Industrial Division
P- 49-10
LEAD PROCESS
ENGINEER
PROCESS ENGINEER
Process
Mass Balance
(49-03-117)
Hydraulics
Preliminary Engineering
Design Criteria
(49-01-118)
Validation
Choose calculation
template and
software
1 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
Show diameter on
P&ID
(49-10-109)
Do initial sizing
based on criteria
(velocity, pressure
loss)
Define
"Eng_Status" to
Preliminary on line
list
Prepare design
brief
MECHANICAL
ENGINEER
PIPING ENGINEER
INSTRUMENTATION
ENGINEER
ELECTRICAL
ENGINEER
Copyright SNC-Lavalin Division Industriel
SNC-Lavalin Inc.
Industrial Division
P- 49-10
Process
Hydraulics
Preliminary Engineering
2 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
LEAD PROCESS
ENGINEER
PROCESS ENGINEER
MECHANICAL
ENGINEER
ELECTRICAL
ENGINEER
Check 2 phases
flow
Preliminary sizes
for pumps and
compressors
49-10-114
Update initial
diameter on P&ID
for 2 phase
Preliminary
datasheets for
pumps and
compressors
49-10-013
SNC-Lavalin Inc.
Industrial Division
P- 49-10
LEAD PROCESS
ENGINEER
PROCESS ENGINEER
Process
Hydraulics
Issued for Detailed Engineering
Design criteria
3 of 7
Mass balance
issued for detailed
engineering
Validate
preliminary sizes.
Freeze class A
sizes
Revision
Date issued
Approved by
02/07/29
M. Lalibert
ATTENTION
Isomtriques pas
encore disponibles
Estimate pipe
length
Complete
preliminary pump
and compressors
calculations
General
arrangements
45-47-002
MECHANICAL
ENGINEER
PROJECT DIRECTOR
Revised scope of
work
SNC-Lavalin Inc.
Industrial Division
P- 49-10
Process
Hydraulics
Issued for detailed engineering
LEAD PROCESS
ENGINEER
PROCESS ENGINEER
Calculate control
valves on pump
discharges
INSTRUMENTATION
ENGINEER
Control valves
preliminary
datasheets
49-10-005
4 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
Show tank
elevations on
P&ID
49-10-110
Prepare design
brief
Update "Eng
Status" field in line
list as appropriate
SNC-Lavalin Inc.
Industrial Division
P- 49-10
Process
Hydraulics
Issued for client's approval
5 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
LEAD PROCESS
ENGINEER
Design criteria
PROCESS ENGINEER
MECHANICAL
ENGINEER
PIPING ENGINEER
INSTRUMENTATION
ENGINEER
Checking
Pumps datasheet
ready for
purchasing
Preliminary vendor
info for pumps
45-25-006
Check control
valves sizes (dP
max at Q min)
Prepare pumps
design brief
Preliminary pump
curves
45-25-004
Isometrics
P-46-02
Preliminary vendor
info for control
valves
48-05- 001
Copyright SNC-Lavalin Division Industriel
SNC-Lavalin Inc.
Industrial Division
P- 49-10
Process
Hydraulics
Issued for client's approval
LEAD ENGINEER
PROCESS ENGINEER
Checking
Prepare control
valves design
brief; update
pumps design
brief
Mass balance
Validate sizes of
line where "Eng
Status" is
"Released"
6 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
Solve conflicts
between frozen
sizes and new info
Update "Eng
Status" field in line
list as appropriate
Mechanical
packages
information
45-25-006
MECHANICAL
ENGINEER
PIPING
ENGINEER
Design criteria
Control valves
datasheets ready
for purchase
49-10-016
Isometrics
INSTRUMENTATION
ENGINEER
PROJECT
MANAGER
SNC-Lavalin Inc.
Industrial Division
P- 49-10
LEAD PROCESS
ENGINEER
Process
Hydraulics
Issued for construction
Design criteria
INSTRUMENTATION
ENGINEER
7 of 7
Revision
Date issued
Approved by
02/07/29
M. Lalibert
Solve conflicts
between frozen
sizes and new info
Validate sizes of
line where "Eng
Status" is
"Released"
PROCESS ENGINEER
MECHANICAL
ENGINEER
Update "Eng
Status" field in line
list as appropriate
Mechanical
packages certified
info
45-25-005
Automation
packages certified
info
48-05-002