You are on page 1of 5

GUJARAT STATE LAND DEVELOPMENT CORPORATION LIMITED, GANDHINAGAR

Revised schedule of Rates for soil conservation and Masonry work form the year 2011-12
Effective from Fiftheenth April 2011.
Description
Unit
Revised
Rate of GLDC
form 2011-12
Rs.

Sr.
No.
.

1 Excavation for contour bunding, nala plug, farm pond/drainage


trenching, channel etc. of soil conservation works including breaking
A
B
C
D
E
F
1B
2
3a
3b
3. A.
4

[A]
(i)
(ii)
[B]
5(I)
5 (II)

of clods dressing with 10 Mt. Lead and 1.5 mt lift & 1.5 mt. depth.
Loose or soft soil
Clay/hard clay/yellow or red soil/hard soil.
Average soil and murrum/soft murrum.
Hard murrum
Soft rocks.
Hard rocks by blasting.
Above activity by hired machinary like tractors, JCB etc.
Extra rates for additional lead of every 10 meters.
Extra rate for additional lift of every 1.50 meters.
Extra rate for additional depth of every 1.50 meter depth.
Sharping of pickaxes.
Terracing/Levelling work in all soft soil / including breaking of
clods; dressing depositing and spreading the excavated materials in
lower part of terrace within 10 meters lead.
By manual labours
Soil/soft soil
Medium black/black soil
By tractor or hired machinary like JCB,Tractors etc.
Transportation of Soil 0 to 1 km
Excavation
Excavation for foundation in soft soil including yellow and gravelly
soil, soft murrum including depositing the excavated stuff in uniform
layers as and where directed within lead of 50 mt. And with depth of
excavation below ground level.

A Upto 1.5 Mt. Depth


B Between 1.50 Mt. To 3.00 Mt. Depth
C Between 3.00 Mt. To 6.00 Mt. Depth
6 Excavation for foundation in hard murrum including depositing the

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
Per Rupees.

28.00
35.00
41.00
56.00
87.00
175.00
30.00
2.00
1.00
3.00
0.09

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.

28.00
35.00
30.00
25.00

1 Cu. M.
1 Cu. M.
1 Cu. M.

50.00
54.00
58.00

excavated stuff in uniform layers as and where directed within a lead


A
B
C
Note :
GM\W o

of 60 Mt. And depth of excavation below G.L.


Upto 1.5 Mt. Depth
66.00
1 Cu. M.
Between 1.50 Mt. To 3.00 Mt. Depth
70.00
1 Cu. M.
Between 3.00 Mt. To 6.00 Mt. Depth
78.00
1 Cu. M.
The rate of Item No.-1-B, 3-B & 7-D are inclusive of all lead and left hence no extra lead and left is
admimssible for hired machinary like JCB and Tractors etc.
VF.8D G\Pv 1-B, 3-B & 7-D GL ;FD[ NXF"J[, EFJM TDFD ,L0 VG[ ,LO8 ;lCTGF K[ TPYL ;NZ EFJMDF\ SM. JWFZFGL ,L0 S[ ,LO8 EF0[ ZFB[,
H[;LAL S[ 8=[S8ZM wJFZF SZJFDF\ VFJ[, SFDULZL DF8[ R]SJJFGL ZC[X[ GlC\

d:\gsldc\2001\project\general\sor_2011_12-new.xls

Sr.
No.

GUJARAT STATE LAND DEVELOPMENT CORPORATION LIMITED, GANDHINAGAR


Revised schedule of Rates for soil conservation and Masonry work form the year 2011-12
Effective from Fiftheenth April 2011.
Description
Unit
Revised
Rate of GLDC
form 2011-12
Rs.

.
7 Excavation for foundation in soft rock including depositing the
excavated stuff as and where directed within a lead of 50 Mt.
including stacking the material nearly with the depth of excavation
below ground level.
A Upto 1.50 Mt. Depth
B Between 1.50 Mt. To 3.00 Mt. Depth
C Between 3.00 Mt To 6.00 Mt. Depth
D By Excavator for all lead and lifts like JCB,Tractors .etc
8 Excavation for foundation in hard rock including depositing the
excavated stuff as and where directed within a lead of 50 Mt.
including stacking the material nearly with the depth of excavation
below G.L.
A Upto 1.50 Mt. Depth
B Between 1.50 Mt. To 3.00 Mt Depth
C Between 3.00 Mt. To 6.00 Mt Depth
9 Extra charges for all sort of soil including soft murrum and hard
murrum if excavation is
to be done in wet condition requiring draining out of water but
without resorting to pumping for all lift Rs.
10 De watering of foundation trenches using pumps of suitable capacity
either diesel or electrical driven including of all labours and lines etc.
for all lifts etc. Complete.
11 Providing and laying cement concrete 1:4:8 (1 cement, 4 course &
hard broken stone aggregate 40 MM nominal size) and curring etc.
complete.
-do- (A) with cement concrete (1:3:6)
-do- (B) with cement concrete (1:5:10)
12 Providing and casting in situ cement concrete (1:2:4) with black stone
crushed metal of 12 to 20 M.M. size for copping,including shuttering
scaffolding curring etc. complete.
13 Providing and laying cement concrete 1:4:8 including watering,
stemping ramming, smooth finishing, curring etc. complete.
Cement sand brick bate 1 : 4 : 8
-do1:3:6
-do1 : 5 : 10
14 Providing burnt brick masonry in C.M. 1:6 including scaffloding

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.

93.00
103.00
120.00
30.00

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.

175.00
196.00
206.00
5.00

1 Cu. M.

6.00

H.P./hour

19.00

1 Cu. M.

1476.00

1 Cu. M.
1 Cu. M.
1 Cu. M.

1757.00
1253.00
2373.00

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.

1574.00
1749.00
1267.00
1541.00

whatever necessary, watering and curring etc.complete.


15 Providing un course rubble masonry with stone of approved quality
including racking out the joints, filling and finishing of joints, curring
watering etc. complete.
(A) in cement mortar 1: 6
1 Cu. M.
16 Providing course rubble masonry in C.M. 1 : 6 including curring
1 Cu. M.
watering etc. complete.
17 Providing and laying the burnt brick pitching in C.M. 1:6 including

1335.00
1575.00

laying in proper slope after necessary training the earth work filing
the joints with mortar, watering curring etc. complete.
(A) 8 C.M. in thick

d:\gsldc\2001\project\general\sor_2011_12-new.xls

1 Sq. M.

141.00

Sr.
No.

GUJARAT STATE LAND DEVELOPMENT CORPORATION LIMITED, GANDHINAGAR


Revised schedule of Rates for soil conservation and Masonry work form the year 2011-12
Effective from Fiftheenth April 2011.
Description
Unit
Revised
Rate of GLDC
form 2011-12
Rs.

.
18 Providing dry rubble pitching of harmor dressed stone to required
slope including trimming of earth tank, band packing, filling the
interestics with spauls etc. complete.
(A) 15 C.M. to 20 C.M. in thickness
19 Cement pointing with C.M. 1:3 to brick/stone masonry including
racking out the joints etc. complete.
20 Providing cement plastering in 12 MM thick in C.M. 1:3 with cement
neroo finished including watering and scaffolding, finishing, curring
etc. complete.
21 Providing cement plastering in 20 MM thick in C.M. 1:3 with
watering scaffolding, finishing curring etc. complete.
22 Providing and fixing the R.C.C. class A N.P.2 non pressure pipe

23
[A]
(1)
(2)

including laying collar joining water proofing curring etc. complete.


(A) 150 MM. Dia.
(B) 225 MM. Dia.
(C) 300 MM. Dia.
Conveyance charges
(Including loading unloading)
Two tons capacity tractor, trailor part or full in bulk irrespective of
weight.
Upto 5 K.M. distance between place of loading and unloading
Extra rate per one K.M. of additional distance from above 5 to 15 K.M.

(3) Extra rate per K.M. of additional distance from above 15 K.M. to 25
K.M.
(4) Extra rate per one K.M. of additional distance from above 25 K.M.
and above
[B] 7 (Seven) ton capacity truck part or full in bulk irrespective of weight
distance between place of loading & un-loading
(1) Upto 15 K.M.
(2) Extra rate per one K.M. of additional distance from above 15 K.M. to
25 K.M.
(3) Extra rate per one K.M. of additional distance from above 25 K.M. to
50 K.M.
(4) Extra rate per one K.M. of additional distance from above 50 K.M. to
75 K.M.
(5) Extra rate per one K.M. of additioanl distance from above 75 K.M. to
100 K.M.
(6) Extra rate per one K.M. of additional distance above 100 K.M.
[C] 10 (Ten) tonne capacity truck part or full in bulk irrespective of
weight distance between place of loading and un-loading upto 15
K.M.
(1) Extra rate per one K.M. of above 15 K.M. to 25 K.M.
(2) Extra rate per one K.M. of above 25 K.M. to 50 K.M.
(3) Extra rate per one K.M. of above 50 K.M. to 75 K.M
(4) Extra rate per one K.M. of above 75 K.M. to 100 K.M.
(5) Extra rate per one K.M. of above 100 K.M.

d:\gsldc\2001\project\general\sor_2011_12-new.xls

1 Sq. M.
1 Sq. M.

81.00
42.00

1 Sq. M.

67.00

1 Sq. M.

114.00

1 Meter
1 Meter
1 Meter

195.00
253.00
373.00

-Per K.M.

500.00
16.00

Per K.M.

14.00

Per K.M.

12.00

-Per K.M.

1000.00
18.00

Per K.M.

16.00

Per K.M.

14.00

Per K.M.

14.00

Per K.M.

12.00
1200.00

Per K.M.
Per K.M.
Per K.M.
Per K.M.
Per K.M.

18.00
16.00
14.00
14.00
12.00

Sr.
No.

GUJARAT STATE LAND DEVELOPMENT CORPORATION LIMITED, GANDHINAGAR


Revised schedule of Rates for soil conservation and Masonry work form the year 2011-12
Effective from Fiftheenth April 2011.
Description
Unit
Revised
Rate of GLDC
form 2011-12
Rs.

.
24
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
25
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
26
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)

27
(1)
(2)
(3)
(4)
(5)
(6)
(7)

LABOUR CHARGES *
Bullock pair with cart and driver
Man cart with driver (handcart)
Bhisti with mashak
Bullock/pads or any animal with driver
Mazdoor (Male/Female)
Skill labour
Unskill labour
Mason Ist Class with tools
Mason IInd Class with tools
*
Vehicle Driver
*
Agricultural labour
Carpenter
LABOUR CHARGES
Un-course rubble masonry
Course rubble masonry
Brick masonry
Concrete (1:4:8)
Concrete (1:2:4)
Pitching (Stone)
Pitching (Brick)
Plastering 12 mm
Pointing
Piple line fixing 150 M.M. dia
Piple 225 M.M. dia
Piple 300 M.M. dia
MATERIAL
Rubble stone on quarry site
40 M.M. hand broken stone
12 to 20 M.M. crushed metal
Sand at river site
Cement
Bricks 925 cm x 11.5 cm x 63 cm
Bricks bats
Supply of R.C. pipes A class N.P.2
Including collar
(A) 150 M.M. dia/1 R.M.
(B) 225 M.M. dia/1 R.M.
(C) 300 M.M. dia/1 R.M.
Consumption use of cement
Without R.C.C. rainforcement (1:2:4)
Cement concrete 1:24 brick
Masonry U.C.R. masonry 1:6
Plastering 1:3
Pitching 1:6
Pointing 1:3
Pipe joints 1:6 (9 to 12 dia)

d:\gsldc\2001\project\general\sor_2011_12-new.xls

Per trip
-doPer day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day

413.00
186.00
110.40
118.70
100.00
124.00
103.00
118.70
113.00
165.00
103.00
118.70

1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Sq. M.
1 Sq. M.
1 Sq. M.
1 Sq. M.
1 R.M.
1 R. M.
1 R. M.

146.00
206.00
186.00
217.00
289.00
25.00
26.00
29.00
25.00
58.00
62.00
68.00

1 Cu. M
1 Cu. M.
1 Cu. M.
1 Cu. M.
1 Beg
1000 no
1 Cu. M.

264.00
180.00
264.00
264.00
As per market rate
2400.00
246.00

158.00
194.00
246.00

1 Cu. Mt.
1 Cu. Mt.
1 Cu. Mt.
1 Sq. Mt.
1 Sq. Mt.
1 Sq. Mt.
1 meter

No change
same as it is.

Sr.
No.

GUJARAT STATE LAND DEVELOPMENT CORPORATION LIMITED, GANDHINAGAR


Revised schedule of Rates for soil conservation and Masonry work form the year 2011-12
Effective from Fiftheenth April 2011.
Description
Unit
Revised
Rate of GLDC
form 2011-12
Rs.

.
27
1 To pick up the stone and collect it from survey no./block area for the
loose boulder structure
2 Construction of stone wall of 1..20 M. height having top width 0.60
mt., (2) base width of 1.20 mt. With 0.15 mt. foundation in depth
3 Construction of bund including foundation with a 0.30 mt.depth in
all kind of earth/murrum.
28 Deep ploughing by tractor
29 Sowing Harowing & inter culturing by bullock pair

d:\gsldc\2001\project\general\sor_2011_12-new.xls

1 Cu. M.

52.00

1 R.M.

35.00

1 Cu. M.

41.00

Hectare
Hectare

1238.00
619.00