APPLICATION AND CERTIFICATE FOR PAYMENT

TO: U.S. Army Engineer District, Wilmington


Attn: Charlenne Figgins
69 Darlington Avenue
Wilmington, NC 28403
FROM(CONTRACTOR):
Weaver Buidling Group, LLC
123 Shug Jordan Parkway
Auburn, AL 36830

AIA DOCUMENT G702

PAGE 1 OF 2

PROJECT: Company Administrative Facility


Camp MacKall
North Carolina, 28307

APPLICATION NO: 1

ARCHITECT:

ARCHITECTS
PROJECT NO.: 61064

Distribution to:
Architect
Owner
Contractor

PERIOD TO: 09/30/2014

Lyman, Davidson, Dooley, Inc.


1640 Powers Ferry Road
Building I, Suite 100
Marietta, GA 30067
CONTRACT FOR: GENERAL CONSTRUCTION FOR COMPANY ADMINISTRATIVE FACILITY

CONTRACT DATE:

8/27/2014

Application is made for Payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document G703, is attached.

CONTRACTOR'S APPLICATION FOR PAYMENT


CHANGE ORDER SUMMARY
Change Orders approved in
ADDITIONS
previous months by Owner
TOTAL
$0.00
Approved this month
Number
Date Approved
1
$0.00

DEDUCT

1. ORIGINAL CONTRACT SUM


2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line1+/-2)
4. TOTAL COMPLETED AND STORED TO DATE

$0.00

$
$
$
$

4,108,842.00
0.00
4,108,842.00
74,862.88

$
$

7,486.29
67,376.59

$
$
$

0.00
67,376.59
4,041,465.41

(Column G on G703)
5. RETAINAGE
a. 10% of completed Work

7,486.29

0.00

(Column D+E on G703)


b. 10% of stored materials

(Column F on G703)
Total Retainage (Line 5a + 5b or

Total in Column I of G703)


TOTALS
Net change by Change Orders

$0.00

$0.00
$0.00

6. TOTAL EARNED LESS RETAINAGE

(Line 4 Less Line 5 Total)

information and belief the Work covered by this Application for Payment has been

7. LESS PREVIOUS APPLICATIONS FOR


(Line 6 from prior Certificate)
PAYMENT
8. CURRENT PAYMENT DUE

completed in accordance with the Contract Documents, that all amounts have been

9. BALANCE TO FINISH, PLUS RETAINAGE

The undersigned Contractor certifies that to the best of the Contractor's knowledge,

(Line 3 less line 6)

paid by the Contractor for Work for which previous Certificates for Payment were
issued and payments received from the Owner, and that current payment shown

State of: NC
County of:
Cumberland
Subscribed and sworn to before me this 30th day of September 2014
Notary Public:
Janene Sargent Symms

herein is now due.

CONTRACTOR:

By:

Weaver Building Group, LLC

Date: 09/30/2014

My Commission expires: January 1, 2020


AMOUNT CERTIFIED

ARCHITECT'S CERTIFICATE FOR PAYMENT


In accordance with the Contract Documents, based on on-site
observations and the data comprising the above application,
the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has
progressed as indicated, the quality of the Work is in
accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
AIA DOCUMENT G702

By:

67,376.59

Mike Rogers

Date: 09/30/2014

This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance,
payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION -AIA C 1983

THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006

(Attach explanation if amount certified differs from the amount applied for.)
ARCHITECT: LDDI

CONTINUATION SHEET

AIA DOCUMENT G703

PAGE 2

AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing


Contractor's signed certification is attached.

APPLICATION NUMBER:
APPLICATION DATE:
PERIOD TO:
ARCHITECT PROJECT NO:

In tabulations below, amounts are stated to the nearest dollar.


Use Column I on Contracts where variable retainage for line items may apply.
A
ITEM
NO.

B
DESCRIPTION OF WORK

C
SCHEDULED
VALUE

OF 2

D
E
WORK COMPLETED
FROM PREVIOUS THIS PERIOD
APPLICATION
(D+E)

F
MATERIALS
PRESENTLY
STORED
(NOT IN D OR E)

G
TOTAL
COMPLETED
AND STORED
TO DATE
(D+E+F)

%
(G/C)

PAGES

1
9/30/2014
9/30/2014
61064

H
BALANCE
TO FINISH
(C-G)

I
RETAINAGE
10.00%

SITEWORK

$556,295.07

$0.00

$39,985.50

$0.00

$39,985.50

7.19%

$516,309.57

$3,998.55

STRIPING

$962.34

$0.00

$0.00

$0.00

$0.00

0.00%

$962.34

$0.00

FENCING

$54,076.37

$0.00

$0.00

$0.00

$0.00

0.00%

$54,076.37

$0.00

CONCRETE

$215,419.41

$0.00

$0.00

$0.00

$0.00

0.00%

$215,419.41

$0.00

METALS

$506,800.12

$0.00

$0.00

$0.00

$0.00

0.00%

$506,800.12

$0.00

MASONRY

$341,605.95

$0.00

$0.00

$0.00

$0.00

0.00%

$341,605.95

$0.00

CASEWORK & COUNTERTOPS

$29,961.69

$0.00

$0.00

$0.00

$0.00

0.00%

$29,961.69

$0.00

ROOFING

$299,344.17

$0.00

$0.00

$0.00

$0.00

0.00%

$299,344.17

$0.00

GC INSTALL

$507,860.26

$0.00

$0.00

$0.00

$0.00

0.00%

$507,860.26

$0.00

$26,684.67

$0.00

$0.00

$0.00

$0.00

0.00%

$26,684.67

$0.00

$188,163.31

$0.00

$0.00

$0.00

$0.00

0.00%

$188,163.31

$0.00

PORCELAIN TILE

$53,931.88

$0.00

$0.00

$0.00

$0.00

0.00%

$53,931.88

$0.00

13

ACOUSTICAL CEILING

$34,031.45

$0.00

$0.00

$0.00

$0.00

0.00%

$34,031.45

$0.00

14

FLOORING

$21,871.75

$0.00

$0.00

$0.00

$0.00

0.00%

$21,871.75

$0.00

15

PAINTING

$67,016.10

$0.00

$0.00

$0.00

$0.00

0.00%

$67,016.10

$0.00

16

FIRE SUPPRESSION

$77,962.40

$0.00

$0.00

$0.00

$0.00

0.00%

$77,962.40

$0.00

17

PLUMBING

$176,324.91

$0.00

$0.00

$0.00

$0.00

0.00%

$176,324.91

$0.00

18

HVAC

$289,760.59

$0.00

$0.00

$0.00

$0.00

0.00%

$289,760.59

$0.00

19

ELECTRICAL

$277,156.00

$0.00

$0.00

$0.00

$0.00

0.00%

$277,156.00

$0.00

20

COMMUNICATIONS

$154,105.32

$0.00

$19,263.16

$0.00

$19,263.16

12.50%

$134,842.16

$1,926.32

21

ESS SYSTEM

$195,112.90

$0.00

$0.00

$0.00

$0.00

0.00%

$195,112.90

$0.00

$0.00

$0.00

$0.00

$0.00

0.00%

$18,781.12

$0.00

$0.00

$1,561.42

$4,033,979.12

$7,486.29

10

WINDOWS & STOREFRONT

11

METAL STUDS & DRYWALL

12

22

LANDSCAPING

$18,781.12

23

JOBSITE OVERHEAD

$15,614.22

$0.00

$15,614.22

$0.00

$15,614.22

$4,108,842

$0.00

$74,862.88

$0.00

$74,862.88

SUB TOTALS

AIA DOCUMENT G703 - APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION - AIA C 1983
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006

100.00%

1.82%

APPLICATION AND CERTIFICATE FOR PAYMENT


TO: U.S. Army Engineer District, Wilmington
Attn: Charlenne Figgins
69 Darlington Avenue
Wilmington, NC 28403
FROM(CONTRACTOR):
Weaver Buidling Group, LLC
123 Shug Jordan Parkway
Auburn, AL 36830

AIA DOCUMENT G702

PAGE 1 OF 2

PROJECT: Company Administrative Facility


Camp MacKall
North Carolina, 28307

APPLICATION NO: 2

ARCHITECT:

ARCHITECTS
PROJECT NO.: 61064

Distribution to:
Architect
Owner
Contractor

PERIOD TO: 10/31/2014

Lyman, Davidson, Dooley, Inc.


1640 Powers Ferry Road
Building I, Suite 100
Marietta, GA 30067
CONTRACT FOR: GENERAL CONSTRUCTION FOR COMPANY ADMINISTRATIVE FACILITY

CONTRACT DATE:

8/27/2014

Application is made for Payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document G703, is attached.

CONTRACTOR'S APPLICATION FOR PAYMENT


CHANGE ORDER SUMMARY
Change Orders approved in
ADDITIONS
previous months by Owner
TOTAL
$0.00
Approved this month
Number
Date Approved
1
$0.00

DEDUCT

1. ORIGINAL CONTRACT SUM


2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line1+/-2)
4. TOTAL COMPLETED AND STORED TO DATE

$0.00

$
$
$
$

4,108,842.00
0.00
4,108,842.00
390,226.43

$
$

39,022.64
351,203.79

$
$
$

67,376.59
283,827.20
3,757,638.21

283,827.20

(Column G on G703)
5. RETAINAGE
a. 10% of completed Work

29,642.64

9,380.00

(Column D+E on G703)


b. 10% of stored materials

(Column F on G703)
Total Retainage (Line 5a + 5b or

Total in Column I of G703)


TOTALS
Net change by Change Orders

$0.00

$0.00
$0.00

6. TOTAL EARNED LESS RETAINAGE

(Line 4 Less Line 5 Total)

information and belief the Work covered by this Application for Payment has been

7. LESS PREVIOUS APPLICATIONS FOR


(Line 6 from prior Certificate)
PAYMENT
8. CURRENT PAYMENT DUE

completed in accordance with the Contract Documents, that all amounts have been

9. BALANCE TO FINISH, PLUS RETAINAGE

The undersigned Contractor certifies that to the best of the Contractor's knowledge,

(Line 3 less line 6)

paid by the Contractor for Work for which previous Certificates for Payment were
issued and payments received from the Owner, and that current payment shown

State of: NC
County of:
Cumberland
Subscribed and sworn to before me this 31st day of October 2014
Notary Public:
Janene Sargent Symms

herein is now due.

CONTRACTOR:

By:

Weaver Building Group, LLC

Date: 10/31/2014

My Commission expires: January 1, 2020


AMOUNT CERTIFIED

ARCHITECT'S CERTIFICATE FOR PAYMENT


In accordance with the Contract Documents, based on on-site
observations and the data comprising the above application,
the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has
progressed as indicated, the quality of the Work is in
accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
AIA DOCUMENT G702

(Attach explanation if amount certified differs from the amount applied for.)
ARCHITECT: LDDI
By:

Mike Rogers

payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION -AIA C 1983

THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006

Date: 10/31/2014

This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance,

CONTINUATION SHEET

AIA DOCUMENT G703

PAGE 2

AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing


Contractor's signed certification is attached.

APPLICATION NUMBER:
APPLICATION DATE:
PERIOD TO:
ARCHITECT PROJECT NO:

In tabulations below, amounts are stated to the nearest dollar.


Use Column I on Contracts where variable retainage for line items may apply.
A
ITEM
NO.

B
DESCRIPTION OF WORK

C
SCHEDULED
VALUE

OF 2

D
E
WORK COMPLETED
FROM PREVIOUS THIS PERIOD
APPLICATION
(D+E)

F
MATERIALS
PRESENTLY
STORED
(NOT IN D OR E)

G
TOTAL
COMPLETED
AND STORED
TO DATE
(D+E+F)

%
(G/C)

PAGES

2
10/31/2014
10/31/2014
61064

H
BALANCE
TO FINISH
(C-G)

I
RETAINAGE
10.00%

SITEWORK

$556,295.07

$39,985.50

$148,363.52

$0.00

$188,349.02

33.86%

$367,946.05

STRIPING

$962.34

$0.00

$0.00

$0.00

$0.00

0.00%

$962.34

$0.00

FENCING

$54,076.37

$0.00

$0.00

$21,300.00

$21,300.00

39.39%

$32,776.37

$2,130.00

CONCRETE

$215,419.41

$0.00

$0.00

$0.00

$0.00

0.00%

$215,419.41

$0.00

METALS

$506,800.12

$0.00

$0.00

$0.00

$0.00

0.00%

$506,800.12

$0.00

MASONRY

$341,605.95

$0.00

$0.00

$38,000.00

$38,000.00

11.12%

$303,605.95

$3,800.00

CASEWORK & COUNTERTOPS

$29,961.69

$0.00

$0.00

$0.00

$0.00

0.00%

$29,961.69

$0.00

ROOFING

$299,344.17

$0.00

$0.00

$0.00

$0.00

0.00%

$299,344.17

$0.00

GC INSTALL

$507,860.26

$0.00

$0.00

$0.00

$0.00

0.00%

$507,860.26

$0.00

$18,834.90

$26,684.67

$0.00

$0.00

$0.00

$0.00

0.00%

$26,684.67

$0.00

$188,163.31

$0.00

$0.00

$0.00

$0.00

0.00%

$188,163.31

$0.00

PORCELAIN TILE

$53,931.88

$0.00

$0.00

$0.00

$0.00

0.00%

$53,931.88

$0.00

13

ACOUSTICAL CEILING

$34,031.45

$0.00

$0.00

$0.00

$0.00

0.00%

$34,031.45

$0.00

14

FLOORING

$21,871.75

$0.00

$0.00

$0.00

$0.00

0.00%

$21,871.75

$0.00

15

PAINTING

$67,016.10

$0.00

$0.00

$0.00

$0.00

0.00%

$67,016.10

$0.00

16

FIRE SUPPRESSION

$77,962.40

$0.00

$0.00

$0.00

$0.00

0.00%

$77,962.40

$0.00

17

PLUMBING

$176,324.91

$0.00

$0.00

$34,500.00

$34,500.00

19.57%

$141,824.91

$3,450.00

18

10

WINDOWS & STOREFRONT

11

METAL STUDS & DRYWALL

12

HVAC

$289,760.59

$0.00

$0.00

$0.00

$0.00

0.00%

$289,760.59

$0.00

19

ELECTRICAL

$277,156.00

$0.00

$0.00

$0.00

$0.00

0.00%

$277,156.00

$0.00

20

COMMUNICATIONS

$154,105.32

$19,263.16

$73,200.03

$0.00

$92,463.19

60.00%

$61,642.13

$9,246.32

21

ESS SYSTEM

$195,112.90

$0.00

$0.00

$0.00

$0.00

0.00%

$195,112.90

$0.00

$0.00

$0.00

$0.00

$0.00

0.00%

$18,781.12

$0.00

$0.00

$1,561.42

$3,718,615.57

$39,022.64

22

LANDSCAPING

$18,781.12

23

JOBSITE OVERHEAD

$15,614.22

$15,614.22

$0.00

$0.00

$15,614.22

$4,108,842

$74,862.88

$221,563.55

$93,800.00

$390,226.43

SUB TOTALS

AIA DOCUMENT G703 - APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION - AIA C 1983
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006

100.00%

9.50%

APPLICATION AND CERTIFICATE FOR PAYMENT


TO: U.S. Army Engineer District, Wilmington
Attn: Charlenne Figgins
69 Darlington Avenue
Wilmington, NC 28403
FROM(CONTRACTOR):
Weaver Buidling Group, LLC
123 Shug Jordan Parkway
Auburn, AL 36830

AIA DOCUMENT G702

PAGE 1 OF 2

PROJECT: Company Administrative Facility


Camp MacKall
North Carolina, 28307

APPLICATION NO: 3

ARCHITECT:

ARCHITECTS
PROJECT NO.: 61064

Distribution to:
Architect
Owner
Contractor

PERIOD TO: 11/30/2014

Lyman, Davidson, Dooley, Inc.


1640 Powers Ferry Road
Building I, Suite 100
Marietta, GA 30067
CONTRACT FOR: GENERAL CONSTRUCTION FOR COMPANY ADMINISTRATIVE FACILITY

CONTRACT DATE:

8/27/2014

Application is made for Payment, as shown below, in connection with the Contract.
Continuation Sheet, AIA Document G703, is attached.

CONTRACTOR'S APPLICATION FOR PAYMENT


CHANGE ORDER SUMMARY
Change Orders approved in
ADDITIONS
previous months by Owner
TOTAL
$0.00
Approved this month
Number
Date Approved
1
11/17/2014
$34,644.00

DEDUCT

1. ORIGINAL CONTRACT SUM


2. Net change by Change Orders
3. CONTRACT SUM TO DATE (Line1+/-2)
4. TOTAL COMPLETED AND STORED TO DATE

$0.00

$
$
$
$

4,108,842.00
34,644.00
4,143,486.00
840,429.34

$
$

84,042.93
756,386.41

$
$
$

351,203.79
405,182.62
3,387,099.59

(Column G on G703)
5. RETAINAGE
a. 10% of completed Work

74,104.33

9,938.60

(Column D+E on G703)


b. 10% of stored materials

(Column F on G703)
Total Retainage (Line 5a + 5b or

Total in Column I of G703)


TOTALS
Net change by Change Orders

$34,644.00

$0.00
$34,644.00

6. TOTAL EARNED LESS RETAINAGE

(Line 4 Less Line 5 Total)

information and belief the Work covered by this Application for Payment has been

7. LESS PREVIOUS APPLICATIONS FOR


(Line 6 from prior Certificate)
PAYMENT
8. CURRENT PAYMENT DUE

completed in accordance with the Contract Documents, that all amounts have been

9. BALANCE TO FINISH, PLUS RETAINAGE

The undersigned Contractor certifies that to the best of the Contractor's knowledge,

(Line 3 less line 6)

paid by the Contractor for Work for which previous Certificates for Payment were
issued and payments received from the Owner, and that current payment shown

State of: NC
County of:
Cumberland
Subscribed and sworn to before me this 30th day of November 2014
Notary Public:
Janene Sargent Symms

herein is now due.

CONTRACTOR:

By:

Weaver Building Group, LLC

Date: 11/30/2014

My Commission expires: January 1, 2020


AMOUNT CERTIFIED

ARCHITECT'S CERTIFICATE FOR PAYMENT


In accordance with the Contract Documents, based on on-site
observations and the data comprising the above application,
the Architect certifies to the Owner that to the best of the
Architect's knowledge, information and belief the Work has
progressed as indicated, the quality of the Work is in
accordance with the Contract Documents, and the Contractor
is entitled to payment of the AMOUNT CERTIFIED.
AIA DOCUMENT G702

By:

405,182.62

Mike Rogers

Date: 11/30/2014

This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance,
payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.

APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION -AIA C 1983

THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006

(Attach explanation if amount certified differs from the amount applied for.)
ARCHITECT: LDDI

CONTINUATION SHEET

AIA DOCUMENT G703

PAGE 2

AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing


Contractor's signed certification is attached.

APPLICATION NUMBER:
APPLICATION DATE:
PERIOD TO:
ARCHITECT PROJECT NO:

In tabulations below, amounts are stated to the nearest dollar.


Use Column I on Contracts where variable retainage for line items may apply.
A
ITEM
NO.

B
DESCRIPTION OF WORK

C
SCHEDULED
VALUE

OF 2

D
E
WORK COMPLETED
FROM PREVIOUS THIS PERIOD
APPLICATION
(D+E)

F
MATERIALS
PRESENTLY
STORED
(NOT IN D OR E)

G
TOTAL
COMPLETED
AND STORED
TO DATE
(D+E+F)

%
(G/C)

PAGES

3
11/30/2014
11/30/2014
61064

H
BALANCE
TO FINISH
(C-G)

I
RETAINAGE
10.00%

SITEWORK

$556,295.07

$188,349.02

$242,706.73

$0.00

$431,055.75

77.49%

$125,239.32

STRIPING

$962.34

$0.00

$0.00

$0.00

$0.00

0.00%

$962.34

$0.00

FENCING

$54,076.37

$0.00

$54,076.37

$0.00

$54,076.37

100.00%

$0.00

$5,407.64

CONCRETE

$215,419.41

$0.00

$65,578.37

$0.00

$65,578.37

30.44%

$149,841.04

$6,557.84

METALS

$506,800.12

$0.00

$0.00

$0.00

$0.00

0.00%

$506,800.12

$0.00

MASONRY

$341,605.95

$0.00

$22,354.37

$82,534.00

$104,888.37

30.70%

$236,717.58

$10,488.84

CASEWORK & COUNTERTOPS

$29,961.69

$0.00

$0.00

$0.00

$0.00

0.00%

$29,961.69

$0.00

ROOFING

$299,344.17

$0.00

$0.00

$0.00

$0.00

0.00%

$299,344.17

$0.00

GC INSTALL

$507,860.26

$0.00

$0.00

$0.00

$0.00

0.00%

$507,860.26

$0.00

$43,105.58

$26,684.67

$0.00

$0.00

$0.00

$0.00

0.00%

$26,684.67

$0.00

$188,163.31

$0.00

$0.00

$0.00

$0.00

0.00%

$188,163.31

$0.00

PORCELAIN TILE

$53,931.88

$0.00

$0.00

$0.00

$0.00

0.00%

$53,931.88

$0.00

13

ACOUSTICAL CEILING

$34,031.45

$0.00

$0.00

$0.00

$0.00

0.00%

$34,031.45

$0.00

14

FLOORING

$21,871.75

$0.00

$0.00

$0.00

$0.00

0.00%

$21,871.75

$0.00

15

PAINTING

$67,016.10

$0.00

$0.00

$0.00

$0.00

0.00%

$67,016.10

$0.00

16

FIRE SUPPRESSION

$77,962.40

$0.00

$0.00

$0.00

$0.00

0.00%

$77,962.40

$0.00

17

PLUMBING

$176,324.91

$0.00

$59,901.07

$16,852.00

$76,753.07

43.53%

$99,571.84

$7,675.31

18

10

WINDOWS & STOREFRONT

11

METAL STUDS & DRYWALL

12

HVAC

$289,760.59

$0.00

$0.00

$0.00

$0.00

0.00%

$289,760.59

$0.00

19

ELECTRICAL

$277,156.00

$0.00

$0.00

$0.00

$0.00

0.00%

$277,156.00

$0.00

20

COMMUNICATIONS

$154,105.32

$92,463.19

$0.00

$0.00

$92,463.19

60.00%

$61,642.13

$9,246.32

21

ESS SYSTEM

$195,112.90

$0.00

$0.00

$0.00

$0.00

0.00%

$195,112.90

$0.00

$0.00

$0.00

$0.00

$0.00

0.00%

$18,781.12

$0.00

$0.00

$1,561.42

$3,268,412.66

$84,042.93

22

LANDSCAPING

$18,781.12

23

JOBSITE OVERHEAD

$15,614.22

$15,614.22

$0.00

$0.00

$15,614.22

$4,108,842

$296,426.43

$444,616.91

$99,386.00

$840,429.34

SUB TOTALS

AIA DOCUMENT G703 - APPLICATION AND CERTIFICATE FOR PAYMENT - MAY 1983 EDITION - AIA C 1983
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006

100.00%