Making Tide of electrical wiring on Primary Adminstration and Year 4,5 buildings

Cable tray.
To manage the cables in safe and secure manner. Size of the cable tray
should be selected such a manner to accommodate the cables in single
layer touching each other each other. Steel powder coated cable tray
with covering lid rate to include for supply & install cable Tray, Thread
bars, powder coated brackets, nuts, washers etc. for fixing of cable tray.

Supply and Installation of 100mm Cable tray.


2

Panel Board and Switch Gear


The metal clad panel boards supplied and installed under this contract
shall be complete with all the required accessories such as neutral bars,
earth bars, fixing materialetc.The Enclosures may be used as a
ELSTEEL OR equivalent Brand.

Renovation work on Year 3 building perimeter


3

Floor rendering for the pavement and "U" drain at Badminton Court End
Rates shall include for all temporary rules, screeds, grounds, etc. for
raking out joints of new brick work or hacking new concrete for key,
internal and curved angles, joints between different surfaces and
between new and old plastering, arises, quirks, intersections between
curved or irregular surfaces, etc and all making good around pipes,
sanitary fittings and the like.

Supply and Fix 110 mm storm water line with necessary fixtures to lead
the Year 3 back side drainage
Construction of man hole internal size: 300x300x300 mm depth, 150
mm the. Gr. 25 R.C.C. base, 150 mm thk. R.C.C. walls and concrete
cover slab. Rate shall include for excavation, piping .

Valance board in treated hard wood "Balaw" or equivalent thick fixed to


sides of rafters and finish with primer under coat and two coats of
enamel paint.

Renovation Work on Security Post at Swimming Pool

Rates for roof shall include for total timber roof frame work consisting of
rafters, wall plates, ridge plates, pole plates, hip rafters, beams, valley
rafters etc., necessary for total completion of roof frame work.

7.1

Asbestos roofing sheets laid on timber roof frame work at building


area complete with laps and ridge cap

8
9
10
11
12
13
14
15

Electrical (3 point) and Telephone wiring (Network Point)


Supply and Installation of Wall mount fan
Supply and Installation of Key Holders
Supply and Installation of wall mounted file cabinet
Supply and fixing of aluminum sliding type overall size 2'-0" x 3'-0"
glazed counter window complete with sliding accessories.
Painting with two coat of whether shield paint
Supply and fixing 6' x 4' notice board
Re-align the damaged chain link fence . Work shall include refixing
damaged fencing post and re tensing the mesh with new lasing wire

d Year 4,5 buildings


Qty

Rate

Amount

120

750.00

90,000.00

15,000.00

45,000.00

Squr

5,200.00

26,000.00

Lft

410.00

2,050.00

Nos

7,000.00

14,000.00

300

240.00

72,000.00

Note

Lft

Item

minton Court End

Lft

Sqft

30

225.00

6,750.00

Item

7,500.00

7,500.00

Nos
Nis
Nos

1.00
1
1

6,500.00
2,500.00
7,500.00

6,500.00
2,500.00
7,500.00

Nos

8,500.00

8,500.00

Sqft
Item

70
1

35.00
3,000.00

2,450.00
3,000.00

Item

15,000.00

15,000.00

Year 3 building and around about 500 sqft ( 5 Squres)


19mm Thick Rendering in Cement Sand 1:3 Including Cement Floating

Materials
Cement-(50 Kg Bags)
Sand
Water

1.75
0.08
45.46

1.75
0.08
45.46

Skill Labourer
Un Skill Labourer
Scaffolding -Add 3 %

1
1.5

1
1.5

cwt @
Cube @
Ltr. @

800.00
3,600.00

Day
Day

1,500.00
1,000.00

Labour

Cost Per square

Proposed drainage adjecent to the Year 2 building


15 m length * 0.1m thick 0.6 m height

0.9

Mixing concrete 1:2:4 (20mm)- Grade 20


Materials
Cement-(50 Kg Bags)
Sand
3/4 " Metel
Mixer of Hire
Virbrater
Water
Add 5% for form work

17
0.5
0.88
0.333
0.33
547.2

17
0.5
0.88
0.333
0.33
547.2

1
8

1
8

25%

25%

cwt @
Cube @
Cube @
Day @
Day @
Ltr. @

800.00
3,600.00
4,200.00
1,000.00
300.00
-

Day
Day

1,500.00
1,000.00

Labour
Skill Labourer
Un Skill Labourer
Cost Per Cube
P & OH
TOTAL COST

proposed brick wall for 2 ft height double brick wall for retain soil for c

Brick Work Ct. & Sand 1:5 in 9"thick Wall in Ground Floor (225mm)
Materials
Brick
Cement-(50 Kg Bags)
Sand
Water

1350
3
0.2
525

1350
3
0.2
525

2
3

2
3

Nos.
cwt @
Cube @
Ltr. @

7.50
800.00
3,600.00
-

Day
Day

1,500.00
1,000.00

cwt @
Cube @
Ltr. @

800.00
3,600.00
-

Day
Day

1,500.00
1,000.00

Labour
Skill Labourer
Un Skill Labourer

16mm thickPlastering to Wall in Cement Sand 1:1:5 Finished Semi- rough

Materials
Cement-(50 Kg Bags)
Sand
Water

0.8
0.07
45.46

0.8
0.07
45.46

Skill Labourer
Un Skill Labourer

1.5
1.5

1.5
1.5

Cost Per square


P & OH

25%

25%

Labour

1,400.00
288.00
-

1,500.00
1,500.00

4,688.00

m3

13,600.00
1,800.00
3,696.00
333.00
99.00
976.40
1,500.00
8,000.00
30,004.40
7,501.10
37,505.50

For 5 squares
7,000.00
1,440.00
7,500.00
7,500.00
23,440.00
-

etain soil for children play ground


50 ft x 2 ft
100 squre

10,125.00
2,400.00
720.00
-

3,000.00
3,000.00

640.00
252.00
2,250.00
1,500.00

23,887.00
5,971.75
29,858.75