CONTENTS

www.kncon.co.kr
FOR HUMAN AND FUTURE
WE CREATE THE NEWEST
CONSTRUCTION TECHNOLOGY
FOR HUMAN FUTURE
HEAD JACKING SHIELD, SEPARATE PANEL SHIELD,
SEMI SHIELD, ROOF PANEL SHIELD, MESSER SHIELD
KANGNUNG CONSTRUCTION
WILL COME CLOSER TO YOU

1. Introduction of Company for Bidding


Greetings
Motto/Management policy

2. Company Profile

Business registrations No.


History
Line of Business
Retained patents
Organization Chart

3. Business License &


Construction Method

Retained licenses
Registration of
Expertise construction business
Construction Method

4. Company Keeping
Engineering Technologists

Technical expert List

5. Company Equipment Status

Equipment List

6. Certification of Quality System


7. Major Performance
8. Location

ISO certification
Inno-biz Certification
Performance
Major Experience
Map of Company

Introduction of
company for
bidding

FOR HUMAN AND FUTURE

To:

From: Kim, Jung Hyi


President
Kang Nung Construction Co., Ltd.
340-8 Jamsilbon-dong, Songpa-gu,
Seoul, Korea

Subject: Submission of Pre-Qualification Document

This is to submit the pre-qualification document


with a view to soliciting your esteemed company to
select our company as Qualified Subcontractor for
the valuable project of by your company of,
compiling the relevant documentation into the PQ
document.

Company
Profile

Greetings
Motto/Management policy
Business registration No.
History
Lines of Business
Organization Chart

FOR HUMAN AND FUTURE


01. Greetings

The first priority is Customer Satisfaction.

Dear Customers,

It is pleasure to greet you.

Since 1994, constant endeavor of Kangnung Construction has built trustful name and
core competency.

Our efforts, holding variety of patents and new technologies from various Know-how
in earth working, do pivotal role for developing key industry of Korea.

Especially, we are not only specialized in underground tunnel and power supply line
but also nations first manufacture and maintenance company of shield machines.

Moreover, we do discharge responsibilities to cultivate human resources and create


healthy corporate culture in order to reside a better world together.

To be the best partner, we always attempt to give our clients satisfaction and
impression.

Thank you.

Representative director Kim, Jung Hyi

FOR HUMAN AND FUTURE


02. Motto / Management Policy
1) Motto : Trust ()
is a Chinese character which
Symbolize trust.
We have confidence each
other and think Customer First.

We are the one as a family!

2) Management Policy of 2012

Maximize winning of Contract

Focusing on Internal Stability

Management Innovation

Launching New Business

FOR HUMAN AND FUTURE


03. Business Registration No.

FOR HUMAN AND FUTURE


04. COMPANY HISTORY
Feb. 17

Founded Georim Construction Company


Representative director Kim, Joong Hyi assumed office

Mar. 15

Changed firm name to Kang Nung Const. Co., Ltd. and Incorporated

Dec. 30

Business :

Jan. 2

Utility model registered for three items (underground tunnel digging

Licensed for Earth work and Reinforced Concrete work

equipment, two shield messer for underground digging)


Apr. 28

Awarded to Best Company in Quality


(Electric Culvert Construction in Seoul for KEPCO)

Oct. 22,

Capital: Capital increased to USD 870,000

Oct. 23

Obtained ISO 9002 Quality Certificate

(Construction & Economy Research Institute of Korea, Certificate No. : CRK-Q1-029)


Dec. 13

Business: Licensed for Boring Grouting Work

Dec. 10

Business: Licensed for Dismantling Scaffolding Work

Apr. 1

Business: Licensed for Water Wupply/ Sewerages Equipment Work

Jul. 6

Capital : Increased to USD 2,180,000

Feb. 9

Joined the Korea International Trade Association (KITA) (11736725)

Feb. 28

Imported SEMI-SHIELD MACHINE (2,400) Japan, Iseki

Apr. 26

Utility model reg. (equipment for timbering)

Mar. 27

Imported SEMI-SHIELD MACHINE (2,000) Japan, Rasa

Oct. 23

Obtained license (Equipment for underground digging )

FOR HUMAN AND FUTURE

Jan. 15

Introduced licensed technology of HJS


(Driving method for underground conduit)

Jan. 15

Imported SEMI-SHIELD MACHINE (2,600) CANADA, LOVAT

Apr. 12

Voluntary Return of license for dismantling scaffolding


(Sonpa 98-07-10)

Nov. 29

Obtained I.S.O 14001 Environmental System Certificate

Nov. 28

Obtained ISO 9001 Quality Control System Certificate

Dec. 27

Introduced licensed technology of SQJ

(Certificate No. : CRK-E0-036)


(Certificate No. : CRK-Q1-176)

(Improving/Building up foundation and equipment)

Mar. 3

Patent applied for P.J.S tunneling method

Jun. 1

Imported equipment of Double-Shield TBM(3500)

Dec. 2

Utility model reg. for S.P.S tunneling method

Jan.

Patent for Bridge construction method by using of PSC beam that


equipped the steel setting device

Feb. 25

Awarded to Best Company in technology


(Korea Specialty Contractors Association)

Feb. 13

Patent applied for M.U.G(Multi-Ultra-grout) mothod

Apr. 14

Business : Licensed for Plastering, Waterproofing and Bricklaying


Works

Aug. 19

Business : Licensed for Metallic Structures, Doors Windows Works

Aug. 19

Business : Licensed for Paving Work

Oct. 18

Cited by the minister of MOCT

Nov. 2

Moved the location of Head Office R/M 302, Hanbat Plaza, 1449-3
Juwol-dong, Namdong-gu, Inchon

Dec. 1

Established Special Project Division(Bridge) (02-516-0606)


5th fl., Saerom bldg., 18-1 Jamwon-dong, Seoch-gu, Seoul

Dec. 22

License applied for the plate equipped with hydraulic jack in the
process of RPS method

Dec. 30

Increased capital to USD2,720,000

FOR HUMAN AND FUTURE

Dec. 27

Capital Increased to USD3,805,000

Mar. 2

Obtained License for P.J.S(Panel Jacking Shield)

Mar. 31

Obtained License for M.U.G(Multi-Ultra-grout)

Jul. 07

Obtained License for R.P.S(Roof Panel Shield)

Jul. 07

Obtained License for S.P.S(Separate Panel Shield)

Dec. 18

Obtained License for M.P.S(Modular Packing Shield)

Dec. 30

Capital Increased to USD4,348,000

Aug. 20

Obtained License for J.O.S(Jet of Saprolite)

Nov. 09

Business : Licensed for Scaffold and Breaking Structure Works

Mar. 10

Bring in SEMI-SHIELD MACHINE(3,500) from LOVAT, CANADA

Oct. 04

Patent for Leakage prevention method using multiplex Cushion

Oct. 20

Established R&D Center (Korea Industrial Technology Association)

Oct. 13

Obtain Certification of INNO-BIZ Enterprises


(INNOVATION AND BUSINESS)

Dec. 15

Bring in SHIELD-TBM(7,020) from HITACHI, JAPAN

Dec. 26

M&A the DAENUNG Construction Co., Ltd. (2nd Grade)

Apr. 07

Business : Licensing for Electronic Works

Apr. 09

Patent for Leakage prevention method using the wrinkled pipe


jointing with propulsive structures

Apr. 09

Patent for Grouting apparatus for various punch and grout

Jun. 30

Patent for The bottom segment and shield tunnel process thereof

Jul. 03

Established Il-juk Factory


(Construction(Civil work) machinery maker))

FOR HUMAN AND FUTURE

Mar. 23

Apr, 08

Business : Licensing for Underwater Works

Build a new office building : 340-8 Jamsilbon-dong, Songpa-gu,


Seoul, Korea

Jan. 03

Moved the location of Head Office 340-8 Jamsilbon-dong,


Songpa-gu, Seoul, Korea

Jul. 19

Registered trading Business (Mineral resources and etc.)

Aug. 03

Patent for Rock splitting method for multilevel rock splitting


type using slot formation apparatus

Dec. 13

Bring in TCZ (300), TCS (400), TCZ(500), TCC(700),


TCS(800), TCL(900), TCS (1650) from ISEKI , JAPAN

Apr. 16

Business: Licensing for Civil works

wq

FOR HUMAN AND FUTURE


05. Lines of Business
Item

Description
1) Retained earth work underground,
temporary works
2) Semi shield tunneling works
3) Single shield tunneling works
4) Double shield TBM tunneling works
5) H.J.S Tunneling works
6) S.P.S Tunneling works (New Messer Shield)
7) Messer shield tunnel works
8) NATM tunneling works
9) R.P.S tunnel works
(underground roadway, walkway)
10) Earthwork
(road, housing site, stream, reclamation)
11) Micro Shield Tunneling work
Culverts for electricity, telecommunication,
and drainage box structure

1) Civil Engineering
Structure

2) Post Tensioning

Concrete, retaining walls , structures for


underground roadway)
Structures for sewage plant

Executing subcontract including material,


equipment and contracted work relating post
tensioning. (Using Dywidag material)
Designing post tensioning structure and
assisting the designing
Designing and Constructing the upper part and
underpart of bridge in the special construction
method
-FCM -FSM -MSS -PSM
-ILM PC BEAM -STAY CABLE -EXTRA DOSED

FOR HUMAN AND FUTURE


05. Lines of Business
Item

Description
1) S.Q.J (Square Jet) Method
2) N-R.J.P(New Rodin Jet pile) Method
3) J.S.P (Jumbo Super pile) Method

4) M.U.G (Multi stage Grout) Method


5) Other Grouting Method
(SGR, LW, ASG, ARC,

MPS)

6) Cast-In-Place Bored Pile Method


(ALL CASING Method, RCD Method)
7) Soil nailing, Anchoring, C.I.P, S.C.W.
8) Investigation BORING

1) Installing facilities to intake, purify, and Supply


water, and Sewage treatment Facilities
2)

Piping for water supply and sewerages


equipment

3)

Cleaning pipe for water supply

4)

Installing deformed joint pipe

Plastering, tile works, water proofing, brick laying


works

Iron works(water gate, handrails, guard rail,


soundproofing wall), window framework
Ascon paving, cement concrete paving

FOR HUMAN AND FUTURE


05. Lines of Business
Item

Description

Scaffolding works, Piling management,


Demolition method of structure.

1) Designing
(Soil and Foundation)

Investigation, planning, designing and technical


consulting on soil

1) Single shield TBM (3.5M, 3.6M))


2) Double shield TBM (3.5M)
3) SEMI-SHIELD
(inner diameter2.0, 2.4, 2.6)

4) CRANE etc.

The electronic work for tunnel and electric culvert


power transmission & electric power supply work

General public and civil works

FOR HUMAN AND FUTURE


06. Retained patents
Type

No.

Item

Registration No. Remarks

A TUNNEL MACHINE (Digging Machine for


underground tunnel excavation)

No.0313646

Apparatus For Assembling Tunnel Support

No.0354335

Bridge construction method using


a prestressed concrete beam installed
anchorage apparatus for temporary tendon

No.0406883

4
5
6

Excavating apparatus and excavating


method using the same
Messer shield excavator apparatus with
separated messer plate and excavation
method using the same
A plate with a hydraulic jack and
excavating method using this plate

No.0558940
No.0601399
No.0601386

Multi stage grout system using a multi


stage injection pipe and the method

No.0568763

Cement Grout Device with Inorganic Soil


Stabilizer Using Modular Packing System and
its Method

No.0661126

Pile Installation Device by Jet of Saprolite and


Cemented its Construction Method

No.0752226

10

leakage prevention method using the wrinkled


pipe jointing with propulsive structures

No.0936268

11

Grouting apparatus for various punch and


grout

No.0948452

12

The bottom segment and shield tunnel process


thereof

No.0977278

Patent Reg.

13
14

Tubing system whit wire-rope and tunneling


method thereof
Propulsion Method and apparatus for underground conduits

No.1008552
No.0231188

15

Shield tunneling apparatus and method B

No.0362810

16

Leakage prevention method for tunnel using


multiple cushion rings

No.1022013

17

Rock splitting method for multilevel rock


splitting type using slot formation apparatus

No. 1055705

FOR HUMAN AND FUTURE


06. Retained patents
Type

No.

Exclusive
License

Shield Tunneling Apparatus and Method a

No.0360560

Method for creating improved ground and app


-aratus for the same

No.0553175

Chemical Grouting by Use of Activated


Silicate

No.0370880

Method of making acrylate injection material


for grouting and applying method thereof

No.0412419

Method for forming hardened layers in the


underground and apparatus therefore

No.0629409

Tunnel process using protective shield

No. 10-2009
-0135213

The bottom segment and shield tunnel process


thereof (2)

No.10-2009
-0097543

Equipment for gathering and storing rainwater


for roof top planting and construction method
for the same

No.10-2010
-0098225

The apparatus of rock excavation using the


longest slot drill and the non-vibration rock
excavating method using thereof

No.10-2010
-0101295

Excavator equipment for ground stabilization


and using the same method of shield tunnel
jam removing

No.10-2010
-0110433

Non-exclusive
License

Patent pending

6
7

Item

Method for collecting water source supplying


underground water of a shield tunnel and
collecting
Underground water using the same equipment
the connection structure and construct
structure of timbering
Variable type messer plate and tunneling
method thereof

Protecting panel for land slide

10

Installing device and method of the panel-roof


and tunneling method using the same

Registration No. Remarks

No.10-2010
-0111495
No.10-2011
-0020486

No.10-2011
-0020487
No.10-2011
-0034891
No.10-2011
-0057037

FOR HUMAN AND FUTURE


06. Retained patents
Type

No.

Item

Registration No. Remarks

11

Water proof and retaining structure and


method

No. 10-2011
-0075238

12

Down the hole drilling apparatus using TBM


and drilling method using the same

No. 10-2011
-0020487

Patent pending

FOR HUMAN AND FUTURE


07. Organization Chart
Chairman
Rep. Director

C E O
Executive director
of Research center

Auditor

Executive Department

Engineering Department

Planning
Department
Research
Center

Finance
/Accounting
Team

Management

Team

Construc
-tion /
Technical
Support
Team

Equipment
Team

Sales &
Promotion
Team

Design
Team

FOR HUMAN AND FUTURE


07. Organization Chart (Description of Organization)
Department

Team

1. Planning Department

Tasks
1.
2.
3.
4.

Establishing management plan, business policy, and goal


Analyzing Macro & Micro economics and industrial information
Analyzing and evaluating new enterprise
Business Innovation related tasks Promotion

1.

General office management


Human resources related tasks
Dealing with legal issues related to the company

1) Management Team 2.

3.

2. Executive Department

1.
2.
2)Finance/Accounting
3.
Team

1) Construction
Management Team

2) Equipment Team
(TBM Factory)
3. Engineering
Department

1.
2.
3.

Supporting all the construction site related work (field works)


Cost control by managing procurement and material
Management in budgeted costs, implement, safety, quality, and
subcontractor

1.
2.

Manufacturing heavy equipment and examination


Producing sales strategies and promoting the sales of heavy equi
-pment
Specialized in shield TBM
(Manufacturing customized TBM & shield TBM)

3.

3) Sales Team

1.
2.
3.
4.

Gathering and analyzing information about contract order


Establishing strategies for obtaining order
Participating in a bid and do bid related tasks
Structuring quotation database and quality management

4) Ground Team

1.

Technical-oriented marketing related to the grouting works.

1.
2.

Gathering information related to techniques in construction and


structuring database
Standardized work sections and draw up construction guideline

1.
2.
3.
4.

Maintaining technical competitiveness


State-of-the-art technique development
Developing cutting-edge equipment and maintenance
Studying on safe and cost-effective construction methods

5) Design Team

4. R&D center

Accounting and financing


Establishing accounting policy and improving accounting system
Analyzing financial information and preparing financial reports to
maintain record of assets, liabilities, profit and loss, tax liability, o
r other financial activities

Business License
& Construction
Method

Retained licenses
Expertise construction business

Construction Method

FOR HUMAN AND FUTURE


01. Retained License
(Exchange rate: \ 1049/1$- Aug.01.2011)

Type of Work

License No.

94-Seoul

Max. Contract
(USD & 1,000,000 KRW)
Year 2010

Year 2011

$25,775,977

$30,734,986

(27,039)

(32,241)

$15,217,350

$16,370,829

(15,963)

(17,173)

Earth Work
02-283
Reinforced

94-Seoul

Concrete Work

10-382

Boring &

Songpa-

$8,181,125

$9,253,575

Grouting Work

97-14-04

(8,582)

(9,707)

Songpa-

$8,775,024

$9,263,108

99-13-13

(9,205)

(9,717)

Songpa-

$4,233,556

$5,156,339

04-03-04

(4,441)

(5,409)

Songpa-

$4,206,864

$5,150,620

04-08-09

(4,413)

(5,403)

Songpa-

$4,636,797

$5,698,761

04-16-02

(4,864)

(5,978)

$5,480,458

$5,013346

(5,749)

(5,259)

Water supply &


Sewerages

Ranking in 2011
Local

Country

44/ 893

73/7,116

99/ 891

168/14,259

38/ 245

67/ 864

57/1,001

133/7,552

153/710

222/2,025

130/ 958

389/6,111

94/682

209/2,291

117/586

219/2,373

Equipment Work
Plastering,
Waterproofing,
Brick laying Works
Metallic structures,
Doors Windows
Works

Paving work

Incheon
Scaffold/Structure

Namdong
Breaking Works
07-07-07

FOR HUMAN AND FUTURE


01. Retained License
(Exchange rate: \ 1049/1$- Aug.01.2011)

Type of Work

License No.

Max. Contract
(USD & 1,000,000 KRW)

Ranking in 2010

Year 2010

Year 2011

Local

Country

Incheon

$1,526,215

$349,857

1993/

12,554/

-000907

(1,601)

(367)

2052

13,142

$5,862,726

$5,093,422
32/ 50

82/ 360

(6,150)

(5,343)

Electric Work

Incheon
Underwater Work

Namdong
10-15-02

FOR HUMAN AND FUTURE


02. Registration of Expertise construction business
Earth Works

Reinforced Concrete Works

FOR HUMAN AND FUTURE


02. Registration of Expertise construction business
Boring & Grouting Works

Plastering / Waterproofing / Bricklaying Works

FOR HUMAN AND FUTURE


02. Registration of Expertise construction business
Water Supply / Sewerages Equipment Works

Metallic Structures / Doors & Windows Works

FOR HUMAN AND FUTURE


02. Registration of Expertise construction business
Paving Works

Scaffold/ Structure Breaking Works

FOR HUMAN AND FUTURE


02. Registration of Expertise construction business
Electric works

Civil works

FOR HUMAN AND FUTURE


03. Construction Method
Method

S.P.S.

(Separate
Panel Shield)

H.J.S

(Head Jacking
Shield)

R.P.S

(Roof Panel
Shield)

SemiShield
(Slurry type
or EPB type)

Single Shield
(soil stratum)

Equipment

Description
- Minimize the digging area by divided earth shield panels in two(L=3m).
- Make up front and rear parts to match each other with enhanced steel
quality, and adjust the interval of the timbering for variant geostatic
conditions, which is impossible with the existing Messer method
(6001000mm)
- Reduce the construction cost and period by not digging wide at the
curved line area
- Exercise simple digging without additional reinforcing materials.
- Eliminate the structural instability at the variant section due to uneven
stress
- Appropriate to tunnel bent by 90, acute angle, or obtuse angle
- Apply to length less than 200m that is too long for steel pipe method
and too short for semi-shield method
- Secure the safety by the concurrent digging and supporting work at the
same time
- Appropriate for urban tunneling by controlling noise and vibration
- Easy changing directions (up, down right and left) : computerized device
- Removing rubble by rail cart
- Possible burying of skin plate at the limited area for equipment
withdrawal
- Environment-friendly due to limit amount of waste
- Available for driving both steel pipe and concrete pipe
- Most safe engineering method with qualified execution of work by
consolidating roofing method and special panel method
- Possibly minimized area on the ground that reduce the pollution of
vibration and noise for an environment-friendly work
- Keeping traffic and structure safe due to no ground sinks on the
upper part of the working
- Higher accuracy upon executing work than that of other methods
- Low in construction cost compared to other methods by digging
the selective section
- Driving ready-made concrete box for small section (appropriate to twolane road)
- Carrying out any type of concrete work on the spot for the large section
- Secure the safety by the concurrent digging and supporting work at the
same time
- Appropriate for urban tunneling by controling noise and vibration
- Easy changing directions (up, down right or left) : computerized device
- Removing debris into sludge through withdrawal pipe(EPB through rail
cart)
- Wide work site is necessary for getting equipment in and out
- It is necessary for checking out head to treat waste (no need of EPB)
- Applicable to tunneling extension from 300mm to 500mm
- Available for driving both steel pipe and concrete pipe
- There is no danger of collapse as segment is installed immediately
after excavation by the hydraulic jack
- Little pollution occurring during work such as traffic jam, noise, dust,
vibration, etc.
- Easy to pass the soft ground without specific supporting work
- Shortening the construction period on the excellent digging capability
compared with other methods
- Equipment moves forward being proped up by the segment

Remark

FOR HUMAN AND FUTURE


03. Construction Method
Method

DoubleShield

(Rock stratum)

N-RJP

(New-Rodin
Jet Pile)

Equipment

Description
- Controlling the initial digging repulsion easily
- Keeping accurate alignment by making segment for straight line
and curve line separately
- Attaining shorter construction period better than NATM and OPEN
TBM methods by installing lining upon digging at the same time
- It has large resistant moment against the external digging repulsion
due to the arch effect by round front shape
- Simple management of project execution
- Easy quality control over the factory made segment
- Equipment advances on the support of rockwall and segment.
- Applicable to tunneling extension over 1km
- Jetting cement paste into the foundation through triple pipe under
high pressure (400kgf/cm) to form a round column
- High pressured jetting and stirring method to be used for protecting
leakage between earth layer to the weathered rocks, and
supporting ground
- Column diameter: RJP( 2,000 3,000m/m)
M-RJP( 1,000 1,500m/m)
C-RJP ( 1,000 1,500m/m)
- Reinforcing soft ground, using as pile, using for filling up the cave of
lime

zzzzzzzzzzzzzzzzzzzzzzz
S.Q.J

(Square Jet)

A.S.G

(Activated
Silicate Grout)

A.R.C

(Acrylic Resin
Chemical)

- Forming square wall body by jetting cement paste into the ground
through multiple pipe under high pressure(400kgt/cm)
- Semi-circle type of globular shape projected in the middle part of
the square wall body work like as anchors
- Thickness of wall body : 300500m/m
- Used as wall body for temporary structure, and protecting leakage
work
- As a grouting method using activated silicate mainly for the purpose
of protecting leakage
- No leaching state
- There are solution type using pure liquid, and suspension mixing
cement.
- Mainly protecting leakage for temporary structure
- Economical than LW, SGR
- To be used in the grouting method of polymerized compound
whose major material is acryl ate
- Higher effect of protecting leakage due to its lowest viscosity(about
2CPS)
- Permanent protection at the leaking water part in the rock bed or
structure. protection at the leaking water part in the segment

Remark

FOR HUMAN AND FUTURE


03. Construction Method
Method

M.U.G

(Multi Stage
Urethane
Grout)

Equipment

Description
- One injection of urethane or liquids to fill other 35 target sections
at the same time
- A multi-phased grouting method of small calibered steel pipe
applied horizontally in the tunneling works
- A method where liquid grouting and reinforcing function of
fore poling are combined
-Protecting and reinforcing at the critical mining part of water
leakage in the tunneling work

C.M.S

(Cement
grout with
Inorganic Soil
Stabilizer
using
Modular
Injection
System)

P.C.T

(Prestressed
composite truss
girders)

- Solidifying method of cement with mineral in inorganic system(CSA)


as the prime element
-High impact (2550kgt/cm) of protecting and reinforcing method
without leaching state
- Mainly applied to the bank or system where a permanent protecting
leakage and reinforcing are required
- Applied to Segment Back fill grout for shield works

- Easy to solve lots of the restrictive conditions of the substructure space by


doing long span bridge construction(90m) due to solve the problem of
the Increasing weight according to increase span
- By factory automation and standardization, as all progress of the work is
repeated identically, it is improving construction period and ability of the
working performance with practiced workers
- Because of graceful figure of bridge and possibility of carrying out long
span, the esthetic value of the bridge has been improved.
- Applicable to various building methods depending on site situation (Crane,
ILM, MSS, FCM)
- Generating stress loss and tensile stress caused by steel + concrete
confining action can be mitigated

Remark

Company-keeping

engineering
technologists

Technical expert List

FOR HUMAN AND FUTURE


01. Technical expert List
Division
Specification
Engineering Works

Geology and
foundation
Civil Engineering

Certification

No. of
person

Professional
Engineer

Civil Works

20

45

Classification

No. of
person
5

Senior
Engineer

Intermediate
Engineer

18

Junior
Engineer

15

45

Classification

No. of
person
53

Office jobs

15

Grand Total

Academic/
Field Background

53

Total technicians

Concrete, Rock Drill, S


teel Material, Iron Bar,
Carpenter, Grouting

Total

Remarks
Academic/
Field Background
(Registered)

Principal
Engineer

Other technical
works

Specification

23

Qualified professional
engineer
Qualified engineer

Subtotal

Specification

Qualified professional
engineer

Professional
Engineer
Engineer
Industrial Engine
er

Remarks

276

362

Remarks

Technician

Company

equipment status

Equipment List

FOR HUMAN AND FUTURE


01. Equipment List 1 (Shield Machine)
Micro Tunneling

Semi-Shield

Equipment

Spec.

Equipment

Spec.

Equipment

Spec.

ISEKI TCZ-300

300

1800SS

1800

1800SS

2270

ISEKi TCS-Jr400
2

ISEKI TCZ-500
3

ISEKI TCC-700
4

ISEKI TCS-800
5

Sand

Sand

Sand

S-Rock

Rock

Rock

SS

SS

SS

400

ISEKITCS-1650

Rock

SS

SS

500

RASADH-200

2800
Sand
Rock
SS

LOVAT-RPM121PJ

3000

Sand

Sand

S-Rock

Rock

Rock

SS

SS

EPB

700

ISEKITCS-2400

2400

ALPINE-PDS350

3600

Sand

Sand

Sand

S-Rock

Rock

Rock

SS

SS

EPB

800

LOVAT-RPM121PJ

900

ALPINE-PDS350

2600

LOVAT-RME143SE

3600

Sand

Sand

Rock

Rock

EPB

EPB

3000

OKUMURA-3560

3600

Sand

Sand

Sand

S-Rock

Rock

Rock

SS

EPB

EPB

LOVAT-RME143SE
7

2000

ISEKITCS-2400

Sand

Rock

ISEKI TCL-900

1650

Rock

SS

Shield

3000

HITACHIZOSEN

7200

Sand

Sand

Rock

S-Rock

EPB

EPB

FOR HUMAN AND FUTURE


01. Equipment List 2 (others)
Equipment

Size

Quant.

Crane

55 TON

2 ea

KOB2LOO
(Japan)

Forklift

5 TON

1 ea

Daewoo

15M3 / HR

2 ea

Kanghan Co.

Heavy Weight Mixer

Remark

Bucket Crane

Inverter

2 ea

Dongkook hoist

Backhoe

06 W

1 ea

Samsung
Heavy Ind.

Gantry grane

15 TON
(Inverter)

3 ea

50 TON

3 ea

Silo

Hanshin
Dongkook hoist
Kanghan Co.

Certification of
quality system

ISO Certification

FOR HUMAN AND FUTURE


01. ISO Certification
ISO 9001

ISO 14001

Major
Performance

Performance
Major Experiences

FOR HUMAN AND FUTURE


01. Performance
(Exchange rate: \ 1049/1$- Aug.01.2011)
Year

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Result of 1994

$2,222,303

Result of 1995

$4,156,941

Result of 1996

$8,650,238

Result of 1997

$12,119,758

Result of 1998

$21,735,478

Result of 1999c

$25,128,436

Result of 2000

$23,341,098

Result of 2001

$39,592,418

Result of 2002

$27,262,334

Result of 2003

$26,424,214

Result of 2004

$33,046,496

Result of 2005

$25,182,506

Result of 2006

$38,560,537

Result of 2007

$42,238,322

Result of 2008

$38,337,482

Result of 2009

$45,636,797

Result of 2010

$59,919,924

Result of 2011

$60,375,596

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)

12/ 31/ 2011 (Excluded V.A.T)

Name of Project

Contract Amount
(USD)

JR Construction
Co., Ltd.

Construction of Ulsan-Maeam
Electric Culvert
(Semi-Shield)

$3,350,815

2001.10.4
2002. 12.24

EE-Hwa
Construction
Co., Ltd.

Construction of Myeong Dong


Power Distribution Station

$710,217

2001. 9.28 2002. 12.20

Client

Contract
Period

SK Engineering
Construction of Seodaemun Branch
and Construction
Circuit Electric Culvert
Co., Ltd.

$1,463,478

Limkwang
Engineering & Co Construction of Duct Line Crossing
nstruction Co., Lt Seongnaecheon Stream
d.

$382,609

2001.11.19 2002. 6.18

Woo Jin
Construction
Co., Ltd.

Earth Work of the Civil work for


154KV Seochimsan S/S

$444,280

2002. 1.21 2003. 4.3

Pumyang
Construction
Co/. Ltd.

Improvement of Barancheon Stream


for Habitual Flood Damage

$1,411,348

2002. 3.12 2003. 4.30

Hyoja
Construction
Co., Ltd.

Semi-Shield work of Dogok Branch


Circuit Electric Culvert

$2,655,431

2002. 3.29 2003. 5.6

Lotte
Engineering &
Construction
Co., Ltd.

Construction of Beomil Branch


Circuit Electric Culvert

$880,957

2002. 4.4 2002. 12.15

Taeyoung
Construction
Co., Ltd.

Telecommunication Culvert for


Connecting to Seocheongju
Telephone Station
(Semi-Shield)

$4,343,685

2002. 4 2004. 9

Yeongnam
Construction
Co., Ltd.

No. 1 Block of Gijangkyo-ri(2)


Apartment Complex Construction

$359,130

2002. 5.22002. 8.31

2001.11
2003. 4

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

$1,853,261

2002. 5.102003. 6.4

Yeongdo
Construction
Co., Ltd.

Construction of Power distribution


Electric Culvert for Inchon S/S
(Messer-Shield)

Heungjin
Construction
Co., Ltd.

Parallel Conduit line to Expanded


Ulsan-si Industrial Highway
(Semi-Shield)

$2,277,717

2002.6.272004. 12.30

Sewon
Engineering
Co., Ltd.

Earth Work and Temporary


Structure in the Water Control
Project of the Jeongneungcheon
Covered Section

$7,166,141

2002. 8.7
2004. 11.30

$1,350,967

2002. 9.12
2003. 12.20

Sewon
Engineering
Co., Ltd.

Earth Work and Structure


Construction in the Jeongneungcheon Covered Section for Branch
Telecommunication Circuit Culvert
(Wolgok)

Daelim
Engineering &
Construction
Co., Ltd.

Shinyangsan-Dongbusan 3rd
Electric Culvert Project
(DOUBLE SHIELD TBM)
D=5,000M/M

$7,619,891

2002. 9 2006. 1.22

JR Construction
Co., Ltd.

yeongil Branch Circuit Electric


Culvert Project (2nd)
(Semi-Shield D=2,600M/M)

$6,106,196

2002. 9.16
2004. 2.22

Shindongah
Construction
Co., Ltd.

Dogok Power distribution S/S


Electric Culvert Project
(Messer-Shield)

$706,272

2002. 9.24
2003. 3.27

Gukje
Engineering &
Construction
Co., Ltd.

Earth Work, Temporary facilities


and Structure in the Connecting
Cultert Project (2nd) to the KT
Dongbusan Branch
(NATM)

$989,079

2002.11.252003. 11.30

Kukdong
Engineering &
Construction
Co., Ltd.

Bypass for National Road within


Uijeongbu-shi (JangamJageum)
(Multi-phased steel pipe)

$2,320,880

2002. 12.62005.10.29

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Baekil
Construction
Co., Ltd.

Earth Work, Structure Construction


in the Junggye S/S Electric Culvert
(H.J.S Method)

$4,329,337

2003. 2.162005.6.15

Baekil
Construction
Co., Ltd.

Earth Work, Structure Construction


in the DongchoonSongdo Electric
Culvert Project (1st, 4th)
(Semi-Shield)

$3,321,330

2003. 3.42004. 7.20

Baekil
Construction
Co., Ltd.

Earth Work in the Naedang


Duryu Electric Culvert Project
(2nd) (Semi-Shield)

$5,717,609

2003. 4.1 2004.12.12

Ilsung
Construction
Co., Ltd.

Seocho S/S Power Distribution


Electric Culvert Project
(S.P.S)

$1,513,457

2003. 4.28 2004. 6.10

Daewoo
Engineering &
Construction
Co., Ltd.

Tunneling (No. 2 Block) in Line


No.2 Subway 911 Block
(NATM)

$8,599,848

2003. 5.152007. 3.30

Daelim
Engineering &
Construction
Co., Ltd.

Earth Work and Structure


Construction in the Civil Project
of Sinjeong Rainwater Pumping
Station (Messer-Shield)
(433, 57.4M)

$5,886,196

2003.10.22005. 8.8

EE-Hwa
Construction
Co., Ltd.

Earth work, Rainforced Concrete,


Boring, Grouting Project in
ShinulsanUlsan 3rd Electric
Culvert Project
(Semi-Shield)

$1,812,848

2003.11.172004.12.31

Sungwon
Development
Co., Ltd.

Solid Structure Installation on


Yongin Pungdeokcheonsageori

$2,535,978

2004. 4.212005.12.31

Hwail
Engineering &
Construction
Co., Ltd.

Connecting Project between


Yeonsu Electric Culvert Terminal
and Yeonsu Joint Area

$1,035,817

2004. 2.262004.11.15

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Contract

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

JR Construction
Co., Ltd.

Flood Control Facilities Construction


about 125 Cheongdam-dong Area
(Semi-Shield D=2,600M/M)

$4,649,891

2004. 3.192005. 6.10

Kukje
Development
Co., Ltd.

Earth Work, Temporary Structures


Installation in Obong-Dongchun Duct
Line Project (2nd)

$2,174,623

2004. 3.22004.12.25

Yoosung
Engineering &
Construction
com. Ltd.

Earth Work and Temporary


Structures in Sinseongnam-Jungwon
Duct line Project
(Messer-Shield)

$277,989

2004. 6.72004.10.14

Daeneung
Construction
Co., Ltd.

Earth Work in the new Sewage


Culvert Installation in Bongujaegil
(R.P.S 5.752.5 ,60M)

$1,538,936

2004. 4.012004.8.31

Shinan
Engineering &
Construction
Co., Ltd.

Earth Work in Sillim S/S Power


Distribution Electric Culvert Project
(Semi-Shield)

$1,673,913

2004. 6.282005.5.31

Namkwang
Engineering &
Construction
Co., Ltd.

Sinulsan S/S 154KV BUS SEC


Electric Culvert Project

$1,283,222

2004. 8.172005. 6.28

$352,717

2004. 9.302006. 6.10

Korea
Small calibered Culvert Driving
Development
(HJS) Project in Sewage
Corporation Ltd. Arrangement of Hangang Water
System (No. 6 Block)
Dongseo
Industrial
Co., Ltd.

Earth Work of 154KV Jangdeok


Substation

$1,563,394

2004.10.282005. 9.30

Sungwon
Construction
Co., Ltd.

Ganggeong Collective Culvert


Burying Project (4th, 5h Block)
(MICRO-SHIELD)

$3,231,649

2004.12.212006.12.31

Remarks

EX

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Contract

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Yooho
Development &
Construction
Co., Ltd.

Flood Control Facilities about


Seogyo-dong, donggyo-dong area,
and Increasing Mangwon 1
Rainwater Pumping Station
(Semi-Shield)

$889,704

2004. 3.122005. 8.27

Songlim
Construction
Co., Ltd.

Earth Work for Housing 154KV


Juan S/S
(R.P.S)

$333,651

2004. 8.62005. 6.10

Sungwon
Construction
Co., Ltd.

2nd Block Building up Project of


3rd Stage Housing Site Development
in Yangsan Mulkeum Area
(Waterway in the higher place)

$8,270,214

2004. 12.12008. 8.31

Sambu
Engineering &
Construction

2nd Project of Jeongja-Suji


Electrical Culvert
(Semi-Shield)

$2,600,286

2005. 3.242006. 11.4

Gyodae-Banbae Electric culvert


(S.P.S)

$6,355,691

2005. 3.162006. 8.31

System Reinforcing Project of


345KW Sinsuwon S/S

$413,641

2005. 3.302005. 7.25

KN
Construction
Co., Ltd.

Earth Work and reinforced


Concrete Project in Wonchang S/S
Drawing out Power Distribution
(Messer-Shield)

$454,545

2005. 5.102005. 10.26

Namkwang
Engineering &
Construction
Co., Ltd.

Maintaining Collective Culvert


in the Songjeong Bypass
(Semi-Shield)

$395,138

2005. 4.182005. 6.14

Doosan Heavy
Industries and
Construction
Co., Ltd.

Earth Work and Reinforced Concrete


in the Gumi-Gwangpeong Electric
Culvert Project
(Semi-Shield)

$4,451,859

2005. 4.262006. 6.17

Hyundai
Engineering &
Construction
Co., Ltd.
Shinku
Engineering &
Construction
Co. Ltd.

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

Sinan
Engineering &
Construction
Co., Ltd.

Temporary Structure and Landfill


Lining Project in Jungsihwa Branch
Circuit (2nd) Electric Culvert
(S.Q.J Method)

Vanseok
Construction
Co., Ltd.

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

$1,649,190

2005. 04.262005. 12.21

Daelim S/S Power Distribution


Electric Culvert Project
(S.P.S)

$428,980

2005. 05.92005.11.17

Dongkwang
Construction
Co., Ltd.

Ulsan T/L
Underground Duct Project
(Semi-Shield)

$838,894

SK Engineering
& Construction
Co., Ltd.

Underpass Connection Project in


Bangbae SK Leader's View
Costruction
(Messer-Shield)

$549,008

Ilsung
Consruction
Co., Ltd.

R.J.P. Project in the 3 Block of Line


1 Inchon Subway Extension to
Songdo New Town.

$1,334,604

2005. 06.132008.08.31

Deukyang
Construction
Co., Ltd.

Duck Line Project Between


Noksan-Nokgong

$2,675,882

2005. 06.252006.9.4

Pumyang
Construction
Co., Ltd.

Jangwi Power Distribution Electric


Culvert Project
(S.P.S Method)

$4,379,062

2005.08.012007.3.19.

Pumyang
Construction
Co., Ltd.

Jukjeon Power Distribution Electric


Culvert Project
(Semi-Shield D=2,000M/M)

$5,274,287

2005.08.242006.11.20.

Daeneung
Construction
Co., Ltd.

Yonsan Boonki Power Distribution


Electric Culvert Project

$1,906,860

2006.05.182008.01.31

2005. 05 2006. 2

2005. 06.132005.11.25

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)

12/ 31/ 2011 (Excluded V.A.T)

Name of Project

Contract Amount
(USD)

Contract
Period

Dongin
Construction
Co., Ltd.

154KV Jukjeon S/S Civil Work

$238,322

2005.09.012005.12.31.

Sambu
Engineering &
Construction
Co., Ltd.

Jukjeon Power Distribution


Duct Line Project

$69,528

2005.09.302006.01.09.

Byucksan
Engineering &
Construction
Co., Ltd.

Earth and Structure Project in


Telecommunication Culvert project
Connecting to Seoul Central Branch
Office (2nd -1)

$3,955,195

2005.12.082007.07.16.

Samho
Construction
Co., Ltd.

Earth Work and Structure Project in


SinyangsanDongbusan 4th Electric
Culbert Project

$17,061,010

2005.12.082010.06.11.

Daeneung
Construction
Co., Ltd.

Earth Work in the Building Up the


Cheonan Distribution Site
Development

$5,798,637

2006.02.032008.09.04.

Hyoja
Consruction
Co., Ltd.

2nd Block Project in Installing


Convenient Facilities Project in
Busan Subway

$1,892,686

2006.03.092007.03.21.

Yeongdo
Construction
Co., Ltd.

Palbok S/S Power Distribution


Electric Culvert Project

$2,714,013

2006.03.212007.02.21.

POSCO
Engineering &
Construction
Co., Ltd.

Under construction of Inchon Hagik


Sewage Treatment Plant
SEMI SHIELD 5(A-6, A-7 LING)

$3,888,112

2006.03.162008.08.22.

Hanjin Heavy
Industries &
Construction
Co., Ltd.

Ochehon 2 Gyo P.S.C. Box(ILM method)


Making and Installing in the 9th Block
of Iksan Jansu Expressway

$3,571,973

2006.02.142007.12.31.

Client

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Shinan
Engineering &
Construction
Co., Ltd.

Earth Work and Reinforced Concrete


Work in Jeonju-Palbok (1st) Electric
Culvert Project

$2,807,108

2006.04.012007.03.30.

Pumyang
Construction
Co., Ltd.

Osong Power Distribution Electric


Culvert Project

$2,109,628

2006.03.062006.12.01.

Dongseo
Industrial
Co. Ltd.

Electric Culvert Connecting System of


Guro S/SDaelim S/S

$1,190,658

2006.07.252007.04.24.

Korea
Development
Co., Ltd.

Jeonju-Palbok Electric Culvert (2nd)

$2,328,885

2006.07.252007.05.24.

POSCO
Engineering &
Construction
Co., Ltd.

Under Construction of Inchon Hagik


Sewage Treatment Plant
SEMI SHIELD 5(A-1, B-5 LING)

$2,870,305

2006.08.302008.08.22.

Kukdong
Engineering &
Construction
Co., Ltd.

Putting Kwanggye Power Cable


underground

$1,489,990

2006.10. 2007.06.

Hanwha
Engineering &
Construction
Co., Ltd.

Under Extension Construction of


KT Yeongdong Branch Office Buiding

$600,572

2006.11. 2007.03.

EE-Hwa
Construction
Co., Ltd.

Cheongcheon S/S Power Distribution


Electric Culvert Project

$659,901

2006.11. 2007.11.

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

IC Corportation
Ltd.

MunsanSeonyu Electric Culvert


Project

$4,194,948

2006.11.24 2008.11.28

Samho
Construction
Co., Ltd.

Jangji Power Distribution


Electric Culvert Project

$1,775,295

2007.04.112008.09.30

KEPCO
Inchon Branch

New Dongseong Pumping Station Boring


, Grouting
work

$564,901

2007.04.232007.08.02

Woo Jin
Construction
Corporation Ltd.

Under Construction of synchronized


Power Distribution Electric Culvert.
Earth Work, Boring Grouting Work
Structure Work

$2,431,459

2007.07.092008.07.22

Kukdong
Engineering &
Construction
Co., Ltd.

Changdong-Donam Electric Culvert


Project
(Earth Work and Structure)

$5,196,654

2007.06.222009.08.09

POSCO
Engineering &
Construction
Co., Ltd.

Boring and Grouting for Reinforcing


Ground Project for Construction of
Road between Dogae and Shingi

$2,793,136

2007.09.212012.01.07

Hanla
Engineering &
Construction
Co., Ltd.

Boring and Grouting for Reinforcing


Ground Project for Construction of
Road between Pyoungchang and
Jungsun

$571,020

2007.09.272009.10.31

Midong
ENC Co., Ltd.

2nd Stage Construction of Power


Transmission Line for
Shuncheon-Gwangyang
(Messer-Shield)

$562,440

2007.10.162007.12.22

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Kukdong
Engineering &
Construction
Co., Ltd.

Songpa-Seokchon Electric Culvert


Project
(Semi-Shield)

$4,174,452

2007.05.09 2008.05.26

Gohap
Construction
Co., Ltd.

Hyunjeo-Seodaemoon Power
Transmission Line Project
(Shaft and Earth Work)

$2,510,906

2007.10.222009.05.10

Dongseo
Industrial
Co. Ltd.

Jungrang Area Power Supply Line


Project
(Messer-Shield)

$3,730,162

2007.12.012009.02.21

Yeongdo
Construction
Co., Ltd.

Sangbong S/S Power Supply Line


Project
(Messer-Shield)

1,274,109

2007.12.072009.01.20

Kukdong
Engineering &
Construction
Co., Ltd.

Dalseo Area Power Supply Line


Project
(Semi-Shield)

$3,919,924

2007.08.302009.04.20

Daewon
Construction &
Industrial
Co., Ltd.

Convenience Facility Construction


in Incheon 1st Line Subway
(Elevator and Earth Work)

$927,550

2008.02.252010.10.09

Byucksan
Engineering &
Construction
Co., Ltd.

Ewha Bridge and Connectin Road


Expansion Project
(Drainage, Structure,Earth Work)

$3,625,319

2008.05.202010.10.09

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Hyundai
Engineering &
Construction
Co., Ltd.

Gyodae-Bangbae Power
Transmission Line Project
(Semi-Shield)

$1,834,128

2008.08.312008.11.13

POSCO
Engineering &
Construction
Co., Ltd.

Songdo D1-5BL, Construction of


Neighborhood Shopping Center
(Earth Work)

$4,214,874

2008.03.142008.12.31

Doosan
Engineering &
Construction
Co., Ltd

Gangnam Area Power Supply


Line Project
(Messer-Shield)

$2,363,203

2008.07.152009.11.30

Daelim
Industrial Co.
Limited
Co., Ltd

Cheongju-Bongmyoung Power
Transmission Line Project
(COMPOSITE SHIELD)

$5,896,525

2008.07.222010.04.13

Daelim
Engineering &
Construction
Co., Ltd.

Duwolcheon Duwoljae

$3,625,319

2008.09.012012.08.31

Giyeon
Construction
Co., Ltd

Jayang Forebay Facility Removal


Project
(Semi-Shield)

$1,315,539

2008.11.012009.05.31

IC
Corportation
Ltd.

345KV Shinpocheon S/S Construction


(Structure, Earth Work)

$2,539,704

2009.02.022009.12.15

Ilsung
Consruction
Co., Ltd.

Boring and Grouting for Extension of


2nd Line Subway of Incheon to Song-do
New Urban Area

$398,475

2008.12.222009.03.12

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

Korea
Development
Co., Ltd.

Ulsan North Area Power Supply


Line Project : Hyundai(T/L)

Sambu
Engineering &
Construction
Co., Ltd.

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

$690,181

2009.02.262009.10.19

Pipeline and Slurry Wall Project in


Arrangement of Hangang Water
Conduction Supply System
(No. 6 Block) Earth Work : TBM

$9,576,740

2009.02.222010.12.31

Woo Jin
Construction
Co., Ltd.

Pavement Working in Site


Development of Pan-gyo Techno
-Valley

$3,896,000

2009.02.172009.07.15

Samho
Construction
Co., Ltd.

Gwangjin-Jungrang Area Power


Supply Line Project
(Earth Work : TBM)

$9,871,306

2009.03.09011.04.28

Korea
Electronic
Power Co.
(KEPCO)

Shin-pocheon S/S Earth work Project

$1,758,008

2009.02.022010.12.15

Hyundai
Engineering &
Construction
Co., Ltd.

Work on a road-widening project of


National highway No.6 of Deokso ramp

$1,353,670

Underground passageway in
Cheonglyangri station (Build transfer
operation)

$2,221,163

2009.04.172010.08.31

$5,943,756

2009.04.302010.12.31

Hanhwa
Engineering
Construction
Lotte
Engineering
Construction

&
&

Channel flow for maintenance and


Gyeonggi urban rainwater undercurrent trillion
innovation Co.
In Gwanggyo newtown water cycle
system

2009.03.042009.08.11

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Korea
Electronic
Power Co.
Daegu Branch
(Banseok Co.)

Jain S/S Power supply Line Project


(Earth work)

$1,449,952

2009.05.112009.11.11

Korea
Electronic
Power Co.
(GS E&C)

Paju-Unjung Construction of
Power Transmission Line Project
(Earth Work & Structure)

$2,602,126

2009.05.292010.03.31

$631,907

2009.06.112010.04.07

Korea
Electronic
Yangsan Area Power Supply
Power Co.
Line Project 2nd th
(Yeongdo Costruct
ion Co.)
Korea
Electronic
Power Co.
(Samho Co,)

Nam gu-Busan Jin gu Area Power Supply


Line Project

Korea
Electronic
Power Co.
(Lotte E&C)

Yongdoo area Power Transmission


Line (excavation of Tunnel &

Korea
Electronic
Power Co.
(SK E&C)

Power supply Line Project in Pajoo area.

Korea
Electronic
Power Co.
(Daelim E&C)
Korea
Electronic
Power Co.
(POSCO)

2009 $12,702,574
2011.04.28

$2,893,603

2009.06.252010.11.30

$965,682

2009.06.252009.12.25

West Incheon area Power Transmission


Line . CheongLa 2nd
(Earth Work & Structure)

$6,948,522

2009.07.022010.07.17

West Incheon area Power Transmission


Line . CheongLa 1st
(Earth Work & Structure)

$2,202,097

2009.07.172010.08.31

Remarks

Segment
was sep
-parated by

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Korea
Electronic
Power Co.
(DongYang)

Dongdaemoon area Power supply Line


Project (Tunneling)

$3,582,583

2009.07.212011.11.15

Korea
Electronic
Power Co.
(Ino C&D)

Euljiro area Power supply Line Project


(Earth Work & Structure)

$1,051,478

2010.01.282010.10.30

Korea
Electronic
Power Co.
(Hyundai E&C.)

Euljiro area Power supply Line Project


(Earth Work & Structure)

$192,564

2010.01.282010.10.30

Korea
Electronic
Power Co.
(Hyundai E&C.)

Gyeongin Arabatgil in west Incheon


Area Power Supply Line Project 2nd

$5,240,229

2010.02.272011.01.21

City of Pohang

City park in abandoned rail roads


Project (Underpass Construction)

$539,042

2009 2011.04.28

Korea
Electronic
Power Co.
(Sambo E&C)

South Daegu area Power supply Line


Project (Messer Shield)

$2,204,004

2010.03.042011.04.30

Korea
Electronic
Power Co.
(POSCO)

Enlargement of Gongchon sewage treat


ment Project (High class treatment syste
m, Boring, Grouting)

$626,840

2010.02.202012.04.02

Korea
Electronic
Power Co.
Gyeong In
(Hanyang Con.)

DeokYang Zone Power supply line


Project (tunneling & structure)

$974,261

2010.04.142011.08.07

Remarks

Segment
was sep
-parated

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Korea
Express way Co.
(Hanjin Heavy
Ind. & Con.
Co., Ltd.)

Express way of Samcheok- Donghae No


. 65, Jeoncheon Bridge Lim Constructi
on

$6,622,498

2010.04.222016.03.31

Korea
Electronic
Power Co.
(TaePyungYang)

Busan Yonjae area Power supply Line


Project (tunneling & Structure)

$2,783,603

2010.05.282012.10.10

Korea
Electronic
Power Co.
Busan Branch
(Dongshin Con.)

Sooyoung area Power supply Line


Project (Earth Work )

$1,535,748

2010.08.102011.05.31

Korea
Electronic
Power Co.
(Kolong E&C.)

Eui-Jeong-boo Area Power SupplyLine


Project 1st (Earthwork & Ferro concrete)

$11,868,446

2010.07.202012.03.11

Korea
Electronic
Power Co.
(Hyundai E&C.)

Gyeongin Arabatgil in west Incheon


Area Power SupplyLine Project
(Complex shield Tunneling)

$2,465,205

2010.09.072011.04.30

Korea
Electronic
Power Co.
Joong-bu branch
(Shinhwa Con.)

Jeonbuk innocity Power supply Line


Project

$4,604,385

2010.03.042011.04.30

Korea
Electronic
Power Co.
(Hyundai E&C.)

Gyeongin Arabatgil in west Incheon


Area Power SupplyLine Project
(Large vertical hole structure & cut and
cover Power supply Line Project)

$3,107,722

2010.11.232012.08.31

Korea rural
community Co.
(Gyeongdo Co.)

Sam-hak zone arable alnd remodeling


project (Earth work)

$1,475,119

2010.09.202011.12.20

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)
Client

Name of Project

Iksan Ministry of
land transpot &
Maritime affairs
(Daelim Con.)

Dongjin river flood control project


Doowolcheon Doowolje repair works
(Pavement work)

Korea
Electronic
Power Co.
(Hyundai E&C.)

Busan Dong-rae area Power supply


Line Project (Cut and cover Power
supply Line work)

Korea
Express way Co.
(Byuksan Con.)

Expressway of Naeng-Jeong & Boosan


(No.104) extension and pavement work
(Earth work & Structure)

Lotte Shoping
(Lotte Con.)

Non excavation of driveway of Gimpo


Air port in Gimpo sky APT

Gangbuk-gu in
City of Seoul
(Yangwoo con.)

Sooyou 2 Sewage Treatment Plant 2nd


zone

Korea
Electronic
Power Co.
Joong-bu branch
(Lotte Con.)

Daegu area Power supply Line


(2nd, 5th ) Project

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

$509,056

2010.10.042012.03.15

$2,721,640

2010.05.282012.10.10

$28,531,935

2010.08.102011.05.31

$1,678,742

2011.04.262011.11.30

$8,144,589

2011.05.272015.05.10

$1,939,958

2011.07.152012.05.15

Korea
Electronic
Yeosoo area Power supply Line
Power Co.
work (Earth Work)
Gwang-ju branch
(Dae-Song.)

$1,663,489

Korea
Electronic
Suwon Yong-tong area Power
Power Co.
supply Line work
Gwang-ju branch
(Dong-seo Con.)

$2,478,469

2011.08.102012.04.30

2011.09.052012.10.18

Remarks

FOR HUMAN AND FUTURE


02. Major Experiences
(Exchange rate: \ 1049/1$- Aug.01.2011)

12/ 31/ 2011 (Excluded V.A.T)

Contract Amount
(USD)

Contract
Period

Tap-Jeong area raising embankment


of agricultural reservoir

$3,322,212

2011.09.292012.12.28

Expressway of SamCheok Donghae


Korea
Express way Co. (No.65) construction work (Zone 4)
(Hanjin-Heavy Ind.) PCT Girder method of Construction

$6,415,634

2011.10.212016.03.30

Korea
Electronic
Power Co.
Joong-bu branch
(Woojin)

$4,176,358

2011.12.192012.09.15

Client
Korea rural
community

Corporation
(Nonsan Branch.)

Name of Project

Daegu, dong-gu area Power supply


Line Project (Shinseo- Steem suplly and
power generation anshim 1 cha)

Remarks

Location

Map of Company

FOR HUMAN AND FUTURE


01. Map of company

FOR HUMAN AND FUTURE


01. Map of company

Contact & Extension No.


Contact
F A X

: 82-(0)2 - 4 1 9 8 3 0 1
: 82-(0)2 - 4 2 4 9 0 4 5

Planning
&
Strategy

Executive
Department

116

Management
Team
146

Construction
team
100

Finance &
Account
112

Technical support
team
163

Project team
122

Engineering
Department
Sales & promotion
Team
213

Iljuk
Factory
Tel:
031-6720431
FAX:
031-6726652

FOR HUMAN AND FUTURE

21C Leader
Concerning Value based management .

Trustful company
To be a best partner

Creativeness & Development


For the competitiveness.