Audio System

No.

SDU

No.

CDU (Custom)

No.

15

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

Supply, wiring, tagging and termination of Cat-6 UTP cable for IP Paging
System in 25mm dia PVC Conduit as per drawing including termination.
Complete in all respects.

Rm.

2,500

10

Installation, programming, testing, commissioning, delivery and training of


the complete system as per the Client requirement.

Job

11

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Not Included
(By Others)

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.
Total Rs. (Q-Management & Display Monitoring Systems)

arcop

Page 5 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

WIFI SYSTEM
Supply, installation, testing, configuration, commissioning and termination of
following items for WIFI System including all material, accessories etc.
Complete in all respects.
Wireless Access Point

WIRELESS ACCESS POINTS (Indoor):


Wi-Fi Alliance-certified 802.11a/b/g/n/ac
with 22 MIMO with 2 spatial streams (2x2: 2) for low density & 3x3 MIMO with
3 spatial streams (3x3: 3) for Hi density clients. Integratable thru Mobility
Controller, PoE powered, Ceiling/Wall mountable

No.

244

WIRELESS ACCESS POINTS (Outdoor):


Wi-Fi Alliance-certified 802.11a/b/g/n/ac
IP66- and IP67-rated protection AP, Temperature: -40C to +65C and
Integratable thru Mobility Controller, PoE powered, Ceiling/Wall mountable

No.

25

Mounting Bracket (Indoor) for ZoneFlex 7372. Mounts to hard wall / ceiling,
outlet box, pole, truss. Includes Security Torx screw. Supports padlock.

No.

244

Mounting Bracket (Outdoor) for ZoneFlex 7372. Mounts to hard wall / ceiling,
outlet box, pole, truss. Includes Security Torx screw. Supports padlock.

No.

25

No.

Wireless Controller

WLAN CONTROLLER:
Wireless LAN controller, two 10GBase-X (SFP+),
supports at least up to 256 APs and 8K clients. Integrated AC power supply.
Support minimum 256 access points/air monitors/remote access points
(include required licenses bundle)
Access Layer Network Switches

Trendnet USA 8 x PoE+ Gigabit ports 2 x Gigabit Ethernet ports and 2 x


shared SFP slots,Up to 30 Watts per port with a 75 Watts total power budget
(Two switch For Each Floor)

No.

26

Not Included
(By Others)

Trendnet USA 24 x Gigabit Auto-MDIX ports 4 x shared SFP (Mini-GBIC slots)


and 1 x RS-232 console port,48Gbps switching capacity (For Server Room)

No.

Not Included
(By Others)

arcop

Page 6 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

Single Mode Transciever 10/100/1000Mbps (If Needed for Fiber Connectivity)

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

No.

RATE
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

Not Included
(By Others)

Fiber Optics
9

12 core single Mode Optical Fiber.

Rm.

1,280

10

Molex 12 Port fiber enclosure Rack mountable and Wall Mount Option
accommodates upto 6 links.

No.

11

Molex Autralia, Single Mode fiber Optics Pig Tails with LC Connector

No.

24

12

Molex Australia, Single Mode Duplex Patch Cord with LC Connector (3


Meter)

No.

20

Network Accessories
13

MOLEX AUSTRALIA, UTP CAT 6 Cable Roll 23AWG.

Coil

14

Wireless Card PCA/USB

No.

48

15

Splicing Charges for Optical Fiber

No.

48

16

Fiber Enclosure Box (ODF) for Server Room.

No.

17

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

18

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.
Total Rs. (Wifi System)

arcop

Page 7 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

IPTV SYSTEM
Supply, installation, testing and commissioning of following items required for
completion of IPTV System, as per design drawings. including all accessories,
mounting brackets, wiring, adapters etc. Complete in all respect.
1

HARD DISK 1 TB, SEGATE

No.

ENTONE KAMAI 5XX HIGH DEFINITION IP SET TOP BOX WITH REMOTE CONTROL
AND EUROPEAN POWER PLUG

No.

168

DISH SIX FEET

No.

LNB LOW AND HIGH BAND

No.

32" Full HD TV 1080P andriod Sony

No.

108

42" Full HD TV 1080P andriod Sony

No.

60

STB Device Access Right Per Device Perpetual License

No.

168

Not Included
(By Others)

Widget includes Development Tool Suite

No.

Not Included
(By Others)

XL CHASSIS REDUNDANT

No.

Not Included
(By Others)

10

DUAL DVB-S2 TUNERS XL/XS MODULE

No.

10

Not Included
(By Others)

11

DVB-CI XL/XS MODULE

No.

Not Included
(By Others)

12

XL/XS PROCESSING UNIT

No.

Not Included
(By Others)

13

TOUCAN BASE LICENSE FOR VOD

No.

Not Included
(By Others)

14

TOUCAN - 10 STREAMS

No.

10

Not Included
(By Others)

arcop

Page 8 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

15

SUPERMICRO STANDARD SERVER 1RU WITH 4 HDD SLOTS

No.

Not Included
(By Others)

16

Dell R620 Server Machine, 2X Six Core E5 2630V2 Xeon Processors, 2.6GHz,
15MB Cache, 64GB RAM, RAID 10, 4X 300GB 15K RPM Drives, PERC H710
Controller 512MB, X540, DP10GB Ethernet, I3501GB DP, DVD ROM, RED HAT
Linux (Primanry)

No.

Not Included
(By Others)

17

Dell R620 Server Machine, 2X Six Core E5 2630V2 Xeon Processors, 2.6GHz,
15MB Cache, 64GB RAM, RAID 10, 4X 300GB 15K RPM Drives, PERC H710
Controller 512MB, X540 (Back-Up)

No.

Not Included
(By Others)

18

IPTV Server Software License, Standard Client features includes Video on


Demand, Subscription VOD, High Definition, DVR and Multiple Channel
Lineup Support, Warm Standby Database Config. Available

No.

Not Included
(By Others)

19

Supply and installation of CAT-6 UTP Cable for IPTV System from Data switch
to each TV in 25 mm dia PVC conduit / channel as per drawings including
termination and tagging at both ends. Complete in all respects.

Rm.

2,576

20

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

21

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

Not Included
(By Others)

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. (IPTV System)

arcop

Page 9 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

CATV SYSTEM
Supply, installation, testing and commissioning of following items required for
completion of CATV System (Community Access TV System), as per design
drawings. including all accessories, mounting brackets, wiring, adapters etc.
Complete in all respect.
1

Following Tap module / Splitter in powder coated sheet steel housing


surface on wall / above false ceiling as per design drawings.

1x12 way Splitter including 18 SWG M.S Sheet powder coated Box.

No.

1x8 way Splitter including 18 SWG M.S Sheet powder coated Box.

No.

1x4 way Splitter including 18 SWG M.S Sheet powder coated Box.

No.

11

Supply and Wiring of Co-axial cable RG-6 for CATV system in 25mm dia PVC
conduit from each T.V point to Splitter as per drawings including
terminations. Complete in all respect.

Rm.

2,800

Wiring of Coaxial Cable RG-11 for CATV System in 25mm dia PVC conduit
from Splitter box at each floor Splitter box as per drawing.

Rm.

660

TV Outlet with face plate (Selected Series for outlet is Clipsal C-Vivace or
equivalent)

No.

35

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job.

Note:
1) Contractor is advised to confirm the cable running lengths and
termination as per site conditions before commencement of work.
2) The Bidder shall provide the complete Technical Literature for the system
offered.

Total Rs. (CATV System)

arcop

Page 10 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

VIDEO CONFERENCING SYSTEM


Supply, installation, testing, commissioning and termination of following
items for Video Conferencing System including all material, accessories etc.
Complete in all respects.
1

Integrator SX80 1080P 12x with following accessories

Hardware Codec, Remote, Cables and 4 No. Microphone

Software with IP Support up to 10 Mbps

HD Camera Precision HD 1080P 12x

Dual Stream Support On Single Screen

Multisite Support 04 Sites

Testing & Commissioning of the complete


requirements & maintenance personnel's.

Supply & installation, testing and commissioning of 65" Flat Screen to be


installed in board room mention in drawings with all connecting cords and
mounting stands.

No.

Supply, installation, testing and commissioning of VGA, HDMI & RC Outlet


with face plate to be installed in standard switch back box.

Job.

Supply, installation, testing and commissioning of Wall Mount Speakers 60


Watts (Extron SM 26) with all connecting cords and installation accessories.
Complete in all respect.

No.

Power Amplifier 2Chx 200 Watts (Extron XPA 1002) with all connecting cords
and installation accessories. Complete in all respect.

No.

Supply, installation, testing and commissioning of VGA cable of approved


European Brand in appropriate size of PVC conduits from VGA Connector
Box to Multimedia Projector, as shown in the drawings. Complete with
Termination at both ends. Cable shall be double shielded having 3 analog
and 8 signal cables. Meeting UL VW-1 standards.

Rm.

325

Job

system as

per

client's

Job.

arcop

Page 11 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

ITEM

Bill of Quantities

(ADDENDUM # 1)

Lahore.

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

Supply, installation, testing and commissioning of High Speed HDMI cable,


designed to handle video resolutions of 1080p and beyond, including
advanced display technologies like 3D plus surround audio. The cable must
be LLC Certified of any approved European brand in appropriate size of
PVC conduit from HDMI outlet box to Multimedia Projector, as shown in the
drawings, complete with termination at both ends including connectors.
Complete in all respects.

Rm.

325

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

10

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

RATE
Rs.

AMOUNT
Rs.

Not Included
(By Others)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. (Video Conferencing System)

arcop

Page 12 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

MULTIMEDIA PROJECTOR
Supply, installation, testing, commissioning and termination of following
items for Multimedia Projector including all material, accessories etc.
Complete in all respects.

Supply & installation of Multimedia Projector suitable for board rooms,


having power full large format display, rounding out full line of IT visual
display on projector screen, Auto focus & zoom lens, high performance in
color and brightness upto 5000 lumens with low operational noise, sound
from any AV or PC source, built-in speaker, standardized audio/video
connection and HDMI port, suitable for ceiling mounting facility, operating
voltage 220V AC 50Hz, compact design, complete in all respects including
mounting brackets etc.

No.

Supply & installation of VGA, HDMI & RC Outlet with face plate to be installed
in standard switch back box.

No.

Supply & installation of VGA cable of approved European Brand in


appropriate size of PVC conduits from VGA Connector Box to Multimedia
Projector, as shown in the drawings. Complete with Termination at both
ends. Cable shall be double shielded having 3 analog and 8 signal cables.
Meeting UL VW-1 standards.

Rm.

535

Supply & installation of High Speed HDMI cable, designed to handle video
resolutions of 1080p and beyond, including advanced display technologies
like 3D plus surround audio. The cable must be LLC Certified of any
approved European brand in appropriate size of PVC conduit from HDMI
outlet box to Multimedia Projector, as shown in the drawings, complete with
termination at both ends including connectors. Complete in all respects.

Rm.

535

Management Server with Management & Client Software


Intel XEON Quad Core E3-1240 3.3GHZ
(8MB Cache) 4GB DDR3 RAM - 4 TB SATA Hard Drive DVD RW

No.

Programming, testing and commissioning of the complete system as per the


Client requirement.

Job

Allow for any other item required for completion of system not covered in
BOQ or specifications / drawings in accordance with the same standards
and brands shown and approved by consultant. All such items shall be
covered in this item but complete description, item rates, quantity required
and brands shall be mentioned separately and to be attached with the
BOQ.

Job

arcop

Not Included
(By Others)

Page 13 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Bill of Quantities

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

UNIT

PARKING BUILDING
(P2, P1 & Ground to First Floor)

Miscellaneous Items
(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

QUANTITY

RATE
Rs.

AMOUNT
Rs.

QUANTITY

RATE
Rs.

AMOUNT
Rs.

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)
QUANTITY

RATE
Rs.

AMOUNT
Rs.

Note:
1) The Bidder shall provide the complete Technical Literature for the system
offered.
2) Contractor is advised to confirm the cable running lengths as per site
conditions before commencement of work.

Total Rs. (Multimedia Projector)


FIRE RESISTANT COATING & MORTAR
Providing and fixing up to three (3) hour rated fire stopping measures for
present & future cable raceway/pipes passing through protection zone
floor/walls including all required fillers,etc. Complete in all respects.
1

Fire Stoping mortar 22KG each bag for vertical opening

Bags

96

Fire Stoping mortar 22KG each bag for horizontal opening

Bags

59

ZZ-Fire Protection block 200 NE for horizontal and vertical opening for power
and communication cables.

No.

88

17

Fire Resistant Cables Coating for Electrical and substation rooms including
generator Cables with Pyro Cord.

Rm.

650

350

Set

Total Rs. (Fire Resistant Coating & Mortar)


AS BUILT DRAWINGS

Preparation of as-built drawings of all electrical and allied works after final
approval from the consultant/client.
Note: Submission of as-build drawings 2 sets after work completion of each
floor and 3 sets & soft copy of complete electrical works after final
commissioning of project. Approval of final bills are subject to completion of
as built drawings.

Total Rs. (As-Built Drawings)


TOTAL OF DIVISION MISC. ITEMS

arcop

Page 14 of 15

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

Summary of Cost

(ADDENDUM # 1)

Lahore.

ITEM

DESCRIPTION

FUEL TRANSPORTATION SYSTEM

DELAYED EGRESS LOCK SYSTEM

IP PAGING SYSTEM

Q-MANAGEMENT & DISPLAY MONITORING SYSTEM

WIFI SYSTEM

IPTV SYSTEM

CATV SYSTEM

VIDEO CONFERENCING SYSTEM

MULTIMEDIA PROJECTOR

10

FIRE RESISTANT COATING & MORTAR

11

AS BUILT DRAWINGS

Miscellaneous Items

PARKING BUILDING
(P2, P1 & Ground to First Floor)

(Block 1 & 2)
MAIN HOSPITAL BUILDING
(Lower Ground i/c. MEP Corridor &
Ground to 10th Floor)

(Block 10)
ENERGY CENTER
(U.G.Tank, MEP Corridor/Sub-Station,
Lower Ground, Ground & First Floor)

AMOUNT
Rs.

AMOUNT
Rs.

AMOUNT
Rs.

TOTAL OF MISC. ITEMS

arcop

Page 15 of 15

LIST OF APPROVED MANUFACTURER

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
1

Contact No.

Contact Person

Schneider Electric (Formerly Areva T&D)

3438-6395-6
0302-8255635

Mr. M. Adnan Khan

General Electric (GE) Green T&D

042-35608000
0321-8200539

Mr. Asim ur Rehman

Siemens Pakistan

021-32574910
0322-22224619

Mr. Salman Khalid

PEL Pvt. Ltd

0333-7549772

Mr. Adnan Ahmed

Schneider Electric (Formerly Areva T&D)

3438-6395-6
0302-8255635

Mr. M. Adnan Khan

General Electric (GE) Green T&D

042-35608000
0321-8200539

Mr. Asim ur Rehman

Siemens Pakistan

021-32574910
0322-22224619

Mr. Salman Khalid

ELKEMA (Hussain & Co.)

021-3636-7002
0333-2315658

Mr. Raza

Schneider Electric (Formerly Areva T&D)

3438-6395-6
0302-8255635

Mr. M. Adnan Khan

Hussain & Co.

021-3636-7002
0333-2315658

Mr. Raza

0331-4999119
042-36305462, 042-36368740

Mr. Ibrar Ul Islam

General Electric (GE) Green T&D

042-35608000
0321-8200539

Mr. Asim ur Rehman

PEL Pvt. Ltd

0333-7549772

Mr. Adnan Ahmed

021-3636-7002
0333-2315658

Mr. Raza

0331-4999119
042-36305462, 042-36368740

Mr. Ibrar Ul Islam

Manufacturers/Vendors
Medium Voltage Switchgear

Dry Type Medium Voltage Transformer

L.V Switchgear / LV Panels

Bilal Switchgear Engineering

L.V Distribution Boards


Hussain & Co.
Bilal Switchgear Engineering

arcop

Page 1 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.

Contact No.

Contact Person

General Electric (GE) Green T&D

042-35608000
0321-8200539

Mr. Asim ur Rehman

South Asian Electrical Concern

0345-2778965

Mirza Atiqullah Baig

ABB, France (Zaincom)

021-3413-1304-05
0332-2233088

Mr. S.Mudassir Ali Hashmi

Schneider,France (Sheikh Wilayat & Sons)

021-3262-4011 ,12
0300-8222173

Mr. Zubair Farooqi

021-3243-9070
0301-2498269

Mr. Adnan Sheriff

021-3413-1304-05
0332-2233088

Mr. S.Musassir Ali Hashmi

Nokian, Finland (Jubilee Corporation)

021-3243-9070
0301-2498269

Mr. Adnan Sheriff

Circutor, Spain (Sheikh Wilayat & Sons)

021-3262-4011 ,12
0300-8222173

Mr. Zubair Farooqi

Schneider, France (Sheikh Wilayat & Sons)

021-3262-4011 ,12
0300-8222173

Mr. Zubair Farooqi

Schneider, France (Sheikh Wilayat & Sons)

021-3262-4011 ,12
0300-8222173

Mr. Zubair Farooqi

ABB, Germany (Zaincom)

021-3413-1304-05
0332-2233088

Mr. S.Mudassir Ali Hashmi

021-3243-9070
0301-2498269

Mr. Adnan Sheriff

021-3413-1304-05
0332-2233088

Mr. S.Mudassir Ali Hashmi

Lovato, Italy (Jubilee Corporation)

021-3243-9070
0301-2498269

Mr. Adnan Sheriff

Schneider, France (Accrescent)

0321-8777477

Mr. Tabish

Manufacturers/Vendors

LV Circuit Breakers

Terasaki, Japan (Jubilee Corporation)


GE (Zaincom)
6

Power Factor Controllers

Magnetic Contactors / Overload Relays

Terasaki, Japan (Jubilee Corporation)


8

Energy Analyzer
ABB, Germany (Zaincom)

arcop

Page 2 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
9

10

11

12

13

Contact No.

Contact Person

Raychem, USA (3M-Pakistan)

021-3263-6011
0321-2555010

Mr. Habib ur Rehman

3M,USA (3M-Pakistan)

021-3263-6011
0321-2555010

Mr. Habib ur Rehman

Pakistan Cables

021-3256-1170 ,75
0345-2873538

Mr. Shahab Alam

Pioneer Cables

021-3241-7786
0300-8209926

Mr. Ali Raza

Newage Cables

35879121, 35837577
0300-8230970

Mr. Syed Adnan

Jeddah Polymer

021-3634-3666
0321-2137162

Mr. Arif Ejaz

Dadex

111-000-789
021-3431-3881

Mr. A Qayuum

CIVIC

021-3660-2121
0300-3945580

Mr. S. Mohsin H. Naqvi

Electroline

021-3586-9201
0334-2146245

Mr. Arif Ahmed

Hussain & Co.

021-3636-7002
0333-2315658

Mr. Raza

Electrech

021-34321590
0301-8212020

Mr. Rizwan

021-32313508

Mr. Azam

Manufacturers/Vendors
Cable Lugs / Termination Kits

LV Power Cables

PVC / UPVC Conduits & Accessories

Cable Trays / Ladder & Accessories

GI/Steel Conduits & Acccessories


International Industries Limited (IIL)
Hilal Industries

021-34550696-98

arcop

Page 3 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
14

Contact No.

Contact Person

021-3256-1170 ,75
0345-2873538

Mr. Shahab Alam

Japan Metal Industries

0312-1006233

Mr. Babar

Zain Lighting

021-3666-9967
0321-9200546

Mr. Ejaz

Electroline

021-3586-9201
0334-2146245

Mr. Arif Ahmed

Hussain & Co.

021-3636-7002
0333-2315658

Mr. Raza

Electrech

021-34321590
0301-8212020

Mr. Rizwan

Falcon Engineering

021-3507-4719
0321-2449043

Mr. Saleem

Davis (Clipsal Pakistan)

021-111-081-081
0308-2228967

Mr. Mukhtar

MK, UK (Leimra Engineering)

021-3455 8611-12
0321-2600102

Mr. Irfan

042-3577908 5-6
0321-8477195

Mr. M. Waseem

Consumer Electric

021-3536-0916
0300-2008982

Mr. Moazzam

Cross Linkers

0300-2685891

Mr. Shoaib

TMG International

021-34325429
0333 2225040

Mr. Anwer Siddiqui

Vital Power

021-3498-9000
0300-9292966

Mr. Saleem Marchant

Manufacturers/Vendors
Linear Aluminum Channels / Wall Trunking & Acccessories
Pakistan Cables

15

16

17

MS Back Boxes / Ceiling Pull Boxes (Local)

Floor Service Outlet Boxes (Imported)

Insulation rubber mat


3M 3-Layer Antistatic Mat (Mitech)

18

Chemical Enhanced Earth

arcop

Page 4 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
19

20

Contact No.

Contact Person

Schneider, (Clipsal Pakistan)

111-081-081
0300 8298946

Mr. Mukhtar

MK, UK (Leimra Engineering)

021-3455 8611-12
0321-2600102

Mr. Irfan

Orange (Orange Electric)

021-3587-3937-38
0346-8208888

Ms. Mona Zubedi

Philips Lighting

021-35644262
0300 8247807

Mr.Adil Alvi

Pierlite Pakistan

021-35360974
0301-8225728

Mr. Syed Owais

Simes (Pierlite Pakistan)

021-35360974
0301-8225728

Mr. Syed Owais

Luman (Britlite Engineering Co.)

021-3580-1096
0321-2964321

Mr. Faisal Pahsa

Geosheen (Future Technologies)

021-35674321-8
0334-3413920

Mr. Muneeb ur Rehman

021-3581-0821-23
0321-2434034

Mr. Kamran Shamsi

General Electric (GE)

042-35608000
0321-8200539

Mr. Asim ur Rehman

OHMS Lighting

0300-8221010

Mr. Luvai Zomkawala

Manufacturers/Vendors
Switches , Sockets & Dimmers

Lighting Fixtures / Lamps / Electronic & Electromagnetic Ballasts

Osram, Unilux

Mr. Syed Iqbal

BEGA Lighting
21

Emergency Lights / Conversion Kits / Fire Exit Sign Lights


Pierlite Pakistan

021-35360974
0301-8225728

Mr. Syed Owais

Philips Lighting

021-35644262
0300 8247807

Mr. Adil Alvi

021-3637-8960, 2
0300-8221208

Mr. Kashif

21-34326707, 34311940
0322-8440899

Mr. Zubair Ahmed

0305-4441408

Mr. Murad Azhar

Meniver (Ezzi Engineering)


22

Uninterruptible Power Supply (UPS)


Schneider APC, USA (CNS Engineering)
Emerson, CMC

arcop

Page 5 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.

Contact No.

Contact Person

21-37130719
0300-8208847

Mr. Kashif Butt

021-35682565-66-67
0322-2937272

Mr. Anees ur Rehman

021-111-081-081
0308-2229597

Mr. Jahanzeb

3M (USA)

021-3263-6011
0321-2555010

Mr. Habib ur Rehman

Commscope (H.K Shah)

021-3567-0406
0315-2000926

Mr. Shamoon

Leviton (M.A Tech)

021-35313721
0333-2350566

Mr. Asif

Infinity (H.K Shah)

021-3567-0406
0315-2000926

Mr. Shamoon

Contech (Solution Cloud)

92-3343086609
03212554234

Mr. Shahzaib

Alcatel (Makkays)

051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Mr. M. Waqar
Mr. Nadeem Javed

Cisco (Commtel)

021-35822467
0321 8230298

Mr. Haris Ali

Juniper (Premier Systems Pvt. Ltd.)

021-2429051

Manufacturers/Vendors
ABB, Switzerland
Eaton (Greaves Pakistan)

23

Network Cables / Voice and Data Equipments (Passive Only)


Schneider (Clipsal Pakistan)

24

25

26

Communication Racks

Data Network Switches

PABX System
051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Alcatel (Makkays)

Avaya (Curve Technologies)

0305-2229272

Cisco (Commtel)

021-35822467
0321 8230298

arcop

Mr. M. Waqar
Mr. Nadeem Javed

Mr. Haris Ali

Page 6 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.

Contact No.

Contact Person

111-500-111 (Ext-134)
0302-8694444

Mr. M. Abbas Lone

051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Mr. M. Waqar
Mr. Nadeem Javed

ZoneFlex (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

Cisco (Commtel)

021-35822467
0321 8230298

Mr. Haris Ali

021-35349077-78
0322-7778634

Mr. Waqar

021-35822467
0321 8230298

Mr. Haris Ali

051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Mr. M. Waqar
Mr. Nadeem Javed

Cisco (Commtel)

021-35822467
0321 8230298

Mr. Haris Ali

Fortinet (Makkays)

051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Mr. M. Waqar
Mr. Nadeem Javed

Paloalto (Inbox Business Technologies)

021-111-551-551, 0321-2428863

Manufacturers/Vendors
Panasonic (Mansha Brothers)
Siemens

27

WIFI System

Makkays

28

Wifi Routers
Ruckus (Astaa Technologies)
Cisco (Commtel)
Aruba / Alcatel (Makkays)

29

30

Firewall (UTM)

Traffic Shaping
Fortinet (Makkays)

051-111-100-800 (EXT:167)
0300-8583963
021-111-100-800, 0301-8561150

Mr. M. Waqar
Mr. Nadeem Javed

Cisco (Commtel)

021-35822467
0321 8230298

Mr. Haris Ali

Paloalto (Inbox Business Technologies)

021-111-551-551, 0321-2428863

arcop

Page 7 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
31

32

Contact No.

Contact Person

Prysmian, FP 200 Flex (Solution Cloud)

0321-2554234

Mr. Shahzaib Ahmed

Eurosafe, Italy (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Pony, Japan (M.A Tech)

021-35313721
0333-2350566

Mr. Asif

021-32729275
0333-2350566

Mr. Asif

Pakistan Cables

021-3256-1170 ,75
0345-2873538

Mr. Shahab Alam

Pioneer Cables

021-3241-7786
0300-8209926

Mr. Ali Raza

Newage Cables

35879121, 35837577
0300-8230970

Mr. Syed Adnan

021-111-081-081
0308-2229597

Mr. Jahanzeb

021-3256-1170 ,75
0345-2873538

Mr. Shahab Alam

Morley by Honeywell (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Bosch (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

Esser by Honeywell (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

Notifier by Honeywell, USA (IMS)

0307-2224318

Mr. Sohail Ehtisham

Gent by Honeywell (Memon Associates)

0333-2350566

Mr. Asif

Manufacturers/Vendors
Fire Resistance Cable (2 Hrs Fire Rated)

Speaker Cables
Pony Cable (M.A Tech)

33

Co-axial Cables
Schneider (Clipsal Pakistan)
Pakistan Cables

34

IP Fire Detection & Alarm

arcop

Page 8 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
35

36

37

38

Contact No.

Contact Person

Bosch (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Bosch (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

TOA (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

Bosch (IMS)

0307-2224318

Mr. Sohail Ehtisham

Honeywell (Memon Associates)

0333-2350566

Mr. Asif

Honeywell (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Bosch (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

Axis (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

Pelco by Schneider Electric, USA (IMS)

0307-2224318

Mr. Sohail Ehtisham

Watchnet (Memon Associates)

0333-2350566

Mr. Asif

HID, USA (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Fingertec (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

Schneider Electric, USA (IMS)

0307-2224318

Mr. Sohail Ehtisham

Suprema (Limton)

111-546-866
021-3492-4560

Mr. Saood ur Rehman


Mr. Ilyas Gill

021-3531-4880-1
0321-2233393

Mr. Ashhad

021-35874402
0300-2852269

Mr. Yousuf

Manufacturers/Vendors
IP Public Address & Voice Evacuation System

IP Video Surveillance

IP Access Control System

Multimedia Projectors
Britlite Engineering Co.
Trace

arcop

Page 9 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.

Contact No.

Contact Person

021-3534-9077
0322-7778634

Mr. Waqar

111-500-111 (Ext-134)
0302-8694444

Mr. M. Abbas Lone

021-3531-4880-1
0321-2233393

Mr. Ashhad

Trace

021-35874402
0300-2852269

Mr. Yousuf

Commtel

021-35822467
0321 8230298

Mr. Haris Ali

111-500-111 (Ext-134)
0302-8694444

Mr. M. Abbas Lone

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

MS Technologies

021-34321201-2
0321-2228362

Mr. M. Faheem

H.K Shah

021-3567-0406
0315-2000926

Mr. Shamoon

Schrack Seconet AG (Biolinks Technologies)

021-34980973
0300-8244665

Mr. Aslam Haroon

Schrack Seconet AG (H.K Shah)

021-3567-0406
0315-2000926

Mr. Shamoon

Schrack Seconet AG (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

Schrack Seconet AG (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Solari Udine, Italy (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Masterclock (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

Simplex (Kingdom International)

021-3452-8801
0336-8225515

Mr. Yasir Azam Hashmi

Manufacturers/Vendors
Astaa Technologies
Panasonic (Mansha Brothers)

39

Video Conferencing System


Britlite Engineering Co.

Panasonic (Mansha Brothers)


40

IPTV System
Telecom Engineering

41

42

Nurse Call System

Master Clock System

arcop

Page 10 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
43

44

45

46

47

Contact No.

Contact Person

Telecom Engineering

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Kingdom International

0332-3385407
0300-8233115

Mr. Khurram

Patient Monitoring & Telemetry System

0334-3602972

Mr. Faisal

Telecom Engineering

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Kingdom International

0332-3385407
0300-8233115

Mr. Khurram

Biolinks Technologies

021-34980973
0300-8244665

Mr. Aslam Haroon

SnowNotify (Al Futtaim)

0345-2191910

Mr. Hunaid Samiwala

Telecom Engineering

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Motorola (Al Futtaim)

0345-2191910

Mr. Hunaid Samiwala

Motorolla (Forbes)

0321-2591618

Mr. Abdul Mannan

0321-9231092

Mr. Asim Mahmood

Falcon Engineering

021-3507-4719
0321-2449043

Mr. Saleem

Seagull

021-36809001-3

Mr. Nazish Yaqoob

021-3413-1304-05
0332-2233088

Mr. S.Mudassir Ali Hashmi

Manufacturers/Vendors
Delayed Egress Lock System

IP Paging System

Wireless Transceivers

Q-Management and Display Monitoring System


TDU- Kiosk (Wavetec Pakistan)

48

49

Fuel Transportation System

KNX Based Lighting Control System / Communication Relays


ABB, France (Zaincom)

arcop

Page 11 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.

Contact No.

Contact Person

111-081-081
0308-2229597

Mr. Adil Iqbal

021-35674321-8
0301-8258399

Mr. Mustufa

Application Technologies (Consumer Electric)

021-3536-0916
0300-2008982

Mr. Moazzam

LPI (Britlite Engineering Co.)

021-3580-1096
0322-2700777

Mr. Hasham

ERICO (Ameejee Valejee & Sons)

021-3262-5492
0321-3883900

Mr. Shaikh Shahab

Duval Messien, France (Ameejee Valejee & Sons)

021-3262-5492
0321-3883900

Mr. Shaikh Shahab

Gersan Electric (Hussain & Co.)

021-3636-7002
0333-3042071

Mr. Raza

Schneider Electric, France

021-3637-7259
0333-2384205

Mr. Farhan Malik

General Electric (GE)

042-35608000
0321-8200539

Mr. Asim ur Rehman

Schneider (IMS)

0307-2224318

Mr. Sohail Ehtisham

Honeywell (Accrescent)

0321-8777477

Mr. Tabish

021-3637-8960, 2
0300-8221208

Mr. Kashif

021-35069297

Mr. Mujahid Iqbal

Keytop (Telecom Engineering)

0335-3035716
0334-3602972

Mr. M. Faisal Saleem

Keytop (Astaa Technologies)

021-3534-9077
0322-7778634

Mr. Waqar

H.K Shah

021-3567-0406
0315-2000926

Mr. Shamoon

Manufacturers/Vendors
Schneider, Australia (Clipsal Pakistan)
Hagger, Itlay (Future Technologies)

50

51

52

Lightning Protection System

Enclosed Bus Assemblies

Integrated Automation (BMS)

Honeywell (RESCO)
Johnson Control (Shan Controls)
53

Parking Guidence System

arcop

Page 12 o 13

Hospital Complex for Pakistan Kidney & Liver Institute and Research Center

List of Approved Manufacturer

Lahore, Pakistan.
S.No.
54

Contact No.

Contact Person

Hyundai, Korea (Islamabad Industrial & Trading Corporation)

021-34320601-5
0308-2220200
0300-8282603

Mr. Ayaz
Mr. Nazeer

ThyssenKrupp (Capital Strategies Group Pvt. Ltd.)

021-35877079-81
0331-5611137

Mr. Saleem

Mitsubishi, Japan (Marketing Center Pvt. Ltd.)

021-34523237-40
0321-2410122
0300-2586751

Mr. Raza

2728202, 2733942, 2734695

Mr. Farooq A. Khan

Manufacturers/Vendors
Conveying Equipments (Elevators & Escalators)

Kone, Finland (Duncan Stratton & Co.)

NOTE:
The provided contact names and numbers are only for reference and ease of approach to the suppliers of recommended brands. They are not to be considered
short listed by any means. But still the Consultant holds the right to discard any supplier, keeping in view the past record and quality of their product.

arcop

Page 13 o 13