You are on page 1of 101

Without preliminary written permission of the Owner, it is prohibited to reproduce, translate,

change in any form or partially, hand over for temporary or permanent use to other organizations
or persons, disclose or use information in commercial interests of persons or organizations having
no contractual relations with the Owner.

"ROSATOM" STATE CORPORATION FOR ATOMIC ENERGY

JOINT-STOCK COMPANY
"ATOMENERGOPROEKT"

AKKUYU NPP

UNITS 1, 2, 3, 4

Agreement on Using the KKS Coding System


in the Akkuyu NPP Project

AKU-AEB0001
Revision B01

2013

"ROSATOM" STATE CORPORATION FOR ATOMIC ENERGY

JOINT-STOCK COMPANY
"ATOMENERGOPROEKT"

AKKUYU NPP
UNITS 1, 2, 3, 4
Agreement on Using the KKS Coding System
in the Akkuyu NPP Project

AKU-AEB0001
Revision B01

First Deputy General Director

L.V. Egorov

Director for Prospective Designin

A.Yu. Kuchumov

Director for Design Technologies

S.V. Ergopulo

Design Chief Engineer

A.Yu. Alaev

2013

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

TABLE OF CONTENTS
Terms and definitions.........................................................................................................................4
List of adopted abbreviations.............................................................................................................5
1 Application guide............................................................................................................................7
1.1 General statements.........................................................................................................7
1.2 Procedure for introducing changes................................................................................8
1.3 Agreement and approval procedure...............................................................................8
1.4 Distribution procedure...................................................................................................8
1.5 Responsibility.................................................................................................................8
2 Agreed provisions............................................................................................................................9
3 List of codes for functional systems, buildings and structures....................................................15
4 List of equipment unit codes.........................................................................................................73
5 Component codes..........................................................................................................................83
Appendix Structure of a functional and process-related code......................................................91
Appendix B Numbering in an equipment unit code.........................................................................91
Appendix C Correspondence between maintenance elevations and height elevations..................100
Appendix D Rules for coding embedded parts, penetrations, and reinforced blocks....................101
Appendix E Cable coding principles..............................................................................................105
Appendix F Principles for coding electrical equipment.................................................................107
Appendix G The procedure of using system numbering in the KKS code in the
process part for the Akkuyu NPP Project.......................................................................................108
Appendix H Principles for coding ventilation system plants and equipment................................110
Revision list....................................................................................................................................111

AKU-AEB0001

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

TERMS AND DEFINITIONS


Term

Definition

ATOMIC STATION (AS)

A nuclear plant for producing power in preassigned


modes and conditions of its use, being located
within a design-defined territory and using a
nuclear reactor (reactors) and complex of
necessary systems, devices, equipment and
structures with the required employees (personnel)
for fulfilling this purpose [NP-001-97 (PNAE G01-011-97) General Provisions for Ensuring Safety
of Nuclear Stations OPB-88/97]

NUCLEAR POWER PLANT (NPP)

An atomic station intended for producing electric


power [NP-001-97 (PNAE G-01-011-97)]

OUTER CONTAINMENT (UJB)

The outer (secondary) shell of the reactor building


including its annulus

AKKUYU NPP PROJECT

The project of the Akkuyu nuclear power plant


including, but not limited to, engineering survey
works at the site, engineering, construction,
commissioning, and operation of the NPP
throughout its entire service life, waste handling,
and decommissioning of the NPP.
The system developed by the Association of
Industrialists VGB

CLASSIFICATION AND CODING


SYSTEM KKS

AKU-AEB0001

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

LIST OF ADOPTED ABBREVIATIONS


ABH
ACS
ADR
AEDR
AERMS
AIDMS
APC
APCS
ARMS
AS
CPS
CPS CMs
CRMS
CTW
DPS
ECR
EE
EE I&C
EPSS
FA
FFS
FP I&C
FSDV-AH

GIS
HIPC
HNMP
HPH
HSS
I&C
IDP
IRG
KKS

LCP
LPC
LPH
MCDS
MCR
MCS
MSR
NFME
NO

AKU-AEB0001

auxiliary boiler house;


automated control system;
absorbed dose rate;
ambient equivalent dose rate;
automated environment radiation monitoring system;
automated individual dosimetric monitoring system;
automatic power controller;
automated process control system;
automated radiation monitoring system;
atomic station;
control and protection system;
reactor control and protection system control members;
central radiation monitoring station;
chemically treated water;
diesel power station;
emergency control room;
electrical equipment;
electrical equipment instrumentation and control system;
emergency power supply system;
fuel assembly;
fuel filling station;
fire protection instrumentation and control system;
fast-acting pressure-reducing valve with dumping steam into the
auxiliary header;
SF6 gas insulated switchgear and control gear;
high-and-intermediate pressure cylinder;
heat network makeup plant;
high-pressure heater;
heat storage system;
instrumentation and controls;
independent demineralizing plant;
inert radioactive gases;
(German) Kraftwerk-Kennzeichensystem, classification and coding
system for power installations;
local control panels;
low-pressure cylinder;
low-pressure heater;
monitoring, control and diagnostic system;
main control room;
monitoring and control system;
moisture separator reheater;
neutron flux monitoring equipment;
normal operation;
Agreement

JSC "Atomenergoproekt"
NPP
OPB
PCM
PHRS
PLCS
PP
PRZ
PSV
RCM
RCP
RMS
RPSS-NO
RVD
RWT
SDPP
SG
SRW
SS
SV
SYCR
TICD
TPTS
TSC
UDP
VLAW
WTP

AKU-AEB0001

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

nuclear power plant;


general provisions for ensuring safety of atomic stations;
periodic and casual monitoring;
passive heat removal system;
plant level control system;
preventive protection;
pressurizer;
pilot-operated safety valve;
radiation contamination monitoring;
reactor coolant pump;
radiation monitoring system;
normal-operation reliable power supply system;
remote viewing display;
radioactive water treatment;
standby diesel power plant;
steam generator;
solid radwastes;
safety system;
safety valve;
switchyard control room;
thermal instrumentation and control department;
standard computerized automation facilities;
technical support center;
unit demineralizing plant;
very low-active wasted;
water treatment plant.

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

1 APPLICATION GUIDE
1.1 GENERAL STATEMENTS
1.1.1
The Akkuyu NPP Project uses the unified classification and coding system
KKS developed by the technical committee of the German association of industrialists VGB for
encoding functional systems, buildings, structures, equipment (equipment units), and equipment
components.
1.1.2
The KKS system is aimed at identifying buildings, structures or premises,
any process systems, equipment sets or parts thereof, as well as the places of their location and
installation in the course of design, construction, operation, and maintenance of power facilities.
1.1.3
The Agreement on Application of the KKS Coding System in the Akkuyu
NPP Project (referred to hereinafter as the Agreement) regulates activities of organizations involved
in development of the Akkuyu NPP Project with regard of applying the classification and coding
system KKS.
1.1.4
The Agreement has been developed in compliance with the standard rules
and guidelines for applying the KKS system.
1.1.5
The standard rules and guidelines for applying the KKS system are
contained in the following KKS documents:
"KKS Rules. The KKS Coding System for Power Stations. VGB- 105 ," version
2010 including the following:

"Guidelines for KKS Application";

"KKS Keys";
"Guidelines for KKS Application. VGB- 106 ," version 2004, including the
following:

"KKS Application Commentaries. Part General";

"KKS Application Commentaries. Part Engineering Discipline-Specific.


Part 1. Identification in Mechanical Engineering";

"KKS Application Commentaries. Part Engineering Discipline-Specific.


Part 2. Identification in Civil Engineering";

"KKS Application Commentaries. Part Engineering Discipline-Specific.


Part 3 Identification in Electrical and Instrumentation and Control Engineering";

"KKS Application Commentaries. Part Engineering Discipline-Specific.


Part 4 Identification of I&C Tasks and Functions in Process Systems and of Functions in I&C
Systems".
1.1.6 The structure of a functional-process KKS code is given in Appendix .
1.1.7 Section 2 of this document "Agreed Statements" contains a list of statements that
are not regulated by the KKS system, and that are a subject of agreement. This list can be further
extended if additional statements emerge in the course of work.
1.1.8 A full list of functional systems, buildings, and structures can be revealed and
encoded only after all participants to the Project complete the development of working documents.
The full list of codes for functional systems, buildings, and structures shall be issued at the
end of the working documentation development stage.
1.1.9 To satisfy additional identification requirements, the KKS codes or part of them
can be combined with other coding systems on agreement with the General Designer.
1.1.10 Additional agreed provisions and codes can be incorporated subject to their
consenting with the General Designer. In this case, the document shall be revised, and its next
revision shall be issued.
AKU-AEB0001

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

1.1.11 Buildings, structures, functional systems and equipment are all subject to
obligatory coding. The coding boundaries of NPP components are defined by the developer of the
documentation.

AKU-AEB0001

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

1.2 PROCEDURE FOR INTRODUCING CHANGES


1.2.1

This document must be revised in the following cases:


- on request of the General Customer or Technical Customer;
- on decision of the General Designer if there is significant amount of changes that
have to be introduced into the document.
1.2.2 Each of the participants involved in works relating to the Akkuyu NPP Project may
introduce a proposal for altering or extending the document and forward it to the General Designer
for agreement.
1.2.3 Changes are incorporated by the General Designer as per a duly established
procedure.

1.3 AGREEMENT AND APPROVAL PROCEDURE


1.3.1 The document has to be agreed with the key participants to the Project. The list of
key participants agreeing the document is defined by the General Designer of the Akkuyu NPP
Project.
1.3.2 The document is regarded to be agreed if no reply has been received from a
participant to the Project for 20 working days since the receipt of official letter about its forwarding
for agreement. The moment at which the incoming letter was registered in the Project participant's
document circulation system is regarded as the fact confirming the receipt of letter by the
participant to the Project.

1.4 DISTRIBUTION PROCEDURE


1.4.1 The General Designer forwards the agreed document to the Technical Customer.
1.4.2 The Technical Customer and General Designer bear responsibility for distributing
this document among their subcontractors.

1.5 RESPONSIBILITY
1.5.1 This document is mandatory for all organizations participating in the development of
the Akkuyu NPP Project at all stages of the NPP lifecycle.
1.5.2 The responsibility for development and revision of this document rests with the
General Designer.
1.5.3 The responsibility for correctness of assigning KKS codes rests with the developers
of documentation.

AKU-AEB0001

Agreement

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

2 AGREED PROVISIONS
Matters subject to
agreement
1 Changing the names of
KKS codes

Adopted for the Akkuyu NPP Project


General
1.1 It is allowed to change the names of KKS codes given in the
KKS Keys listed in the document VGB- 105 without changing
their meaning. Such changes must be agreed upon with the
General Designer.
The list of code names is given in Section 3 of this document.
1.2 The code of buildings (structures) contained in the name of
code for a functional system applied for Units 1 to 4 is given in
the Agreement for four Units, for example:
KRA10 - System for supplying nitrogen to blow-offs from
equipment in the 10UJA (20UJA, 30UJA, 40UJA) building.
In the documentation:
- if the system is applied only for Unit 1, the code name is as
follows: System for supplying nitrogen to blow-offs from
equipment in the 10UJA building;
- if the system is applied only for Unit 3, the code name is as
follows: System for supplying nitrogen to blow-offs from
equipment in the 30UJA building.
1.3 The name of functional system code used in the Agreement
indicates all buildings to which the system applies (sequentially,
separated by a comma), for example:
SMT - Cranes, stationary hoisting devices and handling
equipment in the 00UTF, 00UTH buildings.
In the documentation:
- if the system is applied only for the 00UTF building, the code
name is Cranes, stationary hoisting devices and handling
equipment in the 00UTF building;
- if the system is applied only for the 00UTH building, the code
name is Cranes, stationary hoisting devices and handling
equipment in the 00UTH building.

2 Order and direction of


numbering for all digital
parts of a code

AKU-AEB0001

2.1 This document establishes specific methods of numbering for


concrete parts of the project and kinds of codes. In doing so, the
basic rules of numbering corresponding to i. 2.3.2 of the volume
"Guidelines for KKS Application" of the VGB-B 105 E document
are retained.

Agreement

10

JSC "Atomenergoproekt"

Matters subject to
agreement
3 Defining sector 0 of
codes with regard to:
content;
type of character;
direction of
numbering

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project


3.1 Sector 0 contains a code indicating whether the component
belongs to a power unit, to common-unit, or to common-station
installations and systems.
3.2 Power units are encoded by a digital character beginning from
digit 1.
3.3 Common-unit installations and systems for Units 1 and 2 are
encoded by the digital character 5
3.4 Common-unit installations and systems for Units 3 and 4 are
encoded by the digital character 6.
3.5 Common-station installations and systems for the Akkuyu
NPP (for Units 1 to 4) are encoded by the digital character 0.

4 Code writing method

4.1 A code is written in one, two, or three lines, e.g.:


- in one line:
10JND20AP001 MK01;
20JND20AP002;
10CCA03GW001;
10UMA10AB001;
- in two lines:
10JND20
AP001 MK01;

10CCA03
GW001;

10UMA10
AB001;

- in three lines:
10JND20
AP001
MK01
4.2 When a code is drawn in the SmartPlant Enterprise (SPE)
software system, it is written in accordance with the structure
given in Appendix . If information is not available in the code
group A3, this group is replaced in the SPE and on a paper carrier
by a space. Ordering specifications are an exception from this
rule: in writing them, the relevant codes shall be written in a line
without spaces
5 Use of reserve codes

AKU-AEB0001

5.1 Reserve codes can be used as follows:


on agreement with the VGB Association of Industrialists Task
Force (such codes are marked in the "KKS Keys" volume of the
VGB- 105 document by the words banned for use);
on agreement with the General Designer (such codes are
marked in the "KKS Keys" volume of the VGB- 105
document by the words free for use)

Agreement

11

JSC "Atomenergoproekt"

Matters subject to
agreement

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project


Functional and process related codes

6 Use of code clusters for


functional and processrelated identification

6.1 Code clusters are used in accordance with Section 3.1 of the
"Guidelines for KKS Application" volume of the VGB- 105
document. Code cluster G is used in accordance with i.3 of
Section 2 "Agreed Provisions" of this document. Code cluster A3
is used if a need arises

7 Use of code group


(cluster) F0

7.1 The digital group F0 uses numbering from 0 to 9. The use of


cluster F0 is mandatory:
for the civil part of the design, the digital cluster F 0 is used for
denoting the same functional types of buildings and structures.
For single buildings and structures the digital symbol 0 is used;
the digital symbols 1 and 2 in the cluster F 0 are used in the
process, electrical, and I&C parts of the design to denote elements
of safety trains, elements used in the trains of the emergency
power supply system, and elements that take power supply from
it. The digital symbol 0 is used to denote elements of normal
operation systems and elements belonging to the normal-operation
auxiliary power supply system. Elements belonging to heating,
ventilation, and air conditioning systems taking power supply
from the NO diesel-generator are denoted using the digital
symbol 5.
When references are made in documentation to the functional
system code, cluster F0 can be replaced by a space (e.g., in text, in
the main inscription used in graphic and text documents, lists,
etc.)
8.1 The digital code FN uses numbers from 00 to 99. Examples of
possible numbering for the heat-transfer and mechanical parts are
given in i. 3.1.2.1 "KKS Application Commentaries. Part B
Engineering Discipline-Specific. Part B1 Identification in
Mechanical Engineering" of the VGB-B 106 E document. The
procedure of using system numbering in the process part for the
Akkuyu NPP Project is described in Appendix G
9.1 The digital code N is used for assigning the number to an
equipment unit. The largest number is 999. The numbering in
each cluster begins with 001. For making the designation more
informative, the first digit of the N code can be fixed for certain
kinds of equipment units or can bear other meaning. Details on
using the cluster N of digital codes from 001 to 999 are given in
Appendix B to this document

8 Determining the
numbering in cluster FN

9 Determining the
numbering in cluster N

AKU-AEB0001

Agreement

12

JSC "Atomenergoproekt"

Matters subject to
agreement

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project

10 Use of the alphabetic 10.1 The additional cluster 3 of alphabetic codes is used:
code
for encoding impulse (pilot operated) valves;
for encoding main safety valves and devices protecting from
overpressure;
for encoding impulse valves used in the containment isolation
valves;
for encoding the double drive of an equipment unit;
for encoding multiple power supply;
for encoding several measurement loops with one
measurement point;
for denoting the phases (, , ) in the equipment unit code of
electrical devices produced for individual phases;
for further division of premises;
for further division of lighting systems using the following
Latin letters:
a) N - working lighting system;
b) E - emergency lighting system;
c) F - escape lighting system
11 Determining
the 11.1 Parts of equipment units are numbered from 01 to 99. The
numbering in cluster BN
definitions given in i. 3.1.3 of the volume "Guidelines for KKS
Application" of the VGB-B105 E document are in force.
Examples of BN numbering are given in i. 3.1.3.2
of the volume "KKS Application Commentaries. Part A General"
of the VGB-B106 E document
12 Denoting
elements

attachment 12.1 Attachment elements belonging to a process-related


mechanical system are encoded in accordance with i. 5.4.2 of the
volume "Guidelines for KKS Application" of the VGB-B105 E
document using the equipment unit code *BQ*. The digital
breakdown of the *BQ* code is given in Appendix B.
12.2 Attachment elements belonging to in electrical and I&C
devices are denoted using the code *GZ* (i. 5.6.1 of the volume
"Guidelines for KKS Application" of the VGB-B105 E
document).
12.3 Embedded parts for various functional purposes with
reference to the civil engineering system are encoded as is
explained in Appendix D

AKU-AEB0001

Agreement

13

JSC "Atomenergoproekt"

Matters subject to
agreement
13 Coding of support
systems

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project


13.1 The definitions given in i. 5.4.3. "Guidelines for KKS
Application" are in force. Examples of encoding support systems
are given in i. 3.1.1.3 of the volume "KKS Application
Commentaries. Part B Engineering Discipline-Specific. Part B1
Identification in Mechanical Engineering" of the VGB-B106 E
document

14 Coding
of
united 14.1 The definitions given in i. 5.6.3.1. "Guidelines for KKS
systems for processing data Application" are in force. Examples of coding are given in
of measurements
Section 3 of the volume "KKS Application Commentaries. Part B
Engineering Discipline-Specific Application Commentaries. Part
B4 Identification of I&C Tasks and Functions in Process Systems
and of Functions in I&C Systems" of the VGB-B106 E document
15 Determination and use 15.1 The signal codes X, Y, Z are used in accordance with
of codes for signals and section 5 of this document
determination of subgroups
in the main groups X, Y, and
Z in code sector 3
15 Denoting
parts
of 15.1 Electrical apparatuses appearing in the codes of equipment
equipment units in electric unit parts in circuit diagrams are denoted in accordance with
and I&C circuit diagrams
Appendix F
Codes of erection locations
16 Use of code clusters for 16.1 These groups of codes are applied in accordance with
identifying the erection Appendix F
location
17 Use of code cluster F0

17.1 The code cluster F0 is used in accordance with i. 7 of Section


2 "Agreed Provisions" in this document

18 FN 18.1 The digital code FN uses numbering from 01 to 99. Examples


of possible numbering are given in subsections 5.2 and 5.3 of the
volume "KKS Application Commentaries. Part B Engineering
Discipline-Specific. Part B3 Identification in Electrical and
Instrumentation and Control Engineering" of the VGB-B106 E
document
19 Coding of erection 19.1 The relevant items are encoded in accordance with
location in an erection unit
Appendix F
Codes of location
20 Use of code clusters for 20.1 These code clusters are used in accordance with subsection
location
3.3 of the volume "Guidelines for KKS Application" of the VGBB105 E document. Code cluster G is used in accordance with i. 3
of Section 2 "Agreed Provisions" in this document
21 Use of the code F0

AKU-AEB0001

21.1 The preliminary code F0 is used in accordance with i. 7 of


Section 2 "Agreed Provisions" in this document

Agreement

14

JSC "Atomenergoproekt"

Matters subject to
agreement

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project

22 Use of the codes F2, F3

22.1 The use of subcluster F2, F3 is given in Section 3 of this


document

23 Use of the code FN

23.1 Maintenance elevations used in each building and structure


are numbered individually in accordance with Appendix to this
document

24 Coding of rooms

24.1 Rooms are encoded in accordance with i. 3.3.2.1 of the


volume "Guidelines for KKS Application" of the VGB-B105 E
document. Coding examples are given in i. 3.2.1.1 of the volume
"KKS Application Commentaries. Part B Engineering DisciplineSpecific. Part B2 Identification in Civil Engineering" of the VGBB106 E document.
In doing so, the following requirements must be complied with:
the numbering must be directed along the Cartesian
coordinates;
the code cluster A1 must always contain the code R;
rooms in the cluster AN are numbered by a three-digit numerical
character.
Shafts and rooms passing through several maintenance platforms
are denoted by three-character group codes:
3NN for equipment shafts;
4NN for cable shafts;
5NN for staircase shafts;
6NN for elevator shafts;
7NN for reactor shafts (cavities);
8NN for process shafts; and;
9NN for ventilation shafts.
Items in the code cluster FN can be numbered with respect to the
lower maintenance elevation from which the shaft or room begins,
or with respect to each maintenance elevation

25 Coding of individual 25.1 In case of using united buildings and structures that have
structures
united
with their own KKS codes, an individual KKS code is assigned to the
another structure
united building.
If it is impossible to select an individual KKS code for given
buildings and structures, they are encoded according to the
priority functional purpose of the structure. In this case, the name
of the united building is indicated first in the code name and the
name of building this code directly belongs to is written through a
slash (/) in Section 3 of this document.
For example:
10UJA Reactor building/Inner containment

AKU-AEB0001

Agreement

15

JSC "Atomenergoproekt"

Matters subject to
agreement

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Adopted for the Akkuyu NPP Project

26 Coding of channels and 26.1 Channels and trestles are encoded in accordance with the
trestles
as
connecting code of one of the buildings or structures being connected
structures
according to the priority functional purpose of the building or
structure
27 Cable
principles

encoding 27.1 Cables are encoded in accordance with Appendix E

AKU-AEB0001

Agreement

16

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

3 LIST OF CODES FOR


BUILDINGS AND STRUCTURES

AKU-AEB0001

01

FUNCTIONAL SYSTEMS,

Agreement

17

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

A..

Networks and switchgears

A.

380 kV voltage systems

Busbar of a 380 kV SF6 gas-insulated switchgear (GIS)

AB

Busbars of a 380 kV SF6 gas-insulated switchgear (GIS)

AD

380 kV flexible line links

AL

380 kV power transmission line

ACM

380 kV bus ducts

AQ

380 kV GIS circuit breaker

AR

380 kV shunt reactors

AY

Electrical equipment control, monitoring and relay protection system,


secondary-circuit cabinets, cabinets of interfacing (I/O) devices

AE.

154 kV voltage systems

AEA

154 kV GIS busbar

AEB

154 kV GIS busbar

AEL

154 kV power transmission lines

AEM

154 kV bus ducts

AEQ

154 kV GIS circuit breaker

AEY

Electrical equipment control, monitoring and relay protection system,


secondary-circuit cabinets, cabinets of interfacing (I/O) devices

AP.

SYCR desks, panels, and cabinets

APA

SYCR (area of front control panels)

APB

SYCR (area of rear control panels)

APC

Workstations of SYCR operators

APD

Printers of SYCR operators

AR.

Protection equipment

ARA

Emergency control system (ECS)

AS.

Decentralized panels and cabinets

ASQ

Automated information-measurement system for commercial account of


electric energy (AIMS CEA)

ASS

Synchronization

AT.

Transformer equipment

ATT

380/154 kV coupling autotransformers

ATW

154/10 kV transformers

ATY

Control, monitoring and relay protection system of electrical equipment,

AKU-AEB0001

Agreement

18

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
secondary-circuit cabinets, cabinets of interfacing (I/O) devices

AV.

Electrical equipment (EE) I&C cabinets

AVA

EE I&C controller cabinets

AVB

Server cabinets, gateways, EE I&C auxiliary equipment

AVC

EE I&C workstations

AVD

EE I&C printers

AVE

EE I&C power supply cabinets

AVT

Data acquisition and transmission system (DATS)

B..

Power transmission

BA.

Energy extraction, generator voltage bus ducts

BAA

Power taps from the generator, generator voltage bus ducts

BAB

Cabinets of generator auxiliaries

BAC

24 kV generator circuit breakers, including cooling plants

BAT

Generator transformers, including cooling plants

BAU

Lightning protection and grounding system

BAY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I&C) devices

BB.

10 kV auxiliary power supply switchgears and transformers. Normal


operation system

BBA

10 kV switchgears (unit section 1)

BBB

10 kV switchgears (unit section 2)

BBC

10 kV switchgears (unit section 3)

BBD

10 kV switchgears (unit section 4)

BBE

10 kV switchgears of the reliable power supply system (section 1)

BBF

10 kV switchgears of the reliable power supply system (section 2)

BBG

10 kV switchgears of the reliable power supply system (diesel-generator


plant section)

BBT

24/10-10 kV working auxiliary transformers

BBY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BC.

10 kV standby power supply switchgears, common-station


switchgears, and power supply transformers. Normal operation
system

BCA

10 kV standby power supply switchgears and common-station


switchgears

AKU-AEB0001

Agreement

19

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Code

Name

BCB

10 kV standby power supply switchgears and common-station


switchgears

BCC

10 kV standby power supply switchgears and common-station


switchgears

BCD

10 kV standby power supply switchgears and common-station


switchgears

BCE

10 kV common-station switchgears

BCF

10 kV common-station switchgears

BCL

10 kV standby power supply lines

BCT

Standby and common-station auxiliary transformers

BCY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BD.

10 kV switchgears of the emergency power supply system

BDA

10 kV switchgears (section 1)

BDB

10 kV switchgears (diesel-generator plant section)

BDL

10 kV section power supply lines

BDY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BF.

Main 0,4 kV auxiliary switchgears and 10/0,4 kV transformers.


Normal operation system

BFA

Switchgears from BFT11

BFB

Switchgears from BFT21

BFC

Switchgears from BFT31

BFD

Switchgears from BFT41

BFE

Switchgears from BFT12

BFF

Switchgears from BFT22

BFG

Switchgears from BFT32

BFH

Switchgears from BFT42

BFJ

Switchgears from BFT33

BFL

CPS switchgears from BFT24

BFM

CPS switchgears from BFT44

BFN

Switchgears from BFT15

BFP

Switchgears from BFT25

BFT

10/0.4 kV auxiliary transformer

BFY

Control, monitoring and relay protection system of electrical equipment,

AKU-AEB0001

Agreement

20

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BG.

0,4 kV auxiliary switchgears and 10/0,4 kV transformers. Normal


operation system

BGA

0,4 kV switchgears from BGT11

BGB

0,4 kV switchgears from BGT21

BGC

0,4 kV switchgears from BGT12

BGD

0,4 kV switchgears from BGT22

BGE

0,4 kV switchgears from BGT23

BGT

10/0.4 kV transformers of normal operation reliable power supply system

BGY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BH.

0.4 kV main low-voltage standby power supply networks and 10/0.4


kV standby transformers

BHA

Standby power supply mains from BHT21

BHB

Standby power supply mains from BHT41

BHC

Standby power supply mains from BHT35

BHT

10/0.4 kV standby auxiliary transformer

BHY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BK.

0,4 kV common-station switchgears and 10/0,4 kV transformers.


Normal operation system

BKA

0,4 kV switchgears from BKT11

BKB

0,4 kV switchgears from BKT21

BKC

0,4 kV switchgears from BKT27

BKE

0,4 kV switchgears from BKT16

BKF

0,4 kV switchgears from BKT26

BKG

0,4 kV switchgears from BKT12

BKH

0,4 kV switchgears from BKT22

BKJ

0,4 kV switchgears from BKT13

BKK

0,4 kV switchgears from BKT23

BKL

0,4 kV switchgears from BKT14

BKM

0,4 kV switchgears from BKT24

BKN

0,4 kV switchgears from BKT15

BKP

0,4 kV switchgears from BKT25

BKQ

0,4 kV switchgears from BKT18

AKU-AEB0001

Agreement

21

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

BKR

0,4 kV switchgears from BKT28

BKS

0,4 kV switchgears from BKT17

BKT

10/0.4 kV transformer for common-station loads

BKY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BL.

0,4 kV common-station switchgears and 10/0,4 kV transformers.


Normal operation system

BLK

0,4 kV switchgears from 00BKT31

BLL

0,4 kV switchgears from 00BKT32

BLM

0,4 kV switchgears from 00BKT53

BLN

0,4 kV switchgears from 00BKT63

BLP

0,4 kV switchgears from 00BKT19

BLQ

0,4 kV switchgears from 00BKT29

BLR

0,4 kV switchgears from 00BKT52

BLS

0,4 kV switchgears from 00BKT62

BLY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BM.

0,4 kV switchgears and 10/0,4 kV transformers. Emergency power


supply system

BMA

0,4 kV switchgears from BMT11

BMB

0,4 kV switchgears from BMT21

BMC

0,4 kV switchgears from BMT12

BMD

0,4 kV switchgears from BMT22

BME

0,4 kV switchgears from BMT13

BMF

0,4 kV switchgears from BMT23

BMT

10/0,4 kV auxiliary transformer

BMY

Control, monitoring and relay protection system of electrical equipment,


secondary-circuit cabinets, and cabinets of interfacing (I/O) devices

BR.

Auxiliary switchgears, uninterruptible (inverter) power supply to


emergency power supply systems and to normal operation reliable
power supply systems

BRA

Cabinets supplying power to the instruments on safety panels at the


MCR/ECR. Emergency power supply system.

BRB

Cabinets supplying power to MCR elements and service devices. Normal


operation system

AKU-AEB0001

Agreement

22

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

BRH

Cabinets supplying power to the TPTS

BRT

Inverters of the normal operation reliable power supply system

BRU

Inverters of the emergency power supply system

BT.

Storage batteries

BTA

220 V storage batteries of the EPSS

BTB

220 V storage batteries of the NO reliable power supply system

BTC

110 V storage batteries of the reactor control and protection system

BTL

220 V charging-recharging rectifier of the NO reliable power supply


system

BTM

110 V charging-recharging rectifier of the reactor control and protection


system

BTP

220 V charging-recharging rectifier of the emergency power supply


system

BU.

DC switchgears of the normal operation system

BUA

220 V DC boards from BTB10

BUB

220 V DC boards from BTB20

BUC

220 V DC boards from BTB30

BUD

220 V DC boards from BTB40

BUE

110 V DC boards from BTC21

BUF

110 V DC boards from BTC41

BUY

Electrical equipment control and monitoring system, cabinets of reliable


power supply system secondary circuits

BV.

DC switchgears of the emergency power supply system

BVA

220 V DC switchgears from BTA11

BVB

220 V DC switchgears from BTA21

BVY

Electrical equipment control and monitoring system, cabinets of


emergency power supply system secondary circuits

BY.

Electrical equipment (EE) I&C cabinets

BYA

EE I&C controller cabinets

BYB

Server cabinets, gateways, EE I&C auxiliary equipment

BYC

EE I&C workstations

BYD

EE I&C printers

BYE

EE I&C power supply cabinets

C..

Equipment of instrumentation and control system (I&C)

CE.

Alarming

AKU-AEB0001

Agreement

23

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

CEJ

Important operating parameters recording system (IOPRS)

CF.

Measurement recording and processing cabinets

CFL

ARMS lower-level computerized automation subsystem (ARMS LL CAS)

CFM

ARMS lower-level equipment

CFN

ARMS lower-level equipment

CFP

AERMS lower-level equipment

CFQ

Time synchronization device

CFR

AIDMS lower-level equipment

CFS

Upper-level equipment of the AIDMS, RCM, PCM

CFT

RMS information board

CFU

Equipment of radiation monitoring laboratories

CFV

Equipment of radiation monitoring laboratories

CFW

Equipment of external radiation monitoring laboratories

CFX

Equipment of external radiation monitoring laboratories

CK.

Process computer system

CKA

Remote single-display CPS-ESFAS station of the first safety train

CKB

Remote single-display CPS-ESFAS station of the second safety train

CKF

Document drawing devices

CKH

Engineering station package for monitoring and control systems of the


reactor compartment normal operation equipment

CKK

Switches

CKK90

Data transmission devices

CKM

Server devices

CKM50

Remote viewing display equipment

CKP

Computer equipment interfacing devices

CKX

Group control controllers

CKY

FP I&C and LCP dedicated equipment cabinets

CL.

Equipment of the reactor control and protection system

CLA

Cabinets of the CPS-ESFAS initiating and actuator parts, safety train 1

CLB

Cabinets of the CPS-ESFAS initiating and actuator parts, safety train 2

CLM

PP signal processing and voting cabinets

CLP

CPS-EE power supply equipment cabinets

AKU-AEB0001

Agreement

24

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

CLR

CPS-EE normal operation cabinets

CLS

CPS-EE service equipment

CLW

Marshalling rack cabinets of the group and individual control system

CM.

I&C equipment

CMA

Cabinets for monitoring and control systems of train 1 control safety


system equipment

CMB

Cabinets for monitoring and control systems of train 2 control safety


system equipment

CMG

Means for monitoring and control of gas, gas-aerosol, and powder fire
fighting systems

CMK

PRZ PSV and PHRS electromagnets control cabinets

CML

Cabinets for monitoring and control of fire protection ventilation

CMM

Cabinets for monitoring and control of fire protection ventilation

CMN

Means for monitoring and control of systems for fighting fire with finely
dispersed water

CMR

Cabinets of systems for monitoring and control of normal operation


equipment in the reactor compartment

CMS

Monitoring and control equipment for water fire fighting systems

CMT

Cabinets of monitoring and control systems for normal operation


equipment in the turbine compartment

CMV

Cabinets of monitoring and control systems for normal operation


ventilation equipment

CMW

Cabinets of monitoring and control systems for normal operation


equipment of RWT

CMY

Cabinets of monitoring and control systems for normal operation


equipment in the turbine compartment

CN.

Special-purpose system diagnostic cabinets

CNA

Cabinets of in-core instrumentation system (ICIS) belonging to the first


set of protection-related computerized automation system (CAS-P)

CNB

Cabinets of in-core instrumentation system (ICIS) belonging to the second


set of protection-related computerized automation system (CAS-P)

CND

Automated system for monitoring vibration and mechanical parameters of


main equipment (AVDS)

CNK

Industrial seismic protection system (ISPS)

CNL

Cabinets of the reactor coolant circuit leak monitoring system (LMS)

CNN

Secondary coolant circuit leak detection system (LDS-2)

AKU-AEB0001

Agreement

25

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

CNR

Startup and adjustment measurement system

CNV

Cabinets of the vibration monitoring system (VMS) and loose parts


detection system (LPDS)

CNW

Monitoring, control and diagnostic system (MCDS)

CNY

Automated residual life monitoring system (ARLMS)

CP.

I&C equipment

CPA

Cabinets for safety system I&C transducers (safety train 1)

CPB

Cabinets for safety system I&C transducers (safety train 2)

CPM

Cabinets for NO I&C transducers in the turbine building

CPR

Cabinets for NO I&C transducers. Cabinets for NO I&C transducers in


the reactor compartment

CPW

Cabinets for NO I&C transducers for RWT

CV.

Information receiving and transmission equipment

CVA

Interfacing cabinets of systems for monitoring and control of train 1


control safety system equipment

CVB

Interfacing cabinets of systems for monitoring and control of train 2


control safety system equipment

CVR

Interfacing cabinets of systems for monitoring and control of normal


operation equipment in the reactor compartment

CVT

Interfacing cabinets of systems for monitoring and control of normal


operation equipment in the turbine compartment

CVV

Interfacing cabinets of systems for monitoring and control of normal


operation ventilation system equipment

CVW

Interfacing cabinets of systems for monitoring and control of normal


operation RWT equipment

CW.

Control room

CWA

MCR workstations and desks. Reactor compartment

CWB

MCR workstations and desks. Turbine compartment

CWC

ECR safety panels

CWD

MCR unit shift supervisor's workstations

CWE

Workstations of TSC, information-computation network, and thermal


instrumentation and control department

CWF

MCR safety panels

CWG

MCR normal operation panels

CWH

MCR workstations in the area of rear control panels

CWH90

ARMS (URMS) workstations

AKU-AEB0001

Agreement

26

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

CWK

ECR workstations and desks

CWL

Station-level control system workstations and desks

CWL40

ARMS (CRMS) workstation

CWL41

Workstations of the environment radiation monitoring system in the


sanitary protection zone and in the observation zone (AERMS) within the
plant-level control system

CX.

Local control panels

CXB

Cabinets of radwaste collection, reprocessing and storage systems

CXC

Refueling machine control cabinets

CXD

Gate control cabinets

CXK

Cabinets and workplaces of chemical water treatment system process


operators

CXM

Cabinets of chilling machine monitoring and control systems

CXN

Cabinets for control of diesel fuel supply installations (SDPP)

CXQ

Cabinets for control of effluent and rainwater collection and treatment

CXT

Cabinets of chemical reagent supply and dosing systems

CXU

Service cooling water system monitoring and control cabinets

CXV

Cabinets for control of ventilation, heating, and heat supply systems

CXY

Cabinets for control of drain water collection and purification systems

CY.

Communication, physical protection and industrial TV systems

CYA

Common-station telephone communication system

CYB

Operative telephone communication system

CYC

Operative loud speaking duplex communication system

CYE

Fire alarm and sound warning system

CYF

Master clock system

CYG

Announcement and personnel search system

CYH

Operative personnel actions audio and video recording system

CYK

Voice fire alerting system

CYP

Main process equipment TV monitoring system

CYS

Standby intra-facility radio (trunk) communication

YU

Physical protection system

CYW

Broadcast TV system

CYX

Wired radio broadcasting system

CYY

Operative radio telephone system

AKU-AEB0001

Agreement

27

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

CYZ

Operative talks documenting system

E..

Traditional fuel supply and waste removal methods

EG.

Supply of liquid fuel

EGB

Tank facility of the 00UEJ warehouse

F..

Handling of nuclear fuel and activated elements

FA.

Storage of fuel assemblies and other radioactive parts

FAA

New fuel storage system

FAB

Spent fuel storage system inside the Reactor Building

FAC

Spent fuel storage system outside the 10UJA (20UJA, 30UJA, 40UJA)
building

FAF

Reactor components temporary storage system

FAK

Fuel pool and reactor internals shafts piping system

FAK10

Fuel pool cooling system

FAK50

Fuel pool and reactor internals shafts piping system

FAL

System for supplying fuel pool water for purification

FB.

System for handling of nuclear fuel and other parts of reactor core

FBA

Faulty assembly detection system (FADS)

FBA50

Pipework for supplying media to the bottles of the faulty fuel assembly
detection system

FBB

Equipment for repairing FAs and other reactor core components

FBC

Equipment for cleaning FAs and other reactor core components

FC.

Fuel assemblies and other core parts reloading and transportation


systems

FCA

Loading and withdrawing devices (loading/withdrawing of FAs, absorber


rods, and other reactor components into/from the reactor core)

FCB

Refueling machine

FCC

Equipment for moving reactor core parts (except FCA and FCB)

FCD

Reloading devices in storages for FAs and other reactor core components

FCF

Sluice devices

FCJ

Devices for moving FAs and other reactor core components between
different storages

FJ.

Systems of equipment for erecting and testing reactor components

FJA

Tools and equipment for erection and maintenance of the reactor vessel
and head

FJB

Tools and equipment for erection and maintenance of reactor internals

AKU-AEB0001

Agreement

28

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

FJC

Equipment for periodically testing the reactor vessel and head

FJE

Equipment and tools for maintenance of reactor coolant system elements

FJF

Equipment for periodically testing reactor coolant system components

FJM

Devices for the containment

FK.

Equipment and rooms decontamination systems

FKA

Decontamination system of the 10UJA (20UJA, 30UJA, 40UJA), 10UKC


(20UKC, 30UKC, 40UKC) buildings

FKC

Controlled access area central workshop decontamination system

FKG

The 00UKS building decontamination system

FKK

System of devices for decontaminating withdrawable parts of RCPs and


other machine components

FKN

System of mobile decontaminating installations

FKN01

System of mobile decontaminating installations in the 03UXD building

FKN02
FKN10
FKT

System of mobile decontaminating installations in the 01UXD building


System of mobile decontaminating installations in the 00UKS building
Decontaminating solutions preparation and supply system

FKT10

Decontaminating solutions preparation and supply system

FKT70

Decontamination solution supply system in the 00UKU, 00UKS, 00UYB


buildings

G..

Water supply and waste removal

GC.

Process water demineralization systems

GCB

Source water mechanical purification system

GCF

Source water ion-exchange treatment system

GCK

Pipelines for delivering chemically demineralized water to loads

GCR

System for neutralizing effluent water from the water treatment plant

GH.

Non-potable water distribution systems

GHA

Servomotor cooling system

GHC30

Demineralized water piping system for the 10UKC (20UKC, 30UKC,


40UKC) building

GHD

Process water supply system

GK.

Household and potable water supply systems

GKC

Delivery hot-water supply pipeline

GKD

Household and potable water supply system

GKE

Source water supply system

GKF

Circulation hot-water supply pipeline

AKU-AEB0001

Agreement

29

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

GM.

Industrial effluent collection and removal systems

GMA

Oil-containing water sewerage system

GMB

Sludge dump drain system

GMC

System of pumps for pumping oil-containing waters

GML

Post-fire-fighting effluents collection and removal system

GMM

System of pumps for pumping post-fire-fighting effluents

GMP

System of drains from the oil and diesel facility

GN.

Spent process water reprocessing systems

GNR

System for neutralizing waste water from chemical washing and


equipment preservation operations (GNR10)

GNR10

System for neutralizing waste water from chemical washing and


equipment preservation operations

GQ.

Domestic effluent water collection and removal systems

GQA

Domestic sewerage system of the common access area

GQB

System of pumps for pumping domestic effluents in the common access


area

GQC

System of pumps for pumping domestic effluents in the controlled access


area

GQD

Domestic sewerage system of the controlled access area

GQE

Domestic sewerage system for lavatories in the controlled access area

GQU

System for purifying domestic effluents from personnel locks and


effluents from active laundry

GR.

Domestic effluent purification systems

GT.

Systems for reclaiming water from industrial effluents

GU.

Storm water sewerage systems, including effluent treatment systems

GUC

System of pumps for pumping rain effluents

GUD

Rainwater sewerage system

GUH

Industrial and rain effluents purification system

GUM

Industrial sewerage system of underground structures

J..

Nuclear generation of heat

JA.

Reactor system

JAA

Reactor pressure vessel

JAB

Reactor head (upper unit), including flanges, seals, and studs

JAC

Reactor internals

AKU-AEB0001

Agreement

30

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

JAH

Reactor external insulation

JAJ

External cooling of the reactor

JAT

Leak detection system

JB.

Reactor internals

JBA

Reactor pressure vessel surveillance samples

JD.

Reactor control and trip devices

JDA

CPS drive system

JDK

Emergency protection system

JDY

Group and individual control system of CPS control member drives

JE.

Reactor cooling system (primary coolant circuit)

JEA

System of steam generators

JEA01

System for releasing air from the SG secondary circuit

JEB

System of reactor coolant pumps

JEC

System of reactor coolant pipelines

JEF

Pressurizer system, including injection devices

JEG

System for receiving steam from the PRZ discharge devices

JET

Operating-quality coolant sampling system

JEV

RCP electric motor lubrication system

JK.

Reactor core with accessories

JKA

Reactor core

JKM

Molten core retaining and cooling system

JKS

In-core instrumentation system (ICIS)

JKT

Ex-core instrumentation system

JKU

Fuel rod cladding monitoring system

JM.

Containment with internals

JMA

Protective shell system of the 10UJA (20UJA, 30UJA, 40UJA) building

JME

Equipment airlock

JMF

Main personnel airlock

JMG

Emergency personnel airlock

JMJ

Containment structural parts (only for coding the containment internals)

JMJ10

System of pressure relief devices

JMK

System of pipeline penetrations

AKU-AEB0001

Agreement

31

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

JML

System of cable penetrations

JMN

Sprinkler system

JMN80

Piping system of tanks storing the solution of iodine chemical fixing


reagents

JMT

Emergency hydrogen removal system under the containment

JMU

System for monitoring hydrogen concentration under the containment

JMY

Control and protection systems

JMY10

Automated system for monitoring the containment stressed and strain


state (CSSS AMS)

JMY20

System for measuring leak from the hermetic enclosure during operational
tightness tests

JMY30

Automated system for monitoring tilts of the reactor building raft

JMY40

Equipment of the containment prestressing system

JN.

Residual heat removal systems

JNA

Reactor coolant circuit emergency and planned cooldown and fuel pool
cooling system

JNB

Emergency residual heat removal systems from SGs

JNB10

SG emergency cooldown system

JNB50

Passive heat removal system

JND

Emergency boron injection system

JNG

Passive part of the emergency core cooling system

JNG10

2nd and 3rd stage hydro accumulator system (passive part of the
emergency core cooling system)

JNG50

1st stage hydro accumulator system (passive part of the emergency core
cooling system)

JNK

Borated water storage system

JY.

Control and protection equipment (except for *JR*, *JS*, *JT*)

JYF

Loose parts monitoring system

JYG

Vibration monitoring system

K..

Reactor plant auxiliary systems

KA.

Component cooling systems

KAA

Component cooling system for secured loads in the 10UJA (20UJA,


30UJA, 40UJA) building

KAW

Seal water supply system

KB.

Reactor coolant treatment system

AKU-AEB0001

Agreement

32

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

KBA

Volume and chemical control system

KBB

Operating grade coolant storage system

KBC

Distillate and boron concentrate system

KBC10

Distillate system

KBC40

Boron concentrate system

KBD

System for adding chemical reagents to primary coolant

KBE

Primary coolant low-temperature purification system

KBE50

Primary coolant low-temperature purification system

KBF

Coolant purification system

KBH

Fuel pool water purification system

KL.

Ventilation plants in the controlled access area

KLA

Ventilation system of the 10UJA (20UJA, 30UJA, 40UJA) buildings

KLB

Ventilation system of the 10UJB (20UJB, 30UJB, 40UJB) buildings

KLC

Ventilation system of the 10UKA (20UKA, 30UKA, 40UKA) buildings

KLE

Ventilation system of the 10UK (20UK, 30UK, 40UK), 00UKU


buildings

KLF

Ventilation system of the 00UKS, 00UKT buildings

KLL

Ventilation system of the 00UF building

KLM

Annulus space passive filtration system

KLP

Ventilation system of the 00UGW building

KLS

Ventilation system of the 00UYB, 01-02UJY building

KP.

Handling of radioactive wastes

KPA

Solid radwaste processing system

KPA10

Solid radwaste classifying system

KPA20

Solid radwaste fragmentation system

KPA30

HP solid radwaste pressing system

KPA40

Low-active solid radwaste handling system

KPA50

Preliminary solid radwaste pressing system

KPA60

System for emergency draining of oil from pressing and fragmentation


plants

KPA70

Medium-active solid radwaste handling system

KPA80

Metal solid radwaste decontamination system

KPB

Incineration system

AKU-AEB0001

Agreement

33

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

KPC

Cementation system

KPE

Solid radwaste storage system

KPE10

Very low-active wastes burial system

KPE80

Category assignment system

KPF

Floor water collection system and radioactive sewerage system

KPF10

Floor water treatment system

KPF70

Radioactive sewerage and floor water collection system in the 00UKS


building

KPF85

Floor water collection system in the 00UKU building

KPG

Concentration system

KPJ

Auxiliary distillate and low-salt effluent system

KPK

Intermediate liquid radioactive waste storage system

KPL

System for burning hydrogen from radioactive process blow-offs

KPM

Radioactive process blow-offs purification system

KPN

System for purifying blow-offs from the equipment pertaining to liquid


radioactive media

KR.

Gas supply and removal system

KRA

Nitrogen supply system

KRA10

System for supplying nitrogen to blow-offs from equipment in the 10UJA


(20UJA, 30UJA, 40UJA) building

KT.

Nuclear plant auxiliary systems

KTA

Primary coolant circuit drains and sampling system

KTB

Gas blow-off system

KTC

Boron-containing water collection system

KTC10

Boron-containing water collection system

KTH

Radioactive sewerage system of the 10UJA (20UJA, 30UJA, 40UJA) and


10UKC (20UKC, 30UKC, 40UKC) buildings (the pressure part)

KTN

Radioactive sewerage system of the 10UKC (20UKC, 30UKC, 40UKC)


building (the free-flow part)

KTP

Emergency gas removal system

KTQ

Fuel pool lining tightness monitoring system

KTR

Radioactive sewerage system of the 00UYB building

KU.

Sampling systems

KUA

Primary coolant circuit liquid media sampling system

KUA10

System for taking samples from equipment in the 10UJA (20UJA, 30UJA,

AKU-AEB0001

Agreement

34

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
40UJA) building

KUA60

Automated primary coolant circuit chemical monitoring system

UB

System for taking samples from equipment

KUE

System for taking samples from RWT plants

KUJ

System of taking air samples for a mobile gas-aerosol radiometer

KUJ10

Radioactive gaseous media sampling system in the 10UKA (20UKA,


30UKA, 40UKA), 10UKC (20UKC, 30UKC, 40UKC) buildings

KUJ17

System for sampling radioactive gaseous media from the vent stack

KUK

System of taking air samples for stationary gas-aerosol radiometers

KW.

Sealing and flushing fluid supply systems

KWA

System of I&C transducers hydraulic testing and flushing by distillate


Systems for testing the SG secondary side and flushing I&C sensors with
secondary coolant circuit blowdown water
System for flushing I&C transducers with secondary coolant circuit
blowdown water

KWB
KWB10
KWB50

SG secondary-side hydraulic testing system

KWC

System for hydraulic tests and flushing of I&C transducers with boroncontaining water

L..

Steam, water, and gas circuits

LA.

Feedwater systems

LAA

Feedwater collection and deaeration system

LAB

Main feedwater piping system

LAB10

Main feedwater piping system in the 10UMA (20UMA, 30UMA,


40UMA) building

LAB60

Main feedwater piping system outside the 10UMA (20UMA, 30UMA,


40UMA) building

LAC

Feedwater pumps

LAD

High-pressure regeneration system

LAH

Auxiliary feedwater system

LAJ

Auxiliary feedwater pumps

LAV

Feedwater pump lubrication oil system

LAW

Feedwater pump seal water system

LB.

Steam piping systems

LBA

Live steam piping system

LBA10

Live steam piping system outside the 10UMA (20UMA, 30UMA,

AKU-AEB0001

Agreement

35

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
40UMA) building

LBA50

Live steam piping system in the 10UMA (20UMA, 30UMA, 40UMA)


building

LBB

System of hot reheat piping from the MSR to the intermediate-pressure


turbine stop valves

LBC

System of cold reheat piping from the HP part exhaust to the MSR

LBF

High-pressure reduction station

LBF10

System of fast-acting reduction valves with dumping steam into the


auxiliary header

LBG

Auxiliary steam piping system

LBG10

Auxiliary steam piping system in the 10UMA (20UMA, 30UMA,


40UMA) building

LBG40

Auxiliary steam piping system in the 10UKC (20UKC, 30UKC, 40UKC)


building

LBG50

Auxiliary steam piping system in the 00UNA building

LBG80

Auxiliary steam piping system in the 00UKU, 00UKS, 00UYB building

LBH

Steam supply system

LBJ

Moisture separator/steam reheater system

LBQ

HP steam extraction piping system

LBS

LP steam extraction piping system

LBW

Turbine sealing system

LC.

Condensate systems

LCA

Main condensate piping system

LCA90

Condensate-feedwater path pre-startup flushing system

LCB

System of main condensate pumps

LCC

LP regeneration system

LCE

Main condensate injection system

LCH

HP heater condensate system

LCJ

LP heater condensate system

LCM

Drains and condensate collection (returning) system

LCM10

Drains and condensate collection (returning) system in the 10UMA


(20UMA, 30UMA, 40UMA) building

LCM70

Heating steam condensate collection (returning) system in the 00UKS,


00UKU buildings

LCM80

System for collecting and returning condensate of RWT systems

AKU-AEB0001

Agreement

36

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

LCM90

Auxiliary steam condensate system

LCN

HP steam piping drain system

LCP

Demineralized water system

LCP10

Demineralized water system in the 10UMA (20UMA, 30UMA, 40UMA)


building

LCP90

Demineralized water system in the 00UKU, 00UKS buildings

LCQ

Steam generator blowdown system

LCQ10

Steam generator blowdown and drains system

LCQ50

Steam generator blowdown water purification system

LCS

Moisture separation and steam reheat system

LCT

MSR separator system

LCU

Makeup water system

LCW

Hydraulic seal system

LD.

Condensate polishing systems (UDP)

LDB

Independent demineralizing plant system

LDF

Turbine condensate deironing and demineralization system (UDP)

LDL

System for storing (collecting) drains after polishing turbine condensate

LDP

System for regenerating and flushing spent resins from the UDP

LF.

Common installations for steam, water, and gas circuits

LFG

Steam generators chemical washing system

LFJ

SG preservation system during outage

LFN

System for correction treatment of working fluid in the secondary coolant


circuit

LW.

Seal fluid supply system for steam, water, and gas cycles

LWB

Secondary coolant circuit piping and equipment hydraulic testing system

M..

Main machine sets

MA.

Steam turbine plant

MAA

High-and-intermediate-pressure cylinder (HIPC) HP part

MAB

HIPC intermediate-pressure part

MAC

LP cylinder system

MAD

Turbine bearings system

MAG

Turbine condensers system

MAJ

Main condenser vacuuming system

MAK

Barring gear

AKU-AEB0001

Agreement

37

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

MAL

Turbine plant drain system

MAM

System for sucking steam from seals

MAN

Turbine bypass system

MAV

Lubrication supply and lub oil purification system

MAX

Turbine governor oil supply system

MAY

Turbine control and monitoring system

MK.
MKA
MKC

Generator plant
Turbine generator
Generator excitation system (including the exciter)

MKD

Bearings

MKF

Stator winding water cooling system

MKG

Generator gas cooling system

MKW
MKY
MP.

Generator shaft gland oil system


Electrical equipment control, monitoring and relay protection system,
cabinets of generator secondary circuits
Common installations for main machine sets

MPA

Turbine foundation

MV.

Lubricant supply system

MVA

Oil supply and emergency drain system

MVA10

Oil supply system for components in the 10UMA (20UMA, 30UMA,


40UMA) building

MVA50

Emergency lubricant drain system

MVL

Rotor hydraulic jacking and barring gear system

MVU

Oil drain system in the 10UMA (20UMA, 30UMA, 40UMA) building

N..

Producing energy for external users

NA.

Process steam system, including condensate return systems

NAA

System for extracting turbine steam to delivery-water heaters

NAB

System for returning condensate from delivery-water heaters

NAJ

System for removing nondensables from delivery-water heaters

ND.

Process hot-water system

NDA

Network water piping system

NDA10

Network water piping system in the 10UMA (20UMA, 30UMA, 40UMA)


building

NDA50

Forward network water piping system in the 00UNA building

AKU-AEB0001

Agreement

38

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

NDB

Return network piping system in the 00UNA building

NDC

System of network water pumps

NDD

Heat-transfer equipment

NDF

Makeup water and pure steam system in the 00UNA building

P..

Cooling water plants

PA.

Main cooling water system

PAA

System of mechanical cleaning devices

PAB

Main cooling water piping system

PAC

Main cooling water pump sets

PAH

Condenser tube cleaning system

PAX

System for supplying compressed air to instruments measuring difference


and level in the system

PAY

System for measuring pressure difference across grills and meshes, and
water levels in seawater intake and supply structures

PB.

Cooling seawater treatment system

PBB

Main condenser cooling water purification system

PBF

Sodium hypochlorite preparation system

PBK

System for supplying sodium hypochlorite to consumers

PC.

Cooling water system for conventional components

PCB

Cooling water piping system for non-essential loads

PCC

Pump sets for non-essential loads

PCD
PD.
PDB
PE.

Service cooling water supply system


Component cooling water treatment systems for non-essential loads
Mussel cleaning system
Component cooling water system for essential loads

PEA

System of mechanical cleaning devices

PEB

Component cooling water piping system for essential loads

PEC
PF.
PFB
PG.

Pump sets for essential loads


Component cooling water treatment system for essential loads
Mussel cleaning system
Component cooling water systems for the common access area

PGB

Component cooling water system for normal operation loads in the


10UMA (20UMA,30UMA, 40UMA) building

PG

Component cooling water system for normal operation loads in the

AKU-AEB0001

Agreement

39

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
00UTF, 00USF buildings

PH.

Component cooling water treatment system for the common access


area

PHN

System for correcting water chemistry in the component cooling water


system of normal operation loads in the 10UMA (20UMA, 30UMA,
40UMA) building

PJ.

Component cooling water system for the controlled access area

PJA

Component cooling water system for normal operation loads in the 10UJA
(20UJA, 30UJA, 40UJA) building

PJB

Component cooling water system for normal operation loads in the


10UKC (20UKC, 30UKC, 40UKC) building

PU.

Common devices for cooling water systems

PUA

System for dewatering the flow path of the and pump


installations
System for dewatering the common structures of cooling water systems

PUB
PUD

PUK

System for dewatering the flow path of the pump installations of the
essential component cooling water system
System for dewatering drains from the pump stations of essential loads
System for washing the tray of medium-cleaning trash racks of the PAA
system
System for washing the rotating meshes of the PAA system

PUN

Seawater supply system to the chlorination plant

PUP

Q..

System for washing the tray of medium-cleaning trash racks and rotating
meshes of the system
System for draining and dewatering the tunnels of essential loads
Oil supply system for the pump sets at the 10UQA (20UQA, 30UQA,
40UQA), 11UQC (21UQC, 31UQC, 41UQC), 12UQC (22UQC, 32UQC,
42UQC) pump stations
Auxiliary installations

QC.

Centralized supply of chemical agents

QCA

Reagent preparation and supply system

QCB

Nitric acid receipt and preparation system

QCD

Caustic soda receipt and preparation system

QCE

Hydrazine receipt and preparation system

QCF

Ammonia receipt and preparation system

QCQ

Sulfuric acid preparation and supply system

QCR

Trisodium phosphate receipt and preparation system

QCS

Coagulant receipt and preparation system

PUE
PUJ

PUQ
PUV

AKU-AEB0001

Agreement

40

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

QCU

Sodium hypochlorite preparation and supply system

QE.

General supply of compressed air and air for pneumatic transport

QEC

Compressed air supply system to the SG secondary circuit for checking


primary-to-secondary tightness

QF.

Air supply to pneumatic drives

QFA

Compressed air system for valve pneumatic drives

QFB

Compressed air system for valve pneumatic drives in the 10UMA


(20UMA, 30UMA, 40UMA) building

QH.

Auxiliary steam system

QHA

Steam production system from the auxiliary boiler house

QHG

Boiler water circulation system

QHJ

Boiler burners

QHL

Combustion air supply system

QHN

Combustion products removal system

QJ.

Centralized gas supply systems, including inert gases

QJA

Oxygen storage and supply system

QJB

Nitrogen storage and supply system

QJC

Hydrogen supply, storage, and receipt system

QJD

Oxygen and nitrogen preparation system

QJE

Combustible and noncombustible gas centralized storage system

QJE10

System for storing noncombustible gases in cylinders

QJE20

System for storing combustible gases in cylinders

QJF

Equipment preservation system in the 10UMA (20UMA, 30UMA,


40UMA) building

QK.

Cold supply system

QKA

Cold supply system for ventilation systems of non-essential loads (chilling


plant and mains)

QKB

Cold supply system for essential loads (chilling plant)

QKC

Cold supply system for ventilation systems in the 00UAC, 00UAB,


10UBA (20UBA, 30UBA, 40UBA), 01UBG (02UBG, 03UBG, 04UBG)
buildings

QKD

Cold
supply
system
for
ventilation
systems
in
the
11UBN, 12UBN (21UBN, 22UBN, 31UBN, 32UBN, 41UBN, 42UBN),
13UBN (23UBN, 33UBN, 43UBN) buildings

QKF

Cold supply system for ventilation systems in the 00UFC building

QKJ

Cold supply system for ventilation systems in the 10UJA (20UJA, 30UJA,

AKU-AEB0001

Agreement

41

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name
40UJA) building

QKK

Cold supply system for ventilation systems in the 10UKC (20UK,


30UK, 40UK) building

QKM

Cold
supply
system
for
ventilation
10UMA (20UMA, 30UMA, 40UMA) building

QKN

Cold supply system for ventilation systems in the 10UCB (20UCB,


30UCB, 40UCB) building

QKQ

Cold supply system for ventilation systems in the 03UGF building

QKR

Cold supply system for ventilation systems in the 00USV building

QKS

Cold supply system for ventilation systems in the 00UGD, 10UMX


(20UMX, 30UMX, 40UMX), 00UYB, 00UYC, *UXC* 00UYG, 00UKS,
10UQR (20UQR, 30UQR, 40UQR), 00UTF, 00UKU buildings

QKT

Cold supply system for ventilation systems in the 00UST building

QL.

Feed water, steam, and condensate cycle for the auxiliary steam
production and distribution system

QLA

Feed water system

QLC

Condensate system

QS.

Centralized oil supply and disposal system

QSA

Transformer oil supply and disposal system

QSB

Turbine oil supply and disposal system

QSC

Compressor oil supply and disposal system

QSD

Engine oil supply and disposal system for diesel engines

QU.

Secondary coolant circuit sampling system

QUA

Automated chemical feed water monitoring system

QUB

Automated chemical steam monitoring system

QUC

Automated chemical condensate monitoring system

QUD

Automated generator stator cooling chemical monitoring system

QUF

Secondary coolant circuit sampling system in the 10UMA (20UMA,


30UMA, 40UMA) 10UMX (20UMX, 30UMX, 40UMX) buildings

QUG

Automated chemical UDP monitoring system

QUH

Secondary coolant circuit sampling system in the 10UKC (20UKC,


30UKC, 40UKC) building

QUJ

SG secondary coolant circuit joint tightness monitoring system

QUK

Automated chemical monitoring system for steam generator blowdown


systems

QUL

Auxiliary boiler house sampling system

AKU-AEB0001

Agreement

systems

in

the

42

JSC "Atomenergoproekt"

Code

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Name

QUN

System of taking SG blowdown water samples for radiation monitoring

QUQ

System for monitoring the level in steam generators and steam wetness in steam
lines

S..

Ancillary systems not related to the main production process

SA.

Ventilation and air conditioning plants in the common access area

SAA

Ventilation systems in the 10UJE (20UJE, 30UJE, 40UJE), 10UJG


(20UJG, 30UJG, 40UJG) buildings

SAB

Ventilation systems in the 00UYB building

SAC

Ventilation systems in the 10UBA (20UBA, 30UBA, 40UBA), 01UBG,


02UBG, 03UBG, 04UBG, 05UBG, 07UBG, 10UKC (20UK, 30UK,
40UK), 00UAC, 00UAB, 10UBB (20UBB, 30UBB, 40UBB), 10UCB
(20UCB, 30UCB, 40UCB), 00UYH, 11-12UBP (21-22UBP, 31-32UBP,
41-42UBP), 11-12UBN (21-22UBN, 31-32UBN, 41-42UBN) buildings

SAD

Ventilation systems in the *UXC*, 11-13UBN (21-23UBN, 31-33UBN,


41-43UBN), 00UEJ, 11UEJ-13UEJ (21UEJ-23UEJ, 31UEJ-33UEJ,
41UEJ-43UEJ), 01UEK, 00UEL buildings

SAE

Ventilation systems in the 10UBA (20UBA, 30UBA, 40UBA), 10UBB


(20UBB, 30UBB, 40UBB), 01UBG, 02UBG, 03UBG, 04UBG, 05UBG,
07UBG, 11-12UBP (21-22UBP, 31-32UBP, 41-42UBP), 11UBZ-18UBZ
(21UBZ-28UBZ, 31UBZ-38UBZ, 41UBZ-48UBZ), 10UKC (20UK,
30UK, 40UK), 11UKZ, 12UKZ (21UKZ, 22UKZ, 31UKZ, 32UKZ,
41UKZ, 42UKZ), 00UYH, 11-12UBN (21-22UBN, 31-32UBN, 4142UBN) buildings

SAF

Ventilation systems in the 00UFC, 00UKT building

SAH

Ventilation systems in the *UXC*, 00UYC, *UYE*, *UYF*, 00UTH


buildings

SAJ

Ventilation systems in the 10UQR (20UQR, 30UQR, 40UQR) buildings

SAK

Ventilation systems in the 00USV, 00UYG, 00UYH, 00UTE buildings

SAM

Ventilation systems in the 10UMA (20UMA, 30UMA, 40UMA), 00UNA,


00UNE buildings

SAN

Ventilation systems in the 00UKX, 01-05UYP, 01UYX, 02UYX buildings

SAP

Ventilation systems in the 00UGV, 00UGM buildings

SAQ

Ventilation systems of the 10UQA (20UQA, 30UQA, 40UQA), 1112UQC (21-22UQC, 31-32UQC, 41-42UQC), 11-12UQZ (21-22UQZ,
31-32UQZ, 41-42UQZ), 50UPC (60UPC) buildings and structures

SAR

Ventilation systems in the 50UPK, 60UPK, 01-03UXX buildings

SAS

Ventilation systems in the 00UGD, *UGH*, 10UMX , (20UMX, 30UMX,


40UMX), 00USF, 00UTF, 03UGF, 50UGF, 60UGF, 01-04UXD buildings

SAT

Ventilation systems in the 00UST building

AKU-AEB0001

Agreement

43

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

SB.

Space heating plants for buildings with ancillary systems not related
to the main production process

SBA

Heat supply system (mains)

SBB

Hot water supply system

SBC

Heat supply system for the 00UAC, 00UAB, 10UBA (20UBA, 30UBA,
40UBA), 01UBG, 02UBG, 03UBG, 04UBG, 05UBG, 07UBG, 10UKC
(20UKC, 30UKC, 40UKC) buildings

SBD

Heat supply system for the 01-07UXC, 11UBN, 12UBN (21UBN,


22UBN, 31UBN, 32UBN, 41UBN, 42UBN), 13UBN (23UBN, 33UBN,
43UBN), 01UEK, 00UEL buildings

SBH

Heat supply system for the 10UMA (20UMA, 30UMA, 40UMA),00UTH


buildings

SBJ

Heat supply system for the 10UJA (20UJA, 30UJA, 40UJA) buildings

SBL

Heat supply systems for the 50UPK, 60UPK, 01-03UXX buildings

SBP

Heat supply system for the 10UCB (20UCB, 30UCB, 40UCB), 00UYC,
01UYE, 02UYE, 10UYE, 20UYE, 30UYE, 01-02UYP, 00UYH, 01UYX,
02UYX buildings

SBQ

Heat supply system for the 03UGF, 00UGV, 11-12UQC (21-22UQC, 3132UQC, 41-42UQC), 10UQA (20UQA, 30UQA, 40UQA), 00UGW,
50UGF, 60UGF buildings

SBR

Heat supply system for the 00UKX, 01-03UYF, 10-30UYF, 00UYG,


00UTE, 01-03UXD buildings

SBS

Heat supply system for the 00UFC, 00UGD, 50UGH, 60UGH, 00UGM,
10UMX (20UMX, 30UMX, 40UMX), 10UQR (20UQR, 30UQR,
40UQR), 00USF, 00UTF, 00UFA buildings

SBT

Heat supply system for the 00USV, 00UYB, 00UKT buildings

SBU

Heat supply system for the 00UKU, 00UST, 00UKS buildings

SC.

Stationary compressed air supply systems

SCA

Compressed air generation system

SCB

Compressed air supply system for process needs

SCC

Compressed air supply system for containment tests

SCD

Compressed air supply system for repair needs

SE.

Stationary welding gas systems

SG.

Stationary fire protection systems


Normal-operation fire-fighting water supply system

SGA
SGC

AKU-AEB0001

System of normal-operation automatic water fire-fighting plants (drencher


and sprinkler ones)
Agreement

44

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

SGE

Automatic gas fire-fighting plants system

SGF

Foam fire-fighting plants system

SGH

Device for self-extinguishing of poured combustible liquids (SED)

SGK

Automatic finely-dispersed water fire-fighting plants system (drencher


and sprinkler ones)

SM.

Cranes, hoisting, and transport devices

SMB

Cranes, stationary hoisting devices and transport equipment in the 10UBA


(20UBA, 30UBA, 40UBA), 11UBN-13UBN (21UBN -23UBN, 31UBN33UBN, 41UBN-43UBN), 10UBB (20UBB, 30UBB, 40UBB) buildings

SMB20

Electric cranes in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB
(20UBB, 30UBB, 40UBB) buildings

SMB21

Manually operated cranes in the 10UBA (20UBA, 30UBA, 40UBA),


11UBN-13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN),
10UBB (20UBB, 30UBB, 40UBB) buildings

SMB22

Manually operated movable hoists in the 10UBA (20UBA, 30UBA,


40UBA), 11UBN-13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN43UBN), 10UBB (20UBB, 30UBB, 40UBB) buildings

SMB23

Manually operated hoists (stationary) in the 10UBA (20UBA, 30UBA,


40UBA), 11UBN-13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN43UBN), 10UBB (20UBB, 30UBB, 40UBB) buildings

SMB24

Electric hoists in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN-13UBN


(21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB (20UBB,
30UBB, 40UBB) buildings

SMB25

On-floor transport in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB
(20UBB, 30UBB, 40UBB) buildings

SMB26

Hoisting slings in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN13UBN (21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB
(20UBB, 30UBB, 40UBB) buildings

SMB27

Crabs in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN-13UBN


(21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB (20UBB,
30UBB, 40UBB) buildings

SMB28

Winches in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN-13UBN


(21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB (20UBB,
30UBB, 40UBB) buildings

SMB29

Cross-beams in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN-13UBN


(21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB (20UBB,
30UBB, 40UBB) buildings

AKU-AEB0001

Agreement

45

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

SMB30

Grips in the 10UBA (20UBA, 30UBA, 40UBA), 11UBN-13UBN


(21UBN -23UBN, 31UBN-33UBN, 41UBN-43UBN), 10UBB (20UBB,
30UBB, 40UBB) buildings

SM

Cranes, stationary hoisting devices and handling equipment in the 00UB


building

SM20

Electric cranes in the 00UB building

SM21

Manually operated cranes in the 00UB building

SM22

Manually operated movable hoists in the 00UB building

SM23

Manually operated (stationary) hoists in the 00UB building

SM24

Electric hoists in the 00UB building

SM25

On-floor transport in the 00UB building

SM26

Hoisting slings in the 00UB building

SM27

Crabs in the 00UB buildings

SM28

Winches in the 00UB building

SM29

Cross-beams in the 00UB building

SM30

Grips in the 00UB buildings

SMD

Cranes, stationary hoisting devices and handling equipment in the


00UYB, 01UYX, 06UXC, 00UXG buildings

SMD20

Electric cranes in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD21

Manually operated cranes in the 00UYB, 01UYX, 06UXC, 00UXG


buildings

SMD22

Manually operated movable hoists in the 00UYB, 01UYX, 06UXC,


00UXG buildings

SMD23

Manually operated (stationary) hoists in the 00UYB, 01UYX, 06UXC,


00UXG, 01UYP, 02UYP buildings

SMD24

Electric hoists in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD25

On-floor transport in the 00UYB, 01UYX, 06UXC, 00UXG, 01UYP


buildings

SMD26

Hoisting slings in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD27

Crabs in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD28

Winches in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD29

Cross-beams in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SMD30

Grips in the 00UYB, 01UYX, 06UXC, 00UXG buildings

SME

Cranes, stationary hoisting devices and handling equipment in the


11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ), 01UEK, 00UEL buildings

AKU-AEB0001

Agreement

46

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

SME20

Electric cranes in the 11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ)


buildings

SME21

Manually
operated
cranes
in
the
(21-23UEJ, 31-33UEJ, 41-43UEJ), 00UEL buildings

SME22

Manually
operated
movable
hoists
(21-23UEJ, 31-33UEJ, 41-43UEJ) buildings

SME23

Manually operated (stationary) hoists in the


(21-23UEJ, 31-33UEJ, 41-43UEJ), 00UEL buildings

SME24

Electric
hoists
in
the
(21-23UEJ, 31-33UEJ, 41-43UEJ) buildings

SME25

On-floor
transport
in
the
(21-23UEJ, 31-33UEJ, 41-43UEJ), 01UEK buildings

11-13UEJ

SME26

Hoisting
slings
in
the
(21-23UEJ, 31-33UEJ, 41-43UEJ), 00UEL buildings

11-13UEJ

SME27

Crabs in the 11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ) buildings

SME28

Winches in the 11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ) buildings

SME29

Cross-beams in the 11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ)


buildings

SME30

Grips in the 11-13UEJ (21-23UEJ, 31-33UEJ, 41-43UEJ), 00UEL


buildings

SMF

Cranes, stationary hoisting devices and handling equipment in the 00UFC


building

SMF20

Electric cranes in the 00UFC buildings

SMF21

Manually operated cranes

SMF22

Manually operated movable hoists in the 00UFC buildings

SMF23

Manually operated (stationary) hoists in the 00UFC buildings

SMF24

Electric hoists in the 00UFC buildings

SMF25

On-floor transport in the 00UFC buildings

SMF26

Hoisting slings

SMF27

Crabs

SMF28

Winches

SMF29

Cross-beams

SMF30

Grips

SMG

Cranes, stationary hoisting devices and handling equipment in the 10UGB


(20UGB, 30UGB, 40UGB), 00UGD, 00UGM, 00UGW, 03UGF, 00UGH
buildings

AKU-AEB0001

Agreement

in

11-13UEJ
the

11-13UEJ
11-13UEJ

11-13UEJ

47

JSC "Atomenergoproekt"

Code

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Name

SMG20

Electric cranes in the 10UGB (20UGB, 30UGB, 40UGB) 00UGD,


00UGM, 00UGW, 03UGF, 00UGH buildings

SMG21

Manually operated cranes in the 10UGB (20UGB, 30UGB, 40UGB),


00UGD, 00UGM, 00UGW, 03UGF, 00UGH buildings

SMG22

Manually operated movable hoists in the 10UGB (20UGB, 30UGB,


40UGB), 00UGD, 00UGM, 00UGW, 03UGF, 00UGH buildings

SMG23

Manually operated (stationary) hoists in the 10UGB (20UGB, 30UGB,


40UGB), 00UGD, 00UGM, 00UGW, 03UGF, 00UGH buildings

SMG24

Electric hoists in the 10UGB (20UGB, 30UGB, 40UGB), 00UGD,


00UGM, 00UGW, 03UGF, 00UGH buildings

SMG25

On-floor transport in the 10UGB (20UGB, 30UGB, 40UGB), 00UGD,


00UGM, 00UGW, 03UGF, 00UGH buildings

SMG26

Hoisting slings in the 10UGB (20UGB, 30UGB, 40UGB), 00UGD,


00UGM, 00UGW, 03UGF, 00UGH buildings

SMG27

Crabs in the 10UGB (20UGB, 30UGB, 40UGB), 00UGD, 00UGM,


00UGW, 03UGF, 00UGH buildings

SMG28

Winches in the 10UGB (20UGB, 30UGB, 40UGB), 00UGD, 00UGM,


00UGW, 03UGF, 00UGH buildings

SMG29

Cross-beams in the 10UGB (20UGB, 30UGB, 40UGB); 00UGD,


00UGM, 00UGW, 03UGF, 00UGH buildings

SMG30

Grips in the 10UGB (20UGB, 30UGB, 40UGB); 00UGD, 00UGM,


00UGW, 03UGF, 00UGH buildings

SMJ

Cranes, stationary hoisting devices and handling equipment in the 10UJA


(20UJA, 30UJA, 40UJA), 10UJB (20UJB, 30UJB, 40UJB), 10UJC
(20UJC, 30UJC, 40UJC), 10UJE (20UJE, 30UJE, 40UJE) buildings

SMJ20

Electric cranes in the 10UJA (20UJA, 30UJ, 40UJ), 10UJB (20UJB,


30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE,
30UJE, 40UJE) buildings

SMJ21

Manually operated cranes in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB


(20UJB, 30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE
(20UJE, 30UJE, 40UJE) buildings

SMJ22

Manually operated movable hoists in the 10UJA (20UJA, 30UJA,


40UJA), 10UJB (20UJB, 30UJB, 40UJB), 10UJC (20UJC, 30UJC,
40UJC), 10UJE (20UJE, 30UJE, 40UJE) buildings

SMJ23

Manually operated (stationary) hoists in the 10UJA (20UJA, 30UJA,


40UJA), 10UJB (20UJB, 30UJB, 40UJB), 10UJC (20UJC, 30UJC,
40UJC), 10UJE (20UJE, 30UJE, 40UJE) buildings

SMJ24

Electric hoists in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB,


30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE,
30UJE, 40UJE) buildings

AKU-AEB0001

Agreement

48

JSC "Atomenergoproekt"

Code

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Name

SMJ25

On-floor transport in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB


(20UJB, 30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE
(20UJE, 30UJE, 40UJE) buildings

SMJ26

Hoisting slings in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB,


30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE,
30UJE, 40UJE) buildings

SMJ27

Crabs in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB, 30UJB,


40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE, 30UJE,
40UJE) buildings

SMJ28

Winches in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB, 30UJB,


40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE, 30UJE,
40UJE) buildings

SMJ29

Cross-beams in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB,


30UJB, 40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE,
30UJE, 40UJE) buildings

SMJ30

Grips in the 10UJA (20UJA, 30UJA, 40UJA), 10UJB (20UJB, 30UJB,


40UJB), 10UJC (20UJC, 30UJC, 40UJC), 10UJE (20UJE, 30UJE,
40UJE) buildings

SMK

Cranes, stationary hoisting devices and handling equipment in the 10UKA


(20UKA, 30UKA, 40UKA), 10UKC (20UKC, 30UKC, 40UKC),
00UKU, 00UKS, 00UKX buildings

SMK20

Electric cranes in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC


(20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK21

Manually operated cranes in the 10UKA (20UKA, 30UKA, 40UKA),


10UKC (20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK22

Manually operated movable hoists in the 10UKA (20UKA, 30UKA,


40UKA), 10UKC (20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX
buildings

SMK23

Manually operated (stationary) hoists in the 10UKA (20UKA, 30UKA,


40UKA), 10UKC (20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX
buildings

SMK24

Electric hoists in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC


(20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX, 00UKT buildings

SMK25

On-floor transport in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC


(20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK26

Hoisting slings in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC


(20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK27

Crabs in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC (20UKC,


30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK28

Winches in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC (20UKC,


30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

AKU-AEB0001

Agreement

49

JSC "Atomenergoproekt"

Code

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Name

SMK29

Cross-beams in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC


(20UKC, 30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMK30

Grips in the 10UKA (20UKA, 30UKA, 40UKA), 10UKC (20UKC,


30UKC, 40UKC), 00UKU, 00UKS, 00UKX buildings

SMM

Cranes, stationary hoisting devices and handling equipment in the


10UMA (20UMA, 30UMA, 40UMA), 10UMX (20UMX, 30UMX,
40UMX) buildings

SMM20

Electric cranes in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM21

Manually operated cranes in the 10UMA (20UMA, 30UMA, 40UMA),


10UMX (20UMX, 30UMX, 40UMX) buildings

SMM22

Manually operated movable hoists in the 10UMA (20UMA, 30UMA,


40UMA), 10UMX (20UMX, 30UMX, 40UMX) buildings

SMM23

Manually operated (stationary) hoists in the 10UMA (20UMA, 30UMA,


40UMA), 10UMX (20UMX, 30UMX, 40UMX) buildings

SMM24

Electric hoists in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM25

On-floor transport in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM26

Hoisting slings in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM27

Crabs in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX (20UMX,


30UMX, 40UMX) buildings

SMM28

Winches in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX (20UMX,


30UMX, 40UMX) buildings

SMM29

Cross-beams in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM30

Grips in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX (20UMX,


30UMX, 40UMX) buildings

SMM50

Set of accessories for carrying out tests in the 10UMA (20UMA, 30UMA,
40UMA), 10UMX (20UMX, 30UMX, 40UMX) buildings

SMM51

Hydraulic loaders in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMM54

Anchor pull bars in the 10UMA (20UMA, 30UMA, 40UMA), 10UMX


(20UMX, 30UMX, 40UMX) buildings

SMP

Cranes, stationary hoisting devices and handling equipment in the 50UPC


(60UPC), 50UPK (60UPK) buildings

SMP24

Electric hoists in the 50UPC (60UPC), 50UPK (60UPK) buildings

AKU-AEB0001

Agreement

50

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Code

Name

SMQ

Cranes, stationary hoisting devices and handling equipment in the 11UQC


(21UQC, 31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA
(20UQA, 30UQA, 40UQA), 00UQW, 11-13UQX (21-23UQX, 3133UQX, 41-43UQX), 00UQG buildings

SMQ20

Electric cranes in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC


(22UQC, 32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA),
00UQW buildings

SMQ21

Manually
operated
cranes
in
the
11UQC
(21UQC,
31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA (20UQA,
30UQA, 40UQA) buildings

SMQ22

Manually operated movable hoists in the 11UQC (21UQC,


31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA (20UQA,
30UQA, 40UQA) buildings

SMQ23

Manually operated (stationary) hoists in the 11UQC (21UQC,


31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA (20UQA,
30UQA, 40UQA) buildings

SMQ24

Electric
hoists
in
the
11UQC
(21UQC,
31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA (20UQA,
30UQA, 40UQA), 11-13UQX (21-23UQX, 31-33UQX, 41-43UQX),
00UQG buildings

SMQ25

On-floor
transport
in
the
11UQC
(21UQC,
31UQC, 41UQC), 12UQC (22UQC, 32UQC, 42UQC), 10UQA (20UQA,
30UQA, 40UQA) buildings

SMQ26

Hoisting slings in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC


(22UQC, 32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA)
buildings

SMQ27

Crabs in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC (22UQC,


32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA) buildings

SMQ28

Winches in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC (22UQC,


32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA) buildings

SMQ29

Cross-beams in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC (22UQC,


32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA), 00UQW
buildings

SMQ30

Grips in the 11UQC (21UQC, 31UQC, 41UQC), 12UQC (22UQC,


32UQC, 42UQC), 10UQA (20UQA, 30UQA, 40UQA) buildings

SMS

Cranes, stationary hoisting devices and handling equipment in the 00USF,


01USK, 02USK, 00UST buildings

SMS20

Electric cranes in the 00USF, 01USK, 02USK, 00UST buildings

SMS21

Manually operated cranes in the 00USF, 00UST buildings

SMS22

Manually operated movable hoists in the 00USF, 00UST buildings

SMS23

Manually operated (stationary) hoists in the 00USF, 00UST buildings

AKU-AEB0001

Agreement

51

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

SMS24

Electric hoists in the 00USF, 00UST buildings

SMS25

On-floor transport in the 00USF, 00UST buildings

SMS26

Hoisting slings in the 00USF, 01USK, 02USK, 00UST buildings

SMS27

Crabs in the 00USF, 00UST buildings

SMS28

Winches in the 00USF, 00UST buildings

SMS29

Cross-beams in the 00USF, 00UST buildings

SMS30

Grips in the 00USF, 01USK, 02USK, 00UST buildings

SMT

Cranes, stationary hoisting devices and handling equipment in the 00UTF,


00UTH buildings

SMT20

Electric cranes in the 00UTF building

SMT23

Manually operated hoist in the 00UTF, 00UTH buildings

SMT25

On-floor transport in the 00UTF building

SMT26

Hoisting slings in the 00UTF building

SMT30

Grips in the 00UTF building

SN.

Elevators

SNA

Passenger elevators

SNB

Freight elevators

SR.

Workshops, warehouses, laboratories and staff amenities inside the


controlled access area

SRA

Lathe equipment in the controlled access area

SRA20

Lathe equipment in the 00UKU building

SRA30

Lathe equipment in the 00UKS building

SRG

Radiochemical laboratories in the controlled access area

SRG10

Radiochemical operative monitoring laboratory

SRG20

Radiochemical laboratory in the 00UYB building

SRG30

Radiochemical laboratory in the 00UKS building

SRG50

Unit radiochemical laboratory of the controlled access area

SRP

Contaminated section of active laundry

SRP50

Active laundry water purification system

SRP65

Condensate collection system

ST.

Workshops, warehouses, laboratories and staff amenities in the


common access area

STA

Lathe equipment in the common access area

STA20

Lathe equipment in the 00UGD, 00UST, 00USV buildings

AKU-AEB0001

Agreement

52

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

STA30

Lathe equipment in the 00UXG buildings

STA40

Lathe equipment in the 01UYP, 02UYP buildings

STG

Equipment of laboratories in the common access area

STG10

Chemical laboratory for operative monitoring of the secondary coolant


circuit water chemistry parameters

STG20

Common-station common access area laboratory equipment

STG30

Equipment of water treatment express laboratory

STG40

Equipment of radiochemical laboratory in the 02UXD building

STP

Non-contaminated section of active laundry

STP90

Laundry in the 01UYP building

AKU-AEB0001

Agreement

53

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

U..

Buildings and structures

UA.

Buildings and structures for networks and switchgears

00UAB

380 kV SF6 gas insulated switchgear building

00UAC

Switchyard central control building

01UAF
02UAF

380 kV shunt reactors structures

00UAX

Repair area for electric power equipment

10UAZ
20UAZ
30UAZ
40UAZ

380 kV power output system busduct tunnel

UB.

Structures for electrical equipment

10UBA
20UBA
30UBA
40UBA

Normal operation power supply building

10UBB
20UBB
30UBB
40UBB

Rooms for electrical equipment and rooms for normal operation control
devices in the 10UJA (20UJA, 30UJA, 40UJA) building

10UBF
20UBF
30UBF
40UBF

Generator transformer structure

01UBG
02UBG
03UBG
04UBG

Standby power supply building

05UBG

Common-station power supply building

06UBG

Structure for standby and common-station transformers

07UBG

10 kV common-station switchgear building

10UBH
20UBH
30UBH
40UBH

Transformer oil and water emergency discharge reservoir

50UBH

Transformer oil and water emergency discharge reservoir

AKU-AEB0001

Agreement

54

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

60UBH
01UBJ

Transformer tracks

02UBJ
11-12UBN
21-22UBN
31-32UBN
41-42UBN

Building for standby emergency power supply diesel power station

13UBN
23UBN
33UBN
43UBN

Building for normal operation standby diesel power station

11-12UBP
21-22UBP
31-32UBP
41-42UBP

Rooms for electrical equipment and rooms for safety system control
devices in the 10UJA (20UJA, 30UJA, 40UJA) building

01UBY
02UBY

Cable trestle

11-18UBZ
21-28UBZ
31-38UBZ
41-48UBZ

Cable tunnel of normal operation system

01-06UBZ

Cable tunnel of normal operation system

51-52UBZ
61-62UBZ

Cable tunnel of normal operation system

UC.

Buildings and structures for control equipment

10UCB
20UCB
30UCB
40UCB

Building of standby control room

00UCM

Structures for automated environment radiation monitoring system

UE.

Buildings and structures for supplying fuel and removing wastes


except for nuclear fuel

01UEH
02UEH
03UEH

Intake structure for diesel fuel and oils

AKU-AEB0001

Agreement

55

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

04UEH
05UEH

Structure for emergency discharge of diesel fuel from the 00UKS building

06UEH

Diesel fuel receiving structure

00UEJ

Diesel fuel storage

11-13UEJ
21-23UEJ
31-33UEJ
41-43UEJ

Intermediate diesel fuel storage

01UEK
02UEK

Oil storage

00UEL

Diesel fuel and oil pump station

UF.

Structures for handling of nuclear fuel and activated elements

00UFA

Spent nuclear fuel storage building

00UFC

New fuel storage building

UG.

Water supply and removal buildings and structures

10UGB
20UGB
30UGB
40UGB

Structure for demineralized water tanks and contaminated condensate tank

00UGD

Demineralizing plant building

01UGF
02UGF

Fire-fighting water tank

03UGF

Fire-fighting water and service cooling water pump station

50UGF
60UGF

Building of valve chambers for fire-fighting

00UGG

Potable water supply structures

50UGH
60UGH

Storm water treatment structures belonging to 51UGH - 59UGH


(61UGH - 69UGH), 51UGJ-53UGJ (61UGJ-63UGJ)

51UGH
61UGH

Receiving reservoir

52UGH
62UGH

Storm water sewerage pump station

53UGH
63UGH

Storm water sewerage pump station

54UGH

Two-section storage reservoir

AKU-AEB0001

Agreement

56

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

64UGH
55UGH
65UGH

Effluent storm water purification station

56UGH
66UGH

Reservoir for purified storm water

57UGH
67UGH

Sludge collecting and drying container

58UGH
68UGH

Petroleum product accumulation reservoir

59UGH
69UGH

Petroleum products accumulation reservoir

51UGJ
61UGJ

Sediment low-temperature drying shop

52UGJ
62UGJ

Shelter

53UGJ
63UGJ

Reloading hopper with a screw-type conveyor

00UGM

Oil containing water treatment structures belonging to 01UGM - 06UGM

01UGM

Industrial and surface effluent water treatment station

02UGM

Shop for mechanical treatment of sediment with low-temperature drying

03UGM

Equalizing tank

04UGM

Sediment storage reservoir

05UGM

Reservoir for treated effluent waters

06UGM

Sewerage pump station

00UGR

Sludge dump

01UGT

On-site water supply and sewerage networks

02UGT

Off-site water supply and sewerage networks

00UGV

Common-access area domestic waste water treatment structures belonging


to 01-08UGV

01UGV

Biological treatment station

02UGV

Shop for mechanically dewatering sediment with low-temperature drying

03UGV

Silt storage tank

04UGV

Equalizing tank

05UGV

Sewerage pump station

06UGV

Temporary sediment storage area

AKU-AEB0001

Agreement

57

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

07UGV

Laboratory building

08UGV

Personnel facilities and office building

00UGW

Controlled-access area domestic waste water treatment structures


belonging to 01UGW - 06UGW

01UGW

Biological treatment station

02UGW

Shop for mechanically dewatering sediment with low-temperature drying

03UGW

Sludge storage tank

04UGW

Equalizing tank

05UGW

Sewerage pump station

06UGW

Temporary sediment storage area

01-04UGZ

Normal operation system cable channel . USZ ( .


..)

UJ.

Buildings and structures for nuclear heat generation

10UJA
20UJA
30UJA
40UJA

Reactor building/Inner containment

10UJB
20UJB
30UJB
40UJB

Outer containment in the 10UJA (20UJA, 30UJA, 40UJA) building

10UJC
20UJC
30UJC
40UJC

Premise for PHRS heat exchangers in the 10UJA (20UJA, 30UJA,


40UJA) building

10UJE
20UJE
30UJE
40UJE

Steam chamber in the 10UJA (20UJA, 30UJA, 40UJA) building

10UJG
20UJG
30UJG
40UJG

Transport portal of the 10UJA (20UJA, 30UJA, 40UJA) building

01UJY
02UJY

Gallery of the controlled access area

AKU-AEB0001

Agreement

58

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

11-12UJY
21-22UJY
31-32UJY
41-42UJY

Gallery of the controlled access area

13UJY
23UJY
33UJY
43UJY

Ventilation gallery

11-13UJZ
21-23UJZ
31-33UJZ
41-43UJZ

Process tunnel

UK.

Buildings and structures for reactor plant auxiliary systems

10UKA
20UKA
30UKA
40UKA

Premises in the controlled access area of the 10UJA (20UJA, 30UJA,


40UJA) building

10UKC
20UKC
30UKC
40UKC

Reactor auxiliary building

10UKH
20UKH
30UKH
40UKH

Ventilation stack

01UKH
02UKH
03UKH

Ventilation stack

00UKS

Radioactive waste reprocessing and storage building

00UKT

Radioactive sources storage building

00UKU

Controlled-access area workshops

00UKX

Special-purpose vehicles garage

AKU-AEB0001

Agreement

59

JSC "Atomenergoproekt"

Code
01UKY
02UKY
03UKY
04UKY
05UKY
06UKY

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Name
Gallery of the common-access area

11-12UKZ
21-22UKZ
31-32UKZ
41-42UKZ

Safety system cable tunnel

UL.

Buildings and structures for steam, water, and gas circuits

10ULD
20ULD
30ULD
40ULD

Structure for the UDP and IDP auxiliary tank

UM.

Buildings for main machine sets

10UMA
20UMA
30UMA
40UMA

Turbine building

10UMW
20UMW
30UMW
40UMW

Structure for emergency oil drain tank

10UMX
20UMX
30UMX
40UMX

Unit water demineralization plant building

UN.

Structures for process power supply

00UNA

Heat distribution station

00UNJ

Contaminated network water drain tank structure

01UNK
02UNK

Hot water storage tank structure

UP.

Buildings and structures for cooling water intake installations

50UPC
60UPC

Water intake structure

AKU-AEB0001

01

Agreement

60

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

50UPK
60UPK

Chlorination plant

50UPX
60UPX

Fish barrier

11UPZ-14UPZ Cable tunnel of normal operation system


21UPZ-24UPZ
31UPZ-34UPZ
41UPZ-44UPZ
UQ.

Buildings and structures for cooling water supply installations

10UQA
20UQA
30UQA
40UQA

Main pump station

11-12UQC
21-22UQC
31-32UQC
41-42UQC

Pump station of essential loads

10UQE
20UQE
30UQE
40UQE

Pressure discharge header

00UQG

Conjugation structure

10UQN
20UQN
30UQN
40UQN

Outlet channel

10UQR
20UQR
30UQR
40UQR

Chilling machine building

00UQU

Underwater water discharge structure

00UQW

Cooling water distribution chamber

11-13UQX
21-23UQX
31-33UQX
41-43UQX

Siphon well

AKU-AEB0001

Agreement

61

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

11-12UQZ
21-22UQZ
31-32UQZ
41-42UQZ

Pipeline tunnel for essential loads

US.

Buildings and structures for ancillary systems not related to main


production

10USC
20USC
30USC
40USC

Structure of compressed air receivers for cutoff valves

00USF

Nitrogen-oxygen station

11USF
21USF
31USF
41USF

Structure for nitrogen receivers

12USF
22USF
32USF
42USF

Structure of nitrogen receivers for the needs of the 10UMA (20UMA,


30UMA, 40UMA) building

01USK

Storage of noncombustible gas cylinders

02USK

Storage of combustible gas cylinders

00UST

Workshops of common-access area

00USV

Engineering and personnel amenities building

01USW

Structure for on-site cable networks

02USW

Structure for on-site grounding loop

03USW

Structure for off-site cable networks

00USY

Trestle for process pipelines

01-09USZ

Normal operation cable channel

11-14USZ
21-24USZ
31-34USZ
41-44USZ

Normal operation cable channel

UT.

Buildings and structures for auxiliary installations

00UTE

Structure for electrolyzer plants

00UTF

Compressor building

00UTH

Auxiliary boiler house

AKU-AEB0001

Agreement

62

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

Name

01UTJ
02UTJ

Smoke stack

01-09UTZ

Normal operation cable channel

UU.

Shaft structures

11-15UUB
21-25UUB
31-35UUB
41-45UUB

Ventilation center for normal operation cable tunnel

11-12UUK
21-22UUK
31-32UUK
41-42UUK

Exhaust ventilation center of safety system cable tunnel

11-17UUP
21-27UUP
31-37UUP
41-47UUP

Ventilation center for tunnel with pipelines for essential load

11-17UUQ
21-27UUQ
31-37UUQ
41-47UUQ

Ventilation center for tunnel with pipelines for essential load

UX.

Structures for external systems

00UXA

Desalination plant

01UXC

Security service center building

02UXC

Security service garage

03UXC

Military guard center building

04UXC

Military guard garage

05UXC

Shielded structure for military guard reserve with shelter for guard

06UXC

Standby diesel power station

07UXC

Diesel fuel storage with pump station

08UXC

Sheltered reservoir of diesel fuel

01UXD

Garage

02UXD

Office building

03UXD

Motor vehicle checkpoint structure with wheel washing facility

04UXD

Transformer substation

05UXD

Drain water pumping station

AKU-AEB0001

01

Agreement

63

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

06UXD

Clarified water pumping station

07UXD

Pump station

08-09UXD

Fire-fighting water reservoir

01UXE

Fence 00UXG

02UXE

Intercepting ditch

00UXG

Facility for burying very low-active wastes encompassing 01-09UXG,


01-09UXD, 01-02UXE

01-02UXG

Section for Type I wastes

03-04UXG

Section for Type II wastes

05UXG

Warehouse of materials

06-07UXG

Sludge bed

08-09UXG

Check and control reservoir

00UXX

United warehouse for storing civil defense facilities

UY.

Additional buildings and structures

00UYB

Health physics and personnel amenities building of the controlled access


area

00UYC

Administrative building with canteen

01UYE

Central entrance checkpoint

02UYE

Entrance checkpoint

10UYE
20UYE
30UYE

Entrance checkpoint

01UYF
02UYF
03UYF

Vehicle checkpoint

10UYF
20UYF
30UYF

Vehicle checkpoint

00UYG

Information center

00UYH

Training center

00UYP

Set of fire-fighting
00UYS, 04UZJ

01UYP

Office and production building with places for 10 vehicles

02UYP

Garage for four fire-fighting trucks

03UYP

Warehouse for foam forming agent

AKU-AEB0001

station

structures

Agreement

including

01-09UYP,

64

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

04UYP

Training simulator for fighting fires in electric installations up to 10 kV


voltage level

05UYP

Transformer substation

06UYP

Underground water reservoir for 50 m3

07UYP

Training tower

08UYP

Heat and smoke chamber

09UYP

Fire belt for psychological training of firemen

00UYS

Motor vehicle refueling station for one dispenser

01UYX

Civil defense structure for sheltering 1200 persons

02UYX

Shielded center for managing emergency activities at the NPP

03UYX

Civil defense structure for sheltering 600 persons

04UYX

Civil defense structure for sheltering 600 persons

05UYX

Civil defense structure for sheltering 600 persons

UZ.

Buildings, structures and areas for transport, traffic, fencing,


landscape gardening and other purposes

00UZA

On-site motor roads

01UZC

Site area

02UZC

Area of electric power supply structures

01UZJ

Site fence

02UZJ

Fence of power supply system structures

03UZJ

Fence of diesel fuel and oil reservoirs

04UZJ

Fence of 00UYP

00UZM

Protected zone perimeter in water basin

00UZN

Intercepting ditch

00UZP

Bank protecting structure

50UZQ
60UZQ

Dike dam

00UZR

Cargo terminal "East"

01UZT

Access motor road No. 1

02UZT

Access motor road No. 2 (second exit from the NPP)

03UZT

Bypass motor road 00UZC

04UZT

Access motor road to 00UZR

05UZT

Access motor road to 00UGR

00UZU

Protected area perimeter

AKU-AEB0001

Agreement

65

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

Name

10UZU

Perimeter of protected area between Units 1 and 2

20UZU

Perimeter of protected area between Units 2 and 3

30UZU

Perimeter of protected area between Units 3 and 4

01UZX

Site slopes

02UZX

Production site engineering protection structures

00UZZ

Water discharge structures

AKU-AEB0001

01

Agreement

66

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

X..

Large machines (not the main machine sets)

XJ.

Systems of emergency diesel power station

XJA

Diesel engine

XJG

Cooling system

XJN

Fuel system

XJN10

Fuel system

XJN40

System for supplying diesel fuel to the SDPP in the 00UEL building

XJN50

Fuel system in the 06-07UXC buildings

XJN80

Diesel fuel supply system for the auxiliary boiler house in the 00UEL
building

XJQ

Air intake system

XJR

Gas exhaust system

XJV

Oil system

XJV10

Oil system

XJV50

Oil system in the 06-07UXC buildings

XJX

Startup air system

XK.

Generator installation

XKA

Generator set

XKV

Generator lubrication system

XL.

Electric drive equipment

XLA

Assembled diesel-generator

XLA50

Alternative diesel power station

AKU-AEB0001

Agreement

67

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

4 LIST OF EQUIPMENT UNIT CODES

AKU-AEB0001

Agreement

68

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

Equipment units

Apparatuses

Direct measurement circuits

Control loops

Processing of analog and binary signals

Indirect measurement circuits (comparison with setpoints, calculation-type etc.)

Electrical devices

Structural assemblies of main and large machines (used only with codes of the
main group *M* and *X*)

Nuclear engineering components

AKU-AEB0001

Agreement

69

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

A.

Equipment units

AA

Valves, including drive, manual drive as well; burst rupture devices

AB

Airlocks, manholes, and doors

AC

Heat exchanger without a dedicated power source1) (except with ventilation


system plants and equipment)

AE

Turning, hoisting, handling mechanisms, and manipulators

AF

Conveyors and escalators

AG

Generator sets

AH

Heat exchanger with a dedicated power source and/or drive 2) (except with
ventilation systems plants and equipment3))

AJ

Crushing plants, only used in technological process

AK

Presses and stackers, only used in technological process

AM

Mixers and blenders

AN

Compressors and fans

AP

Pump sets

AS

Adjustment and tightening devices for nonelectrical quantities (only if the


actuator constitutes a united structural assembly connected with another device)

AT

Cleaning, drying, filtering and fluid separation devices, excepting *BT*

AU

Brakes, transmission gears, clutches, nonelectrical transducers

AV

Incineration devices

AW

Stationary processing machines, maintenance devices, laboratory furniture

AX

Verifying and checking devices for maintenance of installations, laboratory


instruments and equipment

B.

Apparatuses

BB

Storage devices (vessels, reservoirs)

BE

Shafts (only for erection and maintenance purposes)

BF

Foundations

BN

Jet pumps, ejectors, injectors, hoods, deflectors

BP

Constricting devices, flow limiters, throttle orifices (not for measurements)

1 1)

A heat exchanger without a dedicated power source is understood to mean an apparatus heat transfer in
which takes place directly from a heat carrier to a coolant.
2)

A heat exchanger with a dedicated power source is understood to mean an apparatus heat transfer in which
takes place with conversion of the energy of admitted medium into energy transferred to the medium for
which this energy is required.
3)

The principles for coding ventilation system plants and equipment are given in Appendix .

AKU-AEB0001

Agreement

70

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

BQ

Supports, load-bearing structures, brackets, piping penetrations

BR

Pipelines, channels, trays, air ducts

BS

Mufflers

BT

Stack gas catalytic converter

BU

Insulation, shells

C.

Direct measurement circuits

CD

Density

CE

Electrical variables (e.g. current, voltage, power, electric frequency)

CF

Flowrate, mass flowrate

CG

Distance, length, position, direction of rotation

CH

Manual entry of information (e.g. fire pushbutton)

CK

Time

CL

Level (also media interface boundary)

CM

Moisture content, humidity

CP

Pressure

CQ

Quality indicators (analyses, material properties), other than *CD*, *CM*,


*CV*

CR

Radiation variables, fire alarm leg

CS

Velocity, rotation speed, frequency (mechanical), acceleration

CT

Temperature

CU

Combined and other variables

CV

Viscosity

CW

Weight, mass, force

CX

Neutron flux

CY

Vibration, extensions

D.

Closed-loop control circuits

DD

Density

DE

Electrical variables (e.g. current, voltage, power, electrical frequency)

DF

Flowrate, mass flowrate

DG

Distance, length, position, direction of rotation

DK

Time

DL

Level (also media interface boundary)

DM

Moisture content, humidity

AKU-AEB0001

Agreement

71

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

DP

Pressure

DQ

Quality indicators (analyses, material properties), other than *DD*, *DM*,


*DV*

DR

Radiation quantity

DS

Velocity, rotation speed, frequency (mechanical), acceleration

DT

Temperature

DU

Combined and other variables

DV

Viscosity

DW

Weight, mass, force

DX

Neutron flux

DY

Vibration, extensions

E.

Processing of analog and binary signals

EA

Control (free for use)

EB

Control (free for use)

EC

Control (free for use)

ED

Control (free for use)

EE

Control (free for use)

EG

Alarms and messages (free for use)

EH

Alarms and messages (free for use)

EJ

Alarms and messages (free for use)

EK

Alarms and messages (free for use)

EM

Computer (free for use)

EN

Computer (free for use)

EP

Computer (free for use)

EQ

Computer (free for use)

ER

Reactor protection

EU

Combined processing of binary and analog signals

EW

Protection (free for use)

EX

Protection (free for use)

EY

Protection (free for use)

EZ

Protection (free for use)

F.

Indirect measurement circuits

FD

Density

AKU-AEB0001

Agreement

72

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

FE

Electrical variables (current, voltage, power, electrical frequency)

FF

Flowrate, mass flowrate

FG

Distance, length, position, direction of rotation

FK

Time

FL

Level (also media interface boundary)

FM

Moisture content, humidity

FP

Pressure

FQ

Quality indicators (analyses, material properties), other than *FD*, *FM*, *FV*

FR

Radiation quantity

FS

Velocity, rotation speed, frequency (mechanical), acceleration

FT

Temperature

FU

Combined and other variables

FV

Viscosity

FW

Weight, mass, force

FX

Neutron flux

FY

Vibration, extensions

G.

Electrical devices

GA

Junction or distribution boxes and cable penetrations (free for use)

GB

I&C junction boxes

GC

Junction or distribution boxes and cable penetrations (free for use)

GD

Junction or distribution boxes and cable penetrations (free for use)

GE

Junction or distribution boxes and cable penetrations (free for use)

GF

Junction or distribution boxes and cable penetrations (free for use)

GG

Junction or distribution boxes and cable penetrations (free for use)

GH

Independently erected electrical devices (cabinets, boxes), control and


measurement units encoded according to the process diagram

GK

Devices for presenting information and operative control in automation systems


(keyboards, displays, printers, etc.)

GM

Junction or distribution boxes for low-current open remote communication


system

GP

Junction or distribution boxes and distribution for lighting

GQ

Junction or distribution boxes and distribution for power receptacles

GR

DC power supplies, batteries

GS

Switching devices if not identified by process codes

AKU-AEB0001

Agreement

73

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

GT

Transformer devices

GU

Converter devices

GV

Lightning protection and grounding devices

GW

Cabinet power supply devices

GX

Actuating equipment for electrical variables

GY

Junction or distribution boxes for low current systems (not for open
telecommunication services)

GZ

Supports, hangers, and bearing structures for electrical and I&C equipment

H.

Structural assemblies of main and large machines


(used only with codes of main group *M* and *X*)

HA

Parts of machine casings

HB

Parts of moving machinery components

HD

Structures of bearings

J.

Nuclear components

JA

Absorber elements

JB

Fuel assemblies

JC

Breeding elements

JD

Throttle grills (elements)

JE

Burnable absorber elements

JF

Reflecting elements

JG

Elements of volume, collection

JM

Moderating elements

JN

Neutron sources

JS

Shielding elements

JZ

Special elements

AKU-AEB0001

Agreement

74

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

5 COMPONENT CODES

AKU-AEB0001

Agreement

75

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

Electrical components

Mechanical components

Mechanical components

I&C components (non-electrical)

Signal sources (definitions for signals depend to a larger degree on the applied
I&C equipment and are specified in Application Rules for a particular project)

Signal receivers (definitions for signals depend to a larger degree on the


applied I&C equipment and are specified in Application Rules for a particular
project)

Interrelated signals (definitions for signals depend to a larger degree on the


applied I&C equipment and are specified in Application Rules for a particular
project)

Electrical components

-A

Self-contained devices, complex devices, units, functional


microprocessor devices for control, monitoring, and relay protection

-B

Converters of nonelectrical quantities into electrical ones and vice versa

-C

Capacitive elements (capacitors)

-D

Logic elements, delay and memory devices

-E

Special elements for which no special alphabetic codes are established, special
equipment

-F

Protection devices (fuses, surge arresters, automatic (non-power) switches

-G

Power supplies

-H

Indication and alarm devices

-K

Relays, contactors, starters

-L

Inductances (coils and chokes)

-M

Electric motors

-N

Amplifiers and controllers

-P

Measurement equipment, counters

-Q

Power circuit breakers, disconnector switches

-R

Resistors

-S

Switching devices (selector switches, knife switches)

-T

Transformers (non-power)

-U

Converters of electrical quantities into other electrical quantities

-V

Radio valves, electronic valves, semiconductors

AKU-AEB0001

Agreement

modules,

76

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

-W

Data transmission channels between computers, aerials, high-frequency


equipment

-X

Connection devices (terminals, receptacles, plugs, clamps)

-Y

Electric drives (not electric motors); solenoids (electromagnets)

-Z

Smoothing devices; filters; limiters; compensators

K.

Mechanical components

KA

Gate valves, cocks, valves, taps, bursting disks, throttling orifices, end plates

KB

Gates, doors, partition walls

KC

Heat exchangers, coolers

KD

Reservoirs, vessels, level (process) vessels

KE

Turning, handling, hoisting and rotating mechanisms

KF

Conveyers, feeders

KJ

Crushing machines

KK

Pressing and stacking machines

KM

Mixers

KN

Compressors, air blowers, fans

KP

Pumps

KT

Cleaning machines, dryers, separators, filters

KV

Burners, fire bars

KW

Stationary machines and processing machines for maintenance

M.

Mechanical components

MB

Brakes

MF

Foundations

MG

Reducing gears

MK

Clutches

MM

Engines (non-electric)

MR

Piping parts, parts of technical channels, sockets

MS

Drives, non-electric

MT

Turbines

MU

Transmission components, non-electric converters and amplifiers, except for


clutches and reducing gears

Q.

I&C components (non-electrical)

QB

Measurement sensors if not structurally integral with *QP*

QH

Signalling devices

AKU-AEB0001

Agreement

77

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

QN

Controllers, centrifugal governors

QP

Measurement instruments, testing equipment

QR

Instrument piping

QS

Level vessels in measurement circuits

QT

Protecting tubes and sleeves for protection of vulnerable sensors

X.

Signal sources (definitions for signals depend to a larger extent on the


applied I&C equipment and are specified in the Application rules for a
particular project)

XA

Signal sources (free for use)

XB

Drive control

XC

Signal sources (free for use)

XD

Signal sources (free for use)

XE

Signal sources (free for use)

XF

Signal sources (free for use)

XG

Signal sources (free for use)

XH

Signal sources (free for use)

XJ

Signal sources (free for use)

XK

Signal sources (free for use)

XL

Signal sources (free for use)

XM

Signal sources (free for use)

XN

Signal sources (free for use)

XP

Signal sources (free for use)

XQ

Signal sources (free for use)

XR

Signal sources (free for use)

XS

Signal sources (free for use)

XT

Signal sources (free for use)

XU

Signal sources (free for use)

XV

Signal sources (free for use)

XW

Signal sources (free for use)

XX

Signal sources (free for use)

XY

Signal sources (free for use)

XZ

Signal sources (free for use)

AKU-AEB0001

Agreement

78

JSC "Atomenergoproekt"

Code
Y.

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Name

YA

Signal receivers (definitions for signals depend to a larger extent on the


applied I&C equipment and are specified in the Application rules for a
particular project)
Signal receivers (free for use)

YB

Signal receivers (free for use)

YC

Signal receivers (free for use)

YD

Signal receivers (free for use)

YE

Signal receivers (free for use)

YF

Signal receivers (free for use)

YG

Signal receivers (free for use)

YH

Signal receivers (free for use)

YJ

Signal receivers (free for use)

YK

Signal receivers (free for use)

YL

Signal receivers (free for use)

YM

Signal receivers (free for use)

YN

Signal receivers (free for use)

YP

Signal receivers (free for use)

YQ

Signal receivers (free for use)

YR

Signal receivers (free for use)

YS

Signal receivers (free for use)

YT

Signal receivers (free for use)

YU

Signal receivers (free for use)

YV

Signal receivers (free for use)

YW

Signal receivers (free for use)

YX

Signal receivers (free for use)

YY

Signal receivers (free for use)

YZ

Signal receivers (free for use)

Z.

Interrelated signals (definitions for signals depend to a larger extent on the


applied I&C equipment and are specified in the Application rules for a
particular project)

ZA

Interrelated signals (free for use)

ZB

Interrelated signals (free for use)

ZC

Interrelated signals (free for use)

ZD

Interrelated signals (free for use)

AKU-AEB0001

Agreement

79

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Code

01

Name

ZE

Interrelated signals (free for use)

ZF

Interrelated signals (free for use)

ZG

Interrelated signals (free for use)

ZH

Interrelated signals (free for use)

ZJ

Interrelated signals (free for use)

ZK

Interrelated signals (free for use)

ZL

Interrelated signals (free for use)

ZM

Interrelated signals (free for use)

ZN

Interrelated signals (free for use)

ZP

Interrelated signals (free for use)

ZQ

Interrelated signals (free for use)

ZR

Interrelated signals (free for use)

ZS

Interrelated signals (free for use)

ZT

Interrelated signals (free for use)

ZU

Interrelated signals (free for use)

ZV

Interrelated signals (free for use)

ZW

Interrelated signals (free for use)

ZX

Interrelated signals (free for use)

ZY

Interrelated signals (free for use)

ZZ

Interrelated signals (free for use)

AKU-AEB0001

Agreement

80

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX
(mandatory)
Structure of a functional and process-related code
Number of
code sector

Content of
code sector
Name of
code groups

Entire plant

Functional code

Equipment unit code

F0

F1F2F3

FN

A1A2

AN

A31)

Component
code
B1B2
BN

AAA

NN

AA

NNN

(A)

AA

NN

Preliminary designation
of system code
Numbering of similar systems or
plants included in the common
code sector 0 of power installation
System classification
Classification of systems or installations
by appropriate KKS-codes
System numbering
Numbering of parts of systems or installations
Equipment unit classification
Classification of equipment units, apparatuses,
electrical equipment and I&C by appropriate KKS-codes
Equipment unit numbering
Numbering of equipment units, apparatuses,
electrical equipment and I&C
Additional code
of equipment unit codes
Classification of components
Classification of components and signals or signal applications
by appropriate KKS-codes
Numbering of components
Numbering of components and signals or signal applications

Figure A.1

1)

For the use of 3 code, refer ii. 6, 10 in Section 2 Agreed Provisions

AKU-AEB0001

Agreement

81

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX B
(mandatory)
Numbering in an equipment unit code
Valves
Numerical
part of code
001199

Kind of equipment unit

200299

Stop valves (powered and manually operated), including process drains and air
vents relating to equipment and pipelines
Throttling devices for ventilation systems
Control valves

300349

Valves in I&C lines

350-399

Valves in dosimetric monitoring lines

400499

Structural pipeline drains. Fire and smoke dampers for ventilation systems

500599

Structural pipeline air vents

600699

Check valves, pressure relief valves (PRVs), universal ventilation duct closing
device (UVCD)

700-729

Fire hydrants

730799

Reserved

800899

Containment cutoff valves

900949

Safety devices

950-999

Hydraulically and pneumatically driven valves (except the containment isolation


system)

AKU-AEB0001

Agreement

82

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

- Doors
Numerical
part of code

Kind of equipment unit

001-099

Wooden, metal, PVC, and mesh doors

100-199

Sealed metal doors

200-299

Sealed protective doors

300-399

Shock wave resistant doors

400-499

Fire doors

500-599

Gates

600-699

Hatches

700-799

Windows, louver grills, ventilation grills, easily removable structures, etc.

800-899

Reserved

900-999

Reserved

AKU-AEB0001

Agreement

83

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

E - Cranes, hoisting devices, and handling equipment


Numerical
part of code

Kind of equipment unit

001-099

Cranes, hoisting devices, and handling equipment in the 10UJA (20UJA, 30UJA,
40UJA), 10UKC (20UKC, 30UKC, 40UKC), 10UMA (20UMA, 30UMA,
40UMA), 00UST, 10UBA (20UBA, 30UBA, 40UBA), 00UYB, 00UEL, 00UNA,
10UGB (20UGB, 30UGB, 40UGB) 50UPC (60UPC) buildings

100-199

Cranes, hoisting devices, and handling equipment in the 10UJC (20UJC, 30UJC,
40UJC), 00UKS, 11-12UBN (21-22UBN, 31-32UBN, 41-42UBN), 01UEK,
00UGD, 00USF, 50UPK (60UPK), 00UQW buildings

200-299

Cranes, hoisting devices, and handling equipment in the 13UBN (23UBN,


33UBN, 43UBN), 00UEJ, 11-13UEJ(21-23UEJ, 31-33UEJ, 41-43UEJ), 10UJE
(20UJE, 30UEJ, 40UEJ), 10UKA (20UKA, 30UKA, 40UKA),
01-02USK, 10UCB (20UCB, 30UCB, 40UCB), 01UYX, 10UMX (20UMX,
30UMX, 40UMX), 11-13UQX (21-23UQX, 31-33UQX, 41-43UQX), 03UGF
buildings

300-399

Cranes, hoisting devices, and handling equipment in the 06UXC,


10UJB (20UJB, 30UJB, 40UJB), 00UKU, 00UGM, 00UNE, 00UQG buildings

400-449

Cranes, hoisting devices, and handling equipment in the 00UFC, 00UGW,


00UTF, 10UB (20UB, 30UBB, 40UBB), 00UKX, 10UQA (20UQA, 30UQA,
40UQA), 01UYP buildings

450-499

Cranes, hoisting devices, and handling equipment in the 00UTH, 00UKT,


11-12UQC (21-22UQC, 31-32UQC, 41-42UQC), 02UYP, 00UXG buildings

500-599

Cranes, hoisting devices, and handling equipment in the 00UGH building

600-699

Elevators

700-799

Reserved

800-899

Reserved

900-999

Reserved

AKU-AEB0001

Agreement

84

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

AW - Stationary processing machines, maintenance devices, laboratory furniture1)


Numerical
part of code

Kind of equipment unit

001-199

Lathe equipment in the 00UGD, 00UKU buildings, laboratory furniture in the


10UKC (20UKC, 30UKC, 40UKC), 10UMX (20UMX, 30UMX, 40UMX)
buildings

200-249

Lathe equipment in the 00USV building

250-699

Lathe equipment in the 00UST building

700-799

Reserved

800-899

Maintenance devices

900-999

Reserved

1)

Any digital codes can be used for laboratory furniture

AKU-AEB0001

Agreement

85

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

BQ Fastening equipment units


Numerical
part of code

Kind of equipment unit

001-099

Supports

100-199

Reserved

200-399

Penetration blocks

400-599

Reserved

600-699

Fasteners for reactor plant equipment and pipelines

700-799

Pipe penetrations

800-899

Non-classified fastening equipment

900-999

Reserved

AKU-AEB0001

Agreement

86

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

BR - Pipelines
Numerical
part of code

Kind of equipment unit

001-199

Main pipelines

200-299

Reserved

300-349

I&C pipelines

350-399

Dosimetric monitoring pipelines

400-499

Drain and venting pipelines

500-599

Air ducts

600-699

Pipelines to sampling and chemical agent metering systems

700-799

Reserved

800-899

Reserved

900-999

Pipelines to safety valves and pipelines for discharge from safety valves

AKU-AEB0001

Agreement

87

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

. - Direct measurement circuits (except for CR)


Numerical
part of code

Kind of equipment unit

001-199

Analog remote measurement circuits

200-299
300-399

For tests
For NFME

400-499

For the power limitation and control function

500-599

Local measurement circuits

600-699

Reserved

700-799

For MCDS

800-899

For reactor emergency protection

900-999

Complex measurement circuits

AKU-AEB0001

Agreement

88

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

CR radiation parameter
Numerical
part of code

Kind of equipment unit

001-099

ADR or AEDR of photon radiation and neutron flux density

100-199
200-299

ADR or AEDR of photon radiation (in-situ monitoring)


Volume activity of airborne iodine

300-399

Monitoring of radioactive contamination

400-499

Volume activity of airborne aerosols

500-599

Reserved

600-699

Volume activity of airborne IRGs

700-799

800-899

Volume activity of liquid medium or vapor

900-999

Reserved

AKU-AEB0001

Agreement

89

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX C
(mandatory)
Correspondence between maintenance elevations and height elevations
Elevation
code
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Height elevations
-100,000
-8,000
-7,000
-6.000
-5,000
-4,000
-3,000
-2,000
-1,000
+0,000
+1,000
+2,000
+3,000
+4,000
+5,000
+6,000
+7,000
+8,000
+9,000
+10,000
+11,000
+12,000
+13,000
+14,000
+15,000
+16,000
+17,000
+18,000
+19,000
+20,000
+21,000
+22,000
+23,000
+24,000
+25,000
+26,000
+27,000
+28,000
+29,000
+30,000
+31,000
+32,000
+33,000
+34,000
+35,000
+36,000
+37,000
+38,000
+39,000

AKU-AEB0001

to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to

-8,010
-7,010
-6,010
-5,010
-4,010
-3,010
-2,010
-1,010
-0,010
+0,990
+1,990
+2,990
+3,990
+4,990
+5,990
+6,990
+7,990
+8,990
+9,990
+10,990
+11,990
+12,990
+13,990
+14,990 1m pitch
+15,990
+16,990
+17,990
+18,990
+19,990
+20,990
+21,990
+22,990
+23,990
+24,990
+25,990
+26,990
+27,990
+28,990
+29,990
+30,990
+31,990
+32,990
+33,990
+34,990
+35,990
+36,990
+37,990
+38,990
+39,990

Elevation
code
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

Agreement

Height elevations
+40,000
+42,000
+44,000
+46,000
+48,000
+50,000
+52,000
+54,000
+56,000
+58,000
+60,000
+62,000
+64,000
+66,000
+68,000
+70,000
+72,000
+74,000
+76,000
+78,000
+80,000
+82,000
+84,000
+86,000
+88,000
+90,000
+92,000
+94,000
+96,000
+98,000
+100,000
+102,000
+104,000
+106,000
+108,000
+110,000
+112,000
+114,000
+116,000
+118,000
+120,000
+122,000
+129,000
+136,000
+143,000
+150,000
+157,000
+164,000
+171,000
+178,000

to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to

+41,990
+43,990
+45,990
+47,990
+49,990
+51,990
+53,990
+55,990
+57,990
+59,990
+61,990
+63,990
+65,990
+67,990
+69,990
+71,990
+73,990
+75,990
+77,990
+79,990
+81,990
+83,990
+85,990
+87,990 2m pitch
+89,990
+91,990
+93,990
+95,990
+97,990
+99,990
+101,990
+103,990
+105,990
+107,990
+109,990
+111,990
+113,990
+115,990
+117,990
+119,990
+121,990
+128,990
+135,990
+142,990
+149,990
+156,990 7 mpitch
+163,990
+170,990
+177,990
+184,990

90

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX D
(mandatory)
Rules for coding embedded parts, penetrations, and reinforced blocks
D.1. Embedded parts for different functional purposes intended for passing process,
ventilation, and electrical service lines through walls and slabs are encoded beyond the KKS system
with reference to the construction system according to the following scheme:
II

I
KKS code of
building,
elevation
NNAAANN

III
Ordinal
number

Design discipline

AA

Additional
information

NNNN

AA

N(N)

Sector I
KKS code of the building in accordance with section 3 and elevation in accordance with
Appendix C.
Sector II
Design discipline for standard embedded parts in accordance with Table D.1:
Table D.1
Code

Name of design discipline

AM

Thermal process monitoring and automatic closed-loop control

EM

Primary circuits of electrical devices

HM

Heating and ventilation systems

RM

Radiation monitoring systems

TM

Heat-generating and mechanical systems

WM

Water supply and sewerage systems

For the embedded parts of rod penetrations, the last letter in the design discipline code is
replaced by letter S.
For sealed penetrations, the last letter in the design discipline code is replaced by letter G.
Sector III
Additional information is not part of the construction part's code and is included in the
embedded part designation in drawings and in specifications for identifying the article according to
the album of standard embedded parts.

AKU-AEB0001

Agreement

91

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Example 1
10UKC10TM0001/TD1
A construction embedded part for passing the pipelines of heat-generating and mechanical
systems, installed in the 10UKC building at a construction elevation in the range from 0,000 to
+0,990. The construction part number is TD1.
Example 2
10UKC11TS0001
An embedded part for the rod penetration of heat-generating and mechanical systems,
installed in the 10UKC building at a construction elevation in the range from +1,000 to +1,990. The
ordinal number is 0001.
Embedded parts of the same type (strips, tables, and angles) are encoded beyond the KKS
system with mandatorily presenting explanatory data in the relevant sets of working documentation
according to the scheme given in Table D.2.
Table D.2

Conventional alphabetic
designation of embedded
part

Registration number of the


base embedded part starting
from 1

N(NN)

Dash

Code of the base


embedded part length,
starting from 1 (taken
arbitrarily with
mandatory
presentation of data on
the drawing)

N(N)

For example, 1-5; 2-1


D.2 Block penetrations are encoded according to the following scheme:
NN AAA NN AA NNN/A NNN
Block No.
KKS code of building
Code of height
elevation
KKS code of
penetration block BQ
Ordinal number
200399
Type of
penetration block P
Ordinal number
of article

AKU-AEB0001

Agreement

92

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Holes in a penetration block are marked and numbered according to the assignment for
designing the civil part in line with the design discipline code (see Table D.1) with indicating the
relevant information in the geometry drawings of building structures:

TM0001
10UKC10BQ250/P001
HM0001

Figure D.1 Coding of a penetration block


The penetration block height elevation is determined from the top elevation of the slab on
which the structures with penetration blocks to be encoded are installed.
D.3 Rules for coding reinforcement shuttering blocks
The reinforcement shuttering blocks are encoded according to the following scheme:
NN AAA NN/AANNN
Block No.
KKS code of
building (room)
Code of height
elevation
Reinforced block
name and
ordinal number
The following codes of reinforced block types are used:

RW - a wall reinforced block;

RS - a slab reinforced block;

RF - a foundation raft reinforced block;

RG a reinforced block of inner containment.


For wall reinforcement blocks, their elevation in the code is determined by the wall lower
elevation; for slab and foundation raft reinforced blocks, their elevation in the code is determined by
the slab (foundation raft) top elevation.

AKU-AEB0001

Agreement

93

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Example 1
10UKC04/RW001
The first wall reinforced block at el. -5,450.
Example 2
10UJA10/RS002
The second slab reinforced block at el. 0,000.
In coding reinforced blocks of the reactor building, the code of building (room) is selected
according to the following principle:

UJA reinforced blocks of UJA, UBB, UBP, UJE, UKA rooms;

UJB outer containment reinforced blocks, including the annulus structures;

UJC reinforced blocks of the rooms for PHRS heat exchangers;

UJG reinforced blocks of the transport portal.


Example 3
10UJA33/RW001 wall reinforced block at elevation +8.140
The first wall reinforced block of steam chamber (UJE) at elevation +23,400.
Example 4
10UJA10/RG003
The third reinforced block of the inner containment at elevation 0,000.
The reinforced blocks of UJA are numbered in the range from 001 to 099.
The reinforced blocks of UBB, UBP, UJE, UKA are numbered in the range from 100 to
999.
The reinforced blocks of UJB, UJC, UJG are numbered starting from 001.

AKU-AEB0001

Agreement

94

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

JSC "Atomenergoproekt"

01

APPENDIX E
(mandatory)
Cable coding principles
Cables are identified by a code consisting of classifying and numerical parts as
detailed in Table E.1.
Table E.1
Classifying part
AAANN

Number of power
unit or 0 for
common-unit
plants

Designation of a
normal operation
system (0) or a
safety train (1,2)

Functional code

(AANNN)

Equipment unit
code

Numerical part
NNNN/()

Cable number

The following may be used as a classifying part:

the functional code of the main process or electrical unit the cable belongs to;

the code of structure (cabinet, console, or panel).


In encoding a cable connecting structural elements with different functional codes, the
classifying part of cable code contains the one of them locating earlier in alphabetic order.
In encoding a cable serving structural units having the same functional codes, the
classifying part of cable code contains the code of structural unit having a smaller number.
Power cables supplying power to group assemblies are denoted according to the code of
the assembly being energized.
Power cable bridges connecting two assemblies with different functional codes are
encoded by the code of the assembly being energized.
Power cables running from a transformer secondary winding are encoded according to the
secondary winding's code.
Control I&C cables and radiation monitoring cables are encoded according to the
measurement loop's code.
Cable groups are encoded using four digital symbols. The first digit of the code serves for
recognizing the cable application field, and the remaining three digits are used for numbering cables
inside the corresponding application field, see Table E.2.
Control I&C cables, as well as radiation monitoring cables belong to the field 5000-5999.
The rules for numbering control cables inside this field must be developed after defining the APCS
architecture and the primary and secondary circuit equipment.
In encoding parallel power cables, the numerical part of the code consists of four
numerical characters and one alphabetic character separated by / (NNNN/A). For encoding such
cables, capital Latin letters (A, B, , F) are used after the separating symbol /.
Table E.2 - Encoding of cable groups
Numerical part of code

Name of cable group

0000-0999

Power cables > 1 kV

1000-1999
2000-2999,
3000-3999

Power cables 1 kV
Control cables > 60 V

AKU-AEB0001

Agreement

105

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

Numerical part of code

01

Name of cable group

4000-4999,
5000-5999

Control cables 60 V

6000-6999

Control cables of the ULCS and special systems 60 V

7000-7999

Communication cables 60 V

8000-8999

Fire alarm and FP I&C control cables 60 V

9000-9999

Spare for control cables 60 V

Cable coding examples are given in Table E.3.


Table E.3 - Cable coding examples
Code
11BMA040027

Code composition
11BMA functional code (bus)
0 cable type (>1 kV)
04 cabinet number
0027 ordinal number

11BMA040027/A

When parallel laying of cables is used

10BMT110001

10BMT11 marking of a transformer. Cable to the first winding

10BMT11GT0020001

Cable to the second winding

10JEB30AP0030001

10JEB30AP003-01 marking of a motor

10JEB30AP0030001/A When parallel laying of cables is used


11FAK10CP0015019

AKU-AEB0001

11FAK10CP001 code of a measurement loop


5019 ordinal number

Agreement

106

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX F
(mandatory)
Principles for coding electrical equipment
The principles of coding electrical equipment will be included in the Agreement after their
agreement among the participants to the Akkuyu NPP Project.

AKU-AEB0001

Agreement

107

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX G
(mandatory)
The procedure of using system numbering in the KKS code in the process part
for the Akkuyu NPP Project
Number of
code sector
Content
of
code sector
Name of code
groups
Type of sign =

Whole plant

Functional code

Equipment unit code

F0

F1 F2 F3

FN

A1 A2

AN

A3

Component
code
B1 B2
BN

(A or N)

(N)

A AA

NN

A A

NNN

(A)

A A

NN

System numbering
Numbering of parts of systems or installations

FN - the numbering is assigned according to the following main rules:

the numbering begins anew if one of the code's preceding parts is changed;

the numbering can be current and group-wise;

the numbering can be with omissions;

the once established numbers are not changed when subsequent changes are made in
the project;

the numbering direction corresponds as a rule to the direction of medium and energy
flows;

numbering is performed according to priorities (for example, main and auxiliary


pipelines) or according to a certain direction (e.g., from left to right and from the top down);

different parts of a process system that do not have a topological connection between
them must have different FN numbering (it is considered that equipment breaks a pipeline route and,
consequently, the topological link). This is connected with the specific features of the SmartPlant
Enterprise software system.
Example 1. Permissible FN numbering in pipeline systems.

Figure G.1
AKU-AEB0001

Agreement

108

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

Sampling pipelines are usually related to the system from which a sample is taken to the
cutoff device, and after the cutoff device they are coded in the subgroup F 3, according to the
sampling system.
Example 2. Pipelines for taking samples from the main feedwater pipeline system.

Figure G.2

AKU-AEB0001

Agreement

109

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

APPENDIX H
(mandatory)
Principles for coding ventilation system plants and equipment
Codes of heating, cooling, air conditioning plants, and ventilation system filtering plants,
as well as codes of equipment items used as part of these plants are assigned to them as follows:
a) codes of plants are written in the sector of equipment unit code using the following
codes:
1)
** with the digital range from 100 to 199 for heating, cooling
and air conditioning plants;
2)
** with the digital range from 100 to 199 for filtering plants;
b) equipment items that are part of the plants, except with independent air conditioners and
split systems are also encoded in the sector of equipment unit code with the digital range from 001 to
099 with application of equipment unit codes** and ** for heat-transfer equipment according
to the following principle:
1)
** for cooling equipment (air coolers);
2)
** for heating equipment (air heaters, including electric heaters).
Example 1 Ventilation system plenum plant 10SAC97AH100 consisting of:
- the 10SAC97AA001 air valve;
- the 10SAC97AT001 filter;
- the 10SAC97AH001 electric air heater;
- the 10SAC97AA201 control air valve;
- the 10SAC97AH002 air heater;
- the 10SAC97AC001 air cooler;
- the 10SAC97AT002 separator;
- the 10SAC97AH003 spray chamber;
- the 10SAC97AP001 spray chamber pump;
- the 10SAC97AT003 separator;
- the 10SAC97AN001 fan.
Example 2 The ventilation system filtering plant 10KLA22AT100 consisting of:
- the 10KLA22AH001 electric air heater;
- the individual aerosol and iodine purification sections 10KLA22AT001,
10KLA22AT002, etc;
c) independent air conditioners, including split systems and equipment included in their
composition, are encoded according to Example 3.
Example 3 Coding of the independent air conditioner inner and outer units
10SAC98AH110 (120, 130,) of the ventilation system:
- inner unit 10SAC98AH111 (121, 131,);
- outer unit 10SAC98AH112 (122, 132,).

AKU-AEB0001

Agreement

110

JSC "Atomenergoproekt"

Akkuyu NPP
Agreement on Using the KKS Coding System in the
Akkuyu NPP Project

01

REVISION LIST
Numbers of sheets (pages)
Rev.
Changed

Replaced

AKU-AEB0001

New

Canceled

Reference
No. and date
Total number
Document
of
of pages in
Signature
number accompanyi
the document
ng
document

Agreement

Date

111

You might also like