Impact on

Environme
ntal
Variable

Source of
Impact

Environme
ntal Impact

Pertinent
Environme
ntal
Regulation
s Applied

Established
Measures

Implementa
tion
Timeframe

Cost per
Mitigatio
n
Measure

Responsi
ble Party

Air

Excavatio
ns

Dust

R.A 8749
Philippine
Clean Air
Act

During
construction

Included
in the
contract
ors
budget

Contract
ors

Machinery
&
Equipmen
t during
Constructi
on
Operating
the Plant

Noise

PRESIDENT
IAL
DECREE
No. 1152
Sec. 6

Spraying
water on
constructio
n platforms;
Wearing of
mask and
safety
glass.
Machine
Operators
should wear
earplugs.

During
construction

Included
in the
contract
ors
budget

Contract
ors

Noise

PRESIDENT
IAL
DECREE
No. 1152
Sec. 6

Equipment
that
produce
high level
of noise
should be
soundproof.

During plant
operation

PhP
133/ft2

Plant
Manager

Leakage
of
chemicals
pipes/stor
age tanks

Chemical
spills

REPUBLIC
ACT NO.
6969
Toxic
Substance

During plant
operation

Included
in the
budget

Plant
Manager

Soil and
Subsoil

Regularly
maintaining

Performan
ce
Indicator
establishe
d to
Monitor
Complianc
e
No
employee
s get sick
due to
exposure
to dust

The noise
level is
within the
allowable
range set
by WHO
The noise
level is
within the
allowable
range set
by WHO
Soil
should be
negative
from
contamina

Surface
and
Goundwate
r

Flora &
Fauna

Occupation
al Health
and

s and
Hazardous
and
Nuclear
Wastes
Control Act
of 1990
RA 9275
Philippine
Clean
Water Act

Improper
use of
fertilizer
in the
stevia
plantation

Ground
water
pollution

Disposal
of waste
during the
excavatio
n

Ground
water
pollution

RA 9275
Philippine
Clean
Water Act

Cutting
down of
trees
wherein
the plant
will be
erected
Machinery
and
Equipmen

Loss of
trees

REPUBLIC
ACT No.
3571

Potential
Accident

Health
Code
Regulation

and
checking of
pipes and
storage
tanks

nts

Composting
instead of
chemical
fertilizer
using dried
stevia
leaves
(byproduct)
Avoid
spilling of
oils from
constructio
n
machinery
in the soil
during
excavation
Avoid
cutting of
trees, use
of earth
balling
instead.

During plant
operation

Included
in the
budget

Plant
Manager

Groundwa
ter quality
should be
potable

During
construction

Included
in the
contract
ors
budget

Contract
or

Groundwa
ter quality
should be
potable

During
construction

Included
in the
contract
ors
budget

Contract
or

Trees that
is suitable
for earth
balling
shouldnt
be cut.

Regularly
scheduled
maintenanc

During Plant
Operation

Included
in the
plants

Plant
Manager

Workers
should
wear

Industrial
Safety

Socioecono
mic
Environme
nt

e of
machines
and
equipment.
Wearing of
PPEs inside
the plant
Train
workers
regarding
on proper
handling
and
industrial
safety.
Prioritize
employing
people from
the
community
of Cagayan
de Oro.
Maintain
communica
tion with
the local
governmen
t of CDO
and the
people of
CDO

Plant
Operation

Bad effects
on human
health

Health
Code
Regulation
s

Municipal
Revenue
and
Employme
nt

Provide job
to the
community
Improve
local
economy

Labor code
of the
Philippines

budget

During Plant
Operation

Included
in the
plants
budget

Plant
Manager

During Plant
Operation

Included
in the
plants
budget

Plant
Manager

Personal
Protective
Equipmen
t at all
times
within the
plants
premises
Record all
the
accident
and
incidents.

Provide
activities
with the
people of
CDO.

Environmental Scenario Changed by the Development of the Project, Work, Industry or Activity
Aspects

Lands

Current Condition
Environmental
Noise level is low since it is located
in the province, far from the city.
Air quality is good since there are a
lot of trees within the vicinity of the
lot.
Land contains a lot of trees

Surface Water

Surface water is not potable

Groundwater

Groundwater is used by the people


as drinking water.

Noise Levels
Air quality

Vehicle traffic

Income

Gross Regional Domestic Product

Social Condition
The lot is 4km away from the
national highway, therefore vehicle
traffic does not occur in the area.
According to NSCB, the
unemployment rate in northern
Mindanao is 5.8%, while
underemployment is at 22.6%
Since there are only few
manufacturing plants in the area,

Forecast
The noise level is expected to rise,
but not higher than the standard.
Air quality Is expected to deteriorate
but the company will ensure that is
within the standard
Trees will decrease, but trees that
are capable of earth balling will not
be removed.
Surface water will still be not
potable.
Groundwater will still be potable
without any contamination.
It wont affect the traffic much

Unemployment and
underemployment is expected to
decrease since the company will
prioritize hiring people from the
community.
GRDP is also expected to rise since
the company will contribute to the

the GRDP in 2014 is PhP 268,


336,627 only.

GDP of region.

Risk Analysis and Contingency Plan


Environmental Risk
Earthquake

Hazard
There are four active fault line in Misamis
Oriental, Cagayan de Oro

Contingency Plan
Do hazard mapping
Build an emergency response team that is
responsible before, during, and after
earthquake.

Flood

Misamis Oriental is prone to flooding

Sinkhole

Some places in Misamis Oriental are


prone to sink hole

Terrorism

The plant is located in Mindanao, home of


Abu Sayaf and other terrorist.

Conduct earthquake drill regularly


Have an emergency evacuation procedure
Keep hazardous material safe and ensure that
is wont not contaminate flood water.
Obtain the geohazard assessment map from
the government so that building structure on
the places that are prone to sinkhole will be
avoided.
Teach employees to do first aid
Know the contact details of different
government agencies especially AFP and PNP