Cable tray.
To manage the cables in safe and secure manner. Size of the cable tray
should be selected such a manner to accommodate the cables in single
layer touching each other each other. Steel powder coated cable tray
with covering lid rate to include for supply & install cable Tray, Thread
bars, powder coated brackets, nuts, washers etc. for fixing of cable tray.
Floor rendering for the pavement and "U" drain at Badminton Court End
Rates shall include for all temporary rules, screeds, grounds, etc. for
raking out joints of new brick work or hacking new concrete for key,
internal and curved angles, joints between different surfaces and
between new and old plastering, arises, quirks, intersections between
curved or irregular surfaces, etc and all making good around pipes,
sanitary fittings and the like.
Supply and Fix 110 mm storm water line with necessary fixtures to lead
the Year 3 back side drainage
Construction of man hole internal size: 300x300x300 mm depth, 150
mm the. Gr. 25 R.C.C. base, 150 mm thk. R.C.C. walls and concrete
cover slab. Rate shall include for excavation, piping .
Rates for roof shall include for total timber roof frame work consisting of
rafters, wall plates, ridge plates, pole plates, hip rafters, beams, valley
rafters etc., necessary for total completion of roof frame work.
7.1
8
9
10
11
12
13
14
15
Rate
Amount
120
750.00
90,000.00
15,000.00
45,000.00
Squr
5,200.00
26,000.00
Lft
410.00
2,050.00
Nos
7,000.00
14,000.00
300
240.00
72,000.00
Note
Lft
Item
Lft
Sqft
30
225.00
6,750.00
Item
7,500.00
7,500.00
Nos
Nis
Nos
1.00
1
1
6,500.00
2,500.00
7,500.00
6,500.00
2,500.00
7,500.00
Nos
8,500.00
8,500.00
Sqft
Item
70
1
35.00
3,000.00
2,450.00
3,000.00
Item
15,000.00
15,000.00
Materials
Cement-(50 Kg Bags)
Sand
Water
1.75
0.08
45.46
1.75
0.08
45.46
Skill Labourer
Un Skill Labourer
Scaffolding -Add 3 %
1
1.5
1
1.5
cwt @
Cube @
Ltr. @
800.00
3,600.00
Day
Day
1,500.00
1,000.00
Labour
0.9
17
0.5
0.88
0.333
0.33
547.2
17
0.5
0.88
0.333
0.33
547.2
1
8
1
8
25%
25%
cwt @
Cube @
Cube @
Day @
Day @
Ltr. @
800.00
3,600.00
4,200.00
1,000.00
300.00
-
Day
Day
1,500.00
1,000.00
Labour
Skill Labourer
Un Skill Labourer
Cost Per Cube
P & OH
TOTAL COST
proposed brick wall for 2 ft height double brick wall for retain soil for c
Brick Work Ct. & Sand 1:5 in 9"thick Wall in Ground Floor (225mm)
Materials
Brick
Cement-(50 Kg Bags)
Sand
Water
1350
3
0.2
525
1350
3
0.2
525
2
3
2
3
Nos.
cwt @
Cube @
Ltr. @
7.50
800.00
3,600.00
-
Day
Day
1,500.00
1,000.00
cwt @
Cube @
Ltr. @
800.00
3,600.00
-
Day
Day
1,500.00
1,000.00
Labour
Skill Labourer
Un Skill Labourer
Materials
Cement-(50 Kg Bags)
Sand
Water
0.8
0.07
45.46
0.8
0.07
45.46
Skill Labourer
Un Skill Labourer
1.5
1.5
1.5
1.5
25%
25%
Labour
1,400.00
288.00
-
1,500.00
1,500.00
4,688.00
m3
13,600.00
1,800.00
3,696.00
333.00
99.00
976.40
1,500.00
8,000.00
30,004.40
7,501.10
37,505.50
For 5 squares
7,000.00
1,440.00
7,500.00
7,500.00
23,440.00
-
10,125.00
2,400.00
720.00
-
3,000.00
3,000.00
640.00
252.00
2,250.00
1,500.00
23,887.00
5,971.75
29,858.75