PL3 Working programme 29 April 2016

Activity ID

Classic WBS Layout

Activity Name

Building Control
Contr (TOP/CSC) Submission, RI / TOP Submission
A1360
A1370
A1380
A1390
A1410
A1400
A1440

[PH2-TOP] Request & Pre-inspection (TFP/FSC) Works


[PH2-TOP] Inspection by RI (M&E)
[PH2-TOP] Insurance of TFP/FSC
[PH2-TOP] Inspection by RI (ARCH)
[PH2-TOP] BCA Submission/ Inspection/ Procession & Insurance of TOP
[PH2-TOP] CBPU Compliance Certificate Insurance (TOP) if any
[PH2-TOP]Completion, Clear Comments & Hand over C8017

Construction
Erection of Stee
Steel Structure Work (Incl. Night Work)
A1460
Upstanding beams Erection
A1470
Form work and RC works on Upstandd beams GL12 to GL10 @linkway Ramp area
A1480
Roller Shutter Erection Works
SE-Platform GL
GL5 to GL1
A1060
[PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB1 to LB 5)
A1070
[PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1 to LB5)
A1080
[PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1 to LB5)
A1090
[PH2-PLF3] Erection of Roof Beams, Purlins, Raftors at Roof Level (GL LB1 to LB5)
A1100
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection,Roof Gutter (
SE-Linkway Bridge
Brid , Escalator & Staircase 2 GL10 to GL5
A1110
[PH2-PLF3] Erection of Steel Beams, Steel Roof Truss, at Roof Level (GL LB5 to LB10)
A1120
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Linkway
A1130
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Stairca
A1420
[PH2-PLF3]Escalator Package Erection by SWC
SE- EXIT Staircase
Stairca GL LB2 to to S2
A1140
[PH2-PLF3] Erection of Steel Beams, Steel Supports, Truss, Roof panels at E-STC (GL L
SE- @Ave4 Link way GL LB1 to to S3
A1200
[PH2-PLF3] Erection of Lower linkway Columns @Ave4 (GL LB1 to S2)
A1210
[PH2-PLF3] Installation of Roof beams, Supports, Rafters,purlins, Roofing @ Linkway Av

RC Works
RC-Linkway Bridge
Brid , Escalator & Staircase 2 GL10 to GL5
A1180
[PH2-PLF3] RC Works at Linkway Level (GL LB5 to LB10)
A1170
[PH2-PLF3] Erection of Bondek at Linkway Level (GL LB5 to LB10)
A1450
[PH2-PLF3] RC Works at Staircase 2 Level (GL LB5 to LB10)
RC-Platform GL
GL5 to GL1
A1150
[PH2-PLF3] Erection of Bondek at Platform Level (GL LB1 to LB5)
A1160
[PH2-PLF3] RC Works at Platform Level (GL LB1 to LB5)
RC- EXIT Stairca
Staircase GL LB2 to to S2
A1190
[PH2-PLF3] RC Works at E-STC Level (GL LB2 to S2)
RC- @Ave4 Link way GL LB1 to to S3
A1220
[PH2-PLF3] RC Works at linkway @Ave4 (GL LB1 to S2)

Installation
Architectural Finishes
Fin
Concourse Leve
Level finishes
A1510
Hand Railings at Concourse Ramp
A1490
Fire rated Glass doors
A1500
Glass pannels for wall (Replacement on existing)
A1520
Ceiling Finishes-Concourse level
Linkway@Ave4
Linkway@Ave
A1530
Ceiling Finishes- Linkway@Ave4
A1540
Singnages Finishes on Overall Concourse level
Platform Below Finishes(Mz level)
A1550
Access Door to Mz level/Under Platform level Finishes (at Exit Staircase area)
A1560
Hand Rails at Under platform level Finishes
A1570
Parapet Wall Skin Coat Finishes
Platform Finishes
Finishe
A1580
Half Hieght Barriers Finishes
Ramp Linkway u
upto Platform Finishes
A1610
Access Door to Mz level/Under Platform level Finishes (at Ramp linkway area)
A1600
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
Staircase 2 Finishes
Finis
A1630
Hand Railings at Staircase 2
A1620
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
Exit Staircase FInishes
F
A1650
Hand Railings at Exit Staircase
A1640
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
A1660
Ceiling Finishes- Exit Staircase
A1680
CAT Ladder on External of Exit Staircase Side with Access door Finishes
A1670
Painting Finishes at Exit Staircase
Combined Platform
Platfo
& Ramp linkway Finishes
A1690
Cieling Finishes at Platform and Ramp linkway
A1700
Painting all over Platform& Staircase, Ramp linkway..
Combined Platform,
Platfo
Staircase 2, Ramp linkway Finishes
A1710
Glass panels with Al.Framed(Windows) Finishes
A1720
Louvres and ventilation panels Finishes
A1730
Cladding Internal/External Finishes

E&M
A1430
A1290
A1300
A1310
A1320
A1330

[PH2-PLF3]LV Power Turn On to SWC- PL3 Isolation Panel Board


[PH2-PLF3] Installation of Fire Protection System
[PH2-PLF3] Installation of Environment Control System(Jet fans)
[PH2-PLF3] Reconstruction of Services Demolished Shops at Platform 3 Corridor (A&A W
[PH2-PLF3] Installation of Electrical System
[PH2-PLF3] Installation of Mechanical Ventilation System(Fire Dampers)

T&C
A1340

[PH2-PLF3] Testing Commissioning by C8017 & SWC

Actual Work

Critical Remaining Work

Remaining Work

Milestone

181d 29-Apr-16 A

26-Oct-16

6.08% 29-Apr-16 26-Oct-16

3d

S$0.00

Actual Total Cost h 2016


14 21
S$0.00

28d 29-Sep-16

26-Oct-16

0% 29-Sep-16 26-Oct-16

3d

S$0.00

S$0.00

26-Oct-16, Building Contr

Original Start
Duration

PL3 Working programme 29 April 2016

Summary

10-May-16 09:32

Finish

Duration % BL Project BL Project


Complete Start
Finish

Total Float

Budgeted Total
Cost

28

04

April 2016
11 18

25

02

May 2016
09 16 23

30

June 2016
06 13 20

27

04

July 2016
11 18

25

01

August 2016
08 15 22

29

September 2016
05 12 19 26

October 2016
November 2016
03 10 17 24 31 07 14 21 28
26-Oct-16, PL3 Working

0%
0%
0%
0%
0%
0%
0%
7.38%

29-Sep-16
29-Sep-16
29-Sep-16
29-Sep-16
01-Oct-16
03-Oct-16
17-Oct-16
29-Apr-16

30-Sep-16
30-Sep-16
30-Sep-16
30-Sep-16
02-Oct-16
16-Oct-16
26-Oct-16
24-Sep-16

3d
3d
3d
29d
3d
3d
3d
35d

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

[PH2-TOP] Request & Pre-inspection (TFP/F


[PH2-TOP] Inspection by RI (M&E)
[PH2-TOP] Insurance of TFP/FSC
[PH2-TOP] Inspection by RI (ARCH)
[PH2-TOP] BCA Submission/ Inspection/ Pr
[PH2-TOP] CBPU Compliance C
[PH2-TOP]Completion, C
24-Sep-16, Construction

15.71%
0%
0%
0%
29.41%
100%
50%
80%
0%
0%
26.19%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

29-Apr-16
30-May-1
02-Jun-16
07-Jun-16
29-Apr-16
29-Apr-16
02-May-1
10-May-1
14-May-1
22-May-1
29-Apr-16
29-Apr-16
10-May-1
10-May-1
31-May-1
20-May-1
20-May-1
18-Jun-16
18-Jun-16
23-Jun-16
10-May-1
10-May-1
10-May-1
17-May-1
17-May-1
18-May-1
18-May-1
25-May-1
19-Jun-16
19-Jun-16
20-Sep-16
20-Sep-16
01-Jun-16

07-Jul-16
01-Jun-16
06-Jun-16
16-Jun-16
05-Jun-16
01-May-16
09-May-16
11-May-16
22-May-16
05-Jun-16
09-Jun-16
02-May-16
16-May-16
16-May-16
09-Jun-16
19-Jun-16
19-Jun-16
07-Jul-16
22-Jun-16
07-Jul-16
24-Sep-16
23-May-16
12-May-16
20-May-16
23-May-16
29-May-16
24-May-16
29-May-16
07-Jul-16
07-Jul-16
24-Sep-16
24-Sep-16
21-Oct-16

114d
135d
135d
135d
147d

162d
120d
0d
115d
115d
109d
109d
109d
35d
159d
-1d
162d
120d
119d
119d
119d
115d
115d
35d
35d
8d

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

07-Jul-16, Erection of Steel Structure Work (Incl. Night Work)


Upstanding beams Erection
Form work and RC works on Upstandd beams GL12 to GL10 @linkway Ramp area
Roller Shutter Erection Works
05-Jun-16, SE-Platform GL5 to GL1
[PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB1 to LB 5)
[PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1 to LB5)
[PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1 to LB5)
[PH2-PLF3] Erection of Roof Beams, Purlins, Raftors at Roof Level (GL LB1 to LB5)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection,Roof Gutter (GL LB1 to LB5)
09-Jun-16, SE-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
[PH2-PLF3] Erection of Steel Beams, Steel Roof Truss, at Roof Level (GL LB5 to LB10)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Linkway bridge (GL LB7 to LB10)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Staircase 2 &Escalator (GL LB7 to LB10)
[PH2-PLF3]Escalator Package Erection by SWC
19-Jun-16, SE- EXIT Staircase GL LB2 to to S2
[PH2-PLF3] Erection of Steel Beams, Steel Supports, Truss, Roof panels at E-STC (GL LB5 to LB10)
07-Jul-16, SE- @Ave4 Link way GL LB1 to to S3
[PH2-PLF3] Erection of Lower linkway Columns @Ave4 (GL LB1 to S2)
[PH2-PLF3] Installation of Roof beams, Supports, Rafters,purlins, Roofing @ Linkway Ave 4
24-Sep-16, RC Works
23-May-16, RC-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
[PH2-PLF3] RC Works at Linkway Level (GL LB5 to LB10)
[PH2-PLF3] Erection of Bondek at Linkway Level (GL LB5 to LB10)
[PH2-PLF3] RC Works at Staircase 2 Level (GL LB5 to LB10)
29-May-16, RC-Platform GL5 to GL1
[PH2-PLF3] Erection of Bondek at Platform Level (GL LB1 to LB5)
[PH2-PLF3] RC Works at Platform Level (GL LB1 to LB5)
07-Jul-16, RC- EXIT Staircase GL LB2 to to S2
[PH2-PLF3] RC Works at E-STC Level (GL LB2 to S2)
24-Sep-16, RC- @Ave4 Link way GL LB1 to to S3
[PH2-PLF3] RC Works at linkway @Ave4 (GL LB1
21-Oct-16, Installation

21-Oct-16
21-Oct-16
03-Jun-16
29-Jun-16
21-Jun-16
09-Jul-16
21-Oct-16
17-Jul-16
21-Oct-16
21-Jun-16
15-Jun-16
21-Jun-16
20-Jun-16
15-Jul-16
15-Jul-16
29-Jul-16
17-Jun-16
29-Jul-16
05-Jul-16
28-Jun-16
05-Jul-16
04-Sep-16
08-Jul-16
20-Jul-16
29-Aug-16
29-Aug-16
04-Sep-16
14-Sep-16
30-Aug-16
14-Sep-16
29-Aug-16
14-Jul-16
14-Jul-16
29-Aug-16
29-Aug-16
30-Jul-16*
29-Aug-16
29-Aug-16
29-Aug-16
29-Aug-16
29-Aug-16
28-Sep-16

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

01-Jun-16
01-Jun-16
01-Jun-16
15-Jun-16
15-Jun-16
20-Jun-16
10-Jul-16
10-Jul-16
15-Oct-16
14-Jun-16
14-Jun-16
15-Jun-16
15-Jun-16
02-Jul-16
02-Jul-16
16-Jun-16
16-Jun-16
16-Jul-16
22-Jun-16
22-Jun-16
29-Jun-16
29-Jun-16
29-Jun-16
07-Jul-16
15-Aug-16
23-Aug-16
01-Sep-16
01-Aug-16
01-Aug-16
01-Sep-16
15-Jun-16
15-Jun-16
15-Jun-16
01-Jul-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
30-Aug-16

21-Oct-16
21-Oct-16
03-Jun-16
29-Jun-16
21-Jun-16
09-Jul-16
21-Oct-16
17-Jul-16
21-Oct-16
21-Jun-16
15-Jun-16
21-Jun-16
20-Jun-16
15-Jul-16
15-Jul-16
29-Jul-16
17-Jun-16
29-Jul-16
05-Jul-16
28-Jun-16
05-Jul-16
04-Sep-16
08-Jul-16
20-Jul-16
29-Aug-16
29-Aug-16
04-Sep-16
14-Sep-16
30-Aug-16
14-Sep-16
29-Aug-16
14-Jul-16
14-Jul-16
29-Aug-16
29-Aug-16
30-Jul-16
29-Aug-16
29-Aug-16
29-Aug-16
29-Aug-16
29-Aug-16
28-Sep-16

8d
8d
3d
8d
8d
8d
8d
8d
8d
130d
92d
92d
131d
92d
92d
92d
134d
92d
101d
92d
101d
55d
113d
101d
61d
61d
55d
45d
45d
45d
61d
61d
61d
61d
3d
3d
3d
3d
3d
3d
3d
3d

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00
S$0.00

28-Sep-16

0% 30-Aug-16 28-Sep-16

3d

S$0.00

S$0.00

2d
2d
2d
2d
2d
14d
10d
149d

29-Sep-16*
29-Sep-16
29-Sep-16
29-Sep-16
01-Oct-16
03-Oct-16
17-Oct-16
29-Apr-16 A

30-Sep-16
30-Sep-16
30-Sep-16
30-Sep-16
02-Oct-16
16-Oct-16
26-Oct-16
24-Sep-16

70d
3d
5d
10d
37d
3d
8d
2d
8d
14d
42d
4d
7d
7d
10d
30d
30d
20d
5d
15d
138d
14d
3d
4d
7d
12d
7d
5d
18d
18d
5d
5d
143d

29-Apr-16 A
30-May-16*
02-Jun-16
07-Jun-16
29-Apr-16 A
29-Apr-16 A
02-May-16 A
08-May-16 A
14-May-16
22-May-16
29-Apr-16 A
29-Apr-16 A
10-May-16
10-May-16
31-May-16*
20-May-16
20-May-16
18-Jun-16
18-Jun-16*
23-Jun-16
10-May-16
10-May-16
10-May-16*
17-May-16*
17-May-16
18-May-16
18-May-16*
25-May-16
19-Jun-16
19-Jun-16
20-Sep-16
20-Sep-16
01-Jun-16

07-Jul-16
01-Jun-16
06-Jun-16
16-Jun-16
05-Jun-16
01-May-16 A
13-May-16
14-May-16
22-May-16
05-Jun-16
09-Jun-16
08-May-16 A
16-May-16
16-May-16
09-Jun-16
19-Jun-16
19-Jun-16
07-Jul-16
22-Jun-16
07-Jul-16
24-Sep-16
23-May-16
12-May-16
20-May-16
23-May-16
29-May-16
24-May-16
29-May-16
07-Jul-16
07-Jul-16
24-Sep-16
24-Sep-16
21-Oct-16

143d
143d
3d
15d
7d
20d
104d
8d
7d
8d
2d
7d
6d
14d
14d
44d
2d
14d
14d
7d
7d
68d
10d
14d
15d
7d
4d
45d
30d
14d
76d
30d
30d
60d
90d
60d
90d
90d
90d
90d
90d
30d

01-Jun-16
01-Jun-16
01-Jun-16*
15-Jun-16
15-Jun-16
20-Jun-16
10-Jul-16
10-Jul-16
15-Oct-16
14-Jun-16
14-Jun-16
15-Jun-16
15-Jun-16
02-Jul-16
02-Jul-16
16-Jun-16
16-Jun-16
16-Jul-16
22-Jun-16
22-Jun-16
29-Jun-16
29-Jun-16
29-Jun-16
07-Jul-16
15-Aug-16
23-Aug-16
01-Sep-16
01-Aug-16
01-Aug-16
01-Sep-16
15-Jun-16
15-Jun-16
15-Jun-16
01-Jul-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
30-Aug-16

30d 30-Aug-16

115d
115d
115d
147d
138d

Page 1 of 1

21-Oct-16, Architectural Finis


21-Oct-16, Concourse Level f
Hand Railings at Concourse Ramp
Fire rated Glass doors
Glass pannels for wall (Replacement on existing)
Ceiling Finishes-Concourse level
21-Oct-16, Linkway@Ave4
Ceiling Finishes- Linkway@Ave4
Singnages Finishes on Overa
21-Jun-16, Platform Below Finishes(Mz level)
Access Door to Mz level/Under Platform level Finishes (at Exit Staircase area)
Hand Rails at Under platform level Finishes
Parapet Wall Skin Coat Finishes
15-Jul-16, Platform Finishes
Half Hieght Barriers Finishes
29-Jul-16, Ramp Linkway upto Platform Finishes
Access Door to Mz level/Under Platform level Finishes (at Ramp linkway area)
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
05-Jul-16, Staircase 2 Finishes
Hand Railings at Staircase 2
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
04-Sep-16, Exit Staircase FInishes
Hand Railings at Exit Staircase
Screed & Tiles Finishes (Incl Tacktiles, Non Silp Homogenous type)
Ceiling Finishes- Exit Staircase
CAT Ladder on External of Exit Staircase Side with Access door Finish
Painting Finishes at Exit Staircase
14-Sep-16, Combined Platform & Ramp linkway Finishes
Cieling Finishes at Platform and Ramp linkway
Painting all over Platform& Staircase, Ramp linkway..
29-Aug-16, Combined Platform, Staircase 2, Ramp linkway Finishes
Glass panels with Al.Framed(Windows) Finishes
Louvres and ventilation panels Finishes
Cladding Internal/External Finishes
29-Aug-16, E&M
[PH2-PLF3]LV Power Turn On to SWC- PL3 Isolation Panel Board
[PH2-PLF3] Installation of Fire Protection System
[PH2-PLF3] Installation of Environment Control System(Jet fans)
[PH2-PLF3] Reconstruction of Services Demolished Shops at Platform
[PH2-PLF3] Installation of Electrical System
[PH2-PLF3] Installation of Mechanical Ventilation System(Fire Dampe
28-Sep-16, T&C
[PH2-PLF3] Testing Commissioning by C8017 &

TASK filter: All Activities