You are on page 1of 4

Linde Job Safety Analysis - Template

Description of Job:

Job Reference (as


applicable):

Working at height

Work System
(area, equipment, materials,
processes):
Principal contractor company
name:

Date the JSA was


prepared:

Principal Contractor or Representative:


Name

Item
Numb
er

Position

Work Activity
Break the job down into
steps

Handling materials

Signature

Linde responsible person:


Date

Hazards

What could harm someone? What can be done to achieve an acceptable


risk level?

Sharp edges, Falling materials


from height, Tools falling
from height, During lifting
used proper way for lifting,
Using inspected power hand
tools

IMS-36-25-GROUP

Position

Control Measures

1.0 December 2010

Name

Used proper tools.


Used proper PPE's
Used a proper safety gloves
Wearing a safety harness during work at
height
Used proper way for lifting and
following safety procedure for lifting.
And GFCI will be provided for used the
power hand tools.
Handled the equipment carefully and to
be stored properly after work finishes.
Tools and test equipment must keep in

Copyright The Linde Group Distributed by a locally registered Linde company

Signature

Persons Responsible
Who will make sure it
happens?

Date

Confirmation
of
Implementat
ion
Date and
signof

Shift Supervisor /
Foreman (CCC)

Page 1 of 4

Using of hand tools and power Improper handling of hand


tools
tools.

Working @ Height using


man-basket

Falling from heights,


Materials and tools falling
from heights

1.0 December 2010

IMS-36-25-GROUP

tools box and tools box must placed at


proper safe place.
Be careful during loading and unloading
of cable drums. And must be area
barricaded
Use of proper PPE's.
Use of correct tools.
Workers to be briefed to appreciate
possible fire risk.
Use of proper type of gloves by all
personnel involved in the work
Personnel to be briefed to use the right
tool for the right job.
Ensure hand tools are inspected free
from patent defects.
All power tools must be inspected and
color code for this month.
Not allowed to use hand made tools in
the work area.
Using face shield during using of
grinder machine and cutting machine.
Fire extinguisher must be located near
the work area.
Cover cutting area by fire blanket
during using of grinder machine.
PTW controls.
To ensure safe access ladder used for
climbing.
Provide training for work at height
Use full body harness with 100% tie off
Barricading and signage in working

Copyright The Linde Group Distributed by a locally registered Linde company

Shift Supervisor /
Foreman (CCC)

Shift Supervisor /
Foreman (CCC)

Page 2 of 4

Housekeeping

Materials falling from height,


Combustible debris- risk of
fire.

1.0 December 2010

IMS-36-25-GROUP

area.
PPE shall be worn by all personnel
Approved scaffolding to be used or man
lift.
Verify ground condition level.
To be sure the man-basket is inspected
and valid certificated.
To be sure use double tag line for
control the man-basket
Need to continue check the wind speed
all time to be sure the man-basket safe
to use.
Only certified cranes operator allowed
operating the crane.
To be sure certified riggers to control
the man-basket.
Nobody allowed going out from the
man-basket while in lifting position.
Barricade the below ground level to
avoid any falling any object.
To be sure all time the door must be
close
All slings which attached to man-basket
must be inspected and color coded.
Regular inspection and corrective
actions.
Adequate stacking/ storage of material
at height.
Cleaning of work site.
Segregation storage for flammable

Copyright The Linde Group Distributed by a locally registered Linde company

Shift Supervisor /
Foreman (CCC)

Page 3 of 4

materials if have.

1.0 December 2010

IMS-36-25-GROUP

Copyright The Linde Group Distributed by a locally registered Linde company

Page 4 of 4