You are on page 1of 14

METSO

EPT

PROJECT

KOHINOOR EVAPS

Doc.NO

P0073930

SUBJECT

Wind load caculation of Vertical Vessel

REFERENCES

Fig1 of IS:875-1987
Table 1of IS:875-1987
Cl5.3.3of IS:875-1987
Cl 5.3 of IS:875-1987
Cl 5.4 of IS:875-1987

DESIGN CALCULATION
WIND LOAD CALCULATIONS
GENERAL DATA
Location
Design Wind Load

=
=
=

K1

Risk Coefficient
Topography factor

K3
Vz
Pd

Design of Wind Speed


Design Wind Pressure

=
=

1.00
Vb k1 k2 k3
0.6*Vz2
Pd
KN/m2

Sl .No.

Ht. From G.L


(m)

1
2
3

10
13.2
13.55

0.98
1.0056
1.0084

52.92
54.30
54.45

1.68
1.77
1.78

15

1.02

55.08

1.82

20
25.6

1.05
1.078
h
d1
d2

56.70
58.21
=
=
=
=

1.93
2.03
25.6
3
2.6
8.534

5
6
Height of the Structure from G.L
Bottom dia of stack
Top dia. of stack
Building Height Ratio Cf

Terrain Factor
Vz
K2
(m/s)

ASSAM
50
1.08

(h/w)

Force Coefficients
Category: As per Table 23 of IS 875 Part 3
Building height Ratio Lies At

5 TO 10
2.6meter

3 meter

Calculation of Static Wind load


Pst, K

Cl 8.2.3 of IS 6533 (Part 2) : 1989


Where,
Pst, K
hk
dk
C

C.qk .hk dk

- static wind load acting at the midpoint of Kth zone, in N


qk - static wind pressure at the midpoint of Kth zone, in Pa:
- height of Kth zone strip, in meters,
- external diameter of stack of Kth zone, in meters taking into account stackes.
- shape factor for chimney which may be taken as 0.7 for cross section,

METSO
EPT

PROJECT

KOHINOOR EVAPS

Doc.NO

P0073930

SUBJECT

Wind load caculation of Vertical Vessel

REFERENCES

DESIGN CALCULATION

1
2
3
4
5
6

hk

dk

qk

(m)
2.7
3.2
0.35
1.45
5
5.6

(m)
3
3
2.8
2.6
2.6
2.6

(m2)
1.68
1.77
1.78
1.82
1.93
2.03

C
0.87
0.87
0.87
0.87
0.87
0.87
Total horizantal load

Load distribution
S.NO

FORCE KN

P1
P2
P3
P4
P5
P6

11.84
14.78
1.52
5.97
21.82
25.75
81.68

DISTANCE M
8.65
11.6
13.375
14.275
17.5
22.8

BM

KN-M

102.42625652
171.41063914
20.288202129
85.226731501
381.78426195
587.20773315
1348.3438244

Horizontal force due to wind per column


Moment due to wind per column

=
=

40.84
674.17

Col to Col distance

2.12

318.0

Uplift or down ward load

METSO

DATE
KOHINOOR EVAPS

15/07/16

P0073930

REV

Wind load caculation of Vertical Vessel

DESIGN CALCULATION

m/sec

m/sec
N/m2

m
m
m

7.3

METSO

DATE
KOHINOOR EVAPS

15/07/16

P0073930

REV

Wind load caculation of Vertical Vessel

DESIGN CALCULATION
Pst, K
(KN)
11.84
14.78
1.52
5.97
21.82
25.75
81.68

P6
P5
P4
P3
P2
P1
KN
KN-M
meter
KN

G.L

BGR ENERGY SYSTEMS LTD


POWER PROJECTS DIVISION
METSO
KOHINOOR EVAPS
P00073930

EPT
Reference
SEISMIC LOAD (SL)

EVALUATION OF BASE SHEAR BY SEISMIC COEFFICIENT METHOD AS PER IS - 1893, PART IV - 2005
Input Data:D

Base shell diameter

Base shell thickness

total height of stack

3.000 meter
10 mm
19.020 meter

Z- Zone factor

0.360

I - Factor for importance of structure

1.500

R- Response reduction factor

4.000

Wt - Wt, of shell
Table 6 of IS1893 p4

55.2 M.T

552 KN

CT -

Co-efficient depending on the slednerness ratio

ES -

Modulus of elasticity of material

Area of c/s at the base of the stack

0.723 m2

0.100 sec

2.500

0.169

Cl. 14.1 of IS1893 Pt 4 2005

CT

36.675
200000000 KN/m2

Wt * h
ES * A * g

Where,
T

fundatmental natural time period for stack

CT =

coefficient depending on the slenderness ratio of the structure given table 6

Wt =

total wt, of structure including weight of lining and contents abvoe the base,

height of structure above the base,

Es =
A

modulus of elasiticy of material of structural shell,

area of c/s at the base of structural shell,


for cicular sections, A=P2rt, where, r is the mean radius of strucral shell
and t its thickness and

acceleration due to gravity, 9.81 m/s2

T- Fundamental natural period


Page16 of IS1893 P1

Sa/g is determined for medium soil sites as per the formula given below
Sa/g = 1+ 15 T ,

where T, 0.00 <=T<=0.10

Sa/g = 2.5 ,

where T, 0.10 <=T<=0.55

Sa/g = 1.36 / T ,

where T 0.55 <=T<=4.00

where T = fundatmental natural time period of structure


Sa/g, spectral acceleration coefficient along X - Direction
DESIGN SPECTRUM i.e Design Horizontal Seismic Coefficient,
Cl. 8.3.2 Part 4

Ah

Z
2

I
R

Sa
g
Ah

Cl. 17.1 of Part 4

Cv .Ah.W t .Dv

Ah.Wt .h.Dm

Where,
Cv
Ah
Wt

coefficient of shear force depending on slenderness ratio k given in Table 6

1.238

design horizontal seismic coefficient

0.169

total weight of shell including weight of lining and contents above the base

552

Dv & Dv =

distribution factors for shear and moment respectivbely at a distance X from the top
as given in Table 10.

115.34

KN

1771.71

KN-M

Horizontal force due to wind per column


Moment due to wind per column

=
=

Column center to center

Uplift or downward load per column

57.67
885.86
2.12
417.86

KN
KN-M
meter
KN

15 Jul 2016
Rev.0

5.9 0.35

12.77

2.6

METSO
EPT

PROJECT
Doc.NO
SUBJECT

REFERENCES

DESIGN CALCULATION

Length,l = 550
From STTAD output
From STTAD output
From STTAD output

Input
Max. Bending Moment
Maximum Uplift force
Maximum Shear
Base plate length, l
Base plate width, b
Bolt center to center,c
Bolt projection, a
Grade of Concrete,
bc =
No. of bolt in width side
Bolt Type

272400
1536.43
1484
550
550
400
75
25
60
3
A307

kg-cm
kg
kg
mm
mm
mm
mm

kg/cm2
Nos.

Taking moment about anchor bolt,


1/2 x 60 x K x (47.5)^2 x 550 (1-K/3) + 1536.43 x 20 = 272400
K =
0.066
Kh =
3.153
Tension of bolt
Tension, T
Tension per bolt, Tb

0.5 x bc * kh * b * + T
6739
kg
2246
kg
945
kg/cm2

Limiting stress in steel bolts


FDN BOLT DIAMETER
Area of fdn bolt requried, Ast
Dia. of bolt requried, db
Provided dia.of bolt db

=
=
=

2.38
1.7
3.9

cm2
cm
cm

Thk. of base plate

1.71

cm

Provide base plate thk.

42

mm

kg/cm2

BASE PLATE THICKNESS

FDN BOLT LENGTH

Table 21 of IS:456

Bond Stress, fs
Length of bolt required ,

Tb = x d x lb x fs
lb =

1.18

cm

Provide the length of bolt =

400

mm

kh

DATE

28/12/11

REV

Width, b = 550

Length,l = 550

kh
bc
h

O.K

O.K

METSO

EPT

KOHINOOR EVAPS
P0073930
LOADING DATA FOR COLUMNS

PROJECT
DOC
SUBJECT

Cloumn Mark

Fx

LOAD CASE
DEAD LOAD
LIVE LOAD

A1

WIND LOAD ALONG X-DIRECTION


WIND LOAD ALONG Z-DIRECTION

378.50

-24.72

-120.44

-131.64
-140.58

SEISMIC LOAD ALONG Z-DIRECTION

-153.64

-0.04

146.05

378.50

-24.69

120.44

-131.64

WIND LOAD ALONG X-DIRECTION


WIND LOAD ALONG Z-DIRECTION
SEISMIC LOAD ALONG X-DIRECTION

-28.82

140.58

SEISMIC LOAD ALONG Z-DIRECTION

-153.64

0.04

146.05

DEAD LOAD
LIVE LOAD
WIND LOAD ALONG X-DIRECTION
WIND LOAD ALONG Z-DIRECTION
SEISMIC LOAD ALONG X-DIRECTION
SEISMIC LOAD ALONG Z-DIRECTION

378.50

-24.72

-120.44

131.64

-28.86

-140.58

153.64

-0.04

146.05

378.50

WIND LOAD ALONG X-DIRECTION

-24.69

120.44

WIND LOAD ALONG Z-DIRECTION

131.64

SEISMIC LOAD ALONG X-DIRECTION

-28.82

140.58

SEISMIC LOAD ALONG Z-DIRECTION

153.64

DEAD LOAD
LIVE LOAD
B2

146.05

-28.86

LIVE LOAD

B1

kN

0.04

SEISMIC LOAD ALONG X-DIRECTION


DEAD LOAD

A2

Fy

kN

1
A

2120 mm

2120 mm

550 x 550 mm x
32Thick Base Plate

4 - 32 mm dia. Anchor bolts

400

550

400

550

DATE :
28-Dec-11
REV
A

PS

OLUMNS

Fz

Mx

Mz

kN

Kn-m

kN-m

0.04

0.03

-0.02

45.27

-24.71

-33.40

52.84

-28.84

-38.99

0.04

0.03

0.02

45.26

-24.71

-33.40

52.82

-28.84

-38.99

-0.04

-0.03

-0.02

45.27

-24.70

-33.40

52.84

-28.83

-38.98

-0.04

-0.03

0.02

45.26

-24.70

-33.40

52.82

-28.83

-38.98

a. Anchor bolts