ETC/MSPR6/008SEWERAGEWORKS

Activity ID

Activity Name

Original Remaining Start


Duration
Duration

MSPR6 - EOT
E
NO 2
Key Access Date

Finish

Total Float

F M A M J Jul A S O N D

2017
J

F M A M J Jul A S O

13-Jun-16

13

13-Jun-16, MSPR6 - EOT NO 2

459

459 04-Dec-14

13-Jun-16

13

13-Jun-16, Key Access Date


13-Jun-16, CONSTRUCTION

246 19-Aug-15

13-Jun-16

13

246
246
20

246 19-Aug-15
246 19-Aug-15
20 19-Aug-15

13-Jun-16
13-Jun-16
12-Sep-15

13
13
164

MIP2-6-1987 Clay Pipe under Internal Road

20

20 12-Sep-15

08-Oct-15

164

MIP2-6-1988 Connection to External Sewerage sump

10

10 08-Oct-15

20-Oct-15

164

MIP2-6-1989 Installation of Clay Pipe

20

9 20-Oct-15

31-Oct-15

164

MIP2-6-1990 Connection to Main Sewerage Line

20

20 26-Mar-16

19-Apr-16

13

MIP2-6-199

30

30 19-Apr-16

25-May-16

13

1 11-Jun-16

13-Jun-16

13

Manhole
MIP2-6-199 No 1, 2, 3

60
20

60 14-Jan-16
20 14-Jan-16

26-Mar-16
10-Feb-16

13
13

MIP2-6-199 No 4, 5, 6

20

20 10-Feb-16

04-Mar-16

13
13

Testing & Commissioning

2016

J A S O N D

459 04-Dec-14

246

MIP2-6-1992 Authority Approval

J F M A M J

459

EXTERNAL / A
ANCILLIARY WORKS
SEWERAGE WORKS
MIP2-6-1986 Pipe Connection Ground Floor

CONSTRUCTION
CONSTRUCT

2015
D

MIP2-6-199 No 7, 8, 9

20

20 04-Mar-16

26-Mar-16

ETC008 - Sewerage
Sew
Works

334

334 04-Dec-14

14-Jan-16

19-Dec-14

41

14-Jan-16, ETC008 - Sewerage Works

PDPI - DSR, Mapping & Piloting works for utilities service. (4&12 Dec)

ETC08 - 0020

PDP Issued IFC W01 - Work Outside Boundary until Jln Sebarau.

10-Feb-15*

ETC08 - 0030

PDP issued IFC W00 - Layout with typical details

06-Mar-15*

ETC08 - 0040

WPC request PDP to change from open cut to pipe jacking between MH 7 to MH 9.

0 17-Apr-15*

ETC08 - 0050

WPC submitted Dilapidation Survey estimate for work outside boundary (sewerage work

0 23-Apr-15*

ETC08 - 0060

PDP to WPC : FAAMH9 TO FAAMH10 - using open cut method

11-May-15*

PDP to WPC : FAAMH9 TO FAAMH10 - using open cut method,

ETC08 - 0070

PDP to WPC : MH7 to MH9 - Pipe jacking not allowed.

11-May-15*

PDP to WPC : MH7 to MH9 - Pipe jacking not allowed.,

ETC08 - 0080

WPC required to carried out dilapidation survey and underground utilities survey.

0 11-May-15*

WPC required to carried out dilapidation survey and underground utilities survey., 11-May-15*

ETC08 - 0090

WPC submitted estimation of additional cost.

ETC08 - 0100

WPC informing PDP (LET-000321) that revised IFC drawing not been issued.

0 01-Dec-15*

ETC08 - 0110

WPC requested PDP to confirm the status of construction of sewer pipes.

0 28-Dec-15*

ETC08 - 0120

SMM No 43 advised WPC to proceed with the preparatory works according to current IF

Critical Remaining Work

Remaining Work

Milestone

summary

14 04-Dec-14*

26-Mar-16, Manhole

ETC08 - 0010

Actual Work

14

13-Jun-16, EXTERNAL / ANCILLIARY WORKS


13-Jun-16, SEWERAGE WORKS

07-Jul-15*

0
0

14-Jan-16*

Page 1 of 1

PDP Issued IFC W01 - Work Outside Boundary until Jln Sebarau.,
PDP issued IFC W00 - Layout with typical details,
WPC request PDP to change from open cut to pipe jacking between MH 7 to MH 9., 17-Apr-15*
WPC submitted Dilapidation Survey estimate for work outside boundary (sewerage works), 23-Apr-15*

WPC submitted estimation of additional cost.,


WPC informing PDP (LET-000321) that revised IFC drawing not been issued., 01-

WPC requested PDP to confirm the status of construction of sewer pipes., 28-D

SMM No 43 advised WPC to proceed with the preparatory works according t

TASK filter: (Untitled Filter)_28.