You are on page 1of 1

Contact Me

Email
Med.lahlaba@gmail.com
Cell Phone Number
06 75 34 91 77

Present adress :NO 3 el Hassani


neighborhood, Gzenaya, Tangier city,
Morocco.

LAHLABA Mhammed
My project : Supervise and accompany technical or production
teams as part of our projects by optimizing each of skills to achieve
our shared objectives, to customer satisfaction.

Industrial Engineer
(Production/Process /Lean)

Single

Genchi genbutsu : Field Expert

Education
Diploma in industrial engineering at the national school of applied sciences in Agadir city-Morocco- aggregate: 78 %
Diploma in Industrial maintenance, School of Technology in SAFI City-Morocco aggregate: 74 %
Baccalaureate in Electrical engineering at high school ALKHAWARIZMI of SAFI city- Morocco aggregate: 70%

26 Years

2010- 2013
2008- 2010
2006- 2008

Professional Experience
Savoy Molding Tangier- Morocco -SAVOY INTERNATIONAL GROUP - certified iso/ts 16949 V. 2015
Production Engineer (assembly operations) (02/2014 01/2015) 1 year
Job description:
Scheduling of customer orders according to their emergencies (Fluent production management approach after the development of the Manufacturing and Sales
Plan - Master production schedule - MPS (ERP monitoring activities).
Ensure the implementation of programs, in accordance with standards of productivity, quality, and safety.
Development and analysis of indicators for monitoring and production management "KPI"(labor efficiency, FTQ, PPH,).
Treatment of non-conformities: monitoring of corrective and preventive actions (5why, QRQC, Problem Solving Techniques)
Work with the Supply Chain department for analysis of the production load and ensure the adequacy of resources in the production plan.
Establishment of action plans based on the results obtained to customer audits, intragroup and ISO.
Improvement cycles and flow diagrams for better: Security - Quality - Productivity.
Removal of wasted time (Mudas), through the implementation of several projects (5S, Hoshin, Kaizen, SMED, ...)

Results

Productivity: - Improving the efficiency of the 2W line from 72% to 91%.


Tools of the Lean Production :
-Improving the efficiency of the B26W line from 62% to 79%.
VSM.
- Improving the efficiency of the 18W line from 65% to 78%.
Process Map.
- Improving the efficiency of the ECO 02 line from 68% to 81%. - Piloting the hoshin sites.
- Improving the efficiency of W.CAP line from 74% to 89%.
- ergonomic study
Quality: Reduced cost of scrap from 2200 euros to 1300 euros per month / Piloting QRQC (8D report): 5WHY, 5M, ..
Safety: Reduced numbers of incidents in the lines of 2 incidents per month to 1 incident in six months.
Gain in space: + 10% / new products Implantation.

Graduation Project at Polydesign systems in tangier, morocco/ EXCO AUTOMOTIVE SOLUTIONS GROUP (02/2014 01/2015) 4 months.
Topic: establishment of a project management process by the standards of the automotive industry (ISO TS 16949 - APQP, requirements of major
manufacturers).
Consider the mapping of information flows between the various departments and directorates, taking into account as the central entity projects department.
Develop Master Planning Activities by tracing the life cycle of the project point of view while respecting the standards of the automotive industry (ISO TS 16949 APQP).
Organize schedule these masters according to the steps of the standard APQP.
Establishment of a Master Planning Global Standard for all projects while respecting the timing of steps of the APQP.
Establishing a system of process management processes common to all Projects department and standardization of project management tools and quotations.

Technical Internship at ONCF Company in Safi, Morocco ( 07/2012) 1 Month.


Topic: Setting up a maintenance system for CNC machines.
Final project assignment at GECAM Company in Agadir, Morocco (02/2013 07/2013) 6 Months (once a week).
Topic: Design and simulation of a rubber cutting system via the CATIA software.
Evaluation Internship at OCP Company in Safi, Morocco ( 07/2011) 1 Month.
Topic: Critical study of the stripping circuit of phosphoric acid by truck.
Technician Internship at MARSA MAROC Company in Safi, Morocco (04/2010 05/2010) 2 Months
Topic: Improved preventive maintenance procedures for equipment Marsa Morocco .

Areas of expertise
Lean Manufacturing: 5S and Kaizen - Process Map- TPM- SMED-Visual Management- Optimization of OEEHOSHIN-Eliminating Waste- POKA YOKE- Value stream mapping,
Production planning & control: Inventory control and Production Scheduling, JIT, Kanban, MRP, JIT, demand
forecast,
Quality Control: 5Why, 5M, QRQC, 8D report, Ishikawa, compatibility matrix, PDCA, Process Decision Program
Chart PDPC, Control Plans,
Supervisory Skills
Preventive Maintenance
Coaching and Motivating Others
Cost Control
Workplace Safety
Time Management
Employee Engagement
Assembly
Eliminating Waste
SOFTWARE SKILLS
- MS.OFFICE
- CNC programming
- ERP CEGID, CATIA 3D, ..
Professional Membership
Association for LEAN SAVOY INTERNATIONAL

You might also like