FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR FY 2011

MINISTRIES, DEPARTMENTS AND AGENCIES (MDAs)


FEDERAL CAPITAL TERRITORY (FCT)
S/N
ITEM/SERVICE

Variation of the Contract


Sum for the provision of
Engineering Infrastructure to
Kubwa Satellite Town
(Districts 4&5), Abuja

Variation of the Contract


Sum for the provision of
Engineering Infrastructure to
Karshi Satellite Town
(Districts 1&2), Abuja
Award of Contract for the
Rehabilitation of Lower
Usuma Dam (LUD) Water
Treatment
Plant (Phase II)
Award of contracts for the
Operation, Maintenance and
Training of Staff for Wupa
Basin Sewage Treatment
Plant

NAME OF COMPANY

IMPLEMENTING
AGENCY

Messrs. S.C.C Nigeria


Limited

Ministry of Federal
Capital Territory

N42,683,490,832.49

2/11/11

Messrs. S.C.C Nigeria


Limited

Ministry of Federal
Capital Territory

N28,220,048,498.00

2/11/11

Messrs. Cupero
(Nigeria) Ltd.

Federal Capital
Territory

N1,018,980,566.82

COST

DATE

2 Years

16/11/11

N1,586,451,516.76
Messrs. SCC (Nigeria) Federal Capital
Limited
Territory

DURATION

07/12/11

80 Weeks

18 Months

2 Years
(from 16th
April 2011
to 15th
April 2013)

Award of Contract for the


Supply of 28 Units of Waste
Compacting Trucks (1 x
Garbage Body 20 + 1.5m3
Capacity, Mounted on
Mercedes Benz 3340, 6x4
Chasis with Euro Engine)
Award of Contract for the
Establishment of Plant
Nursery, Tree Planting,
Landscaping and
Beautification of Umaru
Musa Yar Adua Expressway,
Airport Road, FCT, Abuja
Award of contract for the
supply of 2 Heavy Duty
Recovery Equipment MB
Chasis, 50 Ton Hydraulic
Wrecker, with a dual
50,000lbs
Award of contract for the
supply of 8 units of 3000MX
and 4 units LN50 Motorized
Street Sweepers
Award of Contract for the
Supply of 8No. Light Duty
Recovery Equipment for the
FCT Directorate of Road
Traffic Services (DRTS) under
the Transportation
Secretariat

N1,071,577,507.41
Messrs. Geodetics
Offshore Services
Limited

Federal Capital
Territory
Administration

6 Months

14/12/11

N1,451,605,114.64
Messrs. Kashton
Concepts (Nig) Ltd

Federal Capital
Territory
Administration

18 Months

14/12/11

N180,999,000.00
Messrs. Balyn Auto
(Nigeria) Ltd.,

Messrs. Linens N
Moore (Nigeria)
Limited

Federal capital
Territory

8 weeks
21/12/11

N405,677,546.40
Federal Capital
Territory

6 Months
21/12/11

N151,515,000.00
Messrs Balyn Auto
(Nigeria) Limited

Federal Capital
Territory

6 Weeks

18/01/12

10

11

12

13

Award of Contract for the


Supply of 2 units Mercedes
Benz with Muller Canal
Master Flusher Type 160E 1
unit with High Pressure
Jetting Installation and 1 unit
without High Pressure Jetting
Installation
Award of Contract for the
Development of Phase II of
District I Abuja North Phase
IV West of the Federal
Capital City (FCC)
Award of Contract for the
Supply of 35 Operational
Vehicles for the FCT
Directorate of Road Traffic
Services (DRTS)
Award of Contract for the
Supply of 6 units of 30
Tonnes Mercedes Benz
Diesel Engine RORO Trucks

N130,963,218.75
Messrs Maxtraco
Integrated Concepts
Limited

Federal capital
Territory

6 Months

18/01/12

N25,954,847,809.80
Messrs. Salini
(Nigeria) Limited

Federal Capital
Territory

48 Months
25/01/12

N239,400,000.00
Messrs. Elizade
Nigeria Limited

Messrs. Yae
International Limited

Federal Capital
Territory

4 Weeks
01/02/12

N203,590,497.36
Federal Capital
Territory

29/02/201
2

N103,299,147,108.43

TOTAL

6 Months

MINISTRY OF AVIATION
S/N
1

ITEM/SERVICE

NAME OF
COMPANY

Award of contract for


Procurement, Installation and Messrs. Salbodi
Commissioning of ILS/DME in 5 Group Ltd/Indra
Airports and DVOR/DME in 5
Sistemas S.A
Airports
Messrs. Sancheong
Products of South
Direct/repeat Procurement of
Korea Through
additional 696No. of SCA
Messrs. Plastisol BV
120IN Heat Proximity Clothing
of the Netherlands
form the Original Equipment
(Accredited
Manufacturers
Representatives in
Nigeria)

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Ministry of
Aviation

N1,590,361,027.20

07/12/11

10 Months

Ministry of
Aviation

USD1,577,136
payable at the
prevailing Exchange
Rate at the time of
opening the Letter
of Credit

07/12/11

4 Months

TOTAL

USD1,577,136.00
N1,590,361,027.20

MINISTRY OF COMMUNICATIONS TECHNOLOGY

AWARD OF CONTRACT FOR THE PROVISION OF ICT-ENABLED LEARNING THROUGH THE SCHOOLS ACCESS
PROGRAM BY UNIVERSAL SERVICE PROVISION FUND WITH THE COMPLETION PERIOD OF 36 WEEKS

S/N

NAME OF FIRM/CONTRACTOR

Messrs. Zinox Technologies


Ltd

ii

IMPLEMENTING
AGENCY

No. of
Schools

Project Cost
N

Date

Ministry of
Communication
Technology

70

N1,166,621,253.00

14/09/11

Messrs. Edtek Learning


ServicesLtd.

Ministry of
Communication
Technology

60

N999,961,074.00

14/09/11

iii

Messrs. MDS Technologies

Ministry of
Communication
Technology

60

N999,961,074.00

14/09/11

iv

Messrs. Chips,Bites and


Bytes Ltd.

Ministry of
Communication

60

N999,961,074.00

14/09/11

55

N916,630,948.50

14/09/11

Technology

Messrs ICS Ltd.

Ministry of
Communication
Technology

vi

Messrs Dialogue Global Links Ministry of


Ltd.
Communication
Technology

42

N699,972,751.80

14/09/11

vii

Messrs Sidmach
Technologies

Ministry of
Communication
Technology

40

N666,640,716.00

14/09/11

TOTAL

387

N6,449,748,891.30

S/N
2

ITEM/SERVICE
Award of contract for the
Construction of the National
Information Technology
Center by Galaxy Backbone Plc
Award of Contract for the for
the Provision of IT and
Connectivity services to the
scale-up of the CGS to Local
Government Areas

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

Messrs. Sageto (Nig)


Ltd.

Ministry of
Communications
Technology

Messrs. Galaxy
Backbone Plc

Presidency /Galaxy N391,272,598.98


Backbone

N7,274,638,250.51

DATE

07/12/11
17/08/11

N14,115,659,740.79

TOTAL

DURATION

104 weeks

FEDERAL MINISTRY OF EDUCATION


S/N

ITEM/SERVICE

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Award of Contract for the


Execution of the Pilot Phase of
the Nigerian Universities
Electronic Teaching and
Learning Platform in 12
Universities, 2 (1 Federal and 1
State) from each of the 6 GeoPolitical Zones

Messrs. Richfield
Technology Ltd

Ministry of
Education

N325,274,000.00

16/11/11

8 Weeks

2i

Award of Contract for the


Procurement of Furniture for
Lecture Theatres for 13
faculties( Arts, Engineering,
Physical Sciences, Veterinary
Medicine, Pharmacy,
Agriculture, Social Sciences,
Education, Business
Administration, Dentistry,
Medicine, Health Sciences &
Technology and Law) in the
University of Nigeria, Nsukka

Messrs. Zito
Phranzlo
International Ltd.

Ministry of
Education

N453,871,600.00

16/11/11

40 Weeks

2ii

Award of Contract for the


Procurement of Ubiquitous
Wireless Network for the ICT
Backbone Infrastructure for the

Messrs. BCX
Networks Ltd.,
working with
Wavion Wireless

Ministry of
Education

N275,243,678.00

16/11/11

12 Weeks

Campuses of the University of


Nigeria, Nsukka

Network of Israel,
Business
Connection of
South Africa and
Xiruus Inc. of USA

AWARD OF CONTRACT FOR THE PRINTING AND DISTRIBUTION OF ENGLISH LANGUAGE, MATHEMATICS, ACTIVITY-BASED
SCIENCE, BASIC SCIENCE AND TECHNOLOGY AND SOCIAL STUDIES TEXTBOOKS PRIMARIES 1 AND 2 PUPILS; AND LIBRARY
RESOURCE MATERIALS FOR JUNIOR SECONDARY SCHOOL (JSS) STUDENTS IN PUBLIC SCHOOLS NATIONWIDE BY UBEC

S/N

DESCRIPTION OF PROJECT
(BOOKTITLE)

PUBLISHER/CONTRACTOR QUANTITY
(No. OF
COPIES)

TOTAL COST (N)

Printing and Distribution of of


Macmillan New Pry. Maths. Books 1
for 16 States

Macmillan

640,000

256,320,000.00

ii

Printing and Distribution of Macmillan


New Pry. English Lang. Book 1 for 16
States

Macmillan

640,000

229,248,000.00

iii

Printing and Distribution of Think and


Do: Activity-Based Science Book for
Pry. 1 for 34 States and the FCT

Macmillan

1,225,000

429,975,000.00

iv

Printing and Distribution of Macmillan


Brilliant Primary Social Studies Book 1
for 20 States

Macmillan

1,826,000

547,800,000.00

Printing and Distribution of Macmillan


New Pry. Maths. Book 2 for 16 States

Macmillan

640,000

256,320,000.00

DATE

DURATION

30/11/11

6 weeks

vi

Printing and Distribution of Macmillan


New Pry. Eng. Lang. Book 2 for 16
States

Macmillan

640,000

229,248,000.00

vii

Printing and Distribution of Think and


Do: Activity-based Science Book for
Pry. 2 for 34 States and the FCT

Macmillan

1,225,000

429,975,000.00

viii

Printing and Distribution of Macmillan


Brilliant Primary Social Studies Book 2
for 20 States

Macmillan

1,826,000

547,800,000.00

Printing and Distribution of 160


Assorted Titles Library Resource
Materials of various Quantities for the
36 States and the FCT
Printing and Distribution of Evans
Brothers Publishers Basic Science
Books 1 for 5 States

Macmillan

4,144,000

1,528,763,049.00

Evans Brothers

415,000

132,800,000.00

xi

Printing and Distribution of Evans


Brothers Publishers Basic Science
Books 2 for 5 States

Evans Brothers

415,000

132,800,000.00

xii

Printing and Distribution of Evans


Brothers Publishers Social Studies
Books 1 for 11 States

Evans Brothers

747,000

242,775,000.00

xiii

Printing and Distribution of Evans


Brothers Publishers Social Studies
Books 2 for 11 States

Evans Brothers

747,000

242,775,000.00

ix

30/11/11

6 weeks

xiv

Printing and Distribution of


Heinemann Basic Science &
Technology Book 1 for 15 States

Heinemann

1,245,000

373,500,000.00

xv

Printing and Distribution of


Heinemann Basic Science Technology
Book 2 for 15 States

Heinemann

1,245,000

373,500,000.00

xvi

Printing and Distribution of University


Press Plc Basic Science & Technology
Book 1 for 12 States

University Press Plc

830,000

336,150,000.00

xvii

Printing and Distribution of University


Press Plc Basic Science &Technology
Book 2 I for 12 States

University Press Plc

830,000

348,600,000.00

30/11/11

TOTAL

6,638,349,049.00

N7,692,738,327.00

TOTAL

10

6 weeks

FEDERAL MINISTRY OF ENVIRONMENT


S/N
1

S/N

PROJECT DESCRIPTION

NAME OF
FIRM/CONTRACTOR
Award of Contract for the Messrs. Osprey
Remediation of Sludge Pits Investment Group
at Kaduna Refinery and
Ltd.
Petrochemical Company
(KRPC) dumpsites and
Improvement of the lives
of the Impacted
Communities

IMPLEMENTING
AGENCY
Ministry of
Environment
/Kaduna Refining
and Petrochemical
Company(KRPC)

COST
N 1,811,005,875.00

DATE
14/09/11

DURATION
43 Weeks

AWARD OF FOUR (4) CONTRACTS FOR THE EXECUTION OF EROSION CONTROL WORKS IN THE SOUTH EAST GEOPOLITICAL ZONE OF THE COUNTRY
Lot
No

PROJECT DESCRIPTION

NAME OF
FIRM/CONTRACTOR

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Sakamori/Nwangene Flood
Control and Dredging in
Anambra State

Messrs. Benefaf
International Ltd.

Ministry of
Environment

N1,230,015,404.31

18
Months

ii

Nanka Recednt Landslide in


Anambra State

Messrs. Rhino
Ministry of
Maritime Services & Environment
Construction Ltd.

N1,111,456,582.53

12
Months

11

11

Obinagu/Akpulu/EnuguezeUmunneobagu Erosion Control


in Enugu State.

Messrs. Nostro
Ventures Ltd.

Ministry of
Environment

N1,482,687,008.88 14/09/11

15
Months

15

Channelization of Iyi Okwu and


Iyi Udele Stream in Ebonyi
State.

Messrs City Central


Group

Ministry of
Environment

N1,544,233,440.75

14
Months

TOTAL

S/N
3

ITEM/SERVICE
Award of Contract for the
Channelization of Asa River
and its Tributaries in Ilorin,
Kwara State

N5,368,392,436.47

NAME OF
COMPANY
Messrs Ambico
Sendirian (Nigeria)
Limited

IMPLEMENTING
AGENCY
Ministry of
Environment

12

COST

N1,233,761,817.20

DATE

04/04/12

DURATION

12 Months

TOTAL

N8,413,160,128.67

FEDERAL MINISTRY OF FINANCE


S/N
PROJECT DESCRIPTION
1

Award of Contract for the Design,


Procurement and Implementation
of an Enterprise Resource
Planning (Enterprise Finance and
Accounts) Software for the
Federal Inland Revenue Service

Award of contract of the 2No. A30


Sea Princess Boats with Back Up
Spare Parts and Training of Crew
Members
Award of contract for consultancy
services for stages 1 and 2 in
respect of the construction of new
Federal Inland Revenue Service
(FIRS) Headquarters building in
Abuja

NAME OF
FIRM/CONTRACTO
R
Messrs. Computer
Warehouse Group
Limited

IMPLEMENTING
AGENCY
Federal Inland
Revenue Service
(FIRS)

COST

DATE

DURATION

N150,000,000.00

10/08/11

12 Months

Messrs. John Holt


Plc

Ministry of Finance

N270,000,000.00

19/10/11

6 Weeks

Messrs. ATO
Architects as
consultant
architects and their
team of other
consultants:

Ministry of
Finance/ FIRS

N733,427,476.78

07/12/11

6 Months

13

Structural
Engineers, Messrs.
IAA Associates Ltd;
Mechanical
Engineers, Messrs.
Molecular
Consultants and
Associates;
Electrical Engineers,
Messrs. Molecular
Consultants and
Associates; and
Quantity Surveyors,
Messrs. Sea
Surveyors Ltd
4

Award of Contract for the


Construction of Senior
Management Quarters at Jabi
Lakeside, Abuja for the Nigeria
Customs Service

Messrs Afdin
Construction
Limited
Messrs Africair
Incorporated

Award of contract for the


procurement of 1No. Cessna
Citation CJ4 Acquisition Aircraft

Ministry of Finance

Ministry of
Finance/Nigeria
Customs Service

N6,677,406,192.03
inclusive of 5% VAT
N1,737,503,898.90
(Equiv. to
USD11,123,584.50)
inclusive of 5% VAT

N9,568,337,567.71

TOTAL

14

11/04/12

16/05/12

104 weeks

4 Months

FEDERAL MINISTRY OF HEALTH


S/N
1

ITEM/SERVICE

NAME OF
COMPANY

IMPLEMENTING
AGENCY

Procurement of contraceptive
by the United Nations Fund for United Nations Fund
Population Activities (UNFPA) for Population
Ministry of Health
for the Federal Ministry of
Activities (UNFPA)
Health

COST

DATE

DURATION

USD3,000,000.00
Federal Government 07/12/11
counterpart funding

2
AWARD OF CONTRACTS FOR DIRECT PROCUREMENT OF ANTI-RETROVIRAL (ARV) DRUGS AND OTHER COMMODITIES
S/N
Project Description
i

ii

iii

iv

Supply of 50,576 packs of


Lamivudine/Zidovudine/Nevira
pine ARV MDG Branded Drug
Supply of 50,576 packs of
Lamivudine/Zidovudine/Nevira
pine ARV MDG Branded Drug
Supply of 50,576 packs of
Lamivudine/Zidovudine/Nevira
pine ARV MDG Branded Drug
Supply of 50,576 packs of
Lamivudine/Zidovudine/Nevira
pine ARV MDG Branded Drug

Contractors

Implementing
Agency

Contract Sum

Messrs. Emcure
Nigeria Limited

N124,500,000.00

Messrs. Strides Vital


Nigeria Limited

N126,990,000.00

Messrs. Ranbaxy
Nigeria Limited

Federal Ministry of
Health
N112,050,000.00

Messrs. Evans
Medical Plc

N136,651,200.00

15

Date

Completion
Period

07/12/11

2 weeks

vi

vii

viii

ix

Supply of 50,576 packs of


Lamivudine/Zidovudine/Nevira
pine ARV MDG Branded Drug
Supply of 55,000 tablets of
Cotrimoxazole tablets and
108,108 100ml suspension of
co-trimoxazole

Messrs. May &


Baker Nigeria Plc

N129,480,000.00

Messrs. Clarion
Medical limited

N145,860,000.00

Supply of 428,000 tests Double Messrs. Biotec


Check Gold
Laboratory Products

N194,033,880.00

Supply of 428,000 tests of


Determine Test kits

Messrs. Acouns
Nigeria Limited

N194,033,880.00

Supply of 428,000 Stat Pak


Test Kits

Messrs. Chembio
Diagnostics Limited

N194,033,880.00

TOTAL

N1,357,632,840.00

TOTAL

USD3,000,000.00
N1,357,632,840.00

16

MINISTRY OF INTERIOR
S/N
1

ITEM/SERVICE
Award of Contract for the
Automation of the Citizenship
and Business Department of
the Ministry of Interior on a
Public Private Partnership(PPP)
using Buil Operate and Transfer
(BOT) Model

NAME OF
COMPANY
Messrs. Anchor
Dataware
Solutions

IMPLEMENTING
AGENCY
Ministry of
Interior

TOTAL

COST
N455,055,743.87

DATE
25/01/12

DURATION
Concession
Period of 5
years

N455,055,743.87

FEDERAL MINISTRY OF LAND, HOUSING AND URBAN DEVELOPMENT


1

AWARD OF CONTRACT FOR THE CONSTRUCTION OF 6No. NEW FEDERAL GOVERNMENT SECRETARIATS IN EACH GEOPOLITICAL ZONE OF THE FEDERATION

S/N
Project Title/Location
i

ii

Federal Government
Secretariat, Awka, Anambra
State
Federal Government
Secretariat, Yenagoa, Bayelsa
State

Contractors
Messrs. Cosco
Investment (Nig) Ltd
Messrs. Trenure
(Nig) Ltd

Implementing
Agency

Ministry of Lands,
Housing and Urban
Development
17

Project Cost

Date

Completion
Period

07/12/11

100 weeks

N2,561,268,866.56

N2,563,476,419.85

iii

iv

vi

Federal Government
Secretariat, Gombe, Gombe
State
Federal Government
Secretariat, Lafia, Nassarawa
State
Federal Government
Secretariat, Osogbo, Osun
State
Federal Government
Secretariat, Gusau, Zamfara
State

Messrs. Vic Phranc


(Nigeria) limited

N2,293,261,561.05

Messrs. Faplins (Nig)


Ltd

N2,229,968,101.20

Messrs. Golden
Construction
Company Limited

N2,548,444,283.80

Messrs. Sageto Ltd

N2,528,673,102.10

N14,725,092,334.56

TOTAL

MINISTRY OF NIGER DELTA


1

S/N

AUGMENTATION OF THE CONTRACTS FOR THE EAST-WEST ROAD PROJECT, SECTIONS I, II-I AND II-II (MINISTRY OF NIGER
DELTA AFFAIRS)

PROJECT DESCRIPTION

CONTRACT SUM

East-West Road, Section I (Warri-Kaiama) in


Delta State

Revised Contract Sum


From
N64,125,000,000.00
To
N112,166,400,493.60

18

CONTRACTOR

DATE

COMPLETION
PERIOD

10/08/11

28 Months

Setraco

Ii
East-West Road, Section II-I (Port-HarcourtAhoada-Kaiama ) in Rivers State
iii
East-West Road, Section II-II (Ahoada-Kaiama)
in Rivers/Bayelsa State

Revised Contract Sum


From
N29,922,478,839.19
To
N48,973,303,132.78
Revised Contract Sum
From
N44,883,718,258.18
To
N84,759,913,053.64

Setraco
10/08/11

28 Months

10/08/11

28 Months

Setraco

N245,899,616,680.02

S/N
2

ITEM/SERVICE
Award of the Phase II Contract
for the Construction of
Ogriagbene Torugbene
3.675Km Road with spurs to
Edegbene and Torugbene
townships in Delta State

NAME OF
COMPANY

Messrs. Setraco
(Nig.) Limited

IMPLEMENTING
AGENCY

Ministry of Niger
Delta Affairs

COST

DATE

DURATION

N3,453,476,572.13

09/11/11

12 Months

3
AUGMENTATION OF CONTRACTS FOR THE ENGINEERING CONSULTANCY SERVICES TO INCORPORATE FULL RESIDENT SUPERVISION OF
THE CONSTRUCTION OF FOUR (4) ROAD PROJECTS IN THE NIGER DELTA REGION

S/N

Project Title

Consultant

Implementing
Agency

19

Revised Contract
Sum

Date

Completion
Period

ii

Iii

Iv

Construction of OriagbeneTorugbene Road


Re-construction of BeninAbraka Road
Construction of OdoroboKpakiama Bomadi Road
Construction of Mbato
Junction, Okputuite, Orie
Market, Omara Road

Messrs. Jon Khan


Ltd.
Messrs. Agbomire
Engineering
Consultants
Messrs. Auspoint
Ltd.
Messrs. Techs
Engineering
Associates

N112,937,829.59
24 Months

Ministry of Niger
Delta Affairs

09/11/11
12 Months

N115,663,821.44
18 Months

Ministry of Niger
Delta Affairs

N187,788,747.43

09/11/11
30 Months

TOTAL

N583,184,097.26

ITEM/SERVICE

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Ratification of the Presidents


Approval for the take over of the
18.7km Gbaregolor-Ogriagbene Road
in Bomadi LGA of Delta State from
the Delta State Government

Messrs. Setraco
(Nigeria)Limited

Ministry of Niger
Delta Affairs

N7,348,335,298.50

30/11/11

24 Months

S/N
4

N126,543,689.80

TOTAL

N257,284,612,647.91

20

MINISTRY OF PETROLEUM RESOURCES


S/N
1

ITEM/SERVICE
Award of Contract for the
Dismantling and Reconstruction of
Tank 13 and Rehabilitation of Tank
11, 12, & 22 at NNPC Depot, Mosimi

NAME OF
COMPANY
Messrs. Adano
Engineering Co.
(Nig.) Ltd.,

IMPLEMENTING
AGENCY
Ministry of
Petroleum
Resources

2
Award of Contract for the Execution
of the Outstanding Works for Gas
Supply to PHCN Power Plant,
Papalanto

Messrs. MORPOL
Engineering
Services
Limited/JAIHIND
Projects Ltd.,

Ministry of
Petroleum
Resources

Award of contract for the execution


of the outstanding works for gas
supply to PHCN Power Plant, Alaoji

Messrs. Oil serve


Limited

Ministry of
Petroleum
Resources

Award of contract for the


Messrs. Bouygues
construction of the NPDC Head Office
(Nigeria) Limited
Building at Oko Village, Benin City

Ministry of
Petroleum
Resources

COST

N3,904,635,594.84
N1,015,094,003.11
Plus
USD20,234,439.59
payable at the
prevailing exchange
rate at the time of
payment
Plus 5% VAT of
N202,512,997.10
N2,582,787,557.23
Plus
USD8,216,198.44
Equivalent to
N3,815,217,323.00
Plus
5% VAT of
N190,760,866.10

N14,196,623,377.35

USD28,450,638.03
N21,699,140,532.53

TOTAL

21

DATE

DURATION

30/11/11

20 Months

30/11/11

7 Months

21/12/11

7 Months

21/12/11

24 Months

MINISTRY OF POWER
1

AWARD OF CONTRACT FOR THE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION AND COMMISSIONING OF 2NO.
TRANSMISSION 330/132KV & 32/33KV SUB-STATIONS FOR THE TRANSMISSION COMPANY OF NIGERIA (TCN) PLC

S/N LOT
NO.

ii

Lot
201021

Lot
201022

PROJECT
DESCRIPTION

NAME OF
FIRM/CONTRACTOR

Design, Manufacture,
Supply, Installation
and Commissioning of
2x150MVA,330/132K
V Plus
2x60MVA,132/33KV
Messrs. Matelec
Sub-Station at Akure
ECL/S.A.L.
with TurnIn/Turn out
of One Circuit and
2x330KV Line Bay
Extensions at Osogbo
and Benin North Substations
Design, Manufacture,
Supply, Installation
Messrs. Matelec
and Commissioning of ECL/S.A.L.
2x150MVA,330/132K

IMPLEMENTING
COST
AGENCY

Ministry of
Power

Ministry of
Power
22

USD19,025,537.45
Plus
N1,573,779,429.43
payable at the
prevailing
exchange rate at
the time of
payment inclusive
of a provisional
sum of
N505,050,433.43
for 5% VAT on
onshore
payments,compen
sations and
Contingency
USD15,129,749.22
Plus
N1,267,800,811.75
payable at the

BUDGETARY
PROVISION

DATE

DURATION

10/08/11

24 Months

Provided in
2011
Appropriation

Provided in
2011
10/08/11
Appropriation

24 Months

V Plus
2x60MVA,132/33KV
Sub-Station at
Olorunsogo

prevailing
exchange rate at
the time of
payment inclusive
of a provisional
sum of
N377,182,637.80
for 5% VAT on
onshore
payments,compen
sations and
Contingency
USD34,155,286.67
Plus

N1,772,851,245.18

S/N

ITEM/SERVICE

Award of Contract for the Supply of


Aluminium Conductor Composite
Core Reinforced (ACCCR)

Revision of the Contract Sum for the


Provision of Project Management
Consultancy Service on the 3rd BeninOnitsha 330kv Double Circuit

NAME OF
COMPANY
Messrs.
Composite
Technology
Corporation
Messrs. Colenco
Power
Engineering Ltd.,

IMPLEMENTING
AGENCY
Ministry of Power

Ministry of Power

23

COST
USD1,627,464.00
Plus
N24,853,002.74
inclusive of 5% VAT
USD2,610,413.16
Plus
N204,452,067.90

DATE

DURATION

30/11/11

32 weeks

30/11/11

30th June,
2012

Transmission Line Project

S/N

AWARD OF CONTRACTS FOR THE PROVISION OF PROJECT MANAGEMENT CONSULTANCY SERVICE FOR 2010 HIGH VOLTAGE
TRANSMISSION LINE AND SUB-STATION PROJECTS FOR THE TRANSMISSION COMPANY OF NIGERIA (MINISTRY OF POWER)
COMPANY

PROJECT MANAGEMENT CONSULTANCY SERVICE


LOCATIONS

CONTRACT SUM

Messrs. Jiyoda
Engineering Ltd

Erukan-Omotosho 330kv DC Transmission Line


(132km) and Omotosho-Epe-Aja 330kv Double Circuit
(DC) Transmission Line (135km)

N281,869,932.31

Messrs. London
Power Associates
Ltd

USD1,463,293.68
Plus
N76,477,693.77

Messrs. Fichtner
Engineering/Metr
osource Nigeria
Ltd

Messrs. AFColenco/Colenco
Nigeria Ltd

2x150MVA, 330/132KV + 2x60MVA, 132/33KV


Substation at Omotosho, 2x150MVA, 330/132KV +
2X60MVA, 132/33KV Substation at olorunsogo,
4x330kv Line Bay Extension at Erunkan 330/132kv
Substation, 6x330kv Line Bay Extension at Omotosho
Substation and 2x330kv Line Bay Extension at Aja
330/132kv Substation
Benin North- Oshogbo 330kv DC Transmission Line
with one Single Circuit turning in and out to New
Akure (260km), 2x150MVA, 330/132KV + 2x60MVA,
132/33KV Substation at Akure, 2x330kv Line Bay
Extension at Benin North and Oshogbo 330/132kv
Substations
Kano-Katsina 330KV DC Transmission Line (180km),
2x150MVA, 330/132KV + 2x60MVA, 132/33KV
Substation at Katsina and 2x330kv line Bay Extension
24

USD1,455,789.00
Plus
N114,691,710.00

USD1,896,503.00
Plus
N110,376,420.00

DATE

30/11/11

COMPLETION
PERIOD

24 Months

+ 1x75 MVAr Reactor at Kano 330/132kv Substation

10

Messrs. GopaIntec
International/UE
SL
Messrs. Arcon
Engineers/Afcon
Offshore

Kaduna Power Plant-Mando Road 330kv DC


Transmission Line and 2x330kv Line Bay Extension at
Mando and Akwanga Lafia 132kv Transmission Line,
2x30/40MVA, 132/33kv Substation
Reinforcement with 1x150MVA, 330/132/33KV
Transformer each at Kano AND Birni-Kebbi and
Rehabilitation of Sokoto-Tlata Mafara 132kv Double
Circuit Transmission Line
Messrs. GopaExtension of Kainki 330kv Substation with 330kv
Intec
Single Circuit River Crossing and 1x150MVA, 330/132
International/UE
Substation at Kainji, and Kainji New Bussa 132kv DC
SL
Transmission Line, 2x30/40MVA, 132/33KV
Substation at New Bussa , and Reinforcement with
1x60MVA, 132/33KV Transformer each at Hadejia,
Katsina and Kontagora
Messrs. Trans
Ikeja West Ayobo 132kv DC Transmission Line with
Africa/Elens
associated 2x60MVA, 132/33KV Substation at Ayobo
Consult
and 2x60MVA, 132/33KV Substation at Odogunyan
and Ikorodu-Odogunyan Shagamu 132kv DC
Transmission Line
Messrs. Markcillio Onitsha-Oba-Nnewi-Ideato-Okigwe 132KV DC
Engineering and
Transmission Line, 2x60MVA, 132/33KV Substation at
Cobra 91 Limited Oba and 2x60MVA, 132/33KV at ideato

1,147,500.00
Plus
N49,279,545.00

Messrs. Energy
Giants Drn Ltd

USD1,226,188.16

New Abeokuta-Igbo Ora- Lanlate and Tee off from


Igbo Ora-Igangan, 132kv DC Transmission Lines
(110km), 2x60MVA, 132/33KV Substation at Lanlate,
2x60MVA, 132/33JV Substation at Igangan and 132kv
Switching Station at Igbo Ora
25

USD1,190,722.00
Plus
N86,580,821.25

30/11/11

24 Months

30/11/11

24 Months

1,053,425.00
Plus
N47,515,545.00

USD888,811.00
Plus
N131,628,210.00

691,470.00
Plus
N72,412,425.31

11

Messrs. Great
Northern
Industries and
Metanoya
Group/Enzani

12

Messrs. Amal
Engineering
Services Ltd

13

Messrs. FM
Chidez Ltd/GIT

14

Messrs. Pat-Sam
& Partners

15

Messrs. Yaroson
& Partners

1x30/40MVA, 132/33KV Substation at Kwanar Dogara


ant turn in and out of Zaria-Kano 132 132KV
Transmission line at Kwanar Dangora, 2x30/40MVA,
132/33kv Substation at Tamburawa Water Supply and
turn in and out of Zaria-Kano 132KV Transmission Line
at Tamburawa water Supply
Katsina-Dutsinma-Kankara-Malunfashi 132kv
Transmission Line (173km), 2x30/40MVA, 132/33kv
Substation at Kurfi, 2x30/40MVA,132/33KV
Substation at Dutsinma, 2x30/40MVA, 132/33KV
Substation at Kankara, 2x30/40MVA, 132/33KV
Substation at Malunfashi, 2x132kv Line Bay Extension
at Katsina 132/33kv Substation
Ganmo-Shongal 132kv DC Transmission Line (120km),
2x60MVA, 132/33KV Substation at Shongai, and
2x132kv Line bay Extension at Ganmo

USD939,449.00
Plus
N63,531,880.31

N209,481,557.88

USD888,856.92
Plus
N63,525,000.00

Owerri-Aboh Mbaise 132kv DC Transmission Line


N249,359,029.50
(26km), 2x60MVA, 132/33KV Substation at Aboh
Mbaise, 2x132kv Line Bay Extension at Owerri 132kv
Substation at Amasiri, 2x60MVA, 132/33KV
Substation at Afikpo, 2x132kv Line Bay Extension at
Nenwe 132/33kv Substation and 2x60MVA, 132/33KV
Substation at Mpu
5.5km 1323kv Underground Cable from Golf Course
N244,419,245.60
Asokoro to Central Area 132kv Substation and 4.4 km
132kv Overhead Line from Katampe 330kv Substation
to Golf Course Asokoro, 2x60MVA, 132/33KV
Substation at Kukwaba with 6x33kv Outgoing
Feeders, Daura-Dambatta 132kv DC Transmission Line
(60km), 2x30/40MVA, 132/33KV Substation at
Dambatta and 2x132kv Line Bay Extension at Daura
132/33kv Substation
26

30/11/11

24 Months

16

Messrs.
Oshogbo-Ede 132kv DC Transmission Line (15km),
Derekson/Teshmo 2x60MVA, 132/33KV Substation at Ede, 2X132KV Line
nt Ltd
Bay Extension at Oshogbo, 2x30/40MVA, 132
Substation at Efon Alaye and 2x132kv Line Bay
Extension at Oke Agbe

Project Description

ii

iii

30/11/11

24 Months

AWARD OF CONTRACTS FOR THE CONSTRUCTION OF TRANSMISSION LINES AND SUBSTATIONS FOR THE TRANSMISSION
COMPANY OF NIGERIA(TCN)

S/N

N253,053,399.48

Lot 2011 1
Engineering, design,
manufacture, Supply,
Construction and
Commissioning of the 235km
2nd Kaduna-Kano 330kv Double
Circuit Transmission Line
Lot 2011 2
Engineering, design,
manufacture, Procurement,
Supply, Construction and
Commissioning of the 150
km Delta-Portharcourt 330kv
Double Circuit Transmission
Line
Lot 2011-3
Abakaliki-Amasiri 132kv
Double Circuit Transmission
Line

Contractors

Implementing
Agency

Messrs. National
Power Construction
Corporation
Ministry of
Power/Transmiss
ion Company of
Nigeria (TCN)
Messrs. Icomm Tele
Ltd/PPP
International Ltd

Contract Sum

Date

Completion
Period

07/12/11

24 Months

07/12/11

24 Months

USD42,968,950.21
Payable at prevailing
rate at the time of
exchange
Plus
N4,154,133,631.19

USD27,079,493.25
Plus
N3,627,601,391.33

Ministry of
Messrs. Flour
USD6,044,617.26
Power/Transmiss
Engineering/Eurafric
Plus
ion Company of
Energy Ltd
N898,080,164.52
Nigeria (TCN)
27

iv

Lot 2011-4
Keffi-Kwoi-Kachia 132kv
Double Circuit Transmission
Line
Lot 2011-5
Ugwuaji-Nnenwe 132kv
Double Circuit Transmission
Line

vi
Lot 2011-6
132kv Double Circuit
Transmission Line Nnewi MBO
vii

viii

ix

Lot 2011 7
Engineering, design,
manufacture, Supply,
Construction and
Commissioning of the 50km
Omuaran -Egbe 330kv Double
Circuit Transmission Line
Lot 2011 8
Engineering, design,
manufacture, Procurement,
Supply, Construction and
Commissioning of the 90km
Obajana-Okeagbe 330kv
Double Circuit Transmission
Line
Lot 2011 9
Engineering, design,
manufacture, Supply,
Construction and

USD9,495,089.71
Plus
N1,587,493,882.99

Messrs. Aster
Infrastructures
Messrs.
Ashtavinayaka
Energy Infra Pvt
Ltd/Bran
Engineering Ltd
Messrs. Dorman
Long
Engineering/Genesis
/Power Projects Ltd
Nnenwe-Mpu

USD3,732,770.65
Plus
N511,793,146.63

USD2,858,534.87
Plus
N643,790,391.31

Messrs. Aravali Infra


Power
Limited/Alicon
Ventures Nig. Ltd

USD3,088,924.41
Plus
N621,321,904.69

Messrs. Everest Infra


USD7,743,804.84
Energy
Plus
Ltd/Dyehnum
Ministry of
N803,692,934.38
ventures Ltd
Power/Transmiss
ion Company of
Nigeria (TCN)
USD25,545,146.96
Messrs. Skipper
Plus
Electricals/Summit
N3,471,734,877.83
Energy
28

07/12/11

24 Months

xi

xii

xiii

xiv

Commissioning of the 180km


Yola-Song-Little Gombi-MubiGulak 330kv Double Circuit
Transmission Line
Lot 2011 10
Design, manufacture,
Supply,and Commissioning of
2x330kv Lines Bay Extension in
each of Kaduna (Mando) and
Kano( Kumbotso) 330/132kv
substation
Lot 2011-11
2x330kv Line bays extension in
each of Delta (Ughelli) and
portharcourt 330/132kv
substation
Lot 2011 13
Design, manufacture, Supply,
Construction and
Commissioning of 2x60MVA,
330/132kv substation at
Kachia
Lot 2011 16
Design, manufacture, Supply,
Commissioning of 2x60 MVA,
132/33kv substation at
Okeagbe and 2x132kv line
bays extension at Obajana
Lot 2011 17
Design, manufacture, Supply,
and Commissioning of
2x60MVA, 132/33kv
substation at Song and

Messrs. Exernegia
Power Africa Bigen

USD4,212,379.53
Plus
N500,823,961.92

Messrs. MBH Power


Ltd

USD4,401,074.24
Plus
N551,133,551.17

Messrs. Esterbag
Engineering Limited

USD6,031,516.62
Plus
N437,340,330.79

Messrs. Power
Contral &
Appliances

Ministry of
Power/Transmiss USD5,612,652.66
ion Company of
Plus
Nigeria (TCN)
N687,987,881.45

Messrs. Qingdao
Wuxio Grwa
Company ltd/Ahmin
Technology and
Power System

USD6,506,881.47
Plus
N676,045,227.30
29

07/12/11

24 Months

2x132kv Lines Bay Extension at


Yola
xv

xvi

xvii

S/N
6

Lot 2011 18
Design, manufacture, Supply,
and Commissioning of
2x60MVA, 132/33kv
substation at Little Gombi
Lot 2011 19
Design, manufacture, Supply,
and Commissioning of
2x60MVA, 132/33kv
substation at Mubi
Lot 2011-20
2X60MVA, 132/33kv
substation at Gulak

USD4,852,409.00
Plus
N711,474,893.72

Messrs. Shandong
Taikai

Messrs.
Hyundi/Richfield

USD5,534,586.81
Plus
N574,978,088.57

Concepts
Engineering Pvt
India/Chanref (Nig)
Ltd

ITEM/SERVICE
Revision of the Contract Sum for the
Rehabilitation of Makeri-Pankshin
132kv single circuit transmission line
project

NAME OF
COMPANY
Messrs. Mogabs
(Nigeria) Ltd

USD5,333,749.93
Plus
N1,044,144,867.47

IMPLEMENTING
AGENCY
Ministry of Power

COST
Revised Contract
Sum
USD2,390,900.00
payable at the
prevailing
exchange rate at
the time of
payment
Plus

30

DATE
14/03/2012

DURATION
10 Months

N235,785,213.25

Award of Contract for the design,


manufacture and supply of 10No.
Mobile Transformer Oil filtration
Machines

Messrs. Globe
Core Ltd.

Ministry of Power

673,781.49

14/03/2012

6 Months

payable at the
prevailing
exchange rate at
the time of
payment
Plus
N17,905,155.68
inclusive of port
clearance and
delivery to
Transmission
Company of
Nigeria Plc stores
at Ojo, Lagos

8
AWARD OF CONTRACTS FOR THE CONSTRUCTION OF 5NOs. SUB-STATIONS FOR THE TRANSMISSION COMPANY OF NIGERIA (TCN) PLC
S/N
PROJECT SCOPE

COMPANY

CONTRACT SUM

31

IMPLEMENTING
AGENCY

DATE

COMPLETION
PERIOD

Lot 2011-12
Engineering, Manufacture, Supply,
Construction and Commissioning of
2x60MVA, 132/33KV Substation at
Kwoi and 2x132KV line Bays
extension at Keffi
Lot 2011-14
Engineering, Manufacture, Supply,
Construction and Commissioning of
2x60MVA, 132/33KV Substation at
Nnenwe and 2x132KV line Bays
extension at Ugwuaji
Lot 2011-125
Engineering, Manufacture,
Procurement, Supply, Construction
and Commissioning of 2x60MVA,
132/33KV Substation at Egbe and
2x132KV line Bays extension at
Omuaran
Lot 2011-33
Engineering, Manufacture,
Procurement, Supply, Construction
and Commissioning of 2x60MVA,
132/33KV Substation at Ose LGA
Headquarters and 2x132KV line
Bays extension at Okeagbe
Lot 2011-34
Engineering, Manufacture,
Procurement, Supply, Construction
and Commissioning of 2x60MVA,
132/33KV Substation at Gagarawa,
Jigawa State

Messrs. Liaoning
Efacec Electrical
Equipment Co.

Messrs. Metro
Elektrik

USD5,739,384.54
Plus
N694,464,562.83

USD5,955,066.60
Plus
N825,826,590.01

Messrs. TBEAHenyang

Ministry of
Power/
Transmission
Company of
Nigeria (TCN)

14/03/2012

24 Months

14/03/2012

24 Months

USD5,634,240.14
Plus
N740,273,654.32

Messrs. Junot
Engineering
Services Ltd

Messrs. Power
Control &
Appliances Ltd

5,148,815.00
Plus
N779,567,357.90

USD4,071,959.14
Plus
N635,653,940.81

32

Ministry of
Power/
Transmission
Company of
Nigeria (TCN)

S/N
9

ITEM/SERVICE

NAME OF
COMPANY

Award of Contract for the


Messrs. KEC
completion and commissioning International
of the Umuahia-Ohafia,
Limited
Umuahia-Mbalano and OhafiaArochukwu 132kv Single
Circuit Transmission Lines for
the Transmission Company of
Nigeria Plc (TCN)

IMPLEMENTING
AGENCY
Ministry of
Power/TCN

TOTAL

COST

DATE

USD7,564,756.88
28/03/12
Payable at prevailing
exchange rate
Plus
N1,007,539,148.49
inclusive of a
provisional sum of
N379,143,721.26 for
5% VAT, 10%
Contingency sum
and 2.5% for Right
of Way
Compensation
USD250,741,666.31

DURATION
18 Months

8,714,991.49
N31,565,674,477.78
MINISTRY OF TRADE AND INVESTMENT
APPROVAL OF THE SUM OF N15,000,000,000.00 (FIFTEEN BILLION NAIRA) TO THE FGN-ASSISTED PUBLIC MASS TRANSIT REVOLVING FUND
(PMTF) SHEME FOR ONWARD LENDING TO ELIGIBLE AND CREDIBLE TRANSPORT OPERATORS ACROSS THE COUNTRY UNDER PHASE II OF
THE FEDERAL GOVERNMENT OF NIGERIA ASSISTED PUBLIC MASS TRANSIT REVOLVING FUND (PMTF)
Total Cost (N)
Transport
Unit Price
Unit Price (BPP
Mass Transit
Capacity
Qty
S/N
Operator
(Initial N)
Recommended N)

33

Toyota Coaster (Petrol) 30

80

12,500,000.00

11,875,000.00

950,000,000.00

Toyota Coaster (Diesel) 30

20

13,600,000.00

12,920,000.00

258,400,000.00

Elizade Motors

Sub-total 1,208,400,000.00
655,500,000.00
Innoson IVM660A

Innoson Vehicle
Manufacturing
Co. Ltd

26

100

6,900,000.00

6,555,000.00
418,000,000.00

Innoson IVM6800

35

50

8,800,000.00

8,360,000.00

Innoson IVM660A

98 (48
standing)

19,000,000.00

18,050,000.00

Sub-total
3

Viramsum
Motors

VON Auto Nig.


Ltd.

Tata

Asok Leyland

59

42

200

240

13,000,000.00

13,000,000.00

34

1,073,500,000.00

12,350,000.00

2,470,000,000.00

Sub-total

2,470,000,000.00

12,350,000.00

2,964,000,000.00

Sub-total

2,964,000,000.00

Barbedos Motors
Mercedes
Ltd

50

50

40,000,000.00

38,000,000.00

Sub-total

1,900,000,000.00

Yutong (City Bus)

40

100

13,017,600.00

12,366,720.00

1,236,672,000.00

Yutong (Coach)

59

50

19,161,600.00

18,203,520.00

910,176,000.00

Yutong Hong
Kong Ltd

Sub-total
7
Hyundai Super C

Globe Motors Ltd Hyundai Super Aero

Hyundai Luxury

Anambra Motor
Manufacturing
Co. Ltd

2,146,848,000.00
2,552,901,750.00

38 (8
standing)

300

8,957,550.00

8,509,672.50

64 (14
standing)

17,824,375.00

16,933,156.25

84,665,781.25

71 (21
standing)

26,398,125.00

25,078,218.75

125,391,093.75

Sub-total

1,900,000,000.00

2,762,958,625.00

Anamco (Marcopolo)

52

31,275,000.00

29,711,250.00

148,556,250.00

Anamco (Mascarello)

27

11,902,500.00

11,307,375.00

56,536,875.00

35

Sub-total

Leyland Nig. Ltd

205,093,125.00

Leyland Busan (City


Bus)

38 (21
standing)

10

9,916,830.00

9,420,988.50

94,209,885.00

Leyland Busan
Coastliner

30

20

7,770,000.00

7,381,500.00

147,630,000.00

Sub-total

1,240

GRAND TOTAL

241,839,885.00

14,972,639,635.00

FEDERAL MINISTRY OF TRANSPORT


S/N
ITEM/SERVICE
1

Award of Contract for


the Fast Tracking of
the Development of
the Phase 4 Port
Facilities, at Onne
Port Complex, for
NPA / Ministry of
Transport (MT)
Award of Contracts
for the construction
of Yenagoa Jetty and
Terminal Facilities at

NAME OF COMPANY

IMPLEMENTING
AGENCY

Messrs. Intels (Nig.)


Ltd.

Ministry of
Transport

Messrs. Combined
Building Services
Limited

National Inland
Waterways
Authority/Minis
try of Transport. N1,311,636,134.50

COST

USD370,481,720.42

36

DATE

26/10/11

26/10/11

DURATION

40 Months

Yenagoa, Bayelsa
State for National
Inland Waterways
Authority/Ministry of
Transport.
3.0

3.1

3.2

3.3

3.4

3.5

14 Months

REQUEST FOR THE REVISION OF THE ESTIMATED TOTAL COST (RETC) FOR THE DREDGING OF LOWER RIVER NIGER FROM
WARRI IN DELTA STATE TO BARO IN NIGER STATE (LOTS 1-5)
Warri to Bifurcation
of Forcados and River
Nun = 154km
Warri to Bifurcation
of Forcados and River
Nun to Onitsha
=116km

Messrs Fung Tai (Nig.)


Ltd.

N6,069,422,355.00

2 Years

N5,363,766,897.55
Messrs Dredging Int.
Ltd.

Onitsha to Idah =
118km

Messrs Van Oord


(Nig.) Ltd.

Idah to Jamata =
108km

Messrs Van Oord


(Nig.) Ltd.

Jamata to Baro =
76km

Messrs William Llyods


Tech. Co. Ltd.

Ministry of
Transport/NIWA

N10,399,867,317.00

2/11/11

N13,806,242,793.00

N7,695,412,970.00

N43,334,712,332.55
TOTAL
4

572KM

Re-Development of
the Port Facilities at
Bullnose, Lagos Port
Complex, Apapa

USD124,400,000.00
Messrs Eko Support
Services Limited

Ministry of
Transport/NPA
37

Lease Period
of 20 years

S/N
5

ITEM/SERVICE

NAME OF
COMPANY

Award of Contract for the ReConstruction of Apapa Dual


Carriageway within Apapa
Quays, Lagos
Augmentation of the Contract
for the Rehabilitation of TinCan
Island Port (Quay Wall and
Quay Apron)

Messrs. Sanju
Sunny (Nigeria)
Limited

Award of Contract for the


Design, Supply, Installation and
Commissioning of New
Signalling and Communication
Solutions for the Eastern Line
including 2 Branch Lines for the
Ministry of Transport and
Nigeria Railway Corporation
(NRC)
Award of Contract for the
Supply of Fire and Salvage
Equipment for the Ministry of
Transport/NPA

Messrs. A3 &
O/ANSALDO
Limited

9
Augmentation of the contract
sum for the Rehabilitation of
Lagos Harbour Moles

Messrs. Johnak
Engineering
Limited

IMPLEMENTING
AGENCY
Nigerian Ports
Authority /Ministry
of Transport
Nigerian Ports
Authority(NPA)/
Ministry of
Transport

COST

Messrs. China Civil


Engineering and
Construction
Corporation
(CCECC) Ltd

DURATION

N2,113,656,976.26

09/11/11

12 Months

N3,642,611,404.44
inclusive of all taxes

16/11/11

12 Months

30/11/11

14 Months

30/11/11

4 weeks

07/12/11

21 Months

N5,616,459,436.22

Ministry of
Transport/NRC

Messrs. Jagsul
(Nigeria) Limited

DATE

N136,500,000.00

Ministry of
Transport/ NPA

Ministry of
Transport/Nigeria
Ports Authority

38

Revised Estimated
Total Cost
N20,035,710,566.72

10

11

Award of contract for the ReConstruction of 1.6km Dual


Carraigeway within Apapa
Quays, Lagos
Award of Contract for the
Procurement of 2No. Fast
Moving Passenger Ferries
(Catamaran) by the National
Inland Waterways (NIWA)

12
Award of Contract for the
Strategic Concessioning
Partnership with NIMASA to
provide Platforms for tracking
Ships and Cargoes,
enforcement of Regulatory
Compliance and Surveillance of
the entire Nigerian Maritime
Domain
13

14

Augmentation of the Contract


for the Rehabilitation of
Onitsha Port Complex and
Installation of Cargo Handling
Equipment for Ministry of
Transport/National Inland
Waterways Authority (NIWA)
Award of Contract for the
Rehabilitation of Julius Berger
Terminal C at Old Port, Warri,
Delta State for the Ministry of
Transport and Nigerian Ports
Authority

Messrs. P.W.
(Nigeria) Limited

Messrs. Karflex
Fisheries Limited

Messrs. Global
West Vessel
Specialist Nigeria
Limited (GWVSL)

Messrs. InterBau
Construction
Limited

Messrs. Julius
Berger Nigeria Plc

N3,000,819,175.42

Ministry of
Transport

Ministry of
Transport/ NIWA

Federal Ministry of
Transport/Nigerian
Maritime
Administration and
Safety Agency
(NIMASA)

N168,455,700.00
inclusive of all
taxes

Initial Investment of
the sum of
USD103,400,000.
00 inclusive of all
taxes on a
Contractorfinanced Supply,
Operate and
Transfer
Concession

21/12/11

18 Months

25/01/12

6 Months

01/02/12

10 years and
renewable for
further two
terms of 5
years and no
more

Ministry of
Transport/National
Inland Waterways
Authority (NIWA)

N483,512,696.26

15/02/12

Extended
Completion
period of 3
Months

Ministry of

N9,406,510,158.05

29/02/2012

25 Months

Transport/Nigeria
Ports Authority

39

15

16

Award of Contract for the


provision of Consultancy
Services for the Study and
Design of Yola-Makurdi
Navigational Route Lot 2
Award of Contract for the
Rehabilitation of AMS Terminal
B at Old Port, Warri, Delta
State

20 Months

Messrs. Enviplan
International
Limited

14/03/2012
Ministry of
N221,036,330.00
Transport/ National inclusive of all taxes
Inland Waterways
Authority

Messrs. China
Harbour
Engineering
Company Limited

Ministry of
N7,022,310,942.78 14/03/2012
Transport/ Nigerian inclusive of all taxes
Ports Authority

9 Months

TOTAL

USD598,281,720.42
N96,493,931,853.20

FEDERAL MINISTRY OF WATER RESOURCES


S/N

PROJECT DESCRIPTION

NAME OF
FIRM/CONTRACTOR

Award of Contract for the


rehabilitation and expansion
of Ogbia Central Water Supply
Scheme

Messrs. NAIRDA
Limited

IMPLEMENTING
AGENCY

DATE

DURATION

17/08/11

18 Months

Ministry of Water
Resources

N4,522,864,505.00
Revised Contract
Sum
From
N1,536,802,608.00
To
N2,055,444,192.75

14/09/11

N2,911,284,239.73

07/12/11

COST

Augmentation of Contract
Sum for the Construction of
Agaie/Lapai Earth Dam in
Niger State.

Messrs. Infiouest
International Ltd.

Ministry of Water
Resources
/UNRBDA

Award of contract for the


completion of Nkari Dam
Project in Akwa Ibom State

Messrs. A.G Vision

Ministry of Water
Resources

40

3 Months

24 Months

Augmentation of contract for


the construction of Ogbese
Multi-purpose Dam Project in
Ekiti State
Award of contract for the
repairs to the Goronyo Dam
emergency spillway
Award of contract for the
Construction of Ogwashi-Uku
Multipurpose Earth Dam
Phase II

Messrs. Foundation
Solid (Nigeria)
Limited

Ministry of Water
Resources

N7,802,436,568.66

07/12/11

36 Months

Messrs. Gilmor
Engineering (Nig)
Limited

Ministry of Water
Resources

N3,882,146,985.99

07/12/11

8 Months

Messrs. Nelson
Benjamin Limited

Ministry of Water
Resources

N3,615,323,794.01

07/12/11

24 Months

DATE

DURATION

17/08/11

24 Months

N24,789,500,286.14

TOTAL

FEDERAL MINISTRY OF WORKS


S/N
PROJECT DESCRIPTION
1

NAME OF
FIRM/CONTRACTOR

Award of Contract for the


Reinstatement of washout and
completion of the
Messrs. Mothercat
rehabilitation of Sokoto Illela
Limited
road including repairs of
Usman Danfodiyo University
Road in Sokoto State

IMPLEMENTING
AGENCY

Ministry of Works

41

COST

N2,256,354,874.62

AWARD OF SEVEN (7) CONTRACTS FOR THE CONSTRUCTION AND REHABILITATION OF ROADS SPREAD IN FOUR (4) GEOPOLITICAL ZONES OF THE COUNTRY( SOUTH WEST, SOUTH EAST, SOUTH SOUTH & NORTH EAST)

S/N
PROJECT DESCRIPTION
i

Rehabilitation of Ijebu Igbo-Olomi


(Oyo State Border) Road in Ogun
State

NAME OF
IMPLEMENTING
FIRM/CONTRACTOR
AGENCY
Messrs. A.A Duhu &
Sons Limited

Ministry of
Works

COST

DATE

N1,381,556,046.26

DURATION
13 Months

17/08/11

ii

Rehabilitation of Ondo-Ore Road


in Ondo State

Messrs. Chrisbrown
International
Limited

Ministry of
Works

N1,799,786,661.75

9 Months

Iii

Rehabilitation of Odo-Oba-TakieGambari-Otte Oyo State Border


Along Ibadan-Oyo-OgbomoshoIlorin Road 45.3km (Route 20) in
Oyo State
Reconstruction/Rehabilitation of
Gbongan-Owo-Oyo road in Oyo
State

Messrs. Coduc
(Nigeria) Limited

Ministry of
Works

N2,136,669,265.50

9 Months

Messrs. Kopek
Construction
Limited

Ministry of
Works

N6,917,558,164.42

18 Months

Rehabilitation of Spur from


Onitsha-Owerri Road To OkijaIhembosi-Afor Ukpor-EbenatorEzinifite in Nnewi South LGA in
Anambra State

Messrs. Fodiac
Engineering Co. Ltd

Ministry of
Works

N1,786,546,349.60

9 Months

Iv

17/08/11

42

Vi

Construction of 15 km Inter-State
Road from Aivegunle, Okoko Edo
LGA in Edo State

Messrs. Fame
Highway Company
Limited

Ministry of
Works

N1,428,007,350.00

12 Months

Vii

Construction of Jalingo-Kuna-Lau
Road in Taraba State Section II

Messrs. Amitech
Interglobal
Engineering Limited

Ministry of
Works

N1,430,875,575.94

16 Months

AUGMENTATION OF CONTRACTS FOR THE DUALISATION OF ABUJA-ABAJI-LOKOJA ROAD SECTIONS I&II IN THE
FEDERAL CAPITAL TERRITORY

S/N
PROJECT DESCRIPTION
i

ii

Augmentation of Contract No. 5862


for the Dualisation Abuja-Abaji
Section I (International Airport Link
Road Junction to Sheda Village
Junction)
Augmentation of Contract No. 5863
for the Dualisation Abuja-Abaji
Section II (Sheda Village Junction to
Abaji)

NAME OF
IMPLEMENTING
FIRM/CONTRACTOR
AGENCY
Messrs. Dantata and
Sawoe Construction
Company (Nigeria)
Limited
Ministry of
Works
Messrs. RCC
(Nigeria) Limited

COST

DURATION

Reviewed Contract
Sum
N28, 666, 721,831.64
Reviewed Contract
Sum
N31, 236, 905,170.83

43

DATE

28/09/11

24 to 30
Months

S/N
ITEM/SERVICE
4

S/N
6a

6b

Award of contract for the for


the Construction of the
Oju/Loko-Oweto Bridge (Phase
1) to link Oju/Loko to Oweto in
Nassarawa/Benue States along
Traffic Route F238
Award of Contracts for Repairs
of Third Mainland Bridge, Phase
II Additional Works involving
the Repairs of 8No. Expansion
Joints to Eliminate noticed
Super-Structure Sources of
Stresses on the already
Compromised Foundation
Structures of the Bridge in
Lagos

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Messrs.
Reynolds
Constructio
n Company
Ltd.

Ministry of Works

N36,118,910,405.94

19/10/11

48 Months

Messrs.
Ministry of Works
Borini
Prono
Constructio
n Co. Ltd.,

N1,055,447,608.16

23/11/11

9 Months

COMPLETION OF CONTRACT NOS. 5884 AND 5885 FOR THE DUALISATION OF ABUJA-ABAJI-LOKOJA ROAD SECTION III (ABAJI KOTON
KARFE) AND SECTION IV (KOTON KARFE LOKOJA) REVISION AND AUGMENTATION FOR REVISED SCOPE OF WORKS, ADDITIONAL WORKS
AND VARIATION

ITEM/SERVICE
Completion of Contract No.
5884 for the Dualization of
Abuja-Abaji-Lokoja Road
Section III (Abaji Koton Karfe)
Completion of Contract No.
5885 for the Dualisation of
Abuja Abaji Lokoja Road
Section IV (Koton Karfe

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

Ministry of Works

23/11/11

Messrs. Bulletine
Construction
Company Limited

N25,827,333,686.52

Messrs. Gitto
Construzioni
Generalli Nigeria
Limited

N31,087,756,036.84

44

DATE

23/11/11

DURATION
24 Months

Lokoja)

S/N
7

ITEM/SERVICE
Award of contract for
additional works to address
the gully erosion at Chainages
9+700 and 11+400 be
executed on the contract for
the Rehabilitation of Onitsha
Enugu Dual Carriageway
Section II; Anambra State
Border Enugu Road
Augmentation of contract for
the Rehabilitation of ObiozoraUburu-Mpu-IshiaguPortharcourt Expressway Road

NAME OF
COMPANY

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Messrs. CCC
(Nigeria) Limited

Ministry of Works

N710,135,133.75

07/12/11

24 Months

Messrs. Setraco
(Nigeria)Limited

Ministry of Works

N8,367,343,094.25

07/12/11

12 Months

TOTAL

N122,304,280,253.55

45

PRESIDENCY
S/N
PROJECT DESCRIPTION
1

Award of contract for the


extension of the services of
the National Management
Consultants (NMC) for the
management of the
warehouses in the 6 Geopolitical zones

NAME OF
FIRM/CONTRACTOR
Messrs. ETAT
Consulting Limited

IMPLEMENTING
AGENCY
Presidency

TOTAL

COST
N115,857,000.00

DATE
30/11/11

DURATION
9 Months
(from 1st April,
2011

N115,857,000.00

OFFICE OF THE SECRETARY TO THE GOVERNMENT OF THE FEDERATION (OSGF)


S/N
PROJECT DESCRIPTION
1

Award of Contract for the


reclamation works at the site
of the Federal University of
Technology, Otuoke, Bayelsa
State

NAME OF
FIRM/CONTRACTOR
Messrs. Azikel
Dredging and
Construction

IMPLEMENTING
AGENCY
Presidency/OSGF

TOTAL

COST
N4,997,862843.75

N4,997,862843.75

46

DATE
07/09/11

DURATION
7 Months

POLICE SERVICE COMMISSION


S/N
1

NAME OF
COMPANY

ITEM/SERVICE
Award of contract for the
construction OF Police Service
Commission Corporate Head
Office Building, Abuja

IMPLEMENTING
AGENCY

Messrs. Vita
Presidency/Police
Construction Nigeria Service
Ltd
Commission

TOTAL

COST

N3,486,867,519.53

DATE

07/12/11

DURATION

15 Months

N3,486,867,519.53

NIGERIA EXTRACTIVE INDUSTRY TRANSPARENCY INITIATIVE (NEITI)


S/N
1a

1b

ITEM/SERVICE
Award of Contract for the
conduct of Oil and Gas Industry
Audit (2009 to 2011)
Award of contract for the
conduct of Solid Minerals
Industry Audit (2009 t0 2010)

NAME OF
COMPANY
Messrs Sada Idris
& Co.

IMPLEMENTING
AGENCY

COST

DATE

DURATION

N226,613,000.00
Presidency/NEITI

Messrs Haruna
Yahaya & Co.

18/01/12
N137,000,000.00

TOTAL

N363,613,000.00

47

9 Months

INDEPENDENT NATIONAL ELECTORAL COMMISSION(INEC)


S/N
1

NAME OF
COMPANY

ITEM/SERVICE
Award of Contract for the
printing of forty (40) Million
Permanent Voters Cards

Messrs ACT
Technologies
Limited

TOTAL

IMPLEMENTING
AGENCY

COST

Independent
N2,600,000,000.00
National Electoral at the rate of
Commission (INEC) N65.00 per Card
N2,600,000,000.00

DATE

11/04/12

DURATION

7 Months

NATIONAL EMERGENCY MANAGEMENT COMMISSION (NEMA)


S/N
PROJECT DESCRIPTION
1

Award of Contract for the


procurement of 23No.
Mobile Intensive Care
Ambulances for the
National Emergency
Management Agency
(NEMA)
Award of Contract for the
Procurement of 1No. Bell
429 DPIFR EMS
Configuration with Special
Equipment and Bell
Standard Installed Kits,
Avionics, Specialized

NAME OF
FIRM/CONTRACTOR

IMPLEMENTING
AGENCY

COST

DATE

DURATION

Messrs. Longevity
Services Limited

Presidency/NEMA

N667,000,000.00 at 17/08/11
N29,000,000.00
each unit

5 Months

Messrs. Sea jewel


Energy Limited

Presidency/NEMA

USD9,594,603.17
Plus
N508,394,035.50

8 Months

48

30/11/11

Equipment, Accessories
and Spare Parts and
Emergency Medical Service
Configuration
TOTAL

USD9,594,603.17
N1,175,394,035.50

MILLENNIUM DEVELOPMENT GOALS (MDGs)


S/N

S/N

PROJECT DESCRIPTION

NAME OF
FIRM/CONTRACTOR

Award of Contract for the


completion of Otuoke
Hospital in Bayelsa State

Messrs. Avandale
Services Limited

IMPLEMENTING
AGENCY
Presidency/MDGs

COST

N2,835,746,571.75

DATE

DURATION

17/08/11

12 Months

AWARD OF CONTRACTS FOR THE SUPPLY OF PROJECT VEHICLES FOR TECHNICAL ASSISTANTS FOR THE 113 LOCAL
GOVERNMENTS MDGs CONDITIONAL GRANTS SCHEME SCALE-UP
PROJECT
DESCRIPTION

NAME OF
FIRM/CONTRACTOR

IMPLEMENTING
AGENCY

COST

49

ZONE/REGION

QTY

DATE

DURATION

Toyota Hilum
(Tropicalised), 2.7
Eng. Capacity,
Shell Spec
Toyota Hilum
(Tropicalised), 2.7
Eng. Capacity,
Shell Spec
Toyota Hilum
(Tropicalised), 2.7
Eng. Capacity,
Shell Spec
Toyota Hilum
(Tropicalised), 2.7
Eng. Capacity,
Shell Spec
Toyota Hilum
(Tropicalised), 2.7
Eng. Capacity,
Shell Spec

Messrs Elizade (Nig)


Ltd

N128,417,625.00

North Central

23

Messrs. Elizade (Nig)


Ltd

N128,340,000.00

North West

23

Presidency/MDGs
Messrs. Ivory-Link
International (Nig)
ltd

N118,800,000.00

South West

20

Messrs. R.T Briscoe


(Nig) Ltd

N106,115,000.00

South South

19

Messrs.
Development
Management
System System Ltd

17/08/11

2 Weeks

17/08/11

2 Weeks

North East
N106,305,000.00

19

Presidency/MDGs

Grand Total

N580,977,625.00

S/N

PROJECT DESCRIPTION

NAME OF
IMPLEMENTING
FIRM/CONTRACTOR AGENCY

Award of Contract for the


Extension of the Services of the
National Management Consultants

Messrs. ETAT
Consulting Limited

104

COST

Presidency/ OSSAP- N248,004,847.24


MDGs

50

DATE

DURATION

30/11/11

9 Months
(from 1st
April, 2011)

(NMC) for the Completion of


Quickwins 2008/2009 Projects
TOTAL

N3,664,729,043.99

NIGER DELTA DEVELOPMENT COMMISSION (NDDC)


1

S/N
1

Award of Contracts for Forty-Five (45) Infrastructural Development Projects in Nine (9) States of the Niger Delta Region (NDDC)

PROJECT DESCRIPTION

SCOPE

15.37km Road, asphaltic


concrete surface, culverts and
lined drains
28.5km asphaltic concrete
Construction of Ikot
carriageway, 40m long bridge of
Ekwere Ndukpoise Road 2x20m spans, 11.0m wide, ring
culverts RC offshoot drains
28km + 85 Bridge, ring and box
culverts, RC offshoot drains,
Construction of Mkpot
asphaltic concrete way, span
Okoroba Ekang Road
deck on pile and 85m bridge
works
Construction of Bulo
9.47km shore protection works,
Ndoro Shore Protection dredging of sharp sand to fill the
works
entire area, fixing of geotextile
Construction of Ihie
Ukwu Road Network

STATE/
LOCATION

NAME OF
CONTRACTOR

BPP REVIEWED
PROJECT COST

COMPLETI
ON
PERIOD

Abia State

Oneplus
Holding Nig.
Ltd

N1,967,699,553.75

72 Dry
weeks

Nsit Ubuim
LGA, Akwa
Ibom State

Ewobros &
Company Nig.
Ltd

N3,128,468,773.50

120 Dry
weeks

Cross Rivers
State

John Davis
Construction
Ltd.

N7,679,353,819.73

104 Dry
weeks

Delta State

Cawa Marine &


N6,178,174,054.53
Oil Services Ltd

51

72 Dry
weeks

materials

Construction of Oloa
Ossissa AtuOkpaiOsume-Alala Uno Road
and Bridge

6
Construction of Oboro
Shore Protection Works
7

Construction of St
Saviour and other
adjoining streets
Construction of Assa
Ubrielem Okwu Abasiri
River Umuoka
Umuokabia Road

9
Construction of Shore
Protection and
sandfilling of Ataba to
Aba-Ijong

10

Construction of
Asukoyet Ikuku
Asukama Road and
Bridge

15km of asphaltic concrete


carriageway concrete
carriageway, 120m bridge, ring
and box culvert, 3,500m of
rectangular concrete line drain
RENO matters revetment,
concrete landing apron,
installation of concrete sheet
piles
13.3km earth work, 13.3km
asphaltic concrete carriageway,
ring and box culverts RC drains,
stone base filling
9.5km + 200m bridge Ring and
boxculverts, RC offshoot drains,
Asphaltic concrete carriageway,
span deck on pile and bridge
works
Supply and placement of rockfilled PVC coated Renomattress,
placement of geotextile filter
fabric, concrete beam with
reinforcement and shuttering,
corrosion treatment of U
channel and other metal
accessories
Site clearing and earth works,
ring and box culverts, RC
offshoot drains, asphaltic
concrete concrete carriageway,

Delta State

Inter-Bau
Construction
Nig. Ltd

N3,997,940,111.46

130 Dry
weeks

Delta State

Osmoserve
Global Ltd

N2,816,589,905.05

116 Dry
weeks

Edo State

Deastern Elec.
& Mech Eng
Services

N3,174,362,343.60

86 Dry
weeks

Imo State

FEW Western
Energy Ltd

N4,149,264,426.44

72 Dry
weeks

Rivers State

Atafranc Nig.
Ltd.

N9,996,134,955.95

104 Dry
weeks

Andoni LGA,
Rivers State

Zcubes Nig Ltd

N3,606,805,509.55

72 weeks

52

span deck on pile, bridge work

11

12

13

14

15

16

17

Site clearing and earth works,


ring and box culverts, RC
Construction of Borokiri
offshoot drains, asphaltic
Okirika Road and Bridge
concrete concrete carriageway,
span deck on pile, bridge work
3 HA Sandfilling + 1.651km
shore line, tree planting
construction of Perimeter
Sandfilling and shore
containment bund wall,
Protection of Iko town
Dewatering, pumping sumps
and temporary drain, pre dredge
and post dredge
Dredging including construction
of 9, 013m bund wall/berm,
Construction of Burutu
reclamation works including
Reclamation Works
sand filling to a height of
10.416m
Construction of
25km of asphaltic concrete
Obianuku Ogume Road carriageway, 3No bridges of
with bridge
various spans, drain and culverts
Construction of Ojobo
Shore protection works

Includes Sheet pilling works,


4,400m

Construction of inter
town connection
connecting itc line
linking thirteen villages
Construction of
Obukofia ring road
Egbema

Clearing of 61.3km HT line, HT


overhead materials, transformer
substation materials, connection
of 132kv Transformers
27.49km of asphaltic concrete
carriageway, single cell culverts:
90mm 2Nos, 1200mm 3Nos,

Rivers

Zerock
Construction
Ltd

N16,787,393,981.88

130 Dry
weeks

Eastern
Obolo LGA,
Akwa Ibom
State

Hydrodram
Nig. Ltd

N2,220,469,674.08

78 Dry
weeks

Delta State

Hingla
Integrated
Concept Ltd

N6,554,429,788.98

104 Dry
weeks

Delta State

Mphasis
Fulcrum Ltd

N5,248,122,738.08

134 Dry
weeks

Delta State

Interfaze
Global Services
Ltd

N5,499,079,996.58

Edo

Fiphs Invest Ltd N2,981,407,434.32

160 Dry
weeks

Ohaji/Egbem
a LGA, Imo
State

O.K Isokariri 7
Sons Nig Ltd

72 Dry
weeks

53

N2,667,805,051.38

18

Construction of Ikot
Isong-Ekpene ObomNdon Eyo-Nya Odiong
Road

19
Otuan Erosin Control
Project
20

Construction of
Nigerian Army Jetty

21
Construction of Erema
Ring Road

reinforced concrete side drain5200 meters, reinforced


concrete side drain -5200
meters, reinforced concrete
external 3x2x1.5m trapezoidal
drains- 1000meters, 2000m
precast concrete kerbs along the
edges of the road
14.7km of asphaltic concrete
carriageway, 175m bridges of
various spans, ring and box
culverts, 18,000 of RC side
drains
Sand filling of embankment8733m3, Geotextile covering,
PVC coated galvanized
Renomattress, 1No Landing
aporon
Sheet pilling works, concrete
jetty, slip way, asphaltic
concrete way, buildings to serve
as workshop/warehouse,
cafeteria, base clinic, 2 nr Guest
house, fire station, 2 admin
blocks, 4 nr security watch
towers, fule dump, helipad,
parade ground, fencing water
supply and fire fighting
installation
18.919km of asphaltic Concrete
carriageway, 5No. single cell
culverts, 5 double cell boxes
culverts, crush stone base

Akwa Ibom
State

ET-Dicks Nig
Ltd

N3,377,567,117.76

156 Dry
weeks

Bayelsa State

Neoman
International
Ventures Ltd

N2,622,046,533.75

72 Dry
weeks

Delta

Simoka Marine
Ltd

N4,731,900,048.33

104 Dry
weeks

Rivers

Ahiahu Cost &


Co Ltd

N3,409,156,163.06

76 Dry
weeks

54

course 150mm thick and


37,838m lined drains
22

23

Emergency shore
protection

Okrika LGA,
Rivers State

Roudo Nig. Ltd

N11,151,432,936.00

46.5km

Edo State

Japul Mines &


Product Ltd

N6,062,172,454.15

86 Dry
weeks

Emergency shore
protection & Land
reclamation

Reclamation 1,124,600m2
Sandfilling 4,413m, Landing
Aprons 8no

Itak Abasi,
Okutitak &
Akputuwa,
Akwa Ibom
State

Zement &
Zement Nig.
Ltd

N7,322,249,908.34

24 Months

Construction of
330/132/33kv
Transmission Substation
at Ikot Ekpene and
Associated
Transmission Lines
Construction of
Ogoloma Shore
Protection

Installation of 330/132/33kv
Transmission Substation at Ikot
Ekpene and Associated 132kv &
33kv transmission lines and
substations to different parts of
Akwa Ibom State

Ikot Ekpene
LGA, Akwa
Ibom State

Income Electrix
Ltd

N7,289,223,123.30

120 Dry
weeks

2.851km

Okrika LGA,
Rivers State

Edvic Ltd

N4,808,822,700.00

88 Dry
weeks

13.41km asphaltic concrete


single carriageway, 1.5m
shoulders, 240m long bridge,
160m x 900m pipe culvert,
150mm thick grouted triangular
drains

Cross River
State

John Davids
Construction
Ltd

N4,366,411,760.00

72 Dry
weeks

3.79km

Cross Rivers
State

Zenith
Construction
Ltd

N535,112,567.00

26 weeks

Construction of Udo
Ofunama Road

24

25

26

27
Construction of AdiaboEseku Road

28

Construction of AdiaboOkurikang-Uken Road


Odukpani LGA in Cross
Rivers State

55

29

30

31

32

33

34

35

36

Construction of Ubafan
Adakagbene
Setreboubou Road and
Bridges in Delta State
Erosion control and
sandfilling of
Onuegbum in Bayelsa
State
Construction of
Foreshore protection of
Opobo Community in
Opobo LGA of Rivers
State
Phase 1 of the
Emergency Shore
protection and
Reclamation works
Ayama in Bayelsa State
Phase 1 of the
Emergency Shore
protection and
Reclamation works in
Famgbe in Bayelsa State
Construction of Agge
Shore protection
Ekeremor LGA in
Bayelsa State
Construction of Nsasak
Junction Akon Road in
Akwa Ibom State
Construction of Ajagba Kiribo Road in Ondo
State

15.18km

Delta State

Wintima
Company (Nig)
Ltd

Erosion Control

Bayelsa State

Trenuer (Nig)
Ltd

N2,679,452,580.00

98 weeks

Supply and placement of


rockfilled PVC coated Reno
Mattress

Rivers State

Valdon
Logistics Ltd

N2,818,902,569.57

28 weeks

Reclamation

Bayelsa State

Dredging
International

N2,131,580,000.00

30 weeks

Reclamation

Bayelsa State

Dredging
International

N2,641,580,000.00

30 weeks

2.1km of Shoreline

Bayelsa State

Beks Kimse
(Nig) Ltd

N3,565,500,049.13

80 weeks

30km

Akwa Ibom
State

Seyang Ltd

N5,819,165,840.52

156 weeks

13.43km

Ondo State

Don Frat
Jercess Limited

N1,304,259,671.93

52 weeks

56

N8,976,265,831.01

185 weeks

37

38

39

40

41

42

43

Rehabilitation of inter
town connection (ITC)
Line linking 13 villages
and construction of
2x30MVA 132/33kv
2x30MVA substation at
Ugo in Orhiomwon LGA,
Ondo State
Construction of
Umuojima Omuma Link 14.3km
road/drain

Tehinnah
Investment Ltd

N1,645,053,094.01

160 weeks

Ugwunagbo
LGA, Abia
State
Ukwa
West/Aba
South LGA,
Abia State
Ikoko North
LGA, Delta
State

M/s Decka Eng


& Tech. Serv.
Ltd.

N1,166,254,364.00

52 Dry
weeks

M/s Alliance
Logistics Ltd

N1,239,249,986.00

72 Dry
weeks

M/s S.O Olutu


& Sons Nig. Ltd

N2,431,686,005.50

102 Dry
weeks

Ilaje LGA,
Ondo State

M/s Dreging
Atlantic Ltd

N8,193,235,703.73

104 Dry
weeks

Construction of Okwuzi9.5km
Ugada Road/Bridge

ONELGA,
Rivers State

M/s Jocari
Invest Ltd

N3,914,142,601.90

78 Dry
weeks

Construction of
Rumuekpe-OgbeleAbua Road

15.7km with Bridge

Emohua and
Abua LGA

M/s Jam
Services Ltd

N3,805,221,590.19

120 Dry
weeks

Reclamation 1,124,600m2
Sandfilling 4,413m, Landing
Aprons 8no

Itak Abasi,
Okotitak &
Akputuwa,
Akwa Ibom
State

Zement &
Zement Nig Ltd

N7,322,249,908.34

24 Months

Construction of UgwaliObokwe-UmuekechiUratta Road

9.93km

Construction of Ozoro
Township Road

12.4 km

Reclamation AwoyeMoleletin

2.93km Reclamation 1,043,


288.48m2 Sandfilling

44
Emergency shore
protection & Land
reclamation

Edo State

57

45

Construction of
330/132/33kv
Transmission Substation
at Ikot Ekpene and
Associated
Transmission Lin

Installation of 330/132/33kv
Transmission Substation at Ikot
Ekpene and Associated 132kv &
33kv transmission lines and
substations to different parts of
Akwa Ibom State

Ikot Ekpene
LGA, Akwa
Ibom State
TOTAL
15%

58

Income Electrix
Ltd

N7,289,223,123.30

N211,273,620,349.68
N31,691,043,052.45

120 Dry
weeks

You might also like