Professional Documents
Culture Documents
POA Number
1.1Objective:
This document outlines the steps to carry out kernel Patch upgradation of 2 node cluster
c-24 & obc-cfab server.
1.2Document Details
Date
02nd June 2016
Prepared By
Pratik Dabhade
Verified By
Udit Agarwal
Approved By
Gyan Singh Yadav
1.3 Purpose
The purpose is to update kernel patch to 150400-35 as per Oracle recommendation.
1.4 Scope
OS Kernel Patch will be upgrade for all servers in 2-node cluster from 150400-11 to 150400-35.
1.5 Benefits / Requirement Of Activity
Oracle is releasing set of patches to solve bugs in operating system if any and will resolve
most of security vulnerabilities.
1.6 Risks Involved
No risk involved.
1.7 Mitigation
The rollback plan is to make server running which requires 1 hour of downtime which is
already included in Downtime.
Impact:
We will switchover the c-24 services to cfab server then will do kernel patching of c-24 server.
For switching the services will require 30 min downtime and patching will require total 180
min of downtime to carry out the activity including rollback plan.
Confidential Document
Page 1 of 4
After successfully patching of c-24 server we will do patching of cfab server. For patching of
cfab server also we will require 30 min downtime for switching the services and 180 min
downtime for activity.
Activity Breakup
The Below mentioned steps will be followed to carry out the activity.
1.7 Work Plan
Sr no
Activity
Description
Physically check
the M/C & Storage
LUN's (health
checkup).
command
Responosility
Expected
time
60 min
online
Desired output
Luxadm
Wipro
Explorer
Wipro
45 min
online
Latest explorer
output.
Take OS back up
Ufsdump
Wipro
60 min
online
OS Backup
taken
Successfully
Shutdown the
services of c-24
Finacle srcipt
OBC
10 min
downtime
Services are
successfully
down.
Switchover the
resource group to
failover
clrg switch n
<node_name> <rg_name>
Wipro
10 min
downtime
Shutdown
cluster
Finacle script
OBC
wipro
10 min
downtime
20 min
downtime
Services are
successfully up.
Server booted
from secondary
disk
successfully.
Init s
Wipro
10 min
downtime
Server is in
single user
mode.
Confidential Document
Physical
verification.
Page 2 of 4
Wipro
60 min
downtime
Successfully
install kernel
patch.
10
Boot disk1
Wipro
20 min
downtime
OS booted with
same disk and
cluster up.
11
Start the
application
Finacle script
OBC
10 min
downtime
Application
started
successfully
12
Wipro/OBC
13
if Server and
application
functionality is ok
then during next
weekend activity
we will attach the
sub-mirrors of
primary disk
Wipro
30 min
online
Wipro
45 min
Clrg switch n
<node_name> <rg_name>
To check the
Server &
application
functionality.
Sub-mirrors are
attached
Confidential Document
Boot disk1
Server up with
existing patch
level
OBC
15 min
web and
connect24
services started
Page 3 of 4
Designation
TS
TC
Organization
Wipro
Wipro
Contact Detail
9999644867
9999885251
Kiran Mohite
TC
Wipro
7045355780
Organization
Oriental Bank of
Commerce
Contact Detail
8108178085
Escalation Level
L1
L2
L3
Confidential Document
Designation
AGM-PDC Site
Escalation Level
L1
Page 4 of 4