KIRLOSKAR OIL ENGINES LIMITED

Introduction Of KOEL
Energy Management
Specific Energy Consumption & Benchmarking
Energy Conservation Projects
Waste Recovery Projects
Energy Monitoring & Reporting
Water Conservation & Management
Environmental Improvements
Green Energy
Corrective Preventive Actions
Energy Efficient Products
Trainingg & Awareness
Corporate Society Responsibility
KIRLOSKAR OIL ENGINES LIMITED

Introduction Of KOEL

KIRLOSKAR OIL ENGINES LIMITED

KOEL Vision & Values


Vision
To Be Amongst The Top Ten Global Players
I Off-high
In
Off hi h Way
W Engines
E i
B i
Business

KOEL

Values

TRANSPARENCY

KIRLOSKAR OIL ENGINES LIMITED

Kagal Plant Location & Overview


KOEL Total Sales Turnover
KOEL Power & Fuel Cost
Rs.
2,276
Crs..
Crs

Mumbai Pune
Kolhapur

Rs.
27 41
27.41
Crs..
Crs

% of Energy Cost wrt


Sales Turnover
1.20 %

KAGAL Plant Sales Turnover @


KAGAL Plant Power & Fuel Cost @
KOEL Kagal

Rs.
902
Crs..
Crs

Rs.
11.92
C
Crs

6.5 km

KIRLOSKAR OIL ENGINES LIMITED

% of Energy Cost wrt


Sales Turnover
1.32
1 32 %

Satellite View of Kagal Plant

Expansion
p
in Progress
g
Helipad

CPCP
Rainwater Harvesting Pond
4.5
4
5 MW Captive
Genset plant
Main Plant
Genset Plant

KIRLOSKAR OIL ENGINES LIMITED

Products & Application


Export as well as Domestic
Engines:
Air cooled and water cooled engines of
2 3 & 4 Cylinder
2,3
C li d Engines
E i
10 0 ~ 105 HP
10.0
Varsha Pump sets

Gensets with Air cooled & Liquid


Cooled Engines.
5 ~ 600 KVA

KIRLOSKAR OIL ENGINES LIMITED

Production Process
Machining Lines

Receive Bought out


finished components

Crank Case

Storage

Cylinder
y
Head
Engine Assembly

Crank Shaft
Engine
Test

Engine
Paint

Cam Shaft

Connecting Rod

KIRLOSKAR OIL ENGINES LIMITED

Engine
Up fitment

Storage

Engine
Dispatch

Energy Management

KIRLOSKAR OIL ENGINES LIMITED

KOEL-- Energy Policy


KOEL
Energy Management Program Of
KOEL Has Driven With Respective To
Energy
gy Policy
Policy.
y.
Established On Global Energy
Scenario, Challenges & Revised Time
To Time As Essential
Energy
E
C
Conservation
ti
Obj
Objectives,
ti
Targets & Programs Are Derived In
Line With The Policies
Policies..
KOEL Policy Is Signed By Executive
Chairman - Mr
Mr.. Atul Kirloskar, This
Represents Strong Commitment
From Top Management To The
Subject
Energy Policy
First Published In 2003
3rd Revision In Dec 2011
KIRLOSKAR OIL ENGINES LIMITED

3rd
Revision
on 14th
Dec 11
Dec.11

ENCON Committee

ENCON
Team Kagal

ENCON
Team Pune

ENCON
Team Nashik

ENCON
Team Rajkot

ENCON Team
From Cross Functional Departments (at each Location)
Utility

Maintenance

Machine
Shop

Assembly

Genset
Plant

Finance

KIRLOSKAR OIL ENGINES LIMITED

HR

Admin

CPCP

Stores

Driving Mechanism
Annual
Assessment
for
Achievements
& Celebration

Annual
Budget &
Projects
Finalization

EMS
Monitoring &
p
g
Reporting

Projects Study,
Assignments to
Team &
Execution

Improvements
Th Kaizens
Thru
K i

KOEL
ENCON
Management

Training &
Awareness

Implementation
of Suggestions
From Employees

Cross
Funtional
Team Regular
Meetings

Monthly
Review By
Plant Head
External Audits
- Projects
Finalization &
Implementation

Bi-monthly
Review By
Executive
Director

KIRLOSKAR OIL ENGINES LIMITED

ENCON Part of Individual's PMS

KIRLOSKAR OIL ENGINES LIMITED

ENCON Part of Individual's PMS

KIRLOSKAR OIL ENGINES LIMITED

Specific
p
Energy
gy
Consumption Reduction &
Benchmarkingg

KIRLOSKAR OIL ENGINES LIMITED

Reduction in Specific Energy Consumption


Electricity (kWh / BHP)
6.17

200809
Production in
BHP
Addition of
Load in kW

900708

39%
Reduction
Over FY09.

KWh/BHP

3.86

3 73
3.73

3 72
3.72

200910

201011

2011-12

2989151

3579117

3033468

450

300

KIRLOSKAR OIL ENGINES LIMITED

Reduction in Specific Energy Consumption


Fuel (Liters / BHP)
16 %
Reduction
Over FY09

Liters /BHP
0.19
0.16

200809
Production in
BHP

900708

0.15
0 15

0.16

200910

201011

2011-12

2989151

3579117

3033468

KIRLOSKAR OIL ENGINES LIMITED

SEC Benchmarking

MNC Compititor 1

MNC Compititor 2

3.72

4.00

4.80

kWh / BHP

KOEL Kagal

* Source Data : MEDA Presentations


KIRLOSKAR OIL ENGINES LIMITED

CII
CII-- Code For Ecologically Sustainable
Growth - Benchmarkingg
Specific Consumption Of Energy And
Water

Reduce By 3-5% Every Year

Over Next Ten Years.

Specific Generation Of Waste & Waste


Reduce By 3-5%
3 5% Every Year
G i TTo LLand
Going
d Fills
Fill

Over Next Ten Years.

Use Of Renewables Energy

Increase By 5% Every Year

Over Next Ten Years.

GHG Emissions And Other Process


Emissions

Reduce
Red ce B
By 3
3-5%
5% Every
E er Year

O er Ne
Over
Nextt Ten Years
Years.

Recyclable And Enhance Recyclability Increase Use Of Recyclable And Enhance Recyclability Of
Of Resources
Resources Embedded In The Product.
Share Of Harvested Rainwater In The
Overall Annual Use Of Water

Increase By 5% Every Year

Life Cycle Assessment Criteria For


New Products.

Incorporate Life Cycle Assessment in Alternative


Technologies And Products.

Adopt Green Purchase Policy


Product Stewardship Program
Depletion Of Natural Capital

Over Next Ten Years.

Adopt Green Purchase Policy & Incorporate Clean


Technologies At Design Stage
Promoting & Managing Product Stewardship
Program, By Forging Partnership With Business And
Communities
Communities.
Reduce By 5% Every Year
KIRLOSKAR OIL ENGINES LIMITED

Over Next Ten Years

Energy Conservation
Projects

KIRLOSKAR OIL ENGINES LIMITED

Project Summary (2009 12)

Total No. of
Encon
Projects: 50

Annual
Energy
Savings in
kWh
(Units):
2.10 Mn.

Annual
Energy
Savings:
Rs. 11.75
Mn

Total
Investment:
R 13.36
Rs
13 36
Mn

KIRLOSKAR OIL ENGINES LIMITED

Simple
Payback :
14
Months.

ENCON Projects Zero Investment

SN

Title of Energy
gy savingg project
p j implemented
p

Machine Power Pack Motors interlocking with


machine cycle
Stop the wastage of metal halide lamps in Genset
2
shop floor

Year

Annual Electrical
Invest
Savings
Units
Rs
Rs
Mn
Mn
Mn

Payback
months
th

2009-10

0.004

0.309

Nil

Immediate

2009-10

0.017

0.104

Nil

Immediate

3 Logic for base flush coolant motor

2009-10

0.018

0.099

Nil

Immediate

4 Timer
Ti
f h
for
hydraulic
d li motor operation
i

2009 10
2009-10

0 004
0.004

0 022
0.022

Nil

I
Immediate
di

2010-11

0.099

0.567

Nil

Immediate

2010 11
2010-11

0 023
0.023

0 132
0.132

Nil

Immediate

2010-11

0.027

0.11

Nil

Immediate

2010-11
2010
11

0 09
0.09

0 036
0.036

Nil

Immediate

2010-11

0.002

0.013

Nil

Immediate

All Induction motor switched OFF, after machine


was idle for more then 5 min in RCC
Con rod Line power saving through logic
6
modification of Milling spindle.
Air supply shut down after machine was idle for
7
more then 5 min at RCC -13, CRS - 7.

8 OP 10A & OP 10B transfer cylinder air blocked


9

Replacement of sodium vapor lamps substation


area with energy efficient T-5 Lightings.

KIRLOSKAR OIL ENGINES LIMITED

22

ENCON Projects Zero Investment

SN

Title of Energy
gy savingg project
p j implemented
p

Year

Selector switch was placed on control panel for ON


2010-11
and OFF of work light
Logic modification for for hyd. & coolant motor to
11
2011-12
stop after 5 min idle running at Con Rod Line
Reducing the Pressure setting of Laser cutting
12 machine to Min Specified Pressure thereby
2011-12
reducing total plant pressure by 0.9 bar

10

13 Instead of two motor for coolant one motor


Power saving by modifying logic of PT line basket
operation
Power saving logic modification for RCH & HCH
15
OP90/120 Widma machine.
Gauging station at HCH & CON line power saving
16
through modifing circuit
circuit.

14

Annual Electrical
Invest
Savings
Units
Rs
Rs
Mn
Mn
Mn

Payback
months
th

0.001

0.001

Nil

Immediate

0.074

0.483

Nil

Immediate

0.060

0.390

Nil

Immediate

2011-12

0.018

0.117

Nil

Immediate

2011-12

0.016

0.105

Nil

Immediate

2011-12

0.007

0.043

Nil

Immediate

2011-12

0.002

0.011

Nil

Immediate

KIRLOSKAR OIL ENGINES LIMITED

Zero Investment Innovative Project


Program Modification
All Auxiliary equipments
All Auxiliary equipments
used to be ON during
get switched OFF after 5
Machine Idle time.
Mins of Idle time.

CNC Machines
Hydraulic Oil Pump 1

Panel Cooler

Logic Modification
Coolant Pump

Air Supply Valve

Hydraulic Oil Pump 2

KIRLOSKAR OIL ENGINES LIMITED KAGAL PLANT

Oil Chiller

Illumination lamp

24

ENCON Projects Low Investment

SN

Title of Energy saving project implemented

Use of regenerative load bank instead of resistive


load bank for 10 kVA-30 kVA
Air saving through pressure regulating flow control
2
valve on RCH OP-50
Speed reduction of blower motor of batch type
3
oven
Speed reduction of Blower motor on Pretreatment
4
Line

Year

Annual Electrical
Savings
U i
Units
R
Rs
Mn
Mn

Invest.
Rs
R
Mn

Payback
months

2009-10

0.041

0.245

0.025

2009-10

0.026

0.158

0.008

2009-10

0.026

0.158

0.058

2009-10

0.013

0.079

0.058

5 Use of Energy Efficient motor on Thermopac

2009-10

0.013

0.079

0.058

6 Reduce
R d
C
Consumption
ti off A
Auto
t conveyor motor
t

2009 10
2009-10

0 002
0.002

0 009
0.009

0 001
0.001

0.266

0.013

0 234
0.234

0 025
0.025

0.133

0.010

Use of regenerative load bank for 3 phase 220V 60


2010-11 0.046
HZ genset
Use of regenerative load bank instead of resistive
8
2010-11 0.041
0 041
load bank for single phase gensets in ME
Load optimization of LT 2.5 MVA transformers and
9
2010-11 0.023
stopping one 2.5 MVA transformer.
KIRLOSKAR OIL ENGINES LIMITED
7

ENCON Projects Low Investment

SN

Title of Energy saving project implemented

Con rod Line Coolant lift up pump power saving


through logic modification.
Use of regenerative load bank for testing 3ph, 220V,
11
60Hz gensets in ME Genset testing
Modification of Water line in Plant 2 to eleiminate
12
Pump Operation
Installation of humidity sensors in all AHU pump
13
motors
10

14 Installation of occupancy sensors in all toilets


Stopping of Fume collector during machine idle
time
For operating APG foot paddle was given to reduce
16
air consumption and leakage . op (10A & OP 100 )

15

17 Automatic
A
i timer
i
switch
i h ffor Li
Lightings
hi
iin Pl
Plant 2

Year

Annual Electrical
Savings
U i
Units
R
Rs
Mn
Mn

Invest.
Rs
R
Mn

Payback
months

2010-11

0.010

0.059

0.007

2010-11

0.063

0.025

0.008

2010-11

0.023

0.018

0.002

2011-12

0.010

0.068

0.036

2011-12

0.009

0.059

0.042

2011-12

0.006

0.037

0.001

2011-12

0.006

0.036

0.002

2011 12
2011-12

0 002
0.002

0 013
0.013

0 001
0.001

KIRLOSKAR OIL ENGINES LIMITED

Innovative Project - Use Regenerative Load Bank


For testing of Single phase Gensets (15 to 30 kVA) Genset Resistive
load banks were in used. In which Energy get wasted for testing.
Test Beds
d are shifted
h f d on Regenerative Load
d bank.
b k

Energy Savings
Calculations

Numbers of Testing of Single Phase Gensets @ 200 per


month.
Average units saved per Genset = 17 units
Total Saving per Annum : Rs. 0.234 Mn

KIRLOSKAR OIL ENGINES LIMITED

ENCON Projects Moderate Investment

SN

Title of Energy saving project implemented

Year

Annual Electrical
Savings
U i
Units
R
Rs
Mn
Mn

Invest.
Rs
R
Mn

Payback
months

1 VFD Installation for plant 2 compressor

2010-11

0.103

0.615

0.450

2 VFD installation for CPCP Screw Compressor

2010 11
2010-11

0 073
0.073

0 417
0.417

0 315
0.315

2010-11

0.072

0.413

0.220

2010-11
2010
11

0 058
0.058

0 333
0.333

0 250
0.250

2010-11

0.045

0.259

0.345

16

2010-11
2010
11

0 041
0.041

0 236
0.236

0 370
0.370

19

7 Replacement of Centrifugal Compressor Intercooler. 2010-11

0.031

0.179

0.175

12

8 Replacement of Low efficiency cooling tower pump 2010-11

0.029

0.167

0.290

21

0.025

0.143

0.400

34

Use of induction heating furnace for Crank shaft


Gear heating
VFD Installation for preheating blowers and
4
circulation blowers in Powder coating plant
Replacement of water pumps with higher efficiency
5
pumps with VFD control
Above 5 Hp Coolant motor power saving through
6
VFD interfacing in all 5C.
3

Installation of Fanless cooling tower for Small


engines with elimination of Varsha Cooling tower.

2010-11

KIRLOSKAR OIL ENGINES LIMITED

ENCON Projects Moderate Investment

SN

10

Title of Energy saving project implemented


VFD Installation for Burner blowers and dust
collector motor in CPCP ( 4 Motors)

Year

Annual Electrical
Savings
U i
Units
R
Rs
Mn
Mn

Invest.
Rs
R
Mn

Payback
months

2010-11

0.024

0.138

0.318

28

11 Installation of VFD for Cooling tower fan and pump

2010-11

0.019

0.112

0.232

25

12 VFD Installation for Shot blasting machine

2010-11

0.014

0.083

0.129

19

2010-11
2010
11

0 012
0.012

0 069
0.069

0 100
0.100

17

13

Shifting CPCP load to 500kVA Power house


transformer and stopping 1MVA Transformer.

KIRLOSKAR OIL ENGINES LIMITED

Common Fan-less Cooling Tower


Objective Of Energy Conservation Measure: Install Common Fanless Cooling Tower
Instead of Two for Fan & Pump Energy Saving with added Chemical Cost reduction

Saving
Calculations
Energy saving per
day 79.92 Units
Energy saving Units /
Annum 24 935 Units
Energy Cost saving /
Annum -Rs 0.143 Mn
Investment : Rs. 0.4
M with
Mn
ith Pack
P k back
b k
34 Months
KIRLOSKAR OIL ENGINES LIMITED

VFD For Screw Compressor


Objective of Energy Conservation Measure
Reduce Energy Consumption of Compressor

Use Feedback of Pressure thru Pressure


transducer & vary the motor speed to get
desired pressure & meet Air demand at end use

Energy savings

gy savingg 233 kWh ((Units)) p


Energy
per dayy
Energy Units saving per annum is 72700 kWh (Units)
Total cost saving per annum is Rs 0.42 Mn
Total Investment: Rs. 0.315 Mn
Simple Payback : 9 Months
KIRLOSKAR OIL ENGINES LIMITED

Replacement of Intercoolers for Centrifugal


p
Compressors
Objective Of Energy Conservation Measure:
Reduction In Inter Stage Air Temperature By 10OC by Replacing the
Intercooler of Compressor, Energy Consumption also get Reduced
Energy savings Calculations
Energy saving observed per day : 100 Units
Energy saving / month observed 2600 Kwh
Energy Cost saving per month

: Rs 0.015 Mn

Total Annual Energy Cost saving : Rs 0.179 Mn


Total Investment

: Rs. 0.175 Mn

Simple Payback

: 12 Months
KIRLOSKAR OIL ENGINES LIMITED

ENCON Projects High Investment

SN

Title of Energy saving project implemented

Installation of Polycarbonate roofing sheets to


utilize Daylight
Replacement of 5 MVA transformer with low loss
2
transformer
Installation of Separate Lighting Stabilizer for
3
lighting load and other single phase equipment's.
Above 5 HP Coolant motor power saving through
4
VFD interfacing in 5C (Total 6 m/cs ) .

Year

Annual Electrical
Savings
U i
Units
R
Rs
Mn
Mn

Invest.
Rs
R
Mn

Payback
months

2010-11

0.321

1.841

4.897

32

2010-11

0.034

0.182

2.300

152

2011-12

0.301

1.956

1.650

10

2010-11

0.065

0.374

0.562

18

KIRLOSKAR OIL ENGINES LIMITED

Polycarbonate Sheets for Day Light

Savings
Calculations

Energy saving due to utilization of High-bay Lamps per day : 1030 kWh
Energy saving: 26780 kWh (Units) / Month
Cost Saving / Month
h is - Rs. 0.153 Mn
Total cost Saving / year - Rs 1.85 Mn
Total Investment: Rs. 4.90 Mn
Simple Payback : 32 Months
KIRLOSKAR OIL ENGINES LIMITED

Innovative Project Energy Saving Panel


for Single Phase Loads
Main Control Panel

MLDB Main Plant

MLDB Genset Plant

Offices Panel

KIRLOSKAR OIL ENGINES LIMITED

Street Lighting Panel

Innovative Project Energy Saving Panel


for Single Phase Loads
Main Control Panel

MLDB Main Plant

MLDB Genset Plant

Offices Panel

KIRLOSKAR OIL ENGINES LIMITED

Street Lighting Panel

Innovative Project Energy Saving Panel


for Single Phase Loads

650 kVA ES Panel for MP1


& Genset
G
t Load
L d

60 kVA ES Panel for CPCP


& Power House

Units Saving Per


Month

17220

1195

Units Saving per


Annum

206640

14350

Energy Cost Saving per


Annum

Rs. 1.36 Mn

Rs. 0.095 MN

KIRLOSKAR OIL ENGINES LIMITED

Major ENCON Projects During Expansion Projects


- FY12
Air Dryer

T5- Lighting

5-Star AC

AHU with VFD

Spiral Duct - Inside Insulatio

In New Dining & Kitchen, T5 Energy Efficient Tube lights


Energy Efficient Air Conditioning Unit with high efficiency
for MP1 Building
For Plant3, Compressor with high Energy Efficient Motors
Energy Efficient Dryer for Air Compressor
All ACs procured with 5 Star rated efficiency
Machine Shop AHU with VFD installed
New Spiral ducting having internal insulation introduced
For Dining 5 star rated Fans
KIRLOSKAR OIL ENGINES LIMITED

5-Star Rated Fan

Saving Achieved Thru New Energy Efficient


Equipment's During Project Stage
GENSET AHU-1 Consumption
80801

GENSET AHU2 Consumption


76128

27665

Saving Achieved Thru


kWh/Year If Energy
kWh/Year
Efficient
would
not
implemented
Equipments
Installation in
implemented Project Stage

Humidity Sensors

23436

kWh/Year If
would not
implemented

15392

kWh/Year
implemented

25956

kWh/Year If
kWh/Year
would not implemented
@implemented
2.35 Lacs Units per

O Annum
Occupancy
SSensors
A
18448
9225

kWh/Year If
would not
implemented

KIRLOSKAR OIL ENGINES LIMITED

kWh/Year
implemented

Waste Recovery Projects

KIRLOSKAR OIL ENGINES LIMITED

Steps Taken To Recover Energy Generated In


Testing
Electricity Generation By Utilizing Waste Energy During Engine Testing Process. More Than
3.03 Lac Units of Energy Generated in FY12

KIRLOSKAR OIL ENGINES LIMITED

Reduce Component Weights to Reduce


Machining Time, Waste & Energy
Net
NEW
Weight
Initiatives to Reduce the weight of Crank Case Previous
Weight
Castings without affecting Reliability.
Reliability
Weight (Kg)
Reduction
(Kg)
(Kg)
16
2R1040 CRANK NCASE
94
78
19
9
3R 1040
040 CRANK CASE
CAS
117
7
98
15
4R 1040 CRANK CASE
136
121
5
HA2 CRANK CASE
56
51
26.5
HA3 CRANK CASE
98
71.5
24
HA4 CRANK CASE
122
98
23
HA5 CRANK CASE
147
124
23
HA6 CRANK CASE
168
145
16.8
RB 22 CRANK CASE
63.8
47
13
RB 33 CRANK CASE
79
66
30
6R CRANK CASE
204
174
5
6R HEADER
9
4
10
SL90 CRANK CASE
238
228
KIRLOSKAR OIL ENGINES LIMITED

Improve OLE by Improving Maintenance


gy Wastage
g
Performance to Reduce Energy
MTBF - GENSET

MTTR - GENSET

MTTR in Hrs.

3.0
2.8
2.6
2.4
2.2
2.0
18
1.8
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0.0

1.7

1.55
1.16 1.25 1.18
0.73

1.09

0.94

0.87

0.74

0.59

0.91
0.59

Avg. Avg. Apr-11 May- Jun-11 Jul-11 Aug-11Sep-11 Oct-11 Nov-11Dec-11Jan-12 Feb-12Mar-12
09-10 10-11
11

Avg. 09-10

MTTR

90

85

85

85

85

85

85

85

85

85

85

85

80
Y-09 Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar10 10 10 10 10 10 10 10 10 11 11 11
Avg 09-10

TARGET

OLE

401

394

395

406.0

393
392 395 401 396
399

Avg. 09-10

94
85

410.0

392

405

395

Avg. Avg. Apr-11 May- Jun- Jul-11 Aug- Sep- Oct-11 Nov- Dec- Jan09-10 10-11
11
11
11
11
11
11
12

Target

OLE -4R Assembly Line


100

MTBF in Hrs.

1.9

500.0
450.0
400.0
350 0
350.0
300.0
250.0
200.0
150.0
100.0
50 0
50.0
0.0

MTBF

Feb- Mar12
12

TARGET

Reduction in Overall Down time


Reduction in Repairs time
Analysis of Breakdown root causes &
eliminate
Training & Awareness
Coordination with Support
D
Department
t
t
Actions Review & Close Monitoring

KIRLOSKAR OIL ENGINES LIMITED

Energy Monitoring &


Reporting

KIRLOSKAR OIL ENGINES LIMITED

Schematic of Energy & Utility Management


System
I - Power EMS

RS 232 to RS 485 Data


Converter

Utility
Electricity

Main
Plant
Electricity

Gen-set
Plant
Electricity

Storage
Tank
levels

Diesel Flow

KIRLOSKAR OIL ENGINES LIMITED

Air Flow

Energy Consumption Monitoring & Reporting


Energy Monitoring System:

KIRLOSKAR OIL ENGINES LIMITED

Energy Monitoring Devices


1)
2))
3)
4)
5)

Energy Meters
122 Nos.
Air Flow meters
11 Nos.
Diesel Flow Meters
4 Nos.
Water Flow Meters
44 Nos.
Local Flow-meter Displays (Air, Water, & Diesel
Total 17 Nos) for User Monitoring
6) Single
Si l point
i t Computer
C
t display
di l att Utility
Utilit section
ti
(Energy Monitoring Software)of all flow meters
and Energy Meters.

KIRLOSKAR OIL ENGINES LIMITED

Additional Flourishing Actions In Metering


New Meters Added (20#) For Power House & CPCP Plant for More
Detailing Of Energy Consumption at Various Load Centers
For detailed Water Consumption Monitoring New 20 Meters
Installed
Report Formatting Changed with Target Included (Trials Is In
Progress)
Air Flow Monitoring Started
Fuel Consumption Monitoring Accuracy Improvements Done
All Real & Historical Energy Consumption Data from all Meters are
connected to the EE-Lan
Lan Software.
Software
KIRLOSKAR OIL ENGINES LIMITED

Auto Generated Report (Daily)

KIRLOSKAR OIL ENGINES LIMITED

Demand Management
Maximum Demand (kVA) - FY12
6000
5000
4000
3000
2000
1000
0
April'11May'11June'11 July'11 Aug'11 Sep'11 Oct'11 Nov'11 Dec'11 Jan'12 Feb'12 Mar'12
Sanctioned Demand (kVA)

50% of SD

Power Factor - FY12


1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

0.99

1.00

1.00
1.00

Max Demand (KVA)

0.98
0.97
0.96
0.95
April'11May'11 June'11 July'11 Aug'11 Sep'11 Oct'11 Nov'11 Dec'11 Jan'12 Feb'12 Mar'12
Power Factor

KIRLOSKAR OIL ENGINES LIMITED

Energy Balance
Total - Energy Balance
Fixed

Variable

Khadki Units
6%
4%

Fixed Energy Balance

90%
Administration building

ETP

Fire Hydrant

31%

1%

Power House

2%

Central Kitchen

41%
25%

KIRLOSKAR OIL ENGINES LIMITED

Energy Balance
Variable Energy Balance
Machine Shop

Medium Engine
9%

GENSET
12%

19%

60%

KIRLOSKAR OIL ENGINES LIMITED

Small Engine

Energy Monitoring Chart - Formats


Energy Monitoring Format used by each Area ENCON representative
Description

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Area/Section :Energy
Consumed
in (kWh)
Cumulative
Energy
Consumed
in (kWh)
Production
Quantity
Cumulative
Production
Quantity
SEC

KIRLOSKAR OIL ENGINES LIMITED

Jan

Feb

Mar Total SEC

Energy Saving Reporting Format


Location

Title

Description of the energy conservation measure:

Picture before modification

Picture after modification

Total investment in Rs.


Annual Savings in Rs
Payback Period
Implementation Date:
Energy savings Calculations

Estimated Annual Energy Savings

KIRLOSKAR OIL ENGINES LIMITED

Technology

SEC Monitoring Load Center Wise

KIRLOSKAR OIL ENGINES LIMITED

SEC Monitoring Load Center Wise

KIRLOSKAR OIL ENGINES LIMITED

Water Conservation &


Management

KIRLOSKAR OIL ENGINES LIMITED

Water Conservation
Year
2008 2009
2009 2010
2010 2011
2011 2012
2012 2013

SWC - Engines (Lit/BHP)


Target
Performance
50
50
20
19
18
17
16 5
16.5
31
30.4

SWC Reduction Target not achieved because of Increase


Water Consumption
p
substantiallyy for New Kitchen,, which
has started for employees to get Fresh & Hot Food
(Breakfast & Meals) for All Shifts
KIRLOSKAR OIL ENGINES LIMITED

Rain Water Harvesting


Rain Water Harvesting: 14 lacs Rs Spent last year for collection of Rain water, Total
80,000 M3 of rain water can be stored.

KIRLOSKAR OIL ENGINES LIMITED

Environmental
Improvements

KIRLOSKAR OIL ENGINES LIMITED

Kagal Plant Green Initiatives

Total Land Area

M2

650,900
,

650,900
,

Total Built-Up
Area

M2

55,688

72,797

Plantations
Area

M2

101,000

101,000

No. Off Trees

Nos.

5,097

7,245

M2

3,346

3,483

Natural Grass

M2

12,506

11,582

Rainwater
Harvesting

Mn Ltr.

18.35

18.35

Lawn

KIRLOSKAR OIL ENGINES LIMITED

Plantation on Occasions of World Environment Day

KIRLOSKAR OIL ENGINES LIMITED

Other Environmental Improvements

Packaged type Domestic


Effluent treatment Plant

Genset Test beds


Ventilation System

Industrial Effluent
Treatment Plant.

Machine shop
p Spot
p
cooling System.
KIRLOSKAR OIL ENGINES LIMITED

Oily Water separation


unit for Compressors

ETP Chemical Dosingg


System

Green Energy

KIRLOSKAR OIL ENGINES LIMITED

Renewable Energy Projects


Installation Site
Pachphatta
Nashik
Maharashtra

Wind Mill Capacity

7 x 800 KW

5.6 MW

Investment
in Rs. Mn.

Expected Annual
Generation in kWh
Units

266.00

11.20 Mn

KIRLOSKAR OIL ENGINES LIMITED

Renewable (Windmill) Energy Performance


2009-10
Type of
RES

Wind

Installed
Energy
Capacity
Generated
in kW
(kWh)
5600

3757342*

Annual
Savings
(Rs. Mn)
19.01

2010-11

2011-2012

Energy
Annual
Energy
Generated Savings Generated
(kWh)
(Rs. Mn)
(kWh)
4015090*

21.27

4719173*

* 50% Energy Considered for KAGAL Plant as decided

KIRLOSKAR OIL ENGINES LIMITED

Annual
Savings
(Rs. Mn)
28.92

Wind Mills
MillsBenefits of Green Energy
Windmill Details FY-12
WEC Name Generation (KWH) Capacitor Factor Machine Availability % Grid Availability %
KOEPP_01
1293016
18.40
97.35
99.05
KOEPP_02
1723153
24.52
99.21
99.05
KOEPP_03
1786210
25.42
98.13
99.00
KOEPP 04
KOEPP_04
1762708
25 08
25.08
98 90
98.90
99 00
99.00
KOEPP_05
1771483
25.21
98.36
98.98
KOEPP_06
1543982
21.97
97.53
99.00
KOEPP_07
1536776
21.86
98.12
99.00

CDM Benefits For Wind Power ProjectKOEL is getting the benefits of emission reductions thru appointed M/s E
& Y, Mumbai. Under the Voluntary Carbon Standards 2007, KOEL submitted
project development documents to VCS. For validating the emission
reductions, KOEL has appointed Perry Johnson.
In Dec 11, KOEL has received first VER benefits of worth Of Rs.
11,696/KIRLOSKAR OIL ENGINES LIMITED

Total GHG Emission Reduction (Scope I & II)


kg / BHP of Engine

12.13 %
Reduction
over PY

4 00
4.00

3.35

3.00
2.97

2.00
kg / BHP of Engine

2.94

09 - 10

10 - 11

11 - 12

2.97

3.35

2.94

KIRLOSKAR OIL ENGINES LIMITED

Second - Corporate Sustainability


Report

Industries recognizing the Needs of Addressing the Environmental and Social


Impacts of their Activities & these Impacts with Profits are Popularly Known as
the 'Triple Bottom Line' Issues Of Sustainable Development.
KOELs Corporate Sustainability Reports on GRI- G3 Guidelines are Released to
Public Domain for Years FY10 & FY11 Magnificently
KOEL is The First Engine Manufacturing Company In India, Who Released The
Corporate Sustainability Report & Received Highest Level Check Certification
Of A+ after being Validated By Global Reporting Initiative (GRI), Netherland
KIRLOSKAR OIL ENGINES LIMITED

Carbon Foot Print Assessment Report


Carbon Foot-print Assessment being undertaken by KOEL is pioneering
efforts in their sector
An
A integral
i
l step for
f its
i future
f
carbon
b strategy, which
hi h helps
h l to KOEL to
be advanced prepared for Emission Based Regulations
Also, It reap business benefits out of the Green Movement
The exercise add tremendous value to brand KOEL & it will also help
KOEL to identify:
GHG intensive
i t i areas off their
th i GHG intensive
i t i sites
it and
d operations
ti
Opportunities for reducing emissions & costs
Strategize its operations to abide with new national and international
regulations
Ways to achieve the target of reducing its environmental footprint

Reports for year 2009-10 & 2010-11 were released


KIRLOSKAR OIL ENGINES LIMITED

Corrective Preventive
Actions

KIRLOSKAR OIL ENGINES LIMITED

ENCON Corrective Preventive Actions

Project

Problem

Corrective
Actions

Preventive
Actions

Installation Of Stabilizer For Lighting


Objective:
j
Reduce Operating
p
g Voltage
g From 245 V To 210 V To Save Energy
gy
By 15% For Lighting
Reduction In Voltage By 15%, Causes Switching Off Some Lamps Creating
Dark Zones.
Zones
Ballasts (Chokes) & Igniter Found Weaken Due To Continuous High
Operating Voltages
Voltage Reduction Done Up To 220 V Instead Of 210 V (By 10.2%)
Replacement Of Ballasts & Igniter For Those Lamps Are Done
Study Carried Out For All Lamps For Those, Ballast & Igniter Needs To Be
Replaced
Replacement Started & Now Operating Voltage Can Be Further Reduced

KIRLOSKAR OIL ENGINES LIMITED

ENCON Corrective Preventive Actions

Project

Installation of Common Fan-Less Cooling Tower for two product test beds.
Objective: Reduce Energy Consumption for 2 different conventional cooling
towers of fans & pumps by Single Fan-less
Fan less Cooling tower with two lower
HP pumps

Problem

Failure: Less water flow to one shop


p due to insufficient suction
The reason is common header for both pumps & low pipe size designed
than actual required

Corrective
actions

One conventional cooling tower started with keeping cooling fan off
Suction for fan-less cooling tower throttled to desired output yields in 65%
of saving targeted

Preventive
actions

Additional suction pipeline to pump for cooling tower basin planned


Work is in progress

KIRLOSKAR OIL ENGINES LIMITED

Energy Efficient Products

KIRLOSKAR OIL ENGINES LIMITED

Energy Efficient Products


Our Constant Endeavor To Develop Efficient And Environment
Friendly Products, & Our Typical Focus On The Following Areas

Upgrading
Technology

Improving Present Designs To Reduce The


Consumption Of Naturally Available Fuel And
Lubricating Oil

Improving Power
To Weight Ratio

Reducing Required Raw Material, to Develop


the Same Power Output From The Engine.

Emissions
Reduction

All Engine Series Comply With The Currently


Applicable Emission Norms
The Process Of Being Ready for The Next
Generation Of Emission Norms.
KIRLOSKAR OIL ENGINES LIMITED

Energy Efficient Products to Market


9 KOEL had set a new benchmark in the Power Generation
market by launching of 32 kVA / liters Power Density Engine
9 4R-1040
4R 1040 Engine
E i series
i to
t 4 valves/cylinder
l / li d to
t meett forthcoming
f th
i
Emission Norms with improved Fuel Efficiency.
kVA rating Present Engine

Product with New K1080 engine

100

6R1080TC 6 cylinder
Turbocharged, inline, 6.32 Liters

4K1080TA 4 cylinder Turbo after


cooled, inline, 4.32 Liters

12
125

6R1080TA 6 cylinder
li d TTurbo
b after
f
4K1080TA 4 cylinder
li d TTurbo
b after
f
cooled, inline, 6.32 Liters
cooled, inline, 4.32 Liters

140

6SL90TA - 6 cylinder Turbo after


cooled, inline, 8.86 Liters

6K1080TA 6 cylinder Turbo after


cooled, inline, 6.32 Liters

160

6SL90TA - 6 cylinder Turbo after


cooled, inline, 8.86 Liters

6K1080TA 6 cylinder Turbo after


cooled, inline, 6.32 Liters

KIRLOSKAR OIL ENGINES LIMITED

Renewable Energy Product - Kirloskar Sanjeevani


Sanjeevani means one that gives life
Designed as home energy system for rural and semi-urban
households
Hybrid system that combines two renewable energy sources viz. Biogas
and solar consists of
9 Primarily of A biogas digester of capacity two thousand liters / day
9 Solar photovoltaic of 9 wp with 2 lanterns lighting of up to 8 hrs
Availability for feed like cow dung and food
waste
Easily produce sufficient biogas to fulfill the
cooking requirements of A small family.
The system is provided with accessories such as
suitable biogas burners along with appropriate
plumbing for domestic use.
KIRLOSKAR OIL ENGINES LIMITED

Training & Awareness

KIRLOSKAR OIL ENGINES LIMITED

ENCON Week Celebration 14th 21st Decemeber

Encon Week
KIRLOSKAR OIL ENGINES LIMITED

Efforts / Plans / Programs For Increasing


Awareness
Celebration of National Energy Conservation Day & Week
Every year 14th Dec is celebrated as a "National Energy
Conservation Day"
And 14-20
14 20th Dec as Energy Conservation Week

KIRLOSKAR OIL ENGINES LIMITED

80

Programs and Activities In ENCON Week

Oath Program
Quiz Competition
Poem Competition
Poster Competition
Suggestions
Projects
Seminar for Suppliers.

Encon Week Competitions Response

Poem Competition
Poster Competition
Suggestions
Projects
Slogan
Totall
ENCON Week Competition Award Distribution

KIRLOSKAR OIL ENGINES LIMITED

- 54
- 45
- 13
- 04
-152
- 268

Corporate Social
Responsibility

KIRLOSKAR OIL ENGINES LIMITED

ENCON Efforts Extended to Suppliers & Vendors


Seminars thru External Agencies were
organized
g
for Suppliers
pp
to initiates
ENCON activities
Some of Important Seminars from
Siemens
IPCPL
Baldor
KBL
Recon Consultant
Enthusiastic response
p
received from
Suppliers & Vendors
For FY13 - Energy Conservation Audits are
Scheduled thru ENCON team & External
agencies for benefit of Suppliers
KIRLOSKAR OIL ENGINES LIMITED

ENCON Efforts in Community

ENCON Poster Competition


p
at Talangade
g
Village for School Children

KIRLOSKAR OIL ENGINES LIMITED

FY12 Accolades KAGAL Plant

KOEL, Kagal received Excellent Energy


Efficient Unit Award by CII

KOEL is honored by Sustainability Award


Sustainability Initiatives & Sustainability
Report organized by Mahindra & Mahindra
Ltd.

KIRLOSKAR OIL ENGINES LIMITED

Top 10 Projects Planned for next 3 yrs.


1.

100kW Grid- connected Concentrated Solar Photo Voltaic Power Plant

2.

Solar Energy based Steam generation system for Cooking application.

3.

Briquette Fired Thermopack for Paint Shop & Component washing machines

4.

Heat recovery from Exhaust gases generated during Engine Testing Process.

5.

Speed Reduction of Centrifugal compressor by using V.F.D.

6.

Heat pump application for heating system for Washing machines.

7.

Installation of Solar Street Lights on South Side 250 m Long road.

8.

Replacement of Street lights with LED type Light Fittings

9.

Replacement of High Bay Lights with LED Lights

10. Energy Efficient Equipment's for New Project Buildings


KIRLOSKAR OIL ENGINES LIMITED

KIRLOSKAR OIL ENGINES LIMITED