Activity ID
Activity Name
MSPR6 - EOT
E
NO 2
Key Access Date
Finish
Total Float
F M A M J Jul A S O N D
2017
J
F M A M J Jul A S O
13-Jun-16
13
459
459 04-Dec-14
13-Jun-16
13
246 19-Aug-15
13-Jun-16
13
246
246
20
246 19-Aug-15
246 19-Aug-15
20 19-Aug-15
13-Jun-16
13-Jun-16
12-Sep-15
13
13
164
20
20 12-Sep-15
08-Oct-15
164
10
10 08-Oct-15
20-Oct-15
164
20
9 20-Oct-15
31-Oct-15
164
20
20 26-Mar-16
19-Apr-16
13
MIP2-6-199
30
30 19-Apr-16
25-May-16
13
1 11-Jun-16
13-Jun-16
13
Manhole
MIP2-6-199 No 1, 2, 3
60
20
60 14-Jan-16
20 14-Jan-16
26-Mar-16
10-Feb-16
13
13
MIP2-6-199 No 4, 5, 6
20
20 10-Feb-16
04-Mar-16
13
13
2016
J A S O N D
459 04-Dec-14
246
J F M A M J
459
EXTERNAL / A
ANCILLIARY WORKS
SEWERAGE WORKS
MIP2-6-1986 Pipe Connection Ground Floor
CONSTRUCTION
CONSTRUCT
2015
D
MIP2-6-199 No 7, 8, 9
20
20 04-Mar-16
26-Mar-16
ETC008 - Sewerage
Sew
Works
334
334 04-Dec-14
14-Jan-16
19-Dec-14
41
PDPI - DSR, Mapping & Piloting works for utilities service. (4&12 Dec)
ETC08 - 0020
PDP Issued IFC W01 - Work Outside Boundary until Jln Sebarau.
10-Feb-15*
ETC08 - 0030
06-Mar-15*
ETC08 - 0040
WPC request PDP to change from open cut to pipe jacking between MH 7 to MH 9.
0 17-Apr-15*
ETC08 - 0050
WPC submitted Dilapidation Survey estimate for work outside boundary (sewerage work
0 23-Apr-15*
ETC08 - 0060
11-May-15*
ETC08 - 0070
11-May-15*
ETC08 - 0080
WPC required to carried out dilapidation survey and underground utilities survey.
0 11-May-15*
WPC required to carried out dilapidation survey and underground utilities survey., 11-May-15*
ETC08 - 0090
ETC08 - 0100
WPC informing PDP (LET-000321) that revised IFC drawing not been issued.
0 01-Dec-15*
ETC08 - 0110
0 28-Dec-15*
ETC08 - 0120
SMM No 43 advised WPC to proceed with the preparatory works according to current IF
Remaining Work
Milestone
summary
14 04-Dec-14*
26-Mar-16, Manhole
ETC08 - 0010
Actual Work
14
07-Jul-15*
0
0
14-Jan-16*
Page 1 of 1
PDP Issued IFC W01 - Work Outside Boundary until Jln Sebarau.,
PDP issued IFC W00 - Layout with typical details,
WPC request PDP to change from open cut to pipe jacking between MH 7 to MH 9., 17-Apr-15*
WPC submitted Dilapidation Survey estimate for work outside boundary (sewerage works), 23-Apr-15*
WPC requested PDP to confirm the status of construction of sewer pipes., 28-D