INTRODUCTION
Cracks in the building are of common occurrence in a building

ld

It is due to exceeding stress in a building components


Causes of the cracks are mainly by increase in live load and dead load, seismic load etc.,
Classification of cracks

Structural cracks
Non-structural cracks
Structural cracks

or

Cracks can be classified into two categories viz.,

It arises due to incorrect designs, overloading of structural components


Expenses cracking of foundation walls, beams and columns or slab etc.,
PHOTO OF STRUCTURAL CRACKS
Non structural cracks

TU

They are due to internal forces developed in materials due to moisture variations, temperature
variation, crazing, effects of gases ,liquids etc.,
They can be broadly classified into vertical, horizontal, diagonal, smoothened cracks
PHOTO OF NON STRUCTURAL CRACKS
DIRECTION OF THE CRACKS

JN

Vertical

Horizontal
Diagonal
Straight

Toothed

Variable and irregular

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

WIDTH OF CRACKS
It can be measured through instrument and tell-tale signs.
The changes in the length of the cracks should be noted.
Cracks measuring devices

ld

CAUSES OF CRACKS
Major causes of cracks
Movements of the ground

Effect of gases, liquids and solids


Effect of changes of temperature

Movements of grounds

General causes such as vibrations

or

Over loading

Due to mining subsidence, land slips, earthquakes, moisture changes due to shrinkable soils.
Overloading

Overloading of the building

TU

Overloading of the building parts results in cracks

Overloading forced may be due to

External ( excessive wind/snow loads)


Internal ( from heavy machinery etc.,)

JN

Effects of gases, liquids and solids


Gases

Only gases like Co2 (carbon dioxide) is likely to produce cracks.


It causes Carbonation of porous cement products
Leads into an overall shrinkage crazing cracks

Liquids

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Water is the most commonly used liquid when not taken care it can be hazardous
Construction water i.e., that in the utilization of water during the construction process
Effects of water
Physical(i.e. due to change in water content)

ld

Chemical ( directly or indirectly affecting other materials)


General vibrations

Vibrations can cause cracks in buildings only when their amplitude of vibrations are high.

or

Apart from vibrations caused due to earthquakes, the vibrations caused due to heavy machinery, traffic,
sonic booms are also responsible for the occurrence of cracks in buildings.
THERMAL MOVEMENT

All materials expand on heat and contract on cool.

Thermal movement in components of structure creates cracks due to tensile of shear stresses
One of the most potent causes of cracking in buildings and need attention
GENERAL PRECAUTION TO AVOIDING CRACKS

Before laying up foundation, the type of foundation to be used should be decided based on the
safe bearing capacity of soil.

TU

Providing R.C deep beam or an involved T-beam with adequate reinforcements to withstand the
stress due to differential ground movements. This method is expensive
Construction operations such as cutting for roads drainages etc., close to the structures should
be avoided this will results in reduction of soil moisture with consequent shrinkage of soil
beneath the foundation of the structure.

JN

In buildings close to the water courses are noticed in many places

PLACING OF CONCRETE
Concrete should not be placed in heavy rains unless suitable shelter is provided.
To avoid segregation, concrete should not be dropped from a height of more than 1m.
Working on freshly laid concrete should be avoided
While placing the concrete in R.C.C members the alignment of formwork should not be
disturbed.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Concrete should be laid continuously to avoid irregular and unsightly lines.


Internal surface of the forms either steel or wood should have even surfaces and should be oiled
so that the concrete may not stick to it
MATERIAL QUALITY

ld

Aggregate should be hard, sound, durable, non-absorbent and capable of of developing good bond with
mortar.
Water shall be clean and free from alkaline and acid materials and suitable for drinking purposes.
TEST TO BE CARRIED OUT

Consistency of concrete should also be tested.

or

Slump test to be carried out for the control of addition of water and workability.

A slump of 7.5 to 10cm may be allowed for building work

LAYING TECHNIQUE AND CURING METHOD

Concrete should be laid in layers and should be compacted while laying with wooden tamping rods or
with mechanical vibrators until a dense concrete is obtained
After two hours of laying concrete, when the concrete has begun to harden, it shall be kept damp by
covering with wet gunny bags or wet sand for 24 hours

TU

Evaluation of cracks

To determine the effects of cracks in the building.


First the cracks location and extent should be noted down for the adopting suitable methods of repair
and the future problems due to that cracks.
Crack widths should be measured to the accuracy of 0.001 in (0.025mm) using a crack comparator.

JN

Movements should be recorded with movement sensors.


Based on the reports from the location and width the suitable methods is adopted
Crack as narrow as 0.002 in can be bonded by the injection of epoxy.
Epoxy injection can alone be used to restore the flexural stiffness.
For water retaining structure cracks it can be repaired by the autogenous healing.
Repairing of cracks

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Routing and sealing.


Stitching.
Additional reinforcement.
Gravity filling

ld

Grouting
Dry packing
Polymer impregnation

or

Routing and sealing

Routing and sealing of cracks can be used in conditions requiring remedial repair and where structural
repair is not necessary.
Routing and sealing is used to treat both fill pattern cracks and larger, isolated cracks.

The sealants may be any of several materials, including epoxies, urethanes, silicones, polysulfide,
asphaltic materials, or polymer mortars
Process of routing and sealing
stitching

TU

Stitching involves drilling holes on both sides of the crack and grouting in U-shaped metal units with
short legs (staples or stitching dogs) that span the crack.
Stitching a crack tends to stiffen the structure, and the stiffening may increase the overall structural
restraint.
The stitching procedure consists of drilling holes on both sides of the crack, cleaning the holes, and
anchoring the legs of the staples in the holes, with either a non shrink grout or an epoxy resin-based
bonding system

JN

Figure showing stitching

Additional reinforcements
Conventional reinforcement-Cracked reinforced concrete bridge girders have been successfully
repaired by inserting reinforcing bars and bonding them in place with epoxy .
This technique consists of sealing the crack, drilling holes that intersect the crack plane at
approximately 90 ,filling the hole and crack with injected epoxy and placing a reinforcing bar
into the drilled hole

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Prestressing steel-Post-tensioning is often the desirable solution when a major portion of a member
must be strengthened or when the cracks that have formed must be closed.
Adequate anchorage must be provided for the prestressing steel, and care is needed so that the
problem will not merely migrate to another part of the structure
Fig showing additional reinforcements

ld

grouting

Portland cement grouting-Wide cracks, particularly in gravity dams and thick concrete walls, may be
repaired by filling with portland cement grout.

Gravity filling

or

This method is effective in stopping water leaks, but it will not structurally bond cracked sections.

Low viscosity monomers and resins can be used to seal cracks with surface widths of 0.001 to 0.08 in.
(0.03 to 2 mm) by gravity filling.

High-molecular-weight methacrylates, urethanes, and some low viscosity epoxies have been used
successfully.
The lower the viscosity, the finer the cracks that can be filled.
Dry packing

TU

Drypacking is the hand placement of a low water content mortar followed by tamping or ramming of the
mortar into place, producing intimate contact between the mortar and the existing concrete.
Polymer impregnation

Monomer systems can be used for effective repair of some cracks. A monomer system is a liquid
consisting of monomers which will polymerize into a solid.

The most common monomer used for this purpose is methyl methacrylate.

JN

The procedure consists of drying the fracture, temporarily encasing it in a watertight (monomer proof)
band of sheet metal, soaking the fractures with monomer, and polymerizing the monomer
conclusion

The discussion on our project mainly focused on the cracks deals with failure due to improper settlement
of foundation and poor construction.
By the following discussed remedies and instruction what we have concentrated helps to reducing the
cracks and move on to the next level in the construction.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Content
1. Introduction
2. Rehabilitation
A. Why Rehabilitation

ld

B. What Is Rehabilitation
3. Inspection
4. Common Defects And Possible Causes

6. Composite Wraps For Durability


7. Conclusion
Introduction

or

5. Common Remedies

Deterioration of reinforced concrete structure due to corrosion of steel is a cause of global concern.
The losses due to corrosion every year run in to millions of rupees and any solution to this universal
problem of corrosion has a direct bearing economy of the country.
It is estimated that about 30 to 40% of steel produce each year is used to replace corroded material.

TU

Main objective of rehabilitation in the construction industry to reinstate rejuvenate strengthen and
upgrade existing concrete structure.
Various causes which needs rehabilitation of a building are such as environment degradation, design
inadequacies, poor construction practices, lack of maintenance, increase in load, unexpected seismic
loading condition in addition to corrosion induced distress.
Why rehabilitation

JN

The chief aim of rehabilitation is to restore a prematurely distressed building back to its original
standard and to improve the facilities depending upon the needs and the technological advances.
In the field of building construction, after rehabilitation the building is expected to give a trouble free
service up-to its expected life.
What is rehabilitation
There is basic difference between the words repair and rehabilitation. The word repair normally
indicates small and petty repairs more or less cosmetic, which are not of structural significance.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

A building is said to require rehabilitation, when structural stability and safety of building and occupant
is in danger.
Basic advantage of rehabilitation on repair-

ld

1. Repair building required frequent repair again because these are up to small extent and less
durable so the expenditure spent on repair required more. The life of rehabilitated building is
comparatively more than that of a repair building and economical too.
2. In repair what we apply is plaster only that does not last long hence leads leakage in pipe line,
terrace, therefore there is corrosion in reinforcement of RCC structure but in rehabilitation we
can approach the problem by the identification of main culprits responsible for deterioration.
Plastering is nothing but the waste of money only. So rehabilitation is effective than repair.

or

Causes of distress
1. Design deficiency:

1. underestimation of loads, deflection, shear forces and moments

2. environmental condition for durability neglected wrongly specifying concrete grade,


maximum water to cement ratio and minimum cement content
3. Poor detailing especially at beam and column junction
4. fault analysis and earth quake & wind forces not considered at all

TU

2. Material deficiency:

a. Poor quality cement


b. Poor quality steel

c. Contaminated water

d. Contaminated aggregates

JN

3. Construction deficiency:

a. inadequate cover of concrete to steel reinforcement


b. use of poor quality cover blocks
c. poor formwork and staging
d. poor preparation of construction joints

4. chemical/environmental attacks:

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

a. moisture and chloride attack


b. carbonation
c. sulphate attacks
d. thermal variation, hot and cold cycles

f. biological(insects and fungus) attacks


5. Natural causes:

or

a. earth quakes

ld

e. erosion

b. floods
c. fires

a. over loading
b. fatigue
c. impact
7. Foundation problem-

6. Mechanical causes-

TU

a. failure of load bearing strata


b. soil consolidation

c. soil shrinkage and swelling


d. ground movement

JN

8. Manmade causesa. blasting

b. poor and no maintenance

Cracks in buildings and its components


Cracks in column

Cracks in slabs

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Cracks in beam
Philosophy of rehabilitation
Inspection

1. Preparation of complete defect catalogue

ld

Systematic detailed inspection is the key to success of any rehabilitation scheme and is done to achieve
the following objectives.

2. Evaluate the existing (safety and serviceability) condition of the building and assess the possible
rate of future

Items needed during inspection1. Completion drawing for detailing

or

3. Decide further course of action

2. Masons tool kit- plumb bob, hammer, chisel, punch etc.

3. Measuring instrument- steel tap, scale, ladder, torch, safety belt etc.
4. Labour
5. Details of repairs
Common remedies

TU

1. Jacketing of column-

Jacketing (provision of additional cross section) is done to strengthen column by removing loose concrete
and treating the reinforcement with protection treatment like providing shear anchor of 10mm12mm
diameter with a spacing 2030cm c/c and then concreting is done (M25).
Polymer modified concrete which have good bonding quality and flexural strength, can be used.

JN

2. Patch repairing by polymer mortar-

Patching is done by removing loose concrete and rust of reinforced. Sometimes extra reinforcement is
also provided. after removal of rust a bond coat is applied evenly in order to attain sufficient strength
between old concrete and new polymer mortar then polymer mortar is applied which is prepared by
weight (one part of polymer latex liquid, 5 part of cement and 15 part of quartz sand). Mortar is applied
by hand by pressing it to the damaged or cracked surface.
Column jacketing
3. Repairing of toilet block and GI pipe line-

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

To avoid leakage problem from toilet, they should be made water proof. for this the seats are broke and
cleaned then the surface is applied with suitable polymer coating. After this a coating of 20 mm thick
plaster in cm 1:3 with w/c ratio of 0.4 provided. And joints between the seats are sealed with polymer
mortar.
Pipes which are leaked should be replaced.

ld

4. GroutingGrouting is used to repair deep structural cracks by injecting grout material like cement grout or resin. It
is very effective method for repairing RCC or masonry structure. admixture are added to reduce
shrinkage problem of cement grout so that it can reach upto the deepest crack in the structure and fill
the pores.

or

5. Shotcreting-

Shotcreting is a technique to achieve better structural capability for walls an other elements. In this
method mortar or concrete is conveyed at a high velocity onto a receptive surface by the application of
compressed air for moving concrete. the cement, sand mix and water are kept in separate containers,
which are connected to a nose pipe. Compressed air is forced into these containers through a motor.
FIBER REINFORCED POLYMER COMPOSITE

Fiber reinforced polymer (FRP) is a composite material made by combining two or more materials to give
a new combination of properties.
It is composed of fiber and matrix, which are bonded.

TU

In this case, the reinforcing fiber provides FRP composite with strength and stiffness, while the matrix
gives rigidity and environmental protection.
Formation of Fiber Reinforced Polymer Composite
A fiber is a material made into a long filament with a diameter generally in the order of 10 mm.

The main functions of the fibers are to carry the load and provide stiffness, strength, thermal
stability, and other structural properties in the FRP.

JN

To perform desirable functions, the fibers in FRP composite must have1. High Modulus of Elasticity for use as reinforcement;
2.

High Ultimate Strength;

3.

Low variation of strength among fibers;

4.

High Stability of their strength during handling; and

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

5.

JNTU World

High Uniformity of diameter and surface dimension among fibers.

Matrix
Matrix material is a polymer composed of molecules made from many simpler and smaller units called
monomer.

ld

The matrix must have a lower modulus and greater elongation than those of fibers, so that fibers can
carry maximum load.
Made from Metal, Polymer or Ceramic
Some Ductility is Desirable

USES
To strengthen the structures due to:1) Loading Increase

or

TYPES OF FRP MATERIALS

Increasing the Live Load in warehouses


Increased traffic volume on Bridges

Installation of Heavy machinery in Industrial Building


Vibrating Structures

TU

Change of Building utilization

2) Damage to Structural parts

Ageing of Construction material


Steel Reinforcement corrosion

JN

Vehicle Impact
Fire

Earthquakes

3) Serviceability Improvement
Decrease of Deformation
Stress reduction in steel reinforcement

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Crack width reduction


4) Change in Structural System
Removals of walls or columns
Removal of slab section for openings

ld

5) Design or Construction Defects


Insufficient reinforcement
Insufficient Structural Depth

Low in weight
Available in any Length, no joints required
Low overall thickness

Easy to transport

or

advantages

Laminate Intersections are simple

Economical application- no heavy handling and installation equipment


Very high strength

TU

High modulus of elasticity

Outstanding fatigue resistance


High alkali resistance
No corrosion

JN

conclusion

1. With careful planning and close supervision, expected result can be achieved.
2. We can protect many buildings having historic, cultural, monumental, archeological importance
by rehabilitation.
3. Can save lot of money by rehabilitation.
4. Rehabilitation increases the life of building and any type of structure.
5. FRP gives the strength of the structural member.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-2
Structure Repairs & Rehabilitation In Low Strength Masonry Buildings

Structure Repairs & Rehabilitation

ld

Low Strength Masonry Building is Laid in


Fired brick work in clay & mud mortar

Random rubble ; Uncoursed, Undressed stone masonry in weak mortars made of cement-sand ,
lime-sand & clay-mud.

Structure Repairs & Rehabilitation

or

Component Of Low Strength Masonry Building:


Foundation

Flooring

Brick/ Stone Columns

Brick Work

Stone Masonry

Wood Work

TU

Slab

Slopping Wooden frame Roof

Plaster

Structure Repairs & Rehabilitation

JN

Life Of Structure Depend Upon:


A. Geography Of Location
B. Building Material
C. Technology

D. Workmanship

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

A . Geography Of Location:
Type of Strata

Water Table

Earth Quack, Wind, Cyclone, Flood, Snow

Pollutant

Land Slide

Tree location w.r.t. building

Structure Repairs & Rehabilitation

or

ld

B . Building Materials
Cement

Lime

Fine Sand

Coarse Sand

Coarse Aggregate

Quality of Water

Bamboo/Wood

Brick

Structure Repairs & Rehabilitation

TU

C. Technology

Architectural Design

JN

Structural Design Based On Load Bearing Wall

Construction Methods

Quality Practices

Construction Management

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

D Workmanship
Structural Work

Finishing Work

Water Proofing Work

Development of Drainage (Internal & External)

Maintenance Of Building

Structure Repairs & Rehabilitation

ld

or

Building Needs Repairs & Retrofitting


Crack & Spalling In Structural Members

Crack & Settlement In Flooring

Crack & Spalling in Non Structural Members

Leakage In Water Supply & Drainage System

Redesigning existing structure for nature forces

Changed functional requirements

Structure Repairs & Rehabilitation

TU

Crack & Spalling In Structural Members

Cracks Occur Due To Settlement In Foundation

Cracks Due To Earth Quack ,Wind

Crack Due To Overloading Of Structure

Crack Due To Reduction in Load Carrying Capacity of Structure Due To Weathering

JN

Crack Due To Improper Design Of Structure

Crack due to Poor connection Of Structural Members Resulted From Poor Workmanship

Structure Repairs & Rehabilitation

Crack & Settlement In Flooring

Due To Improper Plinth Filling

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

In case of black cotton soil in foundation not replaced up to sufficient depth by Good Soil under
plinth (For generating enough Counter weight upon black cotton soil)

Water Table vary within the Plinth Sub base (this occur in frequent flooding area & near sea
soar)

Improper curing, Improper laying, Poor Quality of workmanship.

Improper design for loading i.e. thickness & type of flooring.

Structure Repairs & Rehabilitation

ld

Crack & Spalling in Non Structural Members


Crack In Plaster

Crack In Finishing

Crack In Water Proofing Work

Vertical cracks in long boundary wall due to thermal movement Or Shrinkage.

Crack Induced due to thermal changes, change in moisture content in building material,
Chemical Reactions

Structure Repairs & Rehabilitation

or

Leakage In Water Supply & Drainage

It may result from structural cracks & settlement

Improper selection of pipe thickness

Improper selection of Supports & its spacing to Pipe

Improper making Of joints

Non Provision for contraction & expansion (Particularly when pipe is passing over different type
of long structures)

JN

TU

Non Testing of Pipe before & after laying

Insufficient soil cover over pipe

Structure Repairs & Rehabilitation

Redesigning existing structure to meet functional requirement as well as forces generated by Nature
It is a comprehensive task & require planning which include following Information gathering.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Field investigations including details of sub strata, foundation details

Type of Existing structure & its members stability

Design Data Collection

Identification of components required to be strengthened, replaced.

Cost Estimates (it is feasible up to 60% of new construction)

Method or Procedure to be fallowed.

Structure Repairs & Rehabilitation

ld

or

Crack Investigation
Location

Profile (vertical, Horizontal, Diagonal)

Crack Size throughout length (Width,Depth & length)

Thin crack< 1mm

Medium Crack >1 to 2 mm


Wide Crack > 2 mm

Crack may be non-uniform width. i.e. Tapper in width(narrow at one end & wider at other end. )
Static or Live cracks

Structure Repairs & Rehabilitation

Cracks are static or live, is monitored & recorded by Tell-Tale method

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation

JN

TU

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation

Construction Details Of Bearing Of R.C.C. Roof Slab Over a Masonry Wall

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation


When two adjacent walls shake in different directions, their joint at corners comes under a lot
of stress. This causes crack at the junction of two walls.

Structure Repairs & Rehabilitation


When the long wall bends outward or inwards vertically in the middle of its length, this
stretching causes tension and causes vertical cracks in the walls.

Structure Repairs & Rehabilitation


Similarly when the walls bends outward or inwards horizontally in the middle of its height,
this stretching causes tension and causes horizontal cracks in the walls. This happens at the
base of gable wall.

Structure Repairs & Rehabilitation


Many times the wall gets pulled from its corners. This results in to tearing of wall in diagonal
direction. In the wall if there is a window or a door, then the diagonal crack occur at their
corners.

Structure Repairs & Rehabilitation


Flexural Tension Cracks At Lintel Level Due to Shrinkage & contraction of R.C.C. Slab

Structure Repairs & Rehabilitation


If the window is very large or if there are many doors and windows in a wall, then it tears
even more easily in an earthquake.

TU

or

ld

Structure Repairs & Rehabilitation Many times the roof slides on top
of the walls on which it is sitting on

Structure Repairs & Rehabilitation

JN

Structural Repairs

Load Bearing Walls: PROCEDURE IN NEXT SLIDE

Structure Repairs & Rehabilitation

Repairing Of Crack Due To Structural Cause

Replace all cracked bricks

Use R.C.C. Stitching Block In Vertical Spacing In Every 5th or 6th Course ( 0.5 meter apart ).

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Stitching block

Width=equal to wall width,


Length = 1.5 to 2 bricks,

Mortar For Repairs 1:1:6 (1 Cement :1 lime: 6 sand)

Structure Repairs & Rehabilitation

load bearing walls(May be Brick or Stone) have inbuilt deficiency.


Each Brick have different strength

Thickness of Mortar Joints are not also uniform.

Bricks are not perfectly laid horizontally & vertically

Opening in walls

Improper staggered joints

Use of unwanted Brick bats

or

ld

Thick =1 or 2 bricks as per severity of cracks

1. These resulted in cumulative effect & concentration of stress in particular section of wall is more than
other section.
Structure Repairs & Rehabilitation

TU

Corrective Measures For Load Bearing Wall Building


Therefore Shifting of Window, Door ,Inbuilt construction of Almirah should be carried out with
due consideration to IS code 13828:1993

Proper Bearing to lintel over brick work to avoid diagonal cracks & it can be done in retrofitting
work.

JN

It is advisable to keep window width as less as feasible while height can be increased with fixed
glass pans on top portion as per slide 41.

Structure Repairs & Rehabilitation

Importance Factor(I) Depend Upon

Functional Use Of Structures

Hazardous Consequences Of Its Failure

Downloaded From JNTU World (http://www.alljntuworld.in)

JNTU World

Post Earthquake Personal needs

Historical Value

Economic Importance

School Building Have I value=1.5

Structure Repairs & Rehabilitation

Elevation : Distance b1 to b8 changes as per Building

ld

www.alljntuworld.in

Retrofitting

Structure Repairs & Rehabilitation

or

Table :Size, Position Of Opening In Above Figure

Need

Structure Repairs & Rehabilitation

Strengthening Of Window When Its Position Is


Not As Per Table Above Slide No 42.

Structure Repairs & Rehabilitation

Strengthening Arrangements Recommended For low Strength Masonry Building


b = Lintel Bend

TU

C = Roof Bend, Gable bend


d = Vertical steel at corners & junctions of wall
f = Bracing in plan at tie level of Pitched Roofs
g = Plinth band

JN

For Building of Category B in two storey constructed with stone masonry in weak mortar, provide
vertical steel of 10 mm dia in both storey.

Structure Repairs & Rehabilitation

Strengthening Arrangements Recommended For Elements of low Strength Masonry Building

Structure Repairs & Rehabilitation

Seismic wave propagation increases as height of wall/structure increases.

Seismic wave expansion pushes bricks of corner of wall out of building.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Movement of Seismic wave through joints of similar or dissimilar component of building ,makes
joint open, resulting in falling of component of the building.

Structure Repairs & Rehabilitation

Possibility For Old Masonry Structures Strength


Plinth Belt in lieu of plinth band

Lintel level belt in lieu of band

Roof level/ gable level band

Corner steel

Shape, Size & location of Window In Wall

Wall length to Height Ratio

Cross wall/ Brick Pillar/counter fort

Structure Repairs & Rehabilitation Reinforced band on top of gable wall


It will reduce bending of gable wall

Structure Repairs & Rehabilitation


In long walls introduce buttress
to strengthen it.

Structure Repairs & Rehabilitation

TU

or

ld

Low Strength Masonry Building Retrofitting


For Brick Masonry Structure

Height of the building in B.W. shall be restricted to the following.

JN

1. For retrofitting category of building A,B,C up to3 storey with flat roof or 2 storey plus Attic for
pitched roof.
2. For category D up to 2 storey with flat roof or one storey plus Attic for pitched roof.

where each storey height shall not exceed 3.0 m. Cross wall spacing should not be more than 16 times
the wall thickness
CONTD.

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

3. Minimum wall thickness in brick masonry shall be one brick for one & two storey construction, while
in case of three storey, the bottom storey wall thickness is one & half brick.
4. Use brick from kiln only after 2 weeks when work is in summer & 3 week when work in winter.
5. Use leaner mortar preferably also adding lime for repairing cracks in particular& in masonry in
general. It can be 1:1:6,1:2:9,1:3:12 as per need.
Structure Repairs & Rehabilitation

ld

For Stone Masonry

Height of the building in Stone Masonry shall be restricted to the following

or

1. For retrofitting category of building A,B,2 storey with flat roof or 1 storey plus Attic for pitched
roof .In case cement sand mortar 1:6, the building up to 2 storey plus Attic for pitched roof.
2. 2. For category C,D 2 storey with flat roof or 2 storey plus Attic for pitched roof with Cement
sand mortar or 1 storey plus Attic for pitched roof with lime- sand or mud mortar.

CONTD.

Structure Repairs & Rehabilitation

3. Maximum wall thickness in stone masonry shall be 450 mm & preferably 350 mm. ,
Each storey height shall not exceed 3.0 m and span of walls between cross wall is limited to
5.0m

TU

Structure Repairs & Rehabilitation

Cross wall connection In steps

Structure Repairs & Rehabilitation


Wall to wall joints are to be made
by building wall ends in steps form

JN

Structure Repairs & Rehabilitation Vertical reinforcement within the masonry in corners
increases walls capacity to withstand Horizontal cracks due to bending.

Structure Repairs & Rehabilitation

In Each Layer Staggered Toothed Joint

Y A

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

PLAN

ld

Structure Repairs & Rehabilitation


Recommended Longitudinal steel in Reinforcement Concrete Bends

Structure Repairs & Rehabilitation

Steel Profile In Band At Corner & Junction

Structure Repairs & Rehabilitation

or

Bonding Elements
A. Wood Plank

( 38x38x450 mm)

TU

B. R.C.C. Block
(50x50x450 & 8 mm)
C. 8 or 10 mm Hook

or S shape bent Bar

JN

Plan showing Through Stone

Through stone = Bonding Element

Structure Repairs & Rehabilitation


S shaped steel rod placed in a through hole in random rubble wall and fully
encased in concrete

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

JNTU World

ld

www.alljntuworld.in

Plan showing Center bar in Casing

Casing in every 0.6 m is lifted & M15 or Mortar 1:3 is Compacted around bar.
Structure Repairs & Rehabilitation

or

Half Split Bamboo Ties To Rafter

Brace the Rafter to 50 mm Dia Bamboo (B)

Seismic Bend & Rafter should be tied Properly

Structure Repairs & Rehabilitation Diagonal tying on the upper or underside of the roof Prevents
roof from getting distorted and damaged

TU

Structure Repairs & Rehabilitation Installing multiple strands of galvanized iron wires pulled and
twisted to pretension

Structure Repairs & Rehabilitation


Vertical steel at corners and junction of walls up to 350 mm thick should be embedded in plinth
masonry of foundations, bands, roof slab as per table

Structure Repairs & Rehabilitation

JN

One Brick Thick

One & Half Brick Thick

-------- Contain One Bar At Centre

Structure Repairs & Rehabilitation


Seismic Belts & closing a opining with pockets made in jams of masonry.

Structure Repairs & Rehabilitation


Encasing masonry column in cage of steel rods and encased in micro concrete.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Structure Repairs & Rehabilitation Anchoring the roof rafters and trusses with steel angles or
other means

Structure Repairs & Rehabilitation


Weld mesh belt approximately 220mm wide all
around the openings and anchored to masonry wall and encased in cement mortar

Structure Repairs & Rehabilitation


Vertical deformed steel encased in concrete bar from foundation to roof, anchored to both
masonry walls at wall junctions with special connectors.

Structure Repairs & Rehabilitation


Seismic belt in lieu of Seismic Band is made of weld mesh approximately 220mm wide
anchored to masonry wall and encased in cement mortar.

Structure Repairs & Rehabilitation


Use smaller glass panes for windows Prevents the shattering of glass in earthquake and cyclone

Structure Repairs & Rehabilitation Anchoring roof to wall &, reducing roof overhangs,
prevent the roof from getting blown off

Structure Repairs & Rehabilitation Prolonged flooding can weaken the mortar, especially if it is
mud mortar, and hence,
the wall, causing cracking in walls or collapse.

Structure Repairs & Rehabilitation


If the ground is sandy in which the foundation is sitting, then high speed flood/surge water can
scour the land around and under the foundation of your school, leading to settlement and/or
cracking of the wall.

TU

or

ld

Structure Repairs & Rehabilitation


Simple erosion of wall near its bottom, or cracking, plaster peeling off and settlement
in floor.

Structure Repairs & Rehabilitation

Structure Repairs & Rehabilitation


Extensive cracking of walls caused by differential settlement due to flood

Structure Repairs & Rehabilitation


High plinth level to avoid entering flood

Structure Repairs & Rehabilitation

JN

Use of pilasters strengthens walls against flowing water

Structure Repairs & Rehabilitation

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

This Presentation was focused on Low Strength Masonry Buildings therefore for framed
structures & rich cement mortar building ,certain slides are in-valid. In next Presentation this
balance portion will be highlighted.

This Presentation was aiming to provide some technical input to site peoples so that we could
point out any doubtful detailing in drawings to Structural/Architectural Designer.

It is possible that features of Flood, Heavy Rain fall, Cyclone, earth quack may collide but We
have to look priority of our geographical requirement.

ld

JN

TU

or

Thank You

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-3
Definition of Corrosion

ld

Corrosion is the deterioration of materials by chemical interaction with their environment. The
term corrosion is sometimes also applied to the degradation of plastics, concrete and wood, but
generally refers to metals.
Anodic & Cathodic Reactions
Effects of corrosion

or

The consequences of corrosion are many and varied and the effects of these on the safe,
reliable and efficient operation of equipment or structures are often more serious than the simple loss
of a mass of metal. Failures of various kinds and the need for expensive replacements may occur even
though the amount of metal destroyed is quite small.
Underground corrosion

Electronic components

Buried gas or water supply pipes can suffer severe corrosion which is not detected until an
actual leakage occurs, by which time considerable damage may be done.

TU

In electronic equipment it is very important that there should be no raised resistance at low
current connections. Corrosion products can cause such damage and can also have sufficient
conductance to cause short circuits. These resistors form part of a radar installation.

Corrosion influenced by flow-1

The cast iron pump impeller shown here suffered attack when acid accidentally entered the
water that was being pumped. The high velocities in the pump accentuated the corrosion damage.
Corrosion influenced by flow 2

JN

This is a bend in a copper pipe-work cooling system. Water flowed around the bend and then
became turbulent at a roughly cut edge. Downstream of this edge two dark corrosion pits may be seen,
and one pit is revealed in section.
Safety of aircraft

The lower edge of this aircraft skin panel has suffered corrosion due to leakage and spillage
from a wash basin in the toilet. Any failure of a structural component of an aircraft can lead to the most
serious results.

Influence of corrosion on value

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

A very slight amount of corrosion may not interfere with the usefulness of an article, but can
affect its commercial value. At the points where these scissors were held into their plastic case some
surface corrosion has occurred which would mean that the shop would have to sell them at a reduced
price.
Motor vehicle corrosion and safety

ld

The safety problems associated with corrosion of motor vehicles is illustrated by the holes
around the filler pipe of this petrol tank. The danger of petrol leakage is obvious. Mud and dirt thrown
up from the road can retain salt and water for prolonged periods, forming a corrosive poultice.
Corrosion at sea

or

Sea water is a highly corrosive electrolyte towards mild steel. This ship has suffered severe
damage in the areas which are most buffeted by waves, where the protective coating of paint has been
largely removed by mechanical action.
Aluminium Corrosion

The current trend for aluminium vehicles is not without problems. This aluminium alloy chassis
member shows very advanced corrosion due to contact with road salt from gritting operations or use in
coastal / beach regions.
Damage due to pressure of expanding rust

TU

The iron reinforcing rods in this garden fence post have been set too close to the surface of the
concrete. A small amount of corrosion leads to bulky rust formation which exerts a pressure and causes
the concrete to crack. For structural engineering applications all reinforcing metal should be covered by
50 to 75 mm of concrete.

Corrosion of plastics

Not only metals suffer corrosion effects. This dished end of a vessel is made of glass fibre
reinforced PVC. Due to internal stresses and an aggressive environment it has suffered environmental
stress cracking.

JN

Galvanic corrosion

This rainwater guttering is made of aluminium and would normally resist corrosion well.
Someone tied a copper aerial wire around it, and the localised bimetallic cell led to a knife-cut effect.
Galvanic corrosion

The tubing, shown here was part of an aircrafts hydraulic system. The material is an aluminium
alloy and to prevent bimetallic galvanic corrosion due to contact with the copper alloy retaining nut this
was cadmium plated. The plating was not applied to an adequate thickness and pitting corrosion
resulted.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Galvanic corrosion
This polished Aluminium rim was left over Christmas with road salt and mud on the rim.
Galvanic corrosion has started between the chromium plated brass spoke nipple and the aluminium
rim.
Galvanic corrosion

ld

Galvanic corrosion can be even worse underneath the tyre in bicycles used all winter. Here the
corrosion is so advanced it has penetrated the rim thickness.

JN

TU

or

Corrosion prevention

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-4
DAMAGE IN STRUCTURES DUE TO FIRE
DAMAGE IN STRUCTURES DUE TO FIRE

PART 2: Fire Rating of Structures


PART 3: Phenomenon of Desiccation

or

DAMAGE IN STRUCTURES DUE TO FIRE

ld

PART 1: Fire Induced Damages in Structures

PART 1: Fire Induced Damages in Structures


Part I: Fire Induced Structural Damages

Uneven volume changes in affected members, resulting in distortion, buckling and cracking. The
temperature gradients are extreme - from ambient 70oF (21oC), to higher than 1500oF (800oC) at
the source of the fire and near the surface.
Spalling of rapidly expanding concrete surfaces from extreme heat near the source of the fire.
Some aggregates expand in bursts, spalling the adjacent matrix. Moisture rapidly changes to
steam, causing localized bursting of small pieces of concrete.

TU

The cement mortar converts to quicklime at temperatures of 750 oF (400oC), thereby causing
disintegeration of concrete.
Reinforcing steel loses tensile capacity as the temperature rises.
Once the reinforcing steel is exposed by the spalling action, the steel expands more rapidly than
the surrounding concrete, causing buckling and loss of bond to adjacent concrete where the
reinforcement is fully encased.

JN

Concrete undergoes cracking, spalling, and experiences a decrease in stiffness and strength as
the temperature increases.
Concrete has low thermal conductivity, which allows it to undergo heating for longer durations
before the temperature increases significantly and damage occurs.
The concrete compressive strength starts decreasing rapidly after its temperature reaches
approximately 400C (750F).

At temperatures of around 500oC (932oF), the concrete compressive strength is reduced to 50%
of its nominal strength.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

The tensile yield strength of the steel decreases gradually up to 500 oC (932o F). It is reduced to
about 50% of its nominal yield strength at 600 oC (1112oF). This essentially eliminates any factor
of safety, which is usually between 1.5 and 2.0.

Stages of deterioration due to Fire


DAMAGE IN STRUCTURES DUE TO FIRE

PART 2: Fire Ratings of Structures


What is Fire Rating?

or

PART 2: Fire Ratings of Structures

ld

The steel yield strength decreases more rapidly for temperatures greater than 500 oC (932oF),
and failure may be inevitable if temperatures keep increasing while the loading is sustained.

A fire rating refers to the length of time that a material can withstand complete combustion during a
standard fire rating test. Fire testing of building materials and components of buildings -- such as
joists, beams and fire walls -- is required in most places by building codes.
Other fire tests for things such as appliances and furniture are voluntary, ordered by manufacturers to
use in their advertising. Wall and floor safes are examples of products for which fire resistance is a key
selling point.

TU

PART 2: Fire Ratings of Structures


What is Fire Rating?

JN

With the required tests, the results are measured in either units of time, because the emphasis is on
holding up under fire (literally) long enough for the occupants of a home or building to escape, or by
classification designations. This does not mean, necessarily, that the components of every new
structure have to be fire tested. In most cases, the fire rating has been already established by testing
the product before it is even put on the market.
DAMAGE IN STRUCTURES DUE TO FIRE

PART 3: Phenomenon of Desiccation


PART 3: Phenomenon of Desiccation
Desiccation is a phenomenon referring to dryness of the material induced by the loss of
moisture

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-5
DISTRESS OF CONCRETE STRUCTURES & THEIR REPAIR TECHNIQUES
INTRODUCTION

CATEGORIES OF REASONS DISTRESS OF CONCRETE STRUCTURES

2. AGEING
3. ENVIRONMENTAL EFFECTS
4. INADEQUATE MAINTENANCE

or

1. WEATHERING

ld

If a building has given about 25v to 30 years of service without much maintenance or repair then it is
reasonable to expect that it would need some repair sooner or later.

5. POOR DESIGNING AND CONSTRUCTION QUALITY

6. CHANGE OF LOADING PATTERN OR NON CONVENTIONAL LOADING ON STRUCTURE


7. WATER LEAKAGE LEADING TO CORROSION OF CONCRETE STRUCTURE
CAUSES OF EARLY DETERIORATION OF CONCRETE STRUCTURES

TU

EFFECTS OF CRACKING ON LIFE OR DURABILIY OF STRUCTURE


IDENTIFICATION OF DISTRESSED LOCATIONS ON STRUCTURES
MATERIALS AND METHODS FOR CRACK REPAIR
SOME SPECIFIC REPAIR TECHNIQUE FOR CONCRETE SURFACE
ASSESMENT OF QUALITY OF STRUCTURE SOON AFTER ITS CONSTRUCTION

JN

REQUIREMENT FOR TRAINING FOR CONCRETE REPAIR AND CONCRETE WORKERS


THANK YOU

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-6
METHODS OF REPAIRING CONCRETE STRUCTURES

3 Basic symptoms of distress in a concrete structure


Cracking, Spalling and Disintegration

ld

1. INTRODUCTION

or

Reasons for their development may be poor materials, poor design, poor construction practice, poor
supervision or a combination

repair of cracks usually does not involve strengthening

2. Repairing cracks

repair of a structure showing spalling and disintegration, it is usual to find that there have been
substantial losses of section and/or pronounced corrosion of the reinforcement

In order to determine whether the cracks are active or dormant, periodic observations are done utilizing
various types of telltales

TU

by placing a mark at the end of the crack

a pin or a toothpick is lightly wedged into the crack and it falls out if there is any extension of the
defect
A strip of notched tape works similarly :
Movement is indicated by tearing of the tape

JN

The device using a typical vernier caliper is the most satisfactory of all.
Both extension and compression are indicated

If more accurate readings are desired, extensometers can be used


Where extreme accuracy is required resistance strain gauges can be glued across the crack

2.1

Types of cracks

active cracks and dormant cracks

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

the proper differentiation between active and dormant cracks is one of magnitude of
movement, and the telltales are a measure of the difference

If the magnitude of the movement, measured over a reasonable period of time (say 6
months or 1 year), is sufficient to displace or show significantly on the telltales, we can
treat the crack as an active one.

If the movements are smaller, the crack may be considered as dormant.

ld

Cracks can also be divided into solitary or isolated cracks and pattern cracks

Generally, a solitary crack is due to a positive overstressing of the concrete either due to load or
shrinkage

or

Overload cracks are fairly easily identified because they follow the lines demonstrated in laboratory load
tests

In a long retaining wall or long channel, the regular formation of cracks indicates faults in the design
rather than the construction, but an irregular distribution of solitary cracks may indicate poor
construction as well as poor design
Regular patterns of cracks may occur in the surfacing of concrete and in thin slabs. These are called
pattern cracks
Methods of repairing cracks

1. Bonding with epoxies

TU

Cracks in concrete may be bonded by the injection of epoxy bonding compounds under pressure
Usual practice is to

drill into the crack from the face of the concrete at several locations

inject water or a solvent to flush out the

allow the surface to dry

JN

defect

surface-seal the cracks between the injection

inject the epoxy until it flows out of the adjacent sections of the crack or begins
bulge out the surface seals

to

Usually the epoxy is injected through holes of


inch deep at 6 to 12 inches centers

Smaller spacing is used for finer cracks

points

about inch in diameter and

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

The limitation of this method is that unless the crack is dormant or the cause of
cracking is
removed and thereby the crack is made dormant, it will probably recur,
possibly
somewhere else in the structure

Also, this technique is not applicable if the defects are actively leaking to the extent that they
cannot be dried out, or where the cracks are numerous

ld

2. Routing and sealing


This method involves enlarging the crack along its exposed face and filling and sealing it with a
suitable material

or

The routing operation


placing the sealant

This is a method where thorough water tightness of the joint is not required and where appearance is
not important

3. Stitching

Concrete can be stitched by iron or steel dogs

A series of stitches of different lengths should be used

TU

bend bars into the shape of a broad flat bottomed letter U between 1 foot and 3 feet long and with ends
about 6 inches long
The stitching should be on the side, which is opening up first
if necessary, strengthen adjacent areas of the construction to take the additional stress

JN

the stitching dogs should be of variable length and/or orientation and so located that the tension
transmitted across the crack does not devolve on a single plane of the section, but is spread out over an
area
In order to resist shear along the crack, it is necessary to use diagonal stitching
The lengths of dogs are random so that the anchor points do not form a plane of weakness
4. External stressing

cracks can be closed by inducing a compressive force, sufficient to overcome the tension and to provide
a residual compression

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

The principle is very similar to stitching, except that the stitches are tensioned; rather than plain bar
dogs which apply no closing force to the crack
Some form of abutment is needed for providing an anchorage for the prestressing wires or rods
5. Grouting

cleaning the concrete along the crack


installing built-up seats at intervals along the crack

ld

same manner as the injection of an epoxy

sealing the crack between the seats with a cement paint or grout

6. Blanketing
similar to routing and sealing

or

flushing the crack to clean it and test the seal; and then grouting the whole

applicable for sealing active as well as dormant cracks


Preparing the chase is the first step
Usually the chase is cut square

The bottom should be chipped as smooth to facilitate breaking the bond between sealant and concrete

TU

The sides of the chase should be prepared to provide a good bond with the sealant material
The first consideration in the selection of sealant materials is the amount of movement anticipated
and the extremes of temperature at which such movements will occur
elastic sealants

mastic sealants

JN

mortar-plugged joints

7. Use of overlays

Sealing of an active crack by use of an overlay requires that the overlay be extensible and not flexible
alone
Accordingly, an overlay which is flexible but not extensible, ie. can be bent but cannot be stretched, will
not seal a crack that is active
Gravel is typically used for roofs

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

concrete or brick are used where fill is to be placed against the overlay
An asphalt block pavement also works well where the area is subjected to heavy traffic
Repairing spalling and disintegration

ld

In the repair of a structure showing spalling and disintegration, it is usual to find that there have been
substantial losses of section and/or pronounced corrosion of the reinforcement
Both are matters of concern from a structural viewpoint, and repair generally involves some urgency
and some requirement for restoration of lost strength
1. Jacketing

or

primarily applicable to the repair of deteriorated columns, piers and piles

Jacketing consists of restoring or increasing the section of an existing member, principally a compression
member, by encasement in new concrete

The form for the jacket should be provided with spacers to assure clearance between it and the existing
concrete surface
The form may be temporary or permanent and may consist of timber, wrought iron, precast concrete or
gauge metal, depending on the purpose and exposure
Timber, Wrought iron Gauge metal and other temporary forms can be used under certain conditions

TU

Filling up the forms can be done by pumping the grout, by using prepacked concrete, by using a tremie,
or, for subaqueous works, by dewatering the form and placing the concrete in the dry
The use of a grout having a cement-sand ratio by volume, between 1:2 and 1:3 , is recommended
The richer grout is preferred for thinner sections and the leaner mixture for heavier sections
The forms should be filled to overflowing, the grout allowed to settle for about 20 minutes, and the
forms refilled to overflowing

JN

The outside of the forms should be vibrated during placing of the grout
2. Guniting

Gunite is also known as shotcrete or pneumatically applied mortar


It can be used on vertical and overhead, as well as on horizontal surfaces and is particularly useful for
restoring surfaces spalled due to corrosion of reinforcement
Gunite is a mixture of Portland cement, sand and water, shot into the place by compressed air

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Sand and cement are mixed dry in a mixing chamber, and the dry mixture is then transferred by air
pressure along a pipe or hose to a nozzle, where it is forcibly projected on to the surface to be coated
Water is added to the mixture by passing it through a spray injected at the nozzle
The flow of water at the nozzle can be controlled to give a mix of desired stiffness, which will adhere to
the surface against which it is projected

ld

3. Prepacked concrete

This method is particularly useful for carrying out the repair under water and elsewhere where
accessibility is a problem

or

Prepacked concrete is made by filling forms with coarse aggregate and then filling the voids of the
aggregate by pumping in a sand-cement grout

Prepacked concrete is used for refacing of structures, jacketing, filling of cavities in and under structures,
and underpinning and enlarging piers, abutments, retaining walls and footings
Pumping of mortar should commence at the lowest point and proceed upward

4. Drypack

Placing of grout should be a smooth, uninterrupted operation

Drypacking is the hand placement of a very dry mortar and the subsequent tamping of the mortar into
place, producing an intimate contact between the new and existing works

TU

Because of the low water-cement ratio of the material, there is little shrinkage, and the patch remains
tight. The usual mortar mix is 1:2.5 to 1:3
5. Replacement of concrete

This method consists of replacing the defective concrete with new concrete of conventional proportions,
placed in a conventional manner

JN

This method is a satisfactory and economical solution where the repair occurs in depth (at least beyond
the reinforcement), and where the area to be repaired is accessible
This method is particularly indicated where a water-tight construction is required and where the
deterioration extends completely through the original concrete section
Overlays

In addition to seal cracks, an overlay may also be used to restore a spalled or disintegrated surface
Overlays used include mortar, bituminous compounds, and epoxies

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

They should be bonded to the existing concrete surface


Conclusions
When repairing cracks, do not fill the crack with new concrete or mortar
A brittle overlay should not be used to seal an active crack

ld

The restraints causing the cracks should be relieved, or otherwise the repair must be capable of
accommodating future movements
Cracks should not be surface-sealed over corroded reinforcement, without encasing the bars

or

The methods adopted for repairing spalling and disintegration must be capable of restoring the lost
strength
References
[1]

Champion, S. Failure and Repair of Concrete Structures. John Wiley & Sons Inc. New York, 1961

[2]
Sidney.M.Johnson. Deterioration, Maintenance and Repair of Structures. Mc Graw-Hill Book
Company. New York, 1965.
[3]
Lee How Son and George C.S. Yuen. Building Maintenance Technology. Macmillan Distribution
Ltd. England. 1993.

Thomas H. McKaig. Building Failures.

TU

[4]

Mc Graw-Hill Book Company. New York,

Histories. Oxford & IBH Publishing Co. Pvt.

JN

[5] Jagadish, R. Structural Failures - Case


New Delhi.1995.

1962.

Downloaded From JNTU World (http://www.alljntuworld.in)

Ltd.

www.alljntuworld.in

JNTU World

UNIT-7
Repair and Strengthening of Reinforced Concrete Beam-Column Joints: State of the Art
CONTENT

ld

1. INTRODUCTION
1.1 RESEARCH SIGNIFICANCE

2. REPAIR AND STRENGTHENING TECHNIQUES FOR BEAM-COLUMN JOINTS

2.2 Removal and replacement


2.3 Concrete jackets
2.4 Reinforced masonry blocks

2.5 Steel jackets and external steel elements

or

2.1 Epoxy repair

2.6 Fiber-reinforced polymeric composites


3. APPENDIX
4. CONCLUSIONS

TU

5. REFERENCES

1. INTRODUCTION

RESEARCH SIGNIFICANCE

2.REPAIR AND STRENGTHENING TECHNIQUES FOR BEAM-COLUMN JOINTS

JN

2.1 Epoxy

repair

2.3 Concrete jackets

Concrete jackets continues


2.5 Steel jackets and external steel elements
2.6 Fiber-reinforced polymeric composites

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

APPENDIX
3. CONCLUSIONS
From the literature review on the performance, repair, and strengthening of nonseismically detailed RC
beam-column joints presented in this paper, the following conclusions were drawn:

ld

1. The critical nonseismic joint details in existing RC structures have been well-identified as shown in Fig.
1; however, the investigation of their effects on seismic behavior have been limited to testing of isolated
one-way joints (no floor slab, transverse beams, or bidirectional loads) to a very large extent, and 1/8and 1/3-scale building models that may not accurately simulate the actual behavior of structural details;

or

2. Epoxy repair techniques have exhibited limited success in restoring the bond of reinforcement, in
filling the cracks, and restoring shear strength in one-way joints, although some authors believe it to be
inadequate and unreliable.13
The authors believe that injection of epoxy into joints surrounded by floor members would be similarly
difficult;

Conclusion

3. Concrete jacketing of columns and encasing the joint region in a reinforced fillet is an effective but the
most labor-intensive strengthening method due to difficulties in placing additional joint transverse
reinforcement.

TU

Welding an external steel cage around the joint instead of adding internal steel has also proven effective
in the case of a three-dimensional interior joint test. These methods are successful in creating strong
column-weak beam mechanisms, but suffer from considerable loss of floor space and disruption to
building occupancy;
4. An analytical study showed that joint strengthening with reinforced masonry units can lead to
desirable ductile beam failures and reduction of interstory drifts; however, no experimental data are
available to validate their performance;
Conclusion

JN

5. Grouted steel jackets tested to date cannot be practically applied in cases where floor members are
present. If not configured carefully, such methods can result in excessive capacity increases and create
unexpected failure modes.
Externally attached steel plates connected with rolled sections have been effective in preventing local
failures such as beam bottom bar pullout and column splice failure; they have also been successfully
used in combination with a reinforced concrete fillet surrounding the joint;
6. Externally bonded FRP composites can eliminate some important limitations of other strengthening
methods such as difficulties in construction and increases in member sizes.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

The shear strength of one-way exterior joints has been improved with 45-degree fibers in the joint
region; however, ductile beam failures were observed in only a few specimens, while in others,
composite sheets debonded from the concrete surface before a beam plastic hinge formed. Reliable
anchorage methods need to be developed to prevent debonding and to achieve full development of
fiber strength within the small area of the joint, which can possibly lead to the use of FRPs in
strengthening of actual three-dimensional joints; and

ld

Conclusion
7. Most of the strengthening schemes developed thus far have a limited range of applicability, if any,
either due to the unaccounted floor members (that is, transverse beams and floor slab) in real
structures or to architectural restrictions.

REFERENCES

or

Experiments conducted to date have generally used only unidirectional load histories. Therefore, the
research in this area is far from complete, and a significant amount of work is necessary to arrive at
reliable, cost-effective, and applicable strengthening methods. In developing such methods, it is
important that testing programs be extended to include critical joint types (for example, corner) under
bidirectional cyclic loads.

Engindeniz, M.; Kahn, L. F.; and Zureick, A., Repair and Strengthening of Non-Seismically Designed RC
Beam-Column Joints: State-of-the-Art, Research Report No. 04-4, Georgia Institute of Technology,
Atlanta, Ga., Oct. 2004, 58 pp. (available online at http:// www.ce.gatech.edu/groups/struct/reports)

TU

Repair and Strengthening of Reinforced Concrete Beam-Column Joints: State of the Art. by Murat
Engindeniz, Lawrence F. Kahn, and Abdul-Hamid Zureick ,ACI Structural Journal, V. 102, No. 2, MarchApril 2005.

JN

THANK YOU

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

UNIT-8
The Absolutes of Life
Some Other Absolutes of Life (other than Death and Taxes)

So long as structures will keep on


getting built, failures will keep on occurring.

or

The Gosain Dictum No. 2

ld

The Gosain Dictum No. 1

Failures will keep Forensics Engineers busy for a long time


Primary Causes of Engineering Failures

Design flaws
Material failures
Overloading

Deferred maintenance

Combination of all the above

TU

Gosain and Prasad Observation No. 1

Fear of failure will spur some owners to action!


Gosain and Prasad Observation No. 2

An action may be Structural Health Monitoring!

JN

Some failures are sudden and catastrophic, and some failures just take their time
Structural Health Monitoring (SHM) can be very helpful in serving as an alarm system for preventing
both types of failures .
But what is Structural Health Monitoring?
What is Structural Health Monitoring (SHM)?
Definition: The process of implementing a distress or damage detection strategy for aerospace,
mechanical and civil engineering structures is referred to as Structural Health Monitoring or SHM.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Not a new concept


Has been around for several decades
Advances in electronics made it easier to implement.
Several non-destructive evaluation (NDE) tools available for monitoring.

ld

How old is SHM?


SHM work goes back almost 80 years.
Limited to major structures

Bridges
Some early high rises
Unique structures

Life-safety issues
Economic benefits
Performance evaluation

Significant interest in the past 10 years.

or

Dams

TU

Affordable

Case History from the Past


San Jacinto Monument
Built 1936

JN

La Porte, Texas

San Jacinto Monument Mat Foundation SHM


San Jacinto Monument Mat Foundation SHM
San Jacinto Monument Mat Foundation SHM
San Jacinto Monument Mat Foundation SHM
San Jacinto Monument Mat Foundation SHM

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

San Jacinto Monument Mat Foundation SHM


San Jacinto Monument Mat Foundation SHM
San Jacinto Monument Mat Foundation SHM
San Jacinto Monument Mat Foundation SHM

1. Modifications to an existing structure,


2. Monitoring of structures affected by external factors,

or

3. Monitoring during demolition,

ld

Objectives of Structural Health Monitoring: Farrar and Worden (2007)

4. Structures subject to long-term movement or degradation of materials,


5. Feedback loop to improve future design based on experience,
Objectives of Structural Health Monitoring

6. Fatigue assessment,

7. Novel systems of construction,

8. Assessment of post-earthquake structural integrity, and


9. Growth in maintenance needs.

TU

Instrumentation used for SHM


1. Strain gages,

2. Inclinometers,

3. Displacement transducers,

JN

4. Accelerometers,

5. Temperature gages,
6. Pressure transducers,
7. Acoustic sensors,
8. Piezometers, and
9. Laser optical devices

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Instrumentation used for SHM


Most of these sensors can be wirelessly connected.
Technology using solar energy is very common in instrumentation.
Latest technology even has self powered systems, i.e. no external power required.

Case History 1
Health Monitoring of a Stadium Truss During Erection

Segmented Erection.

or

Health Monitoring of a Stadium Truss During Erection

ld

Some Recent Work

Monitor strains and stresses at various stages of erection.

Key Challenges

Verification of predicted behavior was needed

Non-interference with the construction schedule.

No wires were allowed to run from one segment to the other.


No main power supply.

TU

No drilling or welding on to the frame.

Each segment needed to be prepared and instrumented in a narrow 2 day interval.


No lift access after erection.

Health Monitoring of a Stadium Truss During Erection

JN

Instruments

MicroStrain V-Link

4 Strain gauges could be attached to the device.


Fully ruggedized for exterior applications.

One laptop with data querying software was sufficient to access all boxes.
Low duty cycle can give up to 1 year of battery life.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Case History 2
Health Monitoring of a Data Center
Health Monitoring of a Data Center
Health Monitoring of a Data Center

Needed to prevent undesirable vibrations in the data center.

ld

Key Challenges

Quantify sensitivities of many high-performance computing systems.

or

Needed to inform the contractor immediately upon discovery of an issue.


Alarm system to alert Walter P Moore and the contractor.
Health Monitoring of a Data Center

Pre-construction Testing.

Instruments

National Instruments dynamic data acquisition system.


PCB mG scale accelerometers.

Construction and Operations Time Monitoring

TU

Instantel Blastmate device.


Case History 3

Health Monitoring of a Parking Garage Structure


Health Monitoring of a Parking Garage Structure

JN

Key Challenges

Selection of monitoring location.


Selection of types of measurements.
Need to operate during power outages.
Sensor installation.

Data logger installation.

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Remote communication setup.


Alarm system to alert engineer and the client.
Instruments
Campbell Scientific CR10X logger with DC backup.

Anemometer.
Rain gauge.

or

Health Monitoring of a Parking Garage Structure

ld

Inclinometers with temperature sensors.

Health Monitoring of a Parking Garage Structure


Case History 4

Health Monitoring of a Bridge Essential to Business Operations

Key Challenges

Health Monitoring of a Bridge Essential to Business Operations

Installation of inclinometers under girders.


Access was difficult.

TU

Night time installation was preferred.

Installation has to be stopped when a train passed by under the bridge.


The whole system needed to be run with solar power.
Remote communication setup.

JN

Alarm system to alert the engineer and the client.


Instruments

Campbell Scientific CR1000 logger with solar power.


Tilt beams with temperature sensors.
Cellular TCP/IP modem facilitates accessing data over the internet
Evaluate need

Downloaded From JNTU World (http://www.alljntuworld.in)

www.alljntuworld.in

JNTU World

Discuss the motivation in implementing SHM with the client and the benefits to be accrued
Discuss the period of time for monitoring
Have a clarity on how the damage or distress is to be defined and measured
Select the appropriate instrumentation and data acquisition system

Extract meaningful data


Presentation to client in a meaningful and understandable format

Improved hardware.
Extensive usage by the industry.

or

Reduce the implementation cost.

ld

Environmental conditions

Implement wireless and self powered technology.

Simplifies installation.

Facilitates usage even in remote areas.

Insensitive to local power outages.

Estimate potential savings of using SHM.

TU

Develop models to show potential savings in using SHM vs. periodic physical inspections.

JN

Deferred Maintenance and SHM

Downloaded From JNTU World (http://www.alljntuworld.in)

You might also like