BILL NO.

3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Element 1A : Work Below Lowest Floor Finish ( All Provisional )


A Excavate oversite to reduce level average
200mm deep commencing from formation
level, get out, load and cart away from site
including levelling grading and ramming
bottom of excavation

4.00

32.00

B Excavate
trench for ground beam not
exceeding 1.50m deep, commencing from
formation level, get out, part return, fill in, well
rammed and remainder load and cart away
from site

13.20

13.20

12.54

75.24

D 50mm Thick under ground beam

13.80

27.60

E 50mm Thick under floor slab

13.80

82.80

F Ground beam (Grade 25)

228.80

228.80

G 200mm Thick floor slab (Grade 25)

28.60

143.00

42 Kg

3.50

147.00

78 Kg

3.50

273.00

Hardcore bed as specified :C 100mm Thick under floor slab


Lean concrete (Grade 15) blinding as specified :-

Vibrated reinforced concrete as specified :-

Mild steel bar reinforcement as specified :Ground Beam


H 10mm Diameter bar as links
High tensile bar reinforcement as specified :Ground Beam
J

16mm Diameter bar

B3/1A/1

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Floor Slab
K 12mm Diameter bar to slab

228 Kg

To Collection

3.50
RM

798.00
1,820.64

Element 1A : Work Below Lowest Floor Finish ( All Provisional ) (Cont'd)


Sawn formwork as specified : A Sides of ground beam not exceeding 1.00m

45.00

405.00

B Edge of floor slab exceeding 200mm but not


exceeding 300mm

10

10.00

100.00

2.75

13.75

C Layer of polythene or other equal and approved


damp proof membrane, well lapped at joints
and laid on lean concrete (measured nett-no
allowance made for laps) to ground slab

B3/1A/2

BILL NO. 3
Item

Rumah Sampah
Description

Qty

To Collection

Unit

Rate

RM

Amount

518.75

Element 1A : Work Below Lowest Floor Finish ( All Provisional ) (Cont'd)


COLLECTION
B3/1A/1

1,820.64

B3/1A/2

518.75

B3/1A/3

BILL NO. 3
Item

Rumah Sampah
Description

Qty

To Collection

Unit

Rate

RM

B3/1A/4

Amount

2,339.39

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Element 1B : Apron And Perimeter Drain


A Excavate oversite to reduce level average
200mm deep commencing from formation
level, get out, load and cart away from site
including levelling grading and ramming
bottom of excavation

4.00

20.00

6.05

121.00

13.86

69.30

28.60

143.00

10

10.00

100.00

Hardcore as specified :B 100mm Thick under apron slab


Lean concrete (Grade 15) blinding as specified :C 50mm Thick under apron slab
Vibrated reinforced concrete (Grade 25) as specified :D 150mm Thick apron slab, laid to fall
--------------------------------------Sawn formwork as specified :E To edge of apron slab, exceeding 100mm and
not exceeding 200mm high

B3/1B/5

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

To Collection

Rate

RM

Amount

453.30

Element 1B : Apron And Perimeter Drain (Cont'd)


Ramp
Excavate oversite to reduce level average
200mm deep commencing from formation
level, get out, load and cart away from site
including levelling grading and ramming
F bottom of excavation

4.50

9.00

7.00

14.00

13.80

27.60

46.00

92.00

Hardcore as specified :G 100mm Thick under ramp slab


Lean concrete (Grade 15) blinding as specified :H 50mm Thick under ramp slab
Vibrated reinforced concrete as specified :J

200mm Thick ramp slab, laid to fall

B3/1B/6

BILL NO. 3
Item

Rumah Sampah
Description

Qty

To Collection

Unit

Rate

RM

Amount

142.60

Element 1A : Work Below Lowest Floor Finish ( All Provisional ) (Cont'd)


COLLECTION
B3/1B/1

453.30

B3/1B/2

142.60

B3/1B/7

BILL NO. 3
Item

Rumah Sampah
Description

Qty

To Collection

Unit

Rate

RM

B3/1B/8

Amount

595.90

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Element 2A : Frame
Vibrated reinforced concrete (Grade 25) as
specified :A Column

228.80

228.80

B Roof beam

228.80

228.80

32 Kg

3.50

112.00

52 Kg

3.60

187.20

32 Kg

3.60

115.20

F 12mm Diameter bar

31 Kg

3.60

111.60

G 16mm Diameter bar

22 Kg

3.60

79.20

Mild steel bar reinforcement as specified :Column

C 10mm Diameter bar


Roof beam
D 10mm Diameter bar
High tensile bar reinforcement as specified :Column
E 12mm Diameter bar
Roof beam

Sawn formwork as specified :H Sides of column


J

Sides and soffit of roof beam

B3/2A/9

43.00

387.00

43.00

344.00

To Summary

RM

B3/2A/10

1,793.80

BILL NO. 3
Item

Rumah Sampah
Description

Element 2B : Roof
Concrete
interlocking
specified :-

Qty

tiles

Unit

Rate

Amount

as

A Design, fabricate, deliver and install


lightweight structural roof trusses comprising
of purlin, rafter and etc. Whoist and install
into position as per manufacturer's
specification.

16

150.00

2,400.00

B 380mm x 230mm "Monier" concrete roofing


tiles laid at 25 pitch.

16

30.00

480.00

25.00

125.00

D 200mm x 75mm thick fascia board fixed to rafters.

16

40.00

640.00

E Prepare, knot, prime, stop and apply "Nippon"


gloss paint to fascia boards.

16

16.50

264.00

C Extra over for Standard Ridge Tiles.

B3/2B/11

To Summary

RM

B3/2B/12

3,909.00

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

13

55.00

715.00

1.60

11.20

Element 2C : External Wall


Brickwork in common clay bricks in cement
and sand (1:3) mortar with an approved
plasticiser reinforced with and including
`EXMET' or approved equivalent expanded
fabric reinforcement at every fourth course as
A 114mm Thick brickwall
Damp proof course as described (measured
nett-no allowance made for laps) laid on
brickwall
B 114mm wide

To Summary

RM
B3/2C/13

726.20

BILL NO. 3
Item

Rumah Sampah
Description

Qty

B3/2C/14

Unit

Rate

Amount

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Element 2D : Window & External Door


Window
Supply and install the Aluminium Louver
Window and including and other accessories
for the proper installation of the works all as
per manufacturer's instruction and
recommendation.
A Aluminium Louver Window with size 750mm 600m

2 No.

780.00

1560.00

B Aluminium Louver Window with size 1500mm 600

1 No.

1150.00

1150.00

1 No.

2300.00

2300.00

External Door
Supply and install the Galvanised Roller
Shutter Door and including and other
accessories for the proper installation of the
works all as per manufacturer's instruction and
recommendation.
Galvanised Roller Shutter Door 2230mm
C 2100mm high.

B3/2D/15

BILL NO. 3
Item

Rumah Sampah
Description

Qty

To Summary

Unit

Rate

RM

B3/2D/16

Amount

5010.00

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

19

16.50

313.50

19

4.00

76.00

C 19mm Thick plaster to wall and column

22

17.00

374.00

D Extra over for 25mm Thick grooveline

28

4.50

126.00

22

20.00

440.00

Element 3A : Wall Finishes


The quantities in these Bills for different
types of colours and finishes are measured
nett from the Drawings in accordance with
the Standard Method of Measurement. The
Contractor is to conform to the specified
colours as instructed by the S.O.
INTERNAL WALL FINISHES
Cement and sand (1:3) mixed with an approved
plasticiser internally as described:A 19mm Thick plaster to wall and column
Homogeneous wall tiles as described bedded,
jointed and pointed in cement mortar or cement
and sand (1:3) screed to wall.
B 200mm 200mm homogeneous tiles
EXTERNAL WALL FINISHES
Cement and sand (1:3) mixed with an approved
plasticiser internally as described:-

Prepare and apply one alkali resisting primer


and two coats 'ICI' or other equal and approved
emulsion paint as described to wall and
columns.
E Plastered wall and column

B3/3A/17

To Summary

RM

B3/3A/18

1,329.50

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

13.20

66.00

15.00

75.00

20.00

100.00

10.00

40.00

Element 3B : Floor Finishes


INTERNAL FLOOR FINISHES
Cement and sand (1:3) screed trowelled to
receive homogeneous tiles as described:A 20mm Thick to floor slab laid to fall
Homogeneous tiles as described bedded,
jointed and pointed in cement mortar on
cement and sand (1:3) screed to floor :B 300mm x 300mm x 7mm Thick "Sixny" or
other equal and approved Homogeneous tiles
Extra over for 150mm50mm Thick scupper
C drain.
Cement and sand (1:3) screed trowelled hard
and smooth as described:D 20mm Thick to floor laid to fall

B3/3B/19

To Summary

RM

B3/3B/20

281.00

BILL NO. 3
Item

Rumah Sampah
Description

Qty

Unit

Rate

Amount

Element 4 : Sanitary Appliance


Supply and fix the following item to Refuse Chamber :Supply and install the UPVC floor trap overall
size 150mm x 150mm including fixing into
tiled floor wares and fittings, including
assembling and jointing to services and waste
pipe complete with all approved mounting
screws, sealants and jointing materials
A

Supply and install the chrome plated bib tap


with handle including fixing completion,
assembling and jointing to services and waste
pipe complete with all approved mounting
screws, sealants and jointing marerials

B3/4/21

1 No.

31.50

31.50

1 No.

34.38

34.38

To Summary

RM

B3/4/22

65.88

Summary

BILL NO. 3
Item

Description

Rumah Sampah
Qty

Unit

Rate

Amount

Summary

1A Work Below Lowest Floor Finish

B3/1A/3

2,339.39

1B Apron And Perimeter Drain

B3/1B/3

595.90

2A Frame

B3/2A/1

1,793.80

2B Roof

B3/2B/1

3,909.00

2C External Wall

B3/2C/1

726.20

2D Window And External Door

B3/2D/1

5,010.00

3A Wall Finishes

B3/3A/1

1,329.50

3B Floor Finishes

B3/3A/1

281.00

B3/4/1

65.88

4 Sanitary Appliance

B3/23

Summary

TOTAL CARRIED TO FINAL SUMMARY

B3/24

RM

16,050.67