PDA
CSL
PIT
GRL
GRL
Planned
Planned inspection
inspection ( Preferred )
GRL
Included
Included in
in project
project specifications
specifications
Planned
Planned costs
costs -- normal
normal pay
pay item
item
Unplanned
Unplanned inspection
inspection
in
in response
response to
to something
something gone
gone wrong
wrong
Unplanned
Unplanned costs
costs -- who
who pays?
pays?
Delays
Delays project,
project, extra
extra claims
claims
GRL
Low
Low Strain
Strain Integrity
Integrity Methods
Methods
PILE INTEGRITY TESTING (PIT)
Measure
Measure Pile
Pile Top
Top Motion,
Motion, Reflections
Reflections from
from Defects
Defects
For
For concrete
concrete piles,
piles, concrete
concrete filled
filled pipes,
pipes, drilled
drilled
shafts,
shafts, augercast
augercast piles,
piles, and
and sometimes
sometimes timber
timber piles.
piles.
CROSS
-HOLE SONIC LOGGING (CSL)
CROSS-HOLE
Determines
Determines Concrete
Concrete Quality
Quality Between
Between Tubes
Tubes in
in Shaft
Shaft
For
For drilled
drilled shafts
shafts and
and larger
larger augercast
augercast piles
piles
Accelerometer
measures response
ASTM D5882
(defect)
GRL
Local Defect:
small
Local Bulge:
small
medium
medium
GRL
large
large
GRL
Normal test
(pile top free)
Bad Pile
Good Pile
800 mm drilled shafts
L = 25 m (L/D = 31)
GRL
Test Pile
Defect
GRL#994034
GRL
GRL
Bulge
- / + cycle
Neck
+ / - cycle
Classifications
GRL
B - Bad Pile
Clear identification of serious defect; no toe signal
needs contingency tests or corrective measures
C - Possible Defect
re-test, other tests, reduce capacity or replace
D - Inconclusive data
(poor pile top quality,
or no reflections due to strong soil)
fix pile top & re-test; might give info for upper pile shaft
which is reason to accept pile.
GRL
PIT Limitations
Some studies suggest a 30 L/D limit.
Actually this is only a rule of thumb and
useable length depends on:
soil strength,
pile uniformity,
actual diameter and length,
and equipment noise and resolution.
We often see much farther
GRL
PIT Conclusions
GRL
Cross
Cross Hole
Hole Sonic
Sonic Logging
Logging
GRL
ASTM
ASTM D6760
D6760
Transmit
Receive
GRL
Arrival
Arrival
Arrival
Signal
Energy
GRL
Defect
Defect
Defect
GRL
GRL
GRL
GRL
GRL
CSL Conclusions
GRL
Can
Can find
find multiple
multiple defects
defects and
and their
their quadrant;
quadrant;
not
not sensitive
sensitive to
to pile
pile length
length or
or soil
soil
CSL
CSL finds
finds defects
defects between
between (steel)
(steel) access
access tubes;
tubes;
consider
consider defect
defect remedy
remedy in
in advance
advance
CSL
CSL access
access tubes
tubes in
in every
every shaft
shaft inspires
inspires
high
high quality
quality installation
installation for
for every
every shaft
shaft
(even
(even if
if do
do not
not test
test every
every shaft)
shaft)
Allows
Allows low
low cost
cost testing
testing access
access if
if problems
problems occur
occur
during
during installation
installation
Waterfall,
Waterfall, FAT
FAT and
and energy
energy compliment
compliment
interpretation
interpretation of
of results
results
GRL