Professional Documents
Culture Documents
NAME OF WORK :-
Particulars
sr.no.
No.
L.
B.
1x2
1x2
1x1
1x1
1x1
1x1
2x2
2x2
1x1
1x2
2x3
42
40
1x2
1x1
1x2
2x2
1x1
1x3
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
3.70
7.40
8.40
3.65
8.40
5.95
2.40
2.40
6.95
6.95
3.90
1.20
1.20
3.65
3.65
1.00
1.00
1.25
0.75
128.35
2.53
3.13
2.13
7.68
7.60
2.13
3.50
3.90
3.15
3.90
4.27
4.70
1.15
1.55
1.36
2.65
1.36
2.65
2.59
5.4
2.4
2.8
2.4
6.15
0.35
0.15
0.35
0.15
0.35
0.15
0.30
0.15
1.06
0.90
0.30
0.15
0.10
0.10
2.56
0.90
0.90
0.90
0.90
0.90
0.90
1.00
0.65
0.67
1.00
1.50
0.58
1.24
1.00
1.30
1.00
1.30
Room
Wall
Kit
bath
Lat
Ceiling
Landing
Skerting
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1.36
1.80
1.36
2.65
1.36
2.65
1.8
3.1
3.9
9.6
3.1
2.5
3.13
2.13
7.68
7.68
2.13
3.5
3.9
3.15
3.9
4.27
4.7
1.15
1.55
1.36
2.65
1.36
2.65
1.36
1.8
3.9
9.6
3.1
1.30
0.80
1.00
1.30
1
1.3
0.8
1.3
1.05
1.1
1.1
2.56
0.9
0.9
0.9
0.9
0.9
0.9
0.9
1.7
0.9
1.21
1.8
0.58
1.24
1
1.3
1
1.3
1.3
0.9
1.05
1.1
1.1
Deduction
1x2
1x2
1x2
1x2
1x2
1.1
10.96
0.35
1
1.17
1.28
1.3
17.36
3.98
2.46
3.03
7.36
3.35
1x2
1x1
1.3
0.5
2.5
3.05
Total
2x2
2x2x2
2x2x2
2x2
2x2x2
2x2x2
2x2
2x2x2
2x2x2
2x2
2x2x2
2x2x2
2x2
2x2x2
2x2x2
2.5
2.5
2
2.28
2.3
2.28
2.38
2.38
1.88
1.77
1.77
1.53
3.53
3.53
2.3
2.3
1.8
1.53
2.3
Total
For 4.00 No
4
word robe
18
18
6
2
4x4
4x4
4x4
4x4
4x4
2.03
2
2.03
2
1
2.47
1.5
1.27
1.5
0.9
0.9
0.81
0.66
Total
4x4
0.65
J.E.
A.E.
M.D. NO.-1
M.D. N0.1
L.N.V., Lko.
L.N.V., Lko.
49
19.17
79.92
20.16
10.22
20.16
36.59
3.36
1.44
2.43
2.09
8.19
7.56
14.40
1.10
3.87
1.80
0.60
0.19
0.23
12.84
6.48
2.82
1.92
6.91
6.84
1.92
3.15
3.90
2.05
2.61
4.27
7.05
0.67
1.92
1.36
3.45
1.36
3.45
unit
Rate
Amount
1.77
1.44
1.36
3.45
1.36
3.45
1.44
4.03
4.10
10.56
3.41
6.40
2.82
1.92
6.91
6.91
1.92
3.15
3.51
5.36
3.51
5.17
8.46
0.67
1.92
1.36
3.45
1.36
3.45
1.77
1.62
4.10
10.56
3.41
434.44
sqm
sqm
1177.00 511334.1
Total
380.53
2.79
4.92
7.09
18.84
8.71
422.88
6.50
3.05
9.55
413.33
sqm
1034.00 427382.2
0.45
0.45
0.45
0.15
0.45
0.45
0.45
0.45
0.45
0.45
Total
3.3
3.3
3.3
3.3
3.3
20.00
9.00
7.20
20.98
8.28
2.74
17.14
8.57
6.77
10.83
6.37
5.51
32.48
12.71
8.28
176.84
707.3616
32.89
32.40
9.87
2.64
52.80
130.42
79.20
67.06
79.20
sqm
219.00 154912.2
Total
486.46
sqm
20.8
20.8
sqm
1964.00 955414.9
2623
54558.4
49
49
rmt
423.00
20727
###
DETAIL OF MEASURMENT
Description
Excavation
in
foundation
in
ordinary
soil,lome,clay or sand] including lift upto 1.5 m &
lead upto 30m including filling watering &
ramming of excavated earth into the trenches or
into the space beetween the building & the sides
of foundation trenches or in to the plinth &
removal & disposal of surplus earth as directed
by the engineer -in-charge upto a distance of
30m from the foundation trenches.
No.
D/H
1x1
1x1
1x1
1x1
1.55
3.05
2.45
0.765
1.5
1.10
1.10
1.10
1.2
1.20
1.20
1.20
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
0.765
2.005
1.55
5.03
1.53
2.34
2.34
3.96
2.38
14.13
1.36
2.46
2.03
1.82
2.56
5.31
2.4
5.31
1.88
2.97
4.34
4.99
2.01
4.79
5.89
1.11
5.06
4.78
2.46
1.10
1.10
0.5
1.35
2.1
1.55
1.5
1.65
0.76
1.65
1.10
1.50
1.10
1.50
1.50
1.50
1.10
1.50
1.50
0.60
1.35
1.35
1.10
1.50
1.35
1.20
1.10
1.60
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1x1
2.13
1.20
1.20
2
1x2
1x2
5.8
1.43
1.65
1.65
A
1.2
1.2
B
(A+B)
1x2
176.8
A
1x1
5.8
1.43
B
(A+B)
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
For Two Flat
STAIR
2
1x2
1x2
1.55
3.05
2.45
0.765
0.765
2.005
1.55
5.03
1.53
2.34
2.34
3.96
2.38
14.13
1.36
2.46
2.03
1.82
2.56
5.31
2.4
5.31
1.88
2.97
4.34
4.99
2.01
4.79
5.89
1.11
5.06
4.78
2.46
2.13
5.8
1.43
1.50
1.10
1.35
1.20
2.10
1.50
1.35
1.65
0.76
1.65
1.10
1.50
1.10
1.50
1.50
1.50
1.10
1.50
1.50
0.60
1.35
1.10
1.20
1.35
1.10
1.50
1.35
1.20
1.10
1.50
1.20
1.20
1.20
1.20
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
1.65
1.65
A
0.15
0.15
B
2 sec 4-4
3 Sec 3-3
3-4 sec 4
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
3.24
3.325
3.44
3.555
3.67
3.785
3.9
4.015
4.073
4.13
4.245
2.61
2.725
2.84
2.755
3.077
3.185
3.3
3.415
3.472
3.53
3.645
0.965
1.08
1.195
1.31
1.425
1.54
1.655
1.77
1.885
0.965
1.080
1.195
1.310
0.920
0.905
0.690
0.575
0.460
0.345
0.345
0.345
0.345
0.345
0.230
1.035
0.920
0.805
0.690
0.575
0.460
0.345
0.345
0.345
0.345
0.230
0.920
0.805
0.690
0.575
0.460
0.345
0.345
0.345
0.230
1.035
0.920
0.805
0.690
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.675
0.375
0.075
0.075
0.075
0.075
6 sec 5-5
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1.425
1.540
1.655
1.770
1.885
2.165
2.280
2.395
2.510
2.625
2.740
2.885
2.970
3.850
3.200
4.485
4.845
4.845
4.845
4.845
4.845
4.788
4.730
4.730
4.960
4.960
4.960
4.960
4.960
4.903
4.845
4.788
4.73
4.73
4.73
2.303
2.418
2.533
2.648
2.763
2.935
3.051
14.395
14.28
14.165
14.05
13.395
13.82
13.705
13.59
13.475
0.575
0.460
0.345
0.345
0.230
0.920
0.805
0.690
0.575
0.460
0.345
0.345
0.345
0.345
0.230
1.150
1.035
0.920
0.805
0.690
0.575
0.460
0.345
0.230
1.380
1.265
1.150
1.035
0.920
0.805
0.690
0.575
0.460
0.345
23.000
1.035
0.920
0.805
0.690
0.575
0.345
0.230
1.495
1.380
1.265
1.150
1.035
0.920
0.805
0.690
0.575
0.075
0.075
0.075
0.675
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.600
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.750
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
10 bsec 3-3 b r -3
11 sec 6-6 br 3
12 sec 3-3
14 sec 1-1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
13.36
13.245
13.13
3.15
3.135
3.02
3.905
2.79
2.575
2.46
4.06
4.06
4.06
4.06
4.06
4.06
4.06
4.06
4.06
4.06
4.06
2.53
2.645
2.76
2.875
2.99
2.15
3.22
3.335
3.45
0.565
3.68
2.035
2.15
2.265
2.38
2.495
2.61
2.725
2.84
2.897
2.955
3.07
2.84
2.84
2.897
2.955
3.012
3.07
3.127
3.185
0.460
0.345
0.230
0.920
0.805
0.690
0.575
0.460
0.345
0.230
1.380
1.265
1.150
1.150
1.035
0.920
0.690
0.575
0.460
0.345
0.230
0.920
0.805
0.690
0.575
0.460
0.345
0.345
0.345
0.345
0.345
0.230
1.380
1.265
1.150
1.035
0.920
0.805
0.690
0.575
0.46
0.345
0.23
0.46
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.825
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
15
16 kit 7-7
17 Se 6-6
18 sec 6-6
19 Sec 5-5
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
3.242
3.300
3.300
0.075
0.14
0.155
0.37
4.025
3.91
3.795
3.68
3.565
3.45
3.335
3.22
3.105
2.99
2.875
2.76
3.13
3.015
2.9
2.785
2.67
2.555
2.44
2.325
2.21
2.075
1.98
3.51
3.395
3.28
3.165
3.05
2.935
2.82
2.705
2.59
2.475
2.36
2.32
2.435
2.55
2.665
2.78
2.895
3.01
3.125
3.24
3.535
0.345
0.345
0.23
0.575
0.46
0.345
0.23
1.495
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.075
0.525
0.375
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
20 ses 5-5
22 ses 5-5 Br -2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
3.415
3.53
5.05
4.915
4.8
4.685
4.57
4.55
4.35
4.225
4.11
2.495
2.61
2.725
2.84
2.955
3.07
3.185
3.243
3.3
3.358
3.415
3.53
4.995
4.995
4.995
4.995
4.995
4.995
4.995
4.995
5.052
5.11
5.11
1.265
1.38
1.495
1.61
1.725
1.84
1.955
2.07
2.127
2.185
2.3
5.227
5.227
5.227
5.227
5.227
5.227
0.345
0.23
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.23
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.23
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.675
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
27 -sec 2-2
28 sec 4-4
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
5.227
5.227
5.168
5.11
5.11
1.265
1.38
1.495
1.61
1.725
1.84
1.955
2.07
2.127
2.185
2.3
6.273
6.273
6.273
6.273
6.273
6.273
6.273
6.33
6.338
6.448
6.505
6.56
6.56
2.535
2.65
2.765
2.88
2.995
3.11
3.22
3.34
3.455
3.57
3.57
3.685
3.8
2.593
2.708
2.823
2.938
3.053
3.168
3.283
3.398
3.516
0.69
0.575
0.46
0.345
0.23
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.345
0.23
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.345
0.345
0.345
0.375
0.23
0.575
0.46
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.23
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
29 sec 3-3
31 sec - Br 3
32sec 6-6 Br 3
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
3.628
3.685
3.8
0.793
0.908
1.023
1.138
1.253
1.368
1.54
1.598
1.655
1.77
1.523
1.638
1.753
1.868
1.983
2.098
2.155
2.213
2.27
2.328
2.385
2.5
0.5
0.615
0.73
0.895
0.96
1.075
1.132
1.19
1.247
1.305
1.42
1.295
1.408
1.535
1.638
1.753
1.868
1.983
2.098
2.213
2.328
2.385
2.5
5.553
5.553
5.553
0.345
0.345
0.23
0.92
0.805
0.69
0.69
0.46
0.345
0.345
0.345
0.345
0.23
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.345
0.345
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.23
1.38
1.265
1.15
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.525
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.575
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
35 sec 5-5
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
5.553
5.553
5.553
5.553
5.553
5.553
5.553
5.61
5.61
4.208
4.208
4.208
4.208
4.208
4.208
4.208
4.208
4.265
4.268
4.333
4.38
4.38
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.23
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.345
0.345
0.345
0.345
0.23
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.450
0.375
2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x2
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
5.533
5.418
5.303
5.188
5.073
4.958
4.843
4.728
4.613
4.498
4.383
4.268
1.585
1.7
1.815
1.93
2.065
2.16
2.275
2.39
2.505
2.62
2.735
2.85
1.585
1.7
1.815
1.495
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
1.495
1.38
1.265
1.15
1.035
0.92
0.805
0.69
0.575
0.46
0.345
0.23
0.575
0.46
0.345
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.45
0.375
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.45
0.375
0.075
0.075
0.075
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1.93
2.045
2.16
2.275
2.39
2.505
2.62
2.735
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.345
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.45
B
2.16
2.275
2.39
2.505
1x1
1x1
2.725
2.645
0.23
0.23
0.075
0.075
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
For Two No Flat
As Per TS
Total Work
Work Done
Work to be Done
1.515
1.845
1.98
0.37
5.89
3.53
2.76
1.885
1.885
4.11
2.3
3.2
5.34
1.225
2.515
1.55
4.73
1.02
1.03
1.77
5.56
2.3
1.17
4.69
2.91
2.3
2.5
2.46
1.75
1.42
4.29
5.61
3.68
4.35
4.35
2
1.55
4.73
1.02
1.03
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
1.77
5.56
2.30
1.17
1.17
1.85
1.98
0.37
5.39
3.53
2.76
1.89
4.11
2.30
3.20
5.34
1.23
2.52
1.55
4.73
1.02
1.03
1.77
5.56
2.30
1.17
4.69
2.91
2.30
2.50
2.46
1.75
1.42
4.29
5.61
3.68
4.35
4.97
2.85
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
Work Done
Work to be Done
Filling of avialbale excavated earth in trenches,
plinth, sides of foundation, etc in lyaers not
exceeding 20 cms. In depth. Consokidation each
deposited layer by ramming and eatering
including lead upto 50 m and lift upto 1.50m.
1x2
176.8
0.375
Deduction P CC ItemNO
Brick wrk item no
sand filling
same as item No - 01
same as item No - 03 part (a)
189.58
1x2
176.8
0.230
0.375
0.15
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
4.245
4.110
2.645
1.980
0.370
5.660
2.760
0.830
1.885
7.640
3.200
5.110
4.730
4.730
2.300
2.300
6.560
3.800
3.800
3.050
1.770
13.130
2.460
2.500
1.420
4.060
2.910
5.580
4.350
4.350
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
7.64
3.2
5.11
4.73
4.73
2.3
2.3
6.56
3.8
3.8
3.05
1.77
13.13
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
A
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
2.46
2.5
2.5
1.42
4.06
3.91
5.58
4.35
4.35
3.07
4.245
4.11
3.645
1.98
0.37
5.66
2.76
0.83
1.885
1.885
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
4.58
3.07
4.14
4.06
1.42
2.46
2.5
2.5
2.46
10.44
5.35
5.35
3.3
3.99
3.99
1.9
2.3
2.3
1.12
0.6
1.75
4.705
1.885
1.885
3.66
4.88
2.845
2.845
0.6
0.6
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
B
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
D1
D2
DW1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
1x1
4.76
1.8
1.535
3.565
2.515
2.215
2.525
1.215
2.285
1.765
2.6
4.14
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.08
C
1x7
1x2
1.00
0.75
0.23
0.23
2.10
2.10
1x1
1x1
1.00
0.60
0.23
0.23
2.10
0.90
1x1
2.00
0.23
0.90
1x3
1.00
0.23
0.90
1x2
1.50
0.23
0.90
1x1
1.50
0.23
0.90
2
2
80.58
3.00
0.115
0.115
0.80
0.90
W1
W2
W3
W4
10
Parapet Walls
For railling above foyer
Total Qty
Total Work
Work Done
Work to be Done
12
14
15
16
As per TS
Total Qty
17
18
Total Work
Work Done
Work to be Done
Finishing wall with Birla Putty of approved brand
including supply of all materials to give an even
shade and sand papreing the surface even and
smooth.
same as Item No.17 (A+B)
Total Work
Work Done
Work to be Done
One priming coat and one coat Oil bound
distemper on new work including supply of all
materials,labours,and T & P etc required for
proper completion of the work
As per TS
19
Total Work
Work Done
Work to be Done
As in above item.......but for every coat after first
coat or subsequent coat.
Qty same as above
Total Work
Work Done
Work to be Done
20
As per TS
21
22
Total Work
Work Done
Work to be Done
As in above item.......but for every coat after first
coat or subsequent coat.
Qty same as above
Total Work
Work Done
Work to be Done
Finishing walls with anti fungal weather proof
paint such as Apex Ultima of Asian paints or
equivalent of other makes of reputed make,two
coats over one coat of cement primer of
approved quality including cost of all material,
labour, T&P required for proper completion of the
work.
As per TS
23
Total Work
Work Done
Work to be Done
Supply and fixing Salwood wrought framed and
fixed including simple moulding straight work as
in Chaukhat frame including supply of all
materials, labour, T&P etc. required for proper
completion of work.
As per TS
Total Work
Work Done
Work to be Done
24
2
1
1.00
1.65
2.10
2.10
1
4
3
1
4
2.00
1.00
1.50
1.50
0.90
1.20
1.20
1.20
1.05
0.60
1
4
3
1
4
2.00
1.00
1.50
1.50
0.90
1.20
1.20
1.20
1.05
0.60
W1
W2
W3
W4
V1
Total Qty
Total Work
Work Done
Work to be Done
26
Supply & fixing 35mm thick flush door's Commercial
quality conforming to I.S. 2202 part I (1983),both side
teak, including fixing of wooden cleats & stoppers and
including fixing & adjustment of hinges, bolts, locks,
handles, spring, fittings with necerssary scrws to be
supplid departmently.
D1
DW1
Total Qty
2
1
1.00
1.00
2.10
2.10
0.75
2.10
Total Work
Work Done
Work to be Done
27
D2
Total Work
Work Done
Work to be Done
28
Providing following door/windows fittings
a
I.S.I marked Iron hinges 100 mm long
D1
D2
DW1
Wiremesh doors
DW1
D1
32
20
4
4
8
Total Qty
Total Work
Work Done
Work to be Done
b
29
4
16
12
4
16
4
16
12
4
16
Total Work
Work Done
Work to be Done
30
a
12
24
12
18
6
6
6
6
6
6
3
30
6
W5
W6
D/W,W
Total Qty
12
12
8
Total Work
Work Done
Work to be Done
31
12
24
12
18
6
6
8
4
Total Work
Work Done
Work to be Done
32
12
24
6
6
8
4
4
16
12
4
4
Total Qty
33
34
35
Total Work
Work Done
Work to be Done
Aluminium anodized door stoppers
D1
D2
Total Qty
Total Work
Work Done
Work to be Done
M.S. Spring door closer
Wiremesh doors
D1
D2
D/W,D
Total Qty
Total Work
Work Done
Work to be Done
8
5
8
5
1
As per Estimate
36
Total Work
Work Done
Work to be Done
S/F of 25 mm thick flush door shutter one side
laminated ,including supply of all materials,
labour, T&P etc. required for proper completion of
work.
Bed Room Almirah
Dressing
Total Qty
Total Work
Work Done
Work to be Done
2
1
1.20
2.20
3.30
3.30
37
38
8
5
1
4
3
1
4
1
1
1
1.30
1.10
2.30
1.30
1.80
1.70
1.10
1.90
3.10
1.25
D1
D2
W1
W2
W3
W4
V1
D/W,
Jali door
D1
D/W,
W1
W2
W3
W4
V1
D/W,
8
5
1
4
3
1
4
1
1.00
0.75
2.00
1.00
1.50
1.50
0.90
1.65
2.10
2.10
1.20
1.20
1.2
1.05
0.60
2.10
2
1
1
4
3
1
4
1.00
1.65
2.00
1.00
1.50
1.50
0.90
2.10
2.10
1.20
1.20
1.2
1.05
0.60
2.10
1
2
2
1.20
1.20
6.35
0.90
0.90
0.90
4
4
4
6.00
3.82
4.90
0.80
0.80
0.80
Raillings
Main ent,GF
FF & SF
Stair Case (3.50+2.85)
Balconies
Front
Sides
Rear
39
Parapet
Total Qty
Total Qty for both side
Total Work
Work Done
Work to be Done
Providing and laying vitrified floor tiles in different
sizes (thickness to be specified by the
manufacturer) with water absorption less than
0.08% and conforming to IS : 15622, of approved
make, in all colours and shades, laid on 20 mm
thick cement mortar 1:4 (1 cement : 4 coarse
sand), including grouting the joints with white
cement and matching pigments etc., complete.
(size of tiles 600X600mm)
80.04
4
4
4
4
2.00
1.54
2.28
1.89
0.80
Asper Ts
40
Total Work
Work Done
Work to be Done
Providing and laying Ceramic glazed floor
rectifited tiles of size 300x300 mm (thickness to
be specified by the manufacturer), of 1st quality
conforming to IS : 15622, of approved make, in
colours such as White, Ivory, Grey, Fume Red
Brown, laid on 20 mm thick cement mortar 1:4 (1
Cement : 4 Coarse sand), including pointing the
joints with white cement and matching pigment
etc., complete.
Toilet floor
Toilet floor
Toilet floor
Toilet floor
Total Qty
Total Work
Work Done
Work to be Done
2.50
1.77
2.30
2.38
41
Toilet Wall
Toilet Wall
Toilet Wall
Toilet Wall
Kitchen Walls
Less for doors
Less for Window
Net Qty
Total Work
Work Done
Work to be Done
4
4
4
4
4
4
4
4
4
4
5
5
2.00
2.50
1.54
1.77
2.28
2.30
1.89
2.38
3.53
2.30
0.75
0.90
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
0.60
42
44
4
4
3.53
2.3
0.6
0.6
1
4
3
1
4
1
2.00
1.00
1.50
1.50
0.90
1.65
0.25
0.25
0.25
0.25
0.25
0.25
2
2
2
64
1
4.00
3.87
2.50
2.00
6.00
2.00
1.10
6.68
0.30
3.85
Total Work
Work Done
Work to be Done
Kota stone slab flooring over 20 mm (average)
thick base laid over and jointed with grey cement
slurry mixed with pigment to match the shade of
the slab, including rubbing and polishing cmplete
with base of cement mortar 1: 4 (1cement : 4
coarse sand) :25mm thick
Stair case
Stair case
Landing
Steps
For flooring front of stair ( d )
Total Qty
Total Work
Work Done
Work to be Done
45
Total Qty
46
1500.00
80.08
0.90
2
2
10.13
2.07
16.83
0.7
Total Work
Work Done
Work to be Done
40 mm cement concrete flooring 1:2:4( 1
cement : 2 coarse sand : 4 graded stone
aggregate of size 12.5 mm and below) by laid
over base concrete finished with floating coat of
neat cement.
Qty (Length same as perapat wall)
Total Work
Work Done
Work to be Done
47
Total area
2
2
2
1
1
Total Qty
Total Work
Work Done
Work to be Done
2.96
5.49
9.56
8.4
3.31
0.445
2.55
1.3
2.03
4.27
ASURMENT
2.79
4.03
3.23
1.01
1.01
2.65
0.93
8.15
3.86
4.35
4.21
7.84
2.17
27.98
1.80
4.43
2.68
3.28
4.61
9.56
3.17
9.56
3.38
2.14
7.03
8.08
2.65
8.62
9.54
1.60
6.68
9.18
3.54
Unit
Rate
Amount
3.07
178.79
357.59
22.97
5.66
28.63
386.22
785.68
785.68
785.68
0.00
353.6
353.6
8.294
8.294
361.894
cum
Cum
Cum
Cum
Cum
sqm
90.00
70711.20
450.80
282.88
167.92
0.35
0.50
0.50
0.14
0.24
0.45
0.31
1.24
0.17
0.58
0.39
0.89
0.39
3.18
0.31
0.55
0.33
0.41
0.58
0.48
0.49
0.88
0.34
0.60
0.72
1.12
0.41
0.86
0.97
0.25
0.91
0.86
0.44
0.38
21.23
42.45
2.871
0.708
3.579
Sqm
Sqm
Sqm
cum
0.00
147.82
147.82
147.82
147.82
0.00
0.224
0.226
0.178
0.153
0.127
0.098
0.101
0.104
0.105
0.748
0.366
0.203
0.188
0.171
0.143
0.133
0.110
0.085
0.088
0.090
0.639
0.314
0.067
0.065
0.062
0.056
0.049
0.040
0.043
0.412
0.163
0.075
0.075
0.072
0.068
Cum
Cum
Cum
Cum
Cum
0.00
0.061
0.053
0.043
0.412
0.163
0.149
0.138
0.124
0.108
0.091
0.071
0.075
0.077
0.697
0.276
0.387
0.376
0.334
0.293
0.251
0.209
0.165
0.979
0.408
0.513
0.471
0.428
0.385
0.342
0.296
0.251
0.206
1.142
0.612
8.159
0.179
0.167
0.153
0.137
0.119
0.759
0.263
1.614
1.478
1.344
1.212
1.040
0.954
0.827
0.703
0.581
0.461
2.056
1.132
0.217
0.189
0.156
0.168
0.096
0.733
0.212
0.420
0.385
0.350
0.350
0.315
0.280
0.210
0.175
0.140
0.735
0.350
0.175
0.160
0.143
0.124
0.103
0.056
0.083
0.086
0.089
0.102
0.317
0.211
0.204
0.195
0.185
0.172
0.158
0.141
0.122
0.100
0.535
0.265
0.098
0.073
0.075
0.076
0.078
0.079
0.081
0.082
0.084
0.598
0.285
0.003
0.005
0.028
0.032
0.451
0.405
0.360
0.317
0.277
0.238
0.201
0.167
0.134
0.103
0.446
0.238
0.324
0.286
0.250
0.216
0.184
0.154
0.126
0.100
0.076
0.376
0.171
0.363
0.322
0.283
0.246
0.210
0.177
0.146
0.117
0.089
0.448
0.204
0.200
0.189
0.176
0.161
0.144
0.125
0.104
0.081
0.084
0.091
0.530
0.304
0.436
0.382
0.331
0.283
0.236
0.196
0.150
0.984
0.354
0.258
0.248
0.235
0.220
0.204
0.185
0.165
0.140
0.114
0.087
0.530
0.304
0.431
0.388
0.345
0.302
0.258
0.215
0.172
0.129
0.131
0.926
0.441
0.098
0.095
0.090
0.083
0.074
0.063
0.051
0.054
0.055
0.396
0.198
0.541
0.496
0.451
0.406
0.361
0.316
0.270
0.225
0.178
0.926
0.441
0.098
0.095
0.090
0.083
0.074
0.063
0.051
0.054
0.055
0.396
0.198
0.433
0.379
0.325
0.271
0.216
0.162
0.162
0.164
0.164
0.167
0.168
1.107
0.566
0.109
0.091
0.072
0.075
0.077
0.080
0.083
0.086
0.089
0.000
0.092
0.572
0.328
0.201
0.187
0.170
0.152
0.132
0.109
0.085
0.088
0.091
0.094
0.572
0.328
0.055
0.055
0.053
0.059
0.043
0.035
0.040
0.041
0.300
0.153
0.105
0.099
0.091
0.081
0.068
0.054
0.056
0.057
0.059
0.060
0.370
0.216
0.052
0.058
0.063
0.069
0.066
0.065
0.059
0.051
0.043
0.259
0.122
0.134
0.134
0.132
0.127
0.121
0.113
0.103
0.090
0.076
0.060
0.370
0.216
0.575
0.527
0.479
0.431
0.383
0.335
0.287
0.239
0.192
0.144
0.871
0.484
0.363
0.327
0.290
0.254
0.218
0.181
0.145
0.109
0.110
0.110
0.112
0.680
0.378
99.165
198.330
1.241
1.122
1.006
0.895
0.788
0.684
0.585
0.489
0.398
0.310
1.361
0.736
0.178
0.176
0.172
0.166
0.160
0.149
0.137
0.124
0.108
0.090
0.425
0.246
0.068
0.059
0.047
Cum
Cum
0.050
0.053
0.056
0.059
0.062
0.065
0.068
0.425
12.757
349.91
349.91
349.91
0.00
0.047
0.046
Cum
Cum
Cum
Cum
0.00
0.026
0.032
0.034
0.006
0.102
0.061
0.048
0.033
0.033
0.071
0.040
0.055
0.092
0.021
0.043
0.027
0.082
0.018
0.018
0.031
0.096
0.040
0.020
0.081
0.050
0.040
0.043
0.042
0.030
0.024
0.074
0.097
0.063
0.075
0.075
1.814
3.628
17.65
17.65
16.89
0.76
Cum
Cum
Cum
Cum
Cum
Cum
0.00
1.61
0.82
0.82
1.29
1.39
0.26
3.77
2.47
1.93
1.32
2.88
1.61
2.24
3.74
0.86
1.76
1.09
3.31
0.71
0.72
1.24
3.89
1.61
1.64
3.28
2.04
1.61
1.75
1.72
1.23
0.99
3.00
3.93
2.58
6.09
6.96
3.99
82.14
82.14
Sqm
Sqm
144.00
11827.47
0.00
0.00
82.14
Sqm
Sqm
357.59
132.6
490.19
42.45
198.33
53.04
196.37
cum
98.00
Cum
785.68
-147.82
Cum
Cum
-349.91
#REF!
#REF!
#REF!
0.00
#REF!
Cum
Cum
Cum
Cum
Cum
Cum
53.04
53.04
cum
56.00
56.00
56.00
54.18
1.82
Cum
Cum
Cum
Cum
Cum
56.00
#REF!
56.00
3136.00
0.00
1.172
1.134
0.730
0.546
0.102
1.562
0.762
0.229
0.520
2.109
0.883
1.410
1.305
1.305
0.635
0.635
1.811
1.049
1.049
0.842
0.489
3.624
0.679
0.690
0.392
1.121
0.803
1.540
1.201
1.201
31.529
1.581
0.662
1.058
0.979
0.979
0.476
0.476
1.358
0.787
0.787
0.631
0.366
2.718
0.509
0.518
0.518
0.294
0.840
0.809
1.155
0.900
0.900
0.635
0.879
0.851
0.755
0.410
0.077
1.172
0.571
0.172
0.390
0.390
25.214
1.138
0.763
1.028
1.009
0.353
0.611
0.621
0.621
0.611
2.593
1.329
1.329
0.820
0.991
0.991
0.472
0.571
0.571
0.278
0.149
0.435
1.169
0.468
0.468
0.909
1.212
0.707
0.707
0.149
0.149
1.182
0.447
0.381
0.886
0.625
0.550
0.627
0.302
0.568
0.438
0.646
1.028
30.902
87.645
3.381
0.725
0.483
0.124
0.414
0.207
0.311
0.311
5.955
CUM
543.14
543.14
543.14
543.14
0.00
Cum
Cum
Cum
Cum
0.00
#REF!
#REF!
#REF!
0.00
#REF!
Cum
Cum
Cum
Cum
5278.00
#REF!
30.820
30.820
30.820
30.820
0.000
Cum
Cum
Cum
Cum
Cum
187.50
187.50
187.50
0.00
Cum
Cum
Cum
Cum
17.65
30.82
187.50
235.97
0.00
0.00
27785.47
27785.47
23166.68
4618.79
Kg
Kg
Kg
Kg
4159.49
4159.49
4159.49
5175.28
-1015.79
Sqm
Sqm
Sqm
Sqm
Sqm
-1015.79
-1015.79
0.00
-1015.79
Sqm
Sqm
Sqm
1783.16
1783.16
0.00
1783.16
Sqm
Sqm
Sqm
Sqm
1783.16
1783.16
0.00
1783.16
Sqm
Sqm
Sqm
Sqm
65.00
1806055.39
0.00
129.00
536574.21
0.00
0.00
0.00
19.00
33880.04
0.00
399.84
399.84
0.00
399.84
Sqm
Sqm
Sqm
Sqm
399.84
399.84
0.00
399.84
Sqm
Sqm
Sqm
Sqm
1291.40
1291.40
0.00
1291.40
Sqm
Sqm
Sqm
Sqm
5.801
5.801
3.616
2.185
Cum
Cum
Cum
Cum
0.00
33.00
13194.72
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
3143.00
#REF!
3143.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
0.00
#VALUE!
#REF!
#REF!
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
M2
Sqm
Sqm
Sqm
1866.00
#REF!
3124.36
#REF!
#REF!
#REF!
0
#REF!
Each
Each
Each
Each
10.00
#REF!
Each
Each
Each
Each
8.00
#REF!
Each
Each
Each
Each
15.00
#REF!
Each
Each
Each
Each
40.00
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
0
#REF!
Each
Each
Each
Each
26.00
#REF!
Each
Each
Each
Each
155.00
#REF!
Each
Each
Each
Each
50.00
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
0
#REF!
Each
Each
Each
Each
SR
35.00
#REF!
Each
Each
Each
Each
SR
40.00
#REF!
Each
Each
Each
Each
170.00
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
0
#REF!
2500.00
2500.00
2087.15
412.85
Kg
Kg
Kg
Kg
0.00
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
1848.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
RM
RM
RM
RM
300.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
Sqm
60.00
#REF!
708.56
708.56
576.14
132.42
Sqm
Sqm
Sqm
Sqm
984.00
697223.04
0.00
Sqm
Sqm
Sqm
Sqm
850.00
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
833.00
#REF!
#REF!
#REF!
#REF!
#REF!
18.48
#REF!
Sqm
Sqm
Sqm
Sqm
3980.00
#REF!
1027.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
#REF!
#REF!
0.00
#REF!
Ltr
Ltr
Ltr
Ltr
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
#REF!
7.00
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
Sqm
Sqm
Sqm
Sqm
840.00
#REF!
#REF!
Sr. No
ITEM OF WORK
Unit
Sqmt
Earth work in excavation of trenches for foundations pipes, cable etc. in ordinary
soil (loan, clay or sand) including lift upto 1.5 m lead upto 50 m and dressing of sides
and ramming of bottom and disposal or surplus earth as directed by Engineer-incharge.
Cum
Providing and laying in cement concrete 1:4:8 (1 cement:4 fine sand:8 graded brick
aggregate 40mm. Nominal size) and curing complete, including cost of of formwork
in foundation and floors.
Cum
Class- 150 brick work in 1:6 mortar (1 cement:3 coarse sand:3 fine sand) in
foundation and plinth including supply of all materials, labour, T&P etc. required for
proper completion of the work.
Cum
Cast cement concrete door sills, chaukhats, boundary posts, shelves and similar
small works with cement, approved coarse sand, & 2cm.(3/4") gauge approved
stone ballast in the proporation 1:1.5:3 excluding supply of reinforcement and its
bending the same with 24 B WG binding wire and necessary centering and
shuttering etc, and also including supply of all materials labour and tools and plants
etc required for proper completion of works.
Cum
First Class brick work in 1:6 (1 cement: 3 part of coarse sand 2.25 FM: 3 fine sand
2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc.
required for proper completion of the work.
Cum
R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone
ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in lintels of doors &
windows , excluding supply of reinforcement and its bending the same with 24
BWG binding wire and necessary centering and shuttering etc., and also including
supply of all materials, labour, T&P etc. required for proper completion of works.
Strength of the concrete shall no be less than M- 150.
Cum
R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone
ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in slabs excluding
supply of reinforcement and its bending the same with 24 BWG binding wire and
necessary centering and shuttering etc., and also including supply of all materials,
labour, T&P etc. required for proper completion of works. Strength of the concrete
shall no be less than M- 150.
Cum
HYSD steel or iron in plain work such as reinforced concrete or reinforced brick work
(when not included in overall rates) wrought to required shape as necessary
including bending for proper completion of the work and includig supply of all
steeland wastage & overlapping & hooks
Kg
10
15 mm Cement plaster in single coat on rough side of single or half brick wall for
interior plastering upto floor two level including internal rounded angles chamfers,
and rounded angles not exceeding 80 mm. in girth and finished even and smooth.
( 1 Cement :6 coarse sand )
Sqmt
11
Cum
12
Sand filling in plinth including supply of necessary sand from a distance not
exceeding 8 KM,(5 miles) from the site of the work and including watering, ramming,
consolaiting and dressing etc.rate to include cost of all materials,labours and T & P
etc required for proper completion of the work.
Cum
13
Providing and laying in cement concrete 1:4:8 (1 cement:4 fine sand:8 graded brick
aggregate 40mm. Nominal size) and curing complete, including cost of of formwork
in foundation and floors.
Cum
14
Sqmt
15
Supply and fixing Salwood wrought framed and fixed including simple moulding
straight work as in Chaukhat frame including supply of all materials, labour, T&P etc.
required for proper completion of work.
Cum
16
2 cm (3/4) thick dump proof course with cement and approved coarse sand 1:2 and
including water proofing materials as ordered by the Engineer-in-charge in the
proportion as specified by the manufacturer including supply of all material, labour
and tool all complete
Sqmt
17
First Class brick work in 1:4 (1 cement: 2 part of coarse sand 2.25 FM:2 part fine
sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P
etc. required for proper completion of the work. wall of half brick 4" thick.
Cum
18
Supply & fixing 30mm thick flush door's Commercial quality conforming to I.S. 2202
part I (1983), one side teak, including fixing of wooden cleats & stoppers and
including fixing & adjustment of hinges, bolts, locks, handles, spring, fittings with
necerssary scrws to be supplid departmently.
Sqmt
19
Supply & fixing 40 mm thick sall fully glazed shutter, including supply of wooden
cleats & stoppers and including fixing & adjustment of hinges, bolts, locks, handles,
spring & other fittings with necessary screw but excluding there supply.
Sqmt
20
Mild Iron or Iron work of small size and sections such as holding down bolts, hold
fast, tie rods, grill, granting etc. (when not included in an overall rates) wrought to
required shape as necessary for bending etc including supply of steel and its
watage.
21
Supply and fixing Vitrified Tiles (60cm x 60 cm) Superior quality in flooring or in
skirting on dado laid with 1:3 cement and approved coarse sand mortar finished with
white cement slurry jointing and polishing complete including supply of all material,
labour
Sqmt
22
Finishing wall with 2 mm Birla Putty or equivalent of approved brand including supply
of all materials to give an even shade and sand papreing the surface even and
smooth.
Sqmt
23
Finishing walls with anti fungal weather proof paint such as Apex Ultima of Asian
paints or equivalent of other makes of reputed make,two coats over one coat of
cement primer of approved quality including cost of all material, labour, T&P required
for proper completion of the work.
Sqmt
24
Wall painting (two coat) with plastic emulsion paint of approved brand and
manufacture on decorative wall surface to give an even shade include cost of all
materials,labours and T & P etc required for proper completion of the work.
Sqmt
25
Distempering (two coat) with oil bound distemper with one priming coat of required
shade on undecorated wall surface to give an even shadde of approved brand &
manufacture such as Burger, shalimar, J&N including cleaning, brushing the surface
free from mortar.
Sqmt
26
Supply & fixing 40 mm thick sall fully mosquito proof jali shutter, including supply of
wooden cleats & stoppers and including fixing & adjustment of hinges, bolts, locks,
handles, spring & other fittings with necessary screw but excluding there supply.
Sqmt
27
Panting two coat with synthetic Enemal paint on new surface in large area,with
approved paint i/c priming coat on wood / steel surface including cost of all material,
labour T & P etc. complete.(Sl.No 644&645)
Sqmt
28
Supply and fixing of 100 mm dia PVC pipe of 6 kg/cm2 working pressure including all
fitting such as colar, socket, tee, M.S. clamp, bend fixed to wall by 15 cm long iron
nails & solution of damaged wall surface during execution of work
Rmt
Kg.
29
Mild Iron or Iron work of small size and sections such as holding down bolts, hold
fast, tie rods, grill, granting etc. (when not included in an overall rates) wrought to
required shape as necessary for bending etc including supply of steel and its
watage.
Kg.
30
Supply and fixing of H.C.I. Nahani Trap 100 x 75 mm dia size with C.P. Jali including
all materials, labour, T&P etc for proper completion of work
Nos
31
Proving & fixing cast Iron Soil, waste and vent pipe 100 mm dia (ISI mark) including
making proper joints and slope etc, including cost of all materials, labour, T&P etc for
proper completion of work
Rmt
32
Nos
33
Supply and fixing of low density polythene seamless one piece moulded tank and
placing the same in proper position including all taxes labour and T&P etc. for proper
completion of the work.
Liter
34
Supply and fixing of 15 mm dia GI pipe "B" class Jindal/JTC make or equivalent with
GI fittings ISI marked and clamps including cutting walls, floors and making good the
same including supply of all materials, labour, T&P etc required for proper
completion of work
Rmt
35
Supply and fixing of white glazed Orrisa W.C. seat with 105 mm dia, HCI trap, 30
mm dia PVC flushing pipe including supply of all materials, labours, T&P etc.
required for proper completion of the work
Nos
36
Supply and fixing of white Glazed European W.C. seat with 105 mm dia, HCI trap,
Backelite seat cover, 300 mm dia PVC flushing pipe including supply of all material,
labour, T&P etc. required for proper completion of the work (European W.C. Pan)
Nos
37
providing and fixing black granite (polished) in big slab 20 mm thick, for kitchen
platforms, vanity counters, window sill, facias and similar locations of required size of
approved shed, colour and texture laid over 20 mm thick base cement mortar
Sqmt
38
Supply and fixing of steel kitchen sink 510 x 1040 x 250 mm with drain board, with
C.P. jali, PVC waste pipe, bracket including supply of all material, labour, T&P etc for
proper completion of work
Nos
39
supply and fixing Bell/Kajaria tiles of Superior quality in flooring laid with 1:3 cement
and coarse sand mortar finished with white cement slurry jointing and polishing
complete including supply of all material, labour, T&P etc required for proper
completion of work
Sqmt
40
Supply and fixing of PVC low level Cistern with all internal fittings M.S. bracket, PVC
connection, CP angle valve 15 mm dia, brass ball cock complete including including
supply of all material, labour, T&P etc required for proper completion of work
Nos
41
Supply and fixing of white glazed earthen ware wash hand basin with CP jali PVC
waste pipe, pillar cock, bracket etc complete including including supply of all
material, labour, T&P etc required for proper completion of work (22" x 16" size)
Nos
42
Supply and fixing of 600 x 450 mm or (24"x18") size plastic framed / hard board
back, looking mirror of superior quality fixed with clips and screws including supply of
all materials, labour and T&P etc all complete work (plain mirror)
nos
43
Supply and fixing CP Brass Bib cock 15 mm dia H/Q including supply of all materails,
labour T&P etc, required for proper completion of work
Nos
44
S/F of brass Shower 15x100 mm dia H/Q including supply of all materials, labour,
T&P etc complete of the work
Supply and fixing C.P. brass Angle Valve 15 mm dia H/Q including supply of all
material, labour, T&P etc required for proper completion of work
Nos
45
Sr. No
Nos
ITEM OF WORK
Unit
Earth work in excavation of trenches for foundations pipes, cable etc. in ordinary soil
(loan, clay or sand) including lift upto 1.5 m lead upto 50 m and dressing of sides
and ramming of bottom and disposal or surplus earth as directed by Engineer-incharge.
Cum
Providing and laying in cement concrete 1:4:8 (1 cement:4 fine sand:8 graded brick
aggregate 40mm. Nominal size) and curing complete, including cost of of formwork
in foundation and floors.
Cum
Sqmt
Cum
BOQ B (GARRAGE)
Cast cement concrete door sills, chaukhats, boundary posts, shelves and similar
small works with cement, approved coarse sand, & 2cm.(3/4") gauge approved
stone ballast in the proporation 1:1.5:3 excluding supply of reinforcement and its
bending the same with 24 B WG binding wire and necessary centering and
shuttering etc, and also including supply of all materials labour and tools and plants
etc required for proper completion of works.
Cum
First Class brick work in 1:6 (1 cement: 3 part of coarse sand 2.25 FM: 3 fine sand
2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc.
required for proper completion of the work.
Cum
Sand filling in plinth including supply of necessary sand from a distance not
exceeding 8 KM,(5 miles) from the site of the work and including watering, ramming,
consolaiting and dressing etc.rate to include cost of all materials,labours and T & P
etc required for proper completion of the work.
Cum
Supply & fixing 1 mm thick M.S. sheet Garrage door with frame of 40 x 40 x 6 mm
thick M.S. gusset plate at the junction and corners including supply and fixing of
necessary fittings, lock rail of 15" length oxidised iron, pintels, hooks at the top
including cost
Sqmt
Sqmt
10
Finishing wall with two coat water proof cement paint including one coat primer of
white cement including cleaning, brushing of surface dirt, dust & mortar drops &
proper surring including cost of all materialss, labour, T&P etc. complete
Sqmt
11
Dry distemper two coat with one coat cement primer including cleaning, brushing of
surface from dust, dirt & mortar drops including cost of all materials, labour, T&P etc
complete
Sqmt
12
First Class brick work in 1:4 (1 cement: 2 part of coarse sand 2.25 FM:2 part fine
sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P
etc. required for proper completion of the work. wall of half brick 4" thick.
Cum
13
R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone
ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in lintels of doors &
windows , excluding supply of reinforcement and its bending the same with 24
BWG binding wire and necessary centering and shuttering etc., and also including
supply of all materials, labour, T&P etc. required for proper completion of works.
Strength of the concrete shall no be less than M- 150.
Cum
14
R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone
ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in slabs excluding
supply of reinforcement and its bending the same with 24 BWG binding wire and
necessary centering and shuttering etc., and also including supply of all materials,
labour, T&P etc. required for proper completion of works. Strength of the concrete
shall no be less than M- 150.
Cum
15
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work
(when not included in overall rates) wrought to required shape as necessary
including bending for proper completion of the work and includig supply of all
steeland wastage & overlapping & hooks
Kg
16
15 mm Cement plaster in single coat on rough side of single or half brick wall for
interior plastering upto floor two level including internal rounded angles chamfers,
and rounded angles not exceeding 80 mm. in girth and finished even and smooth.
( 1 Cement :6 coarse sand )
Sqmt
17
Mild Iron or Iron work of small size and sections such as holding down bolts, hold
fast, tie rods, grill, granting etc. (when not included in an overall rates) wrought to
required shape as necessary for bending etc including supply of steel and its
watage.
18
Kg.
Sqmt
EXTRA ITEMS
Sr. No
ITEM OF WORK
Unit
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with
grey cement slurry mixed with pigment to match the shade of the slab, including
rubbing and polishing cmplete with base of cement mortar 1: 4 (1cement : 4 coarse
sand) (25mm thick)
Sqmt
Providing and laying "brick coba" 12 mm thick laid with M-150 class brick bat coba
7.50 cm thick with gap of 15 mm to each other , over 20 mm thick base of cement
mortar 1:4 cement and coarse sand mixed with water proofing compound spreading
cement slurry mixed with aerclic cement concrete water proofing compound filled
gaps of coba & top of coba mortar mixed with water proofing compound in 1:4
cement and coarse sand mortar finished smooth & top mashed false square 30 cm
X 30 cm and side wall parapet shall be mono tythic plaster wall upto 30 cm higher
and junction and corner shall be rounded by brick ballast cement and coarse sand
masonary Coba with top finished plaster mixed with acetic water proofing
compound @ 2% by weight & including s/o all material, laboure, T & P etc. complete
for proper completion of work.
Sqmt
Providing and laying water proofing treatment to vertical and horizontal surfaces of
depressed portions of W.C., kitchen and the like consisting of i) 1st course of
applying cement slurry @ 4.4 kg/sqm mixed with water proofing compound
conforming to IS 2645 in recommended proportions including rounding off junction of
vertical and horizontal surfaces. ii) IInd course of 20 mm cement plaster 1:3
(1cement:3 coarse sand) mixed with water proofing compound in recommended
proportion including roundding off junction of vertical and horizontal surface. iii) IIIrd
course of applying blown or residual bitumen applied hot at 1.7 kg per sqm of area.
iv) IVth course of 400 micron thick PVC sheet. (Overlaps at joints of PVC sheet
should be 100 mm wide and pasted to each other with bitumen @1.7 kg/sqm (DSR
no. 22.3/2012)
Sqmt
Sqmt
Providing and fixing factory made 30 mm thick door shutter made of solid PVC foam
profile. The styles & rails shall be of size 75 mm x 30 mm having wall thickness 5
mm. The styles, top & bottom rails shall have one side wall thickness of 15 mm
integrally extruded on the hinge side of the profile for better screw holding power .
The styles and rails shall be reinforced with M.S. tubes of size 33 mm x 17 mmx 1
mm, painted with primer , all four corners of reinforcement to be welded or sealed.
Solid PVC extruded bidding (push fit type) will be set inside the styles and the rails
with a cavity , to receive single piece extruded 5 mm PVC sheet as panel. The styles
and rails will be mitred cut and joint with the help of PVC solvent cement & self
driven self tapping screws. Single piece extruded solid PVC lock rail of size 100 mm
x 30 mm with wall thickness 5 mm & 15 mm integrally extruded in the middle of the
lock rail & fixed with styles with the help of PVC solvent cement & self driven self
tapping screws of size 100 mm x 8 mm complete as per manufacturer's
specifications and direction of Engineer-in-charge. Non decorative finish
Providing and fixing wire gauge shutters using Stainless steel wire guage (Grade304) aperture 1.4 mm and 0.50 mmdia wire, for doors, windows and clerestory
windows with hinges and necessary screws : 35 mm thick shutters, With ISI marked
stainless steel butt hinges of required size Second class teak wood
Sqmt
Providing and fixing glazed shutters for doors, windows and clerestory windows
using 4 mm thick float glass panes including ISI marked stainless steel butt hinges of
required size with necessary screws. Second class teak wood. 35 mm thick
Sqmt
Supply & fixing 35mm thick flush door's Commercial quality conforming to I.S. 2202
part I (1983),both side teak, including fixing of wooden cleats & stoppers and
including fixing & adjustment of hinges, bolts, locks, handles, spring, fittings with
necerssary scrws to be supplid departmently.
Supply and fixing of Fancy Pelmet (Drapery Rod) including supply of all
materials,labour,T & P etc,complete work
Sqmt
Rmt
Providing
and
fixing
1st
quality
ceramic
glazed
wall
tiles
(bell/kajaria/somany)conforming to IS : 15622 (thickness to be specified by the
manufacturer), of approved make, in all colours, shades except burgundy, bottle
green, black of any size as approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse
sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in
white cement mixed with pigment of matching shade complete. 450 x 300 mm.
Sqmt
10
Providing
and
fixing
1st
quality
ceramic
glazed
wall
tiles
(bell/kajaria/somany)conforming to IS : 15622 (thickness to be specified by the
manufacturer), of approved make, in all colours, shades except burgundy, bottle
green, black of any size as approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse
sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in
white cement mixed with pigment of matching shade complete. 300 x 200 mm.
Sqmt
11
Providing and filling of Cinder in shunken portion including caopacing etc complete
in all respect as per requirement.
Cum
12
Providing and fixing PVC rigid foam sheet 1mm thick on existing door shutters
(bathroom and W.C doors) using synthetic rubber based adhesive (DSR no.
9.125/2012)
Sqmt
13
Supply & fixing 30mm thick flush door's Commercial quality conforming to I.S. 2202
part I (1983), non decorative, including fixing of wooden cleats & stoppers and
including fixing & adjustment of hinges, bolts, locks, handles, spring, fittings with
necerssary scrws to be supplid departmently.
Sqmt
14
window chawkhat
15
16
Ventilator chawkhat
Providing and fixing of 5 mm thick glass pans in window and ventilator including
putty, nail etc complete in all respect
Providing and fixing to the inlet mouth of rain water pipe cast iron granting 15 cm
diameter and weighing not less than 440 grams (DSR 12.44/2012)
No.
No.
No.
Sqmt
no.
17
18
Rmt
Rmt
19
Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand: 10 gradded
stone 40 mm nominal size) alround S.W. pipes including bed concrete as per
standard design. 150 mm diameter S.W. pipe
Rmt
20
Providing and laying Non pressure NP 2 class RCC pipe with collars jointed with stiff
mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including
testing of joints etc. complete DSR 19.2.2
Rmt
21
constructing brick masonry chamber 300 x 300 x 500 mm inside with first class brick
work in cement mortar 1:4 (1 cement : 4 coarse sand) for stop cock, with C.I. surface
box 100 x 100 x 75 mm (insiae) with hinged cover fixed inc cement concrete slab
1:2:4 mix (1 cement: 2 coarse sand: 4 gradded stone aggregate 20 mm nominal
size); necessary excavatio, foundation concrete 1:5:10 (1 cement: 5 coarse sand:
10 gradded stone aggregate 40 mm nominal size) and inside plastering with cement
mortar 1:3 (1 cement:3 coarse sand) 12 mm thick, finished with a floating coat of
neat cement complete as per standard design DSR 18.32
No.
22
Constructing brick masonry manhole with first class bricks in cement mortar 1:4 (1
cement: 4 coarse sand) RCC top slab with 1:2:4 mix (1 cement : 2 coarse sand: 4
gradded stone 20 mm nominal size); foundation concrete 1:4:8 mix (1 cement : 4
coarse sand: 8 gradded stone 40 mm nominal size) inside planstering 12 mm thick
with cement mortar 1:3 (1 cement : 3 coarse sand) finshed with a floating coat of
neat cement and making channels in cement concrete 1:2:4 (1 cement: 2 coarse
sand: 4 gradded stone aggregate 20 mm nominal size) finished with a floating coat
of neat cement complete as per standard design
Inside size 90x 80 cm & 45 cm depp including CI cover with frame (light duty) 455 x
610 mm internal dimension total wt. of cover & frame to be not less than 38 kg (wt. of
cover 23 kg and wt. of frame 15 kg) DSR 19.7.1.1
No.
Inside size 120 x 90 cm & 90 cm depp including CI cover with frame (medium duty)
500 mm internal dimension total wt. of cover & frame to be not less than 116 kg (wt.
of cover 58 kg and wt. of frame 58 kg) DSR 19.7.2.1
No.
23
Extra for depth for manhole with first class bricks : size 90 x 80 cm DSR 19.8.1.1
Rmt
24
Supply and fixing of steel kitchen sink 510 x 600 x 180 mm with C.P. jali, PVC waste
pipe, bracket including supply of all material, labour, T&P etc for proper completion
of work
No.
25
Supply and fixing of 25 mm dia GI pipe "B" class Jindal/JTC make or equivalent with
GI fittings ISI marked and clamps including cutting walls, floors and making good the
same including supply of all materials, labour, T&P etc required for proper
completion of work
Rmt
26
A
B
C
D
E
CERA fittings
P/F of Bib Cock "short body" CL203
F
G
H
I
J
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
K
L
M
N
O
P
Q
R
27
28
29
30
No.
No.
No.
No.
No.
No.
No.
No.
Rmt
Sqmt
Sqmt
No.
Qty
450.80
785.68
147.82
349.91
17.65
543.14
30.82
187.50
22078.13
5419.05
418.65
53.04
0.00
0.00
3.62
125.14
15.45
0.00
0.00
2087.15
576.14
5419.05
1965.14
0.00
1235.96
0.00
1241.68
126.00
118.40
66.00
253.70
0.00
6000.00
18.00
8.00
31.73
4.00
137.17
26.00
20.00
20.00
16.00
0.00
10.00
Qty
0.00
0.00
0.00
0.00
0.00
0.00
0.00
57.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
340.74
Qty
Rate
434.44
1027.00
413.33
903.00
707.36
450.00
37.80
3124.36
96.00
3143.00
65.34
3143.00
37.80
1866.00
164.60
300.00
165.94
207.70
71.01
1331.00
13.43
623.00
31.17
1424.00
20.00
10.00
20.00
14.60
109.00
98.00
39.00
834.50
16.00
135.75
220.20
167.70
102.15
649.00
167.70
790.00
52.5 Rmt
19.00
1165.00
26.00
10463.00
5.00
20890.00
2.00
5527.00
10.00
0.00
193.00
242.50
8.00
8.00
46.00
96.00
854.40
1266.70
1108.90
824.80
2178.50
1301.50
2794.10
2097.15
3705.80
2875.40
8.00
8.00
16.00
4.00
16.00
4.00
16.00
16.00
94.00
4.00
16.00
36.00
36.00
48.00
608.00
870.00
355.00
546.55
1864.90
1963.60
1272.50
1051.80
3223.80
5419.05
78.75
16.00
2450.00