During the ADB consultation mission during 27-29 th January 2016, it was
informed by the mission that reconstruction has commenced at all the
three project sites; safeguard monitoring reports should be submitted as
per the loan agreement 2903. Earlier the work was entrusted to SMEC
but as the contract with the consultant has been closed the said report
is being prepared by the Environment & Social Safeguard Specialist at
PMO. As per the ADB environment safeguard standards monitoring of
environment variables (noise, soil, water and air), appropriate
monitoring agencies (NABL accredited Laboratory) would be engaged by
the Implementing agencies or through contractors (wherein cost to be
included in the contract based on specific monitoring plan). As the
provision of the environment monitoring was kept in all the three project
i.e. Madhyamaheshwar, Kaliganga-I & Kaliganga II SHP. The terms of
reference for the proposed monitoring are enclosed as Annexure for your
kind reference.
In view of the urgency of the work few Laboratories from the open
market was approached by the Environment and Social Safeguard
Specialist, PMO-ADB. The comparative rates of the Laboratories are
enclosed as Annexure II. The minimum quotation was received from the
(C.S. Rana)
Dy. General Manager-SHP
SCOPE
HIRING SERVICES OF ENVIRONMENTAL LABORATORY FOR MONITORING
OF ENVIRONMENT PARAMETERS.
BRIEF DISCRIPTION OF THE SCOPE
One season (January-March 2016) study of soil, water, air and noise
environment from the project site at three locations in each namely
Madhyamaheshwar, Kaliganga I & Kaliganga II SHP in district
Rudraprayag for the preparation of Quarterly Environment and Social
Compliance Report is required from the NABL accredited Laboratories.
PROJECT DETAILS
Uttarakhand Power Sector Investment Program (UPSIP),
supported by the Asian Development Bank (ADB) under the multi
tranche financing facility approved on 30 March 2006, is part of the
Investment Program for 20062012, whose goal is to increase power
capacity to meet demand in the state and achieve a year-round
exportable surplus by 2010. New small hydropower plants (SHPPs) will
provide additional clean power to local grids in rural areas and meet
about one third of the projected nonindustrial power demand in the
state at the time of commissioning. Under this construction of new Small
Hydro projects were proposed in district Rudraprayag namely
Madhyamaheswar, KaligangaI and Kaliganga II SHP and work started in
the year 2007. On June 17, 2013 due to unprecedented floods in
Mandakini and Kali rivers project site were affected drastically and most
of the components were washed away. Project works were started again
in January 2016.
TERMS OF REFERENCE:Terms & Conditions for Environment Laboratories: Current valid copy of accreditation certificate obtained from
National Accreditation Board for Testing and Calibration
Laboratories (NABL) and ISO 9001 & 14001.
The Laboratory should have approved by MoEF (Ministry of
Environment and Forests)/CPCB (Central Pollution Control Board)
or other designated body for approval.
The bidder should furnish evidence of One/Two/Three jobs of
requisite amounts of the type of same works in the past.
The bidder should have all the necessary equipment, trained
qualified manpower and its consumables to carry out such tests at
different locations of said project sites.
State
District
Tehsil
Village
:
:
:
:
Uttarakhand
Rudraprayag
Ukhimath
Mansuna (near diversion site)
Chunni (near power house site)
(v)
Access-road
(vi)
Geographical Coordinates
53 N/2, 53 N/1
Diversions site
790 0655 E
300 3255 N
Powerhouse site
790 0531.59 E
300 3151.76 N
(vii)
Longitude
Latitude
Altitude
:
:
:
:
1240.00 m
1044.50 m
2(a)
(i)
River Catchment
Name of River
Madhyamaheshwar Ganga
(a major tributary of Mandakini)
(ii)
Catchment area
Total
(iii)
:
:
:
:
:
:
:
:
:
3.
(a)
(i)
(ii)
(iii)
(iv)
(v)
(b)
(i)
(ii)
(iii)
(iv)
(d)
(i)
(ii)
(iii)
:
:
:
:
1411 cumecs
Raised weir and under sluices
Full width of river 142 m
2 bays, each 4.0 m wide
4.5 m
1411 cumecs at HFL 1244.0 m
4 no.; each 4 m wide,
Hopper type
11.50 / 15 cumecs;
59.00 m
18 m
3.40 m
Tunnel and open channel
11.50 cumecs , free flow
3928.00 m
D-Shaped 2.75m x2.00 m total
height 4.075m
0.25 m
:
:
(i)
(ii)
(f)
(i)
(ii)
(iii)
(iv)
(v)
(g)
(i)
(ii)
(iii)
(iv)
(v)
4 (a)
(i)
(ii)
(iii)
(iv)
(v)
(vi)
:
:
:
:
:
:
;
:
:
:
:
184.95
178.45 m
178.45 m
:
:
:
:
:
:
55.00 m Approx
16 m
10 m
:
:
:
:
3 x 5000 KW
Synchronous salient pole type
5000 Kw, 3.3 KV, 1000 rpm,
Brush-less
AVR type
40 tonnes (electrical operated)
Head
Gross Head
Net head
Design
Turbine
Type
Number
Output (Kw)
Size of power house :
Length
Width
Height
Installed capacity (KW)
Type of generator
Generator specification
Excitation system
(vii)
4(b)
(i)
(ii)
(iii)
5.
(i)
(ii)
(iii)
(iv)
6.
Regulation system
Power house crane/lifting tackle capacity
Tail Race Channel
Bed width
Full supply depth
Longitudinal slope
Power
Installed capacity
Plant Load Factor
Seasonal (max) Power (KW)
Annual energy (KWH) for sale
Switchyard:
42.625 m x 9 m x (4.3) m
1229.45 m
In the channel u/s of forebay
25.0 m; El. 1229.95
0.5 m
11.50 cumecs
3.0 m (stepped spillway)
:
:
:
1 no.,
3 nos.
: 1.95 m
Varying from 08 to 25 mm
: 500 m
: 3.60 wide x 4.0 m high
Three
5208 KW
:
:
:
:
:
3.0 m
1.6 m
1 in 350
:
:
:
76.23 %
15000 KW
100.17 Million kWh
15000 kW
(i)
(ii)
(iii)
:
:
:
33 kV
4 bays
30 x 30 m
and
3000
4000
1200
Note:
Contact Person
C.S. Rana
Dy. General Manager-SHP