1605 C8017 BLP RB (07 05 2014) (May 16 Report)

Activity ID

Classic WBS Layout

Activity Name

1605 C8017 BLP RB (07 05 2014) (May 16 Report)


General
Key Dates
Contract Award
8017GEN10010
Contract Award
Design Submission
8017GEN10020
Approval in Principle (AIP)
8017GEN10030
Cut-of Date for Exchange of Information of Preliminary Design Submission
8017GEN10040
Preliminary Design Submission
8017GEN10050
Cut-of Date for Exchange of Information of Final Design Submission
8017GEN10060
Final Design Submission
CSD/SEM Design Submission
8017GEN10070
Cut-of Date for Exchange of Information of Pre-final CSD/SEM Design Submission
8017GEN10080
Pre-final CSD/SEM Design Submission
8017GEN10090
Cut-of Date for Exchange of Information of Final CSD/SEM Design Submission
8017GEN10100
Final CSD/SEM Design Submission
Sectional Completion
8017GEN10110
Completion of Covered Linkway between New Side LRT Platform 4 & Commercial Bldg
8017GEN10120
Completion of Works at LRT new Fare Gate Area to Support Operation of the new Fare Gate
8017GEN10130
Completion of Works at MRT new Fare Gate Area to Support Operation of the new Fare Gate
8017GEN10140
Completion of Reconstruction of Existing Staircase
8017GEN10150
Basic Structure Completion - New LRT Platform 4
8017GEN10160
Completion of New LRT Platform 4 (Incl. TOP)
8017GEN10170
Basic Structure Completion - New LRT Platform 3
8017GEN10180
Completion of New LRT Platform 3 (Incl. TOP)
8017GEN10760
Handover of High Covered Linkway to Lot 1 (A&A)
Interface Key Dates
8017GEN10190
Access Available at LRT area for Commencement of Fare Gate Installation by C1372
8017GEN10200
Access Available at MRT area for Commencement of Fare Gate Installation by C1372
Other Key Dates
8017GEN10210
LV power turn on to SWC isolators at New Fare Gate - LRT Area
8017GEN10220
LV power turn on to SWC isolators at New Fare Gate - MRT Area
8017GEN10230
LV power turn on to SWC isolators at New LRT Platform 4
8017GEN10240
LV power turn on to SWC isolators at New LRT Platform 3
Completion of the Whole of the Project
8017GEN10300
Completion of the Whole of the Works

Preliminaries / Time Based Items


General
8017GEN10410
Setting up the site for Safety / Health / Environment / Site Security and Vehicular Control
8017GEN10420
Environmental Safety and Security Activities
8017GEN10430
Maintenance and Diversion of Utility services
8017GEN10440
Laboratory test reports
8017GEN10450
Temporary Occupation License (TOL) for Work Site
8017GEN10460
Performance Bond & Mobilization advance bond
8017GEN10470
Insurances
8017GEN10480
Disposal of Waste Material
8017GEN10490
Signages/ Press and public relation matters
8017GEN10500
Maintaining and Servicing Temporary Accommodations and Facilities
8017GEN10510
Site Management
8017GEN10520
Project Quality Plan
8017GEN10530
Scheduling information and Programme & Planning for the works
8017GEN10540
Temporary Water Supply (site office)
8017GEN10550
Temporary Electricity & Lighting Supply (site office)
8017GEN10560
Progress Photographs
8017GEN10570
Traffic Devices Variable Message Signs (VMS) Min 2.5m x 1.8m
8017GEN10580
Erecting and Maintainance of Temporary site hoarding/ protected walkways and accesses
8017GEN10590
Removal of Temporary Site Hoarding/ Protected Walkways/ Reinstatement and Final Cleaning
Moblilisation
8017GEN10610
Contractor's Obligations (Plant & Equipment)
Surveying Work
8017GEN10620
Setting out and Site surveying works
8017GEN10630
Post Construction Condition Survey
Scaffolding / Staging Works
8017GEN10640
Contractor's Obligations (Scaffolding)
Site Office Set-up
8017GEN10650
Construction of Engineer & Contractor Site Offices & Facilities
8017GEN10660
Maintenance of Engineer & Contractor Site Offices & Facilities
8017GEN10670
Demolition of Engineer & Contractor Site Offices & Facilities and Reinstatement
Instrumention and Monitoring Works
8017GEN10680
Contractor's instrumentation and monitoring works
Authority Clearances
8017GEN10700
Factory License Application
8017GEN10710
Obtain Permit to Carry out Works from BCA
8017GEN10720
Application & Approval of first TOL
8017GEN10730
Application of Utility Services for Site office
8017GEN10740
Application for ECM from NEA (for Site Office & Facility area)

Design
Approval In Principle Submission
8017DSG20010
8017DSG20020
8017DSG20030
8017DSG20040

[AIP]
[AIP]
[AIP]
[AIP]

Preparation & Submission AIP (C&S/Archi) to LTA


Review & Comments by LTA
Preparation & Resubmission to LTA
Review & Acceptance by LTA

[PLD]
[PLD]
[PLD]
[PLD]

Preparation & Submission of Preliminary Design to LTA


Review & Comments of Preliminary Design to LTA
Preparation & Resubmission of Preliminary Design to LTA
Review & Acceptance of Preliminary Design to LTA

[FND]
[FND]
[FND]
[FND]

Preparation & Submission of Final Design to LTA


Review & Comments by LTA
Preparation & Resubmission to LTA
Review & Acceptance by LTA

Preliminary Design
8017DSG20050
8017DSG20060
8017DSG20070
8017DSG20080

Final Design
8017DSG20090
8017DSG20100
8017DSG20210
8017DSG20220

Pre-Final CSD/SEM Design


8017DSG20300
8017DSG20310

[PLD CSD/SEM] Preparation & Submission of Pre-final CSD/SEM Design to LTA


[PLD CSD/SEM] Review & Comments by LTA

Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

Original Start
Duration

Finish

1352.1d 10-Sep-13 A

31-May-16 15:49
Physical % S
Complete

Duration %
Complete

Nonlabor Units
% Complete

24-May-17

73.59%

79.25%

24-May

1352.1d 10-Sep-13 A

24-May-17

73.59%

100%

24-May

1352.1d
0.0d
0.0d
630.0d
0.0d
0.0d
0.0d
0.0d
0.0d
547.0d
0.0d
0.0d
0.0d
0.0d
693.1d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
279.5d
0.0d
0.0d
552.1d
0.0d
0.0d
0.0d
0.0d
0.0d
0.0d
1269.0d
1269.0d
1147.0d
1147.0d
1147.0d
1147.0d
1070.0d
90.0d
1057.0d
1147.0d
1147.0d
1147.0d
1147.0d
90.0d
1147.0d
965.0d
965.0d
1147.0d
1070.0d
1012.0d
60.0d
1147.0d
1147.0d
1268.9d
60.0d
60.0d
1000.0d
1000.0d
1194.0d
45.0d
977.0d
50.0d
1087.0d
1087.0d
241.0d
30.0d
15.0d
45.0d
30.0d
30.0d
1352.1d

10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Dec-13 A

24-May-17
10-Sep-13 A

10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
01-Nov-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
21-Dec-13 A
21-Dec-13 A
10-Sep-13 A
10-Sep-13 A
01-Nov-13 A
01-Jan-17
10-Sep-13 A
10-Sep-13 A
28-Oct-13 A
28-Oct-13 A
31-Dec-16
31-Dec-13 A
31-Dec-13 A
01-Nov-13 A
01-Nov-13 A
21-Dec-13 A
11-Jan-17
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
10-Sep-13 A
23-Mar-14 A
10-Sep-13 A
01-Nov-13 A
01-Nov-13 A
10-Sep-13 A

08-Jun-15 A
16-Dec-13 A
10-Dec-13 A
25-Feb-14 A
21-Feb-14 A
08-Jun-15 A
18-Oct-14 A
30-Jan-14 A
04-Mar-14 A
10-Apr-14 A
18-Oct-14 A
24-May-17
01-Jun-16*
13-Jul-15 A
26-Jun-15 A
18-Dec-15 A
30-Oct-15 A
01-Jun-16*
06-Oct-16*
24-May-17*
01-Jun-16*
25-May-15 A
16-Apr-15 A
25-May-15 A
03-Feb-17
15-Jun-15 A
27-Apr-15 A
02-Feb-16 A
03-Feb-17*
24-May-17
24-May-17*
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
01-Mar-17
05-Dec-13 A
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
02-Mar-17
03-Dec-13 A
02-Mar-17
01-Jan-17
01-Jan-17
02-Mar-17
01-Mar-17
01-Jan-17
02-Mar-17
02-Mar-17
02-Mar-17
01-Mar-17
30-Dec-13 A
01-Mar-17
31-Dec-16
31-Dec-16
02-Mar-17
20-Dec-13 A
11-Jan-17
02-Mar-17
02-Mar-17
02-Mar-17
23-Mar-14 A
12-Sep-13 A
23-Mar-14 A
01-Nov-13 A
20-Dec-13 A
20-Dec-13 A
24-May-17

73.59%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
48.48%
0%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
78.38%
78.38%
76.11%
76.11%
76.11%
76.11%
74.4%
100%
74.04%
76.11%
76.11%
76.11%
76.11%
100%
76.11%
77.82%
77.82%
76.11%
74.4%
78.85%
0%
76.11%
76.11%
95.27%
100%
0%
78.61%
78.61%
77.05%
100%
77.07%
0%
74.79%
74.79%
100%
100%
100%
100%
100%
100%
73.59%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
90.81%

98.0d
56.0d
14.0d
14.0d
14.0d
93.0d
51.0d
14.0d
14.0d
14.0d
589.6d
67.0d
14.0d
14.0d
14.0d
80.0d
38.0d
14.0d

10-Sep-13 A
10-Sep-13 A
17-Dec-13 A
04-Feb-14 A
11-Feb-14 A
25-Nov-13 A
25-Nov-13 A
01-Jan-14 A
01-Feb-14 A
15-Feb-14 A
01-Feb-14 A
01-Feb-14 A
01-Oct-14 A
01-Oct-14 A
24-Jun-15 A
15-Feb-14 A
15-Feb-14 A
05-Mar-14 A

17-Feb-14 A
16-Dec-13 A
04-Feb-14 A
11-Feb-14 A
17-Feb-14 A
17-Jun-15 A
25-Feb-14 A
22-Mar-14 A
09-Apr-15 A
17-Jun-15 A
26-Jun-15 A
07-Jun-15 A
23-Jun-15 A
16-Jun-15 A
26-Jun-15 A
31-May-14 A
04-Mar-14 A
04-May-14 A

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

30-Jan-14 A

26-Jun-15 A

16-Apr-15 A

27-Apr-15 A

24-May-17

24-May
100%

10-Sep-13 A, Contract Award


Contract Award
08-Jun-15 A, Design Submission

100%
100%
100%
100%
100%
100%
100%
100%
100%

Approval in Principle (AIP)


Cut-of Date for Exchange of Information of Preliminary Design Submission
Preliminary Design Submission
Cut-of Date for Exchange of Information of Final Design Submission
Final Design Submission
18-Oct-14 A, CSD/SEM Design Submission
Cut-of Date for Exchange of Information of Pre-final CSD/SEM Design Submission
Pre-final CSD/SEM Design Submission
Cut-of Date for Exchange of Information of Final CSD/SEM Design Submission
Final CSD/SEM Design Submission
24-May
Completion of Covered Linkway between New Side LRT Pla
Completion of Works at LRT new Fare Gate Area to Support Operation of the new Fare Gate
Completion of Works at MRT new Fare Gate Area to Support Operation of the new Fare Gate
Completion of Reconstruction of Existing Staircase
Basic Structure Completion - New LRT Platform 4
Completion of New LRT Platform 4 (Incl. TOP)
Basic Structure Completion - New LRT P
Comple
Handover of High Covered Linkway to Lot 1 (A&A)
25-May-15 A, Interface Key Dates
Access Available at LRT area for Commencement of Fare Gate Installation by C1372
Access Available at MRT area for Commencement of Fare Gate Installation by C1372
03-Feb-17, Other Key D
LV power turn on to SWC isolators at New Fare Gate - LRT Area
LV power turn on to SWC isolators at New Fare Gate - MRT Area
LV power turn on to SWC isolators at New LRT Platform 4
LV power turn on to SW
24-May
Comple
02-Mar-17, Prelimin
02-Mar-17, General
Setting up the site
Environmental Safe
Maintenance and D
Laboratory test repo
Temporary Occupat

0%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
100%
100%
0%
0%

60.07%
60.07%
60.07%
60.07%
57.2%
100%
56.67%
60.07%
60.07%
60.07%
60.07%
100%
60.07%
58.75%
58.75%
60.07%
57.2%
60.66%
0%

Performance Bond & Mobilization advance bond


Insurances
Disposal of Waste
Signages/ Press an
Maintaining and Se
Site Management
Project Quality Plan
Scheduling informa
Temporary Water Supply (sit
Temporary Electricity & Ligh
Progress Photograp
Traffic Devices Var
Erecting and Maintainance o
Removal of Tempor
02-Mar-17, Moblilis
Contractor's Obliga
01-Mar-17, Surveyin

60.04%
100%
0%

Setting out and Site surveying works


Post Construction C
31-Dec-16, Scaffolding / Sta
Contractor's Obligations (Sc
02-Mar-17, Site Off

60.2%
100%
58.23%
0%

Construction of Engineer & Contractor Site Offices & Facilities


Maintenance of Engineer &
Demolition of Engin
02-Mar-17, Instrum
Contractor's instrum

57.86%
23-Mar-14 A, Authority Clearances
100%
100%
100%
100%
100%

Factory License Application


Obtain Permit to Carry out Works from BCA
Application & Approval of first TOL
Application of Utility Services for Site office
Application for ECM from NEA (for Site Office & Facility area)
24-May

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Page 1 of 5

17-Feb-14 A, Approval In Principle Submission


[AIP] Preparation & Submission AIP (C&S/Archi) to LTA
[AIP] Review & Comments by LTA
[AIP] Preparation & Resubmission to LTA
[AIP] Review & Acceptance by LTA
17-Jun-15 A, Preliminary Design
[PLD] Preparation & Submission of Preliminary Design to LTA
[PLD] Review & Comments of Preliminary Design to LTA
[PLD] Preparation & Resubmission of Preliminary Design to LTA
[PLD] Review & Acceptance of Preliminary Design to LTA
26-Jun-15 A, Final Design
[FND] Preparation & Submission of Final Design to LTA
[FND] Review & Comments by LTA
[FND] Preparation & Resubmission to LTA
[FND] Review & Acceptance by LTA
31-May-14 A, Pre-Final CSD/SEM Design
[PLD CSD/SEM] Preparation & Submission of Pre-final CSD/SEM Design to LTA
[PLD CSD/SEM] Review & Comments by LTA
TASK filter: All Activities
Oracle Corporation

1605 C8017 BLP RB (07 05 2014) (May 16 Report)


Activity ID

Classic WBS Layout

Activity Name
8017DSG20320
8017DSG20330

Original Start
Duration

[PLD CSD/SEM] Preparation & Resubmission to LTA


[PLD CSD/SEM] Review & Acceptance by LTA

Final CSD/SEM Design


8017DSG20340
8017DSG20350
8017DSG20360
8017DSG20370

[FND CSD/SEM]
[FND CSD/SEM]
[FND CSD/SEM]
[FND CSD/SEM]

Preparation & Submission of Final CSD/SEM Design to LTA


Review & Comments by LTA
Preparation & Resubmission to LTA
Review & Acceptance by LTA

Other Authority / AC / BCA Submissions


URA Submission
8017DSG20610
8017DSG20620
AC Submission
8017DSG20710
8017DSG20720
BCA Submission
8017DSG20810
8017DSG20820
DBC Submission
8017DSG20910
8017DSG20920

[URA] Preparation & Submission to URA


[URA] Approval & Acceptance by URA
[AC] Preparation & Submission to AC
[AC] Approval & Acceptance of by AC
[BCA] Preparation & Submission to BCA
[BCA] Approval & Acceptance by BCA
[DBC] Preparation & Submission to DBC
[DBC] Approval & Acceptance by DBC

As-Built Drawings
8017DSG10870

As-Built Information

RI / TOP Submission
Building Control (TOP/CSC) Submission
Phase 1A - New LRT Fare Gate and High Covered Linkway
8017DSG31140 [PH1A-TOP-LRT] Request & Pre-inspection (TFP/FSC) Works
8017DSG31150 [PH1A-TOP-LRT] Inspection by RI (M&E)
8017DSG31160 [PH1A-TOP-LRT] Inspection by RI (ARCH)
8017DSG31170 [PH1A-TOP-LRT] Insurance of TFP/FSC
8017DSG31180 [PH1A-TOP-LRT] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31190 [PH1A-TOP-LRT] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1A - New MRT Fare Gate
8017DSG31200 [PH1A-TOP-MRT] Request & Pre-inspection (TFP/FSC) Works
8017DSG31210 [PH1A-TOP-MRT] Inspection by RI (M&E)
8017DSG31220 [PH1A-TOP-MRT] Inspection by RI (ARCH)
8017DSG31230 [PH1A-TOP-MRT] Insurance of TFP/FSC
8017DSG31240 [PH1A-TOP-MRT] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31250 [PH1A-TOP-MRT] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1A - New Staircase
8017DSG31260 [PH1A-TOP-ST] Request & Pre-inspection (TFP/FSC) Works
8017DSG31270 [PH1A-TOP-ST] Inspection by RI (M&E)
8017DSG31280 [PH1A-TOP-ST] Inspection by RI (ARCH)
8017DSG31290 [PH1A-TOP-ST] Insurance of TFP/FSC
8017DSG31300 [PH1A-TOP-ST] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG31310 [PH1A-TOP-ST] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 1B - New Platform 4
8017DSG10750 [PH1B-TOP] Request & Pre-inspection (TFP/FSC) Works
8017DSG10760 [PH1B-TOP] Inspection by RI (M&E)
8017DSG10770 [PH1B-TOP] Inspection by RI (ARCH)
8017DSG10780 [PH1B-TOP] Insurance of TFP/FSC
8017DSG10790 [PH1B-TOP] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG10800 [PH1B-TOP] BCA Submission/ Inspection/ Procession & Insurance of TOP
Phase 2 - New Platform 3 (Including affected shops)
8017DSG10810 [PH2-TOP] Request & Pre-inspection (TFP/FSC) Works
8017DSG10820 [PH2-TOP] Inspection by RI (M&E)
8017DSG10830 [PH2-TOP] Inspection by RI (ARCH)
8017DSG10840 [PH2-TOP] Insurance of TFP/FSC
8017DSG10850 [PH2-TOP] CBPU Compliance Certificate Insurance (TOP) if any
8017DSG10860 [PH2-TOP] BCA Submission/ Inspection/ Procession & Insurance of TOP

Procurement/Manufacturing/Fabrication
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017PMF10010 [PH1A-HCLW] Procurement & Fabrication of Steel Structure Columns including Roof trusses
LRT New Fare Gate Area
General
8017PMF10020 [PH1A-LRTAFC] Procurement & Fabrication of Metal Canopy over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017PMF10030 [PH1A-MRTAFC] Procurement & Fabrication of Portal with Alumin. Cladding at MRT New Fare Gate
Reconstruction of Existing Staircase
Structural Steel
8017PMF10040 [PH1A-MRTST] Procurement & Fabrication of Steel Structure Columns/Frame of New Staircase

Phase 1B - Platform 4 & Staircase


E&M Systems
8017PMF20030
8017PMF20040
8017PMF20050
8017PMF20060
Structural Steel
8017PMF20010

[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]

Procurement
Procurement
Procurement
Procurement

&
&
&
&

Fabrication of
Fabrication of
Fabrication of
Fabrication of

Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System

[PH1B-PLF4] Procurement & Fabrication of Steel Structure Columns, UBs, Steel Roof trusses

Phase 2 - Platform 3/ Mezzanine Floor/ Staircase


Structural Steel
8017PMF30010
E&M Systems
8017PMF30030
8017PMF30040
8017PMF30050
8017PMF30060

[PH2-PLF3] Procurement & Fabrication of Steel Structure Columns, UBs, Steel Roof trusses
[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]

Procurement
Procurement
Procurement
Procurement

&
&
&
&

Fabrication of
Fabrication of
Fabrication of
Fabrication of

Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System

Delivery
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017DLV10010
[PH1A-HCLW] Delivery of Steel Structure Columns including Roof trusses
LRT New Fare Gate Area
General
Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

Finish

Duration %
Complete

Nonlabor Units
% Complete

14.0d
14.0d
569.0d
55.0d
14.0d
14.0d
14.0d
133.0d
59.0d
45.0d
14.0d
28.0d
14.0d
14.0d
74.0d
60.0d
14.0d
74.0d
60.0d
14.0d
120.0d
120.0d
697.1d
697.1d
309.0d
22.0d
7.0d
7.0d
7.0d
14.0d
14.0d
92.0d
32.0d
7.0d
7.0d
7.0d
14.0d
14.0d
30.0d
10.0d
5.0d
5.0d
5.0d
10.0d
10.0d
131.0d
20.0d
10.0d
10.0d
10.0d
10.0d
10.0d
60.0d
20.0d
10.0d
10.0d
10.0d
20.0d
20.0d
633.7d

04-May-14 A
18-May-14 A
18-May-14 A
18-May-14 A
01-Oct-14 A
17-Jul-15 A
28-Sep-15 A
01-Jan-14 A
01-Jan-14 A
01-Jan-14 A
25-Jan-14 A
25-Feb-14 A
25-Feb-14 A
22-Mar-14 A
25-Feb-14 A
25-Feb-14 A
22-Mar-14 A
22-Mar-14 A
22-Mar-14 A
22-May-14 A
11-May-15 A
11-May-15 A
15-May-15 A
15-May-15 A
15-May-15 A
27-May-15 A
15-May-15 A
15-May-15 A
26-Feb-16 A
24-Mar-16 A
24-Mar-16 A
15-May-15 A
02-Jun-15 A
15-May-15 A
15-May-15 A
15-Jun-15 A
21-Jun-15 A
22-Jun-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
11-Dec-15 A
26-Feb-16 A
26-Feb-16 A
26-Feb-16 A
26-Feb-16 A
24-Mar-16 A
24-Mar-16 A
24-Mar-16 A
25-Mar-17
25-Mar-17
14-Apr-17
24-Apr-17
24-Apr-17
04-May-17
04-May-17
15-Aug-14 A

18-May-14 A
31-May-14 A
01-Jun-16
08-Oct-14 A
16-Jul-15 A
27-Sep-15 A
01-Jun-16
23-Jun-15 A
06-Aug-14 A
24-Jan-14 A
06-Aug-14 A
23-Jun-15 A
17-Nov-14 A
23-Jun-15 A
15-Jun-15 A
23-Nov-14 A
15-Jun-15 A
25-May-15 A
27-May-14 A
25-May-15 A
27-Feb-17
27-Feb-17
24-May-17
24-May-17
06-Apr-16 A
28-May-15 A
16-May-15 A
16-May-15 A
06-Apr-16 A
06-Apr-16 A
06-Apr-16 A
27-Jun-15 A
17-Jun-15 A
16-May-15 A
16-May-15 A
25-Jun-15 A
26-Jun-15 A
27-Jun-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
15-Dec-15 A
06-Apr-16 A
24-Mar-16 A
24-Mar-16 A
24-Mar-16 A
06-Apr-16 A
06-Apr-16 A
06-Apr-16 A
24-May-17
14-Apr-17
24-Apr-17
04-May-17
04-May-17
24-May-17
24-May-17
21-Jun-16

100%
100%
99.95%
100%
100%
100%
98.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30%
30%
91.39%
91.39%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
96.8%

100%
100%
99.69%
100%
100%
100%
98.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
74.79%
74.79%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
95.92%

196.3d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
45.0d
320.3d
200.0d
200.0d
200.0d
200.0d
200.0d
120.0d
120.0d
322.7d
120.0d
120.0d
200.0d
200.0d
200.0d
200.0d
200.0d
665.3d

15-Aug-14 A
15-Aug-14 A
15-Aug-14 A
15-Aug-14 A
01-Oct-14 A
01-Oct-14 A
01-Oct-14 A
01-Jan-15 A
01-Jan-15 A
01-Jan-15 A
01-Oct-14 A
01-Oct-14 A
01-Oct-14 A
29-Sep-14 A
01-Dec-14 A
02-Dec-14 A
02-Dec-14 A
02-Dec-14 A
01-Dec-14 A
29-Sep-14 A
29-Sep-14 A
01-Aug-15 A
01-Aug-15 A
01-Aug-15 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
04-Oct-14 A

01-Feb-15 A
30-Sep-14 A
30-Sep-14 A
30-Sep-14 A
28-Dec-14 A
28-Dec-14 A
28-Dec-14 A
01-Feb-15 A
01-Feb-15 A
01-Feb-15 A
30-Jan-15 A
30-Jan-15 A
30-Jan-15 A
21-Feb-15 A
30-Dec-14 A
23-Dec-14 A
30-Dec-14 A
30-Dec-14 A
21-Dec-14 A
21-Feb-15 A
21-Feb-15 A
21-Jun-16
03-Jun-16
03-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
21-Jun-16
27-Jul-16

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
93.72%
98%
98%
90%
90%
90%
90%
90%
91.9%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
91.04%
98%
98%
90%
90%
90%
90%
90%
73.27%

204.8d
3.0d
3.0d
3.0d
3.0d
3.0d

04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
31-Oct-14 A
31-Oct-14 A

28-Feb-15 A
04-Oct-14 A
04-Oct-14 A
04-Oct-14 A
28-Feb-15 A
28-Feb-15 A

100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

31-May-16 15:49
Physical % S
Complete
100%
100%
100%
100%
100%
0%

100%
100%
100%
100%
100%
100%
100%
100%
5%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%

[PLD CSD/SEM] Preparation & Resubmission to LTA


[PLD CSD/SEM] Review & Acceptance by LTA
01-Jun-16, Final CSD/SEM Design
[FND CSD/SEM] Preparation & Submission of Final CSD/SEM Design to LTA
[FND CSD/SEM] Review & Comments by LTA
[FND CSD/SEM] Preparation & Resubmission to LTA
[FND CSD/SEM] Review & Acceptance by LTA
23-Jun-15 A, Other Authority / AC / BCA Submissions
06-Aug-14 A, URA Submission
[URA] Preparation & Submission to URA
[URA] Approval & Acceptance by URA
23-Jun-15 A, AC Submission
[AC] Preparation & Submission to AC
[AC] Approval & Acceptance of by AC
15-Jun-15 A, BCA Submission
[BCA] Preparation & Submission to BCA
[BCA] Approval & Acceptance by BCA
25-May-15 A, DBC Submission
[DBC] Preparation & Submission to DBC
[DBC] Approval & Acceptance by DBC
27-Feb-17, As-Built
As-Built Information
24-May
24-May
06-Apr-16 A, Phase 1A - New LRT Fare Gate and High Covered Link
[PH1A-TOP-LRT] Request & Pre-inspection (TFP/FSC) Works
[PH1A-TOP-LRT] Inspection by RI (M&E)
[PH1A-TOP-LRT] Inspection by RI (ARCH)
[PH1A-TOP-LRT] Insurance of TFP/FSC
[PH1A-TOP-LRT] CBPU Compliance Certificate Insurance (TOP) if
[PH1A-TOP-LRT] BCA Submission/ Inspection/ Procession & Insur
27-Jun-15 A, Phase 1A - New MRT Fare Gate
[PH1A-TOP-MRT] Request & Pre-inspection (TFP/FSC) Works
[PH1A-TOP-MRT] Inspection by RI (M&E)
[PH1A-TOP-MRT] Inspection by RI (ARCH)
[PH1A-TOP-MRT] Insurance of TFP/FSC
[PH1A-TOP-MRT] CBPU Compliance Certificate Insurance (TOP) if any
[PH1A-TOP-MRT] BCA Submission/ Inspection/ Procession & Insurance of TOP
15-Dec-15 A, Phase 1A - New Staircase
[PH1A-TOP-ST] Request & Pre-inspection (TFP/FSC) Works
[PH1A-TOP-ST] Inspection by RI (M&E)
[PH1A-TOP-ST] Inspection by RI (ARCH)
[PH1A-TOP-ST] Insurance of TFP/FSC
[PH1A-TOP-ST] CBPU Compliance Certificate Insurance (TOP) if any
[PH1A-TOP-ST] BCA Submission/ Inspection/ Procession & Insurance of TOP
06-Apr-16 A, Phase 1B - New Platform 4
[PH1B-TOP] Request & Pre-inspection (TFP/FSC) Works
[PH1B-TOP] Inspection by RI (M&E)
[PH1B-TOP] Inspection by RI (ARCH)
[PH1B-TOP] Insurance of TFP/FSC
[PH1B-TOP] CBPU Compliance Certificate Insurance (TOP) if any
[PH1B-TOP] BCA Submission/ Inspection/ Procession & Insurance
24-May
[PH2-TOP] R
[PH2-TOP]
[PH2-TOP
[PH2-TOP
[PH2-T
[PH2-T
21-Jun-16, Procurement/Manufacturing/Fabrication
01-Feb-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
30-Sep-14 A, High Covered Linkway
30-Sep-14 A, General
[PH1A-HCLW] Procurement & Fabrication of Steel Structure Columns including Roof trusses
28-Dec-14 A, LRT New Fare Gate Area
28-Dec-14 A, General
[PH1A-LRTAFC] Procurement & Fabrication of Metal Canopy over New Fare Gate Lobby
01-Feb-15 A, MRT New Fare Gate Area
01-Feb-15 A, General
[PH1A-MRTAFC] Procurement & Fabrication of Portal with Alumin. Cladding at MRT New Fare Gate
30-Jan-15 A, Reconstruction of Existing Staircase
30-Jan-15 A, Structural Steel
[PH1A-MRTST] Procurement & Fabrication of Steel Structure Columns/Frame of New Staircase
21-Feb-15 A, Phase 1B - Platform 4 & Staircase
30-Dec-14 A, E&M Systems
[PH1B-PLF4] Procurement & Fabrication of Electrical System
[PH1B-PLF4] Procurement & Fabrication of Mechanical Vantilation System
[PH1B-PLF4] Procurement & Fabrication of Fire Protection System
[PH1B-PLF4] Procurement & Fabrication of Environment Control System
21-Feb-15 A, Structural Steel
[PH1B-PLF4] Procurement & Fabrication of Steel Structure Columns, UBs, Steel Roof trusses
21-Jun-16, Phase 2 - Platform 3/ Mezzanine Floor/ Stairc
03-Jun-16, Structural Steel
[PH2-PLF3] Procurement & Fabrication of Steel Structure C
21-Jun-16, E&M Systems
[PH2-PLF3] Procurement & Fabrication of Electrical Sys
[PH2-PLF3] Procurement & Fabrication of Mechanical Va
[PH2-PLF3] Procurement & Fabrication of Fire Protection
[PH2-PLF3] Procurement & Fabrication of Environment C
27-Jul-16, Delivery

100%

100%

100%

100%

100%
100%
100%
100%
100%

0%
0%
0%
0%
0%

28-Feb-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
04-Oct-14 A, High Covered Linkway
04-Oct-14 A, General
[PH1A-HCLW] Delivery of Steel Structure Columns including Roof trusses
28-Feb-15 A, LRT New Fare Gate Area
28-Feb-15 A, General

100%

Page 2 of 5

TASK filter: All Activities


Oracle Corporation

1605 C8017 BLP RB (07 05 2014) (May 16 Report)


Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

8017DLV10020
[PH1A-LRTAFC] Delivery of Metal Canopy over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017DLV10030
[PH1A-MRTAFC] Delivery of Portal with Alumin. Cladding at MRT New Fare Gate
Reconstruction of Existing Staircase
Structural Steel
8017DLV10040
[PH1A-MRTST] Delivery of Steel Structure Columns/Frame of New Staircase

Phase 1B - Platform 4 & Staircase


Structural Steel
8017DLV20010
E&M Systems
8017DLV20030
8017DLV20040
8017DLV20050
8017DLV20060

[PH1B-PLF4] Delivery of Steel Structure Columns, UBs, Steel Roof trusses


[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]
[PH1B-PLF4]

Delivery of
Delivery of
Delivery of
Delivery of

Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System

Phase 2 - Platform 3/ Mezzanine Floor/ Staircase


Structural Steel
8017DLV30010
E&M Systems
8017DLV30030
8017DLV30040
8017DLV30050
8017DLV30060

[PH2-PLF3] Delivery of Steel Structure Columns, UBs, Steel Roof trusses


[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]
[PH2-PLF3]

Delivery of
Delivery of
Delivery of
Delivery of

Electrical System
Mechanical Vantilation System
Fire Protection System
Environment Control System

Construction
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
General
8017CON10000 [PH1A-HCLW] Setting out and Publish Notice and Agreement with Lot 1
8017CON10010 [PH1A-HCLW] Hoarding up and install Monitoring Device
Substructure Works
8017CON10050 [PH1A-HCLW] Excavation and RC Footing Works with Cast-in-items (or Pile Caps if applicable)
8017CON10060 [PH1A-HCLW] Topping Up Floor to Road Level with Ramp & Drain Cov er
8017CON10770 [PH1A-HCLW] Installation of Bored Micro Pile - 2 nos & Testing
8017CON31380 [PH1A-HCLW] Moblization of Piling Machine and Equipments
Super Structure Works
8017CON10080 [PH1A-HCLW] Erection of Steel Structure Columns including Roof trusses
8017CON10090 [PH1A-HCLW] Roof Covering Work (Connect to Lot 1 Side)
LRT New Fare Gate Area
General
8017CON11010 [PH1A-LRTAFC] Setting out and Publish Notice
8017CON11020 4436819
8017CON11030 [PH1A-LRTAFC] Demolition of Existing Staircase/ Glazed Pannel Door & Canopy
8017CON11040 [PH1A-LRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
Structure Works
8017CON11060 [PH1A-LRTAFC] Erection of Metal Canopy with Alum False Ceiling over New Fare Gate Lobby
MRT New Fare Gate Area
General
8017CON12010 [PH1A-MRTAFC] Setting out and Publish Notice and obtain SMRT Demolition Permit
8017CON12020 [PH1A-MRTAFC] Hoarding up and install Monitoring Device
8017CON12030 [PH1A-MRTAFC] Demolition of Existing 3 Shops (#01-36/37/38) & Advert Panels
8017CON12040 [PH1A-MRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
Structure Works
8017CON12050 [PH1A-MRTAFC] Erection of Portal with Alumin. Cladding & Alum. Ceiling at MRT New Fare Gate
Reconstruction of Existing Staircase
General
8017CON13010 [PH1A-MRTST] Setting out and Publish Notice and obtain PTW from DBC/SMRT
8017CON13020 [PH1A-MRTST] Hoarding up and install Monitoring Device by SWC
8017CON13040 [PH1A-MRTST] Existing Services to be Supporting Works
8017CON13050 [PH1A-MRTST] Demolition of Existing Staircase/ Advert Panels with Control System
Structure Works
8017CON13070 [PH1A-MRTST] Erection of Steel Structure/ Steps & Landing with 6mm S-Plate & Concrete of New Staircase

Phase 1B - Platform 4 & Staircase


General
General
8017CON20000 [PH1B-PLF4] Setting out and Publish Notice
8017CON20010 [PH1B-PLF4] Installation of Monitoring Instrumentation
8017CON20020 [PH1B-PLF4] Trial Trenching works
8017CON20030 [PH1B-PLF4] Erection of Site Hoarding the Work Area
Demolition Works
8017CON20040 [PH1B-PLF4] Demolition Works
Drain Diversion Works
8017CON20050 [PH1B-PLF4] Construction of New RC Drain with Grating Cover to Replace on Existing Drain
Substructure Works
Pile Load Test/ Piling Work
8017CON20060 [PH1B-PLF4] Moblization of Piling Machine and Equipments
8017CON20090 [PH1B-PLF4] Installation of Bored Micro Pile - 20nos (GL S2 to LA7) & Testing
8017CON20100 [PH1B-PLF4] Installation of Bored Micro Pile - 9nos (GL LA7 to LA10) & Testing
Pile Cap/ RC Stumps/ Ground Beams Work
8017CON20110 [PH1B-PLF4] Excavation Work & Lean Concrete Work (GL LA7 to LA10)
8017CON20120 [PH1B-PLF4] Excavation Work & Lean Concrete Work (GL S2 to LA7)
8017CON20130 [PH1B-PLF4] Construction of Pile Caps - 8nos (GL LA7 to LA10)
8017CON20140 [PH1B-PLF4] Construction of Pile Caps - 18nos (GL S2 to LA7)
8017CON20150 [PH1B-PLF4] Construction of Ground Beams (GL LA7 to LA10)
8017CON20160 [PH1B-PLF4] Construction of Ground Beams (GL S2 to LA7)
8017CON20170 [PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL LA7 to LA10)
8017CON20180 [PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL S2 to LA7)
8017CON21110 [PH1B-PLF4] ECC Check with Pile Hacking Works - 12nos (GL LA7 to LA10)
8017CON21120 [PH1B-PLF4] ECC Check with Pile Hacking Works - 16nos (GL S2 to LA7)
RC Ground Slabs & Beams
8017CON20190 [PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL LA7 to LA10)
8017CON20200 [PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL S1 to LA7)
Platform 4 - Super Structure Works (GL LA1 to LA7)
Erection of Steel Structure Work (Incl. Night Work)
8017CON20210 [PH1B-PLF4] Erection of Steel Columns at Mezzanine Level (GL LA1 to LA7)
8017CON20220 [PH1B-PLF4] Erection of Steel Columns at Platform Level (GL LA1 to LA7)
8017CON20230 [PH1B-PLF4] Erection of Steel Columns at Roof Level (GL LA1 to LA7)
Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

Finish

Duration %
Complete

Nonlabor Units
% Complete

3.0d
3.0d
3.0d
3.0d
14.0d
14.0d
14.0d
355.0d
21.0d
21.0d
60.0d
60.0d
60.0d
60.0d
60.0d
149.7d
21.0d
21.0d
60.0d
60.0d
60.0d
60.0d
60.0d
920.1d

31-Oct-14 A
13-Feb-15 A
13-Feb-15 A
13-Feb-15 A
30-Oct-14 A
30-Oct-14 A
30-Oct-14 A
31-Oct-14 A
31-Oct-14 A
31-Oct-14 A
01-Sep-15 A
01-Sep-15 A
01-Sep-15 A
21-Dec-15 A
01-Sep-15 A
01-Jan-16 A
01-Jan-16 A
01-Jan-16 A
21-May-16 A
21-May-16 A
21-May-16 A
21-May-16 A
21-May-16 A
26-Feb-14 A

28-Feb-15 A
17-Feb-15 A
17-Feb-15 A
17-Feb-15 A
31-Oct-14 A
31-Oct-14 A
31-Oct-14 A
10-Jan-16 A
23-Mar-15 A
23-Mar-15 A
10-Jan-16 A
30-Dec-15 A
30-Dec-15 A
10-Jan-16 A
23-Dec-15 A
27-Jul-16
05-Jun-16
05-Jun-16
27-Jul-16
27-Jul-16
27-Jul-16
27-Jul-16
27-Jul-16
06-Oct-16

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
64%
92%
92%
40%
40%
40%
40%
40%
86.63%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
44.18%
92%
92%
40%
40%
40%
40%
40%
86.94%

576.0d
283.0d
12.0d
5.0d
7.0d
182.0d
15.0d
5.0d
21.0d
14.0d
69.5d
10.0d
7.0d
344.0d
242.1d
5.0d
10.0d
14.0d
7.0d
21.0d
21.0d
277.6d
186.5d
5.0d
14.0d
25.0d
25.0d
17.0d
17.0d
485.0d
485.0d
5.0d
7.0d
7.0d
20.0d
45.0d
45.0d
653.6d
343.0d
50.0d
10.0d
15.0d
15.0d
10.0d
21.0d
21.0d
21.0d
21.0d
154.1d
90.0d
7.0d
55.0d
28.0d
49.9d
6.0d
8.0d
10.0d
14.0d
12.0d
14.0d
12.0d
14.0d
6.0d
8.0d
19.9d
12.0d
14.0d
243.2d
213.2d
10.0d
10.0d
12.0d

26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
28-Mar-14 A
28-May-14 A
21-Jul-14 A
01-Oct-14 A
04-Jun-14 A
28-May-14 A
28-Oct-14 A
28-Oct-14 A
04-Nov-14 A
01-May-14 A
01-May-14 A
01-May-14 A
15-May-14 A
12-Aug-14 A
07-Nov-14 A
27-Feb-15 A
27-Feb-15 A
01-Oct-14 A
01-Oct-14 A
08-Jan-15 A
01-Oct-14 A
20-Oct-14 A
28-Jan-15 A
24-Apr-15 A
24-Apr-15 A
01-Jun-14 A
01-Jun-14 A
01-Jun-14 A
05-Jan-15 A
26-Sep-15 A
27-Sep-15 A
14-Jun-15 A
14-Jun-15 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
03-May-14 A
18-Apr-14 A
28-Mar-14 A
02-Dec-14 A
02-Dec-14 A
12-Jul-14 A
12-Jul-14 A
28-May-14 A
28-May-14 A
28-May-14 A
04-Jun-14 A
04-Jun-14 A
12-Jul-14 A
29-Jul-14 A
13-Aug-14 A
11-Aug-14 A
11-Aug-14 A
13-Sep-14 A
25-Sep-14 A
13-Sep-14 A
13-Sep-14 A
04-Aug-14 A
12-Jul-14 A
13-Sep-14 A
13-Sep-14 A
26-Sep-14 A
02-Mar-15 A
02-Mar-15 A
02-Mar-15 A
07-Mar-15 A
12-Jul-15 A

24-Oct-15 A
14-Apr-15 A
25-May-14 A
20-Mar-14 A
25-May-14 A
31-Oct-14 A
26-Jul-14 A
31-Oct-14 A
18-Jun-14 A
03-Jun-14 A
14-Apr-15 A
18-Nov-14 A
14-Apr-15 A
16-Apr-15 A
10-Dec-14 A
05-May-14 A
31-May-14 A
09-Dec-14 A
10-Dec-14 A
16-Apr-15 A
16-Apr-15 A
28-May-15 A
16-Apr-15 A
07-Mar-15 A
10-Oct-14 A
14-Apr-15 A
16-Apr-15 A
28-May-15 A
28-May-15 A
24-Oct-15 A
12-Oct-15 A
05-Jun-14 A
12-Jan-15 A
28-Sep-15 A
12-Oct-15 A
24-Oct-15 A
24-Oct-15 A
30-Nov-15 A
20-Dec-14 A
25-May-14 A
20-Mar-14 A
20-May-14 A
12-May-14 A
25-May-14 A
20-Dec-14 A
20-Dec-14 A
11-Aug-14 A
11-Aug-14 A
02-May-15 A
30-Aug-14 A
03-Jun-14 A
30-Aug-14 A
29-Aug-14 A
15-Apr-15 A
08-Sep-14 A
26-Oct-14 A
20-Sep-14 A
03-Jan-15 A
15-Apr-15 A
15-Dec-14 A
15-Apr-15 A
07-Mar-15 A
16-Sep-14 A
06-Oct-14 A
02-May-15 A
02-May-15 A
23-Dec-14 A
30-Oct-15 A
09-Sep-15 A
14-Mar-15 A
20-May-15 A
24-Jul-15 A

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

31-May-16 15:49
Physical % S
Complete

[PH1A-LRTAFC] Delivery of Metal Canopy over New Fare Gate Lobby


17-Feb-15 A, MRT New Fare Gate Area
17-Feb-15 A, General
[PH1A-MRTAFC] Delivery of Portal with Alumin. Cladding at MRT New Fare Gate
31-Oct-14 A, Reconstruction of Existing Staircase
31-Oct-14 A, Structural Steel
[PH1A-MRTST] Delivery of Steel Structure Columns/Frame of New Staircase
10-Jan-16 A, Phase 1B - Platform 4 & Staircase
23-Mar-15 A, Structural Steel
[PH1B-PLF4] Delivery of Steel Structure Columns, UBs, Steel Roof trusses
10-Jan-16 A, E&M Systems
[PH1B-PLF4] Delivery of Electrical System
[PH1B-PLF4] Delivery of Mechanical Vantilation System
[PH1B-PLF4] Delivery of Fire Protection System
[PH1B-PLF4] Delivery of Environment Control System
27-Jul-16, Phase 2 - Platform 3/ Mezzanine Floor/ S
05-Jun-16, Structural Steel
[PH2-PLF3] Delivery of Steel Structure Columns, UBs, Ste
27-Jul-16, E&M Systems
[PH2-PLF3] Delivery of Electrical System
[PH2-PLF3] Delivery of Mechanical Vantilation Syst
[PH2-PLF3] Delivery of Fire Protection System
[PH2-PLF3] Delivery of Environment Control System
06-Oct-16, Construction

100%

100%

100%

100%
100%
100%
100%
100%

0%
0%
0%
0%
0%

24-Oct-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
14-Apr-15 A, High Covered Linkway
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
Page 3 of 5

25-May-14 A, General
[PH1A-HCLW] Setting out and Publish Notice and Agreement with Lot 1
[PH1A-HCLW] Hoarding up and install Monitoring Device
31-Oct-14 A, Substructure Works
[PH1A-HCLW] Excavation and RC Footing Works with Cast-in-items (or Pile Caps if applicable)
[PH1A-HCLW] Topping Up Floor to Road Level with Ramp & Drain Cov er
[PH1A-HCLW] Installation of Bored Micro Pile - 2 nos & Testing
[PH1A-HCLW] Moblization of Piling Machine and Equipments
14-Apr-15 A, Super Structure Works
[PH1A-HCLW] Erection of Steel Structure Columns including Roof trusses
[PH1A-HCLW] Roof Covering Work (Connect to Lot 1 Side)
16-Apr-15 A, LRT New Fare Gate Area
10-Dec-14 A, General
[PH1A-LRTAFC] Setting out and Publish Notice
4436819
[PH1A-LRTAFC] Demolition of Existing Staircase/ Glazed Pannel Door & Canopy
[PH1A-LRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
16-Apr-15 A, Structure Works
[PH1A-LRTAFC] Erection of Metal Canopy with Alum False Ceiling over New Fare Gate Lobby
28-May-15 A, MRT New Fare Gate Area
16-Apr-15 A, General
[PH1A-MRTAFC] Setting out and Publish Notice and obtain SMRT Demolition Permit
[PH1A-MRTAFC] Hoarding up and install Monitoring Device
[PH1A-MRTAFC] Demolition of Existing 3 Shops (#01-36/37/38) & Advert Panels
[PH1A-MRTAFC] Existing Services (E&M Cables) to be Supported (Ceiling)
28-May-15 A, Structure Works
[PH1A-MRTAFC] Erection of Portal with Alumin. Cladding & Alum. Ceiling at MRT New Fare Gate
24-Oct-15 A, Reconstruction of Existing Staircase
12-Oct-15 A, General
[PH1A-MRTST] Setting out and Publish Notice and obtain PTW from DBC/SMRT
[PH1A-MRTST] Hoarding up and install Monitoring Device by SWC
[PH1A-MRTST] Existing Services to be Supporting Works
[PH1A-MRTST] Demolition of Existing Staircase/ Advert Panels with Control System
24-Oct-15 A, Structure Works
[PH1A-MRTST] Erection of Steel Structure/ Steps & Landing with 6mm S-Plate & Concrete
30-Nov-15 A, Phase 1B - Platform 4 & Staircase
20-Dec-14 A, General
25-May-14 A, General
[PH1B-PLF4] Setting out and Publish Notice
[PH1B-PLF4] Installation of Monitoring Instrumentation
[PH1B-PLF4] Trial Trenching works
[PH1B-PLF4] Erection of Site Hoarding the Work Area
20-Dec-14 A, Demolition Works
[PH1B-PLF4] Demolition Works
11-Aug-14 A, Drain Diversion Works
[PH1B-PLF4] Construction of New RC Drain with Grating Cover to Replace on Existing Drain
02-May-15 A, Substructure Works
30-Aug-14 A, Pile Load Test/ Piling Work
[PH1B-PLF4] Moblization of Piling Machine and Equipments
[PH1B-PLF4] Installation of Bored Micro Pile - 20nos (GL S2 to LA7) & Testing
[PH1B-PLF4] Installation of Bored Micro Pile - 9nos (GL LA7 to LA10) & Testing
15-Apr-15 A, Pile Cap/ RC Stumps/ Ground Beams Work
[PH1B-PLF4] Excavation Work & Lean Concrete Work (GL LA7 to LA10)
[PH1B-PLF4] Excavation Work & Lean Concrete Work (GL S2 to LA7)
[PH1B-PLF4] Construction of Pile Caps - 8nos (GL LA7 to LA10)
[PH1B-PLF4] Construction of Pile Caps - 18nos (GL S2 to LA7)
[PH1B-PLF4] Construction of Ground Beams (GL LA7 to LA10)
[PH1B-PLF4] Construction of Ground Beams (GL S2 to LA7)
[PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL LA7 to LA10)
[PH1B-PLF4] Construction of RC Stump with Cast-in-items (GL S2 to LA7)
[PH1B-PLF4] ECC Check with Pile Hacking Works - 12nos (GL LA7 to LA10)
[PH1B-PLF4] ECC Check with Pile Hacking Works - 16nos (GL S2 to LA7)
02-May-15 A, RC Ground Slabs & Beams
[PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL LA7 to LA10)
[PH1B-PLF4] Cast RC Slabs & Beams at Concourse Level (GL S1 to LA7)
30-Oct-15 A, Platform 4 - Super Structure Works (GL LA1 to LA7)
09-Sep-15 A, Erection of Steel Structure Work (Incl. Night Work)
[PH1B-PLF4] Erection of Steel Columns at Mezzanine Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Steel Columns at Platform Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Steel Columns at Roof Level (GL LA1 to LA7)
TASK filter: All Activities
Oracle Corporation

1605 C8017 BLP RB (07 05 2014) (May 16 Report)


Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

8017CON31160 [PH1B-PLF4] Erection of Steel Beams at Mezzanine Level (GL LA1 to LA7)
8017CON31170 [PH1B-PLF4] Erection of Steel Beams at Platform Level (GL LA1 to LA7)
8017CON31180 [PH1B-PLF4] Erection of Bondek at Platform Level (GL LA1 to LA7)
8017CON31190 [PH1B-PLF4] Erection of Roof Beams at Roof Level (GL LA1 to LA7)
8017CON31200 [PH1B-PLF4] Erection of Purlin at Roof Level (GL LA1 to LA7)
Composite Floor Slab Work @ Bondek
8017CON20240 [PH1B-PLF4] Installation of Protection Frame and Cast RC Slab on Bondek at Platform Level (GL LA1 to LA7)
Roofing Works
8017CON20250 [PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection (GL LA1 to LA7)
Platform 4 - Linkbridge Structure Works (GL LA7 to LA10)
Erection of Steel Structure Work (Incl. Night Work)
8017CON20260 [PH1B-PLF4] Erection of Steel Columns at Linkway Level (GL LA7 to LA10)
8017CON20270 [PH1B-PLF4] Erection of Steel Columns for Staircase at Platform Level (GL LA7 to LA10)
8017CON20280 [PH1B-PLF4] Erection of Steel Roof Truss at Roof Level (GL LA7 to LA10)
8017CON31210 [PH1B-PLF4] Erection of Steel Beams at Linkway Level (GL LA7 to LA10)
8017CON31220 [PH1B-PLF4] Erection of Bondek at Linkway Level (GL LA7 to LA10)
8017CON31230 [PH1B-PLF4] Erection of Steel Beams for Staircase at Platform Level (GL LA7 to LA10)
8017CON31240 [PH1B-PLF4] Erection of Bondek for Staircase at Platform Level (GL LA7 to LA10)
8017CON31250 [PH1B-PLF4] Erection of Steel Roof Beams at Roof Level (GL LA7 to LA10)
8017CON31260 [PH1B-PLF4] Erection of Purlin at Roof Level (GL LA7 to LA10)
Composite Floor Slab Works @ Bondek
8017CON20290 [PH1B-PLF4] Cast RC Slab on Bondek at Linkway Level (GL LA7 to LA10)
8017CON20300 [PH1B-PLF4] Cast RC Steps on Steel Staircase at Platform Level (GL LA7 to LA10)
8017CON20380 [PH1B-PLF4] Cast RC Parapet Wall/ RC Kerb (GL LA7 to LA10)
Roofing Works
8017CON20310 [PH1B-PLF4] Erection of New Clay Roofing over Pedestrain Linkbridge (GL LA9 to LA10)
8017CON20320 [PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection over ST1 (GL LA7 to LA9)
Platform 4 - New Access Staircase (GL S1 to S2)
RC Columns Work
8017CON20330 [PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Conc. to Lower Landing) & GL S2 (Conc. to Upper Landing) (2nos)
8017CON20340 [PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Lower Landing to Platform Landing) (1nos)
RC Beams/ Steps & Landing Slab Works
8017CON20350 [PH1B-PLF4] Cast Lower & Upper Landing RC Beams/Slabs and RC Steps at GL S1 to S2
8017CON20360 [PH1B-PLF4] Cast Platform Landing RC Beams/Slabs and RC Steps at GL LA1 to S2
Roofing Works
8017CON20370 [PH1B-PLF4] Erection of Metal Posts/ Frames/ Cat Ledder/ Alum. composite Roof over New Access Staircase1 (GL LA1 to S2)

Phase 2 - Platform 3/ Mezzanine Floor/ Staircase


General
General
8017CON30010 [PH2-PLF3] Setting out and Publish Notice and affected shops notice
8017CON30020 [PH2-PLF3] Installation of Monitoring Instrumentation
8017CON30030 [PH2-PLF3] Trial Trenching works
8017CON30040 [PH2-PLF3] Erection of Site Hoarding the Work Area
Demolition Works
8017CON30050 [PH2-PLF3] Demolition of Existing Shops/ Structures and Finishes
Utility Diversion Works
8017CON30060 [PH2-PLF3] Existing Utility Diversion (if any)
Substructure Works
Pile Load Test/ Piling Work
8017CON30070 [PH2-PLF3] Moblization of Piling Machine and Equipments
8017CON30100 [PH2-PLF3] Installation of Bored Micro Pile - 17nos (GL S2 to LB5) & Testing
8017CON30110 [PH2-PLF3] Installation of Bored Micro Pile - 14nos (GL LB5 to LB9) & Testing
Pile Cap/ RC Stumps/ Ground Beams Work
8017CON30120 [PH2-PLF3] Excavation Work & Lean Concrete Work - 10nos (GL LB5 to LB9)
8017CON30130 [PH2-PLF3] Excavation Work & Lean Concrete Work - 12nos (GL S2 to LB5)
8017CON30140 [PH2-PLF3] Construction of Pile Caps - 8nos (GL LB5 to LB9)
8017CON30150 [PH2-PLF3] Construction of Pile Caps - 13nos (GL S2 to LB5)
8017CON30160 [PH2-PLF3] Construction of Ground Beams (GL LB5 to LB9)
8017CON30170 [PH2-PLF3] Construction of Ground Beams (GL S2 to LB5)
8017CON30180 [PH2-PLF3] Construction of RC Stump with Cast-in-items (GL LB5 to LB9)
8017CON30190 [PH2-PLF3] Construction of RC Stump with Cast-in-items (GL S2 to LB5)
8017CON31120 [PH2-PLF3] ECC Check with Pile Hacking Works - 14nos (GL LB5 to LB9)
8017CON31130 [PH2-PLF3] ECC Check with Pile Hacking Works - 18nos (GL S2 to LB5)
RC Ground Slabs & Beams
8017CON30200 [PH2-PLF3] Cast RC Slabs & Beams at Concourse Level (GL LB5 to LB9)
8017CON30210 [PH2-PLF3] Cast RC Slabs & Beams at Concourse Level (GL S2 to LB5)
Platform 3 - Super Structure Works (GL LB1 to LB5)
Erection of Steel Structure Work (Incl. Night Work)
8017CON30220 [PH2-PLF3] Erection of Steel Columns at Mezzanine Level (GL LB1 to LB5)
8017CON30230 [PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB1 to LB5)
8017CON30240 [PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1 to LB5)
8017CON31270 [PH2-PLF3] Erection of Steel Beams at Mezzanine Level (GL LB1 to LB5)
8017CON31280 [PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1 to LB5)
8017CON31290 [PH2-PLF3] Erection of Bondek at Platform Level (GL LB1 to LB5)
8017CON31300 [PH2-PLF3] Erection of Roof Beams at Roof Level (GL LB1 to LB5)
8017CON31310 [PH2-PLF3] Erection of Purlin at Roof Level (GL LB1 to LB5)
Composite Floor Slab Work @ Bondek
8017CON30250 [PH2-PLF3] Cast RC Slab on Bondek at Mezzanine Level (GL LB1 to LB6)
8017CON30260 [PH2-PLF3] Installation of Protection Frame and Cast RC Slab on Bondek at Platform Level (GL LB1 to LB5)
Roofing Works
8017CON30270 [PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection (GL LB1 to LB5)
Platform 3 - Linkbridge Structure Works (GL LB5 to LB9)
Erection of Steel Structure Work (Incl. Night Work)
8017CON30280 [PH2-PLF3] Erection of Steel Columns at Linkway Level (GL LB5 to LB9)
8017CON30290 [PH2-PLF3] Erection of Steel Columns for Staircase at Platform Level (GL LB5 to LB9)
8017CON30300 [PH2-PLF3] Erection of Steel Roof Truss at Roof Level (GL LB5 to LB9)
8017CON31320 [PH2-PLF3] Erection of Steel Beams at Linkway Level (GL LB5 to LB9)
8017CON31330 [PH2-PLF3] Erection of Bondek at Linkway Level (GL LB5 to LB9)
8017CON31340 [PH2-PLF3] Erection of Steel Beams for Staircase at Platform Level (GL LB5 to LB9)
8017CON31350 [PH2-PLF3] Erection of Bondek for Staircase at Platform Level (GL LB5 to LB9)
8017CON31360 [PH2-PLF3] Erection of Steel Beams at Roof Level (GL LB5 to LB9)
8017CON31370 [PH2-PLF3] Erection of Purlin at Roof Level (GL LB5 to LB9)
Composite Floor Slab Works @ Bondek
8017CON30310 [PH2-PLF3] Cast New RC Ramp/ Slab on Bondek at Linkway to Mezzanine Level (GL LB5 to LB9)
8017CON30320 [PH2-PLF3] Cast RC Steps on Steel Staircase at Platform Level (GL LB5 to LB9)
Roofing Works
Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

10.0d
10.0d
10.0d
12.0d
12.0d
21.0d
21.0d
30.0d
30.0d
322.4d
294.7d
5.0d
10.0d
10.0d
5.0d
4.0d
9.0d
9.0d
9.0d
9.0d
106.0d
14.0d
14.0d
14.0d
162.4d
7.0d
21.0d
80.8d
49.8d
10.0d
9.0d
60.8d
21.0d
21.0d
10.0d
10.0d
459.9d
317.9d
141.8d
10.0d
15.0d
15.0d
10.0d
45.0d
45.0d
30.0d
30.0d
156.9d
85.2d
7.0d
43.0d
40.0d
67.1d
5.0d
6.0d
10.0d
12.0d
21.0d
21.0d
14.0d
14.0d
7.0d
9.0d
20.3d
14.0d
14.0d
102.0d
102.0d
11.0d
7.0d
7.0d
10.0d
7.0d
7.0d
7.0d
7.0d
42.0d
21.0d
21.0d
21.0d
21.0d
118.8d
118.8d
7.0d
10.0d
10.0d
7.0d
7.0d
9.0d
9.0d
9.0d
9.0d
56.6d
21.0d
21.0d
21.0d

02-Mar-15 A
07-Apr-15 A
15-Jun-15 A
28-Aug-15 A
01-Sep-15 A
26-Jul-15 A
26-Jul-15 A
10-Sep-15 A
10-Sep-15 A
23-Feb-15 A
23-Feb-15 A
23-Feb-15 A
10-Mar-15 A
15-Nov-15 A
23-Feb-15 A
23-Feb-15 A
07-Apr-15 A
07-Apr-15 A
20-Nov-15 A
23-Nov-15 A
10-Jun-15 A
10-Jun-15 A
07-Aug-15 A
01-Sep-15 A
25-May-15 A
25-May-15 A
27-Nov-15 A
14-Sep-15 A
14-Sep-15 A
14-Sep-15 A
19-Oct-15 A
18-Sep-15 A
18-Sep-15 A
21-Oct-15 A
23-Oct-15 A
23-Oct-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
06-Jan-15 A
30-Jan-15 A
22-Aug-15 A
23-Jan-16 A
23-Jan-16 A
01-Sep-15 A
01-Sep-15 A
06-Sep-15 A
06-Sep-15 A
06-Sep-15 A
15-Sep-15 A
15-Sep-15 A
12-Oct-15 A
12-Oct-15 A
14-Oct-15 A
26-Oct-15 A
28-Oct-15 A
19-Nov-15 A
18-Nov-15 A
05-Nov-15 A
17-Nov-15 A
21-Oct-15 A
21-Oct-15 A
07-Jan-16 A
17-Jan-16 A
07-Jan-16 A
05-Mar-16 A
05-Mar-16 A
05-Mar-16 A
21-Apr-16 A
11-May-16 A
22-Mar-16 A
21-Apr-16 A
26-May-16 A
21-May-16 A
10-Jul-16
26-May-16 A
28-May-16 A
26-May-16 A
17-Jul-16
17-Jul-16
27-Feb-16 A
27-Feb-16 A
27-Feb-16 A
17-Apr-16 A
17-Apr-16 A
12-Mar-16 A
27-Jun-16 A
06-May-16 A
05-Jul-16
27-Apr-16 A
26-May-16 A
08-Jun-16
08-Jun-16
14-Jul-16
26-May-16 A

Finish
22-May-15 A
17-Jun-15 A
07-Aug-15 A
31-Aug-15 A
09-Sep-15 A
28-Aug-15 A
28-Aug-15 A
30-Oct-15 A
30-Oct-15 A
30-Nov-15 A
25-Nov-15 A
17-May-15 A
25-Mar-15 A
19-Nov-15 A
18-May-15 A
23-Jun-15 A
18-May-15 A
23-May-15 A
22-Nov-15 A
25-Nov-15 A
19-Sep-15 A
17-Aug-15 A
19-Sep-15 A
07-Sep-15 A
30-Nov-15 A
27-Nov-15 A
30-Nov-15 A
29-Oct-15 A
22-Oct-15 A
17-Sep-15 A
22-Oct-15 A
26-Oct-15 A
23-Oct-15 A
26-Oct-15 A
29-Oct-15 A
29-Oct-15 A
06-Oct-16
27-Feb-16 A
19-Sep-15 A
30-Jan-15 A
30-Jan-15 A
18-Sep-15 A
19-Sep-15 A
27-Feb-16 A
27-Feb-16 A
29-Jan-16 A
29-Jan-16 A
19-Jan-16 A
05-Nov-15 A
11-Sep-15 A
05-Nov-15 A
22-Oct-15 A
17-Jan-16 A
25-Oct-15 A
18-Nov-15 A
25-Nov-15 A
22-Dec-15 A
17-Jan-16 A
17-Jan-16 A
27-Nov-15 A
29-Dec-15 A
21-Nov-15 A
26-Nov-15 A
19-Jan-16 A
19-Jan-16 A
11-Jan-16 A
07-Aug-16
17-Jul-16
31-Mar-16 A
30-Apr-16 A
20-May-16 A
17-Apr-16 A
05-May-16 A
23-Jun-16
26-May-16 A
17-Jul-16
10-Jul-16
21-Jun-16
10-Jul-16
07-Aug-16
07-Aug-16
17-Aug-16
06-Aug-16
08-Mar-16 A
01-Jul-16
05-Aug-16
16-Apr-16 A
08-Jun-16
05-Jul-16
14-Jul-16
06-Aug-16
06-Aug-16
04-Aug-16
29-Jun-16
04-Aug-16
17-Aug-16

Duration %
Complete

Nonlabor Units
% Complete

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
73.26%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
38.24%
75.29%
100%
100%
100%
100%
100%
80%
100%
0%
16.67%
20%
20%
0%
0%
38.24%
47.08%
100%
80%
90%
100%
50%
60%
0%
90%
90%
0%
0%
0%
50%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
69.34%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
86.67%
100%
100%
100%
100%
100%
80%
100%
0%
20%
20%
20%
0%
0%
47.57%
72.86%
100%
80%
90%
100%
50%
60%
0%
90%
90%
0%
0%
0%
50%

31-May-16 15:49
Physical % S
Complete

[PH1B-PLF4] Erection of Steel Beams at Mezzanine Level (GL LA1 to LA7)


[PH1B-PLF4] Erection of Steel Beams at Platform Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Bondek at Platform Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Roof Beams at Roof Level (GL LA1 to LA7)
[PH1B-PLF4] Erection of Purlin at Roof Level (GL LA1 to LA7)
28-Aug-15 A, Composite Floor Slab Work @ Bondek
[PH1B-PLF4] Installation of Protection Frame and Cast RC Slab on Bondek at Platform Level (GL LA
30-Oct-15 A, Roofing Works
[PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection (GL LA1 to LA
30-Nov-15 A, Platform 4 - Linkbridge Structure Works (GL LA7 to LA10)
25-Nov-15 A, Erection of Steel Structure Work (Incl. Night Work)
[PH1B-PLF4] Erection of Steel Columns at Linkway Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Steel Columns for Staircase at Platform Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Steel Roof Truss at Roof Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Steel Beams at Linkway Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Bondek at Linkway Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Steel Beams for Staircase at Platform Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Bondek for Staircase at Platform Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Steel Roof Beams at Roof Level (GL LA7 to LA10)
[PH1B-PLF4] Erection of Purlin at Roof Level (GL LA7 to LA10)
19-Sep-15 A, Composite Floor Slab Works @ Bondek
[PH1B-PLF4] Cast RC Slab on Bondek at Linkway Level (GL LA7 to LA10)
[PH1B-PLF4] Cast RC Steps on Steel Staircase at Platform Level (GL LA7 to LA10)
[PH1B-PLF4] Cast RC Parapet Wall/ RC Kerb (GL LA7 to LA10)
30-Nov-15 A, Roofing Works
[PH1B-PLF4] Erection of New Clay Roofing over Pedestrain Linkbridge (GL LA9 to LA1
[PH1B-PLF4] Erection of New Metal Roofing System with Lighting Protection over ST1
29-Oct-15 A, Platform 4 - New Access Staircase (GL S1 to S2)
22-Oct-15 A, RC Columns Work
[PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Conc. to Lower Landing) & GL S2 (Conc.
[PH1B-PLF4] Cast 400x400mm RC Columns at GL S1 (Lower Landing to Platform Landing)
26-Oct-15 A, RC Beams/ Steps & Landing Slab Works
[PH1B-PLF4] Cast Lower & Upper Landing RC Beams/Slabs and RC Steps at GL S1 to S2
[PH1B-PLF4] Cast Platform Landing RC Beams/Slabs and RC Steps at GL LA1 to S2
29-Oct-15 A, Roofing Works
[PH1B-PLF4] Erection of Metal Posts/ Frames/ Cat Ledder/ Alum. composite Roof over Ne
06-Oct-16, Phase 2 - Platform 3/ Mezzan
27-Feb-16 A, General
19-Sep-15 A, General
[PH2-PLF3] Setting out and Publish Notice and affected shops notice
[PH2-PLF3] Installation of Monitoring Instrumentation
[PH2-PLF3] Trial Trenching works
[PH2-PLF3] Erection of Site Hoarding the Work Area
27-Feb-16 A, Demolition Works
[PH2-PLF3] Demolition of Existing Shops/ Structures and Finishes
29-Jan-16 A, Utility Diversion Works
[PH2-PLF3] Existing Utility Diversion (if any)
19-Jan-16 A, Substructure Works
05-Nov-15 A, Pile Load Test/ Piling Work
[PH2-PLF3] Moblization of Piling Machine and Equipments
[PH2-PLF3] Installation of Bored Micro Pile - 17nos (GL S2 to LB5) & Testing
[PH2-PLF3] Installation of Bored Micro Pile - 14nos (GL LB5 to LB9) & Testing
17-Jan-16 A, Pile Cap/ RC Stumps/ Ground Beams Work
[PH2-PLF3] Excavation Work & Lean Concrete Work - 10nos (GL LB5 to LB9)
[PH2-PLF3] Excavation Work & Lean Concrete Work - 12nos (GL S2 to LB5)
[PH2-PLF3] Construction of Pile Caps - 8nos (GL LB5 to LB9)
[PH2-PLF3] Construction of Pile Caps - 13nos (GL S2 to LB5)
[PH2-PLF3] Construction of Ground Beams (GL LB5 to LB9)
[PH2-PLF3] Construction of Ground Beams (GL S2 to LB5)
[PH2-PLF3] Construction of RC Stump with Cast-in-items (GL LB5 to LB9)
[PH2-PLF3] Construction of RC Stump with Cast-in-items (GL S2 to LB5)
[PH2-PLF3] ECC Check with Pile Hacking Works - 14nos (GL LB5 to LB9)
[PH2-PLF3] ECC Check with Pile Hacking Works - 18nos (GL S2 to LB5)
19-Jan-16 A, RC Ground Slabs & Beams
[PH2-PLF3] Cast RC Slabs & Beams at Concourse Level (GL LB5 to LB9)
[PH2-PLF3] Cast RC Slabs & Beams at Concourse Level (GL S2 to LB5)
07-Aug-16, Platform 3 - Super Structure Works (G
17-Jul-16, Erection of Steel Structure Work (Incl. Nig
[PH2-PLF3] Erection of Steel Columns at Mezzanine Level (GL LB1
[PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB
[PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1
[PH2-PLF3] Erection of Steel Beams at Mezzanine Level (GL LB1
[PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1
[PH2-PLF3] Erection of Bondek at Platform Level (GL LB
[PH2-PLF3] Erection of Roof Beams at Roof Level (GL LB1
[PH2-PLF3] Erection of Purlin at Roof Level (GL LB1
10-Jul-16, Composite Floor Slab Work @ Bondek
[PH2-PLF3] Cast RC Slab on Bondek at Mezzanine Leve
[PH2-PLF3] Installation of Protection Frame and Cast
07-Aug-16, Roofing Works
[PH2-PLF3] Erection of New Metal Roofing Syste
17-Aug-16, Platform 3 - Linkbridge Structure Wo
06-Aug-16, Erection of Steel Structure Work (Incl
[PH2-PLF3] Erection of Steel Columns at Linkway Level (GL LB5 to LB9
[PH2-PLF3] Erection of Steel Columns for Staircase at
[PH2-PLF3] Erection of Steel Roof Truss at Roof L
[PH2-PLF3] Erection of Steel Beams at Linkway Level (GL LB5 to

100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
0%
100%
100%
0%
100%
0%
100%
0%

[PH2-PLF3] Erection of Steel Beams for Staircase at P


[PH2-PLF3] Erection of Bondek for Staircase at Platf
[PH2-PLF3] Erection of Steel Beams at Roof Leve
[PH2-PLF3] Erection of Purlin at Roof Level (GL L
04-Aug-16, Composite Floor Slab Works @ Bonde
[PH2-PLF3] Cast New RC Ramp/ Slab on Bondek at Lin
[PH2-PLF3] Cast RC Steps on Steel Staircase at
17-Aug-16, Roofing Works

0%
0%

Page 4 of 5

TASK filter: All Activities


Oracle Corporation

1605 C8017 BLP RB (07 05 2014) (May 16 Report)


Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

8017CON30340 [PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over ST1 (GL LB5 to LB9)
Platform 3 - New Access Staircase (GL S1 to S2)
RC Columns Work
8017CON30350 [PH2-PLF3] Cast 400x400mm RC Columns at GL S1 (Conc. to Lower Landing) & GL S2 (Conc. to Upper Landing) (2nos)
8017CON30360 [PH2-PLF3] Cast 400x400mm RC Columns at GL S1 (Lower Landing to Platform Landing) (1nos)
RC Beams/ Steps & Landing Slab Works
8017CON30370 [PH2-PLF3] Cast Lower & Upper Landing RC Beams/Slabs and RC Steps at GL S1 to S2
8017CON30380 [PH2-PLF3] Cast Platform Landing RC Beams/Slabs and RC Steps at GL LB1 to S2
Roofing Works
8017CON30390 [PH2-PLF3] Erection of Metal Posts/ Frames/ Cat Ladder/ Alum. composite Roof over New Access Staircase1 (GL LB1 to S2)

Installation
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
8017INS10010
[PH1A-HCLW] Conceal to Existing RWDP Pipe and Finishes
8017INS10020
[PH1A-HCLW] Installation of Alum Clading with Frame & Galzed Balustrade
8017INS10030
[PH1A-HCLW] Floor Finishes including Interlocking Tiles
8017INS10040
[PH1A-HCLW] Installation E&M works by C8017 & SWC
LRT New Fare Gate Area
8017INS11010
[PH1A-LRTAFC] Installation of New Full High Glazed Alum. Frame Wall Panel
8017INS11020
[PH1A-LRTAFC] Floor Finishes including New Homogeneous Tiles
8017INS11030
[PH1A-LRTAFC] Installation of New Metal Security Shutter infront of New Faregate
8017INS11040
[PH1A-LRTAFC] Installation E&M works by C8017 & SWC
MRT New Fare Gate Area
8017INS12010
[PH1A-MRTAFC] Installation of New Glazed Balustrade
8017INS12020
[PH1A-MRTAFC] Floor Finishes including New Granite Floor
8017INS12030
[PH1A-MRTAFC] Installation of New Motorised Security Shutter
8017INS12040
[PH1A-MRTAFC] Installation E&M works by C8017 & SWC
Reconstruction of Existing Staircase
8017INS13000
[PH1A-MRTST] Laying of Light-weight Blockwall under Landing
8017INS13010
[PH1A-MRTST] Installation of New SS Glazed Balustrade Railing
8017INS13020
[PH1A-MRTST] Plaster & Painting to Blockwall/ Existing Wall & Exposed RC Surfaces
8017INS13030
[PH1A-MRTST] Floor Finishes including New Homogenious Tiles and Contrasting Nosing Tiles
8017INS13040
[PH1A-MRTST] Installation of New Alum. Ceiling underside Staircase
8017INS13050
[PH1A-MRTST] Installation E&M works by C8017 & SWC

Phase 1B - Platform 4 & Staircase


Architectural Finishes
8017INS20010
[PH1B-PLF4] Laying of Light-weight Blockwall with Access Panel
8017INS20020
[PH1B-PLF4] Plaster & Painting to RC Parapet Wall/ Blockwall
8017INS20030
[PH1B-PLF4] Architectural Finishing & Alum Cladding/Glazed Panels/ Alum. Louvres to column and wall
8017INS20040
[PH1B-PLF4] Glass Railing/ Starcase Railing/ Rain Louvres/ Alum. Composite Roof/ Doors and Alum. False Ceilings
8017INS20050
[PH1B-PLF4] Floor Finishes including New Homogenious Tiles/ Tactile and Yellow Marking Tiles
8017INS20110
[PH1B-PLF4] Installation of Half Height Barriers at Platform Level (Night Work)
E&M Installation works by C8017 & SWC
8017INS20070
[PH1B-PLF4] Installation of Electrical System
8017INS20080
[PH1B-PLF4] Installation of Mechanical Ventilation System
8017INS20090
[PH1B-PLF4] Installation of Fire Protection System
8017INS20100
[PH1B-PLF4] Installation of Environment Control System

Phase 2 - Platform 3/ Mezzanine Floor/ Staircase


Architectural Finishes
8017INS30010
[PH2-PLF3] Laying of Light-weight Blockwall with Access Panel
8017INS30020
[PH2-PLF3] Plaster & Painting to RC Parapet Wall/ Blockwall
8017INS30030
[PH2-PLF3] Architectural Finishing & Alum Cladding/Glazed Panels/ Alum. Louvres to column and wall
8017INS30040
[PH2-PLF3] Glass Railing/ Starcase Railing/ Rain Louvres/ Alum. Composite Roof/ Doors and Alum. False Ceilings
8017INS30050
[PH2-PLF3] Floor Finishes including New Homogenious Tiles/ Tactile and Yellow Marking Tiles
8017INS30110
[PH2-PLF3] Installation of Half Height Barriers at Platform Level (Night Work)
E&M Installation works by C8017 & SWC & Reconstruction of Shops (A&A Works)
8017INS30060
[PH2-PLF3] Reconstruction of Demolished Shops at Platform 3 Corridor (A&A Works)
8017INS30070
[PH2-PLF3] Installation of Electrical System
8017INS30080
[PH2-PLF3] Installation of Mechanical Ventilation System
8017INS30090
[PH2-PLF3] Installation of Fire Protection System
8017INS30100
[PH2-PLF3] Installation of Environment Control System

STC/ITC
Phase 1A - MRT & LRT New Fare Gate & High Walkway
High Covered Linkway
8017ITC10010
[PH1A-HCLW] Testing and Commissioning by C8017 & SWC
MRT New Fare Gate Area
8017ITC12010
[PH1A-MRTAFC] Testing and Commissioning by C8017 & SWC
LRT New Fare Gate Area
8017ITC11010
[PH1A-LRTAFC] Testing and Commissioning by C8017 & SWC
Reconstruction of Existing Staircase
8017ITC13010
[PH1A-MRTST] Testing and Commissioning by C8017 & SWC

Phase 1B - Platform 4 & Staircase


General
8017ITC20010

[PH1B-PLF4] Testing Commissioning by C8017 & SWC

Phase 2 - Platform 3/ Mezzanine Floor/ Staircase


General
8017ITC30010

[PH2-PLF3] Testing Commissioning by C8017 & SWC

Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

Finish

Duration %
Complete

Nonlabor Units
% Complete

21.0d
81.0d
42.0d
14.0d
14.0d
42.0d
14.0d
14.0d
25.0d
25.0d
784.1d

26-May-16 A
17-Jul-16
17-Jul-16
17-Jul-16
14-Aug-16
31-Jul-16
31-Jul-16
28-Aug-16
11-Sep-16
11-Sep-16
08-Dec-14 A

17-Aug-16
06-Oct-16
28-Aug-16
31-Jul-16
28-Aug-16
11-Sep-16
14-Aug-16
11-Sep-16
06-Oct-16
06-Oct-16
03-Feb-17

50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
77.04%

50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
53.3%

412.5d
144.0d
4.0d
4.0d
4.0d
20.0d
80.0d
4.0d
4.0d
4.0d
20.0d
42.0d
10.0d
10.0d
10.0d
30.0d
88.5d
5.0d
5.0d
5.0d
10.0d
10.0d
25.0d
215.7d
215.7d
28.0d
28.0d
60.0d
30.0d
25.0d
45.0d
120.0d
120.0d
120.0d
120.0d
120.0d
180.0d
175.0d
28.0d
28.0d
30.0d
30.0d
25.0d
30.0d
120.0d
120.0d
120.0d
120.0d
120.0d
120.0d
632.5d

08-Dec-14 A
08-Dec-14 A
01-Apr-15 A
08-Dec-14 A
08-Dec-14 A
08-Dec-14 A
30-Mar-15 A
04-Jun-15 A
16-Apr-15 A
18-Apr-15 A
30-Mar-15 A
27-Mar-15 A
18-Apr-15 A
16-Apr-15 A
18-Apr-15 A
27-Mar-15 A
25-Oct-15 A
25-Oct-15 A
28-Oct-15 A
18-Nov-15 A
12-Nov-15 A
16-Nov-15 A
24-Nov-15 A
07-Sep-15 A
05-Oct-15 A
21-Oct-15 A
27-Oct-15 A
15-Oct-15 A
17-Jan-16 A
05-Oct-15 A
18-Mar-16 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Sep-15 A
07-Aug-16
07-Aug-16
07-Aug-16
04-Sep-16
05-Nov-16
05-Dec-16
04-Jan-17
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
06-Oct-16
29-Apr-15 A

10-Dec-15 A
01-May-15 A
01-May-15 A
12-Jan-15 A
12-Dec-14 A
09-Jan-15 A
13-Jul-15 A
13-Jul-15 A
15-May-15 A
02-May-15 A
13-Jul-15 A
18-Jun-15 A
21-May-15 A
21-Apr-15 A
02-May-15 A
18-Jun-15 A
10-Dec-15 A
25-Nov-15 A
25-Nov-15 A
23-Nov-15 A
10-Dec-15 A
10-Dec-15 A
26-Nov-15 A
13-Apr-16 A
13-Apr-16 A
17-Dec-15 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
13-Apr-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
08-Mar-16 A
03-Feb-17
29-Jan-17
04-Sep-16
02-Oct-16
05-Dec-16
04-Jan-17
29-Jan-17
05-Nov-16
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
03-Feb-17
25-Mar-17

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
92.09%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80.77%

283.4d
40.0d
40.0d
55.0d
55.0d
40.0d
40.0d
25.0d
25.0d
50.0d
50.0d
50.0d
50.0d
50.0d
50.0d

29-Apr-15 A
01-Mar-16 A
01-Mar-16 A
29-Apr-15 A
29-Apr-15 A
22-Jun-15 A
22-Jun-15 A
25-Nov-15 A
25-Nov-15 A
04-Mar-16 A
04-Mar-16 A
04-Mar-16 A
03-Feb-17
03-Feb-17
03-Feb-17

23-Mar-16 A
23-Mar-16 A
23-Mar-16 A
08-Jun-15 A
08-Jun-15 A
13-Jul-15 A
13-Jul-15 A
27-Nov-15 A
27-Nov-15 A
15-Apr-16 A
15-Apr-16 A
15-Apr-16 A
25-Mar-17
25-Mar-17
25-Mar-17

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%

31-May-16 15:49
Physical % S
Complete

[PH2-PLF3] Erection of New Metal Roofing Syst


06-Oct-16, Platform 3 - New Access Stai
28-Aug-16, RC Columns Work
[PH2-PLF3] Cast 400x400mm RC Columns at GL S
[PH2-PLF3] Cast 400x400mm RC Columns at
11-Sep-16, RC Beams/ Steps & Landing Sla
[PH2-PLF3] Cast Lower & Upper Landing RC Be
[PH2-PLF3] Cast Platform Landing RC Beam
06-Oct-16, Roofing Works
[PH2-PLF3] Erection of Metal Posts/ Fra
03-Feb-17, Installation

0%

0%
0%
0%
0%
0%

10-Dec-15 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
01-May-15 A, High Covered Linkway
[PH1A-HCLW] Conceal to Existing RWDP Pipe and Finishes
[PH1A-HCLW] Installation of Alum Clading with Frame & Galzed Balustrade
[PH1A-HCLW] Floor Finishes including Interlocking Tiles
[PH1A-HCLW] Installation E&M works by C8017 & SWC
13-Jul-15 A, LRT New Fare Gate Area
[PH1A-LRTAFC] Installation of New Full High Glazed Alum. Frame Wall Panel
[PH1A-LRTAFC] Floor Finishes including New Homogeneous Tiles
[PH1A-LRTAFC] Installation of New Metal Security Shutter infront of New Faregate
[PH1A-LRTAFC] Installation E&M works by C8017 & SWC
18-Jun-15 A, MRT New Fare Gate Area
[PH1A-MRTAFC] Installation of New Glazed Balustrade
[PH1A-MRTAFC] Floor Finishes including New Granite Floor
[PH1A-MRTAFC] Installation of New Motorised Security Shutter
[PH1A-MRTAFC] Installation E&M works by C8017 & SWC
10-Dec-15 A, Reconstruction of Existing Staircase
[PH1A-MRTST] Laying of Light-weight Blockwall under Landing
[PH1A-MRTST] Installation of New SS Glazed Balustrade Railing
[PH1A-MRTST] Plaster & Painting to Blockwall/ Existing Wall & Exposed RC Surfaces
[PH1A-MRTST] Floor Finishes including New Homogenious Tiles and Contrasting No
[PH1A-MRTST] Installation of New Alum. Ceiling underside Staircase
[PH1A-MRTST] Installation E&M works by C8017 & SWC
13-Apr-16 A, Phase 1B - Platform 4 & Staircase
13-Apr-16 A, Architectural Finishes
[PH1B-PLF4] Laying of Light-weight Blockwall with Access Panel
[PH1B-PLF4] Plaster & Painting to RC Parapet Wall/ Blockwall
[PH1B-PLF4] Architectural Finishing & Alum Cladding/Glazed Panels/
[PH1B-PLF4] Glass Railing/ Starcase Railing/ Rain Louvres/ Alum. Co
[PH1B-PLF4] Floor Finishes including New Homogenious Tiles/ Tactile
[PH1B-PLF4] Installation of Half Height Barriers at Platform Level (
23-Mar-16 A, E&M Installation works by C8017 & SWC
[PH1B-PLF4] Installation of Electrical System
[PH1B-PLF4] Installation of Mechanical Ventilation System
[PH1B-PLF4] Installation of Fire Protection System
[PH1B-PLF4] Installation of Environment Control System
03-Feb-17, Phase 2 - P
29-Jan-17, Architectural
[PH2-PLF3] Laying of Light-weight Blockwall w
[PH2-PLF3] Plaster & Painting to RC Par
[PH2-PLF3] Architectural Finish
[PH2-PLF3] Glass Railing/ S
[PH2-PLF3] Floor Finish
[PH2-PLF3] Installation of Half Heigh
03-Feb-17, E&M Install
[PH2-PLF3] Reconstruc
[PH2-PLF3] Installation
[PH2-PLF3] Installation
[PH2-PLF3] Installation
[PH2-PLF3] Installation
25-Mar-17, STC

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

23-Mar-16 A, Phase 1A - MRT & LRT New Fare Gate & High Walkway
23-Mar-16 A, High Covered Linkway
[PH1A-HCLW] Testing and Commissioning by C8017 & SWC

100%

08-Jun-15 A, MRT New Fare Gate Area


[PH1A-MRTAFC] Testing and Commissioning by C8017 & SWC
13-Jul-15 A, LRT New Fare Gate Area
[PH1A-LRTAFC] Testing and Commissioning by C8017 & SWC
27-Nov-15 A, Reconstruction of Existing Staircase
[PH1A-MRTST] Testing and Commissioning by C8017 & SWC
15-Apr-16 A, Phase 1B - Platform 4 & Staircase
15-Apr-16 A, General
[PH1B-PLF4] Testing Commissioning by C8017 & SWC
25-Mar-17, Phas
25-Mar-17, Gen
[PH2-PLF3] Tes

100%
100%
100%

100%

0%

Page 5 of 5