Professional Documents
Culture Documents
PURPOSE
REPORTING RELATIONSHIPS
Reports To
Supervises
RESPONSIBILITY/ACCOUNTABILITIES
Responsibility /
Accountability
Key Activities
To handle and managed the implementation status in accordance on the
given projects target schedule of accomplishments of the clients. Quality and
Deliverables
Project Execution
construction
REQUIREMENTS
Education
Planning and design of detailed primary cable plan and detailed conduit
plan for the local outside plant network.
Undertook the engineering survey and study planning and design for the
cable and conduit network using fiber optic primary cable
Experience
Coordinates with the government offices and private entities to acquire the
necessary right of way permits needed to implement the detailed plans.
Detailed design of MDF (main distribution frame) and cable vault lay out.
Manage and control day to day activities related to client approval, permit
acquisition, logistics, priorities, documentation, and other matters that requires
urgent attention and consideration.