Objective
Subject: Describe how to perform the incoming inspection for the parts delivered by the vendor.
Goal: This procedure is applicable for Continental Powertrain Brasov Plant.
Scope
This regulation is mandatory for:
Continental Automotive and its majority
interests as well as minority interests with
management control by Continental Automotive.
Division
Business Unit
Automotive Function
Region
Country
Site
Plant
Brasov
Other
Table of Content
Procedure: Inspection of parts coming from the vendor ............................................................................................... 1
1
Process Flow ........................................................................................................................................................ 2
1.1
Inspection of parts coming from the vendor process .................................................................................... 2
2
Additional to be observed ..................................................................................................................................... 5
2.1
Additional explanations ................................................................................................................................. 6
2.2
Ship-to-stock conditions ................................................................................................................................ 7
2.3
Abbreviations ................................................................................................................................................ 7
3
Implementation ..................................................................................................................................................... 8
4
References............................................................................................................................................................ 8
4.1
Mandatory ..................................................................................................................................................... 8
4.2
Other ............................................................................................................................................................. 8
5
Document History ................................................................................................................................................. 8
6
Responsible persons ............................................................................................................................................ 8
6.1
Process Team ............................................................................................................................................... 8
Page 1 of 8
CAP0600690-07
`
Process Flow
1.1
no
5. PPAP Approved?
yes
only if financial
relevant !
no
yes
1
yes
10. Any
disabled parts due to inspection
method ?
no
Page 2 of 8
CAP0600690-07
`
Yes
No
Overwiev
No.
Input
Activities
Output
Materials blocked in
quality stock (Q)
Parts requested in
IQC for inspection
Parts transferred in
IQC
Applicable
Documents
Logistics
Warehouse
Logistics
Disposition
Financial
IQC Technician
Supplier
SQM
R: Responsibility, A: Approval,
S: Support, I: Information
Parts physically in
IQC
Page 3 of 8
CAP0600690-07
`
No.
Input
Activities
Output
Inspection plan
prepared for
inspection
Inspected parts
PPAP Approved
Inspected parts
Decision on the
inspection parts
10
Inspect the
materials or ship
back to supplier
Decision on the
inspection parts
Lot accepted or
rejected
Lot accepted
Parts disabled or
not
11
12
Disabled parts
scraped
13
Accepted lot's
transferred in WHS
14
15
Lot rejected
16
17
18
19
Quality Notification
received from IQC
Applicable
Documents
Logistics
Warehouse
Logistics
Disposition
Financial
IQC Technician
Supplier
SQM
R: Responsibility, A: Approval,
S: Support, I: Information
CAP06007
14-F01
Scrap
approval
request
Page 4 of 8
CAP0600690-07
`
No.
Input
Activities
Output
21
22
23
24
25
Parts sorting
Applicable
Documents
Logistics
Warehouse
20
26
Logistics
Disposition
Financial
IQC Technician
Supplier
SQM
R: Responsibility, A: Approval,
S: Support, I: Information
Parts in Quarantine
area
Decision about the
affected lot
Approval from the
supplier
Parts in IQC area
All locations
blocked prepared
for sorting
Additional to be observed
Explanations about the incoming inspection process:
1. To start the inspection a Transfer Order must be issued for one minimum storage bin from WHS to IQC
(LT10 Create Transfer Order from List movement type 971 - GR into Quality Stock).
2. The storage bin is physically transferred to IQC.
3. IQC confirms the received materials (LT11 Confirm Transfer Order Item) using the transfer order number
from point 1.
4. IQC must print the inspection plan from the SAP system for the concerned material (QA03 - Display
inspection lot).
5. IQC technician must check the status of the component/supplier Release status (PPAP approved).
6. If PPAP is not approved IQC technician must inform LO to return the material to the supplier.
7. If PPAP is approved IQC tech inspects physically the parts as per the Inspection Plan defined by the
responsible SQM.
8. IQC technician records the results for the concerned inspection lot (QE01 - Record characteristic results).
9. IQC technician must take a decision to accept or reject the inspected lot.
10. If the lot is acceptable after inspection there could be disable parts.
11. In case of disable parts after inspection IQC must record the decision for the concerned lot (QA11
Record Usage Decision code AS - accepted with corrections).
12. The disable parts are transferred to the scrap area by the IQC together with Scrap Approval form which
has to be signed by all relevant persons according CAP0600714- Material scrap management.
Page 5 of 8
CAP0600690-07
`
13. IQC issues TO for the storage bins to unrestricted stock (LU04 Selection of Posting Change Notices).
14. In case there are no disable parts IQC technician must take the decision to accept the lot (QA11 Record
Usage Decision code "A" - accepted).
15. IQC issues TO for the storage bins to unrestricted stock (LU04 Selection of Posting Change Notices).
16. Logistic WHS transfers the storage bins to the shelves in unrestricted stock.
17. In case the lot is not acceptable the IQC technician is responsible to inform by email all the involved
persons about the issue.
18. IQC is responsible to issue a Quality notification (QM01 Create Quality Notification type II -Incoming
Inspection).
19. SQM must create the NR and sent official complain to the supplier.
20. In case sorting is needed the decision must be taken by SQM, Logistic and supplier. The sorting will be
done according with the general sorting instruction CI-715-a.
21. In case the sorting is not necessary and all parts can be returned to the supplier, IQC technician is
responsible to issue TO for the storage bins from the WHS to the Quarantine area
22. Logistic WHS transfers the materials from all requested locations to Quarantine area.
23. SQM it is responsible to inform the supplier about the decision for the parts and ask for approval to sent the
parts back or scrap them. In case of accepting the scrap, SQM must ensure collection of all additional cost
using the ADCOM tool. In case the supplier wants to see the physical parts, a temporary zone will be
defined and marked inside the quarantine area. The parts will be labeled accordingly and they will exist
only physical (once the parts are charged in ADCOM, they are automatically scraped in SAP). In SAP the
temporary zone occupied with parts charged in ADCOM will not be available for SAP transactions (the
zone will be bloked - LS06).
24. In case of sorting it is necasary SQM must request from supplier the approval to start the sorting.
25. IQC technician is responsible to issue TO for the storage bins from the WHS to the IQC area (LT10
Create Transfer Order from List movement type 971 - GR into Quality Stock).
26. Record usage decision for the concerned lot
Follow the steps from the procedure CAP0600698 Faulty Material in Unrestricted Stock.
Metrics and performance indicators:
- Monthly ppm level
- Monthly cycle time
- Monthly number of incidents
2.1
Additional explanations
Page 6 of 8
CAP0600690-07
`
The results and usage decision for the inspection of vendor parts are documented in SAP_QM and can be
used for further evaluations (e.g. supplier assessment).
The deliveries not automatically accepted into free stock, but evaluated by the IQC tech, must be recorded
also in the form CAP0600690-F02 Quality Inspection Record Sheet.
If for a material-vendor no inspection plan is defined and assigned in SAP_QM, but the quality inspection is
activated in SAP (MM01) and a delivery is received and booked in SAP_WM, then:
- no test instruction can be printed;
- the inspection lot assigned to that delivery is blocked in SAP and cannot be used in production.
Handling of the inspection lot is possible only when an inspection plan is defined and assigned in
SAP_QM.
If an inspection lot is (partial) rejected, the bad components are marked at storage bin level by
CAP0600690-F01 Blocked Parts and the storage bins are blocked in SAP, in order to prevent their usage.
Responsible function to block is IQC technician. Responsible function to mark is IQC technician.
2.2
Ship-to-stock conditions
The conditions to be fulfilled by a part (material - supplier) in order to be proposed as STS are:
1. At least 1 delivery/lot inspected and accepted by IQC responsible;
2. At least 3 deliveries/lots inspected and accepted by IQC responsible after a complaint;
3. The supplier has a valid certification for ISO /TS 16949:2009;
4. The component and the supplier are released (CASA complete);
5. The component is bought from another Continental Plant (intercompany business).
Each delivery that will reach Continental will be inspected by LO WHS and by IQC. All un-released
suppliers represent a risk to Continental production and hence all parts delivered by un-released suppliers will not
be put into ship-to-stock. The usage in production is prohibited for such parts and if any parts coming from an
unreleased supplier arrive to Continental they should be blocked and sent back.
All un-released materials (PPAP not approved) delivered from released suppliers must not be used in
production. They should be blocked and sent back.
At least 1 delivery/lot will be inspected after a revision change of the part number.
At the first failure detected by IQC/production, the STS flag is automatically removed for the concerned
delivery/lot. The next deliveries/lots are inspected also by IQC responsible till 3 consecutive released deliveries /
lots are recorded. Then, the next deliveries/lots are inspected only by Logistic Department/ Warehouse responsible.
The cycle is repeated.
All new materials with status released (PPAP approved) delivered from released supplier will be inspected
by IQC at the first delivery, and if no defects have been seen at this inspection, all further shipments will be
considered ship-to-stock.
The SQM responsible decides about the parts that fulfill the above defined STS conditions.
Records are archived in accordance to CAP1000678 - Management of obsolete documents.
Until SAP implementation all records are kept in paper form. After SAP implementation all documents are stored in
the system.
2.3
Abbreviations
IQC
IQC tech
PPAP
SQM
LO
LO WHS
STS flag
SAP
SAP_QM
SAP_WM
Quality Notification (II)
TO
A
AS
Page 7 of 8
CAP0600690-07
`
R
PR
S
Implementation
References
4.1
Mandatory
CAP0600690-F01 - Blocked Parts
CAP0600690-F02 - Quality Inspection Record Sheet
4.2
Other
CAP0600698 - Faulty Material in Production Area
CAP0600714 - Material scrap management
Document History
Rev.
#
Change Description
Process
Owner
Date
01
Ince Oezer
05.11.2010
02
Irina Gaceu
01.04.2011
03
Irina Gaceu
28.04.2011
04
Irina Gaceu
30.03.2012
05
Irina Gaceu
18.03.2013
06
IQT will make the Quality Notification and will link the Nonconformity
Report from production with the claim. (E-sign ID: 3750379).
Hans-Guenther
Kein
20.03.2015
07
Hans-Guenther
Kein
27.03.2015
Responsible persons
6.1
Process Team
(dd.mm.yyyy)
The members of the Process Team have reviewed the procedure and their feedback has been considered. The
Process Owner keeps records about the Review.
Name
Department
Site
Cristian Lupsiasca
SQM
Brasov
Hilmar Burg
Logistics
Brasov
Hans-Guenther Kein
Quality
Brasov
Manuela Aghiana
Finance
Brasov