Professional Documents
Culture Documents
New
Product
Pipe
HOST PIPE
Cast iron
Concrete
PVC
Truss
Corrugated pipe
Ductile Iron
Steel
Clay
RCP
Asbestos cement
Liners
LENGTH OF RUN
Manhole to manhole
Through manholes
Longer runs possible
SOIL CONDITIONS
DIFFICULTY
BEST
Original backfill
Expandable clay
Loose cobble
Beach & running sand
Densely compacted clay
Sandstone
WORST
6
BENTONITE LUBRICATION
USE
MAYBE
ALWAYS
7
GRUNDOMUDD
Bentonite Mixing & Delivery System
UPSIZING ABILITY
Soil conditions
Original trench
width
Expand enough
to overcut
Burst depth =
10x upsize
diameter
9
IMPORTANCE OF VIDEO
See it to believe it
Rely only on current video
Never burst blind
Communication between all parties
10
SERVICE CONNECTIONS
Fusion or Electro Fusion Welding
Insert-a Tees
Strap-on Service Saddles
Traditional Corp. Stop
PE Ball Valve
11
TOOL SELECTION
2 Major Categories of Bursting:
Pneumatic
Fracturable pipes (Cast Iron, VCP)
HDPE Installations
Static Hydraulic
Ductile pipe (Ductile Iron, Steel)
Fracturable pipe
Multiple product pipe options
12
13
STATIC BURSTING
Static Pull System
Hydraulically Operated
Roller Cutting Blades Split Pipe
Quick-Lock Bursting Rods
Burst Ductile Iron & Steel + Fracturable
Pull in Numerous Product Pipe Options
14
15
16
17
18
PIPE MATERIAL
Volatile Subject
Stumbling Block to the use of Pipe Bursting
Many Utilities Wont Consider certain Pipe Materials
Vested in one Type
Because of Familiarity, History, etc.
19
PIPE MATERIAL
HDPE Most Commonly Used for Pipe Bursting
Considerable Interest in other Pipe Material options
Other Options are Available
Bursting Equipment & Pipe Manufacturers Working
Together
Developing Real World Solutions
20
PIPE MATERIAL
Typical Pipe Characteristics
Sectional
Jointed
Gasketed
Allows for Some Level of Flexibility
21
PIPE MATERIAL
Typical Bursting Application:
Static Process
Hydraulic Puller
Cutting Blade
Expander
Quick Lock Bursting Rods
22
Static Hydraulic
23
Static Hydraulic
24
Static Hydraulic
25
Static Hydraulic
26
Static Hydraulic
27
Static Hydraulic
Installation details:
High residential area
Service connection pits with temporary by-pass lines set up
No driveways blocked - minimal exception during pull-in (couple of hours)
Pulled pipe every Tues & Wed for 4.5 months
Pull lengths approximately 640, half street per day
28
29
Pipe Burst
1160' 6" PVC
$2,831.00
$2,789.00
$601.22
$600.00
$0
$0
$27,156.00
$29,775.75
Materials
$12,411.00
$11,882.20
$37,759.25
$3,321.23
$1,401.43
$196.00
Asphalt Cutting
$0
$0
$0
$0
$3,665.80
$0
Compaction Tests
$535.00
$0
$594.00
$264.00
$4,712.50
$2,575.00
$185.63
$233.24
Sweeping
$620.00
$0
Road Base
$131.75
$0
Labor
$7,832.00
$5,698.50
Material
$1,735.15
$1,490.60
$102,171.73
$58,825.52
Trucking
CHANGEOVERS
30