You are on page 1of 21

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description
TRANSLATION

Agreement of Permanent Technical Service


For Civil, Mechanical And Electrical Work
Between
General Petroleum Company
And
Petroleum Projects And Technical
Consultancies Company
(PETROJET)
September 2007

Unit

Price
(L.E)

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Civil Work Price Rate Tables

Unit

Price
(L.E)

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Excavation Works
1
1.1
m3: Excavation works for foundations in normal soil clay or dry sand soil to a depth
of 1.5 m using mechanical equipment. The price includes the transportation of the
.excess excavated soil according to the directions of the supervising engineer
1.2
.m3: Excavation works as per item No.(1.1) to a depth from 1.5 m to 2.5 m
1.3
m3: Manual excavation works for foundations in a clay or dry sand soil to a depth of
1.5 m. The price includes the transportation of the excess excavated soil according to
.the directions of the supervising engineer
1.4
.m3: Excavation works as per item No.(1.3) to a depth from 1.5 m to 2.5 m
1.5
m3: Excavation works for foundations in a stone or rock soil to a depth of 1.5 m
using mechanical equipment. The price includes the transportation of the excess
excavated soil by the contractor's trucks to the Dumping areas outside the site
1.6
m3: Excavation works for foundations in a stone or rock soil to a depth from 1.5 m
to 2.5 m using mechanical equipment. The price includes the transportation of the
excess excavated soil by the contractor's trucks to the Dumping areas outside the site
1.7
m3: Backfilling using suitable materails from the excavated soil after excluding
large stones. The item includes the backfilling layers not exceeding 30 cm after
compaction and with water & well compacting to reach the maximum possible
.compaction density
1.8
.m3: Backfilling using sand free from lime materials and silt as per item (1.7)
1.9
m3: Supply and laying replacement layer of pit run gravel according to the required
.classification as per item (1.7)
1.10
Extera over price per each m3 for shoring excavation sides to a depth from 1.5 m to
2.5 m according to specifications, approving the shoring system by the supervising
.engineer before execution
1.11
m3: Excavation works as per item No.(1.2) to a depth from 2.5 m to 4 m. The item
.price includes shoring excavation sides
Demolitions 2
2.1
m3 Demolation all types of plain concrete of the ground stages using mechanical
equipment, The price includes the transportation of the broken materails to the
Dumping areas outside the site
2.2
m3: Demolation all types of reinforced concrete of the ground stage using
mechanical equipment, The price includes the transportation of the broken materails
to the Dumping areas outside the site
2.3
m3: Demolation consisting of bricks, stones to any thickness in the ground stages
only using mechanical equipment, The price includes the transportation of the broken
materials to the Dumping areas outside the site
2.4
Extera over price per each m3 for Demolation reinforced concrete, consisting of
bricks, stones or plain concrete for floors above the ground stages at a floor height
.3.3 m
2.5
M2: Demolation floor tiles,( marble, ceramic , ect ).. The price includes the
transportation of the broken materials to the Dumping areas outside the site
2.6
M2: Demolation roof tiles. The price includes the removal of the slope concrete
layer if any and also the removal of insulation layers if any to obtain a clean concrete
surface. also price includes the transportation of the broken materials to the Dumping
areas outside the site
3

Unit

Price
(L.E)

m3
m3

27.6
42

m3
m3

42
62.4

m3

138

m3

180

m3
m3

25.2
52.8

m3

75.6

m3

20.4

m3

117.6

m3

110.4

m3

158.4

m3

97.2

m3

34.8

M2

20.4

M2

27.6

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

M2: Demolation plaster of internal ceiling and walls. The price includes the cleaning
of the surfaces and the transportation of the broken materials to the Dumping areas
outside the site
2.8
M2: Demolation external plaster of external walls The price includes the breaking
accurately and carefully using light hammers and bolts to avoid damage of the
.internal finishing works of the building
2.9
M2: Demolation for external walls cladding consisting of Sornaga, Pharonic, pink
bricks , ect. The price includes the breaking accurately and carefully using light
.hammers and bolts to avoid damage of the internal finishing works of the building
Plain concrete works
3
.13
m3: Supply and laying a of plain concrete under the foundations and semells. The
mixture consists of 0.8 m3 graded gravel free from impurities + 0.4 m3 clean sand +
250 Kg ordinary Portland cement. The item includes shuttering works (concrete
.strength must not be less than 200 Kg/cm2
3.2
M2: Supply and laying of plain concrete layer of thickness 10 cm of the same mixing
ratios of item 3.1 under the ground layer of the ground floor or basement or
equivelent
3.3
M2: Supply and laying a of plain concrete layer of thickness 15 cm of the same
mixing ratios of item 3.1 under the ground layer of the ground floor or basement or.
equivelent
3.4
M2: Supply and pouring of plain concrete tiles paving of thickness 20 cm. The
mixture consists of 0.8 m3 Dolomite crushed stones + 0.4 m3 clean sand + 250 Kg
.ordinary Portland cement. The item includes shuttering works
M2: Supply and laying of concrete slopes for roofs of thickness range (3-10) cm
3.5
with average thickness 7 cm consists of 3 parts one made from clean ball stones and
the other two parts consist of 1m3 sand + 0.5 m3 slaked lime stone + 200 Kg
ordinary Portland cement. The inclinations and levels must be adjusted and well
compacted & following the best specifications, instructions of the supervising
.engineer and the industrial safety

Unit

Price
(L.E)

2.7

3.6
3.7

3.8

Per meter length ( m.l ): Supply and apply resisting joints for the concrete pavement
.consist of Bitumen and wet sand
M2: Supply and apply hard finish layer by spraying Shabdour material (produced by
Sica Egypt Company or equivelent ) above the surface of the fresh concrete
according to the rates of the producing company. The item includes surface troweling
.and finishing the work according to specifications
.Kg: The increase or decrease of ordinary Portland cement content in concrete works

Reinforced concrete works


4
m3:
Supply
and
laying
a
of
reinforced concrete for the foundations and smells. The
4.1
mixture consists of 0.8 m3 graded gravel + 0.4 m3 clean sand free from impurities
+ 350 Kg ordinary Portland cement putting the necessary additives and using
mechanical mixer and concrete vaibrator during the pouring process. concrete cubes
strength after 28 days must not be less than 300 Kg/cm2 reinforcement in concrete
.not more than 75 Kg/ m3
4.2

m3: Supply and laying a of reinforced concrete for the columns, roofs , beams and
stairs as per item 4.1. reinforcement in concrete not more than 100 Kg/cm3 for
.ground floors only
4

M2

14.4

M2

27.6

M2

34.8

m3

432

M2

57.6

M2

86.4

M2

115.2

M2

40.8

m.l

9.6

M2

50.4

Kg

0.6

m3

1125.6

m3

1200

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

M2: Supply and laying a of reinforced concrete for the roofs according to Hollow
Blocks system. The mixture consists of 0.8 m3 graded gravel + 0.4 m3 clean sand
free from impurities + 350 Kg ordinary Portland cement putting the necessary
additives and using mechanical mixer during the pouring process. concrete cubes
strength after 28 days must not be less than 300 Kg/cm3 reinforcement in concrete
not more than 75 Kg/cm3. The price includes the supply and erection of the s Blocks
to fill the spaces between webs and also includes the embedded beams, webs, and
treatment of concrete after pouring & all necessary to finalize the work according to
.the specifications
4.3.1
.M2:As before but for slab thickness 7 cm and Blocks height 20cm
4.3.2 .M2:As before but for slab thickness 7 cm and Blocks height 25cm
4.4
Extera over price per each m3 for reinforced concrete for roofs and beams of height
.exceeding 4 m to a maximum of 6 m
4.5
Extera over price per each m3 for reinforced concrete for roofs, beams, columns and
.stairs for each floor above the upper first floor
4.6
M2: Supply and pouring reinforced concrete for flooring to a depth of 20 cm for at a
reinforcement (5 10 mm/ m.l) in the two directions (upper and lower) consists of
.0.8 m3 graduated gravel + 0.4 m3 rough sand + 350 Kg ordinary Portland cement
4.7
M2: Supply and pouring reinforced concrete for flooring with thickness 15 cm with
reinforcement one layer in the two directions (5 10 mm/ m.l consists of 0.8 m3
.graded gravel + 0.4 m3 clean sand + 350 Kg ordinary Portland cement
4.8
Extera over price added for each cement package used in the reinforced concrete
(1 package = 50 Kg) when using Sulphate resistant cement instead of ordinary
.Portland cement
4.9
Extera over price added for each m3 of the concrete to execute concrete smooth (fair)
.faces
4.10
Extera over price added for each m3 of the concrete when using foreign levers
.according to the instructions of the supervising engineer
4.11
Extera over price added for each m3 of the concrete when using additives that
prevent permeability as per the approved specimen according to the instructions of
.the producing company at a rate of (3:4 liters)
4.12
In Kg of the reinforcement steel bars: The supply and painting with an anti-corrosion
epoxy material an Epoxy Zink as per the approved specimen according to the
.instructions of the producing company (painting only without the supply of steel)
4.13
Per Kg supply, cut , bend , and fixing of steel reinforcement bars in the reinforced
.concrete over the ratio stated in the concrete items
Injection works & fixing bolts and boxes
5
5.1
m3: Supply and apply cement grouting from the cement mortar consisting of a
.mixture of sand and cement at a ratio of 500 Kg ordinary Portland cement /m3 sand
5.2 M2: Supply and pouring Sika grout 214 material (non shrinkable cement grout, or a
.similar material under pivoting plates of bridges metal columns of thickness 5 cm
5.3
M2: Supply and apply epoxy mortar injections of thickness 10 mm
5.4
Per Each: Supply, fixing and adjusting bolts of diameter 16 mm made of termision
steel of length 1 m as a maximum to be completed as per the working drawings &
making the necessary tests according to the best specifications, following the
.directions of the supervising engineer and industrial safety
5.5 .Per Each: Supply, fixing and adjusting bolts of diameter 19 mm as per item No. (5.4)

Unit

Price
(L.E)

4.3

M2
M2

540
600

m3

30

m3

30

M2

187.2

M2

142.8

pack
age

2.4

m3

60

m3

52.8

m3

45.8

Kg

2.3

Kg

6.7

m3

1050

M2
M2

528
825.6

Each
Each

72

Item

5.6
5.7
5.8
5.9

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Per Each: Supply, fixing and adjusting bolts of diameter 20-22 mm as per item No.
.(5.4)
Per Each: Supply, fixing and adjusting bolts of diameter 24-26 mm as per item No.
.(5.4)
Per Each: Supply, fixing and adjusting bolts of diameter 28-30mm as per item No.
.(5.4)
Per Each Supply, fixing and adjusting bolts of diameter 32-34 mm as per item No.
.(5.4)

Masonry And Brick works


6
6.1
m3: Supply and installation silty red solid brick of thickness 25mm from approved
sample from the supervising engineer before the supply. The item includes the
sticking with mortar consists of 250 Kg ordinary Portland cement /m3 sand and
spraying the bricks with pure water for three consecutive days. The item includes
also all necessary materials, equipment, scaffolding and others with following the
instructions of the supervising engineer and industrial safety & completion of work
.according to the best specifications in m3
6.2
M2: Supply and installation silty soil brick of thickness 12mm from approved
sample from the supervising engineer before the supply. The item includes the fixing
with mortar consists of 300 Kg ordinary Portland cement /m3 sand and spraying the
buildings with pure water for three consecutive days. The item includes also all
necessary materials, equipment, scaffolding and others with following the
instructions of the supervising engineer and industrial safety & completion of work
.according to the best specifications in m2
6.3
m3: Supply and installation solid cement brick of thickness 25mm as per item No.
(6.1)
6.4
M2: Supply and installation solid cement brick of thickness 12mm as per item No.
(6.2)
6.5
.m3: Supply and installation hollow brick of thickness 25mm as per item No. (6.1)
6.6
6.7
6.8
6.9
6.10
6.11
6.12

Unit

Price
(L.E)

90

Each

108

Each

144

Each
.
Each

189.5

m3

436.8

M2

55.2

m3

436.2

M2

55.2

m3

436.2

M2

55.2

m3

702

270

.M2: Supply and installation hollow brick of thickness 12mm as per item No. (6.2)
m3: Supply and installation facing sandy bricks of thickness 25mm built fair from
.two side as per item No. (6.1)
M2: Supply and installation sandy bricks of thickness 12mm built fair from one side
.as per item No. (6.2)
M2: Supply and installation sandy bricks of thickness 12mm built fair from two side
.as per item No. (6.2)

M2

74.4

M2

81.4

.m3: Erection s only sornaga bricks using Fondy cement


m3

648

m3

184.8

M2

180

.m3: Erection only silty bricks using Fondy cement


.M2: Erection only sornaga bricks using Fondy cement

Plastering works

8
6

Item
8.1

8.2

8.3

8.4

8.5

8.6
8.7
8.8

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

M2: Supply and apply external plaster for walls consists of two layers which are
lining and final coat over the sprayed material on walls. The spread mortar consists
of cement and sand at a ratio of 450 Kg cement /m3 sand then grouting and chords
are made using the level. The lining is made from a mortar consists of sand added to
it 150 Kg cement /m3 of this mixture and the walls that will make a hammer finish
are smoothed and cleaned using tools. The spraying mortar consists of three parts:
white sand, one (1) part rough sand, two (2) parts lime stone, one (1) part rough
sand, two (2) parts lime stone, one and half (1.5) pieces of white or colored cement.
While the smooth parts consist of final coat mortar: (4) parts of white sand, two (2)
parts lime, one and half (1.5) parts of white or colored cement according to the
specifications. The item price includes making the special scaffolding without
making holes in the walls & geometric measurement for all executed works at
facades. The item price will be approved for each completed square meter and
breaking grouting and chords & refilling with plastering mortar before executing the
.final coat
M2: Supply and apply fetisa plaster for internal walls and ceilings of the same
specifications of item (8.1) according to the specifications for the height indicated in
drawings & geometric measurement for walls and ceilings surface after deduction of
.empty gaps completely in square meter
:M2: Supply and apply cement plaster for parapets as follows
General spraying (spreading of mortar): Is done after removing spaces in buildings -1
using wire brushes and spraying the surfaces with water then making spreading of
.mortar consists of 450 Kg cement /m3 sand
The lining is done by a mortar consists of 300 Kg cement /m3 sand & making -2
groutings and chords with roughing and well serving with the initial plastering
works and finalizing the work according to the directions and specifications &
.geometric measurement for the parapets after deduction of gaps
M2: Supply and apply internal cement plastering consists of a spread mortar layer of
dense cement mortar consists of 450 Kg cement /m3 sand then lining layer consists
of 300 Kg cement /m3 sand with making groutings and chords on the level with
roughing using tools and finalizing the work according to the specifications and the
directions of the supervising engineer & geometric measurement as per item No.
.(7.5)
M2: Supply and apply industrial stone plastering for the outer external lower parts.
The lining consists of cement and sand mortar at a ratio of 300 Kg cement/m3 sand
of a thickness 2 cm that will be well leveled and a final coat of a thickness 6 mm is
made after sculpted & erected as 5 parts: small parts of stone with the required color
as per drawings + 1.5 part of stone powder + two parts of the ordinary, white or
colored cement or white cement added to it the required color. The price includes the
classification according to what required, hammering with toothed bush hammer ,
sculpting with stone mason hammer and geometric measurement for the executed
.parts. The price includes the filling of spaces
M2: Supply and apply external plastering for walls consists of roughing with Kim
.stone material or the similar
M2: Supply and apply a painting layer using Acrylic paint according to the required
.color at the same rates stipulated in the producing company catalogues
:M2: Supply and apply fetisa plaster on an expanded wire mesh as follows
7

m2

Unit

Price
(L.E)

34.8

m2

30

m2

25.2

m2

25.2

m2

88.8

m2

70.8

m2
m2

62.4
202.8

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Unit

Price
(L.E)

A- A mesh of steel bars of diameter 8 mm is done in two perpendicular directions


such that its opening not exceed 40 x 40 cm. These bars are suspended in the bars
coming down from the concrete ceilings of diameter 6 mm put when pouring the
ceiling concrete such that the distance between a bar and another not exceeding 40
cm in both directions and the suspension bars are wrapped and levered using bars on
the mesh bars such that they follow the required levels, planes and shapes & the
mesh overlap at joints must not be less than 5 cm and the welded parts lie under the
bars mesh even if the network is tightened in case the metal mesh plate width is not
enough for the mentioned 40 cm. The bars mesh ends must be fixed at the walls in a
.cavity done for each bar separately to avoid future cracking of the plastering
B- An expanded wire mesh of meter weight 1.25 Kg and eye thickness 28 x 6 mm is
fixed on the bars mesh by binding to the thin galvanized wire of diameter 1 mm at
.distances not exceeding 20 cm
C- A plastering layer consists of a mortar contains 450 Kg cement + 1m3 sand is
made and the metal mesh is completely covered with this mortar then spraying is
.done by a mortar consists of 450 Kg cement / 1m3 sand
D- After that, a general spraying is done after seven days and after making sure of
dryness, the required plastering is done as per specifications of item No. (8.4)
according to the specifications and the detailed drawings. The outlets, lighting
torches, electrical works and air conditioning works are taken into consideration
.according to the drawings. In square meter of the completed works
8.9

Per meter length ( m.l ) : Supply and apply cement skirting of height 10 cm and
thickness 2 cm. The mixture mortar consists of 300 Kg cement /m3 sand according
.to the specifications
m.l

8.10

15.6

M2: Supply and apply cement plastering for wells and inspection chambers consists
of one spraying layer of thickness 5 cm consists of 450 Kg cement /m3 sand to be
sprayed by water for three consecutive days with making a lining layer of thickness 2
cm made of a mortar consists of 300 Kg ordinary Portland cement /m3 sand with
adding a material that reduce permeability such as Sica or a like material to be
approved by the supervision authority, this material is added to the mixing water
with completion of work according to the directions of the supervising engineer and
.the best specifications

8.11

M2: Supply and installation Pharonic stone cladding from the best kinds, of
thickness 2 cm equipped with Basalt. A sample will be submitted to be approved
before the supply according to the drawings and specifications. The approved sample
is built on bars with a mortar of sand and cement 300 Kg /m3 sand. The price
includes making double special scaffolding without making holes at walls and also
binding the stone cladding, regarding the submittal of a specimen to be approved
before the supply of facades according to the drawings and specifications. The
approved sample is built on bars with a mortar of sand and cement 300 Kg /m3 sand.
The price includes the clearing of welds and filling spaces with white cement mortar
and the geometric measurement according to the drawings for all executed facades
.parts

8.12

M2: Supply and installation sornaga brick cladding. A sample will be submitted to be
8

m2

43.2

m2
m2

117.6
148.8

Item

8.13

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Unit

Price
(L.E)

approved before the supply according to the drawings and specifications. The
approved sample is built on bars with a mortar of sand and cement 300 Kg /m3 sand.
The price includes the clearing of welds and filling spaces with white cement mortar
.added to it a red oxide according to the direction of the supervising engineer
M2: The erection of thermal cement mortar for walls of connection pipes trench
.necessary for Kolenga heaters

M2: Supply and erection of glassed pottery brick, local manufacture of the same
.specifications as the last item
Painting works
9
9.1
:M2: Supply and apply oil paintings. The price includes
The cleaning of initial plastering surface, smoothing with abrasive material and -1
.preparation to make it ready for paintings
Grinding over the initial plastering layer (two coats) of the approved original -2
.boiled linen seed oil
Withdrawal of two stock coats of two different colors with smoothing with -3
abrasive material after each coat, smoothing and picking up the paste. The paste
.consists of Spidag, Zink and oil as the ratios in specifications
Painting four coats with the readymade oil painting without dilution and with the -4
required color. Each coat will be received separately. The paintings must be produced
by the paintings company or the similar & finalizing the work according to the
.direction of the supervising engineer and industrial safety
9.2
M2: Supply and apply paintings using plastic emulsion of type as Sipes or the
similar. The item includes the same steps 2 in of item (9.1.4) such that four plastic
coats of an approved quality are painted instead of the readymade oil painting, &
finalizing the work according to the direction of the supervising engineer and the
.specifications

m2

42

m2

202.8

m2

30

m2

34.8

m2

45.6

m2

49.2

m2

75.6

m2

22.8

M2

180

8.14

9.3
9.4

M2: Supply and apply paintings using smooth Cimplico material on the surfaces of
.cement plaster of internal walls and ceiling according to its technical bulletin
M2: Supply and making paintings using rough Cimplico material for the external
.walls according to its technical bulletin

9.5

M2: Supply and apply Grafiato external paintings or the similar according to the
approved sampl and the required color. Execution is achieved according to the rates
and specifications of the producing company and the geometric measurement for the
painted parts with finalizing the work according to the best specifications and the
.direction of the supervising engineer and industrial safety

9.6

M2: Supply and apply paintings using Flott material with a transparent color for the
.sandy bricks, the Pharonic stone or Sornaga two coats according to specifications
M2: Supply and apply anti acidic paintings produced by chemicals for Modern
Building Company ( CMB ) for discharger chamber and the like. The price includes
the preparation The price includes the preparation and leveling the walls with the
paste before painting (or according to the recommendations of the supplier and the
.specifications)

9.7

Flooring and Tiling Works

10
9

Item
10.1

10.2

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

M2: Supply and fix cement tiles for roofs of dimensions 20x20 cm ( a approved
sample by the supervising engineer ) the face is of thickness not less than 6 mm of
mortar consists of a part sand and a part squirrel cement and the final coat of a
mortar consists of 3 parts sand and a part cement and fixed with a mortar consists of
1 m3 sand + 0.5 m3 slacked lime stone + 250 Kg cement. All parapets and others are
made skirting of a similar tile. The edges of these tiles are stuck to the walls and have
plastering as cladding. The dimension will be according to the horizontal projection
of the surfaces without allowance for the inclinations and the skirting. The price
.includes the lower sand layer, all in square meter
M2: Supply and fix automatic Mosaic tiles (a approved sample by the consulting
engineer) of dimensions 25 x 25 x 2.5 cm a face of thickness not less than 8 mm
consists of 8 parts broken marble of Egypt's Bank gravel, a part of Basalt having fine
volume, two parts of marble powder, and three parts of white cement. The lining
consists of a ratio 3 parts sand and a part of black cement stuck with a mortar
consists of 300 Kg cement/m3 sand. The price includes tile polishing after erection
and the sand layer under it. The measurement is geometrically according to the
.horizontal view out of the plastering and skirting

10.3

M2: Supply and fix automatic Mosaic tiles (a approved sample by the consulting
engineer) of dimensions 30 x 30 x 3 cm a face of thickness not less than 8 mm
consists of 8 parts broken marble of Egypt's Bank gravel , two parts of marble
powder, and three parts of white cement. The lining consists of cement and fine sand
at a ratio 3 parts sand and a part of black cement stuck with a mortar consists of 300
Kg cement/m3 sand and the mortar thickness is not less than 3 cm. The price
includes the sand layer under it. The measurement is geometrically according to the
.horizontal view out of the plastering and skirting

10.4

M2: Supply and fix local product floor ceramic of dimensions 40 x 40 x 0.8 cm
Cleopatra, El-Gawhara or similar production of first sorting. The price includes the
supply and making a ground sand layer under the ceramic to adjust inclinations and
levels. The erection is achieved by a mortar consists of 300 Kg ordinary cement/m3
sand with the best adjustment and filling the spaces & following the best
.specifications, industrial safety and the direction of the supervising engineer

10.5

M2: Supply and fix floor ceramic of dimensions 25 x 25 x 0.8 cm Cleopatra, El.Gawhara or a similar production as the item No. (10.4)
M2: Supply and fix wall ceramic Cleopatra, El-Gawhara or a similar production of
dimensions 20 x 30 x 0.6 cm of first sorting of approved sample The price includes
spreading the buildings with a rich mortar consists of 450 Kg ordinary Portland
cement/m3 clean sand taking into consideration the horizontal & vertical well
adjustment of the spaces and making the necessary filling & following the best
.specifications, industrial safety and the direction of the supervising engineer

10.6

10.7

10.8

Per meter length ( m.l ): The Supply and fix ceramic skirting Cleopatra, El-Gawhara
or a similar production. The price includes the erection with a mortar consists of 300
Kg cement/m3 sand and finalizing the work following the best specifications,
industrial safety and the direction of the supervising engineer
M2: Supply and fix anti acid Sornaga tiles of dimensions 20 x 20 x 0.8 cm of first
10

Unit

Price
(L.E)

M2

34.8

M2

52.8

M2

69.6

M2

110.4

M2

97.2

M2

97.2

m.l
M2

34.8
65.61

Item

10.9
10.10

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

sorting. The price includes the supply and making a ground sand layer under the
ceramic to adjust inclinations and levels. The erection is achieved by a mortar
consists of 300 Kg sulphate resistant cement/m3 sand with adjustment the
inclinations and levels and filling the spaces with the white cement following the
.best specifications and the direction of the supervising engineer
M2: Supply and fix Porcelain floors of dimensions 40 x 40 x 0.8 cm El-Gawhara or a
.similar production as the item (10.4)
M2: Supply and fix Porcelain floors of dimensions 30 x 30 x 0.8 cm El-Gawhara or a
.similar production as the item (10.4)

Marble Works
11
11.1
M2: Supply and fix of Assiut marble tiles 30x30x2 cm of the best kinds (the
approved sample by the supervising engineer before the erection). The clean sand
ground layer thickness is not less than 6 cm and stuck with a mortar consists of 300
Kg cement/m3 sand of thickness not less than 3 cm. The price includes the smooth
polishing by the white cement according to the specifications and also protecting the
marble in the points exposed to passing by covering it by clean empty package
papers, canvas or gypsum. The measurement is geometric for the seen parts only, all
.in square meter
11.2
M2: Supply and fix Karara marble tiles 30x30x2 cm as the item No. (11.1) , all in
.square meter
11.3
M2: Supply and fix Granite marble tiles 30x30x2 cm as the item No. (11.1) , all in
.square meter
11.4
M2: Supply and fix Felto Hasana marble tiles 30x30x2 cm as the item No. (11.1) , all
.in square meter
11.5
M2: Supply and fix Galala marble tiles 30x30x2 cm as the item No. (11.1) , all in
.square meter
11.6
Per meter length ( m.l ) Supply and fix of the main stairs made of Assiut marble of
going thickness 4 cm & rise thickness 2 cm according to approved sample by the
supervising engineer and the dimensions indicated in the drawings & fixed by a
mortar consists of 350 Kg cement /m3 sand. The measurement is geometric for the
.seen parts only all are completed
11.7
Per meter length ( m.l ): Supply and fix of the stairs as the specifications of item
(11.6)but of granite marble of going thickness 4 cm & rise thickness 2 cm all are
.completed
11.8
Per meter length ( m.l ): Supply and fix of the stairs as the specifications of item
(11.6)but of Fleto El-Hasana or Meshaab marble of going thickness 4 cm & rise
.thickness 2 cm all are completed
11.9
Per meter length ( m.l ): Supply and fix of the stairs as the specifications of item
(11.6)but Galala marble of going thickness 4 cm & rise thickness 2 cm all are
.completed
11.10
M2 : Supply and fix of the Assiut marble cladding 2 cm in the dimensions and kind
required in drawings and approved by the consulting engineer before the erection for
the walls cladding and is fixed by a mortar consists of 350 Kg cement /m3 sand. The
item includes the smooth polishing by the white cement according to the
specifications. In addition to what is mentioned, the marble cladding is fixed on the
walls or floors by copper stirrups. Only one course is made in an upper plane and the
second course will be allowed to be built in the second day to insure the stability and
11

Unit

Price
(L.E)

M2

172.8

M2

158.4

M2

158.4

M2

648

M2

561.6

M2

230.4

M2

201.6

m.l

165.6

m.l

432

m.l

288

m.l
m.l

216
316.8

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

prevent the shifting of the first course before dryness and spraying it with much
water for the seen parts only, all are completed. Per meter length
11.11
.M2: Supply and fix of Granite marble cladding as per item (11.10)
11.12
.M2: Supply and fix of Fleto Hasana marble cladding as per item (11.10)
11.13
.M2: Supply and fix of Galala marble cladding as per item (11.10)
Aluminum Works
12
12.1
M2: Supply and Fixing Silver Aluminum windows made of El- Saad sections or the
similar according to the drawings equipped with a rain section and a fiber wire doors
mesh sashe. The price includes the supply and erection of a transparent white glass
of thickness 6 mm and also the supply and erection of all the necessary and hardware
such as handles, hinges, wheels, rubber and beds of an excellent kind local
production. The marble frame prices will be as the skirting prices, finalizing the
work according to the specifications, the directions of the supervising engineer and
the industrial safety. The item includes the finishing between the Aluminum section
.and the marble frame with silicon to prevent the leakage of water
.A- Sliding
.B-Hinged
12.2

Price
(L.E)

M2
M2
M2

648
302.4
360

M2

621.6

M2

655.2

M2

655.2

M2

690

M2

655.2

M2

690

M2

690

M2: Supply and Fixing Silver Aluminum doors single or double leaves made of ElSaad sections or the similar according to the drawings. The price includes the supply
and erection of a transparent white glass of thickness 6 mm and also the supply and
erection of all the necessary and hardware such as handles, hinges, wheels, rubber
and beds of an excellent kind local production. Finalizing the work according to the
specifications, the directions of the supervising engineer and the industrial safety.
The price doesn't include the supply and erection of an automatic door closer ,
finalizing the work according to the specifications, the directions of the supervising
.engineer and the industrial safety
.A- Sliding
.B-Hinged

12.3

Unit

M2: Supply and Fixing Aluminum windows of El- Saad sections colored brown
.degree 6 and feme glass 6 mm as the item (12.1)
.A- Sliding
.B-Hinged

12.4

M2: Supply and Fixing Aluminum doors of El- Saad sections colored brown degree
.6 and feme glass 6 mm as the item (12.2)
.A- Sliding

12

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Unit

Price
(L.E)

.B-Hinged
12.5

M2: Supply and Fixing of El- Saad Aluminum silver partitions and a white glass of
thickness 6 mm. The item includes all necessary for fixing such as wooden wedges,
copper screw bolts. The Aluminum and glass distribution is according to the
drawings & finalizing the work according to the specifications, the directions of the
.supervising engineer

12.6

M2: Supply and Fixing of El- Saad Aluminum partitions colored brown degree 6 and
.feme glass of thickness 6 mm as the specifications of item (12.5)

Per meter length ( m.l ): Supply and Fixing of a white silver Aluminum handrail
made of El-Saad sections of height 30 cm. The price includes all the necessary for
erection, wadding, fixing wedges and also includes all the necessary to complete the
work according to the specifications, the directions of the supervising engineer.
12.8
Per meter length ( m.l ): Supply and Fixing of a white silver Aluminum handrail
.made of El-Saad sections of height 45 cm as the item (12.7)
12.9
M2: Supply and Fixing of Aluminum door Tecnal sections (Flex 100) of electrostatic
brown color 2 minutes and a transparent glass of thickness 6 mm. The handles are
made of Aluminum and the price doesn't include the supply and erection of the door
.closer
12.10
M2: Supply and Fixing Aluminum window Tecnal sections (Flex 100) of
electrostatic brown color 2 minutes and a transparent glass of thickness 6 mm. The
.handles are made of Aluminum
Metal Works
13
13.1
M2: Supply and installation of prefabricated boards for inner and outer partitions
made of sandwich panels of colored sheet iron which is painted by prepared oven
paint, lightly corrugated from the two sides and injected by Polyorithan- of thickness
4 cm to isolate sound, heat and humidity. The outside sheet iron thickness is 0.7 mm
and inside thickness is 0.4 mm. The item includes all the bolts and rivet and washers
required for fixing and finalizing the work according to the specifications and the
.directions of the supervising engineer

M2

724.8

M2

517.2

M2

552

m.l

276

m.l

345.6

12.7

13.2

13.3

M2

1518

M2

1345.2

M2

420

Ton

15600

In Tons: Supply and installation of sliding or hinged steel gates. The item includes
the passages that limits gate movement and all equipment and material required to
erect the gate and also includes the required accessories like hinges and wheels &
supply and erection of Al-Ahram kind gate drum or the similar. The item includes the
painting two coats as primer + two coats with oil painting and finalizing the work
.according to the specifications and the directions of the supervising engineer
M2: Dismantling and the removal of a steel sheet ceiling. The item includes the
.removal of damaged boards from the site
M2

Sanitary Works
14
14.1
Per each: Supply and making inspection chamber of dimensions 60x60x60 cm. The
item includes the excavation backfilling and transporting the wastes to the dumps
13

Each

30
1350

Item

14.2

14.3

204
180
240
144

172.8

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

and pouring an ordinary concrete layer of thickness 20 cm with a cement content


not less than 300 kg /m3 & masonary the outer walls with solid brick masonary
(red or cement) and plastering with a mortar consists of sand and cement at a ratio
300 Kg cement with adding non permeable materials and the well trimming of the
surface & making inner means to direct the inclinations and the drainage. The item
includes the supply and erection of a double cast iron cover including the frame of
weight 125 Kg of good quality approved by the supervising engineer, following the
.specifications and the directions of the supervising engineer
Per each: Supply and making inspection chamber of dimensions 100x100x100 cm.
The item includes the, excavation backfilling and transporting the wastes to the
dumps and pouring an ordinary concrete layer of thickness 20 cm with a cement
content not less than 300 kg /m3 & the outer walls with solid brick (red or cement)
and plastering with a mortar consists of sand and cement at a ratio 300 Kg cement
with adding non permeable materials and the well trimming of the surface &
making inner means to direct the inclinations and the drainage. The item includes
the supply and erection of a double cast iron cover including the frame of weight
125 Kg of good quality & making a ceiling made of reinforced concrete for the
chamber with a thickness 20 cm and mixture ratio 0.8 m3 gravel + 0.4 m3 sand +
350 Kg cement and reinforcement with steel bars not less than 80 Kg /m3,
Each
.following the specifications and the directions of the supervising engineer
.
Per each Supply and making clay vitrous gallytrap , of approved specimen of
diameter 4/6 inch, the frame 12x12 inch and the cast iron cover 7 inches. The item
includes the supply and erection and finalizing the work following the
.specifications and the directions of the supervising engineer
Each
Per meter length: Supply and erection of cast iron pipes produced by foundries
for drainage of diameter 1/4x4 inches (tested). The price includes the erection and
patching up by a linen rope covered with tar and pouring the molten lead & also
fixing and adjusting the vertical position of the pipes on the wall at a distance 3
cm from plastering by an iron stirrups equipped u the collars consist of two
pieces for easier dismantling and erection. The item includes the supply: erection
and fixing all the required accessories such as head pieces and elbows. The item
includes the testing of pipelines under an experimental water pressure of 6
atmospheres and also the painting of pipes two faces primer according to the
specifications, the directions
of the supervising engineer and the instructions of industrial safety. The item
M.L includes the measurements for the seen parts only.
Per meter length: Supply and erection of cast iron pipes produced by foundries
M.L for drainage of diameter 1/4x3 inches as the item (14.4).
Per meter length: Supply and erection of cast iron pipes produced by foundries
for drainage of diameter 1/4x4 inches as the item I !4.4).The price includes the
M.L supply and erection of toe elbow.
Per meter length: Supply and erection of cast iron pipes produced by foundries
M.L for ventilation of diameter 3/16x2inches as the item ( 14,4),
Per each: Supply and erection of casted copper ground siphon equipped with a
stainless steel screwed lid and a strainer to secure the closure on the siphon. A
copper outlet or two outlets of diameter 2 inches is casted with it. The item
includes the erection with securing the fixing, finalizing the work according to
Each the specifications and the directions of the supervising engineer.
14

Unit

Price
(L.E)

1980

252
14.4

14.5
14.6
14.7
14.8

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item

655.2

966

1035.6

966

1794

2346

966

759.6

Unit

Per each : Supply and erection of local water closet ( eastren closet ) made of
cast iron coated ith white porcelain, of the best kinds having dimensions
60x50x6 cm has leg treadles and equipped with cast iron bowl without stone of
thickness 1/'4 inch coated with white porcelain from the interior and exterior of
weight 10: 12 Kg., The item includes the supply and erection of a discharge pipe
with copper comb (not including the feed and draining).

14.9

Per each: Supply and erection of foreign water closet made of colored porcelain,
first sorting Lecico or the similar according to the required color. The item
includes the supply and erection of a plastic lid of the best Kinds, a copper rinser.
two stopcocks painted with Nickel half inch, the required joints and a complete
porcelain discharge box of capacity 5 gallons and the float. finalizing the work
according to the specifications and the directions of the supervising engineer (not
including the feed and draining).
Per each Supply and erection of Lavomano lavatory for washing hands of
dimension 60 cm porcelain first sorting Lecico or the similar (according to the
required color. the item includes the supply and erection of a local Nickel mixer 1
tirtth frab kind or the similar and a Nickel siphon 1.5 inches, fixing cantilver Ts
o! iron galvanized steel 3/4 inches. It must be painted 2 laces primer and faces
oil paint. finalizing the work according to the specifications and the directions of
the supervising engineer (not including the teed and draining).
Per each Supply and erection of lavatory for washing hands of dimension 60 cm
with porcelain post with the same specifications as item (14.11 ] without
cantilever (not including the feed and draining).

14.10

Per each Supply and erection of Ideal Standard water closet Rogada kind, of
white color has a low discharge box including the supply and erection of the
plastic cover of kind Ideal Standard . 2 stop cocks and the necessary joints (not
including the feed and draining).
Per each: Supply and erection of Ideal Standard water closet Afalox kind with
Karara white marble and mixer Jacop Dilalphon and a nickel siphon 1.5 inches,
{not including the feed and draining).

14.13

Per each: Supply and erection of a porcelain lavatory of dimension 60 crn, first
sorting Lecico or the similar. The item includes the supply and erection of a local
Nickel mixer Frab kind or the similar and a Nickel siphon 1.5 inches, fixing
cantilevers of iron 3/4 inches. It must be painted 2 layers primer and 3 layers oil
paint, finalizing the work according to the specifications and the directions of the
supervising engineer (not including the feed and draining).
Per each Supply and erection of a porcelain urinal first sorting Lecico or the
similar. Has a protruded basin, fixed at walls by screw copper bolts and wooden
wedges. The item includes the supply and erection of a local Nickel rinser and an
angled stop cock 1/2 inches and the supply and erection of a Nickel siphon 1.25
inches, the supply and erection of Assiut type marble partition of dimensions
60x40x2.5 cm. finalizing the work according to the specifications and the
directions of the .supervising engineer (not including the feed and draining)

14.15

Each

Each

Each

14.11

14.12

Each

Each

14.14

Each

Each

Each
15

14.16

Price
(L.E)

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item

1104
1656
124.6

241.2

1069.2

each
Each
Each

Unit

Per each Supply and erection of a stainless steel basin of type Franki Samy or the
similar of dimensions 100 cm with one strainer of the best types. The item
includes the supply and erection of a local Nickel mixer Farab kind or the similar
and a Nickel siphon 2 inches, fixing cantilevers of iron 3/4 inches. It must be
painted 2 layers s primer and 3 layers oil paint, finalizing the work according to
the specifications and the directions of the supervising engineer (not including the
feed and draining).
Per each Supply and erection of a stainless steel basin of type Franki Sarny or the
similar of dimensions 150 cm with otie strainer of the best types as the item
(14.17) (not including the feed and draining).
Per each Supply and erection of cast iron Gregory for rain with a funnel and a
movable strainer diameter 4/6 inch. It must be adjusted and fixed by sand and
cement mortar at a ratio 300 Kg cement /m3 sand.
Per each Supply and erection of a Nickel shower equipped with a hot and cold
mixer of the excellent type local production Farab or the similar. The item
includes the fixing at wall with securing screw copper bolts. wooden wedges and
a nickel clamp, finalizing the work according to the best specifications.

14.17

Per each Supply and erection of foot bath of cast iron porcelain painted
dimensions 90x90 cm first sorting with the required color. The item includes the
supply and erection of a copper discharge according to the best specifications
(not including the feed and draining).

14.21

14.18
14.19
14.20

Each

Each
Per meter length: Supply and erection of galvanized steel pipes for cold and hot
14.22
water Work of the best qualities. The item includes all the elbows, T shaped parts
and common parts. The item includes also performing the required water tests
under atmospheric pressure. The erection is achieved by stirrups and clamps
equipped with two parts collars. The item includes the painting 2 faces primer r 3
faces oil paints as the required color according to the excellent specifications,
directions of the industrial safety and the directions of the supervising engineer In
longitudinal meter with the following diameters:

34.8
42
55.2
69.6
34.8
79.2
110.4

M.L
M.L
M.L
M.L
M.L
M.L
M.L

1- Galvanized steel feeding pipes of diameter 1/2 inches.


2- Galvanized steel feeding pipes of diameter 3/4 inches.
3- Galvanized steel feeding pipes of diameter 1 inch.
4- Galvanized steel feeding pipes of diameter 1.5 inches.
Per meter length: Supply and erection of Poly propylene pipes inside the wall of
Diameter 1/2 inches.
Per meter length: Supply and erection of Poly propylene pipes inside the wall of
diameter 1 inches
Per meter length In longitudinal meter: Supply and erection wrapped lead of
diameter 50/58 mm.
The item includes all the necessary for fixing, patching up for sanitary erections
and floors siphons and includes also the necessary tests before insulation and
packaging with isolating the lines after that by painting 2 faces hot Bitumen and
wrapping with the tarred canvas and making the necessan packaging by a mortar
16

14.23
14.24
14.25

Price
(L.E)

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item

Unit

consists of sand and cement in a ratio 300 Kg cement'm3 sand all is completed
according to the excellent specifications, directions of the industrial safety and
the directions of the supervising engineer

82.8

3450

58.8
70.8
97.2
117.8
159.6

Per each According to the executed numbers: Supply and erection of a spherical
fiber glass tank of capacity 1 m3 of approved good quality. The item includes all
the necessary for lifting and erecting the lank with the inlets and outlets openings
required for entrance and exit of water & also all the required cocks and also the
supply and erection of ordinary copper float with the same diameter as feeding
pipe and an automatic float of approved good quality and finalizing the work
according to the excellent specifications.

14.27

Per each: Supply and erection of a gate valve made of copper coated with
chromium all is completed for diameters with diameter :

14.28

Each

Each
Each
Each
Each
Each

Each

70.8

Each

97.2

Each

117.8
159.6

Ech
Each

25.2
50.4

14.26

M.L

58.8

90

Per meter length Supply and erection of wrapped lead of diameter 35/42 mm as
item No. (14.22).

M.L

M2
M2

1- 1/2 inches.
2- 3/4 inches.
3- 1 inch.
4- 1.5 inches.
5- 2 inches.
Per each: Supply and erection of an angle valve made of copper coated -with
chromium all is completed for diameters:

14.29

1 - 1 12 inches.
2- 3/4 inches.
3- I inch.
4- 1.5 inches.
2 inches.
Per meter length: Supply, erection and adjusting rain drainage pipes of U.P.V.C
of good approved quality of diameter 4 inches with full height. The item includes
the supply of fixing clamps and also fixing a shoe elbow at the end of the post all
are completed according to the excellent specifications, directions of the
industrial safety and the directions of the supervising engineer.
15
Insulation Work
M2: Supply and apply water proofing consists of 3 coats of oxidized Bitumen.
The item includes the cleaning of horizontal and vertical walls before coated and
also filling the vertical spaces and openings if existed all are completed according
to the specifications, directions of the industrial safety and the directions of the
supervising engineer.
M2: Supply and installation a horizontal water proofing layer from 3 coats of hot
Bitumen + 2 layer of normal bitumized feletpaper of good sample. All are
17

14.30

15.1

15.2

Price
(L.E)

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item

75.6

M2

58.8

M2

134.4

M2

58.8

1168.8
1335.6
1502.4
1670.4

2628
1050

M2

Each
Each
Each
Each

completed according to specifications, directions of the industrial safety and the


directions of the supervising engineer.
M2: Supply and installation a horizontal water proofing insulating layer for
including materials and erection prices made3 coats of hot Bitumen + 2
bitumized feletpaper (Ansogot J3 ) of good sample. All are completed according
to t specifications, directions of the industrial safety and the directions of the
supervising engineer.
M2: Supply and spreading out a mixture of Bitumen and sand (Mastic) of
average thickness 7 cm. All are completed according to (he directions of the
industrial safety and the directions of the supervising engineer.
M2: Supply and heat installation layer made of foam boards manufactured by
extrusion method of thickness 5 cm and density 35 Kg/'m3.
M2: Supply and heat installation layer made of the ordinary white foam boards
but of thickness 5 cm.
16
Carpentry work
Per each: Supply and installation of wooden doors of El-Sweed timber of frame
2x6 inches and stile 2x6 inches with wooden tamping from the two sides made of
beech 3 mm with design each 15 cm. The item includes the supply and erection
of all necessary for finalizing work such as fixing stirrups, copper hinges of
approved specimen, drum and copper knobs of local production excellent quality
(AI-Ahram or the similar) to be approved before the supply. The Item includes
the outer painting of the frame two faces with anti humidity bituminous substance
& painting the entire door two faces made of oil and Zink mixture or the similar
and two paste knives then three faces with oil painting Sipes type according to
the required color All are completed according to the excellent specifications,
directions of the industrial safet> and the directions of the supervising engineer.
A- Dimension 0.7 m x 2.2 m.
B- Dimension 0.8 m x 2.2 m
C- Dimension 0.9 m x 2.2 m
D- Dimension 1 in x 2.2 m
M2: Supply and Fixing wooden hand rails for stair El-Sweed timber, the price
includes the iron Work consists of an upper Permanent bar 1/4 x 1 inch for fixing
the wood carried on iron posts 19x19 mm each every 30 cm and fixed inside the
concrete hand rail. The item includes The wooden hand rail made of El-Sweed
timber of section 3x3 inches formed according to the approved specimen. The
price includes an allowance for the pure iron and wood Work, wadding, painting
the iron two faces Salakon and three faces oil paint or polishing the wooden hand
rails according to the excellent specifications.

Unit

15.3

15.4
15.5
15.6
16.1

16.2

M.L
M2

17
Metal Crystal work
M2: Supply and Fixing Metal windows of sections 1, 2. 3 with vertical and
horizontal plates leaves of axial rotational or hinged movement, item includes the
supply of a wooden frame of dimensions 2x4 inches and its fixing with iron bar
or Fisher bolts and also all the required tools. The price includes the supply and
erecting a transparent glass of thickness 6 mm including all necessary wooden
strips and iron paste & also the painting 2 faces primer + 2 faces oil paint
according to the required color All are completed according to specifications,
18

17.1

Price
(L.E)

Item

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

directions of the industrial safety and the directions of the supervising engineer.
120
M2
Extera over price for the erection of 6 mm reinforced glass
Miscellaneous items
18
18.1
M2: Supply and erection of Canaltex floors of thickness 2 mm of best approved
quality local production. The item includes the erection by a cold sticking material
with erection without the appearance of any separations at all after cleaning the
floors. The Canaltex and the fixing material are approved before the supply all are
completed according to the specifications and the directions of the supervising
.engineer
M2
18.2
M2: Supply and erection of a false ceiling made of fiber plates of Asbestos having
dimensions 60x60x1.5 cm according to the approved specimen of type Armstrong
or the similar all are completed according to the excellent specifications, directions
.of the industrial safety and the directions of the supervising engineer
M2
20
Industrial Sanitary Work
15000
L.S.
In Lump Sum: Supply and making manhole of dimensions 1.2 x 1.2 m of
depth up to 2 m clean according to prescribed levels. The item price includes
the excavation, backfilling, and breaking, getting rid of water if needed and
shoring the excavation sides. The item price includes the pouring Work of a
plain concrete for foundations consists of 0.8 m3 gravel or Sansawisy -r 0.4
m3 Egyptian sand free of silt + 250 Kg sea water cement and pouring the
reinforced concrete for ground, wall and ceilings (FAIR FACE) in the
following ratios: (0.8 m3 clean gravel + 0.4 m3 Egyptian sand free of
organic materials + 350 Kg sea water Portland cement.
Per each: Supply and making a valve chamber of dimensions 1.25 x 1.2 5 m of
depths up to 2 m according to the drawings. The item price includes the excavation,
backfilling, and breaking and shoring the excavation sides. The item price includes
the pouring Work of a plain concrete for foundations consists of 0.8 m3 graduated
gravel 0.4 m3 Egyptian sand free of silt + 250 Kg sea water cement and pouring the
reinforced concrete for ground, wall and ceilings I FAIR FACE) using the
mechanical vibrator in concrete Work in the following ratios: (0.8 m3 graduated
gravel - 0.4 m3 Egyptian sand + 350 Kg sea water Portland cement, The reinforced
concrete stress must not be less than 350 Kg/cm2 after 28 days. The item price
includes also the inner and outer insulation Work 2 faces Sicatop Sil (107) or the
equivalent. The item price includes the supply and erection of the steel cover and
its painting with a primer face and 2 faces of oil paint in the black color & returning
the site to its state. The returning prices of returning the site to its state according to
the items of the agreement & all required to complete the work such as
materials, workmanship. The item price includes the erection of a marine ladder.
9000
Each
Per each: Supply and making a valve chamber of dimensions 1.25 x 1.2 5 m of
depths from 2 to 3 m according to the drawings such as the item (20.2).
11250
Each
Per each: Supply and making a valve chamber of dimensions 1.25 x 1.2 5 m of
depths from 3to 3.5 m according to the drawings such as the item (20.2).
12000
Each
21
Superficial and Sanitary Drainage Work
19

Unit

17.2

90

150
20.1

20.2

20.3

20.4

Price
(L.E)

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item
228

M.L

312
M.L
354
M.L
552

26.4
36
72

M.L
M.L
M.L

110.4

M.L
M.L

276

M.L

303.6

1518
22
840

All kinds of piping Work:-In meter length : Supply and installation of pottery clay
vitrous pipes of diameter 8 inches of a good approved type has a flexible joint. The
item price includes the excavation Work up to a depth 1.5 m and backfilling with
clean sands under and above the pipes and returning the site to its state. The
returning prices of returning the site to its state according to the items of the
agreement. In case of pouring concrete to return the site to its state, the same
covering concrete ratio is used but with using Portland cement.
Per meter run: Supply and erection of clay vitrous pipes of diameter 10 inches
according to the stipulations and specifications mentioned at item (21.1) &
finalizing the work according to the excellent specifications and [he directions of
the supervising authority,
Per meter run: Supply and erection of clay vitrous pipes of diameter 12 inches
according to the stipulations and specifications mentioned at item (2 1 , 1 ) &
finalizing the work according to the excellent specifications and the directions of
the supervising authority.
Per meter run: Supply and erection of clay vitrous pipes of diameter 15 inches
according to the stipulations and specifications mentioned at item (21.1) &
finalizing the work according to the excellent specifications and the directions of
the supervising authority.
Per meter run: Supply and installation of U.P.V.C for drainage of diameter 2 inches
Per meter run: Supply and installation of U.P.V.C for drainage of diameter 3 inches
Per meter run: Supply and installation of U.P.V.C for drainage of diameter 4
inches .
Per meter run: Supply and installation of U.P.V.C for drainage of diameter 6 inches.
Per meter run: Supply and installation of a drainage pipe line type p.v.c of
approved specimen diameter 8 inches till a depth of 2 m. The item price includes the
excavation Work, shoring the sides of excavation and wrapping Work with the clean
red sands of thickness 20 cm from all directions. The item price includes the supply
and erection of rubber gaskets and all necessary of materials, workmanship,
experimental Work and testing to ensure the safety of pipes before wrapping with
sand & also backfilling Work with clean dusts from the resulted excavation with the
well compaction and returning the site to its state and prices according to the
agreement items.

Unit
21.1

21.2

21.3

21.4

21.5
21.6
21.7
21.8
21.9

Per meter run: Supply and erection of drainage pipe line type p.v.c diameter 1 0
inches according to the stipulations and specifications mentioned at item (21.5).

21.10

Per each: Supply and erection of a rain sink (rain holed block to drain rain water of
dimensions 60x60 cm and depth up to 1 m. The item includes the excavation,
getting rid of water if existed and making the plain concrete for walls and ground
with a thickness 25 cm and plastering the inner walls by an anti permeable material
such as Adcrete with plain concrete components 0.8 m3 gravel + 0.4 m3 sand + 250
Kg ordinary Portland cement. A cast iron cover of weight not exceeding 125 Kg s to
be erected.

21.11

M.L

Each
Cast Iron Covers Work
Per each : Supply and erection of a cast iron cover for draining sink of weight up to
each
125 Kg according to the approved specimen by the supervising authority and the
enclosed drawing. The item includes the excavation and demolish work on the old
20

22.1

Price
(L.E)

The Project : South Bakr Offloading / Transfer Terminal Construction


The Client : Scimitar Production Egypt LTD. ( SPEL )
Civil Works
Work Description

Item

1008

672

each

each

damaged cover & rubbing and painting the new cover with a primer face and 2
faces oil paint with the black color & its adjustment and fixing according to the
prescribed levels and the instructions of the supervising engineer with making the
necessan carpentry boxing around it & pouring a plain concrete under and around it
at a ratio 0.8 m3 graduated clean crushd stone + 0.4 in m3 Egyptian sand free from
organic materials + 350 Kg ordinary Portland cement. The item includes the
transporting the resulted wastes by the trucks owned to the contractor & finalizing
the work according to the excellent specifications and the direction of the
supervisor engineer
Per each : Supply and erection of a cast iron cover for draining rooms of weight up
to 125 Kg of type Gonz according to the approved specimen by the supervising
authority and the enclosed drawing. The work is achieved according to the
stipulations and technical specifications of the item (22.1) finalizing the work
according to the excellent specifications and the directions of the supervising
engineer.
According to the executed number: Supply and erection of a cast iron cover for
septic tanks for the buildings of sanitary drainage rooms and tanks. The cover is
double and of weight up to 125 Kg according to the approved specimen by the
supervising authority and the enclosed drawing. The work is achieved according to
the stipulations and technical specifications of the item (22.1) finalizing the work
according to the excellent specifications and the directions of the supervising
engineer.

21

Unit

22.2

22.3

Price
(L.E)

You might also like