Environme
ntal
Variable
Source of
Impact
Environme
ntal Impact
Pertinent
Environme
ntal
Regulation
s Applied
Established
Measures
Implementa
tion
Timeframe
Cost per
Mitigatio
n
Measure
Responsi
ble Party
Air
Excavatio
ns
Dust
R.A 8749
Philippine
Clean Air
Act
During
construction
Included
in the
contract
ors
budget
Contract
ors
Machinery
&
Equipmen
t during
Constructi
on
Operating
the Plant
Noise
PRESIDENT
IAL
DECREE
No. 1152
Sec. 6
Spraying
water on
constructio
n platforms;
Wearing of
mask and
safety
glass.
Machine
Operators
should wear
earplugs.
During
construction
Included
in the
contract
ors
budget
Contract
ors
Noise
PRESIDENT
IAL
DECREE
No. 1152
Sec. 6
Equipment
that
produce
high level
of noise
should be
soundproof.
During plant
operation
PhP
133/ft2
Plant
Manager
Leakage
of
chemicals
pipes/stor
age tanks
Chemical
spills
REPUBLIC
ACT NO.
6969
Toxic
Substance
During plant
operation
Included
in the
budget
Plant
Manager
Soil and
Subsoil
Regularly
maintaining
Performan
ce
Indicator
establishe
d to
Monitor
Complianc
e
No
employee
s get sick
due to
exposure
to dust
The noise
level is
within the
allowable
range set
by WHO
The noise
level is
within the
allowable
range set
by WHO
Soil
should be
negative
from
contamina
Surface
and
Goundwate
r
Flora &
Fauna
Occupation
al Health
and
s and
Hazardous
and
Nuclear
Wastes
Control Act
of 1990
RA 9275
Philippine
Clean
Water Act
Improper
use of
fertilizer
in the
stevia
plantation
Ground
water
pollution
Disposal
of waste
during the
excavatio
n
Ground
water
pollution
RA 9275
Philippine
Clean
Water Act
Cutting
down of
trees
wherein
the plant
will be
erected
Machinery
and
Equipmen
Loss of
trees
REPUBLIC
ACT No.
3571
Potential
Accident
Health
Code
Regulation
and
checking of
pipes and
storage
tanks
nts
Composting
instead of
chemical
fertilizer
using dried
stevia
leaves
(byproduct)
Avoid
spilling of
oils from
constructio
n
machinery
in the soil
during
excavation
Avoid
cutting of
trees, use
of earth
balling
instead.
During plant
operation
Included
in the
budget
Plant
Manager
Groundwa
ter quality
should be
potable
During
construction
Included
in the
contract
ors
budget
Contract
or
Groundwa
ter quality
should be
potable
During
construction
Included
in the
contract
ors
budget
Contract
or
Trees that
is suitable
for earth
balling
shouldnt
be cut.
Regularly
scheduled
maintenanc
During Plant
Operation
Included
in the
plants
Plant
Manager
Workers
should
wear
Industrial
Safety
Socioecono
mic
Environme
nt
e of
machines
and
equipment.
Wearing of
PPEs inside
the plant
Train
workers
regarding
on proper
handling
and
industrial
safety.
Prioritize
employing
people from
the
community
of Cagayan
de Oro.
Maintain
communica
tion with
the local
governmen
t of CDO
and the
people of
CDO
Plant
Operation
Bad effects
on human
health
Health
Code
Regulation
s
Municipal
Revenue
and
Employme
nt
Provide job
to the
community
Improve
local
economy
Labor code
of the
Philippines
budget
During Plant
Operation
Included
in the
plants
budget
Plant
Manager
During Plant
Operation
Included
in the
plants
budget
Plant
Manager
Personal
Protective
Equipmen
t at all
times
within the
plants
premises
Record all
the
accident
and
incidents.
Provide
activities
with the
people of
CDO.
Environmental Scenario Changed by the Development of the Project, Work, Industry or Activity
Aspects
Lands
Current Condition
Environmental
Noise level is low since it is located
in the province, far from the city.
Air quality is good since there are a
lot of trees within the vicinity of the
lot.
Land contains a lot of trees
Surface Water
Groundwater
Noise Levels
Air quality
Vehicle traffic
Income
Social Condition
The lot is 4km away from the
national highway, therefore vehicle
traffic does not occur in the area.
According to NSCB, the
unemployment rate in northern
Mindanao is 5.8%, while
underemployment is at 22.6%
Since there are only few
manufacturing plants in the area,
Forecast
The noise level is expected to rise,
but not higher than the standard.
Air quality Is expected to deteriorate
but the company will ensure that is
within the standard
Trees will decrease, but trees that
are capable of earth balling will not
be removed.
Surface water will still be not
potable.
Groundwater will still be potable
without any contamination.
It wont affect the traffic much
Unemployment and
underemployment is expected to
decrease since the company will
prioritize hiring people from the
community.
GRDP is also expected to rise since
the company will contribute to the
GDP of region.
Hazard
There are four active fault line in Misamis
Oriental, Cagayan de Oro
Contingency Plan
Do hazard mapping
Build an emergency response team that is
responsible before, during, and after
earthquake.
Flood
Sinkhole
Terrorism