Professional Documents
Culture Documents
PROCESO
OBRA
:
:
ADS N 0008-2011/MPH-CEP
MEJORAMIENTO DE LA PREVENCION Y CONTROL DEL RIESGO SANITARIO POR ENFERMEDADES
:
:
:
RESIDENTE
FINANCIA
MONTO CONTRATADO
SISTEMA DE CONTRATACION
:
:
:
MODALIDAD DE EJECUCION
FECHA DE FIRMA DE CONTRATO
CONSORCIO HUARAL
ING. LUDWIG DAVID SALAZAR SANCHEZ
CONTRATO N
VALOR REFERENCIAL
HUARAL
S/.
261,982.52
S/.
284,763.62
SUMA ALZADA
LLAVE EN MANO
:
:
:
:
:
:
:
:
:
:
:
:
:
8/24/2011
9/8/2011
9/9/2011
180 D.C
12/30/1899
LIQUIDACION DE LA OBRA
Obra
Sistem. de Contrat.
Supervisor de Obra
SUMA ALZADA
Residente de Obra
Pto Contrat.
6,089,021.62
C/IGV
Pto Contrat.
5,160,187.81
S/IGV
Fecha de Inicio
Contratista
CONSORCIO BERAKAH
240 D.C.
12/17/2014
Ampliacin de Plazo 1
121 D.C.
Fecha de termino
ITEM
DESCRIPCION
1.00
1.01
PRESUPUESTO PRINCIPAL
1.02
DEDUCTIVO DE OBRA
1.03
ADICIONAL DE OBRA
TOTAL
2.00
REJUSTES Y DEDUCCIONES
2.01
2.02
2.03
APROBADO
DE LOS ADELANTOS
3.01
ADELANTO DIRECTO
3.02
ADELANTO DE MATERIALES
4.01
4.02
4.03
DE LOS ADELANTOS
TOTAL
5.00
5.01
MULTA
4,731,278.86
5,160,187.81
428,908.95
4,731,278.86
10,017.93
0.00
384.35
10,402.28
29,587.70
0.00
0.00
29,587.70
0.00
384.35
384.35
0.00
0.00
0.00
0.00
1,662,254.50
1,662,254.50
0.00
0.00
0.00
928,833.81
1,872.41
0.00
930,706.22
77,203.61
5,325.79
299,205.81
381,735.21
851,630.20
0.00
0.00
851,630.20
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
6.00
6.01
6.02
6.03
DE LOS ADELANTOS
6.04
DE I.G.V. ( 19% )
6.05
SALDO A FAVOR
428,908.95
TOTAL
4.00
PAGADO
5,160,187.81
TOTAL
3.00
12/12/2015
4,731,278.86
384.35
0.00
851,630.20
0.00
5,583,293.41
TOTAL
TOTALES
Sistem. de Contrat.
Supervisor de Obra
Residente de Obra
Pto Contrat.
6,089,021.62
C/IGV
Pto Contrat.
5,160,187.81
S/IGV
Fecha de Inicio
Contratista
CONSORCIO BERAKAH
Ampliacin de Plazo 1
Fecha de termino
SUMA ALZADA
240 D.C.
12/17/2014
121 D.C.
12/12/2015
MONTOS AUTORIZADOS
MONTO DEL CONTRATO
DEDUCTIVO DE OBRA
ADICIONAL DE OBRA
REINTEGRO DE OBRA
SUBTOTAL
I.G.V. (18 %)
COSTO TOTAL DE LA OBRA
SON: SEIS MILLONES SESENTA Y SEIS MIL TRESCIENTOS OCHENTA Y DOS CON 82/100 SOLES
5,160,187.81
0.00
0.00
-19,185.42
5,141,002.39
925,380.43
6,066,382.82
SALDO EN CONTRA
0.00
0.00
-19,569.77
0.00
0.00
-19,569.77
0.00
-1,662,254.50
-1,662,254.50
0.00
-3,453.38
-299,205.81
-302,659.19
0.00
0.00
0.00
-19,569.77
-1,662,254.50
-302,659.19
541,026.03
-1,443,457.43
4,139,835.97
RESUMEN DE VALOR
ADJUDICACION
OBRA
CONTRATISTA
FECHA DE
PRESENT.
I.G.V. 18%
CONSORCIO BERAKAH
FECHA DE
PAGO
AVANCE CONTRATADO
%
MONTO
MES
REAJUSTE
OTROS
ACUM
Subtotal
Adelanto Directo
Adelanto Materiales
Dec-14
01
0.00
0.00%
0.00%
0.00
Jan-15
02
7,245.77
0.14%
0.14%
364.56
Feb-15
03
5,761.02
0.11%
0.25%
1,934.37
Jun-15
04
113,932.95
2.21%
2.46%
5,571.02
Jul-15
05
84,306.79
1.63%
4.09%
4,843.68
Aug-15
06
113,932.95
2.21%
6.30%
8,089.24
Sep-15
07
58,427.33
1.13%
7.43%
5,024.75
Oct-15
08
0.00
0.00%
7.43%
0.00
Nov-15
09
19,672.07
0.38%
7.82%
1,632.78
Dec-15
10
25,630.07
0.50%
8.31%
2,127.30
TOTAL
SALDOS
PLAZO DE EJECUCION :
428,908.95
29,587.70
4,731,278.86
361
D.C
FECHA DE INICIO
403,278.88
5,547,995.59
458,496.65
RESUMEN DE VALORIZACIONES
ECHA DE INICIO
928,833.81 IGV
0.00 IGV
6,089,021.62 TOTAL
0.00 TOTAL
AMORTIZACION
VALORIZ.
BRUTA
ADELANTOS
DIRECTO
VALORIZ.
MATERIAL
I.G.V
ADELANTO
NETA
I.G.V
CALENDARIO
DEL
COMPROMISO
ADELANTO
VN + IGV
5,160,187.81
0.00
0.00
1,662,254.50
315,828.36
0.00
0.00
0.00
0.00
0.00
0.00
7,610.33
0.00
0.00
7,610.33
1,369.86
8,980.19
7,695.39
0.00
0.00
7,695.39
1,385.17
9,080.56
119,503.97
0.00
0.00
119,503.97
21,510.71
141,014.68
89,150.47
0.00
0.00
89,150.47
16,047.08
105,197.55
122,022.19
0.00
0.00
122,022.19
21,963.99
143,986.18
63,452.08
0.00
0.00
63,452.08
11,421.37
74,873.45
0.00
0.00
0.00
0.00
0.00
0.00
21,304.85
0.00
0.00
21,304.85
3,834.87
25,139.72
27,757.37
0.00
0.00
27,757.37
4,996.33
32,753.70
458,496.65
0.00
0.00
458,496.65
82,529.38
0.00
-1,662,254.50
1,662,254.50
315,828.36
541,026.03
5,547,995.59
-1,662,254.50
12/17/2014
12/12/2015
1,662,254.50
299,205.81
1,961,460.31
RETENCION
PAGADO
10.00%
EFECTIVO
Inc. IGV
0.00
0.00
0.00
8,980.19
0.00
9,080.56
0.00
141,014.68
0.00
105,197.55
0.00
143,986.18
0.00
74,873.45
0.00
0.00
0.00
25,139.72
0.00
32,753.70
0.00
541,026.03
541,026.03
ESPECIALIDAD DE A
CONTRATO P
LPN N
: 001-2012-MPO/CE
OBRA
UBICACIN
CONTRATISTA
SUPERVISIN
ADEL. DE MATERIALES :
PRESUPUESTO OBRA S/.
S/. 1,961,460.31
INC. IGV.
S/. 1,662,254.50
SIN IGV
S/. 6,089,021.62
INC. IGV.
S/. 5,160,187.81
SIN IGV.
FORMULA GENERAL :
Pagado en:
Aug-15
D= ( (
_() _))/
_
MES DE LA
VALORIZACIN
ADELANTO OTORGADO
FECHA
IU = 21
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
Aug-15
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
Aug-15
TOTALES
IU = 3
TOTALES
AGREGADO FINO
IU = 4
Val N 01
Val N 02
Val N 03
Val N 04
Val N 05
Val N 06
Val N 07
Val N 08
Val N 09
Val N 10
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
Aug-15
TOTALES
MADERA IMPORTADA PARA ENCOF. Y CARPINT.
Val N 05
Dec-14
Val N 08
Jan-15
Val N 09
Feb-15
Val N 10
Jun-15
Val N 11
Jul-15
Val N 12
Aug-15
Val N 13
Sep-15
Val N 14
Oct-15
Val N 15
Nov-15
Val N 17
Dec-15
IU = 42
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
Aug-15
TOTALES
TOTALES
Notas:
1. Cuando el adelanto utilizado (AU) alcanza el mismo monto que el Adelanto Deflacionado, deben interrumpirse las Deducciones
ING. SUPERVISOR:
12/17/2014
121 D.C.
AMPLIACION DE PLAZO
FECHA TERMINO:
12/12/2015
361 D.C.
el Presupuesto Base
ADELANTO OTORGADO
ADELANTO
Adel (A)
354,456.07
Imo
Dec-14
375.64
INDICES
Ima
Aug-15
389.65
COEFICIENTE
Imr
375.64
389.65
389.65
389.65
389.65
389.65
389.65
389.65
389.65
0.067
100.00%
354,456.07
392,880.20
MONTO
DEFLATADO
Adel*Imo/Ima
341,711.48
341,711.48
501.72
462.12
501.72
509.07
517.67
496.56
458.09
462.12
457.96
461.49
468.48
468.66
0.072
100.00%
426,546.90
392,880.20
372,710.75
426,546.90
1,020.54
1,026.44
1020.54
1026.64
1028.43
1029.50
1028.72
1026.44
1040.14
1043.81
1041.14
1048.03
0.152
44.079%
372,710.75
542,207.48
542,207.48
1,662,254.50
370,568.40
370,568.40
261.54
280.35
261.54
263.40
266.59
276.83
277.84
280.35
272.68
280.69
284.48
286.45
0.152
55.92%
505,828.23
505,828.23
1,644,655.01
DEDUCCIN
D=AU*(Imr-Ima)/Imo
0.00
485.47
385.99
7,633.51
5,648.55
7,633.51
3,914.63
0.00
19,988.53
45,690.19
0.00
0.00
521.70
414.79
8,203.17
6,070.09
8,203.17
4,206.77
0.00
1,416.39
1,845.37
48.82
45.93
563.10
-48.76
-34.88
17.95
24.05
30,881.45
616.21
0.00
485.47
385.99
7,633.52
2,400.62
2,401.62
0.10
0.75
22.89
34.58
50.81
13,307.22
109.12
0.00
615.89
489.69
9,684.29
7,166.07
9,684.29
4,966.32
0.00
1,672.12
1,845.37
-39.91
-25.76
-130.34
-68.77
-145.64
26.40
43.04
36,124.04
-340.99
126,002.90
384.35
Sistem. de Contrat.
Supervisor de Obra
Residente de Obra
284,763.62
CONSORCIO BERAKAH
SUMA ALZADA
240 D.C.
Fecha de Inicio
12/17/2014
Ampliacin de Plazo 1
121 D.C.
Fecha de termino
12/12/2015
Dec-14
INDICE BASE
INDICE
DESCRIPCION
SIMBOLO
INCIDENCIA %
FACTOR
Dec-14
47
100.000
-
INDICE
Jan-15
COEF.
INDICE
0.249
523.700
523.700
0.250
523.150
0.062
375.640
375.640
0.060
389.650
0.072
501.720
501.720
0.070
509.070
44.079
0.152
1,020.540
1,020.540
0.070
1,026.640
55.921
100.000
0.152
261.540
261.540
0.080
263.400
100.000
-
0.079
346.680
346.680
0.080
348.430
0.386
404.870
404.870
0.390
405.560
100.000
21
FE
100.000
100.000
100.000
100.000
AGREGADO FINO
42
48
MA
100.000
39
100.000
100.000
INDICE K DE REAJUSTE
1.000
Jan-15
Feb-15
COEF.
INDICE
Jun-15
COEF.
INDICE
Jul-15
COEF.
INDICE
Aug-15
COEF.
INDICE
Sep-15
COEF.
INDICE
Oct-15
COEF.
INDICE
0.249
523.150
0.249
523.150
0.249
523.150
0.249
544.590
0.259
544.590
0.259
544.590
0.064
389.650
0.064
389.650
0.064
389.650
0.064
389.650
0.064
389.650
0.064
389.650
0.073
517.670
0.074
496.560
0.071
458.090
0.066
462.120
0.066
457.960
0.066
461.490
0.067
1,028.430
0.068
1,029.530
0.068
1,028.720
0.068
1,026.440
0.067
1,040.140
0.068
1,043.810
0.086
266.590
0.087
276.830
0.090
277.840
0.090
280.350
0.091
272.680
0.089
280.690
0.079
350.890
0.080
356.200
0.081
357.000
0.081
359.330
0.082
358.590
0.082
359.730
0.387
406.790
0.388
415.200
0.396
417.070
0.398
418.640
0.399
418.760
0.399
419.350
1.005
1.010
1.019
1.016
1.028
1.027
Oct-15
Nov-15
COEF.
INDICE
Dec-15
COEF.
INDICE
COEF.
0.259
544.590
0.259
544.590
0.259
0.064
389.650
0.064
389.650
0.064
0.066
468.480
0.067
468.660
0.067
0.069
1,041.140
0.068
1,048.030
0.069
0.091
284.480
0.092
286.450
0.093
0.082
363.200
0.083
364.860
0.083
0.400
420.800
0.401
422.670
0.403
1.031
1.034
1.038
OBRA
UBICACIN
V. REFERENCIAL
6,089,021.62
Imo
Dec-14
V. SIN IGV
5,160,187.81
Ima
Jun-15
FORMULA
K = 0.249*(Mr /Mo ) + 0.062*(Cr /Co ) + 0.072*(Ar /Ao ) + 0.152*(MAr /MAo ) + 0.079*(Mr /Mo ) + 0.386*(Ir/Io)
DESCRIPCION
INDICE
21
3
4
42
Coeficiente de Incidencia
Monomio
(1)
(2)
0.067
0.072
0.152
0.152
100.000%
100.000%
44.079%
55.921%
E ADELANTO DE MATERIALES
Saldo x Valorizar
Indice Base
Adelanto Maximo
S/IGV
Imo
Ima
a otrgar
(3)
(4)
(5)
(6)= 1*2*3*(5/4)
5,160,187.81
5,160,187.81
5,160,187.81
5,160,187.81
354.74
469.58
955.01
223.94
389.65
496.56
1,029.53
276.83
379,756.16
392,880.20
372,710.75
542,207.48
SUBTOTAL
IGV 18%
TOTAL
1,687,554.59
303,759.83
1,991,314.42
Adelanto Solicitado
S/I.G.V.
Adelanto Concedido
S/I.G.V.
354,456.07
397,116.76
376,760.12
546,245.90
354,456.07
392,880.20
372,710.75
542,207.48
1,662,254.50
299,205.81
1,961,460.31
32.21%
: INSTALACION DEL SERVI INSTALACION DEL SERVICI INSTALACION DEL SERVICINSTALACION DEL SERVICI
UBICACIN
CONTRATISTA
CONSORCIO BERAKAH
ADELANTO DIRECTO
S/. 0.00
INC. IGV.
S/. 0.00
SIN IGV
(AD)
S/. 5,160,187.81
SIN IGV
(C)
S/. 6,089,021.62
INC. IGV.
ING. RESIDENTE:
ING. SUPERVISOR:
240 D.C.
FECHA INICIO:
12/17/2014
AMPLIACION DE PLAZO
121 D.C.
FECHA TERMINO:
12/12/2015
361 D.C.
FORMULA GENERAL :
D=/
(/1)
Val N 01
Val N 02
Val N 03
Val N 04
Val N 05
Val N 06
Val N 07
Val N 08
Val N 09
Val N 10
TOTALES
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
COEFICIENTES
MES DE PAGO DE LA
VALORIZACION
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
MONTO DE LA VALORIZ.
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
428,908.95
MES DE PAGO DE LA
VALORIZACION (K)
1.000
1.005
1.010
1.019
1.016
1.028
1.027
1.031
1.034
1.038
R ADELANTO DIRECTO
INSTALACION DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO DE QENHUAPUNKU - CHUYMAY QUIAHUASI, DISTRITO DE TOTOS, PROV. DE CANGALLO , AYACUCHO
COEFICIENTES
DEDUCCIN (D)
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
D = V*AD/C((K/Ka)-1)
0.00
Sistem. de Contrat.
Supervisor de Obra
Residente de Obra
Pto Contrat.
6,089,021.62
Contratista
CONSORCIO BERAKAH
Fecha de Inicio
Ampliacin de Plazo 1
Fecha de termino
S/.
0.00
S/.
5,160,187.81
1.000
(2)
(3)
VALORIZ.
(4)
(5)
VxK
AxV/C
(6)
VALORIZACION
N
FECHA
01
02
03
04
05
06
07
08
09
10
TOTAL
Dec-14
Jan-15
Feb-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
0.00
7,245.77
5,761.02
113,932.95
84,306.79
113,932.95
58,427.33
0.00
19,672.07
25,630.07
428,908.95
1.000
1.005
1.010
1.019
1.016
1.028
1.027
1.031
1.034
1.038
0.00
7,282.00
5,818.63
116,097.68
85,655.70
117,123.07
60,004.87
0.00
20,340.92
26,604.01
(k/ka-1)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.005
0.010
0.019
0.016
0.028
0.027
0.031
0.034
0.038
438,926.88
10,017.93
(7)
(8)
(9)
VRC
REINTEGRO
(4) - (7)
(8) - (2)
(5) x (6)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,282.00
5,818.63
116,097.68
85,655.70
117,123.07
60,004.87
0.00
20,340.92
26,604.01
0.00
36.23
57.61
2,164.73
1,348.91
3,190.12
1,577.54
0.00
668.85
973.94
0.00
438,926.88
10,017.93
CUADRO CORREGIDO DE
OBRA
CONSTRUCCION DE ESCALONATAS EN EL BARRIO DE COLCAPATA Jr. LOS CIPRESES Y PASAJE LOS EUCALIPTOS - OYON
INSPECTOR:
RESIDENTE:
CONTRATISTA:
PLAZO DE EJECUCION
ENTREGA DE TERRENO
PRES. REFER.:
83,789.28
PRES. CONTR:
83,803.10
FECHA DE TERMINO
PRESUPUESTO CONTRACTUAL
ITEM
VALORIZACION 1
DESCRIPCION
UND
METRADO
PRECIO
PARCIAL
METRADO
VALORIZACION 2
PARCIAL
ESTRUCTURAS
01
OBRAS PROVISIONALES
01.01
02
TRABAJOS PRELIMINARES
02.01
TRAZO Y REPLANTEO
03
MOVIMIENTO DE TIERRAS
03.01
03.02
UND
1.00
410.37
410.37
100.00%
1.00
410.37
0.00%
M2
368.18
1.25
460.23
100.00%
368.18
460.23
0.00%
M3
207.65
16.04
3,330.71
100.00%
207.65
3,330.71
0.00%
M3
56.55
14.04
793.96
60.00%
33.93
476.38
0.00%
03.03
M3
90.99
13.73
1,249.29
75.00%
68.24
936.93
0.00%
03.04
M2
377.01
15.80
5,956.76
60.00%
226.20
3,573.96
0.00%
03.05
M2
285.04
3.09
880.77
60.00%
171.02
528.45
0.00%
03.06
M3
207.85
18.53
3,851.46
100.00%
207.85
3,851.46
0.00%
03.07
M3
207.85
5.83
1,211.77
0.00%
0.00
0.00
50.00%
04
04.01
M3
19.06
148.92
2,838.42
100.00%
19.06
2,838.42
0.00%
04.02
M3
8.60
177.39
1,525.55
70.00%
6.02
1,067.88
30.00%
04.03
M2
90.39
20.40
1,843.96
70.00%
63.27
1,290.71
30.00%
04.04
M2
101.02
19.50
1,969.89
100.00%
101.02
1,969.89
0.00%
04.05
M3
7.13
220.32
1,570.88
0.00%
0.00
0.00
0.00%
04.06
M2
28.66
21.86
626.51
0.00%
0.00
0.00
0.00%
04.07
KG
373.97
4.43
1,656.69
0.00%
0.00
0.00
0.00%
05
05.01
ZAPATAS
05.01.01
M3
60.61
270.05
16,367.73
100.00%
60.61
16,367.73
0.00%
05.01.02
KG
3,774.46
4.20
15,852.73
100.00%
3,774.46
15,852.73
0.00%
05.02
05.02.01
M3
28.38
295.76
8,393.67
100.00%
28.38
8,393.67
0.00%
05.02.02
KG
2,717.78
4.20
11,414.68
100.00%
2,717.78
11,414.68
0.00%
05.02.03
M2
138.18
30.55
4,221.40
100.00%
138.18
4,221.40
0.00%
05.03
COLUMNAS
05.03.01
M3
31.18
347.58
10,837.54
55.00%
17.25
5,995.76
20.00%
05.03.02
KG
4,406.01
4.08
17,976.52
60.00%
2,643.60
10,785.89
15.00%
05.03.03
M2
272.01
34.31
9,332.66
60.00%
163.00
5,592.53
15.00%
05.04
VIGAS
05.04.01
M3
25.12
298.19
7,490.53
0.00%
0.00
0.00
60.00%
05.04.02
KG
3,789.60
4.15
15,726.84
30.00%
1,136.88
4,718.05
30.00%
05.04.03
M2
161.69
42.14
6,813.62
30.00%
48.50
2,043.79
28.00%
05.05
LOSAS ALIGERADAS
05.05.01
M3
21.92
294.82
6,462.45
0.00%
0.00
0.00
100.00%
05.05.02
KG
1,698.38
4.28
7,269.07
0.00%
0.00
0.00
100.00%
05.05.03
05.05.04
05.06
ESCALERA
05.06.01
05.06.02
05.06.03
06
ESTRUCTURA SANITARIA
06.01
M2
259.78
29.42
7,642.73
0.00%
0.00
0.00
75.00%
2,086.42
2.56
5,341.24
0.00%
0.00
0.00
100.00%
M3
3.28
297.47
975.70
0.00%
0.00
0.00
0.00%
KG
290.55
4.24
1,231.93
20.00%
58.11
246.38
17.00%
M2
14.16
52.31
740.71
0.00%
0.00
0.00
0.00%
M3
0.23
292.73
67.33
0.00%
0.00
0.00
0.00%
06.02
M2
3.30
31.25
103.13
0.00%
0.00
0.00
0.00%
07
ESTRUCTURA DE MADERA
07.01
UND
11.00
1,132.20
12,454.20
0.00%
0.00
0.00
55.00%
07.02
UND
22.00
111.03
2,442.66
0.00%
0.00
0.00
0.00%
07.03
UND
192.00
18.86
3,621.12
0.00%
0.00
0.00
0.00%
08
DISEOS Y ENSAYOS
08.01
DISEO DE MEZCLA
GLB
1.00
126.05
126.05
50.00%
0.50
63.02
50.00%
UND
#REF!
#REF!
S/.
203,083.46
S/.
106,431.02
S/.
18,277.51
S/.
9,578.79
UTILIDAD
S/.
16,246.68
S/.
8,514.48
S/.
237,607.65
S/.
124,524.29
8.00%
SUBTOTAL
FACTOR DE RELACION
1.07999998
1.07999998
SUBTOTAL REAL
S/.
256,616.26
S/.
134,486.24
I.G.V. 19.00 %
S/.
48,757.09
S/.
25,552.39
TOTAL PRESUPUESTO
S/.
305,373.35
S/.
160,038.63
100.00%
52.41%
100.00%
52.41%
CUADRO CORREGIDO DE
OBRA
CONSTRUCCION DE ESCALONATAS EN EL BARRIO DE COLCAPATA Jr. LOS CIPRESES Y PASAJE LOS EUCALIPTOS - OYON
INSPECTOR:
RESIDENTE:
CONTRATISTA:
PLAZO DE EJECUCION
ENTREGA DE TERRENO
PRES. REFER.:
83,789.28
PRES. CONTR:
83,803.10
FECHA DE TERMINO
PRESUPUESTO CONTRACTUAL
ITEM
VALORIZACION 1
DESCRIPCION
UND
METRADO
PRECIO
PARCIAL
METRADO
VALORIZACION 2
PARCIAL
ARQUITECTURA
01
01.01
M2
204.97
97.06
19,894.39
30.00%
61.10
5,930.37
44.00%
01.02
M2
123.06
49.08
6,039.78
25.00%
30.83
1,513.14
49.00%
02
02.01
M2
866.87
11.42
9,899.66
0.00%
0.00
0.00
0.00%
02.02
M2
311.87
18.09
5,641.73
0.00%
0.00
0.00
0.00%
02.03
124.80
8.74
1,090.75
0.00%
0.00
0.00
0.00%
02.04
89.65
5.08
455.42
0.00%
0.00
0.00
0.00%
02.05
BRUAS DE 10 CM
548.78
3.76
2,063.41
0.00%
0.00
0.00
0.00%
03
CIELORASOS
03.01
M2
250.14
20.82
5,207.91
0.00%
0.00
0.00
0.00%
03.02
M2
257.93
36.57
9,432.50
0.00%
0.00
0.00
0.00%
03.03
M2
14.16
16.99
240.58
0.00%
0.00
0.00
0.00%
03.04
UND
18.00
19.05
342.90
0.00%
0.00
0.00
0.00%
04
PISOS Y PAVIMENTOS
04.01
M2
657.85
8.75
5,756.19
18.00%
120.78
1,056.83
82.00%
04.02
M2
657.85
14.61
9,611.19
9.00%
60.39
882.30
91.00%
04.03
M2
396.70
20.25
8,033.18
0.00%
0.00
0.00
0.00%
04.04
M2
79.98
34.25
2,739.32
0.00%
0.00
0.00
0.00%
04.05
100.80
5.60
564.48
0.00%
0.00
0.00
0.00%
05
ZOCALOS Y CONTRAZOCALOS
05.01
54.43
5.90
321.14
0.00%
0.00
0.00
0.00%
05.02
117.38
7.69
902.65
0.00%
0.00
0.00
0.00%
06
CARPINTERIA METALICA
06.01
M2
79.32
180.00
14,277.60
0.00%
0.00
0.00
0.00%
06.02
M2
19.08
190.00
3,625.20
0.00%
0.00
0.00
0.00%
07
CERRAJERIA
07.01
PZA
18.00
8.44
151.92
0.00%
0.00
0.00
1.00%
07.02
PZA
6.00
65.14
390.84
0.00%
0.00
0.00
0.00%
07.03
JGO
6.00
8.81
52.86
0.00%
0.00
0.00
0.00%
08
08.01
P2
896.25
12.39
11,104.54
0.00%
0.00
0.00
0.00%
09
PINTURA
09.01
M2
866.87
4.49
3,892.25
0.00%
0.00
0.00
0.00%
09.02
M2
577.68
4.07
2,351.16
0.00%
0.00
0.00
0.00%
09.03
M2
231.81
3.88
899.42
0.00%
0.00
0.00
0.00%
09.04
M2
311.86
6.22
1,939.77
0.00%
0.00
0.00
0.00%
09.05
M2
98.40
7.03
691.75
0.00%
0.00
0.00
0.00%
10
PIZARRAS
10.01
UND
6.00
454.39
2,726.34
0.00%
0.00
0.00
0.00%
10.02
UND
6.00
118.38
710.28
0.00%
0.00
0.00
0.00%
11
COBERTURAS
11.01
M2
339.06
18.88
6,401.45
0.00%
0.00
0.00
0.00%
11.02
26.10
40.88
1,066.97
0.00%
0.00
0.00
0.00%
12
12.01
63.25
48.71
3,080.91
0.00%
0.00
0.00
0.00%
12.02
63.25
24.90
1,574.93
0.00%
0.00
0.00
0.00%
12.03
UND
14.00
9.30
130.20
0.00%
0.00
0.00
0.00%
12.04
UND
4.00
19.20
76.80
0.00%
0.00
0.00
0.00%
13
OTROS
13.01
368.18
0.31
114.14
0.00%
0.00
0.00
0.00%
M2
#REF!
#REF!
S/.
143,496.51
S/.
9,382.64
S/.
12,914.69
S/.
844.44
UTILIDAD
8.00%
SUBTOTAL
S/.
11,479.72
S/.
750.61
S/.
167,890.92
S/.
10,977.69
FACTOR DE RELACION
1.07999998
1.07999998
SUBTOTAL REAL
S/.
181,322.19
S/.
11,855.90
I.G.V. 19.00 %
S/.
34,451.22
S/.
2,252.62
TOTAL PRESUPUESTO
S/.
215,773.41
S/.
14,108.52
100.00%
6.54%
100.00%
6.54%
CUADRO CORREGIDO DE
OBRA
CONSTRUCCION DE ESCALONATAS EN EL BARRIO DE COLCAPATA Jr. LOS CIPRESES Y PASAJE LOS EUCALIPTOS - OYON
INSPECTOR:
RESIDENTE:
CONTRATISTA:
PLAZO DE EJECUCION
ENTREGA DE TERRENO
PRES. REFER.:
83,789.28
PRES. CONTR:
83,803.10
FECHA DE TERMINO
PRESUPUESTO CONTRACTUAL
ITEM
VALORIZACION 1
DESCRIPCION
UND
METRADO
PRECIO
PARCIAL
METRADO
VALORIZACION 2
PARCIAL
INSTALACIONES ELECTRICAS
01
01.01
PTO
38.00
61.46
2,335.48
0.00%
0.00
0.00
0.00%
01.02
PTO
2.00
61.60
123.20
0.00%
0.00
0.00
0.00%
01.03
PTO
60.00
60.38
3,622.80
0.00%
0.00
0.00
0.00%
02
CANALIZACIONES DE TUBERIA
02.01
80.00
13.45
1,076.00
0.00%
0.00
0.00
50.00%
02.02
460.00
7.65
3,519.00
0.00%
0.00
0.00
59.00%
03
CABLEADO
03.01
40.00
4.29
171.60
0.00%
0.00
0.00
0.00%
03.02
916.00
5.29
4,845.64
0.00%
0.00
0.00
0.00%
04
MONTAJE DE TABLEROS
04.01
PZA
1.00
537.11
537.11
0.00%
0.00
0.00
0.00%
05
05.01
UND
38.00
40.31
1,531.78
0.00%
0.00
0.00
0.00%
05.02
JGO
2.00
45.97
91.94
0.00%
0.00
0.00
0.00%
06
PUESTAS A TIERRA
04.04
UND
1.00
411.83
411.83
0.00%
0.00
0.00
0.00%
#REF!
#REF!
S/.
18,266.38
S/.
S/.
1,643.97
S/.
UTILIDAD
S/.
1,461.31
S/.
S/.
21,371.66
S/.
8.00%
SUBTOTAL
FACTOR DE RELACION
1.07999998
1.07999998
SUBTOTAL REAL
S/.
23,081.39
S/.
I.G.V. 19.00 %
S/.
4,385.46
S/.
TOTAL PRESUPUESTO
S/.
27,466.85
S/.
100.00%
0.00%
100.00%
0.00%
RO CORREGIDO DE VALORIZACIONES
PLAZO DE EJECUCION
ENTREGA DE TERRENO
30 D.C.
30-11-10
01-12-10
FECHA DE TERMINO
30-12-10
VALORIZACION 3
PARCIAL
METRADO
VALORIZACION 4
PARCIAL
METRADO
VALORIZACION 5
PARCIAL
METRADO
VALORIZACION ACUMULADA
PARCIAL
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
40.00%
22.62
317.58
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
25.00%
22.75
312.36
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
40.00%
150.81
2,382.80
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
40.00%
114.02
352.32
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
103.92
605.86
50.00%
103.93
605.91
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
2.58
457.67
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
27.12
553.25
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
7.13
1,570.88
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
28.66
626.51
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
373.97
1,656.69
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
6.00
2,085.47
25.00%
7.93
2,756.31
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
660.00
2,692.80
25.00%
1,102.41
4,497.83
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
40.00
1,372.40
25.00%
69.01
2,367.73
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
15.00
4,472.85
40.00%
10.12
3,017.68
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
1,130.00
4,689.50
40.00%
1,522.72
6,319.29
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
45.00
1,896.30
42.00%
68.19
2,873.53
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
21.92
6,462.45
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
1,698.38
7,269.07
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
195.00
5,736.90
25.00%
64.78
1,905.83
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
2,086.42
5,341.24
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
3.28
975.70
0.00%
0.00
0.00
100.00%
50.00
212.00
63.00%
182.44
773.55
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
14.16
740.71
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.23
67.33
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
3.30
103.13
0.00%
0.00
0.00
100.00%
6.00
6,793.20
0.00%
0.00
0.00
45.00%
5.00
5,661.00
0.00%
0.00
0.00
100.00%
0.00
0.00
55.00%
12.00
1,332.36
45.00%
10.00
1,110.30
0.00%
0.00
0.00
100.00%
0.00
0.00
52.00%
100.00
1,886.00
48.00%
92.00
1,735.12
0.00%
0.00
0.00
100.00%
0.50
63.03
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
#REF!
#REF!
#REF!
S/.
50,703.99
S/.
33,357.77
S/.
12,590.68
S/.
S/.
4,563.36
S/.
3,002.20
S/.
1,133.16
S/.
S/.
4,056.32
S/.
2,668.62
S/.
1,007.25
S/.
S/.
59,323.67
S/.
39,028.59
S/.
14,731.09
S/.
1.07999998
1.07999998
1.07999998
1.07999998
S/.
64,069.56
S/.
42,150.88
S/.
15,909.59
S/.
S/.
12,173.22
S/.
8,008.67
S/.
3,022.82
S/.
S/.
76,242.78
S/.
50,159.55
S/.
18,932.41
S/.
24.97%
16.43%
6.20%
0.00%
77.37%
93.80%
100.00%
100.00%
RO CORREGIDO DE VALORIZACIONES
PLAZO DE EJECUCION
ENTREGA DE TERRENO
30 D.C.
30-11-10
01-12-10
FECHA DE TERMINO
30-12-10
VALORIZACION 3
PARCIAL
METRADO
VALORIZACION 4
PARCIAL
METRADO
VALORIZACION 5
PARCIAL
METRADO
VALORIZACION ACUMULADA
PARCIAL
90.00
8,735.40
24.00%
48.48
4,705.47
2.00%
5.39
523.15
0.00%
0.00
0.00
100.00%
60.00
2,944.80
23.00%
28.00
1,374.24
3.00%
4.23
207.60
0.00%
0.00
0.00
100.00%
0.00
0.00
85.00%
736.84
8,414.71
15.00%
130.03
1,484.95
0.00%
0.00
0.00
100.00%
0.00
0.00
85.00%
265.09
4,795.48
15.00%
46.78
846.25
0.00%
0.00
0.00
100.00%
0.00
0.00
85.00%
106.08
927.14
15.00%
18.72
163.61
0.00%
0.00
0.00
100.00%
0.00
0.00
85.00%
76.20
387.10
15.00%
13.45
68.32
0.00%
0.00
0.00
100.00%
0.00
0.00
85.00%
466.46
1,753.89
15.00%
82.32
309.52
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
250.14
5,207.91
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
257.93
9,432.50
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
14.16
240.58
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
18.00
342.90
0.00%
0.00
0.00
100.00%
537.07
4,699.36
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
597.46
8,728.89
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
396.70
8,033.18
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
80.00%
63.98
2,191.32
20.00%
16.00
548.00
0.00%
0.00
0.00
100.00%
0.00
0.00
50.00%
50.40
282.24
50.00%
50.40
282.24
0.00%
0.00
0.00
100.00%
0.00
0.00
50.00%
27.22
160.60
50.00%
27.21
160.54
0.00%
0.00
0.00
100.00%
0.00
0.00
50.00%
58.69
451.33
50.00%
58.69
451.32
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
79.32
14,277.60
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
19.08
3,625.20
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
18.00
151.92
0.00%
0.00
0.00
0.00%
0.00
0.00
101.00%
0.00
0.00
100.00%
6.00
390.84
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
6.00
52.86
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
896.25
11,104.54
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
866.87
3,892.25
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
577.68
2,351.16
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
231.81
899.42
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
311.86
1,939.77
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
98.40
691.75
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
6.00
2,726.34
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
6.00
710.28
0.00%
0.00
0.00
100.00%
0.00
0.00
32.00%
109.01
2,058.11
68.00%
230.05
4,343.34
0.00%
0.00
0.00
100.00%
0.00
0.00
25.00%
6.53
266.95
75.00%
19.57
800.02
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
63.25
3,080.91
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
63.25
1,574.93
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
14.00
130.20
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
4.00
76.80
0.00%
0.00
0.00
100.00%
0.00
0.00
50.00%
184.09
57.07
50.00%
184.09
57.07
0.00%
0.00
0.00
100.00%
#REF!
#REF!
#REF!
S/.
25,108.45
S/.
41,662.36
S/.
67,343.06
S/.
S/.
2,259.76
S/.
3,749.61
S/.
6,060.88
S/.
S/.
2,008.68
S/.
3,332.99
S/.
5,387.44
S/.
S/.
29,376.89
S/.
48,744.96
S/.
78,791.38
S/.
1.07999998
1.07999998
1.07999998
1.07999998
S/.
31,727.04
S/.
52,644.56
S/.
85,094.68
S/.
S/.
6,028.14
S/.
10,002.47
S/.
16,167.99
S/.
S/.
37,755.18
S/.
62,647.03
S/.
101,262.67
S/.
17.50%
29.03%
46.93%
0.00%
24.04%
53.07%
100.00%
100.00%
RO CORREGIDO DE VALORIZACIONES
PLAZO DE EJECUCION
ENTREGA DE TERRENO
30 D.C.
30-11-10
01-12-10
FECHA DE TERMINO
30-12-10
VALORIZACION 3
PARCIAL
METRADO
VALORIZACION 4
PARCIAL
METRADO
VALORIZACION 5
PARCIAL
METRADO
VALORIZACION ACUMULADA
PARCIAL
0.00
0.00
100.00%
38.00
2,335.48
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
2.00
123.20
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
100.00%
60.00
3,622.80
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
40.00
538.00
50.00%
40.00
538.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
270.00
2,065.50
41.00%
190.00
1,453.50
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
40.00
171.60
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
916.00
4,845.64
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
1.00
537.11
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
38.00
1,531.78
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
2.00
91.94
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
1.00
411.83
100.00%
#REF!
#REF!
#REF!
S/.
2,603.50
S/.
8,072.98
S/.
S/.
7,589.90
S/.
234.32
S/.
726.57
S/.
S/.
683.09
S/.
208.28
S/.
645.84
S/.
S/.
607.19
S/.
3,046.10
S/.
9,445.39
S/.
S/.
8,880.18
1.07999998
1.07999998
1.07999998
1.07999998
S/.
3,289.78
S/.
10,201.02
S/.
S/.
9,590.60
S/.
625.06
S/.
1,938.19
S/.
S/.
1,822.21
S/.
3,914.84
S/.
12,139.21
S/.
S/.
11,412.81
14.25%
44.20%
0.00%
41.55%
14.25%
58.45%
58.45%
100.00%
VALORIZACION ACUMULADA
METRADO
PARCIAL
1.00
410.37
368.18
460.23
207.65
3,330.71
56.55
793.96
90.99
1,249.29
377.01
5,956.76
285.04
880.77
207.85
3,851.46
207.85
1,211.77
19.06
2,838.42
8.60
1,525.55
90.39
1,843.96
101.02
1,969.89
7.13
1,570.88
28.66
626.51
373.97
1,656.69
60.61
16,367.73
3,774.46
15,852.73
28.38
8,393.67
2,717.78
11,414.68
138.18
4,221.40
31.18
10,837.54
4,406.01
17,976.52
272.01
9,332.66
25.12
7,490.53
3,789.60
15,726.84
161.69
6,813.62
21.92
6,462.45
1,698.38
7,269.07
259.78
7,642.73
2,086.42
5,341.24
3.28
975.70
290.55
1,231.93
14.16
740.71
0.23
67.33
3.30
103.13
11.00
12,454.20
22.00
2,442.66
192.00
3,621.12
1.00
126.05
#REF!
S/.
203,083.46
S/.
18,277.51
S/.
16,246.68
S/.
237,607.65
1.07999998
S/.
256,616.26
S/.
48,757.09
S/.
305,373.35
100.00%
100.00%
VALORIZACION ACUMULADA
METRADO
PARCIAL
204.97
19,894.39
123.06
6,039.78
866.87
9,899.66
311.87
5,641.73
124.80
1,090.75
89.65
455.42
548.78
2,063.41
250.14
5,207.91
257.93
9,432.50
14.16
240.58
18.00
342.90
657.85
5,756.19
657.85
9,611.19
396.70
8,033.18
79.98
2,739.32
100.80
564.48
54.43
321.14
117.38
902.65
79.32
14,277.60
19.08
3,625.20
18.00
151.92
6.00
390.84
6.00
52.86
896.25
11,104.54
866.87
3,892.25
577.68
2,351.16
231.81
899.42
311.86
1,939.77
98.40
691.75
6.00
2,726.34
6.00
710.28
339.06
6,401.45
26.10
1,066.97
63.25
3,080.91
63.25
1,574.93
14.00
130.20
4.00
76.80
368.18
114.14
#REF!
S/.
143,496.51
S/.
12,914.69
S/.
11,479.72
S/.
167,890.92
1.07999998
S/.
181,322.19
S/.
34,451.22
S/.
215,773.41
100.00%
100.00%
VALORIZACION ACUMULADA
METRADO
PARCIAL
38.00
2,335.48
2.00
123.20
60.00
3,622.80
80.00
1,076.00
460.00
3,519.00
40.00
171.60
916.00
4,845.64
1.00
537.11
38.00
1,531.78
2.00
91.94
1.00
411.83
#REF!
S/.
18,266.38
S/.
1,643.97
S/.
1,461.31
S/.
21,371.66
1.07999998
S/.
23,081.39
S/.
4,385.46
S/.
27,466.85
100.00%
100.00%