Professional Documents
Culture Documents
Fracturing Options
Open Hole
Diverters
Sand Slugs
History of StackFRAC
First system in 2001
First Bakken well in 2002
More than 400 systems deployed to date
Carbonates
Shales
Dolomites
Cherts
Sandstone
Coalbed Methane
2007 Williston Basin Petroleum Conference
Increase Productivity
Overcome poor Kv
Bypass drilling
damages
2007 Williston Basin Petroleum Conference
610 m
Horizontal well with
10 x 46 m (150 ft) fractures
7715 m2 of contact
2
20.4 m of contact
418 m2 of contact
20 X vertical
378 X vertical
18 X horizontal
2007 Williston Basin Petroleum Conference
Type of Fractures
Longitudinal (Colinear) Fractures
Reservoir fluid
2007 Williston Basin Petroleum Conference
Type of Fractures
Transverse Fractures
Reservoir fluid
2007 Williston Basin Petroleum Conference
10
Goals of Fracturing
Effective Toe-to-Heel Stimulation
Increase IP
Increase primary recovery
Reduced well completion costs
Prepare for future reservoir requirements
11
RockSeal II Packer
12
13
Underlying Water
14
15
Conclusions
Mechanical Diversion Effective
RockSeal Packer
16
StackFRACTM Technical
Publications
SPE 103046 - New Barnett Shale Horizontal Completion Lowers Cost and Improves
Efficiency - 2006 SPE Annual Technical Conference and Exhibition held in San Antonio,
Texas, U.S.A., 2427 September 2006.
Effective Stimulation of Horizontal Wells - A New Completion Method. This paper was
prepared for presentation at the 2006 SPE Technical Symposium of Saudi Arabia
Section held in Dhahran, Saudi Arabia, 21-23 May 2006.
The American Oil & Gas Reporter March 2007, Completion Improves HZ Wells
SPE 101230 Nov. 2006 Abu Dhabi Intl. Petroleum Conference An Effective HZ Well
completion and stimulation system.
17