SUPPLY
RULES
ADVISORY SERVICE
Advice concerning matters relating to the supply of electricity may be obtained free of
charge from the Company.
HEAD OFFICE
147 Argyle Street, Kowloon
GENERAL ENQUIRIES
Telephone : 2678 8111
INTERNET http://www.clpgroup.com
RULES
SUPPLY
SUPPLY
RULES
SUPPLY
RULES
- 29 -
SUPPLY
RULES
Supply
Arrangement
No. of Phases
From Company's
Overhead Line
System
M 1.5
1.5 < M < 3.8
3.8 M 11
1-phase
3-phase
3-phase
6
6
2.5
From Company's
Non-Overhead
Line System
M 2.2
2.2 < M < 11
11 M 55
1-phase
3-phase
3-phase
6
6
2.5
(b) The Customer shall ensure that motors exceeding the sizes listed above
shall not cause voltage fluctuation outside the limits set out in Rule 220.1.
(c) Motors that do not comply with the stipulations set out above shall not
be connected to the supply system without the prior written agreement
of the Company.
2. Synchronous Motors and High Voltage Motors
Synchronous motors and high voltage motors shall only be installed by
special arrangement with the Company.
304 Earthing
1. In every Installation the Customer is required to provide his own earthing
system by which the exposed conductive parts of the Installation are
connected to earth.
2. The earth electrodes of the Customer's earthing system shall be installed
within Customer's own property. The material used and the construction of
the earth electrodes should be such as to withstand damage due to corrosion
and passage of earth fault currents. The following types of earth electrodes
are acceptable:- 30 -
SUPPLY
RULES
- 31 -