Our prices:
Activity
Unit
Measurement
Unitary
Price
Observations
Stripping
1,8 2,5
Ballast filling
9,5 13,5
Concrete
foundation
demolition
M3
10 25
Smashing of
concrete without
reinforcement
Smashing of
reinforced
concrete
(10 cm)
Smashing of
reinforced
concrete
(10-13 cm)
Smashing of
reinforced
concrete
(13-20 cm)
Smashing of
reinforced
concrete
(20-35 cm)
Demolition of
Masonry
(concrete)
58
10
M3
17
M3
20 22
M3
30-45
M3
5 15
-depending on
work complexity
-depending on
ballast quantity
and
transportation
-depending on
work complexity
-depending on
concrete layer
width
-depending on
concrete layer
width and
reinforcement
-depending on
concrete layer
width and
reinforcement
-depending on
concrete layer
width and
reinforcement
-depending on
concrete layer
width and
reinforcement
-depending on
work complexity
Demolition of
Masonry (metallic)
Demolition of
structure only with
ground floor
(without concrete)
+transportation of
materials
M3
4 14
-depending on
work complexity
25 50
8-13
-depending on
quantity and
transportation
-depending on
quantity and
transportation
Sand (0-3mm)
Gravel
10-13
Crushed Concrete
M3
10 12
Full or crushed
brick
M3
8 - 10
Brick/ACC
demolition
(up to 20 cm )
Demolition of
Pylon,Beams
(up to 30cm)
M2
30
Concrete
Ventilation
Chimney
(length 2,5m)
-depending on
quantity and
transportation
-depending on
quantity and
transportation
-depending on
work complexity
-depending on
work complexity
-depending on
50/Piece work complexity
Demolition of
Ceillings
(Width up to 40
cm)
15
-depending on
work complexity
Uploading Debris
Bags
Bag
Wood floor
Removal
M2
-depending on
work complexity
Steel Demolition
Kg
3-4
-depending on
work complexity
Compacting Ballast
M3
8-13
-depending on
quantity
Machines:
Machinery
Unit
Measurement
Unitary
Price
Observations
Day
200
250
-depending on work
complexity
Day
250
380
-depending on work
complexity and
equipment type
Day/Night
38
-depending on number
of days
Dump Truck
(20 M3)
Day
1,5 3
-depending on road
conditions
Excavator
(Hydraulics)
Day
280-370
-depending on work
complexity
Backhoe
(Buldoexcavator)
Buldozer
Pick-up (Dacia)
Crane type
Maximum
Mass
Price/Hour
ADK
12.5 t
150 RON
16 - 18 t
200 RON
250 RON
CKD
28 t
300 RON
KATO
45 t
100 EUR
COLES
80 t
150 RON
PRBT
16 M
100 RON
BULDOEXCAVATOR
M.F.965
MINI BULDOEXCAVATOR
BOBCAT
65 RON
INCARCATOR FRONTAL
L 34 WOLA
160 RON
MERCEDES
100 RON/h
10
Tools:
11
Tool
Quantity
Price
Crowbar
34Lei
Hammer(Masonry)
22Lei
Hammer(Absorption)
21Lei
Plier
14lei
Nail Jack
25
Saw (concrete)
Saw (ACC)
100Lei
Saw (Metal)
25 Lei
Saw (Wood)
10Lei
Axe
Tweezer
6Lei
Steel Scissor
200Lei
Drilling Machine
224Lei
Drilling Machine
463Lei
Warning vest
15
11Lei
Tool Box
10
24Lei
Screwdriver
Set(10pieces)
Electric Saw(metal)
40Lei
250Lei
12
Electric Saw(wood)
180Lei
Protection Glove
10
7Lei
Dynamite
20
6.
Financial plan:
initial investment:
office accessories:
software: 500
computer: 300
printer: 100
monthly costs:
13
FUTURE DEVELOPEMENT:
1st year total cost (rent, salaries, bills): 55172,28
monthly: 4597,69
monthly: 5212,76
profit estimation:
o
14
monthly: 6328,59
stripping: 25 m3 x 2 = 50
15