New Installations
New
Installations
Non-Steering
Methods
Moling/Piercing
Pipe Ramming
Auger Boring
Pipe Jacking
Steering
Methods
Microtunnelling
Horizontal Directional Drilling
Pipe Jacking
Pipe Jacking
Person entry
Pipe Jacking
Pipe Jacking
Types of Tunneling
Hand mining
Liner Plate
Jack Reinforced Concrete Pipe
Jack Steel Liner
Cap and Leg (Wood Lined Tunnel)
10
11
12
14
Hand Excavation
15
16
19
20
10
Other Forces
21
11
12 to 19mm plywood
12 to 25mm manila rope, jute, oakum
23
24
12
25
26
13
2.
3.
14
Jacking Pipe
REINFORCED
CONCRETE PIPE
CLAY PIPE
29
15
31
PIPE JOINTS
32
16
Pipe Joints
33
PJ Applications
34
17
PJ Advantages
Quick set-up
When grade is critical
Versatile in various ground conditions
Cost efficient for large diameter pipe
Small surface settlements
35
PJ Limitations
Rock
Soft Soil
Water Table
18
New Installation
Steering Methods
Microtunnelling
Horizontal directional drilling (HDD)
37
Microtunnelling
New
Installations
Non-Steering
Methods
Moling
Pipe Ramming
Auger Boring
Pipe Jacking
Steering
Methods
Microtunnelling
Horizontal Directional Drilling
38
19
Microtunnelling
Microtunnelling
Non-person entry
Machine excavated
(mini TBM)
Remote controlled
Similar to pipe jacking
Pipe OD less than 1.0m
40
20
Chunnel
people
41
Microtunnelling
42
21
Microtunnelling
43
Microtunnelling
44
22
Microtunnelling
46
23
47
48
24
Jacking System
49
History
25
History
First Microtunnelling project in North
America
Second project
Bridgeport CT in 1986
3610 feet of 72 inch pipe
51
History
As of October 1996
52
26
MT Classification Methods
Slurry method
Auger method
53
Slurry Method
27
Slurry Method
LOVAT MTS 1000
55
Slurry Method
56
28
Slurry Method
Slurry Method
58
29
Lubrication System
Typical system components:
Variable speed discharge pump
Charge pump
Intermediate pumps
Flow meter
Flow controller
Pit by pass to permit diversion of flows
Piping, flexible hoses and cabling
59
Slurry Separation
Typical separation plant components:
Vibrating screens
Settlement tank
60
30
Slurry System
61
Auger Method
62
31
Auger Method
63
Auger Method
LOVAT MTS 1000
64
32
65
66
33
Phase I
67
Guidance System
68
34
Phase I
69
70
35
71
Phase II
72
36
73
Phase II
74
37
75
76
38
77
78
39
79
Phase III
80
40
81
MT Equipment Selection
Type of soil/rock
41
MT Equipment
83
MT Advantages
42
MT Advantages
Worker safety
No ground surface settlement
85
MT Disadvantages
86
43
Microtunnelling Pipe
87
Other Recommendations
88
44
Safety Precautions
89
MT Risks
Pipe diameter
Length
90
45
Cost
50 to 100k
Depends on groundwater, depth & soil
conditions
Microtunnelling in KL
92
46
Microtunnelling in KL
93
Microtunnelling in KL
EXIT SHAFT
94
47
Microtunnelling in KL
95
48