RATES FOR PROPOSED HOUSE FOR

DR. HASITHA AT HORANA


ITEM

DESCRIPTION

QTY UNIT

RATE
Rs. Cts.

UP TO 1ST FLOOR LEVEL


1. Preliminaries
Setting out

###

2. Excavation & Earthwork


SITE PREPARATION .
2.1 Excavation in padfoundation any soil other than rock
requiring blasting for removal, depth not exceeding
3'-0" from ground level,

cube 2,750.00

Hard core filling


2.2 Earth filling on the pad footing in
layers and compact well to specified standards

cube 3,500.00

3. Concrete Work
Plain in situ concrete in grade 15 mix placed on ground
3.1 In 2" thick lean concrete under pad foundation

sqrft

80.00

3.2 In 3" thick lean concrete under pad foundation

sqrft

120.00

Reinforced cement concrete in grade 25 (3/4")


(1:11/2:3) fill in to form work and well packed
around reinforcement
3.3 All concrete work

cube

###

Reinforcement in mild steel and tor steel including


bends, square and circular links, hooks tying wire,
distance blocks and spacers etc.
Characteristic strength shall be
Tor Steel fy = 460 N/mm2 to BS 4449
Mild Steel - 250 N/mm2 to BS 4449
3.4 Reinforcement (10,12,16,20,25 mm bars)

kg

210.00

3.4 Reinforcement (R6 bars)

kg

195.00

4.1 Form work (exclude staircase)

sqrft

110.00

4.2 staircase

sqrft

120.00

4.Form Work

5. Masonry Work
5.1 Random rubble (6"x9") masonry in wall
foundations in 1:5 cement and sand mortar mix

cube

###

5.2 9" thick brick work 1:6 cement and sand mortar

sqft

320.00

5.3 4" thick brick work 1:6 cement and sand mortar

sqft

240.00

6.1 In Ground floor internal

sqrft

88.00

6.2 In Ground floor external

sqrft

95.00

6.3 soffit plastering

sqrft

130.00

Lft

125.00

6.4 24" x 24" floor tile

sqrft

190.00

6.5 4" height skirting

Lft

6. Finishes
Walls
5/8" thick internal plaster in 1:5 cement and sand
finished smooth with
putty to internal plaster
walls,
columns. (WL2)

6.3 Door, window, beams and columns edge plastering


Floor
Tiling, tile grouts and beading will be supplied by client

85.00

6.6 Bath room wall

sqrft

180.00

6.7 Bath room floor

sqrft

160.00

6.8 staircase

sqrft

200.00

6.9 pantry top and wall

sqrft

200.00

sqrft

110.00

sqrft

60.00

sqrft

125.00

sqrft

110.00

sqrft

90.00

9.1 Lay Type 1000 1/2" dia. PVC water supply pipe

Lft

80.00

9.2 Lay Type 1000 3/4" dia. PVC water supply pipe

Lft

110.00

9.3 Lay Type 1000 1" dia. PVC water supply pipe

Lft

145.00

9.4 Lay Type 1000 1 1/2" dia. PVC water supply pipe

Lft

195.00

9.5 Lay Type 600 3/4" dia. PVC water supply pipe

Lft

85.00

9.6 Lay Type 600 1" dia. PVC water supply pipe

Lft

115.00

9.7 Lay Type 600 1 1/2" dia. PVC water supply pipe

Lft

160.00

9.8 Lay Type 600 4" dia. PVC water supply pipe

Lft

500.00

7. Painting
7.1 Prepare and apply one coat of primer and
two coats of emulsion paint on internal
walls in ground floor

7.2 Prepare and apply one coat of Primer two


coats of approved acrylic weather shield
paint to on external walls
7.3 Paint for soffit
8.Water Proofing
8.1 Supply and apply two coats of tar
8.2 Water proofing material "Baralastic" bathroom floor
and wall
9.Plumbing

Waste water side

Sanitarary fitting will be supply by client


9.10 Fix WC and connect to supply and waste line

No

3,500.00

9.11 Fix wash basin and connect to supply and waste line

No

2,700.00

9.12 Fix bide spray and connect to supply line

No

1,200.00

9.13 Fix bide taps and connect to supply line

No

400.00

9.15 Fix Mirror

No

500.00

9.16 Fix Hand rail

No

750.00

9.17 Fix soap disc

No

750.00

9.18 Fix Paper holder

No

750.00

9.19 Fix Sink and connect to supply and waste line

No

2,500.00

9.20 Fix floor gully and connect to waste line

No

2,750.00

Septic tank and waste water pit


9.21 Septic Tank

No

###

9.22 Waste water pit

No

###

AMOUNT
Rs. Cts.