Professional Documents
Culture Documents
SMC-9004D
Content
1 Safety Information ....................................................... 4
1.1 Application objective ........................................................................................... 4
1.2 Authorized operator ............................................................................................. 4
1.3 Safety rules and measuring protection.............................................................. 4
1.3.1 Power supply safety ................................................................................................. 5
1.3.2 Danger caused by hot, corrosive or over pressured gases ........................................ 5
1.3.3 Inspection and malfunction prevention .................................................................... 5
1.3.4 Switch off, pause and store....................................................................................... 5
1.4 Symbols used in this document ......................................................................... 5
3 Installation ..................................................................11
3.1 System installation ............................................................................................. 11
3.1.1 Install flange with pipe ........................................................................................... 11
3.1.2 Assembly of sample pipeline.................................................................................. 11
3.1.3 Assembly of system cabinet ................................................................................... 11
3.1.3 Installation of pneumatic pipe ................................................................................ 12
3.2 Electric installation............................................................................................. 12
3.2.1 Installation of power supply wire ........................................................................... 12
3.2.2 Installation of signal wire ....................................................................................... 12
3.3 Installation of Trace Heated Line ...................................................................... 12
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
5. Maintenance ............................................................. 18
5.1 General introduction .......................................................................................... 18
5.1.1 Patrol inspection ..................................................................................................... 18
5.1.2 Periodic draining and cleaning ............................................................................... 18
5.1.3 Heat preservation and heat tracing ......................................................................... 19
5.2 System daily maintenance ................................................................................ 19
5.2.1 Daily check-up ....................................................................................................... 19
5.2.2 Analyzer system maintenance list .......................................................................... 20
5.3 Infrared analyzer maintenance ......................................................................... 20
5.3.1 Manual calibration zero point and span point of infrared analyzer ........................ 20
5.3.2 Zero point calibration ............................................................................................. 20
5.3.3 Span point calibration ............................................................................................ 20
Note
This document is the explanation document of SMC-9004D analyzer
system for fine coal silo (1 measurement point).
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
1 Safety Information
1.1 Application objective
SMC-9004D gas analyzer system is used merely on the special devices in cement
plant. Maintenance personnel should be trained by specialists before taking the role
and attentions should be paid on following points:
Operations and maintenance work should be done strictly following: 1) the
procedures mentioned in this manual; 2) the equipment parameters; 3) installation
specifications and work condition requirements (refer to drawings, nameplate,
other project documents).
Provide all the measuring data neededsuch as data for maintenance and
measurement.
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
Warning
In order to eliminate potential risk, dangerous sources-such as toxic,
overpressure, overheat, or explosion gas-should be shut off before
replacing defective/failed parts.
1.3.3 Inspection and malfunction prevention
Important
During normal operation, any abnormality should be regarded as potential
problem, and special attention should be drawn on, which includes but
not limited- :
Over-range drift of measuring value
Power consumption increase sharply
Temperature rise increasingly for some components
Monitoring device be triggered somehow
Abnormal fierce vibration / fan noise becomes bigger
Smog and abnormal smell
1.3.4 Switch off, pause and store
SMC-9004D system will remain running during the factory shutdown.
The whole system should be stored in a clean and dry location if power off is longer than 7
days.
Important
Warns of the risk to destroy the system or components or reducing its
function.
Warning
Warns of dangers, which emerge by inappropriate handing, and which can
result in death, bodily harm and/or substantial property damage.
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
SMC-9004D
Gas Analyzer System
2 Product description
Working principle
System composition
System configuration
Technical data
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
2 Product Description
2.1 Working principle
The SMC-9004D gas analyzer system is especially designed for gas sampling and
analysis of cement plant. The analyzing system includes back-purgable sampling probe,
heated sample gas line, gas cooler, special powerful sample gas pump, filters, valves and
analyzer S710 (SIDOR). The sample pump draws the process gas from sample point,
through the sampling unit, transmission unit and pretreatment unit, and then into the
infrared analyzer. Thus, it can fulfill difficult measuring tasks with high dust loads or high
water content. If multiply sample points are required, the system can also be modified to
switch between several measuring points. In regularly intervals or on request the dust
filter and the probe can be blown out by means of backpurging using compressed gas. A
programmable logic controller executes all control functions. Thus, it can be adapted to a
wide variety of measuring tasks. This system is an elementary and economic solution for
standard applications.
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
1 set
2Sampling pipeline
1 set
3Pretreatment unit
Cabinet
Back flushing unit
Calibration unit
Control and data processing unit
1 set
4Analysis unit
1 set
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
Gaseous contaminant
Measuring range
CO:0-2000ppm;
O2:0-10%
Measuring accuracy
1%
Response time
O2, CO,
1)
Connection
Analog output
Relay output
Digital input
Power supply
sampling probe
230VAC/50Hz
500W/set
sampling pipeline
230VAC/50Hz
35W/m
SMC-9004D cabinet
230VAC/50Hz
1000W
Dimensionwidthheightthickness
sampling tube
SMC-9004D cabinet
Remarks:
1)
Response time is related to the length of sample line.
SICK MAIHAK(Beijing)Co.,Ltd.
SMC-9004D
SMC-9004D
Gas Analyzer System
Installation
System installation
Electrical installation
Installation of Trace Heated Line
SICK MAIHAK(Beijing)Co.,Ltd.
10
SMC-9004D
3 Installation
3.1 System installation
3.1.1 Install flange with pipe
Procedures:
Affirm and mark installing point
Remove the seal (if have)
Make a suitable hole on sample pointrefer to flange diameter
Insert flange (with pipe), pay attention to the position of fixed hole.
Weld flange into sample point.
Note
Seal flange holes quickly to prevent leakage once installation completed.
If possible, heat preservation measures can be taken for parts exposed in
air.
After the flange is installed, the probe can be installed.
3.1.2 Assembly of sample pipeline
Routing and mounting of sampling pipeline:
Sampling pipe can be laid out in the power cable tray, but need to separate from power
cables. Sampling pipe should be fastened with cable tray every 2m in horizontal direction
and every 1.5m in vertical direction, the minimal bending radius is 0.5m. in order to extend
life time of sampling pipe please try to avoid the direct sunlight.
From sampling probe to Gas Analyzer, the incline degree of complex sampling pipe
should be higher than 1%,
Or
Binding sampling pipe with a steel rope, and fixing the steel rope on stack. Special
measures need to be taken to guarantee the sampling pipe will not be scratched by stack
wall.
Sampling pipe and span gas pipe need to be back flushed at least 2 or 3 times before
connecting into the system, a leakage test for the whole system must be conducted after
these back flushing.
3.1.3 Assembly of system cabinet
System cabinet is recommended to locate inside shelter where there is no strong
electromagnetic and no mechanical vibration.
In order to shorten response time system cabinet location should be as close as possible
to the sampling point. The cabinet can be located by itselfs weight or by 4 bolts (M14)
fixing on steel supporting baseplate.
Ventilation pipe needs to be installed on the top of cabinet to ensure exhaust gas flow out
into air.
SICK MAIHAK(Beijing)Co.,Ltd.
11
SMC-9004D
Important
The system is not an explosion-proof system. Please do not operate the
system in explosion hazard.
3.1.3 Installation of pneumatic pipe
Calibration gases are lead to Cal. gas 1, Cal. gas 2 and Cal. gas 3 respectively via
nylon pipes of 6 mm in diameter, which are provided by the manufacturer.
Vent, exhaust and drainage outlet are leaded outside with nylon pipes of 6 mm in diameter,
which are provided by the manufacturer.
Sampling point and sampling gas inlet of the cabinet are connected with pipe of 8 mm in
diameter. The port Backflush gas 1 and Backflush gas 2 are lead to the decompressors
with filter via nylon pipe of 8 mm in diameter. The compressed air line is connected to inlet
of the filter. The pipe for compressed gas is supposed to be prepared by the customer.
SICK MAIHAK(Beijing)Co.,Ltd.
12
SMC-9004D
SMC-9004D
Gas Analyzer System
General
System calibration
Manual mode
Auto mode
Parameter setting
SICK MAIHAK(Beijing)Co.,Ltd.
13
SMC-9004D
Important
Check safety rules and earthing conductor before system power on!
4.1.2 Basic procedures
Switch on the main power supply; the indicating lamp should be on. Power on the
compressor cooler and PLC in sequence, then check if they can work normally.
Power on S710SIDORanalyzer. Wait few minutes for preheating and initiation.
Waiting few minutes for compressor cooler until targeted cooling temperature Is reach
(normally 2-5 degree C).
Operation can be carry out if everything is normalno alarm.
SICK MAIHAK(Beijing)Co.,Ltd.
14
SMC-9004D
SICK MAIHAK(Beijing)Co.,Ltd.
15
SMC-9004D
flushing automatically.
When the remote signal is off, you can execute the auto operation by the button Sample
gas.
When the backflushing is done in auto mode, the drain valves Y1 and Y2 will open
automatically to drain the water.
Set value
Adjusted way
5min-30min
PLC potentiometer 0
0S-357S
PLC potentiometer 1
In the initial set of the program, the data update time is set to 90S, and the auto sampling
interval time is set to 15 minutes approximately. When the parameter need be adjusted,
adjust the potentiometer.
SICK MAIHAK(Beijing)Co.,Ltd.
16
SMC-9004D
SMC-9004D
Gas Analyzer System
Maintenance
General introduction
System daily maintenance
Maintenance and Operation of infrared analyzer
SICK MAIHAK(Beijing)Co.,Ltd.
17
SMC-9004D
5. Maintenance
5.1 General introduction
Daily maintenance is a crucial job which insures safety and stable running of SMC-9004D
gas analyzer system. From maintenance point of view, preventive maintenance is always
better than corrective action when issue happened.
System daily maintenance contains:
patrol inspection periodic draining and cleaning
heat preservation and heat tracing troubleshooting
Interval of daily maintenance
Interval time of maintenance - which is affected by dust concentration, type of dust,
sampling gas temperature, programs developed and field environment - is set up by
operators. Hence, this parameter setting should follow experts advice. Generally
speaking, system maintenance should be carried out every 2-6weeks, and maintenance
results should be documented.
Maintenance protocol
Periodic maintenance should be carried out by experienced operators, or this
maintenance work can be contracted to SICKMAIHAK service team, SICKMAIHAK can
provide out customer with professional maintenance services.
5.1.1 Patrol inspection
Check system apparatus display and recordkeeping in touch with operators to know
system working status.
Check power supply, gas source (including compressed air, calibration gas).
Check heat strip inside sampling pipe.
Check corrosion situation for components and connectors of pretreatment part, repair
or replace defective parts.
Check leakage for joint parts of between system and flue.
SICK MAIHAK(Beijing)Co.,Ltd.
18
SMC-9004D
Warning
(1) Before maintenance, related technologists and operators should be
informed and certain permission should be gotten.
(2) System should be put into manual mode.
(3) Be careful for electric shock and high temperature during maintenance.
(4) Seal all parts tightly after cleaning.
5.1.3 Heat preservation and heat tracing
Check heat preservation, heat tracing of system is an important task of daily maintenance
which related to correctness of measured data and normal running of system.
SICK MAIHAK(Beijing)Co.,Ltd.
19
SMC-9004D
Maintenance Task
Check up running
analyzer system
manual calibration
point, span point
Remarks
state
1)
1day
of
for zero
2)
30days
180days
Y
Y
Y
Y
Calibration gas buying: Preparing to buy when gas pressure lower than
10bar, and stop using when gas pressure is lower than 1bar.
Concentration of Calibration gas should be between 80% and 100% of
full measuring range.
Note 1): increase /reducing times if necessary
Note 2): according to actual condition
SICK MAIHAK(Beijing)Co.,Ltd.
20
SMC-9004D
SMC-9004D
Gas Analyzer System
6 Trouble shooting
SICK MAIHAK(Beijing)Co.,Ltd.
21
SMC-9004D
6. Trouble shooting
6.1 Trouble-shooting for sample probe
Malfunction
phenomenon
do not heat up
Possible cause
Solution
Block
filter
of
probe
Poor maintenance
Cleaning or
probe filter.
Block
staff
of
probe
Cleaning
replacing
the
Checking
by
multi-meter,
replace it if necessary.
Replace it
do not heat up
Block of pipe
Possible cause
Solution
Heating
strip
sampling pipe.
Examining it by multi-meter,
replace it if necessary.
Poor maintenance
SICK MAIHAK(Beijing)Co.,Ltd.
damaged
inside
22
SMC-9004D
Possible cause
Solution
Switch on power supply and fix
correctly
Replacing
supply
Check wiring
PLC damage
Replace PLC
Alarm occurred
Identifying
alarm
Devices
damage
controlled
by
PLC
are
SICK MAIHAK(Beijing)Co.,Ltd.
24VDC
and
power
eliminating
Check wiring
23
SMC-9004D
Malfunction
phenomenon
Measuring value
is incorrect:
Eg. SO2/NO
value looks lower
but O2 looks
higher.
Possible cause
Treatment
Reseal
Leakage happened
solenoid valve
on
sampling
Sampling
flow is low
gas
Replace diaphragm
Clean or replace
condensing cylinder
Cleaning
magnetic valve
SICK MAIHAK(Beijing)Co.,Ltd.
24