10 MW Grid Tied SPV Plant at Charanka(GJ).

1.0

INTRODUCTION

2.0

OBJECTIVE

3.0

REFERENCE DRAWINGS/DOCUMENTS

4.0

SYSTEM DESCRIPTION

5.0

STUDY APPROACH / BASIS & ASSUMPTIONS

6.0

RELAY IDENTIFICATION TABLE

7.0

ATTACHMENT

10 MW Grid Tied SPV Plant at Charanka(GJ).

1.0

INTRODUCTION
This document represents the relay settings for 10 MW GridTied SPV Plant at
Charanka(GJ)

2.0

OBJECTIVE
The Relay setting and Coordination analysis is conducted to recommend the relay settings
and achieve proper coordination between relays installed at 10MW Solar Plant.

A. The Relay coordination study is performed to determine various relay settings under
normal operating condition and to ensure:
a. Sensitivity to over current and earth faults under minimum and maximum fault
conditions.
b. Selectivity of relays.
c. Stability for non operating conditions.

3.0

REFERENCE DRAWINGS/DOCUMENTS
a) 66kV Feeder C&R Panel,
b) 66kV Transformer Bay C&R Panel,

4.0

SYSTEM DESCRIPTION
The power distribution diagram is shown in the Single Line Diagram. As shown, 11kV
voltage is generated through inverter transformer which is further stepped up to 66 kv and
fed to grid.

5.0

STUDY APPROACH / BASIS & ASSUMPTIONS


The phase Fault level on 66kV bus is 10kA.
Grading margin of 0.25 seconds has been considered between outgoing and incomer
feeders.
Back-up protection for O/C and E/F has been considered upto two levels only.
Time of operation for Normal Inverse relay at 1.0 TMS (as per IEC)

t = / [(I/Is) - 1]
Where,
t = Tripping Time
I = Fault current
Is = Inverse time over current pickup,
TMS = Time Multiplier Setting
I/Is = Plug setting Multiplier = PSM
= 0.02, = 0.14
= 1,
= 13.5
= 2,
= 80

For Normal Inverse


For Very Inverse
For Extremely Inverse

10 MW Grid Tied SPV Plant at Charanka(GJ).

6.0

RELAY IDENTIFICATION TABLE


SN
1
2
3
4
5
6

7.0

RELAY NO.
50
50N
51
51N
67
87

DESCRIPTION
Instantaneous Over current
Instantaneous Earth fault
IDMT Over current
IDMT Earth fault
Directional Over current
Transformer Differential Protection

REMARKS

ATTACHMENTS
Attachment-1:

Summary of Relay settings

Attachment-2:

Overcurrent and Earth fault Relay Co-ordination curves

ATTACHMENT1
SummarySheet

Project:10MWGridTiedSPVPlantatCharanka(GJ)

Relay Setting Range

Relay Description
SR. No.

Service

66KVOUTGOINGFEEDER

TRANSFORMER1

Rated
Rating
voltage
(kW/kVA)
(Volts)
66KV

66KV

CT
Ratio
300600/1

6000KVA

60/1

Symbol

Service

Sheet1of1

Manuf.

ModelNo.

7SR1206

51
51N
67
67N

IDMTO/C
IDMTE/F
DIRO/C
DIRE/F

SIEMENS

51
50
50N
87

IDMTO/C
DTO/C
DTE/F
DIFFERENTIALPROTECTION

SIEMENS

SIEMENS

Parameter

7SR1103

7SR2422

MULTIPLIER
INITIALSETTING
1STBIASSLOPESETTING
1STBIASSLOPELIMIT
2NDBIASSLOPESETTING
DELAYSETTING

Recommended Relay Setting

PlugSetting

TimeDial

0.05to2.5In
0.005to0.5In
0.05to2.5In
0.05to2.5In

0.0251.6

0.05to2.5In
0.05to50In
0.05to5In

0.0251.6

TimeDial Time
(TMS)
Delay(s)

Relay
Characteristic

PlugSetting

0to20s
0to20s
0to20s

NormalInverse
Definitetime
NormalInverse
Definitetime

0.8
0.15
0.5
0.15

0.13
0.13

NormalInverse
Definitetime
Definitetime

1.1
13
0.2

0.26

0to14400s
0to14400s

TimeDelay

0.1.2In
0.1.0.7In
1.220In
12In

0.2
0.2

0.05
0.05

0.1
0.25
1.2
1
0

0To1s

OUTGOINGTO66KVTRANSFORMER

11KV

400/1

51
51N

IDMTO/C
IDMTE/F

ABB

REJ601

0.21In
0.055In

0.0251.6
0.0251.6

NormalInverse
NormalInverse

0.9
0.2

0.11
0.24

INCOMERTO11KVBOARD

11KV

400/1

51
51N

IDMTO/C
IDMTE/F

ABB

REJ601

0.21In
0.055In

0.0251.6
0.0251.6

NormalInverse
NormalInverse

0.8
0.15

0.07
0.13

INCOMERTORMU

11KV

100/1

51
50
50N

IDMTO/C
DTO/C
DTE/F

ABB

REJ601

0.21In
0.055In
0.05to50In

0.0251.6
0.0251.6

NormalInverse
Definitetime
Definitetime

0.8
16
0.15

0.12

0to14400s

0.05
0.05

Remarks

(directiontowardsgrid)
(directiontowardsgrid)

Project:10MWGridTied
SPVPlantatCharanka(GJ)

ATTACHMENT2.1

Sheet1of2

OVER CURRENT CURVES


100000
66kVOUTGOING
6MVATRAFO.PRIMARY
11KVOUTGOING
11KVINCOMER

10000

1.5MVATRAFOPRI

1000

100

TIME(SEC)

10

0.1

0.01
1

10

100

MVA

1000

10000

Project:10MWGridTied
SPVPlantatCharanka(GJ)

ATTACHMENT2.2

Sheet2of2

EARTH FAULT CURRENT CURVES


100000
6MVATRAFOPRI
66kVLINE
RMUI/C
11KVINCOMER

10000

11KVOUTGOING

1000

100
TIME(SEC)

10

0.1

0.01
1

10

100
If(A)

1000

10000

Project:10MWGridTied
SPVPlantatCharanka(GJ)

ATTACHMENT3
CALCULATION

Sheet1of2

66KV OUTGOING LINE


Setting Range
CT Ratio
Load Current
Fault Current
Current Setting
Relay Characteristics

=
=
=
=
=
=

300 / 1A
300.0 A
10.00 kA
80 %
Normal Inverse

IDMT O/C Relay setting


Multiples of plug setting current

10000
300 x 0.80

41.67

2.27 sec

Operating time of downstream O/C relay

0.05 sec

Allowing a grade margin of 250 msec,


Operating time required

0.300 sec

0.13

0.29 sec

222.22

2.27 sec

Operating time of downstream E/F relay (To Trafo feeder)

0.05 sec

Allowing a grade margin of 250 msec,


Operating time required

0.30 sec

0.132

0.29 sec

Relay opert'n time@

TMS

41.67

times PS and 1.0 TMS

0.30 sec
2.27 sec
2.27 x 0.13

Actual Opert'n time =


Recommended Settings :
Current Setting
TMS

=
=

t =

( PSM ) 1

80%
0.13

IDMT E/F Relay setting


Multiples of plug setting current
Relay opert'n time@

TMS
Actual Opert'n time =
Recommended Settings :
Current Setting
TMS

10000
300 x 0.15

=
222.22

times PS and 1.0 TMS

0.30 sec
2.3 sec
2.27 x 0.130
=
=

15%
0.13

t =

( PSM ) 1

Project:10MWGridTied
SPVPlantatCharanka(GJ)

ATTACHMENT3
CALCULATION

O/G to 6.0MVA TRANSFORMER


Relay, Make
Setting Range
CT Ratio
Load Current
Fault Current
Current Setting
Relay Characteristics

=
=
=
=
=
=
=

Sheet2of2

SIEMEN'S 7SR1103
0.1 to 40 In
60 / 1A
52.5 A
0.62 kA
110 %
Normal Inverse

IDMT Relay setting (51)


Fault current at the secondary side of 66/11kV, 6000 kVA transformer =
(Considering Z = 8.5% for 6000 KVA Transformer)

3.71

Reflected current on primary side = (66 kV) =


Multiples of plug setting current

618 A
618
60 x 1.10

9.36

3.06 sec

Operating time of downstream O/C relay

0.55 sec

Allowing a grade margin of 250 msec,


Operating time required

0.80 sec

0.26

0.80

Relay opert'n time@

TMS

9.36

times PS and 1.0 TMS

0.80 sec
3.06 sec
3.06 x 0.26

Actual Opert'n time =


Recommended Settings :
Current Setting
TMS

=
=

110%
0.26

Highset Setting (50)


Relay Setting range
Time delay

=
=

0.1 to 40 In
0-150 sec

The relay has to trip for a fault in the primary side of Trafo i.e @

Recommended Settings :
Current Setting
Time Delay (DT)

0.741
60 x 1.00

=
=

t =

( PSM ) 1

10.00 kA

The relay shall be set such that it does not operate for the reflected down stream fault of
66kV side
The minimum fault current for the relay to operate
(Considering 20% margin) =
0.6175 x 1.2 times =
Multiples of plug setting current

kA

1300%
0.05 sec

E/F Relay Setting (50N)


Relay Setting range
=
Time delay
=
0 to 64 sec
=
20%
Current setting
Time Delay (DT)
=
0.05 sec
The relay has to operate with minimum time delay for ground fault in the primary side of Transformer

0.6175 kA @

0.741 kA
=

12.35