Activity ID
Activity Name
Design
Approval In Principle Submission
8017DSG20010
8017DSG20020
8017DSG20030
8017DSG20040
[AIP]
[AIP]
[AIP]
[AIP]
[PLD]
[PLD]
[PLD]
[PLD]
[FND]
[FND]
[FND]
[FND]
Preliminary Design
8017DSG20050
8017DSG20060
8017DSG20070
8017DSG20080
Final Design
8017DSG20090
8017DSG20100
8017DSG20210
8017DSG20220
Actual Work
Remaining Work
Milestone
Summary
Original Start
Duration
Finish
1352.1d 10-Sep-13 A
31-May-16 15:49
Physical % S
Complete
Duration %
Complete
Nonlabor Units
% Complete
24-May-17
73.59%
79.25%
24-May
1352.1d 10-Sep-13 A
24-May-17
73.59%
100%
24-May
1352.1d
0.0d
0.0d
630.0d
0.0d
0.0d
0.0d
0.0d
0.0d
547.0d
0.0d
0.0d
0.0d
0.0d
693.1d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
279.5d
0.0d
0.0d
552.1d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
1269.0d
1269.0d
1147.0d
1147.0d
1147.0d
1147.0d
1070.0d
90.0d
1057.0d
1147.0d
1147.0d
1147.0d
1147.0d
90.0d
1147.0d
965.0d
965.0d
1147.0d
1070.0d
1012.0d
60.0d
1147.0d
1147.0d
1268.9d
60.0d
60.0d
1000.0d
1000.0d
1194.0d
45.0d
977.0d
50.0d
1087.0d
1087.0d
241.0d
30.0d
15.0d
45.0d
30.0d
30.0d
1352.1d
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Dec-13 A
24-May-17
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
01-Nov-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
21-Dec-13 A
21-Dec-13 A
10-Sep-13 A
10-Sep-13 A
01-Nov-13 A
01-Jan-17
10-Sep-13 A
10-Sep-13 A
28-Oct-13 A
28-Oct-13 A
31-Dec-16
31-Dec-13 A
31-Dec-13 A
01-Nov-13 A
01-Nov-13 A
21-Dec-13 A
11-Jan-17
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
23-Mar-14 A
10-Sep-13 A
01-Nov-13 A
01-Nov-13 A
10-Sep-13 A
08-Jun-15 A
16-Dec-13 A
10-Dec-13 A
25-Feb-14 A
21-Feb-14 A
08-Jun-15 A
18-Oct-14 A
30-Jan-14 A
04-Mar-14 A
10-Apr-14 A
18-Oct-14 A
24-May-17
01-Jun-16*
13-Jul-15 A
26-Jun-15 A
18-Dec-15 A
30-Oct-15 A
01-Jun-16*
06-Oct-16*
24-May-17*
01-Jun-16*
25-May-15 A
16-Apr-15 A
25-May-15 A
03-Feb-17
15-Jun-15 A
27-Apr-15 A
02-Feb-16 A
03-Feb-17*
24-May-17
24-May-17*
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
01-Mar-17
05-Dec-13 A
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
03-Dec-13 A
02-Mar-17
01-Jan-17
01-Jan-17
02-Mar-17
01-Mar-17
01-Jan-17
02-Mar-17
02-Mar-17
02-Mar-17
01-Mar-17
30-Dec-13 A
01-Mar-17
31-Dec-16
31-Dec-16
02-Mar-17
20-Dec-13 A
11-Jan-17
02-Mar-17
02-Mar-17
02-Mar-17
23-Mar-14 A
12-Sep-13 A
23-Mar-14 A
01-Nov-13 A
20-Dec-13 A
20-Dec-13 A
24-May-17
73.59%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
48.48%
0%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
78.38%
78.38%
76.11%
76.11%
76.11%
76.11%
74.4%
100%
74.04%
76.11%
76.11%
76.11%
76.11%
100%
76.11%
77.82%
77.82%
76.11%
74.4%
78.85%
0%
76.11%
76.11%
95.27%
100%
0%
78.61%
78.61%
77.05%
100%
77.07%
0%
74.79%
74.79%
100%
100%
100%
100%
100%
100%
73.59%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
90.81%
98.0d
56.0d
14.0d
14.0d
14.0d
93.0d
51.0d
14.0d
14.0d
14.0d
589.6d
67.0d
14.0d
14.0d
14.0d
80.0d
38.0d
14.0d
10-Sep-13 A
10-Sep-13 A
17-Dec-13 A
04-Feb-14 A
11-Feb-14 A
25-Nov-13 A
25-Nov-13 A
01-Jan-14 A
01-Feb-14 A
15-Feb-14 A
01-Feb-14 A
01-Feb-14 A
01-Oct-14 A
01-Oct-14 A
24-Jun-15 A
15-Feb-14 A
15-Feb-14 A
05-Mar-14 A
17-Feb-14 A
16-Dec-13 A
04-Feb-14 A
11-Feb-14 A
17-Feb-14 A
17-Jun-15 A
25-Feb-14 A
22-Mar-14 A
09-Apr-15 A
17-Jun-15 A
26-Jun-15 A
07-Jun-15 A
23-Jun-15 A
16-Jun-15 A
26-Jun-15 A
31-May-14 A
04-Mar-14 A
04-May-14 A
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30-Jan-14 A
26-Jun-15 A
16-Apr-15 A
27-Apr-15 A
24-May-17
24-May
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
100%
100%
0%
0%
60.07%
60.07%
60.07%
60.07%
57.2%
100%
56.67%
60.07%
60.07%
60.07%
60.07%
100%
60.07%
58.75%
58.75%
60.07%
57.2%
60.66%
0%
60.04%
100%
0%
60.2%
100%
58.23%
0%
57.86%
23-Mar-14 A, Authority Clearances
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Page 1 of 5
Activity Name
8017DSG20320
8017DSG20330
Original Start
Duration
[FND CSD/SEM]
[FND CSD/SEM]
[FND CSD/SEM]
[FND CSD/SEM]
As-Built Drawings
8017DSG10870
As-Built Information
RI / TOP Submission
Building Control (TOP/CSC) Submission
Phase 1A - New LRT Fare Gate and High Covered Linkway
8017DSG31140 [PH1A-TOP-LRT] Request & Pre-inspection (TFP/FSC) Works
8017DSG31150 [PH1A-TOP-LRT] Inspection by RI (M&E)
8017DSG31160 [PH1A-TOP-LRT] Inspection by RI (ARCH)
8017DSG31170 [PH1A-TOP-LRT] Insurance of TFP/FSC
8017DSG31180 [PH1A-TOP-LRT] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31190 [PH1A-TOP-LRT] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1A - New MRT Fare Gate
8017DSG31200 [PH1A-TOP-MRT] Request & Pre-inspection (TFP/FSC) Works
8017DSG31210 [PH1A-TOP-MRT] Inspection by RI (M&E)
8017DSG31220 [PH1A-TOP-MRT] Inspection by RI (ARCH)
8017DSG31230 [PH1A-TOP-MRT] Insurance of TFP/FSC
8017DSG31240 [PH1A-TOP-MRT] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31250 [PH1A-TOP-MRT] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1A - New Staircase
8017DSG31260 [PH1A-TOP-ST] Request & Pre-inspection (TFP/FSC) Works
8017DSG31270 [PH1A-TOP-ST] Inspection by RI (M&E)
8017DSG31280 [PH1A-TOP-ST] Inspection by RI (ARCH)
8017DSG31290 [PH1A-TOP-ST] Insurance of TFP/FSC
8017DSG31300 [PH1A-TOP-ST] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31310 [PH1A-TOP-ST] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1B - New Platform 4
8017DSG10750 [PH1B-TOP] Request & Pre-inspection (TFP/FSC) Works
8017DSG10760 [PH1B-TOP] Inspection by RI (M&E)
8017DSG10770 [PH1B-TOP] Inspection by RI (ARCH)
8017DSG10780 [PH1B-TOP] Insurance of TFP/FSC
8017DSG10790 [PH1B-TOP] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG10800 [PH1B-TOP] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 2 - New Platform 3 (Including affected shops)
8017DSG10810 [PH2-TOP] Request & Pre-inspection (TFP/FSC) Works
8017DSG10820 [PH2-TOP] Inspection by RI (M&E)
8017DSG10830 [PH2-TOP] Inspection by RI (ARCH)
8017DSG10840 [PH2-TOP] Insurance of TFP/FSC
8017DSG10850 [PH2-TOP] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG10860 [PH2-TOP] BCA Submission/ Inspection/ Procession & Insurance of TOP
Procurement/Manufacturing/Fabrication
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017PMF10010 [PH1A-HCLW] Procurement & Fabrication of Steel Structure Columns including Roof trusses
LRT New Fare Gate Area
General
8017PMF10020 [PH1A-LRTAFC] Procurement & Fabrication of Metal Canopy over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017PMF10030 [PH1A-MRTAFC] Procurement & Fabrication of Portal with Alumin. Cladding at MRT New Fare Gate
Reconstruction of Existing Staircase
Structural Steel
8017PMF10040 [PH1A-MRTST] Procurement & Fabrication of Steel Structure Columns/Frame of New Staircase
[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]
Procurement
Procurement
Procurement
Procurement
&
&
&
&
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System
[PH1B-PLF4] Procurement & Fabrication of Steel Structure Columns, UBs, Steel Roof trusses
[PH2-PLF3] Procurement & Fabrication of Steel Structure Columns, UBs, Steel Roof trusses
[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]
Procurement
Procurement
Procurement
Procurement
&
&
&
&
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System
Delivery
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017DLV10010
[PH1A-HCLW] Delivery of Steel Structure Columns including Roof trusses
LRT New Fare Gate Area
General
Actual Work
Remaining Work
Milestone
Summary
Finish
Duration %
Complete
Nonlabor Units
% Complete
14.0d
14.0d
569.0d
55.0d
14.0d
14.0d
14.0d
133.0d
59.0d
45.0d
14.0d
28.0d
14.0d
14.0d
74.0d
60.0d
14.0d
74.0d
60.0d
14.0d
120.0d
120.0d
697.1d
697.1d
309.0d
22.0d
7.0d
7.0d
7.0d
14.0d
14.0d
92.0d
32.0d
7.0d
7.0d
7.0d
14.0d
14.0d
30.0d
10.0d
5.0d
5.0d
5.0d
10.0d
10.0d
131.0d
20.0d
10.0d
10.0d
10.0d
10.0d
10.0d
60.0d
20.0d
10.0d
10.0d
10.0d
20.0d
20.0d
633.7d
04-May-14 A
18-May-14 A
18-May-14 A
18-May-14 A
01-Oct-14 A
17-Jul-15 A
28-Sep-15 A
01-Jan-14 A
01-Jan-14 A
01-Jan-14 A
25-Jan-14 A
25-Feb-14 A
25-Feb-14 A
22-Mar-14 A
25-Feb-14 A
25-Feb-14 A
22-Mar-14 A
22-Mar-14 A
22-Mar-14 A
22-May-14 A
11-May-15 A
11-May-15 A
15-May-15 A
15-May-15 A
15-May-15 A
27-May-15 A
15-May-15 A
15-May-15 A
26-Feb-16 A
24-Mar-16 A
24-Mar-16 A
15-May-15 A
02-Jun-15 A
15-May-15 A
15-May-15 A
15-Jun-15 A
21-Jun-15 A
22-Jun-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
26-Feb-16 A
26-Feb-16 A
26-Feb-16 A
26-Feb-16 A
24-Mar-16 A
24-Mar-16 A
24-Mar-16 A
25-Mar-17
25-Mar-17
14-Apr-17
24-Apr-17
24-Apr-17
04-May-17
04-May-17
15-Aug-14 A
18-May-14 A
31-May-14 A
01-Jun-16
08-Oct-14 A
16-Jul-15 A
27-Sep-15 A
01-Jun-16
23-Jun-15 A
06-Aug-14 A
24-Jan-14 A
06-Aug-14 A
23-Jun-15 A
17-Nov-14 A
23-Jun-15 A
15-Jun-15 A
23-Nov-14 A
15-Jun-15 A
25-May-15 A
27-May-14 A
25-May-15 A
27-Feb-17
27-Feb-17
24-May-17
24-May-17
06-Apr-16 A
28-May-15 A
16-May-15 A
16-May-15 A
06-Apr-16 A
06-Apr-16 A
06-Apr-16 A
27-Jun-15 A
17-Jun-15 A
16-May-15 A
16-May-15 A
25-Jun-15 A
26-Jun-15 A
27-Jun-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
06-Apr-16 A
24-Mar-16 A
24-Mar-16 A
24-Mar-16 A
06-Apr-16 A
06-Apr-16 A
06-Apr-16 A
24-May-17
14-Apr-17
24-Apr-17
04-May-17
04-May-17
24-May-17
24-May-17
21-Jun-16
100%
100%
99.95%
100%
100%
100%
98.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30%
30%
91.39%
91.39%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
96.8%
100%
100%
99.69%
100%
100%
100%
98.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
74.79%
74.79%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
95.92%
196.3d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
320.3d
200.0d
200.0d
200.0d
200.0d
200.0d
120.0d
120.0d
322.7d
120.0d
120.0d
200.0d
200.0d
200.0d
200.0d
200.0d
665.3d
15-Aug-14 A
15-Aug-14 A
15-Aug-14 A
15-Aug-14 A
01-Oct-14 A
01-Oct-14 A
01-Oct-14 A
01-Jan-15 A
01-Jan-15 A
01-Jan-15 A
01-Oct-14 A
01-Oct-14 A
01-Oct-14 A
29-Sep-14 A
01-Dec-14 A
02-Dec-14 A
02-Dec-14 A
02-Dec-14 A
01-Dec-14 A
29-Sep-14 A
29-Sep-14 A
01-Aug-15 A
01-Aug-15 A
01-Aug-15 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
04-Oct-14 A
01-Feb-15 A
30-Sep-14 A
30-Sep-14 A
30-Sep-14 A
28-Dec-14 A
28-Dec-14 A
28-Dec-14 A
01-Feb-15 A
01-Feb-15 A
01-Feb-15 A
30-Jan-15 A
30-Jan-15 A
30-Jan-15 A
21-Feb-15 A
30-Dec-14 A
23-Dec-14 A
30-Dec-14 A
30-Dec-14 A
21-Dec-14 A
21-Feb-15 A
21-Feb-15 A
21-Jun-16
03-Jun-16
03-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
27-Jul-16
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
93.72%
98%
98%
90%
90%
90%
90%
90%
91.9%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
91.04%
98%
98%
90%
90%
90%
90%
90%
73.27%
204.8d
3.0d
3.0d
3.0d
3.0d
3.0d
04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
31-Oct-14 A
31-Oct-14 A
28-Feb-15 A
04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
28-Feb-15 A
28-Feb-15 A
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
31-May-16 15:49
Physical % S
Complete
100%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
5%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
28-Feb-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
04-Oct-14 A, High Covered Linkway
04-Oct-14 A, General
[PH1A-HCLW] Delivery of Steel Structure Columns including Roof trusses
28-Feb-15 A, LRT New Fare Gate Area
28-Feb-15 A, General
100%
Page 2 of 5
Activity Name
Original Start
Duration
8017DLV10020
[PH1A-LRTAFC] Delivery of Metal Canopy over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017DLV10030
[PH1A-MRTAFC] Delivery of Portal with Alumin. Cladding at MRT New Fare Gate
Reconstruction of Existing Staircase
Structural Steel
8017DLV10040
[PH1A-MRTST] Delivery of Steel Structure Columns/Frame of New Staircase
Delivery of
Delivery of
Delivery of
Delivery of
Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System
Delivery of
Delivery of
Delivery of
Delivery of
Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System
Construction
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017CON10000 [PH1A-HCLW] Setting out and Publish Notice and Agreement with Lot 1
8017CON10010 [PH1A-HCLW] Hoarding up and install Monitoring Device
Substructure Works
8017CON10050 [PH1A-HCLW] Excavation and RC Footing Works with Cast-in-items (or Pile Caps if applicable)
8017CON10060 [PH1A-HCLW] Topping Up Floor to Road Level with Ramp & Drain Cov er
8017CON10770 [PH1A-HCLW] Installation of Bored Micro Pile - 2 nos & Testing
8017CON31380 [PH1A-HCLW] Moblization of Piling Machine and Equipments
Super Structure Works
8017CON10080 [PH1A-HCLW] Erection of Steel Structure Columns including Roof trusses
8017CON10090 [PH1A-HCLW] Roof Covering Work (Connect to Lot 1 Side)
LRT New Fare Gate Area
General
8017CON11010 [PH1A-LRTAFC] Setting out and Publish Notice
8017CON11020 4436819
8017CON11030 [PH1A-LRTAFC] Demolition of Existing Staircase/ Glazed Pannel Door & Canopy
8017CON11040 [PH1A-LRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
Structure Works
8017CON11060 [PH1A-LRTAFC] Erection of Metal Canopy with Alum False Ceiling over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017CON12010 [PH1A-MRTAFC] Setting out and Publish Notice and obtain SMRT Demolition Permit
8017CON12020 [PH1A-MRTAFC] Hoarding up and install Monitoring Device
8017CON12030 [PH1A-MRTAFC] Demolition of Existing 3 Shops (#01-36/37/38) & Advert Panels
8017CON12040 [PH1A-MRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
Structure Works
8017CON12050 [PH1A-MRTAFC] Erection of Portal with Alumin. Cladding & Alum. Ceiling at MRT New Fare Gate
Reconstruction of Existing Staircase
General
8017CON13010 [PH1A-MRTST] Setting out and Publish Notice and obtain PTW from DBC/SMRT
8017CON13020 [PH1A-MRTST] Hoarding up and install Monitoring Device by SWC
8017CON13040 [PH1A-MRTST] Existing Services to be Supporting Works
8017CON13050 [PH1A-MRTST] Demolition of Existing Staircase/ Advert Panels with Control System
Structure Works
8017CON13070 [PH1A-MRTST] Erection of Steel Structure/ Steps & Landing with 6mm S-Plate & Concrete of New Staircase
Remaining Work
Milestone
Summary
Finish
Duration %
Complete
Nonlabor Units
% Complete
3.0d
3.0d
3.0d
3.0d
14.0d
14.0d
14.0d
355.0d
21.0d
21.0d
60.0d
60.0d
60.0d
60.0d
60.0d
149.7d
21.0d
21.0d
60.0d
60.0d
60.0d
60.0d
60.0d
920.1d
31-Oct-14 A
13-Feb-15 A
13-Feb-15 A
13-Feb-15 A
30-Oct-14 A
30-Oct-14 A
30-Oct-14 A
31-Oct-14 A
31-Oct-14 A
31-Oct-14 A
01-Sep-15 A
01-Sep-15 A
01-Sep-15 A
21-Dec-15 A
01-Sep-15 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
21-May-16 A
21-May-16 A
21-May-16 A
21-May-16 A
21-May-16 A
26-Feb-14 A
28-Feb-15 A
17-Feb-15 A
17-Feb-15 A
17-Feb-15 A
31-Oct-14 A
31-Oct-14 A
31-Oct-14 A
10-Jan-16 A
23-Mar-15 A
23-Mar-15 A
10-Jan-16 A
30-Dec-15 A
30-Dec-15 A
10-Jan-16 A
23-Dec-15 A
27-Jul-16
05-Jun-16
05-Jun-16
27-Jul-16
27-Jul-16
27-Jul-16
27-Jul-16
27-Jul-16
06-Oct-16
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
64%
92%
92%
40%
40%
40%
40%
40%
86.63%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
44.18%
92%
92%
40%
40%
40%
40%
40%
86.94%
576.0d
283.0d
12.0d
5.0d
7.0d
182.0d
15.0d
5.0d
21.0d
14.0d
69.5d
10.0d
7.0d
344.0d
242.1d
5.0d
10.0d
14.0d
7.0d
21.0d
21.0d
277.6d
186.5d
5.0d
14.0d
25.0d
25.0d
17.0d
17.0d
485.0d
485.0d
5.0d
7.0d
7.0d
20.0d
45.0d
45.0d
653.6d
343.0d
50.0d
10.0d
15.0d
15.0d
10.0d
21.0d
21.0d
21.0d
21.0d
154.1d
90.0d
7.0d
55.0d
28.0d
49.9d
6.0d
8.0d
10.0d
14.0d
12.0d
14.0d
12.0d
14.0d
6.0d
8.0d
19.9d
12.0d
14.0d
243.2d
213.2d
10.0d
10.0d
12.0d
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
28-Mar-14 A
28-May-14 A
21-Jul-14 A
01-Oct-14 A
04-Jun-14 A
28-May-14 A
28-Oct-14 A
28-Oct-14 A
04-Nov-14 A
01-May-14 A
01-May-14 A
01-May-14 A
15-May-14 A
12-Aug-14 A
07-Nov-14 A
27-Feb-15 A
27-Feb-15 A
01-Oct-14 A
01-Oct-14 A
08-Jan-15 A
01-Oct-14 A
20-Oct-14 A
28-Jan-15 A
24-Apr-15 A
24-Apr-15 A
01-Jun-14 A
01-Jun-14 A
01-Jun-14 A
05-Jan-15 A
26-Sep-15 A
27-Sep-15 A
14-Jun-15 A
14-Jun-15 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
03-May-14 A
18-Apr-14 A
28-Mar-14 A
02-Dec-14 A
02-Dec-14 A
12-Jul-14 A
12-Jul-14 A
28-May-14 A
28-May-14 A
28-May-14 A
04-Jun-14 A
04-Jun-14 A
12-Jul-14 A
29-Jul-14 A
13-Aug-14 A
11-Aug-14 A
11-Aug-14 A
13-Sep-14 A
25-Sep-14 A
13-Sep-14 A
13-Sep-14 A
04-Aug-14 A
12-Jul-14 A
13-Sep-14 A
13-Sep-14 A
26-Sep-14 A
02-Mar-15 A
02-Mar-15 A
02-Mar-15 A
07-Mar-15 A
12-Jul-15 A
24-Oct-15 A
14-Apr-15 A
25-May-14 A
20-Mar-14 A
25-May-14 A
31-Oct-14 A
26-Jul-14 A
31-Oct-14 A
18-Jun-14 A
03-Jun-14 A
14-Apr-15 A
18-Nov-14 A
14-Apr-15 A
16-Apr-15 A
10-Dec-14 A
05-May-14 A
31-May-14 A
09-Dec-14 A
10-Dec-14 A
16-Apr-15 A
16-Apr-15 A
28-May-15 A
16-Apr-15 A
07-Mar-15 A
10-Oct-14 A
14-Apr-15 A
16-Apr-15 A
28-May-15 A
28-May-15 A
24-Oct-15 A
12-Oct-15 A
05-Jun-14 A
12-Jan-15 A
28-Sep-15 A
12-Oct-15 A
24-Oct-15 A
24-Oct-15 A
30-Nov-15 A
20-Dec-14 A
25-May-14 A
20-Mar-14 A
20-May-14 A
12-May-14 A
25-May-14 A
20-Dec-14 A
20-Dec-14 A
11-Aug-14 A
11-Aug-14 A
02-May-15 A
30-Aug-14 A
03-Jun-14 A
30-Aug-14 A
29-Aug-14 A
15-Apr-15 A
08-Sep-14 A
26-Oct-14 A
20-Sep-14 A
03-Jan-15 A
15-Apr-15 A
15-Dec-14 A
15-Apr-15 A
07-Mar-15 A
16-Sep-14 A
06-Oct-14 A
02-May-15 A
02-May-15 A
23-Dec-14 A
30-Oct-15 A
09-Sep-15 A
14-Mar-15 A
20-May-15 A
24-Jul-15 A
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
31-May-16 15:49
Physical % S
Complete
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
24-Oct-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
14-Apr-15 A, High Covered Linkway
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Page 3 of 5
25-May-14 A, General
[PH1A-HCLW] Setting out and Publish Notice and Agreement with Lot 1
[PH1A-HCLW] Hoarding up and install Monitoring Device
31-Oct-14 A, Substructure Works
[PH1A-HCLW] Excavation and RC Footing Works with Cast-in-items (or Pile Caps if applicable)
[PH1A-HCLW] Topping Up Floor to Road Level with Ramp & Drain Cov er
[PH1A-HCLW] Installation of Bored Micro Pile - 2 nos & Testing
[PH1A-HCLW] Moblization of Piling Machine and Equipments
14-Apr-15 A, Super Structure Works
[PH1A-HCLW] Erection of Steel Structure Columns including Roof trusses
[PH1A-HCLW] Roof Covering Work (Connect to Lot 1 Side)
16-Apr-15 A, LRT New Fare Gate Area
10-Dec-14 A, General
[PH1A-LRTAFC] Setting out and Publish Notice
4436819
[PH1A-LRTAFC] Demolition of Existing Staircase/ Glazed Pannel Door & Canopy
[PH1A-LRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
16-Apr-15 A, Structure Works
[PH1A-LRTAFC] Erection of Metal Canopy with Alum False Ceiling over New Fare Gate Lobby
28-May-15 A, MRT New Fare Gate Area
16-Apr-15 A, General
[PH1A-MRTAFC] Setting out and Publish Notice and obtain SMRT Demolition Permit
[PH1A-MRTAFC] Hoarding up and install Monitoring Device
[PH1A-MRTAFC] Demolition of Existing 3 Shops (#01-36/37/38) & Advert Panels
[PH1A-MRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
28-May-15 A, Structure Works
[PH1A-MRTAFC] Erection of Portal with Alumin. Cladding & Alum. Ceiling at MRT New Fare Gate
24-Oct-15 A, Reconstruction of Existing Staircase
12-Oct-15 A, General
[PH1A-MRTST] Setting out and Publish Notice and obtain PTW from DBC/SMRT
[PH1A-MRTST] Hoarding up and install Monitoring Device by SWC
[PH1A-MRTST] Existing Services to be Supporting Works
[PH1A-MRTST] Demolition of Existing Staircase/ Advert Panels with Control System
24-Oct-15 A, Structure Works
[PH1A-MRTST] Erection of Steel Structure/ Steps & Landing with 6mm S-Plate & Concrete
30-Nov-15 A, Phase 1B - Platform 4 & Staircase
20-Dec-14 A, General
25-May-14 A, General
[PH1B-PLF4] Setting out and Publish Notice
[PH1B-PLF4] Installation of Monitoring Instrumentation
[PH1B-PLF4] Trial Trenching works
[PH1B-PLF4] Erection of Site Hoarding the Work Area
20-Dec-14 A, Demolition Works
[PH1B-PLF4] Demolition Works
11-Aug-14 A, Drain Diversion Works
[PH1B-PLF4] Construction of New RC Drain with Grating Cover to Replace on Existing Drain
02-May-15 A, Substructure Works
30-Aug-14 A, Pile Load Test/ Piling Work
[PH1B-PLF4] Moblization of Piling Machine and Equipments
[PH1B-PLF4] Installation of Bored Micro Pile - 20nos (GL S2 to LA7) & Testing
[PH1B-PLF4] Installation of Bored Micro Pile - 9nos (GL LA7 to LA10) & Testing
15-Apr-15 A, Pile Cap/ RC Stumps/ Ground Beams Work
[PH1B-PLF4] Excavation Work & Lean Concrete Work (GL LA7 to LA10)
[PH1B-PLF4] Excavation Work & Lean Concrete Work (GL S2 to LA7)
[PH1B-PLF4] Construction of Pile Caps - 8nos (GL LA7 to LA10)
[PH1B-PLF4] Construction of Pile Caps - 18nos (GL S2 to LA7)
[PH1B-PLF4] Construction of Ground Beams (GL LA7 to LA10)
[PH1B-PLF4] Construction of Ground Beams (GL S2 to LA7)
[PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL LA7 to LA10)
[PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL S2 to LA7)
[PH1B-PLF4] ECC Check with Pile Hacking Works - 12nos (GL LA7 to LA10)
[PH1B-PLF4] ECC Check with Pile Hacking Works - 16nos (GL S2 to LA7)
02-May-15 A, RC Ground Slabs & Beams
[PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL LA7 to LA10)
[PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL S1 to LA7)
30-Oct-15 A, Platform 4 - Super Structure Works (GL LA1 to LA7)
09-Sep-15 A, Erection of Steel Structure Work (Incl. Night Work)
[PH1B-PLF4] Erection of Steel Columns at Mezzanine Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Steel Columns at Platform Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Steel Columns at Roof Level (GL LA1 to LA7)
TASK filter: All Activities
Oracle Corporation
Activity Name
Original Start
Duration
8017CON31160 [PH1B-PLF4] Erection of Steel Beams at Mezzanine Level (GL LA1 to LA7)
8017CON31170 [PH1B-PLF4] Erection of Steel Beams at Platform Level (GL LA1 to LA7)
8017CON31180 [PH1B-PLF4] Erection of Bondek at Platform Level (GL LA1 to LA7)
8017CON31190 [PH1B-PLF4] Erection of Roof Beams at Roof Level (GL LA1 to LA7)
8017CON31200 [PH1B-PLF4] Erection of Purlin at Roof Level (GL LA1 to LA7)
Composite Floor Slab Work @ Bondek
8017CON20240 [PH1B-PLF4] Installation of Protection Frame and Cast RC Slab on Bondek at Platform Level (GL LA1 to LA7)
Roofing Works
8017CON20250 [PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection (GL LA1 to LA7)
Platform 4 - Linkbridge Structure Works (GL LA7 to LA10)
Erection of Steel Structure Work (Incl. Night Work)
8017CON20260 [PH1B-PLF4] Erection of Steel Columns at Linkway Level (GL LA7 to LA10)
8017CON20270 [PH1B-PLF4] Erection of Steel Columns for Staircase at Platform Level (GL LA7 to LA10)
8017CON20280 [PH1B-PLF4] Erection of Steel Roof Truss at Roof Level (GL LA7 to LA10)
8017CON31210 [PH1B-PLF4] Erection of Steel Beams at Linkway Level (GL LA7 to LA10)
8017CON31220 [PH1B-PLF4] Erection of Bondek at Linkway Level (GL LA7 to LA10)
8017CON31230 [PH1B-PLF4] Erection of Steel Beams for Staircase at Platform Level (GL LA7 to LA10)
8017CON31240 [PH1B-PLF4] Erection of Bondek for Staircase at Platform Level (GL LA7 to LA10)
8017CON31250 [PH1B-PLF4] Erection of Steel Roof Beams at Roof Level (GL LA7 to LA10)
8017CON31260 [PH1B-PLF4] Erection of Purlin at Roof Level (GL LA7 to LA10)
Composite Floor Slab Works @ Bondek
8017CON20290 [PH1B-PLF4] Cast RC Slab on Bondek at Linkway Level (GL LA7 to LA10)
8017CON20300 [PH1B-PLF4] Cast RC Steps on Steel Staircase at Platform Level (GL LA7 to LA10)
8017CON20380 [PH1B-PLF4] Cast RC Parapet Wall/ RC Kerb (GL LA7 to LA10)
Roofing Works
8017CON20310 [PH1B-PLF4] Erection of New Clay Roofing over Pedestrain Linkbridge (GL LA9 to LA10)
8017CON20320 [PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection over ST1 (GL LA7 to LA9)
Platform 4 - New Access Staircase (GL S1 to S2)
RC Columns Work
8017CON20330 [PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Conc. to Lower Landing) & GL S2 (Conc. to Upper Landing) (2nos)
8017CON20340 [PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Lower Landing to Platform Landing) (1nos)
RC Beams/ Steps & Landing Slab Works
8017CON20350 [PH1B-PLF4] Cast Lower & Upper Landing RC Beams/Slabs and RC Steps at GL S1 to S2
8017CON20360 [PH1B-PLF4] Cast Platform Landing RC Beams/Slabs and RC Steps at GL LA1 to S2
Roofing Works
8017CON20370 [PH1B-PLF4] Erection of Metal Posts/ Frames/ Cat Ledder/ Alum. composite Roof over New Access Staircase1 (GL LA1 to S2)
Remaining Work
Milestone
Summary
10.0d
10.0d
10.0d
12.0d
12.0d
21.0d
21.0d
30.0d
30.0d
322.4d
294.7d
5.0d
10.0d
10.0d
5.0d
4.0d
9.0d
9.0d
9.0d
9.0d
106.0d
14.0d
14.0d
14.0d
162.4d
7.0d
21.0d
80.8d
49.8d
10.0d
9.0d
60.8d
21.0d
21.0d
10.0d
10.0d
459.9d
317.9d
141.8d
10.0d
15.0d
15.0d
10.0d
45.0d
45.0d
30.0d
30.0d
156.9d
85.2d
7.0d
43.0d
40.0d
67.1d
5.0d
6.0d
10.0d
12.0d
21.0d
21.0d
14.0d
14.0d
7.0d
9.0d
20.3d
14.0d
14.0d
102.0d
102.0d
11.0d
7.0d
7.0d
10.0d
7.0d
7.0d
7.0d
7.0d
42.0d
21.0d
21.0d
21.0d
21.0d
118.8d
118.8d
7.0d
10.0d
10.0d
7.0d
7.0d
9.0d
9.0d
9.0d
9.0d
56.6d
21.0d
21.0d
21.0d
02-Mar-15 A
07-Apr-15 A
15-Jun-15 A
28-Aug-15 A
01-Sep-15 A
26-Jul-15 A
26-Jul-15 A
10-Sep-15 A
10-Sep-15 A
23-Feb-15 A
23-Feb-15 A
23-Feb-15 A
10-Mar-15 A
15-Nov-15 A
23-Feb-15 A
23-Feb-15 A
07-Apr-15 A
07-Apr-15 A
20-Nov-15 A
23-Nov-15 A
10-Jun-15 A
10-Jun-15 A
07-Aug-15 A
01-Sep-15 A
25-May-15 A
25-May-15 A
27-Nov-15 A
14-Sep-15 A
14-Sep-15 A
14-Sep-15 A
19-Oct-15 A
18-Sep-15 A
18-Sep-15 A
21-Oct-15 A
23-Oct-15 A
23-Oct-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
30-Jan-15 A
22-Aug-15 A
23-Jan-16 A
23-Jan-16 A
01-Sep-15 A
01-Sep-15 A
06-Sep-15 A
06-Sep-15 A
06-Sep-15 A
15-Sep-15 A
15-Sep-15 A
12-Oct-15 A
12-Oct-15 A
14-Oct-15 A
26-Oct-15 A
28-Oct-15 A
19-Nov-15 A
18-Nov-15 A
05-Nov-15 A
17-Nov-15 A
21-Oct-15 A
21-Oct-15 A
07-Jan-16 A
17-Jan-16 A
07-Jan-16 A
05-Mar-16 A
05-Mar-16 A
05-Mar-16 A
21-Apr-16 A
11-May-16 A
22-Mar-16 A
21-Apr-16 A
26-May-16 A
21-May-16 A
10-Jul-16
26-May-16 A
28-May-16 A
26-May-16 A
17-Jul-16
17-Jul-16
27-Feb-16 A
27-Feb-16 A
27-Feb-16 A
17-Apr-16 A
17-Apr-16 A
12-Mar-16 A
27-Jun-16 A
06-May-16 A
05-Jul-16
27-Apr-16 A
26-May-16 A
08-Jun-16
08-Jun-16
14-Jul-16
26-May-16 A
Finish
22-May-15 A
17-Jun-15 A
07-Aug-15 A
31-Aug-15 A
09-Sep-15 A
28-Aug-15 A
28-Aug-15 A
30-Oct-15 A
30-Oct-15 A
30-Nov-15 A
25-Nov-15 A
17-May-15 A
25-Mar-15 A
19-Nov-15 A
18-May-15 A
23-Jun-15 A
18-May-15 A
23-May-15 A
22-Nov-15 A
25-Nov-15 A
19-Sep-15 A
17-Aug-15 A
19-Sep-15 A
07-Sep-15 A
30-Nov-15 A
27-Nov-15 A
30-Nov-15 A
29-Oct-15 A
22-Oct-15 A
17-Sep-15 A
22-Oct-15 A
26-Oct-15 A
23-Oct-15 A
26-Oct-15 A
29-Oct-15 A
29-Oct-15 A
06-Oct-16
27-Feb-16 A
19-Sep-15 A
30-Jan-15 A
30-Jan-15 A
18-Sep-15 A
19-Sep-15 A
27-Feb-16 A
27-Feb-16 A
29-Jan-16 A
29-Jan-16 A
19-Jan-16 A
05-Nov-15 A
11-Sep-15 A
05-Nov-15 A
22-Oct-15 A
17-Jan-16 A
25-Oct-15 A
18-Nov-15 A
25-Nov-15 A
22-Dec-15 A
17-Jan-16 A
17-Jan-16 A
27-Nov-15 A
29-Dec-15 A
21-Nov-15 A
26-Nov-15 A
19-Jan-16 A
19-Jan-16 A
11-Jan-16 A
07-Aug-16
17-Jul-16
31-Mar-16 A
30-Apr-16 A
20-May-16 A
17-Apr-16 A
05-May-16 A
23-Jun-16
26-May-16 A
17-Jul-16
10-Jul-16
21-Jun-16
10-Jul-16
07-Aug-16
07-Aug-16
17-Aug-16
06-Aug-16
08-Mar-16 A
01-Jul-16
05-Aug-16
16-Apr-16 A
08-Jun-16
05-Jul-16
14-Jul-16
06-Aug-16
06-Aug-16
04-Aug-16
29-Jun-16
04-Aug-16
17-Aug-16
Duration %
Complete
Nonlabor Units
% Complete
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
73.26%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
38.24%
75.29%
100%
100%
100%
100%
100%
80%
100%
0%
16.67%
20%
20%
0%
0%
38.24%
47.08%
100%
80%
90%
100%
50%
60%
0%
90%
90%
0%
0%
0%
50%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
69.34%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
86.67%
100%
100%
100%
100%
100%
80%
100%
0%
20%
20%
20%
0%
0%
47.57%
72.86%
100%
80%
90%
100%
50%
60%
0%
90%
90%
0%
0%
0%
50%
31-May-16 15:49
Physical % S
Complete
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
100%
0%
100%
100%
0%
100%
0%
100%
0%
0%
0%
Page 4 of 5
Activity Name
Original Start
Duration
8017CON30340 [PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over ST1 (GL LB5 to LB9)
Platform 3 - New Access Staircase (GL S1 to S2)
RC Columns Work
8017CON30350 [PH2-PLF3] Cast 400x400mm RC Columns at GL S1 (Conc. to Lower Landing) & GL S2 (Conc. to Upper Landing) (2nos)
8017CON30360 [PH2-PLF3] Cast 400x400mm RC Columns at GL S1 (Lower Landing to Platform Landing) (1nos)
RC Beams/ Steps & Landing Slab Works
8017CON30370 [PH2-PLF3] Cast Lower & Upper Landing RC Beams/Slabs and RC Steps at GL S1 to S2
8017CON30380 [PH2-PLF3] Cast Platform Landing RC Beams/Slabs and RC Steps at GL LB1 to S2
Roofing Works
8017CON30390 [PH2-PLF3] Erection of Metal Posts/ Frames/ Cat Ladder/ Alum. composite Roof over New Access Staircase1 (GL LB1 to S2)
Installation
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
8017INS10010
[PH1A-HCLW] Conceal to Existing RWDP Pipe and Finishes
8017INS10020
[PH1A-HCLW] Installation of Alum Clading with Frame & Galzed Balustrade
8017INS10030
[PH1A-HCLW] Floor Finishes including Interlocking Tiles
8017INS10040
[PH1A-HCLW] Installation E&M works by C8017 & SWC
LRT New Fare Gate Area
8017INS11010
[PH1A-LRTAFC] Installation of New Full High Glazed Alum. Frame Wall Panel
8017INS11020
[PH1A-LRTAFC] Floor Finishes including New Homogeneous Tiles
8017INS11030
[PH1A-LRTAFC] Installation of New Metal Security Shutter infront of New Faregate
8017INS11040
[PH1A-LRTAFC] Installation E&M works by C8017 & SWC
MRT New Fare Gate Area
8017INS12010
[PH1A-MRTAFC] Installation of New Glazed Balustrade
8017INS12020
[PH1A-MRTAFC] Floor Finishes including New Granite Floor
8017INS12030
[PH1A-MRTAFC] Installation of New Motorised Security Shutter
8017INS12040
[PH1A-MRTAFC] Installation E&M works by C8017 & SWC
Reconstruction of Existing Staircase
8017INS13000
[PH1A-MRTST] Laying of Light-weight Blockwall under Landing
8017INS13010
[PH1A-MRTST] Installation of New SS Glazed Balustrade Railing
8017INS13020
[PH1A-MRTST] Plaster & Painting to Blockwall/ Existing Wall & Exposed RC Surfaces
8017INS13030
[PH1A-MRTST] Floor Finishes including New Homogenious Tiles and Contrasting Nosing Tiles
8017INS13040
[PH1A-MRTST] Installation of New Alum. Ceiling underside Staircase
8017INS13050
[PH1A-MRTST] Installation E&M works by C8017 & SWC
STC/ITC
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
8017ITC10010
[PH1A-HCLW] Testing and Commissioning by C8017 & SWC
MRT New Fare Gate Area
8017ITC12010
[PH1A-MRTAFC] Testing and Commissioning by C8017 & SWC
LRT New Fare Gate Area
8017ITC11010
[PH1A-LRTAFC] Testing and Commissioning by C8017 & SWC
Reconstruction of Existing Staircase
8017ITC13010
[PH1A-MRTST] Testing and Commissioning by C8017 & SWC
Actual Work
Remaining Work
Milestone
Summary
Finish
Duration %
Complete
Nonlabor Units
% Complete
21.0d
81.0d
42.0d
14.0d
14.0d
42.0d
14.0d
14.0d
25.0d
25.0d
784.1d
26-May-16 A
17-Jul-16
17-Jul-16
17-Jul-16
14-Aug-16
31-Jul-16
31-Jul-16
28-Aug-16
11-Sep-16
11-Sep-16
08-Dec-14 A
17-Aug-16
06-Oct-16
28-Aug-16
31-Jul-16
28-Aug-16
11-Sep-16
14-Aug-16
11-Sep-16
06-Oct-16
06-Oct-16
03-Feb-17
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
77.04%
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
53.3%
412.5d
144.0d
4.0d
4.0d
4.0d
20.0d
80.0d
4.0d
4.0d
4.0d
20.0d
42.0d
10.0d
10.0d
10.0d
30.0d
88.5d
5.0d
5.0d
5.0d
10.0d
10.0d
25.0d
215.7d
215.7d
28.0d
28.0d
60.0d
30.0d
25.0d
45.0d
120.0d
120.0d
120.0d
120.0d
120.0d
180.0d
175.0d
28.0d
28.0d
30.0d
30.0d
25.0d
30.0d
120.0d
120.0d
120.0d
120.0d
120.0d
120.0d
632.5d
08-Dec-14 A
08-Dec-14 A
01-Apr-15 A
08-Dec-14 A
08-Dec-14 A
08-Dec-14 A
30-Mar-15 A
04-Jun-15 A
16-Apr-15 A
18-Apr-15 A
30-Mar-15 A
27-Mar-15 A
18-Apr-15 A
16-Apr-15 A
18-Apr-15 A
27-Mar-15 A
25-Oct-15 A
25-Oct-15 A
28-Oct-15 A
18-Nov-15 A
12-Nov-15 A
16-Nov-15 A
24-Nov-15 A
07-Sep-15 A
05-Oct-15 A
21-Oct-15 A
27-Oct-15 A
15-Oct-15 A
17-Jan-16 A
05-Oct-15 A
18-Mar-16 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Aug-16
07-Aug-16
07-Aug-16
04-Sep-16
05-Nov-16
05-Dec-16
04-Jan-17
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
29-Apr-15 A
10-Dec-15 A
01-May-15 A
01-May-15 A
12-Jan-15 A
12-Dec-14 A
09-Jan-15 A
13-Jul-15 A
13-Jul-15 A
15-May-15 A
02-May-15 A
13-Jul-15 A
18-Jun-15 A
21-May-15 A
21-Apr-15 A
02-May-15 A
18-Jun-15 A
10-Dec-15 A
25-Nov-15 A
25-Nov-15 A
23-Nov-15 A
10-Dec-15 A
10-Dec-15 A
26-Nov-15 A
13-Apr-16 A
13-Apr-16 A
17-Dec-15 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
13-Apr-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
08-Mar-16 A
03-Feb-17
29-Jan-17
04-Sep-16
02-Oct-16
05-Dec-16
04-Jan-17
29-Jan-17
05-Nov-16
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
25-Mar-17
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
92.09%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80.77%
283.4d
40.0d
40.0d
55.0d
55.0d
40.0d
40.0d
25.0d
25.0d
50.0d
50.0d
50.0d
50.0d
50.0d
50.0d
29-Apr-15 A
01-Mar-16 A
01-Mar-16 A
29-Apr-15 A
29-Apr-15 A
22-Jun-15 A
22-Jun-15 A
25-Nov-15 A
25-Nov-15 A
04-Mar-16 A
04-Mar-16 A
04-Mar-16 A
03-Feb-17
03-Feb-17
03-Feb-17
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
08-Jun-15 A
08-Jun-15 A
13-Jul-15 A
13-Jul-15 A
27-Nov-15 A
27-Nov-15 A
15-Apr-16 A
15-Apr-16 A
15-Apr-16 A
25-Mar-17
25-Mar-17
25-Mar-17
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
31-May-16 15:49
Physical % S
Complete
0%
0%
0%
0%
0%
0%
10-Dec-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
01-May-15 A, High Covered Linkway
[PH1A-HCLW] Conceal to Existing RWDP Pipe and Finishes
[PH1A-HCLW] Installation of Alum Clading with Frame & Galzed Balustrade
[PH1A-HCLW] Floor Finishes including Interlocking Tiles
[PH1A-HCLW] Installation E&M works by C8017 & SWC
13-Jul-15 A, LRT New Fare Gate Area
[PH1A-LRTAFC] Installation of New Full High Glazed Alum. Frame Wall Panel
[PH1A-LRTAFC] Floor Finishes including New Homogeneous Tiles
[PH1A-LRTAFC] Installation of New Metal Security Shutter infront of New Faregate
[PH1A-LRTAFC] Installation E&M works by C8017 & SWC
18-Jun-15 A, MRT New Fare Gate Area
[PH1A-MRTAFC] Installation of New Glazed Balustrade
[PH1A-MRTAFC] Floor Finishes including New Granite Floor
[PH1A-MRTAFC] Installation of New Motorised Security Shutter
[PH1A-MRTAFC] Installation E&M works by C8017 & SWC
10-Dec-15 A, Reconstruction of Existing Staircase
[PH1A-MRTST] Laying of Light-weight Blockwall under Landing
[PH1A-MRTST] Installation of New SS Glazed Balustrade Railing
[PH1A-MRTST] Plaster & Painting to Blockwall/ Existing Wall & Exposed RC Surfaces
[PH1A-MRTST] Floor Finishes including New Homogenious Tiles and Contrasting No
[PH1A-MRTST] Installation of New Alum. Ceiling underside Staircase
[PH1A-MRTST] Installation E&M works by C8017 & SWC
13-Apr-16 A, Phase 1B - Platform 4 & Staircase
13-Apr-16 A, Architectural Finishes
[PH1B-PLF4] Laying of Light-weight Blockwall with Access Panel
[PH1B-PLF4] Plaster & Painting to RC Parapet Wall/ Blockwall
[PH1B-PLF4] Architectural Finishing & Alum Cladding/Glazed Panels/
[PH1B-PLF4] Glass Railing/ Starcase Railing/ Rain Louvres/ Alum. Co
[PH1B-PLF4] Floor Finishes including New Homogenious Tiles/ Tactile
[PH1B-PLF4] Installation of Half Height Barriers at Platform Level (
23-Mar-16 A, E&M Installation works by C8017 & SWC
[PH1B-PLF4] Installation of Electrical System
[PH1B-PLF4] Installation of Mechanical Ventilation System
[PH1B-PLF4] Installation of Fire Protection System
[PH1B-PLF4] Installation of Environment Control System
03-Feb-17, Phase 2 - P
29-Jan-17, Architectural
[PH2-PLF3] Laying of Light-weight Blockwall w
[PH2-PLF3] Plaster & Painting to RC Par
[PH2-PLF3] Architectural Finish
[PH2-PLF3] Glass Railing/ S
[PH2-PLF3] Floor Finish
[PH2-PLF3] Installation of Half Heigh
03-Feb-17, E&M Install
[PH2-PLF3] Reconstruc
[PH2-PLF3] Installation
[PH2-PLF3] Installation
[PH2-PLF3] Installation
[PH2-PLF3] Installation
25-Mar-17, STC
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
23-Mar-16 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
23-Mar-16 A, High Covered Linkway
[PH1A-HCLW] Testing and Commissioning by C8017 & SWC
100%
100%
100%
100%
100%
0%
Page 5 of 5