DATA BOOK

Item No.

Quantity

Unit

Specification of item of work

Unit

Chapter I -- Clearing Site & Ferlling Trees


Clearing grass & other overgrowths of vegitation and small trees of girth up to 30 cm
including rooting out and removal of rubbish up to a distance of 150 mtr outside the
periphery of area cleared

1
0.50

Man
Clearing grass & other overgrowths including uprooting of thick vegitation and small trees of
girth up to 30 cm and removal of rubbish up to a distance of 150 mtr outside the periphery
of area cleared

2
1.00

2.00

100 M2

Man

Clearing thick & thorny jungle and small trees of girth up to 30 cm including rooting out and
removal of rubbish up to a distance of 150 mtr outside the periphery of area cleared

100 M2

100 M2

Man
Felling Trees
Felling Trees including cutting of Trunks and branches, removing the root completely and
stacking servicable materials.

4
a

Each

Beyond 30 cm and up to 60 cm girth

0.20
0.25
LS

Wood cutter (felling trees, cutting branches, rooting out etc.)


Man ( removing earth, assisting wood cutter, removing stumps, stacking
servicable materials)
Sundries such as hire for rope, axe etc.

Beyond 60 cm and up to 120 cm girth

0.30
0.50
LS

0.45
Each

Wood cutter (felling trees, cutting branches, rooting out etc.)


Man ( removing earth, assisting wood cutter, removing stumps,
stacking )

0.75

Sundries such as hire for rope, axe etc.

Beyond 120 cm and up to 180 cm girth


0.60
0.60
LS

Sundries such as hire for rope, axe etc.


Beyond 180 cm and up to 240 cm girth

0.90
0.75
LS
e

5
a

Each

Sundries such as hire for rope, axe etc.

1.20
Each

Wood cutter (felling trees, cutting branches, rooting out etc.)


Man ( removing earth, assisting wood cutter, removing stumps,
stacking )
Sundries such as hire for rope, axe etc.

Uprooting & removing stumps of trees


Palmyrah, Co-conut stumps including stacking
0.4

Man

0.6

Stumps of trees of all girths, other than palmirah & co-conut, including stacking
Man

1.00

Wood cutter (felling trees, cutting branches, rooting out etc.)


Man ( removing earth, assisting wood cutter, removing stumps,
stacking )
Beyond 240 cm and up to 300 cm girth

1.20
0.9
LS

Each

Wood cutter (felling trees, cutting branches, rooting out etc.)


Man ( removing earth, assisting wood cutter, removing stumps,
stacking )

1.37

Each

Each

DISMANTLING & DEMOLITION


1.The Term 'dismantling' implies carefully taking up or down to ground and removing all materials with out
damage. Articles shall be passed by hand, where necessary and lowered to the ground and not thrown. Where
these are fixed by nails, screws, bolts etc. dismantling shall be done by taking out the fixing with proper tools
and not by tearing or ripping off.

Note

2.The Term 'dismantling' implies taking up or down to ground or breaking up.


3. The rate for items include seperation of servicable materials from the unservicable, stacking with in 150 m.
and disposal of debris.
4. Measurement of all work except hidden work shall be taken before demolition or dismantling and no
allowance for increase in bulk shall be allowed.
5. Supporting members such as rafters, purlins, beams, joists, trusses etc. whereof wood shall be given in cubic
contents and its appropriate units and where of steel and iron sections in quintals.
6. The weight of all steel and iron work shall be given in quintals and shall be computed from standard tables
unless the actual weight can be readily determined.
7. All copings, corbels, cornices and other projections shall be included with the wall measurements.
8. Honey comb work and hollow block walling shall be measured as solid.
9. In measuring thickness of plastered walls, the thickness of plaster shall be excluded.
10. Dismantling Doors and Windows ( wood or steel ) shall be paid for each and those exceeding 3 Sq. Mtr.
Each shall be measured separately.
Item No.

Quantity

6
0.70

Specification of item of work

Unit

DISMANTLING, clearing away and carefully stacking materials useful for re-use for any
thickness of walls of BRICK, LATERITE OR RUBBLE IN MUD, including disposal of debris
with in a distance of 150 M.

M3

Man
DISMANTLING, do of Dry Rubble work, Dry Grouted Rough Stone or Dry Stone
Bouldersincluding disposal of debris with in a distance of 150 M.

M3

0.70

Man
of Brick, Laterite or Rubble in Lime or Surkey Mortar do including

M3

1.15

DISMANTLING do
disposal of debris
Man
DISMANTLING do
debris

of Brick, Laterite or Rubble in Cement Mortar do including disposal of

M3

of ASHLAR MASONRY

.do including disposal of debris with in a

M3

Dismantling and removing Ashlar Paving of any thickness and carefully stacking materials
use ful for reuse with in a distance of 150 mtr.

M3

9
1.60

Man

0.35
1.60

DISMANTLING do
distance of 150 M.
Mason
Man

10

11
0.15
0.80

Stone Mason
Mason
Chipping & removing portions of existing RCC work carefully with out damaging remaining
structure and removing the debris with in a distance of 150 mtr.

12
0.05
0.05

Stone Mason
Man
Lifting & removing tiles set in mortarin floors including clearing & stacking materials and
removing the debris with in a distance of 150 mtr.

13
0.25
0.25

10 dm3

Brick Layer
Man

10 M2

Dismantling and removing Mangalore Tiles over roofs including ridges, hips, valley sheets,
wind ties a d bordering but excluding roof timber and stacking materials within a distance of
150 mtr.

14
0.50

Man
Dismantling and removing Pan or Pot Tiles over roofs including ridges, hips, valley sheets,
wind ties a d bordering but excluding roof timber and stacking materials within a distance of
150 mtr.

15
1.00

0.014
0.014

0.20
0.18
0.30

0.15
0.10
0.20

0.10
0.05
0.10

0.35
0.35

0.10
0.10

0.10
0.05

0.05
0.02

M2

Carpenter
Man
Taking down shutters of ventilators including removal of hinges & all other fittings and
stacking with in a distance of 150 mtr.

23

M2

Carpenter
Man
Taking down shutters of Windows with or with out ventilators including removal of hinges &
all other fittings and stacking with in a distance of 150 mtr.

22

10 M2

Carpenter
Man
Taking down shutters of Doors with or with out ventilators including removal of hinges & all
other fittings and stacking with in a distance of 150 mtr.

21

Each

Mason
Carpenter
Man
Dismantling, removing and lowering planked sheeting or boarded floor or ceiling etc. and
stacking materials with in a distance of 150 m.

20

Each

Mason
Carpenter
Man
Dismantling & Removing Ventilators including removal of shutters, hinges, hold fasts and all
other fittings and stacking materials with ina distance of 150 m.

19

Each

Mason
Carpenter
Man

Dismantling & Removing Windows with or without Ventilators including removal of shutters,
hinges, hold fasts and all other fittings and stacking materials with ina distance of 150 m.

18

10 dm3

Carpenter
Man

Dismantling & Removing Doors with or without Ventilators including removal of shutters,
hinges, hold fasts and all other fittings and stacking materials with ina distance of 150 m.

17

10 M2

Man
Dismantling & removing wrought and framed Timbers in roofs & Floors and stacking
materials with in a distance of 150 Mtr.

16

10 M2

Carpenter
Man

M2

Dismantling and removing old thatched roof, including tying materials in to small bundles for
reuse and disposal of unservicable materials with in a distance of 150 M.

24
0.60

Man
Demolishing mud or sundried brick walls of any thickness including disposal of debris with
in a distance of 150 M.

25

10 M2

M3

0.50

Man

M3

1.85

Demolishing concrete in lime or surki mortar and clearing away debris with in a distance of
150 M.
Man
Demolishing concrete in cement mortar and clearing away debris with in a distance of 150
M.

M3

26

27
3.00

Man
Demolishing R C C Work including seperately removing and stacking the available
reinforcement and clearing away debris with in a distance of 150 M.

28
0.03

Man

Demolishing old asphalt flooring and disposal of debris with in 150 M.

29
1

0.3

0.5

10 M2

Man
Demolishing & removing old Cement plaster & disposal of debris with in 150 M.

31

10 M2

Man
Demolishing & removing old lime plaster and disposal of debris with in 150 M.

30

10 dm3

10 M2

Man
Chapter II -- Excavation & Earthwork

51

(*)Earth Excavation in Ordinary Soil and depositing on bank with initial lead of 50 m. & lift
up to 1.5 m including breaking clods, watering, ramming and sectioning of spoil banks etc.
complete (*) These items of work will apply to building excavation for foundation to
compensate for narrow section of E/W
1.1

Man

3.0

Boy = 3 x 0.75 = 2.25 Man

4.0
3.0

(*)Earth Excavation in Hard Soil and depositing on bank with initial lead of 50 m. & lift up to
1.5 m including breaking clods, watering, ramming and sectioning of spoil banks etc.
complete (*) These items of work will apply to building excavation for foundation to
compensate for narrow section of E/W
Man
Boy = 3 x 0.75 = 2.25 Man

52

53

Excavation in Ordinary Rock and depositing on bank with initial lead of 50 m. & lift up to
1.5 m including breaking clods, watering, ramming and sectioning of spoil banks, stacking
servicable material for measurements and disposal of unservicable material as directed.
10.0
2.3

Man
Boy = 2.3 x 0.75 = 1.725 Man

10 M3

10 M3

10 M3

53(a)

1.60
4.50
3.53
0.60
0.60
0.85
5.65
1.15

Kg
m

54
3.20
9.00
10.60
1.20
1.20
4.50
2.62

Kg
m

1.75

3.20
23
0.33
0.74
0.74
0.37

Blasting in hard Rock (measured in solid), conveying blasted rock and stacking for
measurement with in initial lead of 50 m. and lift of 1.5 m.
Country Blasting Powder
Country Fuse
Quarrymen for boring holes 45 cm deep & 19 to 22 mm dia.
Quarrymen for charging holes with pqwder and tamping & firing
Hammerman for breaking big boulders
Men for conveying 15 m3 of blasted rubble with in 50 m. @ 3 Men per 10 M3 of Rubble.
Men for stacking 15 m3 of blasted rubble for measurement @ 1.75 Men per 10 M3
Stacking Rubble for Measurement
Man

54(a)

54(b)

Excavation in Medium Rock and depositing on bank with initial lead of 50 m. & lift up to 1.5
m including stray blasting, breaking clods, watering, ramming and sectioning of spoil banks,
stacking servicable material for measurements and disposal of unservicable material as
directed.
Country Blasting Powder
Country Fuse
Quarrymen for boring holes
Quarrymen for charging holes with pqwder and tamping & firing
Hammerman for breaking big boulders
Women for conveyance of blasted materials
Men
Boy = 1.15 x 0.75 = 0.8625 Man

Blasting and removing hard Rock (measured in solid), in wet condition using machinery
such as Jack Hammer with Compressor and explosives such as Gelatine, Detonators and
conveying blasted rock and stacking for measurement with in initial lead of 50 m. and lift of
1.5 m.
Kg Gelatine
Nos. Detonators
No Drilling rod ( One Rod per 30 M3)
Quarry Man
Man Mazdoor
Blaster ( For charging hole & Firing)

2.50

Hammer man for breaking boulders

4.50

Man ( for removing blasted rock to a distance of 50 M.

2.62

Man for Stacking

0.37
0.74
0.37
14.80
0.185
LS
LS

day
day
day
Ltr
Ltr

5.30
12.30
2.00
3.00
6.00

0.90
2.75

(**)Earth Excavation in Ordinary Soil and depositing with initial lead up tp 50 m. & lift up to
1.5 m including neat banking. (**) These items of work do not require breaking clods,
ramming and sectioning of spoil banks.
Man
Boy = 2.75 x 0.75 = 2.0625 Man

56

10 M3

10 M3

10 M3

Hire for Compressor


Hire for Jack Hammer
Hire for Air Line
Diesel for Compressor
Engine Oil
Current Charges
Sundry

(*) Chiselling in hard rock (where blasting is prohibited), measured in solid, depositing and
stacking materials for measurement with in initial lead of 50 m. and lift up to 1.5 m.
Quarry man
Hammer man
Stone cutter
Men
Women

55

10 M3

5.00

3.70
2.50

10 M3

10 M3

3.60
2.50

(**)Earth Excavation in Hard Soil and depositing with initial lead up tp 50 m. & lift up to 1.5
m including neat banking. (**) These items of work do not require breaking clods, ramming
and sectioning of spoil banks.
Man
Boy = 2.50 x 0.75 = 1.875 Man
Extra for every additional lift of 1.5 m. or part there of over initial lift
Women

10 M3

0.40

10 M3

1.70

Extra for every additional lead of 50 m. or part there of over initial lead
Women

57

58

59

10 M3

60
Excavation in or under water or liquid mud (@) Extra percentage in rate is applicable in
respect of each item but limited to quantities of work executed in these difficult conditions.
Add to the Respective Item 20 %
61
0.65
0.04
LS
62
0.20
63

Ltr
day

Extra for Consolidation by Power Roller ( Daily Out turn 1850 M3 )


Diesel Oil for Roller
Hire for Roller
Sundries such as Fencing, Lighting, Watching etc.

10 M3

0.45

Trimming, dressing and sectioning road berms or slopes and earth surface
Man
Earth Work for Open Well Excavation
Diameter of excavation
Add to the Rate for Initial Depth for defferent classes of soil

Up to 2.5 M

2.5 to 3.5
M

Above
3.5 M

25 %

20%

10%

(i)

For First Depth of 1.5 m. after initial depth of 1.5 m.

(ii)

For Second Depth of 1.5 m. & up to & including 5th depth after do

25 %

20%

10%

(iii)

For 6th Depth of 1.5 m.after initial & subsequent depths. Add to previous

10 %

10%

10%

Chapter III
Mortar & Concrete
All measurements shall be taken to the nearest entimetre, except that thickness of slabs, partition etc. and sectional
diamensions in case of posts, columns, beams and like shall be taken to the neatrest Half c.m.
No deduction shall be made for (1) end of dissimilar materials 9eg., Joists, beams, posts, girders, rafters, purlins,
trusses, corbel steps etc.) up to 500 square centimetre in section.
(2) Opening up to 0.1 sq. mtr.
Note: In calculating area of opening up to 0.1 sq.mtr., the size of opening includes the thickness of any separate
lintels or sills. No extra labour for forming sjuch openings or voids shall be measured.
In Volume occupied by water pipes, conduits etc. not exceeding 25 sq. centimetres in cross sectional area shall not
be deducted.
Reinforcement shall be measured seperately and paid for.
In T Beam construction the floor or roof shall be taken as running continueously through, and the beams as that
portion above or below the floor or roof.
Columns shall be measured from the floor surface to the underside of the beams or slabs as the case may be.
Where columns are connected to beams by "haunchings", the columns shall be measured up to the springing of the
haungings and the latter included with the beams. Where the width of the beam is less than the width of the
Column, the extra width at junction shall be included with the beam.
Item No. Quantity
Unit
Specification of item of work
Unit
101
m3
Preparing Lime Mortar 1:2 by grinding in power-driven mortar mill.
0.50
m3
Lime
m3
3
1.00
m
Sand
m3
0.14
Day Hire charges for mortar mill
Day
1.20
ltr
Fuel, Oil
ltr
LS
Sundries such as grease, lubricating oil, cotton waste etc.
LS
1.25
0.14
Day Pay of Driver
0.14
Day Pay of Cleaner
0.35
Man
0.35
Woman
Total
102
0.50
0.25
1.00
0.14
1.20
LS

103
0.67
0.33
0.67
0.14
1.20
LS

104
0.50
1.00
0.35
0.35

m3
m3
m3
m3
Day
ltr

m3
m3
m3
m3
Day
ltr

m3
m3
m3
Day

Preparing Surki Mortar 1:1/2:11/2 by grinding in power-driven mortar mill.


Lime
Surki
Sand
Hire charges for mortar mill
Fuel, Oil
Sundries such as grease, lubricating oil, cotton waste etc.
Labour
same as item 101
Total

m3
m3
m3
Day
ltr
LS

1.25

m3
m3
m3
Day
ltr
LS

1.25

Preparing Surki Mortar 1:1/2:1 by grinding in power-driven mortar mill.


Lime
Surki
Sand
Hire charges for mortar mill
Fuel, Oil
Sundries such as grease, lubricating oil, cotton waste etc.
Labour
same as item 101
Total
Preparing Lime Mortar 1:2 by grinding in bullock mill.
Lime
Sand
Pair of Bull with Driver for turning mill
Man for measuring, carrying & depositing for mixing

m3
m3
Day

1.40

105
0.50
0.25
0.75

106
0.67
0.33
0.67

107

Woman
Total
m3
m3
m3
m3

m3
m3
m3
m3

0.95
0.48
0.10
1.00
1.40

109

Lime
Surki
Sand
Labour
Total

m3
m3
m3
same as item 104

Preparing Surki Mortar 1:1/2:1 by grinding in bullock mill.


Lime
Surki
Sand
Labour
Total

m3
m3
m3
same as item 104

m3

Preparing Mud Mortar


Man for digging earth & tampering well under foot
Boy for bringing Water
Total

m3
Each
Each

m3
m3
m3

Lime Concrete using 40 mm nominal size broken stones


40 mm nominal size broken stones
Lime mortar 1:2
Mason
Man
Woman
Total

m3
m3
m3
Each
Each
Each

0.70
0.35

108

Preparing Surki Mortar 1:1/2:11/2 by grinding in bullock mill.

Surki Concrete using 40 mm nominal size broken stones and surki


mortar 1: 0.5:1.50
40 mm nominal size broken stones
Surki mortar 1:0.5:1.5
Labour
same as item 108
Total

0.95
0.48

m3
m3
m3

0.95
0.48
228

m3
m3
m3
Kg

Cement Concrete 1:3:6 using 40 mm nominal size broken stones


40 mm nominal size broken stones
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48
171

m3
m3
m3
Kg

Cement Concrete 1:4:8 using 40 mm nominal size broken stones


40 mm nominal size broken stones
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48

m3
m3
m3

Cement Concrete 1:5:10 using 40 mm nominal size broken stones


40 mm nominal size broken stones
Sand

m3
m3
m3

110

111

112

m3
m3
m3

137

113

Kg

Cement
Labour
Total

Kg
same as item 108

0.95
0.48

m3
m3
m3

Lime Concrete 1:2:4 using 40 mm nominal size broken bricks


40 mm nominal size broken brick
Lime mortar 1:2
Labour
same as item 108
Total

m3
m3
m3

0.95
0.48
228

m3
m3
m3
Kg

Cement Concrete 1:3:6 using 40 mm nominal size broken bricks


40 mm nominal size broken bricks
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48

m3
m3
m3

Lime Concrete 1:2:4 using sifted silicious gravel


Sifted silicious gravel
Lime mortar 1:2
Labour
same as item 108
Total

m3
m3
m3

0.95
0.48
228

m3
m3
m3
Kg

Cement Concrete 1:3:6 using Sifted silicious gravel


Sifted silicious gravel
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48
171

m3
m3
m3
Kg

Cement Concrete 1:4:8 using Sifted silicious gravel


Sifted silicious gravel
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48
137

m3
m3
m3
Kg

Cement Concrete 1:5:10 using Sifted silicious gravel


Sifted silicious gravel
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95
0.48
115

m3
m3
m3
Kg

Cement Concrete 1:6:12 using Sifted silicious gravel


Sifted silicious gravel
Sand
Cement
Labour
same as item 108
Total

m3
m3
m3
Kg

0.95

m3
m3

114

115

116

117

118

119

120

Lime Concrete 1:2:4 using 40 mm nominal size broken stones mixed


with 80 Kg of cement per m3 of mortar
40 mm nominal size broken stones

m3
m3

0.48
38

m3
Kg

0.95
0.48
48

m3
m3
m3
Kg

121

122
0.009
0.0045
3.30
0.002
0.01
0.035

122(a)

10 dm3
m3
m3
Kg

0.009
0.0045
4.32

10 dm3
m3
m3
Kg

0.009
0.0045
2.16

10 dm3
m3
m3
Kg

0.009
0.0045
1.62

10 dm3
m3
m3
Kg

123

124

125
0.90
0.45
81
0.10
1.00

m3
m3
m3
Kg

Lime mortar 1:2


Cement
Labour
same as item 108
Total

Lime Concrete 1:2:4 using 40 mm nominal size broken stones mixed


with 100 Kg of cement per m3 of mortar
40 mm nominal size broken stones
Lime mortar 1:2
Cement
Labour
same as item 108
Total
Cement Concrete 1:2:4 using 20 mm nominal size broken stones for
Reinforced Cement Concrete work
20 mm nominal size broken stoness
Sand
Cement
Mason
Man
Woman (including for watering)
Total
Cement Concrete 1:1.5:3 using 20 mm nominal size broken stones for
Reinforced Cement Concrete work
20 mm nominal size broken stoness
Sand
Cement
Labour
same as item 122
Total
Cement Concrete 1:3:6 using 20 mm nominal size broken stones for
Reinforced Cement Concrete work
20 mm nominal size broken stoness
Sand
Cement
Labour
same as item 122
Total
Cement Concrete 1:4:8 using 20 mm nominal size broken stones for
Reinforced Cement Concrete work
20 mm nominal size broken stoness
Sand
Cement
Labour
same as item 122
Total
Grouting 20 cm depth to revetments with cement concrete 1:8:16 using
20 mm nominal size broken stones and rubbing joints smooth.
20 mm broken stones
Dry Sand
Cement
Mason
Man

m3

m3
m3
m3

10 dm3
m3
m3
Kg

10 dm3
m3
m3
Kg

10 dm3
m3
m3
Kg

10 dm3
m3
m3
Kg

m3
m3
m3
Kg
Each
Each

1.40

126
0.90
0.45
130

127

m3
m3
m3
Kg

0.95
0.48

m3
m3
m3

m2

128
1
0.48

129

Woman

10
0.3
0.03
0.25
0.5
0.5

130
1
0.45
1
1.48

130a
1

131
0.006
0.003
2
0.1

m3
m3
m3

m2
m3
m3

Qntl
Qntl
Kg

Qntl
Qntl

10 dm2
m3
m3
Kg
Kg

Grouting 20 cm depth to aprons with cement concrete 1:5:10 using 20


mm nominal size broken stones and rubbing joints smooth.
20 mm broken stones
Dry Sand
Cement
Labour
same as item 125
Grouting 20 cm depth to aprons and revetments with lime concrete 1:2:4
using 40 mm nominal size broken stones and pointing with cement
mortar 1:2.
20 mm broken stones
Lime mortar 1:2
Labour
same as item 125
Add for pointing with cement mortar 1:2
Total
Grouting 20 cm depth to aprons and revetments with surki concrete
using 40 mm nominal size broken stones and surki mortar 1:0.5:1.5 and
pointing with cement mortar 1:2.
Rate as per Grouting 20 cm depth with lime concrete 1:2:4
Add or Deduct difference in cost of mortar
Total

Each

m3
m3
m3
Kg

m3
m3
m3
10 m2

m3
m3
m3

Repair Grouting 20 cm. depth to aprons and revetments with surki


concrete using 40 mm nominal size broken stones and surki mortar
1:0.5:1.5 and pointing with surki mortar.
Surki concrete using 40 mm broken stones
Surki mortar 1:0.5:1.5
Extra Labour Brick Mason
Extra Labour Man
Extra Labour Woman
Total

10 m2
m3
m3
Each
Each
Each

Reinforcement for R.C.C. works, bent, tied and placed in position (plain
grill requiring bending cold)
M.S.Rod for grills
Iron wire for tying grills (22 G)
Black smith for bending cold
Men for tying grills and placing in position
Total

Qntl
Qntl
Kg
Each
Each

Reinforcement for R.C.C. works, bent, tied and placed in position (plain
grill requiring bending cold) using Torsteel
Rate as per Item 130 above
Add difference in Value between twisted and round bars.
Total
Providing 40 mm thick precast jali with cement concrete 1:2:4 using 15
mm broken stones and reinforced with 3 mm dia. G.I.wire including fixing
in cement mortar 1:3, scaffolding charges etc. complete.
15 mm broken stones (nominal size)
Dry Sand
Cement
3 mm duia. G.I. wire

Qntl
Qntl

10 dm2
m3
m3
Kg
Kg

0.11
0.06
0.04
LS
LS

132

Mason
Man
Woman
Labour for cutting & tying GI wire as grills
Scaffolding charges

10 m2

320
190
9
1
LS
4.00
2.50

dm3
dm3
Nos
Kg

a
b

133

134

135

Extra for Form work for RCC work in sunshde, Lintels & Beams
Extra for Form work for RCC work in Columns

10 dm3
10 dm3
Each
Kg
LS
Each
Each

RCC 1:2:4 for Sunshde, Lintel & Beams including all form work,
10 dm3 watering, curing etc. complete but excluding cost of reinforcement
10 dm3 Cement Concrete 1:2:4 using 20 mm broken stones.
. m2 Add for Form Work as per item 132(a)
Total

10 dm3
10 dm3
10 m2

RCC 1:2:4 for Columns including all form work, watering, curing etc.
complete but excluding cost of reinforcement
Cement Concrete 1:2:4 using 20 mm broken stones.
Add for Form Work as per item 132(b)
Extra Man for lifting up of Materials
Total

10 dm3
10 dm3
10 m2
Each

Extra Lift and Labour for RCC Work in First Floor and Successive Floors
up to 5 Mtr height in Each Floor
Add to the Labour for the Relevant Items
For First Floor
10 % Over Ground Floor
For Second Floor
20 % Over Ground Floor
For Third Floor
30 % Over Ground Floor & so on

10 dm3

R.C.C. 1:2:4 in Over Head Reservoirs including all form work, watering,
curing etc. complete but excluding reinforcement ( Up To 5 Mtr height
brace level

0.62

Add 10 % over 132


Add 20 % over 132

10 dm3
10 dm3
10 m2

10 dm3
10 dm3
. m2
0.02

0.07
0.05

10 m2

RCC 1:2:4 in slabs including all form work, watering, curing etc.
10 dm3 complete but excluding cost of reinforcement
10 dm3 Cement Concrete 1:2:4 using 20 mm broken stones.
. m2 Add for Form Work as per item 132
Total

136

137

Form work for R.C.C,. In slabs including wooden planks, joists, bamboo
posts and labour for taking down after completion of work. (Hire and
labour charge only)
30 mm thick mango or jungle wood planks & J.W. joists 100mm x 70 mm
at 60 cm. intervals.
Mango/Jungle wood planks-Taking that materials can be used 4 times
JW Joists & Cleats etc.- Taking the materials can be used 8 times.
Bamboos-Taking the materials can be used 6 times
Spike or Wire Nails
Coir
Carpenter for fitting up forms & taking down after completion
Men
Total

Each
Each
Each
LS
LS

10 dm3

10 dm3 Cement Concrete 1:2:4 using 20 mm broken stones.


. m2 Add for Form Work as per item 132(b)
Total

138

10 dm3
10 m2

Extra Lift and Labour for R.C.C. work in O.H.Reservoirs up to 5 mtr.


Height between each successive brace level
Add to the labour for Relevent Item - 10% over Labour for Initial Height up to 5 mtr.

Chapter IV
Brick work generally shall be in cubic metre.

Brick Work

Thickness of walling - Brick wall up to and including three bricks in thickness shall be measured in multiples of half
brick which shall be demmed to be inclusive of the mortar joints. Where fractions of half brick occur due to
architectural or other reasons, the measurements shall be taken as follows.
For Fractions of 2 cm and under
Actual Measurements.
For Fractions exceeding 2 cm.
Full Half Brick
The Following shall be taken as Half Brick Measurement. For Bricks 19x9x9cm - 10 cm.
Note: During the changeover period, the half brick size shall be deemed to be 11.2cm when the existing brick size
22.9 x 11.2 x x7 cm (nominal size) have to be used.
For Walling which is more than three bricks in thickness, the actual thickness shall be measured to the nearest one
cm.namely fractions including 0.5 centimetre and above shall be measured as one centimetre. and fractions below
0.5 centimetre. shall be ignored.
No deduction or addition shall be made on accounts for
( 1 ) Ends of dissimilar materials (ie, joists, beams,
lintels, posts, girders,rafters, purlins, trusses, corbals, steps etc) up tp 500 sq. cm. in section.
( 2 ).Openings up to 0.1 sq. metres in section.
Note: - In Calculating the area, the size of opening includes any separate lintels or sills, but not the extra width of
rebated reveals if any.
( 3 ) Wall and Bed plates, bearing, sunshade and the like. The Volume occupied by the wall plate and the like up to
10 cm. in depth
Honey comb brick walling shall be given in square metres stating the thickness of the wall and the pattern of honey
combing. Honey comb openings shall not be deducted.
Brick work in Arches shall be measured seperately.
Quantity
151
1

Item No.

151a

152

152a

153

Unit
m3

500
0.20
0.70
0.35
0.70

Nos.
m3

m3

460
0.20

Nos.
m3

m3

m3

m3

m3

m3

500
0.20
72

Nos.
m3
Kg

Specification of item of work


Brick work in Lime Mortar 1:2 with wire cut bricks 19x9x9cm for
foundation and basement
Wire cut Bricks 19x9x9 cm (Table moulded)
Lime Mortar 1:2
Brick Mason
Man
Woman
Alternatevely - Brick work in Lime Mortar 1:2 with wire cut bricks
22.9x11.2x7 cm for foundation and basement
Wire Cou Bricks 22.9x11.2x7 cm
Lime Mortar 1:2
Labour as per Item 151

Unit
m3
1000
m3

m3
1000
m3

Brick work in Surki Mortar 1 : 1/2 : 11/2 with wire cut bricks 19x9x9cm for
foundation and basement
Brick work in lime mortar 1:2
Add difference in cost of mortar

m3
m3
m3

Alternatively Brick work in Surki Mortar 1 : 1/2 : 11/2 with wire cut bricks
22.9x11.2x7 cm for foundation and basement
Brick work in lime mortar 1:2
Add difference in cost of mortar

m3
m3
m3

Brick work in Cement Mortar 1:4 with Wire cut Bricks 19 x 9 x 9 cm for
foundation and basement
Wire cut Bricks 19x9x9 cm (Table moulded)
Dry Sand
Cement

m3
1000
m3

Labour as per Item 151


153a

154

154a

155

156

156a

157

157a

158

m3

500
0.20
72

Nos.
m3
Kg

m3

500
0.20
58

Nos.
m3
Kg

m3

500
0.20
58

Nos.
m3
Kg

m3

500
0.11
0.02
58

Nos.
m3
m3
Kg

m3

500
0.24

Nos.
m3

m3

500
0.24

Nos.
m3

m3

1
0.24

m3
m3

m3

1
0.24

m3
m3

m3

Alternatively Brick work in Cement Mortar 1:4 with Wire cut Bricks of size
22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151
Brick work in Cement Mortar 1:5 with Wire cut Bricks 19 x 9 x 9 cm for
foundation and basement
Wire cut Bricks 19x9x9 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151
Alternatively Brick work in Cement Mortar 1:5 with Wire cut Bricks of size
22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151
Alternatively using Sand Lime Bricks 19 x 9 x 9 cm for brick work in
combination mortar 1:1:6 for foundation and basement
Sand Lime Bricks 19x9x9 cm (Table moulded)
Dry Sand
Lime
Cement
Labour as per Item 151

m3
1000
m3

m3
1000
m3

m3
1000
m3

m3
1000
m3
m3

Brick work in Lime Mortar 1:2 with Country Burnt bricks 19x9x9cm for
foundation and basement
Country Burnt Bricks 19x9x9 cm
Lime Mortar 1:2
Labour as per Item 151

m3
1000
m3

Alternatively Brick work in Lime Mortar 1:2 with Country Burnt bricks 22.9
x 11.2 x 7 cm for foundation and basement
Country Burnt Bricks 22.9 x 11.2 x 7 cm
Lime Mortar 1:2
Labour as per Item 151

m3
1000
m3

Brick work in Surki Mortar 1 : 1/2 : 11/2 with Country Burnt bricks
19x9x9cm for foundation and basement
Brick work in lime mortar 1:2
Add difference in cost of mortar

m3
m3
m3

Alternatively Brick work in Surki Mortar 1 : 1/2 : 11/2 with Country Burnt
bricks 22.9x11.2x7 cm for foundation and basement
Brick work in lime mortar 1:2
Add difference in cost of mortar

m3
m3
m3

Brick work in Cement Mortar 1:5 with Country Burnt Bricks 19 x 9 x 9 cm


for foundation and basement

m3

158a

159

159a

160

160a

161

162

163

500
0.24
69

Nos.
m3
Kg

m3

500
0.24
69

Nos.
m3
Kg

m3

500
0.24
58

Nos.
m3
Kg

m3

500
0.24
58

Nos.
m3
Kg

m3

500
0.24

Nos.
m3

m3

500
0.24

Nos.
m3

m3

500
0.24

Nos.
m3

m3

500
0.24
0.04
58

Nos.
m3
m3
Kg

m3

LS

Country Burnt Bricks 19x9x9 cm (Table moulded)


Dry Sand
Cement
Labour as per Item 151
Alternatively Brick work in Cement Mortar 1:5 with Country Burnt Bricks
of size 22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151
Brick work in Cement Mortar 1:6 with Country Burnt Bricks 19 x 9 x 9 cm
for foundation and basement
Country Burnt Bricks 19x9x9 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151
Alternatively Brick work in Cement Mortar 1:6 with Country Burnt Bricks
of size 22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151

1000
m3

m3
1000
m3

m3
1000
m3

m3
1000
m3

Brick work in Mud Mortar with Country Burnt Bricks 19 x 9 x 9 cm for


foundation and basement
Country Burnt Bricks 19x9x9 cm (Table moulded)
Mud Mortar
Labour as per Item 151

m3
1000
m3

Alternatively Brick work in Mud Mortar 1:6 with Country Burnt Bricks of
size 22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Mud Mortar
Labour as per Item 151

m3
1000
m3

Sun dried Bricks 19 x 9 x 9 cm in Mud Mortae for foundation and


basement
Sun dried Bricks 19x9x9 cm
Mud Mortar
Labour as per Item 151

m3
1000
m3

Brick work in combination mortar 1:1:6 with Country Burnt Bricks of size
19 x 9 x 9 cm for foundation and basement
Country Burnt Bricks 19x9x9 cm (Table moulded)
Dry Sand
Lime
Cement
Labour as per Item 151
For Superstructure in Ground Floor up to 5 Mtr. Height
Add to Correspoding item of Work in Foundation & Basement
10 % of Labour required for Foundation & Basement
Hire Charges of Scaffolding Materials

m3
1000
m3
m3

m3

LS

1.25

164

m3

LS
165

m3

0.35
0.50
LS
165a

m3

0.35
0.50
LS

For Superstructure in First Floor up to 5 Mtr. Height or in Successive


Floor up to 5 mtr. Height in each floor
Add to Correspoding item of Work in Superstructure in Ground Floor or
previous floor
10 % of Labour required for Foundation & Basement
Hire Charges of Scaffolding Materials
Brick Arch Work Flat, Semi-Circular or Segmental with Wire Cut Bricks
19 x 9 x 9 cm with any mortar - Ground Floor
Extra Brick Required 5% of Quantity of bricks in ordinary work
Extra Labour
Mason
Woman
Centering & Sundries
Alternatively Brick Arch Work Flat, Semi-Circular or Segmental with Wire
Cut Bricks 22.9 x 11.2 x 7 cm with any mortar - Ground Floor
Extra Brick Required 5% of Quantity of bricks in ordinary work
Extra Labour
Mason
Woman
Centering & Sundries
Country Burnt Brick Revetment (Dry Packing 20 cm thick)
Country Burnt Bricks 19x9x9cm
Brick Mason
Man
Woman

m3

LS

m3

LS

LS
m3
1000

1
120
0.10
0.10
0.20

m3
Nos.

167

1
1.70
0.35

m3

Mud Walling
Man
Boy

m3

168

1
0.20

m3

Extra Labour in Face Brick Work


Brick Mason

m3

169

m3

Add to Items of Brick Work, Extra Labour for Coping, Open Parapets,
Ornamental Cornice, Oval tyope Drains, Well Lining etc.
Brick Mason
Woman

m3

m2

m2

80
0.075
0.80
0.15
0.45

Nos.
m3

Honey Comb Work 20 cm thick with Country Burnt Bricks 19x9x9 cm


with square holes.
Country Burnt Bricks 19x9x9 cm.
Lime Mortar 1:2
Brick Mason
Man
Woman

m3

500
0.24
43

Nos.
m3
Kg

170

171

Brick work in Cement Mortar 1:8 with Country Burnt Bricks 19 x 9 x 9 cm


for foundation and basement
Country Burnt Bricks 19x9x9 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151

1.25

m3

166

0.35
0.5

1.25

1000
m3

m3
1000
m3

1.25

171a

201

202

m3

500
0.24
43

Nos.
m3
Kg

60
0.90
0.35

Nos

m3

60
0.16
1.50
0.35
0.50

Nos
m3

Alternatively Brick work in Cement Mortar 1:8 with Country Burnt Bricks
of size 22.9 x 11.2 x 7 cm for foundation and basement
Wire cut Bricks 22.9 x 11.2 x 7 cm (Table moulded)
Dry Sand
Cement
Labour as per Item 151

Chapter V
Laterite Masonry
Laterite Roughly dressed stone of size 44x24x14 cm laid dry in pitching,
revetments etc.
Laterite Stone un-dressed
Laterite or Brick Mason
Man
Laterite neatly dressed stone of size 44x24x14 cm in lime mortar 1:2 for
foundation and basement
Laterite Stone un-dressed
Lime Mortar 1:2
Laterite or Brick Mason
Man
Woman
Laterite Sones 44 x 24 x 19 cm for 1 m 3
Laterite Sones 29 x 24 x 14 cm for 1 m 3
Laterite Sones 44 x 24 x 14 cm for 1 m 3

203

m3

m
0.16

204

m3
0.16

206

m3
m3

205

m3
m3

60
0.16
58

Nos
m3
Kg

m3

60
0.16
46

Nos
m3
Kg

m3
1000
m3

m3
100

m3
100
m3

45 Nos
90 Nos
60 Nos

Laterite neatly dressed stone of size 44x24x14 cm in Mud Mortar for


foundation and basement
Rate for Laterite neatly dressed stone of size 44x24x14 cm in lime
mortar 1:2 for foundation and basement
Deduct/Add for difference in cost of mortar
Laterite neatly dressed stone 44x24x14cm in Surki Mortar 1 : 1/2 : 11/2 for
foundation and basement
Rate for Laterite neatly dressed stone of size 44x24x14 cm in lime
mortar 1:2 for foundation and basement
Deduct/Add for difference in cost of mortar
Laterite neatly dressed stone 44x24x14cm in Cement Mortar 1 : 4 for
foundation and basement
Laterite Stone un-dressed
Dry Sand
Cement
Labour as per Item 202 above
Laterite neatly dressed stone 44x24x14cm in Cement Mortar 1 : 5 for
foundation and basement
Laterite Stone un-dressed
Dry Sand
Cement
Labour as per Item 202 above

m3
m3

m3
m3

m3
100
m3

m3
100
m3

206a

207

m3

Kg

m3

LS
208

m3

LS
209

m3

0.35
LS

Laterite neatly dressed stone 44x24x14cm in Cement Mortar 1 : 6 for


foundation and basement
Rate for Item 206 above
Deduct Value of Cement
For Superstructure in Ground Floor up to 5 Mtr. Height
Add to Corresponding Item of Work in Foundation & Basemnt
10% of Labour required in Foundation & Basement
Hire Charges of Scaffolding Materials.
For Superstructure in First Floor up to 5 Mtr. Height or in each
successive floors up to 5 Mtr. Height in each floor.
Add to Corresponding Item of Work in Superstructure in Ground Floor or
previous floors
10% of Labour required in Foundation & Basement
Hire Charges of Scaffolding Materials.
Add to Item for Flat, Semi-Circular or Segmental Arch Works
ExtraLaterite Stone Required 5% of Quantity in ordinary work
Extra Labour
Laterite or Brick Mason
Centering & Sundries

m3

m3

LS

1.25

m3

LS

1.25

m3

LS

210

1
0.35
0.5

m3

Add to Items for Extra Labour in Well Lining, Cornice, Coping etc.
Brick Mason
Woman

m3

211

m2

m2

45
0.03
0.20
0.05

Nos.
m3

Honey Comb Work with Laterite Stones of size 19x9x9 cm with 9 cm.
size square holes.
Laterite Stones 19x9x9 cm.
Lime Mortar 1:2
Brick Mason
Man

1.25

1000
m3

Chapter VI - Stone Masonry

Thickness of Walling: When measuring walls, the thickness shall be measured to the nearest one centimetre, namely fract
including 0.5 c.m. and above shall be measured as one centi metre and fractions below o.5 cm shall be ignored.

No deduction or addition shall be made on any account for : ( 1 ) Ends of dissimilar materials (i.e., Joists, Beams, Lintels,
Posts, Girders, Rafters, Purlins, Truss, Corbels, steps etc.) up to 500 square centimetre in section.
(2
Opening up to 0.1 Sq. mtr. in section.
Note: In Calculating this area, the size of opening includes any
seperate lintels or sills but not the extra width of rebated reveals, if any.
( 3 ) Wall and Bed Plates, beari
of sunshades nd the like. The Volume occupied bt the wall plates and like up to 10 cm. in depth.

Dressed Stone Work - Each stone shall be measured as the smallest rectangular dressed block from which the dressed
finished stone can be worked. The Length, Breadth and Height shall be meaured to the nearest centimetre, namely fraction
including 0.5 cm. and above shall be measured as one cm. and fractions below 0.5 cm. shall be ignored.
Stone Work in rough arches and vaulting shall be described and measured seperately and shall include centering for spans
Facing to Arches, if different from general face work, shall be measured seperately.
When Stone Masonry is built of Cement Mortar and requires no plastering over, the pointing of the exposed faces shall be d
simultaneously, for which 0.5 extra Mason shall be allowed for 10 Sq. Mtr. Area. No regular pointing item shall be included in
these cases being not required ordinarily.

251

252

m3

Cut Stone Work in Steps 15 to 22 cm. rise, tread, rise and joints one line
dressed, bed and rear not dressed in lime mortar 1:2
Split Stone
Lime Mortar 1:2
Stone Cutters for Dressing
Rubble Mason for Building
Men
Women

m3

1.05
0.10
16.00
1.40
1.40
0.70

m3
m3

m3

Cut Stone Work in Steps 15 to 22 cm. rise, tread, rise, bed and joints two
line dressed, rear not dressed in lime mortar 1:2
Rate as per Previous item
Extra Labour - Stone Cutters

m3

m3

m3

1.05
0.10
8.00
1.40
1.40
0.70

m3
m3

Cut Stone Work in Floors, Aprons etc. 15 to 22 cm. thick, top surface
dressed one, joints dressed for 5 cm. from top to form close joints in lime
mortar 1:2
Split Stone
Lime Mortar 1:2
Stone Cutters for Dressing
Rubble Mason for Building
Men
Women

1.00
0.10

m3
m3

Add to Items 251 to 253 for Surki Mortar 1: 1/2 : 1 1/2


Add difference in cost of Lime mortar & surki mortar

m3
m3

m3

m3

1.05
0.086
62

m3
m3
Kg

Cut Stone Work in Steps 15 to 22 cm. rise, tread, rise and joints one line
dressed, bed and rear not dressed in Cement mortar 1:2
Split Stone
Dry Sand
Cement
Labour as per Item 251 above

m3

Cut Stone Work in Steps 15 to 22 cm. rise, tread, rise, bed and joints two
line dressed, rear not dressed in Cement mortar 1:2
Rate as per Previous item 255
Extra Labour - Stone Cutters

m3

m3

m3

1.05
0.086
62

m3
m3
Kg

Cut Stone Work in Floors, Aprons etc. 15 to 22 cm. thick, top surface
dressed one, joints dressed for 5 cm. from top to form close joints in lime
mortar 1:2
Split Stone
Dry Sand
Cement
Labour as per Item 253 above

m3

Extra for Arch Work in Ashlar Masonry


Add to 251 to 257
Rubble Mason
Man
Centering etc.

m3

11
253

254

255

256

11
257

258

2
2
LS
259

m3

Coursed Rubble Work First Sort in Lime Mortar 1:2 with Split Stone
chisel dressed 7.5 cm. back from face in bed & cm from face in joints

m3
m3

m3
m3

m3
m3

m3
m3

LS
m3

1.25

260

261

262

263

264

265

1.05
0.16
1.40
1.75
0.70
0.70

m3
m3

Split Stone
Lime Mortar 1:2
Stone Cutters
Rubble Mason
Men
Women

m3
m3

m3

m3

1
0.16

m3
m3

Coursed Rubble Work 1st sort in Surki Mortar 1:1/2:11/2 with Split Stone
chisel dressed 7.5 cm. back from face in bed &4 cm from face in joints
Rate as per Item 259 above
Add for difference in Cost of Mortar

m3

m3

1.05
0.14
101

m3
m3
Kg

Coursed Rubble Work Split Stone in Cement Mortar 1:2, 1 st sort, chisel
dressed 7.5 cm. back from face in bed & cm from face in joints
Split Stone
Dry Sand
Cement
Labour as per Item 259 above

m3

m3

0.55
0.50
0.22
0.70
1.20
0.70
0.70

m3
m3
m3

Coursed Rubble Work 2nd sort, in lime mortar 1:2 stone chisel dressed
7.5 cm. back from face in bed & cm from face in joints
( For Abutments, Pier, Wings etc.)
Coursed Rubble 1st sort including bond stones
Blasted Rubble
Lime Mortar 1:2
Stone Cutter
Mason
Man
Woman

m3

m3

1.00
0.22

m3
m3

Coursed Rubble Work 2nd sort in Surki Mortar 1:1/2:11/2 Stone chisel
dressed 7.5 cm. back from face in bed & 4 cm from face in joints
Rate as per Item No. 262 Above
Add difference in cost of mortar

m3

m3

0.55
0.50
0.22
79.00

m3
m3
m3
Kg

Coursed Rubble Work 2nd sort, in cement mortar 1:4 stone chisel dressed
7.5 cm. back from face in bed & cm from face in joints
( For Abutments, Pier, Wings etc.)
Coursed Rubble 1st sort including bond stones
Blasted Rubble
Dry Sand
Cement
Labour as per Item 262 Above

m3

m3

0.55
0.50
0.22
63.00

m3
m3
m3
Kg

Coursed Rubble Work 2nd sort, in cement mortar 1:5 stone chisel dressed
7.5 cm. back from face in bed & cm from face in joints
( For Abutments, Pier, Wings etc.)
Coursed Rubble 1st sort including bond stones
Blasted Rubble
Dry Sand
Cement
Labour as per Item 262 Above

m3
m3

m3
m3

m3
m3
m3

m3
m3

m3
m3
m3

m3
m3
m3

266

267

268

269

270

m3

1.05
0.10
24.00
1.40
1.40
0.70

m
m3

m3

1.00
2.50

m3

m3

1.05
0.16
8.00
1.40
1.40
0.70

m3
m3

m3

1.05
0.10
23.00
1.40
1.40
0.70

m
m3

m3

1
0.30

m
m3

272

273

Ashlar work in lime mortar 1:2, stones two line dressed in face and one
line dressed in beds and joints.
Rate as per previous Item
Extra Labour - Stone Cutter
Ashlar fine faced with hammer dressed sides and beds set in lime mortar
1:2.
Split Stone
Lime Mortar 1:2
Stone Cutters
Rubble Mason
Men
Women
Ashlar rock faced with twoline dressed chisel draft margins and one line
dressed in beds & Joints set in lime mortar 1:2.
Split Stone
Lime Mortar 1:2
Stone Cutters
Rubble Mason
Men
Women
Random Rubble masonry in lime mortar 1:2 for foundation&basement.
Blasted Rubble
Lime Mortar 1:2

m3
m3
m3

m3
m3

m3
m3
m3

m3
m3
m3

m3
m3
m3

Rubble Mason
Men
Women

0.70
0.35
0.70
271

Ashlar work in lime mortar 1:2, stones one line dressed in face, bed and
joints, ie., all six sides for bed of machinery etc.
Split Stone
Lime Mortar 1:2
Stone Cutters
Rubble Mason
Men
Women

1
1
0.30

m3
m3
m3

R. R. masonry in surki mortar 1:1/2:11/2 for foundation and basement.

m3

Rate for Random rubble in lime mortar


Add for difference in cost of mortar

m3
m3

m3

1
0.30
108.00

m3
m3
Kg

Random Rubble masonry in Cement mortar 1:4 for foundation and


basement.
Blasted Rubble
Dry Sand
Cement
Laboure Charges as per Item 270 above.

m3

1
0.30

m3
m3

Random Rubble masonry in Cement mortar 1:5 for foundation and


basement.
Blasted Rubble
Dry Sand

m3
m3
m3

m3
m3
m3

86.00

Kg

Cement
Laboure Charges as per Item 270 above.

m3

1
0.30
72.00

m3
m3
Kg

Random Rubble masonry in Cement mortar 1:6 for foundation and


basement.
Blasted Rubble
Dry Sand
Cement
Laboure Charges as per Item 270 above.

m3

1
0.30

m
m3

m3

274

274a

275

LS
1

276

m3

LS

m3
m3
m3

Random Rubble masonry in Mud mortar for foundation and basement.


Blasted Rubble
Mud mortar
Laboure Charges as per Item 270 above.

m3

For Superstructure in Ground Floor up to 5 mtr. Height


Add to corresponding item of work in Foundation & Basement
10% of Labour required for Foundation & basement.
Hire charges for scaffolding

m3

For Superstructure in First Floor up to 5 mtr. Height or in each


successive floor up 5 mtr. Height in each floor.
Add to corresponding item of work in previous floor
10% of Labour required for Foundation & basement.
Hire charges for scaffolding

m3
m3

Ls

1.25

m3

Ls

1.25

277

1
1.05
0.80
0.70

m3
m3

Dry stone masonry for retaining walls


Blasted rubble including chips
Rubble Mason
Men

m3
m3

278

1
1.05
0.35
0.70
0.70

m3
m3

Rough stone dry packing for aprons & revetments.


Blasted rubble including chips
Rubble Mason
Men
Woman

m3
m3

m3

Removing old revetment and aprons and repacking with old stone
including stacking old stonesb for measurements
Laboure as per previous item
Add Extra Men

279

0.70

m3

280

1
1.00
0.70

m3
m3

Quarry rubbish (Granite Chips) backing for revetment


Quarry rubbish
Woman

m3
m3

281

1
1.15
0.35
0.35

m3
m3

Gravel backing for revetments


Cut Gravel
Man for Working with water in to plastic state
Woman

m3
m3

m3

Covering stone to culvert dressed and fitted in lime mortar 1:2, bearing
dressed one line and sides dressed for not less than 5cm from bottom to
form close joints.
Split Stones

282
3

m3
m3

283

0.05
3
1
1
0.35

m3

Lime mortar 1:2


Stone Cutter
Rubble Mson
Man
Woman

m3

Add to Items of Rubble Work Extra for Coping, Open Parapets,


Ornamental Cornice, Oval type Drains, Well lining etc.
Rubble Mson
Woman

m3
m3
Kg

R.R. masonry in Cement mortar 1:8 for foundation and basement.


Rate as per Item 274 above
Deduct Value of Cement

0.35
0.50
284

1
1
18.00

m3

m3

m3
m3

Chapter7 - Wood Work


Sl No
301

Qty
10
14.4
0.02
0.33
3.8

302

10
14.4
0.02
0.33
3.8

303

10
14.4
0.02
0.33
3.8

304

10
183
0.55
1080
45

Unit
Description of Item
dm3 Teak Wood Scantlings.
dm3 Teak Wood Log Average rate of I, II & III classes
Man to put the log in position & to assist sawyers
M2 Sawing (at 4.3 sawyer per 10 M2 Sawing.)
Total
dm3 Deduct Cost of Outer Slabs @ 25% Log Value

Unit
10 dm3
10 dm3

dm3 Black wood, Thembavu & Irul Wood Scantlings.


dm3 Black Wood, Thembavu or Irul wood Log Average rate
Man to put the log in position & to assist sawyers
M2 Sawing (at 5.3 sawyer per 10 M2 Sawing.)
Total
3
dm Deduct Cost of Outer Slabs @ 25% Log Value

10 dm3
10 dm3

dm3 Nangu or Thembakom wood Scantlings.


dm3 Nangu or Thembakom wood Log
Man to put the log in position & to assist sawyers
2
M Sawing (at 6.4 sawyer per 10 M2 Sawing.)
Total
3
dm Deduct Cost of Outer Slabs @ 25% Log Value

10 dm3
10 dm3

M2 Teak ceiling planks 12 mm thick


dm3 Teak Log 2nd class
Man to put the log in position & to assist sawyers
2
M Sawing (at 4.3 sawyer per 10 M2 Sawing.)
Total
3
dm Deduct Cost of Outer Slabs @ 25% Log Value

10 M2
dm3

10 dm3

M2
10 dm3

M2
10 dm3

M2
10 dm3

M2

305

10
15
0.82

dm3 Teak Reepers 50x25 mm to 38x16mm


dm3 Teak logs @ 33% log value average
M2 Sawing (at 4.3 sawyer per 10 M2 Sawing.)

10 dm3
10 dm3
M2

306

10
0.4
0.5

mtr Palmyra rafters first class 0.35 split


No. Palmyra
No. Carpenter for splitting, chiping & planing

10 mtr
Each

NB:- Items as above are for guidence only. Rates for Scantlings etc. for estimating purpose to be based
on tariff rates.
307

dm3
10
10.5 dm3
0.04
0.04

308

10
10.5
0.22
0.10

309

dm3 Thembakom Wood Wrought and put up


10
10.5 dm3 Thembakom Wood Scantlings, allowing 5% wastage
0.04
Carpenter

Teak Wood Wrought and put up


Teak Wood Scantlings, allowing 5% wastage
Carpenter
Man

dm3 Teak Wood Planed and Framed work for Frames of Doors, W, V, Gates etc.
dm3 Teak Wood Scantlings, allowing 5% wastage
Carpenter
Man

10 dm3
10 dm3

10 dm3
10 dm3

10 dm3
10 dm3

0.04

Man
Add 10% of total labour as extra

310

10
10
10.5

dm3 Vengai Wood Wrought and put up


dm3 Rate as per Item 307 for Teak wood Wrought & put up
dm3 Deduct difference in cost of teak & vengai scantlings

10 dm3
10 dm3
10 dm3

311

10
10
10.5

dm3 Vengai Wood Planed and Framed work


dm3 Rate as per Item 308 for Teak wood Planed & Framed work
dm3 Deduct difference in cost of teak & vengai scantlings

10 dm3
10 dm3
10 dm3

312

10
10
10.5

dm3 Anjili Wood Wrought and put up


dm3 Rate as per Item 307 for Teak wood Wrought & put up
dm3 Deduct difference in cost of teak & Anjili wood scantlings

10 dm3
10 dm3
10 dm3

313

10
10
10.5

dm3 Anjili Wood Planed and Framed work


dm3 Rate as per Item 308 for Teak wood Planed & Framed work
dm3 Deduct difference in cost of teak & Anjili wood scantlings

10 dm3
10 dm3
10 dm3

314

10
10
10.5

dm3 Venteak or Maruthu Wood Planed and Framed work


dm3 Rate as per Item 308 for Teak wood Planed & Framed work
dm3 Deduct difference in cost of teak & Maruthu wood scantlings

10 dm3
10 dm3
10 dm3

Note: - For wood work wrought & put up using Irul, Pongu, Pullamaruthu, Kunnivaka, Karimthakara,
Chadachi, Churili and Agil the details are the same as those provided for teak wood
315

10
10.5
0.50
0.15

mtr
mtr

Palmyra rafter 1/3rd split up wrought & put up


Palmyra rafter 1/3rd split
Carpenter
Man

10 mtr
11 mtr

316

10
10
0.5
0.10
0.10

dm3 Supplying & fitting teak wood reepers with wire nail of suitable length
dm3 Teak wood reepers
Kg Wire nail
Carpenter
Man

10 dm3
10 dm3

317

10
10
10

dm3 Supplying & fitting Vengai wood reepers with wire nail of suitable length
dm3 Rate for previous item No. 316
dm3 Deduct difference in cost of teak & Vengai reepers.

10 dm3
10 dm3
10 dm3

318

10
10
10

dm3 Supplying & fitting Anjili wood reepers with wire nail of suitable length
dm3 Rate for previous item No. 316
dm3 Deduct difference in cost of teak & Anjili reepers.

10 dm3
10 dm3
10 dm3

319

10
0.22
0.10

dm3 Planed and Framed work with departmental scantlings


Carpenter
Man

10 dm3

320

10
0.04
0.04

dm3 Wood work Wrought & put up with departmental scantlings


Carpenter
Man

10 dm3

321

10

dm3 Labopur for refitting dismantled wood work of old roof

10 dm3

0.04
0.04

Carpenter
Man

322

323

Extra lift and labour for wood work in First Floor & Successive Floors
Add to the Labour for relevant items
First Floor
- 10% Over Ground Floor
Second Floor - 20% Over Ground Floor
Third Floor
- 30% Over Ground Floor and so on
10

M2 Reepering with 50x25mm teak wood reepers with wire nails 50 mm long at
suitable
spacinf
for M.P. roofingshall
320be
mm
or nearest
*)
( * ) Note:
( 1 ) Measurements
taken
overallavailable
includingsize.(
both battens
&

dm3
45
0.25 Kg
0.35
0.35
324

10
38.75
0.25
0.35
0.35

325

spaces. Deductions shall be made only for opening exceeding 0.40 m 2 each.
( 2 ) The rates include all cutting and waste and also a larger section battens at
eves if required.
36 mtr teak wood reepers 50x25 mm
Wire nail 50 mm long
Carpenter
Man

M2 Reepering with 50x25mm teak wood reepers with wire nails 50 mm long at
suitable spacinf for M.P. roofing 340 mm or nearest available size.( * )
dm3 31 mtr teak wood reepers 50x25 mm
Kg Wire nail 50 mm long
Carpenter
Man

M2 Reepering with 38 mm x 16 mm teak wood reepers and wire nails 30 mm long


at suitable spacing for PWD pattern tiles 225 mm x 150 mm or nearest
available size ( * )
3
dm 130 mtr teak wood reepers
79
0.75 Kg Wire nail 30 mm long
1.20
Carpenter
1.20
Man

10 M2

10 dm3

10 M2
10 dm3

10

10 M2
10 dm3

Ceiling
All works, unless other wise described, shall be given in square metres.
No
deduction shall be made for openings not exceeding o.40 sq. mtrs. Each.
326 10
M2 Ceiling with 12 mm teak planks, planed, lap jointed and wire nailed to rafters
and collars
2
10
M Ceiling Planks 12 mm thick
0.25 Kg Wire nail
1.10
Carpenter for fitting
2.15
Carpenter for planing
1.10
Man
LS
Scaffolding etc
327

328

M2 Ceiling with 12 mm teak planks, planed, lap jointed and 40 mm iron screws
instead of wire nailed
2
10
M Rate for previous item 326
0.25 Kg
Deduct - Wire nail
200 Nos Add
- Iron Screws 40 mm long
0.75
Add
- Carpenter for fitting
10

10

M2 Ceiling with 12 mm Anjili wood or Jack wood planks, planed, lap jointed and
wire nailed to rafters and collars

10 M2
10 M2

LS

10 M2
10 M2

10 M2

1.25

10
10.5

329

10
10
10.5

330

10
21
2.6
0.20
0.50
0.50

331

10

21
49
1.3
0.35
0.75
0.25
332

10

10
49

M2 Rate for previous item 326


M2 Deduct for difference in cost of teak and Anjili or Jackwood planks

10 M2
10 M2

M2 Ceiling with 12 mm Venteak planks, planed, lap jointed and wire nailed to
rafters and collars
2
M Rate for previous item 326
M2 Deduct for difference in cost of teak and Venteak planks

10 M2
10 M2
10 M2

M2 Ceiling with Double new Bamboo mat thatties with 1/6 split bamboo reepers
60cm c to c on both sides and fitted with wire nails.
M2 Bamboo Mats
Nos Bamboo for reepers
Kg Wire nail 40 mm long
Carpenter
Man
M2 Ceiling with Double new Bamboo mat thatties with 1/6 split bamboo reepers on
one side and teak reepers 50x25 mm on the other side 60cm c to c and fitted
with wire nails.
2
M Bamboo Mats
mtr T.W.Reepers 50x25 mm
Nos Bamboo for reepers
Kg Wire nail 50 mm long
Carpenter
Man
M2 Ceiling with Double new Bamboo mat thatties with 1/6 split bamboo reepers on
one side and reepers of other spices of wood 50x25 mm on the other side
60cm c to c and fitted with wire nails.
2
M Rate for previous item 331
mtr Deduct for difference in cost of Teak and other Reepers

10 M2
10 M2

10 M2
10 M2

10 M2
10 M2

Chapter 8 - Doors, Windows and Ventilators.


The Frames of Doors, Windows, Ventilators will be measured separately and paid for on cubic contents &
the shutters only measured & paid for on area basis & rates will include labour charge for fixing all Fitting.
Cost if Fittings including Hold Fast, Clamps etc., actually required and used will be paid seperately.
Sl No
Qty
Unit
Description of Item
Unit
351

10

0.386
0.028
352

10

LS
0.386
0.028
353

10

LS
0.386
0.028
354

10

LS
0.386
0.028
355

10

0.519
0.028
356

10

dm2

Supplying & Fitting Teak Wood Fully Panelled Shutters (as per
Standard Drawings) to suit the Door Frames already fixed, inclusive
of labour charges for fixing all fittings, but exclusive of cost of
fittings etc. complete.
10 dm3 Teak wood scantlings
Add 5% Wastage
Carpenter
Man

10 dm2
10 dm3

dm2

Supplying & Fitting Teak Wood Fully Glazed Shutters (as per
Standard Drawings) to suit the Door Frames already fixed, inclusive
of labour charges for fixing all fittings, but exclusive of cost of
fittings etc. complete.
10 dm3 Teak wood scantlings
Add 5% Wastage
2
M
Glass pans
Nails, Fillets or putty
Carpenter
Man

10 dm2
10 dm3
M2
LS

0.25

dm2

Supplying & Fitting Teak Wood Half Glazed and Half Panelled
Shutters (as per Standard Drawings) to suit the Door Frames
already fixed, inclusive of labour charges for fixing all fittings, but
exclusive of cost of fittings etc. complete.
3
10 dm Teak wood scantlings
Add 5% Wastage
2
M
Glass pans
Nails, Fillets or putty
Carpenter
Man

10 dm2
10 dm3
M2
LS

0.12

dm2

Supplying & Fitting Teak Wood One third Panelled and two third
glazed Shutters (as per Standard Drawings) to suit the Door
Frames already fixed, inclusive of labour charges for fixing all
fittings, but exclusive of cost of fittings etc. complete.
3
10 dm Teak wood scantlings
Add 5% Wastage
2
M
Glass pans
Nails, Fillets or putty
Carpenter
Man

10 dm2
10 dm3
M2
LS

dm2

Supplying & Fitting Teak Wood Venetianed Shutters (as per


Standard Drawings) to suit the Door Frames already fixed, inclusive
of labour charges for fixing all fittings, but exclusive of cost of
fittings etc. complete.
3
10 dm Teak wood scantlings
Add 5% Wastage
Carpenter
Man
dm2

Supplying & Fitting Teak Wood Half Panelled and Half Venetianed
Shutters (as per Standard Drawings) to suit the Door Frames
already fixed, inclusive of labour charges for fixing all fittings, but
exclusive of cost of fittings etc. complete.

10 dm2
10 dm3

10 dm2

0.15


0.482
0.028
357

10

0.519
0.028
358

359

10 dm3 Teak wood scantlings


Add 5% Wastage
Carpenter
Man
dm2

Supplying & Fitting Teak Wood One third Panelled and two third
Venetianed Shutters (as per Standard Drawings) to suit the Door
Frames already fixed, inclusive of labour charges for fixing all
fittings, but exclusive of cost of fittings etc. complete.
3
10 dm Teak wood scantlings
Add 5% Wastage
Carpenter
Man

10

dm2

dm

0.09
0.028

Kg

10

dm2

dm

0.386
0.028
360

10

...
LS
0.386
0.028
361

362

dm2

dm3
m2

10

dm2

dm

...
LS
0.386
0.028

10 dm3

m2

10

dm2

dm

Supplying & Fitting Teak Wood Battened Shutters (as per Standard
Drawings) to suit the Door Frames already fixed, inclusive of labour
charges for fixing all fittings, but exclusive of cost of fittings etc.
complete.
Teak wood scantlings
Add 5% Wastage
Wire Nails
Carpenter
Man
Supplying & Fitting Teak Wood Fully panelled Shutters (as per
Standard Drawings) to suit the Window Frames already fixed,
inclusive of labour charges for fixing all fittings, but exclusive of
cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Carpenter
Man
Supplying & Fitting Teak Wood Fully glazed Shutters (as per
Standard Drawings) to suit the Window Frames already fixed,
inclusive of labour charges for fixing all fittings, but exclusive of
cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Glass pan
Nails, Fillets, putty
Carpenter
Man
Supplying & Fitting Teak Wood Half glazed and Half Panelled
Shutters (as per Standard Drawings) to suit the Window Frames
already fixed, inclusive of labour charges for fixing all fittings, but
exclusive of cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Glass pan
Nails, Fillets, putty
Carpenter
Man
Supplying & Fitting Teak Wood 1/3rd Panelled and 2/3rd Glazed
Shutters (as per Standard Drawings) to suit the Window Frames
already fixed, inclusive of labour charges for fixing all fittings, but
exclusive of cost of fittings etc. complete.
Teak wood scantlings

10 dm2
10 dm3

10 dm2
10 dm3

10 dm2
10 dm3

10 dm2
10 dm3
m2
LS

0.25

10 dm2
10 dm3
m2
LS

10 dm2
10 dm3

0.12

...
LS
0.386
0.028
363

Add 5% Wastage
Glass pan
Nails, Fillets, putty
Carpenter
Man

m2

10

dm2

dm

0.519
0.028
364

10

dm2

dm

0.336
0.028
365

10

dm2

dm

0.519
0.028
366

10

...
0.09
0.028
367

10

...
LS
0.386
0.028

dm2

dm3
kg

dm2

dm3
m2

m2
LS

0.15

Supplying & Fitting Teak Wood Venetianed shutters (as per


Standard Drawings) to suit the Window Frames already fixed,
inclusive of labour charges for fixing all fittings, but exclusive of
cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Carpenter
Man

10 dm2
10 dm3

Supplying & Fitting Teak Wood Half Panelled and Half Venetianed
shutters (as per Standard Drawings) to suit the Window Frames
already fixed, inclusive of labour charges for fixing all fittings, but
exclusive of cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Carpenter
Man

10 dm2
10 dm3

Supplying & Fitting Teak Wood 1/3rd Panelled and 2/3rd


Venetianed shutters (as per Standard Drawings) to suit the Window
Frames already fixed, inclusive of labour charges for fixing all
fittings, but exclusive of cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Carpenter
Man

10 dm2
10 dm3

Supplying & Fitting Teak Wood Battened shutters (as per Standard
Drawings) to suit the Window Frames already fixed, inclusive of
labour charges for fixing all fittings, but exclusive of cost of fittings
etc. complete.
Teak wood scantlings
Add 5% Wastage
Wirenails
Carpenter
Man
Supplying & Fitting Teak Wood Fully glazed Shutters (as per
Standard Drawings) to suit the Ventilator Frames already fixed,
inclusive of labour charges for fixing all fittings, but exclusive of
cost of fittings etc. complete.
Teak wood scantlings
Add 5% Wastage
Glass pan
Nails, Fillets, putty
Carpenter
Man

368

1
1
1
2

Qntl
Qntl

Providing MS Rods to Windows and Ventilators.


M.S.Rods
Blacksmith
Carpenter

369

Qntl

Providing Flat Iron work to Doors and Windows

10 dm2
10 dm3

10 dm2
10 dm3
m2
LS

qntl

0.25

1
10
LS
5
1

Qntl
kg

370

10
10
0.10
0.10

dm2
dm2

Providing Flush Door 35mm solid core with veneer on both sides
Flush Door
Carpenter for fixing
Man for helping

371

10

dm2

Supplying and fixing Steel Doors, windows or ventilators painted


with a coat of iron primer, in brick work, stone masonry or concrete
including embedding the legs (hold fasts) in cement mortar 1:3,
fixing glass pans to frames with metal sash putty or beeding,
screws etc. complete
Cost of Door, Window or Ventilator
Glass pans
Putty, Beeding, Screws etc.
Mason
Man for Assisting
Painter

10
. ..
LS
0.015
0.015
0.10

dm2
m2

Flat Iron
Charcoal
Sundries such as screws etc.
Blacksmith
Bellow Boy

qntl
kg
LS

0.62

10 dm2
10 dm2

10 dm2
10 dm2
m2
LS

0.5

Details of Doors, Windows & Ventilators.


Size of
opening
in
masonry
cm x cm
3

Door
Frame
mm x
mm
4

Sl No
1
1
a
b
c
d
e
f
g
h

Description
2
Door with V & Double shutters
Fully Panelled Shutters
100x260
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

Shutter
Panel
Frame
Plank
Sash
mm x thickness mm x
mm
mm
mm
5
6
7
...
100x35
16
do
35x25
do
16
35x25
do
16
35x25
do
do
16
do
16
..

2
a
b
c
d
e
f
g
h

Door with V & Double shutters


Fully Panelled Shutters
140x260
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

3
a
b
c
d
e
f
g
h

Door with V & Double shutters


Fully Panelled Shutters
120x260
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

4
a
b
c
d
e
f
g
h

Door with Double shutters


Fully Panelled Shutters
140x240
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

5
a
b
c
d
e
f
g

Door with single shutters


Fully Panelled Shutters
110x240
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do

100x70
do
do
do
do
do
do

100x35
do
do
do
do
do
do

16

Qty. of
wood
work in
d/frame
w/out sill
dm3
8
61.887
do
do
do
do
do
do

...

16
16

35x25
35x25
35x25

16
16

58.917
do
do
do
do
do
do

...

16
16

35x25
35x25
35x25

16
16

56.007
do
do
do
do
do
do

...

16
16

35x25
35x25
35x25

16
16

45.717
do
do
do
do
do
do

...

16
16
16
16

35x25
35x25
35x25

43.512
do
do
do
do
do
do

h Battened Shutters

do

do

..

Details of Doors, Windows & Ventilators.

Size of
opening
in
masonry
cm x cm
3

Door
Frame
mm x
mm
4

Sl No
1
6
a
b
c
d
e
f
g
h

Description
2
Door with Double shutters
Fully Panelled Shutters
120x210
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

Shutter
Panel
Frame
Plank
Sash
mm x thickness mm x
mm
mm
mm
5
6
7
...
100x35
16
do
35x25
do
16
35x25
do
16
35x25
do
do
16
do
16
..

7
a
b
c
d
e
f
g
h

Door with Single shutters


Fully Panelled Shutters
100x210
Fully Glazes Shutters
do
Half Glazes & Half Panelled
do
2/3rd Glazes & 1/3rd Panelled
do
Venetiened
do
Half Panelled & Half Venetiened
do
1/3rd Panelled & 2/3 Venetiened
do
Battened Shutters
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

8
a
b
c
d
e
f
g
h

Door with Single shutters


Fully Panelled Shutters
Fully Glazes Shutters
Half Glazes & Half Panelled
2/3rd Glazes & 1/3rd Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

90x210
do
do
do
do
do
do
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

9
a
b
c
d
e
f
g
h

Door with Single shutters


Fully Panelled Shutters
Fully Glazes Shutters
Half Glazes & Half Panelled
2/3rd Glazes & 1/3rd Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

80x210
do
do
do
do
do
do
do

100x70
do
do
do
do
do
do
do

100x35
do
do
do
do
do
do
..

16

Qty. of
wood
work in
d/frame
w/out sill
dm3
8
39.837
do
do
do
do
do
do

...

16
16

35x25
35x25
35x25

16
16

38.367
do
do
do
do
do
do

...

16
16

35x25
35x25
35x25

16
16

37.632
do
do
do
do
do
do

...

16
16
16
16

35x25
35x25
35x25

36.897
do
do
do
do
do
do

Details of Doors, Windows & Ventilators.


Details of Fittings
Extra Qty
of wood
work for
B/sill dm3
9

Area of
shutters
m2
10

11.76
do
do
do
do
do
do

3.0192
do
do
do
do
do
do

10.29
do
do
do
do
do
do

8.82
do
do
do
do
do
do

10.29
do
do
do
do
do
do

8.085
do
do
do
do
do
do

2.6112
do
do
do
do
do
do

2.2032
do
do
do
do
do
do

2.9952
do
do
do
do
do
do

2.2932
do
do
do
do
do
do

Quantity
of wood
work in
shutters
dm3
11

Butt/Parli
amentary
hinges
No/size
Tower Bolt
mm
No/size mm
12
13

Hasp &
Staple
s
No/siz
e mm
14

Door
Handle
No/Siz
e mm
15

Pad
Lock
No/Siz
er mm Remarks
16
17

87.189
44.100
69.600
62.116
95.771
94.321
94.662
119.574

6 \ 125
do
do
do
do
do
do
do

2\300,2\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

77.604
41.895
63.103
56.878
84.851
83.657
83.927
103.383

6 \ 125
do
do
do
do
do
do
do

2\300,2\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

68.020
39.690
56.608
51.639
73.931
72.992
73.192
87.192

6 \ 100
do
do
do
do
do
do
do

2\300,2\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\65
do
do
do
do
do
do
do

89.384
39.690
56.608
51.639
73.931
72.992
73.192
87.192

6 \ 100
do
do
do
do
do
do
do

2\150,2\100
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do

1\65
do
do
do
do
do
do
do

63.491
27.710
46.816
40.893
69.518
67.341
66.970

3 \ 100
do
do
do
do
do
do

2\250,
do
do
do
do
do
do

1\100
do
do
do
do
do
do

1\75
do
do
do
do
do
do

1\65
do
do
do
do
do
do

Ventilator shutter if provided


corresponding area to be
added.
Venetien Blade 150x12;
Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 29 Nos;
Vnetian Hooks 14 Nos;
Vnetian Hooks 18 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 29 Nos;
Vnetian Hooks 14 Nos;
Vnetian Hooks 18 Nos;

89.901

do

do

do

do

do

Plank 35 & Batten 75x38 mm

Details of Doors, Windows & Ventilators.


Details of Fittings

Extra Qty
of wood
work for
B/sill dm3
9

Area of
shutters
m2
10

8.82
do
do
do
do
do
do

2.2032
do
do
do
do
do
do

7.35
do
do
do
do
do
do

6.615
do
do
do
do
do
do

5.88
do
do
do
do
do
do

1.7952
do
do
do
do
do
do

1.5912
do
do
do
do
do
do

1.3872
do
do
do
do
do
do

Quantity
of wood
work in
shutters
dm3
11

Butt/Parli
amentary
hinges
No/size
Tower Bolt
mm
No/size mm
12
13

Hasp &
Staple
s
No/siz
e mm
14

Door
Handle
No/Siz
e mm
15

Pad
Lock
No/Siz
er mm Remarks
16
17

68.020
39.690
56.608
51.639
73.931
72.992
73.192
87.192

6 \ 100
do
do
do
do
do
do
do

2\200; 2\150, 1\100


do
do
do
do
do
do
do
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

1\65
do
do
do
do
do
do
do

54.503
23.594
39.347
34.725
55.529
54.626
54.846
71.001

3 \ 100
do
do
do
do
do
do
do

1\200; 1\150, 1\100


do
do
do
do
do
do
do
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

1\65
do
do
do
do
do
do
do

45.511
22.491
36.099
32.106
50.069
49.293
49.478
62.906

3 \ 75
do
do
do
do
do
do
do

1\150; 1\100, 1\125


do
do
do
do
do
do
do
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

1\60
do
do
do
do
do
do
do

40.719
21.389
32.851
29.487
44.609
43.961
44.110
54.810

3 \ 75
do
do
do
do
do
do
do

1\150; 1\100, 1\125


do
do
do
do
do
do
do
do
do
do
do
do
do
do

1\75
do
do
do
do
do
do
do

1\60
do
do
do
do
do
do
do

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Venetien Blade 150x12;


Stanchion 35x25;
Vnetian Hooks 25 Nos;
Vnetian Hooks 12 Nos;
Vnetian Hooks 16 Nos;
Plank 35 & Batten 75x38 mm

Details of Windows

Sl No

Description

Size of
opening in
Window
Shutter
Panel Plank
masonry cm Frame mm x Frame mm x thickness
x cm
mm
mm
mm

Sash mm x
mm

Qty. of wood
work in
W/frame
w/out sill
dm3

1
a
b
c
d
e
f
g

2
Window with 3 Leaves with Ventilator
Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

210x180
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

91.875
do
do
do
do
do
do

2
a
b
c
d
e
f
g

Window with 3 Leaves


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

210x150
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

74.970
do
do
do
do
do
do

3
a
b
c
d
e
f
g

Window with 3 Leaves


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

210x130
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

69.090
do
do
do
do
do
do

4
a
b
c
d
e
f
g

Window with 3 Leaves with Ventilator


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

160x180
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

80.850
do
do
do
do
do
do

5
a
b
c
d
e
f

Window with 3 Leaves


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened

160x150
do
do
do
do
do

100x70
do
do
do
do
do

90x35
do
do
do
do
do

16

...
35x25
35x25

67.620
do
do
do
do
do

16
16
16

16
16
16

16
16
16

16
16
16

16
16
16

g Battened Shutters

do

do

do

do

Details of Windows

Sl No

Description

Size of
opening in
Window
Shutter
Panel Plank
masonry cm Frame mm x Frame mm x thickness
x cm
mm
mm
mm

Sash mm x
mm

Qty. of wood
work in
W/frame
w/out sill
dm3

6
a
b
c
d
e
f
g

2
Window with 3 Leaves
Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

160x130
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

61.740
do
do
do
do
do
do

7
a
b
c
d
e
f
g

Window with Double shutter & Ventilator


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

110x180
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

60.270
do
do
do
do
do
do

8
a
b
c
d
e
f
g

Window with Single shutter


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

110x170
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

41.160
do
do
do
do
do
do

9
a
b
c
d
e
f
g

Window with Double shutters


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

110x150
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

49.245
do
do
do
do
do
do

10
a
b
c
d

Window with Single shutters


Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened

110x150
do
do
do

100x70
do
do
do

90x35
do
do
do

16

...
35x25
35x25

38.220
do
do
do

16
16
16

16
16
16

16
16
16

16
16
16

16

e Half Panelled & Half Venetiened


f 1/3rd Panelled & 2/3 Venetiened
g Battened Shutters

do
do
do

do
do
do

do
do
do

16
16

do
do
do

Details of Windows

Sl No

Description

Size of
opening in
Window
Shutter
Panel Plank
masonry cm Frame mm x Frame mm x thickness
x cm
mm
mm
mm

Sash mm x
mm

Qty. of wood
work in
W/frame
w/out sill
dm3

2
Window with Single shutters
Fully Panelled Shutters
Fully Glazed Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

11
a
b
c
d
e
f
g
e
f
g

60x150
do
do
do
do
do
do
do
do
do

100x70
do
do
do
do
do
do
do
do
do

90x35
do
do
do
do
do
do
do
do
do

16

...
35x25
35x25

30.870
do
do
do
do
do
do
do
do
do

12
a
b
c
d
e
f
g

Window with Single shutters


Fully Panelled Shutters
Fully Glazesd Shutters
Half Glazed & Half Panelled
Venetiened
Half Panelled & Half Venetiened
1/3rd Panelled & 2/3 Venetiened
Battened Shutters

110x130
do
do
do
do
do
do

100x70
do
do
do
do
do
do

90x35
do
do
do
do
do
do

16

...
35x25
35x25

35.280
do
do
do
do
do
do

60x60
70x110
80x110
70x160
80x160

100x70
do
do
do
do

90x35
do
do
do
do

...
...
...
...
...

35x25
do
do
do
do

17.640
26.460
27.930
33.810
15.280

16
16
16
16
16

16
16
16

Ventilators
1 Ventilators with Glazed Shutter
2
do
3
do
4
do
5
do

Details of Windows
Details of Fittings

Area of
shutters m2

Quantity of
wood work
in shutters
dm3

Butt/Parliam
entary
hinges
Tower Bolt
No/size mm No/size mm

10

11

12

13

2.2184
do
do
do
do
do
do

65.415
38.514
55.724
71.335
71.486
70.591
92.065

6\100
do
do
do
do
do
do

3\150
do
do
do
do
do
do

3\75; 3\200
do
do
do
do
do
do

2.5944
do
do
do
do
do
do

77.77
42.483
62.046
83.794
80.792
81.343
105.883

6\100
do
do
do
do
do
do

3\150
do
do
do
do
do
do

3\75; 3\200
do
do
do
do
do
do

2.2184
do
do
do
do
do
do

65.415
38.514
55.724
71.335
71.486
70.391
92.065

6\100
do
do
do
do
do
do

3\150
do
do
do
do
do
do

3\75; 3\200
do
do
do
do
do
do

1.6284
do
do
do
do
do
do

51.406
33.819
45.246
55.739
55.706
54.583
67.385

6\100
do
do
do
do
do
do

3\150
do
do
do
do
do
do

3\75; 3\200
do
do
do
do
do
do

1.9044
do
do
do
do
do

61.014
37.788
50.727
65.363
63.254
63.087

6\100
do
do
do
do
do

3\150
do
do
do
do
do

3\75; 3\200
do
do
do
do
do

Hooks & Eyes


No/Size mm

Remarks

14

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 16 Nos;
Vnetian Hooks 7 Nos;
Vnetian Hooks 11 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 16 Nos;
Vnetian Hooks 7 Nos;
Vnetian Hooks 11 Nos;

do

77.528

do

do

do

Plank 35 & Batten 75x38 mm

Details of Windows
Details of Fittings

Area of
shutters m2

Quantity of
wood work
in shutters
dm3

Butt/Parliam
entary
hinges
Tower Bolt
No/size mm No/size mm

10

11

12

13

1.6284
do
do
do
do
do
do

51.406
33.819
45.246
55.739
55.796
54583
67.385

6\100
do
do
do
do
do
do

3\150
do
do
do
do
do
do

3\75; 3\200
do
do
do
do
do
do

1.0974
do
do
do
do
do
do

34.551
22.356
30.373
37.471
37.511
36.917
45.417

4\125
do
do
do
do
do
do

2\300
do
do
do
do
do
do

2\60; 2\200
do
do
do
do
do
do

1.5484
do
do
do
do
do
do

41.839
17.51
31.379
47.108
45.148
44.432
59.717

2\125
do
do
do
do
do
do

1\200
do
do
do
do
do
do

2\60; 2\200
do
do
do
do
do
do

1.2834
do
do
do
do
do
do

41.011
25.286
34.044
43.944
42.519
42.675
52.252

4\100
do
do
do
do
do
do

2\100
do
do
do
do
do
do

1\60; 1\200
do
do
do
do
do
do

1.3524
do
do
do

37.761
17.753
28.678
40.952

2\100
do
do
do

1\150
do
do
do

1\75; 1\200
do
do
do

Hooks & Eyes


No/Size mm

Remarks

14

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 19 Nos;
Vnetian Hooks 9 Nos;
Vnetian Hooks 12 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 16 Nos;
Vnetian Hooks 7 Nos;
Vnetian Hooks 11 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 16 Nos;

do
do
do

39.256
40.518
52.514

do
do
do

do
do
do

do
do
do

Vnetian Hooks 7 Nos;


Vnetian Hooks 11 Nos;
Plank 35 & Batten 75x38 mm

Details of Windows
Details of Fittings

Area of
shutters m2

Quantity of
wood work
in shutters
dm3

Butt/Parliam
entary
hinges
Tower Bolt
No/size mm No/size mm

10

11

12

13

0.6624
do
do
do
do
do
do
do
do
do

21.008
12.783
17.362
22.525
21.784
22.264
25.660
21.784
22.264
25.660

2\100
do
do
do
do
do
do
do
do
do

1\150
do
do
do
do
do
do
do
do
do

1\75; 1\200
do
do
do
do
do
do
do
do
do

1.1564
do
do
do
do
do
do

31.702
16.146
25.977
34.796
34.913
35.054
45.311

2\100
do
do
do
do
do
do

1\150
do
do
do
do
do
do

1\75; 1\200
do
do
do
do
do
do

0.2304
0.5684
0.6664
0.8584
1.0064

6.113
10.624
11.469
14.836
15.861

...
...
...
...
...

...
...
...
...
...

...
...
...
...
...

Hooks & Eyes


No/Size mm

Remarks

14
Ventilator shutter if provided corresponding area
to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 16 Nos;
Vnetian Hooks 7 Nos;
Vnetian Hooks 11 Nos;
Plank 35 & Batten 75x38 mm
Vnetian Hooks 7 Nos;
Vnetian Hooks 11 Nos;
Plank 35 & Batten 75x38 mm

Ventilator shutter if provided corresponding area


to be added.
Venetien Blade 150x12; Stanchion 35x25;
Vnetian Hooks 13 Nos;
Vnetian Hooks 6 Nos;
Vnetian Hooks 9 Nos;
Plank 35 & Batten 75x38 mm

Quantity of wood work for mullions to


be added, if provided

Chapter 9

Flooring

All work shall be measured net and the area covered shall be given in sq. mtrs, unless otherwise stated. In
all cases the thickness shall be measured net exclusive of any bedding mortar or materials.
Special
surface finishes to treads, risers and the ends of concrete steps and the like shall be measured seperately
and given in sq. metres and shall include form work if required.
When the
thickness of the Paving exceeds 20 cm. it shall be measured as work in foundation
Sl No
Qty
Unit
Description of Item
Unit
401

402

403

10

m2

1.00
0.45
230.00
0.50
1.00
3.00

m3
m3

10

m2

1.00
0.22
115.00

m
m3

10

m2

kg

kg

Flooring with C.C. using stone chippings, 40mm thk over cement
concrete 1:5:10, 100 mm thk using 40 mm (nominal size) broken
stones including rendering the surface smooth.
Cement Concrete 1:5:10 using 40 mm broken stones
Stone Chippings (2.5 mm to 7.5 mm size)
Cement ( No sand to be used)
Brick Mason
Man
Woman
Flooring with Lime Concrete using stone chippings, 20mm thk (Ellis
pattern first sort) over lime concrete 1:2:4, 100 mm thk using 40
mm (nominal size) broken stones including rendering the surface
smooth.
Lime Concrete1:2:4 using 40 mm broken stones
Stone Chippings (2.5 mm to 7.5 mm size)
Cement ( No sand to be used)
Labour as per Item 401

10 m2
m3
m3

Flooring with Cement Concrete using stone chippings, 20mm thk


(Ellis pattern first sort) over surky concrete , 100 mm thk using 40
mm (nominal size) broken stones and surkey morate 1:0.5:1.50
including rendering the surface smooth.
Surky Concrete using 40 mm broken stones & surky mortar
Stone Chippings (2.5 mm to 7.5 mm size)
Cement ( No sand to be used)
Labour as per Item 401

10 m2
m3
m3

1.00
0.22
115.00

m3
m3

404

10
1.05
0.75
0.50

m2
m3

Flooring with gravel 100 mm thk well consolidated


Gravel
Man
Woman

405

10

m2

0.40
0.75
LS

m3

Granolithic Flooring 40 mm thick in Cement Concrete 1:3:6 using


20 mm (nominal size) broken stone
Cement Concrete 1:3:6 using 20 mm broken stones
Brick Mason for smoothening surface
Add for extra Cement Mortar

10

m2

0.25
0.75
LS

m3

10

m2

0.20

406

407

kg

10 m2
m3
m3

Granolithic Flooring 25 mm thick in Cement Concrete 1:3:6 using


25 mm (nominal size) broken stone
Cement Concrete 1:3:6 using 25 mm broken stones
Brick Mason for smoothening surface
Add for extra Cement Mortar
Granolithic Flooring 20 mm thick in Cement Concrete 1:3:6 using
20 mm (nominal size) broken stone
Cement Concrete 1:3:6 using 20 mm broken stones

10 m2
m3

10 m2
m3
LS

0.62

10 m2
m3
LS

10 m2
m3

0.50

Brick Mason for smoothening surface


Add for extra Cement Mortar

0.75
LS
408

409

410

411

412

413

10

m2

0.75

m3

Flooring with surkit Concrete 75 mm thick with gravel in surki


mortar 1:0.5:1.5, and plastering with cement mprtar 1:3, one coat
12 mm thick floated hard and trowelled smooth
Surki Concrete using Gravel & Surki moratr 1: 1/2:11/2 (50% mortar)

10

m2

Plastering with Cement Mortar 1:3, 12 mm thick one coat

10

m2

Flooring with First class Paving Tiles 225x225 mm (nominal size)


laid in 12 mm thick lime mortar 1:2, with 6 mm open joints and
grouted and pointed with cement mortar 1:2
Paving Tiles 225x225 mm (nominal size) or nearest available
Lime Mortar 1:2
Brick Mason
Man
Boy
Pointing with Cement Mortar 1:2

200
0.13
1.00
0.50
0.50
10

Nos
m3

10

m2

0.75
10

10

m2

m2

m2

0.75
10

10

m2

0.75
10

10

m2

10.5
0.20
23
1
0.25
0.10
1.5
0.5
0.5

m2

m2

m2
m3
kg
No
kg
kg

LS

10 m2
m3
10 m2

10 m2
m3

10 m2

Flooring with Cement Concrete 1:4:8, 75 mm thick using 40 mm


(nominal size() broken stones and plastered over with 6 mm thick
cement mortar 1:3, one coat floated hard & trowelled smooth
Cement Concrete 1:4:8, using 40 mm broken stones
Plastering with cement mortar 1:3, 12 mm thick one coat

10 m2
m3
10 m2

Flooring with Cement Concrete 1:5:10, 75 mm thick using 40 mm


(nominal size() broken stones and plastered over with 6 mm thick
cement mortar 1:3, one coat floated hard & trowelled smooth
Cement Concrete 1:5:10, using 40 mm broken stones
Plastering with cement mortar 1:3, 12 mm thick one coat

10 m2
m3
10 m2

Flooring with Cement Concrete 1:3:6, 75 mm thick using 40 mm


(nominal size() broken stones and plastered over with 6 mm thick
cement mortar 1:3, one coat floated hard & trowelled smooth
Cement Concrete 1:3:6, using 40 mm broken stones
Plastering with cement mortar 1:3, 12 mm thick one coat

10 m2
m3
10 m2

Supplying, Paving & Polishing Mosaic Tiles 20 mm thk (Machine


pressed) (having mosaic thickness of not less than 6 mm) Grey
colour with black & white chips, over a bed of 20 mm thick lime
mortar 1:2, adding necessary pure cement grout for the proper
binding of the tiles to mortar including pointing the joints and
closing the voids with cement of the colour to match and polishing
with machine 3 coats to smooth finish, acid finishing, mansion
polishing etc. complete
Mosaic Tiles (Grey colour) inclusive of cement for pointing
Lime Mortar 1:2
Cement
Carborandum Stone
Oxalic Acid
Mansion Polish
Brick Mason
Mansion Polish
Boy
Polishing

10 m2
10 m2
m3

0.37

Polisher ( at rate of special mazdoor)


Man
Hire charges for Polishing Machine
Sundries

4
2
2

days

414

10

m2

Mosaic Flooring as above in other colours


Add Difference in cost of Tiles.

415

10

m2

Mosaic Cast in situ 18 mm thk with mosaic mixture in grey colour


6mm thk with black & white chips over a base cement plastering
1:3, one coat 12 mm thick hand or machine polishing 3 coats to
smooth finish including intermediate filling of voids with cement of
the colour to match, curing and finishing with oxalic acid mansion
polishing etc. complete.
Plastering with cement mortar 1:3, 12 mm thick one coat for base
Marble Powder
Cement
White Chips
White Cement
Oxalic Acid
Carborandum Stone
Mansion Polish
Mason ( For providing groves)
Mason ( For plastering etc.)
Man ( For plastering etc.)
Polisher
Man Mazdoor for assisting
Sundries

LS

10
30
50
80
12
0.3
0.75
0.1
0.12
2
2
3
1
LS
416

417

418

1.25

10 m2

10 m2
10 m2

LS

1.25

m2

Mosaic Cast in situ in other colours


Add difference in cost of colour cement

10 m2

10

m2

10 m2

0.01
6.2
13.6
13.6
3
4

m3

Mosaic Cast in situ in Steps, Stair cases etc.


Add to Item No. 415 above
Sand
Cement
Colour Cement
White Chips
Mason
Polisher

10

m2

10
92

0.15
0.75
LS
419

m2
kg
kg
kg
kg
kg
No.
kg

day
LS

10
11
8
1.3
0.1
1

kg

kg
kg
kg

kg

m2
mtr
mtr
kg
kg

Polishing Wooden Floors with Mansion Polish including rubbing


with sand peper and cleaning the surface etc. complete
Mansion Polish
Painter
Cost of Sand paper etc.
Plain Coir matting with tape border etc.
Coir Mat 1 mtr wide
Cotton Tape 40 mm wide
Country Twine for stitching
Wire Nail 40 mm long
Man (for stitching mats & wire nailing mats to floor)

m3

10 m2

LS
10 m2

0.25

Chapter 10

Roof Covering

Roof Covering shall generally be given in sq. metres and shall be measured net with out any allowances for
la[p. Opening up to 0.40 square metre shall no be deducted and where applicable, no cutting for forming
such opening shall be measured.
Portions of Hip or Ridge coverings
shall be included in the measurements of roof, except where other wise stated.
Ridges, Hips and
Valley shall be measured in Running Metres stating the girth.
Corrugated and
semi-corrugated sheeting shall be measured flat and not girthed.
Sl No
Qty
Unit
Description of Item
Unit
2
10
m
Roofing with first class MP Tiles 320mm or nearest available size
10 m2
451
160
No. MP Roofing Tiles 320mm or nearest available size
0.35
Brick Mason
0.35
Man
452

10
145
0.35
0.35

m2
No.

Roofing with first class MP Tiles 340mm or nearest available size


MP Roofing Tiles 340mm or nearest available size
Brick Mason
Man

453

10

m2

11.5
14

m
No.

Roofing with A C Corrugated sheets with G I Bolts and nuts and


bitumen washers including necessary overlap of 150mm at ends etc.
complete
A C Sheets (Corrugated)
GI Hooks or Crank Bolts & nuts 10 mm dia. Including GI plain
washers, Bitumen washers etc.
Carpenter
Man

1.6
1.6
454

455

Providing and Fitting AC Ridge Caping with GI Bolts & Nuts and plain
R.mtr washers, bitumen washers etc. complete.
Details for 30. Mtr.
31 Pair
AC Plain Ridges
1.5
Carpenters
1.5
Man
10

10

m2

86

kg

22

No.

1.35
1.35
456

10
820
1
1

457

10
38.5
0.5
0.5

458

10

27
0.1

m2
Nos

Roofing with Galvanised Iron Corrugated sheets 0.80 mm thick or


nearest available thickness with overlaps of 150 mm at ends and G I
Hooks and Crank Bolts and nuts including plain washers and
bitumen washers etc. complete
GI Corrugated sheets 0.80 mm thick or nearest available thickness
GI Hooks or Crank Bolts & nuts 6 mm dia. Including GI plain
washers, Bitumen washers etc.
Carpenter
Man
Roofing with PWD pattern Tiles
PWD pattern Tiles
Brick Mason
Man

R.mtr Plain GI Ridge Caping 225 mm flaps with 1.00 mm thick or nearest
available size including crank bolts & nuts &washers etc.complete
kg
GI Sheet 1mm thk or nearest available size
Brick Mason
Man
R.mtr MP Hip & Riodge Tiles 1st class set in surki morar 1:1/2:11/2
including finishing edges.
Nos
m

Hip and Ridge Tiles


Surki Mortar 1:1/2:11/2

10 m2

10 m2
10 m2

10 Rmtr

10 m2

10 m2

10 Rmtr

10 Rmtr

0.75
0.3
0.3

Brick Mason
Man
Boy
Extra Lift&Labour for work in Roof for 1st Floor&Successive Floors
Add to the Laboure for the Relevant Items
For First
Floor
10 % Over Ground Floor
For Second Floor
20 % Over Ground Floor
For Third Floor
30 % Over Ground Floor & so on

459

460

10

174
0.25
1.5
1.5

R.mtr Valleying with GI sheets 0.63mm thk or nearest available thickness


900 mm wide with overlap of 150 mm at joints excluding planking and
including nail etc. complete
Details for 30 Mtr.
kg
0.63 mm thk GI sheet or nearest available size
kg
Wire nail 25 mm long
Carpenter for fitting
Man

461

10
0.25
2
0.5

R.mtr Lime mortar bordering for tiled roof about 65 cm 2 in section


m3 Lime mortar 1:2
Brick Mason
Man

10 Rmtr
m3

462

10

R.mtr Surki mortar bordering for tiled roof about 65 cm 2 in section


Details for 30 Mtr.
1
1
3
Surki mortar 1: /2:1 /2
m
Brick Mason
Man

10 Rmtr

0.25
2
0.5

10 Rmtr

m3

463

10
43
1.5
0.4

m2
Nos
Nos

Thatching roof with double new coconut cadjan


Coconut cudjan madals
Gree Coconut cudjan madals
Special Mazdoor (for thatching)

10 m2

464

10
23
1.5
0.4

m2
Nos
Nos

Thatching roof withone old and one new coconut cadjan


Coconut cudjan madals
Gree Coconut cudjan madals
Special Mazdoor (for thatching)

10 m2

465

10

m2

1
0.09
0.18

No
kg

10

m2

0.5
0.09
0.12

No
kg

466

Trellising Thatched roof with1/6th split new bamboo rea[pers 60 cm


apart daigonally
Bamboo 2nd class
Coir
Special Mazdoor for spliting & tying
Trellising Thatched roof with 50% old and 50% new 1/6th split new
bamboo rea[pers 60 cm apart daigonally
Bamboo 2nd class
Coir
Special Mazdoor for spliting & tying

10 m2

10 m2

Chapter 11

Plastering & Pointing

All plastering and Pointing shall be given in Sq. metres, unless other wise described.
For
Jambs, soffits, sills etc. for openings not exceeding 0.5 m 2 each in area, ends of Joists, beams, posts,
girders, steps etc. not exceeding 0.5 m 2 each in area and openings not exceeding 3 m2 each , deductons
and additions shall be made in the following manner.
(a) NO Deduction shall be made for ends of Joists, Beams, Posts etc.& Openings not exceeding 0.5 m 2
each, and NO Additions shall be made for Reveals, Jambs, Soffits, Sills etc. of these Openings, nor finishing
the plaster around ends of Joists, Beams, Posts etc.
(b) Deductions for Openings Exceeding 0.5 m 2 but not exceeding 3 m2 Each shall be made as follows and
no additions shall be made for Reveals, Jambs, Soffits, Sills etc. of these Openings.
(i)
When Both Faces of Wall are plastered, or Pointing done, deduction shall be made for one Face only. (ii)
When Two Faces of Walls are plastered with different plasters or Pointed with different pointings or if one
face is plastered and the other pointed, deduction shall be made from the plaster or pointing on the side of
Frames of Doors, Windows etc. on which the width of reveals is less than that on the other side, but No
deduction shall be made from the plaster or pointing on the other side.
In Case of Openings of area above 3 m2 each, deduction shall be made for the opening, but Jambs, Soffits
and Sills shall be measured.
Thickness shall be exclusive of the thickness of key, i.e., Grooves
or Open joints in the brick work, Stone work etc.
Ceiling shall be measured between the walls or
partitions and the dimensions before plastering shall be taken.
Width Covered by Cornice if any, shall be deducted.
Ceiling with Projected Beams shall be
measured over beams and plastered sides of beams shall be measured & added to plastering on ceiling.
The Measurement of Wall Plastering shall be taken between the Walls or Partitions (the dimensions before
plastering shall be taken) for the length and from the top of floor or skirting to the ceiling for the Height.
Depth of Cornices if any shall be deducted.
Sides of Plasters,
Projections etc. shall be added to the plaster on walls.
Plastering
Sl No
Qty
Unit
Description of Item
Unit
501

10
0.15
1.0
0.5
0.5

m2
m3

Plastering with lime mortar 1:2, 12mm thick, one coat


Lime Mortar 1:2
Brick Mason
Man
Woman

10m2
m3

502

10
0.165

m2
m3

Plastering with lime mortar 1:2, 15mm thick, one coat


Lime Mortar 1:2
Labour as per Item 501 above

10m2
m3

503

10
0.15

m2
m3

Plastering with Surki mortar 1:1/2:11/2, 12mm thick, one coat

10m2
m3

10
0.165

m2
m3

Plastering with Surki mortar 1:1/2:11/2, 15mm thick, one coat

504

505

10
0.038
0.036
0.5
0.5

506

10
0.14
66
0.9
0.55
1.1

m2
m3
m3

m2
m3
kg

Surki mortar 1:1/2:11/2


Labour as per Item 501 above

Surki mortar 1:1/2:11/2


Labour as per Item 501 above
Plastering over lime mortar one coat 12 mm or 15mm thick neat lime
and fine sand finished smooth
White Sand or Fine Sand
Lime
Brick Mason
Woman
Plastering with Cement mortar 1:3, 12mm thick, one coat
Dry Sand
Cement
Brick Mason
Man
Woman

10m2
m3

10m2
m3
m3

10m2
m3

506a

10
0.09
43

m2
m3
kg

Plastering with Cement mortar 1:3, 9mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

507

10
0.15
54

m2
m3
kg

Plastering with Cement mortar 1:4, 12mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

508

10
0.15
43

m2
m3
kg

Plastering with Cement mortar 1:5, 12mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

509

10
0.15
38

m2
m3
kg

Plastering with Cement mortar 1:6, 12mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

510

10
0.15
72

m2
m3
kg

Plastering with Cement mortar 1:3, 15mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

511

10
0.165
59

m2
m3
kg

Plastering with Cement mortar 1:4, 15mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

512

10
0.165
48

m2
m3
kg

Plastering with Cement mortar 1:5, 15mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

513

10
0.165
40

m2
m3
kg

Plastering with Cement mortar 1:6, 15mm thick, one coat


Dry Sand
Cement
Labour as per Item 506 above

10m2
m3

514

10

m2

22
0.5

kg

Add to Cement Plastering Items for Plastering neat Cement


Flushing Coat.
Cement
Brick Mason

515

10
22

m2
kg

Add to Cement Plastering Items for use of coloured Cement


Add the excess value of coloured Cement

516

10

m2

Add to All Plastering Items if plaster is thread lined to represent


masonry
Mason

m2
m3
m3

Fine Chunnam plastering to the outside of RCC Floors


White Sand or Fine Sand
Lime
Brick Mason
Man
Scaffolding Charges

0.2
517

10
0.038
0.036
0.75
0.75
LS

10m2

10m2

10m2

10m2
m3
m3

LS

0.62

518

10
1.4
0.5

m2
kg

For Polishing Plastered Surfaces with Lamp Black


Lamp Black
Mason Extra for Polishing

10m2

519

10
0.038

m2
m3

Fine Chunnam plastering to the outside of RCC Floors


White Sand or Fine Sand

10m2
m3

520

10
0.15
0.025
36

m2
m3
m3
kg

Plastering with Combination mortar 1:1:6, 12mm thick, one coat


Dry Sand
Lime
Cement
Labour as per Item 506 above

10m2
m3
m3

520a

10
0.075
0.0125
18

m2
m3
m3
kg

Plastering with Combination mortar 1:1:6, 6mm thick, one coat


White Sand or Fine Sand
Lime
Cement
Labour as per Item 517 above

10m2
m3
m3

521

10
0.013
6
0.5
0.15

522

10

R.Mtr Providing Border 75mm wide & 15mm thick in Cement Mortar 1:3
m3 White Sand or Fine Sand
kg
Cement
Brick Mason
Boy
m2

0.5
0.25
10

m2

523
10
0.15
14.5
1.75
0.5
1

m2
m3
kg

Clean removal of old plaster from walls including raking out joints
and cleaning the surface for replaster including disposal of debris
with in 150 mtr.
Mason
Boy
Providing Stucco plastering to walls with selected broken stones 15
mm size over a base coat of cement plastering 1:3, 15 mm thk.
Plastering with Cement mortar 1:3, 15mm thick one coat
15mm selected Broken Stones
Cement (for slurry for applying)
Mason
Man
Woman

10 Rm
m3

10m2

10m2
10m2
m3

Pointing
NB 1 For Raised or line pointing, add 0.5 Brick Mason to the corresponding labour for flush pointing
For Pointing to Coursed Rubble masonry the same rate as for brick work pointing will apply in the
2
absence of other data which may be required for certain classes of coursed rubble
3 Pointing Laterite Masonry, the rates for rubble work will apply
Sl No
524

525

Qty

Unit

Description of Item
Pointing Brick work with Lime Mortar 1:2
Lime Mortar 1:2
Brick Mason
Man
Woman

Unit
10m2
m3

10
0.03
0.8
0.54
0.54

m
m3

10

m2

Pointing Brick work with Surki mortar 1:1/2:1

10m2

0.03

m3

Surki mortar 1:1/2:1


Labour as per Item 524 above

m3

526

10
0.028
13.25

m2
m3
kg

Pointing Brick work with Cement mortar 1:3


Dry Sand
Cement
Labour as per Item 524 above

10m2
m3

527

10
0.03
10

m2
m3
kg

Pointing Brick work with Cement mortar 1:4


Dry Sand
Cement
Labour as per Item 524 above

10m2
m3

528

10
0.014
6.62

m2
m3
kg

Pointing Brick work with Cement mortar 1:3, Tile Flooring


Dry Sand
Cement
Labour as per Item 524 above

10m2
m3

529

10
0.03
0.54
0.54
0.54

m2
m3

Pointing Random Rubble Masonry with Lime Mortar 1:2


Lime Mortar 1:2
Rubble Mason
Man
Woman

10m2
m3

530

10

m2

Pointing Random Rubble masonry with Surki mortar 1: 1/2:1

10m2

0.03

m3

Surki mortar 1: /2:1


Labour as per Item 529 above

531

10
0.026
18.58

m2
m3
kg

Pointing Random Rubble masonry with Cement mortar 1:2


Dry Sand
Cement
Labour as per Item 529 above

10m2
m3

532

10
0.028
13.25

m2
m3
kg

Pointing Random Rubble masonry with Cement mortar 1:3


Dry Sand
Cement
Labour as per Item 529 above

10m2
m3

533

10
0.03
10

m2
m3
kg

Pointing Random Rubble masonry with Cement mortar 1:4


Dry Sand
Cement
Labour as per Item 529 above

10m2
m3

534

10
0.013
9.29
0.4
0.25

m2
m3
kg

Flush Pointing Ashlar masonry with Cement mortar 1:2


Dry Sand
Cement
Rubble Mason
Boy

10m2
m3

535

10
0.014
6.62

m2
m3
kg

Flush Pointing Ashlar masonry with Cement mortar 1:3


Dry Sand
Cement
Labour as per Item 534 above

10m2
m3

536

m2

Dadoing walls with best glazed white or coloured tile 7.5mm thick or
nearest in 12mm cement mortar 1:3 & pointing with coloured
cement.
Cost of 150mm2 Tiles as fitted on work including extra cost of
Angles and Cornices etc.
Dry Sand

m2

44
0.01

m3

m3

m2

m3

536a

0.48
0.9
0.5
LS
1

kg

1
1
44

m2
m2
Nos

Cement
Mason
Man
Cost of coloured cement
Add Cement plastering 1:3, 12mm thick one coat as per 506
- do - for coloured tiles and - do Rate as per Item 536 above
Add difference in cost of coloured and plain Tiles.

LS

m2
m2

0.62

Chapter 12

White Washing, Colure Washing & Distempering

All work falling under this head shall be given in square metres.
The
Rates for the items shall include brushing, cleaning and preparing the surface.
The
same Rate shall also apply for walls and ceilings.
For Jambs,
Soffits, Sills etc. for openings not exceeding 0.5 sq.mtr. each in area, ends for Joists, Beams, Posts,
Girders, Steps etc. not exceeding o.5 sq.mtr. each in area; and Openings not exceeding 3 sq. mtrs each
deductions or additions shall be made in the following manner.
(a) NO Deduction shall be made for ends of Joists, Beams, Posts etc.& Openings not exceeding 0.5 m 2
each, and NO Additions shall be made for Reveals, Jambs, Soffits, Sills etc. of these Openings,
(b) Deductions for Openings Exceeding 0.5 m 2 but not exceeding 3 m2 Each shall be made as follows and
no additions shall be made for Reveals, Jambs, Soffits, Sills etc. of these Openings.
(1) When Both Faces of Wall are treated with same finish, deduction shall be made for one Face only. (2)
When Two Faces of Walls are treated with different finishes, deduction shall be made from the finish on the
side of Frames of Doors, Windows etc. on which the width of reveals is less than that on the other side, but
No deduction shall be made from finish on the other side.
In case of
openings of area above 3 sq. mtrs each, deduction shall be made for the openings, but Jambs, Soffits and
Sills shall be measured.
Corrugated Surfaces
shall be measured flat as fixed and not girthed. The Quantities so measured shall be increased by the
following percentages and the result included with the general area.
Corrugated Steel Sheets
14 %
Corrugated AC sheets with large corrugations such as big six sheet
20 %
Semicorrugated AC Sheets such as Trafford sheets
10 %
The Cornices and other wall features, when they are not picked out in a different finish / colour, shall be
girthed and included in the wall measurements.
The Items shall include removing nails
and making good holes, cracks, patches etc. not exceeding 0.1 sq. mtr. each with material similar in
composition to the surface to be prepared.
Sl No
551

552

553

554

555

556

Qty
10
0.03
LS
0.12
0.12

Unit
m2
m3

10
10

m2
m2

10
0.02
LS
0.08
0.08

m2
m3

10
10

m2
m2

10
1.48
LS
0.12
0.12

m2
kg

10
1.00
LS
0.08
0.08

m2
kg

Description of Item
White washing Two coats
Quick Lime
Glue and other sundries
Special Mazdoor for white washing
Boy

Unit
10m2
m3
LS

0.37

10m2
10m2
LS

0.62

White washing for each suceeding coat for New or 1coat OldWork
Quick Lime
Glue and other sundries
Special Mazdoor for white washing
Boy

10m2
m3
LS

0.25

Colour washing for each suceeding coat for New or 1coat OldWork
Rate for White washing as per Item 553 above
Add Rate for Colours

10m2
10m2
LS

0.50

Cementwashing fOne coat


Cement
Sundries including Brushes
Special Mazdoor
Boy

10m2

Cementwashing for each suceeding coat for New or 1coat OldWork


Cement
Sundries including Brushes
Special Mazdoor
Boy

10m2

Colour washing Two coats


Rate for White washing 2 coats as per Item 551 above
Add Rate for Colours

LS

LS

0.12

0.12

557

10
1.00
LS
0.3

558

kg

m2
kg

10
3.20
LS
0.5
0.7

561

m2

10
0.60
LS
0.25

560

kg

10
0.50
LS
0.2

559

m2

m2
kg

10
1.40
LS
0.25
0.25

m2
kg

Distempering with Oil Bound Distemper on New work one coat


including smoothening with sand paper
Distemper
Brushes, Sand Paper etc.
Painter
Distempering with Oil Bound Distemper for each suceeding coat on
New work including smoothening with sand paper
Distemper
Brushes, Sand Paper etc.
Painter
Distempering with Oil Bound work with Dry Distemper including
smoothening with sand paper
Distemper
Brushes, Sand Paper etc.
Painter
Finishing new cement plastered walls with Cement Water Proof
paint Two coats.
Cement Water Proof Paint
Brushes, Sand Paper etc.
Painter
Woman for watering
Finishing new cement plastered walls with Cement Water Proof
paint coating on old surface one coat or suceeding coats on new
surface.
Cement Water Proof Paint
Brushes, Sand Paper etc.
Painter
Woman for watering

10m2
LS

0.37

10m2
LS

0.37

10m2
LS

0.37

10m2
LS

0.37

10m2
LS

0.37

Chapter 13

Painting

Painting, except where otherwise stated, shall be given in Sq. Mtrs.

Sl No
601

Qty
10
1

Unit
M2
LS

602

10

M2

0.5
LS
603

10

M2

0.85

Ltr
Ls

0.4
604

10

M2

0.75

Ltr
Ls

0.4
605

10

M2

Ltr
Ls

0.4
606

10
1

M2
Ltr
Ls

0.25
607

10

M2

0.65

Ltr
Ls

0.2
608

10
0.75

M2
Ltr
Ls

0.25
609

10

1.05
0.25

M2

Ltr
Ls

Description of Item
Scraping & Clweaning old painted surface with sand paper etc.
Man
Sanmd Paper
Scraping & Clweaning old wood oiled or varnished surface with
sand paper etc.
Man
Sanmd Paper

Unit
10 M2
LS

0.37

10 M2
LS

0.37

Painting Priming coat on new wood work after with sand paper and
cleaning the surface
Wood Primer
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Painting Priming coat on new Iron work after with emery paper and
cleaning the surface
Iron Primer
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Painting Priming coat on new Plastered surface after cleaning the


surface
Surface Primer
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Painting with paint of suitable colour using approved quality paint as


specified - one coat over a priming coat (already done & to be paid
seperately) to new wood work
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Painting with paint of suitable colour using approved quality paint as


specified - for Each Suceeding coat to new wood work
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.25

Painting with paint of suitable colour using approved quality paint as


specified - for Each Suceeding coat to Old wood work after rubbing
with sand paper and cleaning the surface
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

10 M2
Ltr
LS

0.37

Painting with Aluminium paint using approved quality paint as


specified - one coat over a priming coat (already done & to be paid
seperately) to New Iron work after rubbing with sand paper and
cleaning the surface
Aluminium Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

610

10
0.7

M2
Ltr
Ls

0.2
611

10
0.8

M2
Ltr
Ls

0.25
612

10

0.7

M2

Ltr
Ls

0.65
613

10
0.45

M2
Ltr
Ls

0.45
614

10
0.5

M2
Ltr
Ls

0.5
615

10
1.15

M2
Ltr
Ls

1.15
615a

10
0.4

M2
Ltr
Ls

0.4
616

10

M2

0.5

Ltr
Ls

0.5
617

10
0.3
0.3

M2
Ltr
Ls

Painting with Aluminium paint using approved quality paint as


specified - for Each Suceeding coat to New Iron work after rubbing
with sand paper and cleaning the surface
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.25

Painting with Aluminium paint using approved quality paint as


specified - for one coat to Old Iron work after rubbing with sand
paper and cleaning the surface
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

10 M2
Ltr
LS

0.37

Painting with Synthetic Enamel paint using approved quality paint as


specified - for Each Suceeding coat to New Wood work after
rubbing with sand paper and cleaning the surface
Syntetic Enamel Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.25

Painting with Synthetic Enamel paint using approved quality paint as


specified - for one coat to Old surfaces of wood work after rubbing
with sand paper and cleaning the surface
Approved quality Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Painting with two coats with ready mixed plastic emulsion paint
using approved quality as specified and including priming coat after
rubbing with sand paper and cleaning the surface
Plastic Emulsion Paint including Priming Coat
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.62

Painting with One coat with ready mixed plastic emulsion paint of
approved quality on Old surface or Suceeding coat on New surface
Plastic Emulsion Paint including Priming Coat
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Wood Oiling First Coat on New Wood work after rubbing with sand
paper and cleaning the surface
Wood Oil
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

10 M2
Ltr
LS

0.25

Painting with Synthetic Enamel paint using approved quality as


specified - one coat (over a priming coat already done & to be paid
seperately) to New Wood work after rubbing with sand paper and
cleaning the surface
Syntetic Enamel Paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

Wood Oiling on New Wood work for Each Suceeding Coat


Wood Oil
Sundries including Brush, Sand paper, soap, putty etc.
Painter

618

10

M2

0.35

Ltr
Ls

0.4
619

10

M2

0.5

Ltr
Ls

0.6
620

10

M2

0.3

Ltr
Ls

0.4
621

10

M2

0.35

Ltr
Ls

0.45
622

10
1

Wood Oiling Old Wood work after rubbing with sand paper and
cleaning the surface
Wood Oil
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Varnishing with Copal Varnish One Coat to New Wood work after
rubbing with sand paper and cleaning the surface
Copal Varnish
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

Varnishing with Copal Varnish to New Wood work for Each


Suceeding Coat
Copal Varnish
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.25

Varnishing with Copal Varnish on Old Wood work after rubbing with
sand paper and cleaning the surface
Copal Varnish
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10 M2
Ltr
LS

0.37

10 M2
Kg
LS

0.50

M2
Kg
Ls

Tarring with Coaltar to New Wood work One Coat


Coal Tar
Sundries including Brush, Sand paper, soap, putty etc.
Painter

0.35
623

10

M2

Allow 0.65 of the First Coat for Each Suceeding Coat for New Wood
Work or Old Wood Work.

624

10
0.12
0.75

M2
Kg
Ltr
Ls

Bee Waxing
Bee Wax
Turpentine
Sundries including Brush, Sand paper, soap, putty etc.
Painter

10

M2

1.4

Kg
Ls

Painting with Black Japan Paint One Coat after Rubbing with sand
paper and cleaning the surface
Black Japan paint
Sundries including Brush, Sand paper, soap, putty etc.
Painter

0.75
625

0.5
626

10

627

1
0.25

2
0.5

628

1
0.45

M2

Allow 0.65 of the First Coat for Each Suceeding Coat for New Wood
Work or Old Wood Work.

Each Painting Letters or Figures 2.5, 4 or 5 cm height (Block, Roman,


Italic or Indian) with any kind of paint.
Details of Cost of 100 Letters of 2.5, 4 or 5 cm height
Ltr Approved Quality Paint
Ls
Brushes etc.
Ls
Scaffolding Charges
Painter
Man
Hence Average Cost of Each Letter or Figure
Each Painting Letters or Figures 6.5, 8, or 10 cm height (Block, Roman,
Italic or Indian) with any kind of paint.
Details of Cost of 100 Letters of 6.5, 8 or 10 cm height
Ltr Approved Quality Paint

10 M2
10 M2
Kg
Ltr
LS

0.25

10 M2
Kg
LS

0.25

10 M2

Each
Ltr
LS
LS

Each
Ltr

0.62
3.75

Ls
Ls
4.5
1.5

629

1
0.6

7
2

630

1
0.9

10
2

Brushes etc.
Scaffolding Charges
Painter
Man
Hence Average Cost of Each Letter or Figure

Each Painting Letters or Figures 13, 15 or 18 cm height (Block, Roman,


Italic or Indian) with any kind of paint.
Details of Cost of 100 Letters of 13, 15 or 18 cm height
Ltr Approved Quality Paint
Ls
Brushes etc.
Ls
Scaffolding Charges
Painter
Man
Hence Average Cost of Each Letter or Figure
Each Painting Letters or Figures 23, 25 or 30 cm height (Block, Roman,
Italic or Indian) with any kind of paint.
Details of Cost of 100 Letters of 23, 25 or 30 cm height
Ltr Approved Quality Paint
Ls
Brushes etc.
Ls
Scaffolding Charges
Painter
Man
Hence Average Cost of Each Letter or Figure

LS
LS

0.62
3.75

Each
Ltr
LS
LS

0.62
3.75

Each
Ltr
LS
LS

0.62
3.75

Chapter 14

Road Work